How to drain residue from a flash vessel
By diluting residue with washing water and adjusting pressure to ensure the liquid level is below the manhole, the method addresses pipe blockage and scattering issues, enabling efficient and safe discharge for flash vessel inspection.
Patent Information
- Application Number
- JP2020185779
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-06
- Publication Date
- 2024-10-23
- Estimated Expiration
- 2040-11-06
AI Technical Summary
The existing methods for discharging residue from a flash vessel in a high-pressure acid leaching process face issues such as blockage of drain pipes due to the presence of solids, leading to scattering of slurry during manhole opening and increased operational burden on workers.
A method that involves diluting the residue with washing water and adjusting the internal pressure of the flash vessel to ensure the liquid level is below the manhole opening, allowing safe and efficient discharge through drain valves.
Enables safe and efficient opening of the manhole without scattering residue, reducing the operational burden and facilitating quick inspection and repair.
Smart Images

Figure 0007571477000001 
Figure 0007571477000002 
Figure 0007571477000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for discharging residue from a flash vessel, and more particularly to a method for discharging residue consisting mainly of leaching residue from a flash vessel located downstream of an autoclave which performs high-pressure acid leaching of an ore slurry during shutdown. [Background technology]
[0002] In recent years, attention has been drawn to a hydrometallurgical process using the high-pressure acid leaching method, also known as the HPAL (High Pressure Acid Leach) method, in which acid leaching is performed by adding sulfuric acid under high temperature and pressure to nickel oxide ore, which is mainly composed of iron. This high-pressure acid leaching method is capable of recovering nickel and cobalt from nickel oxide ore with a low nickel content of about 1 to 2 mass% by performing processing in a consistent hydrometallurgical process, and is an advantageous processing method in terms of energy and cost because it does not include dry processing steps such as drying and roasting, unlike conventional general nickel oxide ore dry smelting methods.
[0003] The nickel smelting method using the high pressure acid leaching method includes, for example, an ore slurry preparation step of adding water to nickel oxide ore to prepare an ore slurry, a leaching step of introducing the ore slurry into a pressure leaching reactor called an autoclave and subjecting it to a leaching treatment under high temperature and high pressure to leach nickel and cobalt from the ore, a solid-liquid separation step of recovering the leachate containing nickel and cobalt obtained in the leaching step from the leach residue by solid-liquid separation, a neutralization step of neutralizing the leachate at a pH of 3 to 4 to separate and remove impurity elements such as iron contained in the leachate, and a sulfurization step of supplying a sulfurizing agent such as hydrogen sulfide gas to the leachate from which the impurity elements have been removed to produce a nickel-cobalt mixed sulfide.
[0004] In the above leaching step, as shown in Patent Document 1, for example, an autoclave is charged with an ore slurry, and sulfuric acid and high-pressure steam are further introduced to perform leaching treatment of nickel and cobalt under high temperature and high pressure at a temperature of 220 to 250°C and a pressure of 3,000 to 4,500 kPaG. In the solid-liquid separation step following this leaching step, the leaching residue is generally separated and removed by gravity settling using a thickener or the like, so the high-temperature and high-pressure leaching slurry discharged from the autoclave is introduced into a flash vessel at a lower pressure than the autoclave to be flashed before being fed to the thickener. The steam generated by this flash is recovered, and the temperature of the leaching slurry is lowered by the latent heat generated during the steam generation. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2010-031341 A Summary of the Invention [Problem to be solved by the invention]
[0006] The flash vessel is lined with bricks on the inside to improve corrosion resistance and abrasion resistance against steam and leach slurry containing sulfuric acid transferred from the autoclave in the previous stage. However, in the flash vessel, the amount of steam generated by flashing fluctuates, and the volume expands due to the reduced pressure of the generated steam. In addition, the leach slurry is forcefully introduced from the top, so the bricks are subject to repeated stresses of expansion and contraction and strong external impacts due to collisions with the leach slurry, which can cause the bricks to fall off. For this reason, it is necessary to periodically stop operation and open a manhole provided in the body of the flash vessel to inspect the condition inside the flash vessel and repair the bricks.
