Water treatment system and water treatment method

The water treatment system with interchangeable main and reserve facilities addresses inefficiencies by enabling flexible use of equipment for water treatment and wastewater recovery, ensuring consistent water supply and reducing inefficiencies.

JP7568009B2Active Publication Date: 2024-10-16KURITA WATER INDUSTRIES LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023127953
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-08-04
Publication Date
2024-10-16
Estimated Expiration
2039-10-17

AI Technical Summary

Technical Problem

Existing water treatment systems face inefficiencies due to fixed equipment configurations that cannot be easily adapted for different uses, leading to inefficiencies such as inadequate water supply or underutilized units.

Method used

A water treatment system with a main line and a reserve facility having the same configuration as the main facility, allowing for flexible use in water treatment, wastewater recovery, or standby modes, utilizing flocculation, turbidity removal, and desalination devices.

Benefits of technology

Enables efficient use of equipment by allowing adaptation to varying demands, ensuring consistent water supply and reducing inefficiencies through interchangeable use of main and reserve facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007568009000001
    Figure 0007568009000001
  • Figure 0007568009000002
    Figure 0007568009000002
  • Figure 0007568009000003
    Figure 0007568009000003
Patent Text Reader

Abstract

To provide a water treatment system and a water treatment method that enable efficient use of equipment in a water treatment system including water treatment equipment.SOLUTION: Raw water is supplied to an irrigation water treatment facility 2 by a pipe 1 for treatment, and treated water is supplied to a use point 4 by a pipe 3. Discharged water of the use point 4 is supplied to a wastewater treatment facility 6 by a pipe 5, and treated water is discharged by a pipe 7. A reserve water treatment facility 2A having substantially the same configuration as the water treatment facility 2 is provided, and if necessary, a part of the wastewater discharged from the use point 4 or the wastewater treatment facility 6 is received and treated, and returned to the water treatment facility 2 or the use point 4.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a water treatment system and a water treatment method for treating water for use. [Background technology]

[0002] 2. Description of the Related Art Water treatment devices are used in water-using facilities that use pure water, ultrapure water, or the like, to treat raw water and supply water of a predetermined quality.

[0003] For example, in various manufacturing plants, equipment suitable for each process, such as water treatment, wastewater treatment, and wastewater recovery, is designed independently for each process. As a result, the equipment configuration is not uniform, which tends to increase design costs and prolong on-site testing.

[0004] Japanese Patent Laid-Open Publication No. 9-192643 describes a method of separating wastewater from pure water and treating the wastewater in two recovery systems, one for reusing pure water and the other for reusing miscellaneous water, using units of the same equipment configuration.

[0005] Furthermore, JP 2018-171578 A, JP 2018-158310 A, JP 2017-140577 A, and JP 2017-170275 A describe the use of a water treatment unit based on the same concept of coagulation → turbidity removal → desalination for water treatment and wastewater recovery.

[0006] However, even in this case, once the use of the unit was decided, such as for water treatment or wastewater recovery, it was fixed to that use and could not be changed to another use during the process. This resulted in inefficiencies such as cases where the required amount of water could not be obtained or where the demand was low and some water treatment units were not used. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] Japanese Patent Application Publication No. 9-192643 [Patent Document 2] JP 2018-171578 A [Patent Document 3] JP 2018-158310 A [Patent Document 4] JP 2017-140577 A [Patent Document 5] JP 2017-170275 A Summary of the Invention [Problem to be solved by the invention]

[0008] An object of the present invention is to provide a water treatment system and a water treatment method that enable efficient use of facilities in a water treatment system including industrial water treatment equipment. [Means for solving the problem]

[0009] The water treatment system of the present invention is characterized in that, in a main line equipped with a water treatment facility for treating raw water, the system is provided with a spare water treatment facility of approximately the same configuration as the water treatment facility, and the spare water treatment facility can be incorporated into the main line.

[0010] In one aspect of the present invention, the water treatment facility and the standby water treatment facility each include at least a flocculation device, a turbidity clarifier, and a desalination device.