[0007] As described above, in order to open the manhole of the flash vessel after the operation is stopped and to inspect the inside, it is necessary to reduce the pressure in the flash vessel to normal pressure and to discharge the residues such as the leaching slurry and leaching residue remaining in the flash vessel to the outside of the flash vessel. Conventionally, as a method for discharging this residue, when the pressure in the flash vessel is reduced to a certain degree, cleaning water such as industrial water is introduced into the flash vessel to dilute the residues such as the leaching slurry and leaching residue remaining in the flash vessel to make them into a diluted residue with high fluidity, and then a drain valve of a drain pipe provided at the bottom of the flash vessel is opened to discharge the diluted residue by utilizing the residual pressure in the flash vessel.
[0008] However, the above-mentioned diluted residue may contain, in addition to the leaching slurry and leaching residue, fallen bricks and scales that are thought to have peeled off from the inner wall of the autoclave, which may clog the drain pipe during discharge. If the drain pipe is clogged while the diluted residue is being discharged from the flash vessel, the diluted residue cannot be discharged to a liquid level lower than the lower end of the manhole opening of the flash vessel. In this case, if the manhole door is forcibly opened, the slurry will splash around the manhole, which will take time to clean up, and the diluted residue remaining in the flash vessel will have to be manually removed, which places an excessive burden on the workers.
[0009] The present invention has been made in view of the above circumstances, and has an object to provide a discharge method that makes it possible to discharge diluted residues, such as leach slurry and leach residue, remaining in a flash vessel in a state in which the residues are diluted with cleaning water, such as industrial water, to a liquid level that makes it possible to open the manhole, when opening and inspecting the flash vessel after the operation of the flash vessel is stopped. [Means for solving the problem]
[0010] In order to achieve the above object, the method for discharging residue from a flash vessel according to the present invention comprises discharging a raw ore slurry into a flash vessel. Slurry temperature: 200-270°C and atmospheric pressure: 1.8-5.8MPaG This method is for discharging, after the operation of an autoclave that performs acid leaching treatment under high-temperature and high-pressure conditions, a residue remaining inside a flash vessel located at a downstream stage of the autoclave, the method comprising the steps of: replacing the residue with washing water and lowering the internal pressure of the flash vessel; and opening a drain valve to discharge, from a drain pipe, the diluted residue remaining in the flash vessel in a state diluted with the washing water after the replacement. The method is characterized in that the internal pressure of the flash vessel when the drain valve is opened is adjusted so that the liquid level of the diluted residue remaining in the flash vessel without being discharged from the drain pipe is lower than the lower end level of an opening of a manhole. Effect of the Invention
[0011] According to the present invention, when the flash vessel is opened and inspected after the operation of the flash vessel is stopped, the diluted residues remaining in the flash vessel in a state in which the residues, such as the leaching slurry and the leaching residue, are diluted with washing water, such as industrial water, can be discharged to a liquid level that allows the manhole to be opened. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a block flow diagram of a hydrometallurgical process carried out using an HPAL plant having a flash vessel to which the residue discharge method of an embodiment of the present invention is applied. [Diagram 2] FIG. 1 is a schematic flow diagram of a treatment apparatus including a preheater tank, an autoclave, and a flash vessel to which a residue discharge method according to an embodiment of the present invention is applied. [Diagram 3] 3 is a cross-sectional view showing the state after dilution residue has been discharged from the flash vessel of FIG. 2 using a residue discharge method according to an embodiment of the present invention. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] First, a hydrometallurgical process performed using an HPAL plant having a flash vessel to which a residue discharge method according to an embodiment of the present invention is applied will be described with reference to Fig. 1. The hydrometallurgical process shown in Fig. 1 includes a pretreatment step S1 in which raw nickel oxide ore is subjected to crushing, sieving, etc. to adjust the nickel oxide ore to a predetermined particle size, a leaching step S2 in which sulfuric acid is added to the ore slurry prepared by adding water to the pretreated nickel oxide ore and an acid leaching process S3 in which valuable metals nickel and cobalt are leached by performing an acid leaching process under high temperature and high pressure, and a leaching slurry generated by the acid leaching process is preferably subjected to a multi-stage flash to lower the pressure and temperature, and then the leached slurry is passed through a series of multiple thickeners. The process generally comprises a countercurrent multistage washing step S3 in which the leachate containing the valuable metals is separated from the leach residue by flowing the leachate and wash water in a countercurrent manner; a neutralization step S4 in which a neutralizing agent is added to the leachate to separate and remove impurity elements contained in the leachate as a neutralized precipitate to obtain a neutralized final solution; a sulfurization step S5 in which a sulfurizing agent such as hydrogen sulfide is added to the neutralized final solution to recover nickel and cobalt in the form of a mixed sulfide; and a final neutralization step S6 in which a neutralizing agent such as slaked lime is added to the nickel-poor solution discharged during the recovery of the mixed sulfide to render it harmless.
[0014] Among the above-mentioned series of wet processes, the leaching process S2 uses an autoclave 10 having a shape of a cylindrical pressure vessel turned sideways as shown in Fig. 2. The inside of this autoclave 10 is divided into a plurality of storage sections 10b arranged in a row by a weir 10a (four storage sections 10b are illustrated in Fig. 2), and the ore slurry and sulfuric acid are supplied to the storage section 10b located at the most upstream side of the plurality of storage sections 10b, at the left end of the drawing, via an ore slurry supply line 11 and a sulfuric acid supply line 12, respectively. The ore slurry is heated to a predetermined temperature preferably by a two- or three-stage preheater using steam discharged from a flash vessel described later as a heat source, before being introduced into the autoclave 10.
[0015] High-pressure steam is further introduced into the autoclave 10 via a steam supply line 13. As a result, the ore slurry charged into the autoclave 10 overflows the weir 10a while being stirred by a stirrer (not shown) provided in each storage section 10b, and is transferred to the adjacent storage sections 10b on the downstream side in sequence, during which the ore slurry is subjected to an acid leaching treatment under high temperature and high pressure at a slurry temperature of about 200 to 270°C and an atmospheric pressure of about 1.8 to 5.8 MPaG, and nickel and cobalt are leached as valuable metals.
[0016] The leaching slurry, which is composed of the leachate and leach residue thus produced, is discharged from the storage section 10b located at the most downstream right end of the drawing by a leach slurry discharge line 14 that hangs down from the top of the autoclave 10. As the nickel oxide ore used as the raw material, mainly so-called laterite ores such as limonite ore and saprolite ore are used. Laterite ores usually contain nickel in the form of hydroxide or magnesia (magnesium silicate) mineral, with a nickel content of 0.8 to 2.5 mass%.
[0017] The leaching slurry withdrawn through the leaching slurry withdrawal line 14 is preferably introduced into two or three flash vessels connected in series, where the pressure is gradually reduced to approximately atmospheric pressure, before being subjected to countercurrent multistage washing in a plurality of continuous thickeners in the next countercurrent multistage washing step S3. Note that Fig. 2 illustrates an example in which the first flash vessel 20 and the second flash vessel 30 are connected in series.
[0018] The first and second flash vessels 20, 30 are pressure vessels each consisting of a vertical cylindrical body and a substantially hemispherical top and bottom joined to the top and bottom of the body. A line for supplying leaching slurry and a line for recovering steam generated by flashing are connected to the top, and an overflow line for leaching slurry cooled by the latent heat of the generated steam is connected to the body. As shown in FIG. 3, the inner wall surface of each of the first and second flash vessels 20, 30 is lined with bricks 20a, 30a such as 'R' Acid Brick manufactured by SEMCO, preferably in a thickness of 2 to 3 layers, for corrosion resistance and wear resistance. The flash vessels of HPAL plants generally have a diameter of about 4 to 6 m and a height from the lowest to the highest part of about 10 to 12 m.