[0011] In one aspect of the present invention, the main line includes the water treatment facility to which raw water is supplied through a first pipe, a use point to which treated water from the water treatment facility is supplied through a second pipe, a wastewater treatment facility to which discharge water from the use point is supplied through a third pipe, and a fourth pipe for carrying out the outflow water from the wastewater treatment facility.

[0012] In one aspect of the present invention, the first, second, third and fourth pipes are each provided with a pipe connection portion.

[0013] The water treatment method of the present invention is a water treatment method using the water treatment system of the present invention.

[0014] In one embodiment of the method of the present invention, a portion of the discharged water from the point of use is treated in the spare water treatment facility, and the treated water from the spare water treatment facility is returned to the water treatment facility or the point of use.

[0015] In one embodiment of the method of the present invention, a part of the discharged water from the piping is treated in the spare water treatment facility, and the treated water from the spare water treatment facility is returned to the water treatment facility or the point of use.

[0016] In one aspect of the method of the present invention, a portion of the discharge water from the use point is branched off, a portion of this branched water is returned to the water treatment facility, and the remainder of the branched water is treated in the spare water treatment facility, and the treated water from the spare water treatment facility is returned to the water treatment facility or the use point.

[0017] In one aspect of the method of the present invention, a portion of the discharged water from the wastewater treatment facility is branched off, a portion of this branched water is returned to the industrial water treatment facility, and the remainder of the branched water is treated in the spare water treatment facility, and the treated water from the spare water treatment facility is returned to the industrial water treatment facility or a use point. Effect of the Invention

[0018] The water treatment system of the present invention includes a standby water treatment facility that can be incorporated into a main line having a water treatment facility and has substantially the same configuration as the main line. This standby water treatment facility can be used for water treatment, wastewater recovery treatment, or standby standby, depending on requirements. [Brief description of the drawings]

[0019] [Figure 1] 1 is a configuration diagram of a water treatment system according to an embodiment. [Diagram 2] 1 is a configuration diagram of a water treatment system according to an embodiment. [Diagram 3] 1 is a configuration diagram of a water treatment system according to an embodiment. [Figure 4] 1 is a configuration diagram of a water treatment system according to an embodiment. [Diagram 5] 1 is a configuration diagram of a water treatment system according to an embodiment. [Figure 6] 1 is a configuration diagram of a water treatment system according to an embodiment. [Figure 7] 1 is a configuration diagram of a water treatment system according to an embodiment. [Figure 8] 1 is a configuration diagram of a water treatment system according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Fig. 1 shows the configuration of a water treatment system according to an embodiment. In this water treatment system, raw water is supplied to water treatment facility 2 via pipe 1, where it is treated to produce product water, and this product water is sent to a point of use 4 via pipe 3. Water used at the point of use 4 is supplied to wastewater treatment facility 6 via pipe 5, where it is treated, and the treated water is discharged from pipe 7.

[0021] In addition to the main system consisting of these pipes 1, 3, 5, 7, the water treatment facility 2, the use point 4, and the wastewater treatment facility 6, a standby water treatment facility 2A that can be connected to the main system is provided.

[0022] The piping 1, 3, 5, 7 is provided with piping connections 1a, 3a, 5a, 7a for incorporating the standby water treatment facility 2A. The inlet side of the standby water treatment facility 2A can be connected to the connections 1a, 5a, 7a, and the outlet side of the standby water treatment facility 2A can be connected to the connections 1a, 3a, 7a.

[0023] The water treatment facility 2 and the standby water treatment facility 2A are of substantially the same configuration. The water treatment facility 2 and the standby water treatment facility 2A are substantially the same means that the configuration of the main water treatment equipment of each facility is the same, or one facility includes all of the main water treatment equipment of the other facility and further includes other water treatment equipment.

[0024] In this embodiment, the water treatment facility 2 and the standby water treatment facility 2A each include a plurality of water treatment devices a1, a2, and a3. a1 is, for example, a flocculation device, a2 is a turbidity device, and a3 is a desalination device.

[0025] The clarification device may be, for example, any of the following: ·UF membrane equipment ·Filter -Pressurized flotation device and subsequent filter -Pressure flotation device and subsequent UF membrane device - Sedimentation device and subsequent filter - Sedimentation equipment and subsequent UF membrane equipment Among the above, the turbidity removing device is preferably a turbidity removing membrane device. The turbidity removing membrane device may be of a cross-flow type or a dead-end filtration type.