[0019] More specifically, the first flash vessel 20 at the front stage has the above-mentioned leaching slurry withdrawal line 14 connected to its top, and the leaching slurry withdrawn from the most downstream storage section 10b of the autoclave 10 due to the pressure difference is transferred to the first flash vessel 20 via this leaching slurry withdrawal line 14. This leaching slurry withdrawal line 14 is provided with a level control valve 14a, and the leaching slurry is lowered in pressure by passing through this level control valve 14a, and the temperature is lowered by the vapor generated by the flash caused by this pressure drop, which removes the latent heat of evaporation. A level gauge is provided in the most downstream storage section 10b of the autoclave 10, and the opening degree of the level control valve 14a is controlled by this level gauge.
[0020] The steam generated by the flash on the secondary side of the level control valve 14a undergoes gas-liquid separation from the leaching slurry in the first flash vessel 20, is discharged from a nozzle at the top, and is transferred to the preheater tanks 1, 3 preferably provided upstream of the autoclave 10 via a first steam recovery line 21 connected thereto, where it is used as a heat source. On the other hand, the leaching slurry from which the steam has been separated temporarily resides in the lower part of the first flash vessel 20, and is then extracted by overflow from an overflow nozzle in the body of the first flash vessel 20. The operating conditions in the first flash vessel 20 are, for example, a temperature of about 180 to 220°C and a pressure of about 1.6 to 2.2 MPaG.
[0021] The leaching slurry extracted from the overflow nozzle of the first flash vessel 20 is transferred to the second flash vessel 30 through a first slurry transfer line 22 that connects the overflow nozzle of the first flash vessel 20 to the top of the second flash vessel 30 in the subsequent stage. A slurry discharge valve 22a is provided on the first slurry transfer line 22, and the pressure of the leaching slurry is reduced to approximately atmospheric pressure by passing through this slurry discharge valve 22a, and the latent heat of evaporation is removed by steam generated by flash caused by this pressure reduction, thereby lowering the temperature.
[0022] The steam generated by the flash on the secondary side of the slurry discharge valve 22a undergoes gas-liquid separation from the leaching slurry in the second flash vessel 30, is discharged from a nozzle at the top, and is transferred to the preheater tanks 1, 3 preferably provided upstream of the autoclave 10 by a second steam recovery line 31 connected thereto, where it is used as a heat source. On the other hand, the leaching slurry from which the steam has been separated temporarily remains in the lower part of the second flash vessel 30, and is then extracted by overflow from an overflow nozzle in the body of the second flash vessel 30.
[0023] The leaching slurry extracted from the overflow nozzle of the second flash vessel 30 is sent to a group of thickeners (not shown) via a second slurry transfer line 32 connected to the overflow nozzle. These thickeners are connected in series, and the leaching slurry and the washing liquid are caused to flow in countercurrent to each other, so that multi-stage washing is performed while repeating solid-liquid separation by gravitational settling. As a result, mainly hematite (Fe 2 O 3 The leaching residue, consisting of nickel and cobalt, is extracted from the bottom of the thickener located at the most downstream side, and the supernatant leachate containing nickel and cobalt is recovered by overflow from the thickener located at the most upstream side. A flocculant is added to each thickener as necessary to promote solid-liquid separation.