[0026] The turbidity removal process using the turbidity removal membrane preferably includes the steps of water passing, air bubbling, backwashing, and water filling. The filtration water passing time is preferably 20 to 40 minutes (usually 30 minutes), and the differential pressure (inlet pressure - outlet pressure) is preferably about 0.02 to 0.04 MPa. When the differential pressure reaches 0.07 to 0.10 MPa, it is preferable to perform stationary cleaning. The material of the turbidity removal membrane is preferably PVDF, which has excellent chemical resistance, and the pore size is preferably 0.02 μm or more.

[0027] As the desalting device, an RO membrane device, an electrodialysis device, etc. are suitable. As the desalting device, an ion exchange resin tower using an ion exchange resin or an electric regeneration type deionization device can also be used, but since conditioning is difficult when using wastewater treatment for water treatment, an RO membrane device or an electrodialysis device is more suitable. However, an electric deionization device or an ion exchange resin tower may be installed downstream of the RO membrane device, etc.

[0028] Among the above, the RO membrane device is preferable as the desalination device. In this case, the line amount is 3.6 m 3 It is preferable to ensure that the RH is at least 1 / h.

[0029] There is no limit to the reverse osmosis membrane. It is also possible to use ultra-low pressure membranes with a standard pressure of 0.735 MPa. The membrane area is 35 to 41 m. 2 It is preferable that the initial pure water flux at 0.735 MPa is about 1.0 m / d (25° C.) or more, and the initial salt rejection rate is 98% or more.

[0030] It is preferable to set the recovery rate so that the calcium hardness Langelier index is 0 or less.

[0031] It is preferable to set the recovery rate of silica so that it is within the solubility of the brine water. The recovery rate is usually 50 to 80%.

[0032] In order to prevent RO membrane fouling, a slime control agent may be added to the raw water. The slime control agent may be a combined chlorine-based oxidizing agent such as chloramine or sodium chlorosulfamate, or an isothiazolone-based compound. The slime control agent may be used alone or in combination of two or more types.

[0033] In the case of a combined chlorine-based oxidizing agent, it is preferable to add it so that the concentration becomes 0.3 to 1.0 mg / L as Cl2.

[0034] As the sodium chlorosulfamate oxidizing agent, for example, an aqueous solution containing a chlorine-based oxidizing agent with an effective chlorine concentration of 1 to 8% by weight, preferably 3 to 6% by weight, and a sulfamic acid compound with an effective chlorine concentration of 1.5 to 9% by weight, preferably 4.5 to 8% by weight, and having a pH of 12 or more can be used.

[0035] In addition, a scale dispersant may be added.

[0036] The water treatment plant 2 and the standby water treatment plant 2A are provided with a discharge section d for discharging backwash wastewater and concentrated wastewater (including extracted sludge) from the clarifier and the demineralizer.

[0037] Under normal circumstances, produced water is produced and point-of-use discharge water is treated using the main line that does not incorporate the reserve water treatment equipment 2A, as shown in Figure 1. Note that when the main line water treatment equipment 2 is repaired, the water treatment equipment 2 can be replaced with the reserve water treatment equipment 2A.

[0038] When wastewater is recovered, when there is an increase in water demand at the point of use, when there is a restriction on raw water intake, when the capacity of the wastewater treatment equipment is reduced, etc., a standby water treatment equipment 2A is incorporated into the main line and water treatment is also performed by the standby water treatment equipment 2A.

[0039] The connection of the standby water treatment facility 2A is, for example, performed in one of the following ways. Remove the water supply piping from the main system, move the spare water treatment equipment 2A closer to the main system, and connect the water supply piping. Remove the water piping from the main system and reconnect it to the standby water treatment equipment 2A side. · Both the water treatment facility 2 and the wastewater treatment facility 6 are connected in advance to the standby water treatment facility 2A by water flow piping in such a manner that a valve (not shown) or the like can be used to switch the water flow direction.