[0024] The leachate recovered from the thickener on the most upstream side is added with a neutralizing agent such as calcium carbonate, slaked lime, or sodium hydroxide in the next neutralization step S4, and the pH is adjusted to preferably within the range of 1 to 4. As a result, impurity elements such as iron and aluminum contained in the leachate are removed as neutralized precipitates. A sulfurizing agent such as hydrogen sulfide, sodium sulfide, or sodium hydrosulfide is added to the neutralized end solution obtained by removing the neutralized precipitates in the next sulfurization step S5, and a nickel-cobalt mixed sulfide is produced from the nickel and cobalt contained in the neutralized end solution.
[0025] The nickel-poor solution with a low nickel concentration discharged during the recovery of the nickel-cobalt mixed sulfide is detoxified in the final neutralization step S6, preferably with a neutralizing agent such as slaked lime, together with the leaching residue discharged from the countercurrent multistage washing step S3. If the neutralization end solution contains zinc, it is preferable to perform a dezincing treatment by adding a sulfurizing agent to the neutralization end solution under a slightly pressurized state before producing the nickel-cobalt mixed sulfide in the sulfurization step S5.
[0026] In the periodic inspection and repair after the shutdown of the HPAL plant where the above-mentioned hydrometallurgical process is performed, it is necessary to open the manhole provided in the body of the flash vessel to carry out the work. Therefore, after the operation is stopped by stopping the supply of the ore slurry from the ore slurry tank to the preheater tank provided on the upstream side of the autoclave 10 and stopping the introduction of sulfuric acid to the autoclave 10, the introduction of washing water such as industrial water to the preheater tanks 1 and 3 is started and the supply of high-pressure steam to the autoclave 10 is gradually reduced to lower the temperature inside the autoclave 10 at a predetermined rate.
[0027] When the preheater is composed of a plurality of stages, it is preferable that the washing water is introduced from the most upstream stage and transferred to the subsequent stages in sequence. For example, as shown in Fig. 2, when the preheater is composed of two stages, washing water is supplied to the first stage preheater tank 1, so that the ore slurry remaining in the first stage preheater tank 1 is gradually replaced with the washing water. The first stage preheater tank 1 and the second stage preheater tank 3 are connected by an ore slurry transfer line 2, and the ore slurry diluted with washing water is discharged from the bottom of the first stage preheater tank 1 and then transferred to the second stage preheater tank 3 via the ore slurry transfer line 2.
[0028] In the second-stage preheater tank 3, the ore slurry remaining therein is gradually replaced with washing water, similarly to the first-stage preheater tank 1. The ore slurry diluted with the washing water is discharged from the bottom of the second-stage preheater tank 3, and then transferred to the autoclave 10 via the ore slurry supply line 11 connecting the second-stage preheater tank 3 and the autoclave 10. Thereafter, in the same manner, the ore slurry, leaching slurry, and other residues remaining in the autoclave 10, the first flash vessel 20, and the second flash vessel 30 are gradually replaced with washing water. After the replacement of the residues in the system with the washing water is continued for a while, and it is confirmed that the washing water discharged from the second flash vessel 30 contains almost no solids, the introduction of the washing water into the preheater tanks 1 and 3 is stopped.
[0029] By replacing the residue with the above-mentioned washing water, it is possible to discharge almost all of the residue in the preheater tanks 1, 3 and the autoclave 10. However, in the first and second flash vessels 20, 30, since the slurry is discharged from the overflow nozzle in the body, in addition to the leaching residue originally remaining in the flash vessel, solids such as the ore and leaching residue contained in the diluted residue transferred from the autoclave 10, scale peeled off from the liquid-contacting parts in the system, and fallen brick fragments remain below the above-mentioned overflow nozzle in the form of diluted residue mixed with washing water.
[0030] Drain pipes 23, 33 equipped with drain valves 24, 34 are provided at the bottoms of the first and second flash vessels 20, 30, respectively, and by opening these drain valves 24, 34, which are normally in a closed state, the diluted residue remaining in the first and second flash vessels 20, 30 can be discharged to the outside of the system through these drain pipes 23, 33. This allows the liquid level of the diluted residue in the first and second flash vessels 20, 30 to be lowered, making it possible to open the manholes in the trunks without scattering the diluted residue around.
[0031] Incidentally, in discharging the diluted residue by opening these drain valves 24, 34, when reducing the pressure in the system after the autoclave 10 described above, it is considered that the diluted residue can be efficiently discharged outside the system in a short time by keeping the internal pressure (internal pressure) of the first and second flash vessels 20, 30 in a pressurized state without reducing it to atmospheric pressure, and using the internal pressure of the first and second flash vessels 20, 30 as a driving force. However, if the internal pressure of the first and second flash vessels 20, 30 is too high when the drain valves 24, 34 are opened, the diluted residue may not be discharged smoothly from the first and second flash vessels 20, 30.
[0032] The reason for this is thought to be that, as mentioned above, the diluted residue remaining in the first and second flash vessels 20, 30 contains various types of solid matter. Specifically, the solid matter derived from the leaching slurry contains leaching residues of various sizes, ranging from fine particles of about 3 to 4 μm to relatively large particles of about 0.15 to 1.7 mm, and the scales and brick fragments are larger than the leaching residues and contain various shapes, such as flakes and fragments.
[0033] That is, if the internal pressure of the first and second flash vessels 20 and 30 is too high when the drain valves 24 and 34 are opened, an excessive pressure difference is applied to the diluted residue flowing in the drain pipes 23 and 33, so that various solids in the diluted residue flowing from the first and second flash vessels 20 and 30 toward the outlets of the drain pipes 23 and 33 are excessively consolidated, resulting in a decrease in fluidity and clogging the drain pipes 23 and 33. If the drain pipes 23 and 33 are clogged in this way, the diluted residue will no longer be discharged, so it will no longer be possible to lower the liquid level of the diluted residue in the first and second flash vessels 20 and 30, and it will no longer be possible to open the manholes provided in the bodies without scattering the diluted residue around it.
[0034] Therefore, in the method for discharging the residue according to the embodiment of the present invention, in order to open the manholes 25, 35 in the body of the first and second flash vessels 20, 30 without scattering the diluted residue around them, the lower end level L of the openings 25a, 35a of the manholes 25, 35 shown in FIG. 1 , L 2 The internal pressures of the first and second flash vessels 20, 30 are respectively reduced until they reach a pressure at which the diluted residue can be discharged to a liquid level lower than the liquid level at which the diluted residue can be discharged, and then the drain valves 24, 34 are opened, thereby using the internal pressures of the first and second flash vessels 20, 30 as the driving force for discharge.
[0035] This prevents the diluted residue flowing through the drain pipes 23 and 33 from being excessively consolidated, so that the fluidity of the diluted residue can be maintained at a good level. Therefore, when the covers 25b and 35b of the manholes 25 and 35 are opened, the liquid levels of the diluted residue in the first and second flash vessels 20 and 30 are set to the lower end levels L of the openings 25a and 35a of the manholes 25 and 35. 1 , L 2 As a result, the manholes 25, 35 can be opened without scattering the diluted residue in the surrounding area, and inspection, repair, and other work inside the first and second flash vessels 20, 30 can be quickly started.
[0036] The diluted residue in the first and second flash vessels 20 and 30 is flushed to the lower end levels L 1 , L 2The internal pressure of the first and second flash vessels 20, 30 when the drain valves 24, 34 are opened, which allows the liquid to be discharged to a level lower than the above level, may vary depending on conditions such as the size and shape of solids contained in the diluted residue, the inner diameters of the drain pipes 23, 33 and their distances to the discharge ports, the capacities of the first and second flash vessels 20, 30, and the positions of the manholes 25, 35 and overflow nozzles. Therefore, a more suitable internal pressure may be determined by appropriately changing the internal pressure of the first and second flash vessels 20, 30 when the drain valves are opened in accordance with the timing of regular maintenance of an actual operating plant, or may be determined by conducting a test before the actual operation. In the case of a flash vessel having a diameter of about 4 to 6 m and a height of about 10 to 12 m from the bottom to the top, which is used in a general HPAL plant, the internal pressure of the first and second flash vessels 20, 30 when the drain valves are opened is preferably about atmospheric pressure or higher and 100 KPaG or lower.