[0040] When switching the water flow from a common water treatment unit that has been used for wastewater treatment to industrial water treatment or wastewater recovery, check in advance whether the functional materials are dirty, and if so, clean the inside of the system. After that, confirm that the treated water quality has achieved the target, complete preliminary conditioning, and start passing water through it.

[0041] An example in which the standby water treatment facility 2A is incorporated is shown in FIGS.

[0042] 2 and 3 show an example in which a standby water treatment facility 2A is incorporated in order to recover a portion of the treated water from the wastewater treatment facility 6. FIG.

[0043] In FIG. 2a, a portion of the effluent from a point of use 4 is supplied to the inlet side of a standby water treatment facility 2A via a pipe 5 and a pipe 10, and the treated water is returned to the pipe 1 via a pipe 11 and sent to the water treatment facility 2 together with the raw water.

[0044] In Fig. 2b, a portion of the outflow water from the point of use 4 is supplied to the inlet side of the standby water treatment facility 2A via pipe 5 and pipe 10. Since the treated water (production water) from the standby water treatment facility 2A is of good quality, the treated water (production water) is returned to pipe 3 instead of pipe 1, and is sent to the point of use 4 together with the product water from the water treatment facility 2.

[0045] Other configurations in Figures 2a and 2b are the same as those in Figure 1. Figures 2a and 2b are used when the cleanliness of the outflow water at the point of use 4 is relatively high.

[0046] When the cleanliness of the effluent water from the point of use is low, part of the treated water from wastewater treatment facility 6 is sent from pipe 7 through pipe 10 to the inlet side of standby water treatment facility 2A, as shown in Figures 3a and 3b. When the quality of the treated water (product water) from standby water treatment facility 2A is low, the treated water is returned to pipe 1, as shown in Figure 3a, and when the water quality is good, the treated water is returned to pipe 3, as shown in Figure 3b.

[0047] The other configurations of Figures 3a and 3b are the same as those of Figures 2a and 2b.

[0048] Figures 4 and 5 show an example of the case where the amount of recovered wastewater is increased due to restrictions on raw water intake and a decrease in the raw water flow rate. For example, normally 70% of the raw water intake capacity is taken, but if intake is restricted to 50% due to a drought, the shortfall of 20% is made up with recovered wastewater. In Figures 4 and 5, the amount of recovered wastewater is increased, so part of the recovered wastewater is treated in the standby water treatment facility 2A, and the remainder is returned to the piping 1.

[0049] That is, in Fig. 4a, a portion of the point-of-use effluent water branched off from pipe 5 to pipe 10 in Fig. 2b is treated in spare water treatment facility 2A, and the remainder is returned to pipe 1 via pipe 12 branched off from pipe 10. In this case, when the quality of the treated water (product water) from spare water treatment facility 2A is good, the treated water (product water) is returned to pipe 3 via pipe 11. The other configurations in Fig. 4a are the same as those in Fig. 2b.

[0050] Fig. 4b shows a case where the quality of the treated water from the standby water treatment facility 2A is poor in Fig. 4a. In this case, the treated water from the standby water treatment facility 2A is merged with the point-of-use effluent from the branch pipe 12 via pipe 11, and is returned to pipe 1 via merge pipe 13. The other configurations in Fig. 4b are the same as those in Fig. 4a.

[0051] In Figures 4a and 4b, the quality of the effluent from the point-of-use 4 is relatively good, so the effluent from the point-of-use is sent to standby water treatment facility 2A, but if the quality of the effluent from the point-of-use is relatively poor, as shown in Figures 5a and 5b, part of the treated water from wastewater treatment facility 6 is branched from pipe 7 to pipe 10. The other configurations in Figure 5a are the same as those in Figure 4a, and the other configurations in Figure 5b are the same as those in Figure 4b.

[0052] In Fig. 6, when a malfunction occurs in the wastewater treatment facility 6, part of the outflow water at the point of use 4 is branched off into a pipe 10 and supplied to a standby water treatment facility 2A. The other configurations in Fig. 6a are the same as those in Fig. 4a, and the other configurations in Fig. 6b are the same as those in Fig. 4b.

[0053] In the above-mentioned Figs. 1 to 6, the water treatment facility 2 is installed independently, but a water treatment facility having the same configuration as the water treatment facility 2 may be installed in parallel with the water treatment facility 2.