[0037] As a method of the above test, for example, the diluted residue is stored in the first flash vessel 20 up to the position of the overflow nozzle with the drain valve 24 closed, the internal pressure of the first flash vessel 20 is set to atmospheric pressure, the drain valve 24 is opened, and the diluted residue is discharged from the drain pipe 23. Thereafter, the nozzle at the top of the first flash vessel 20 is opened, and the liquid level of the diluted residue is measured visually or the like. Next, the diluted residue is stored in the first flash vessel 20 up to the position of the overflow nozzle with the drain valve 24 closed again, and the internal pressure of the first flash vessel 20 is set to, for example, 50 MPaG, the drain valve 24 is opened, and the diluted residue is discharged from the drain pipe 23. Thereafter, the nozzle at the top of the first flash vessel 20 is opened, and the liquid level of the diluted residue is similarly measured. Thereafter, in the same manner, the internal pressure of the first flush vessel 20 is gradually increased, and the liquid level of the diluted residue after the drain valve 24 is opened is measured to obtain the lower end level L of the opening 25a of the manhole 25. 1 The internal pressure of the first flash vessel 20 that allows discharge to a lower liquid level can be determined.
[0038] If clogging due to dilution residue occurs in the drain pipes 23, 33, it is preferable to close the auxiliary drain valves 27, 37 and open the backwash industrial water supply valves 26, 36 to perform backwashing, thereby removing the solid matter causing the clogging by the water pressure of the industrial water during the backwashing. EXAMPLES
[0039] [Example 1] Using an HPAL plant having preheater tanks 1 and 3, an autoclave 10, and first and second flash vessels 20 and 30 shown in FIG. 2, an operation was carried out to produce nickel-cobalt mixed sulfides from a raw material nickel oxide ore slurry in accordance with the hydrometallurgical process shown in FIG. 1, and then the operation of the HPAL plant was stopped for an internal inspection of the first and second flash vessels 20 and 30.
[0040] In this operation shutdown, first, the supply of nickel oxide ore slurry to the preheater tanks 1 and 3 in front of the autoclave 10 and the introduction of sulfuric acid to the autoclave 10 were stopped, and then industrial water was introduced as washing water from the preheater tank 1 to replace the ore slurry and leach slurry remaining inside the preheater tanks 1 and 3, the autoclave 10, and the first and second flash vessels 20 and 30 in that order. In parallel with this replacement with industrial water, the flow rate of the high-pressure steam introduced into the autoclave 10 was gradually reduced to lower the temperature inside the autoclave 10 at a rate of 20° C. / hr, thereby lowering the pressure inside the autoclave 10 and the first and second flash vessels 20 and 30.
[0041] When it was confirmed by the pressure gauges 28, 38 installed at the tops of the first and second flash vessels 20, 30, each having a height of 9.6 m and an inner diameter of 3.7 m, that the pressure in each of the vessels had dropped to atmospheric pressure, the supply of industrial water to the preheater tanks 1, 3 was stopped, and further, the drain valves 24, 34, each consisting of a ball valve, of the drain pipes 23, 33, each having an inner diameter of 100 mm, installed at the bottoms of the first and second flash vessels 20, 30, were opened to discharge the diluted residue remaining in the first and second flash vessels 20, 30 from the drain pipes 23, 33.