[0054] FIG. 7 shows an example in which the amount of treated water (product water) from the water treatment plant is secured when the water demand at the point of use 4 increases during operation in FIG. In Figure 7, a portion of the raw water is supplied from pipe 1 through pipe 12 to the inlet side of the standby water treatment facility 2A, and the treated water (product water) is returned to pipe 3 through pipe 13 and sent to the point of use 4 together with the product water from the water treatment facility 2. The other configuration in FIG. 7 is the same as that in FIG. Figure 7 can also be applied to reduce the load per unit of water treatment equipment when raw water quality deteriorates, especially when turbidity increases due to heavy rainfall.

[0055] Figure 8 shows an example of ensuring the quality of treated water from water treatment plants when the quality of raw water deteriorates, particularly when a river drought causes seawater to flow back into the river, increasing the ionic strength, or when humus from fallen leaves on the ground flows into a well, increasing the TOC. In FIG. 8, at least a portion of the raw water is supplied from pipe 1 through pipe 12 to the inlet side of standby water treatment facility 2A, and the treated water is returned through pipe 14 between the branch point of pipe 1 and the inlet side of water treatment facility 2. The other configuration in FIG. 8 is the same as that in FIG. The higher the raw water load, the more desirable it is to increase the flow rate ratio to the standby water treatment facility 2A.

[0056] In the present invention, the raw water may be pretreated in the upstream stage of the water treatment facility 2.

[0057] The present invention is not limited to the above-described embodiment, and may be modified in other ways. [Explanation of symbols]

[0058] 2. Water treatment facilities 2A Standby water treatment facility 4 Use points 6 Wastewater treatment facilities

Claims

1. In a water treatment system having a main line equipped with a water treatment facility for treating raw water, A standby water treatment facility having substantially the same configuration as the water treatment facility is provided. The water treatment system is capable of incorporating the standby water treatment equipment into the main line, the main line includes the water treatment facility to which raw water is supplied by a first pipe, a use point to which treated water from the water treatment facility is supplied by a second pipe, a wastewater treatment facility to which discharge water from the use point is supplied by a third pipe, and a fourth pipe for carrying effluent from the wastewater treatment facility, The first, second, third and fourth pipes are each provided with a pipe connection portion for connecting a connecting pipe between the main system and the standby water treatment facility, The spare water treatment facility includes: (a) an arrangement in which water is supplied from the third pipe, the water is treated, and the treated water is sent to the first pipe; (b) an arrangement in which water is supplied from the third pipe, the water is treated, and the treated water is sent to the second pipe; (c) an arrangement in which water is supplied from the fourth pipe, the water is treated, and the treated water is sent to the first pipe; (d) an arrangement in which water is supplied from the fourth pipe, the water is treated, and the treated water is sent to the second pipe; (e) an arrangement in which water is supplied from the first pipe, the water is treated, and the treated water is sent to the second pipe; The water treatment system is characterized in that it can be arranged in any one of the above manners.

2. The first pipe is provided with a first pipe connection part and a second pipe connection part downstream thereof as the pipe connection part, The spare water treatment facility further comprises: (f) The water treatment system of claim 1, further comprising an arrangement in which water is supplied from the first piping via the first piping connection portion, and the water is treated and sent to the first piping via the second piping connection portion.

3. 2. The water treatment system according to claim 1, wherein the main water treatment facility and the standby water treatment facility each have at least a flocculation device, a turbidity clarifier and a desalination device.

4. A pipe A for connecting any one of the pipe connection parts provided on the first to fourth pipes to an inlet side of the spare water treatment facility; a pipe B for connecting the outlet side of the spare water treatment facility to another pipe connection portion provided on any one of the first to fourth pipes; The water treatment system of claim 1 further comprising:

Citation Information

Patent Citations

  • Ultrapure water producing device

    JP1997192643A

  • Water treating system for manufacturing device of electronic parts and members

    JP2005288410A

  • Ultra-pure water producing apparatus

    JP2013202587A

  • Water treatment method

    JP2017140577A

  • Method of removing calcium in highly alkaline water

    JP2017170275A