[0042] After the above-mentioned discharge, the top nozzles of the first and second flash vessels 20 and 30 were opened, and the liquid level of the diluted residue was visually inspected. The liquid level of the diluted residue was found to be at the lower end level L of the openings 25a and 35a of the manholes 25 and 35, which were located 1.9 m higher than the bottom of the first and second flash vessels. 1 , L 2 Both were about 1.0 m lower than the above, and the covers 25b, 35b of the manholes 25, 35 could be opened without scattering the dilution residue to the surroundings. This enabled cleaning, inspection, and repair of the insides of the first and second flash vessels 20, 30 to be completed in a short time. The solid content concentration of the dilution residue was less than 10 mass%.
[0043] [Example 2] When the pressure in the first and second flash vessels 20 and 30 dropped to 100 KPaG, the supply of industrial water to the preheater tanks 1 and 3 was stopped and the drain valves 24 and 34 were opened, and the residue was discharged in the same manner as in Example 1. As a result, the liquid level of the diluted residue reached the lower end level L of the openings 25a and 35a of the manholes 25 and 35. 1 , L 2 As a result, the covers 25b, 35b of the manholes 25, 35 could be opened without scattering the diluted residue in the surrounding area. This enabled cleaning, inspection, and repair of the insides of the first and second flash vessels 20, 30 to be completed in a short time.
[0044] [Comparative Example] The residue was discharged in the same manner as in Example 1 above, except that the supply of industrial water to the preheater tanks 1 and 3 was stopped and the drain valves 24 and 34 were opened when the pressure in the first and second flash vessels 20 and 30 had dropped to 600 KPaG. As a result, the diluted residue could be vigorously discharged from the drain pipes 23 and 33 immediately after the drain valves 24 and 34 were opened, but the drain pipes 23 and 33 became clogged in the early stage of the discharge and were no longer discharged thereafter. As a countermeasure, the auxiliary drain valves 27 and 37 were closed and the industrial water supply valves 26 and 36 were opened to attempt backwashing of the drain pipes 23 and 33, but the diluted residue still could not be discharged.
[0045] Therefore, the discharge work was stopped, the top nozzles of the first and second flash vessels 20, 30 were opened, and the liquid level of the diluted residue was visually checked. It was found that the diluted residue was above a level 3 m higher than the lowest part of the first and second flash vessels 20, 30. Therefore, the diluted residue remained up to a level exceeding the upper end level of the openings 25a, 35a of the manholes 25, 35, and the covers 25b, 35b could not be opened. In order to remove this large amount of diluted residue, it became necessary to insert a hose from the top of the first and second flash vessels 20, 30 and perform a vacuum to suck out the diluted residue, which significantly delayed the start of cleaning, inspection, and repair work inside the first and second flash vessels 20, 30. [Explanation of symbols]
[0046] 1, 3 Preheater tank 2. Ore slurry transfer line 10 Autoclave 10a Weir 10b Storage section 11 Ore slurry supply line 12 Sulfuric acid supply line 13 Steam supply line 14 Leaching slurry extraction line 14a Level control valve 20, 30 1st and 2nd flash vessels 20a, 30a Brick 21, 31 Steam recovery line 22, 32 Slurry transfer line 22a Slurry discharge valve 23, 33 Drain pipe 24, 34 Drain valve 25, 35 Manhole 25a, 35a opening 25b, 35b lid 26, 36 Industrial water supply valve 27, 37 Secondary drain valve 28, 38 Pressure gauge L 1 , L 2 Bottom Level R Dilution Residue
Claims
1. A method for discharging residues remaining in a flash vessel located downstream of an autoclave in which a raw ore slurry is acid-leached under high-temperature and high-pressure conditions of a slurry temperature of 200 to 270°C and an atmospheric pressure of 1.8 to 5.8 MPaG, after the operation is stopped, comprising: a step of replacing the residue with cleaning water and lowering the internal pressure of the flash vessel; and a step of opening a drain valve and discharging the diluted residue remaining in the flash vessel in a state diluted with the cleaning water after the replacement through a drain pipe, wherein the internal pressure of the flash vessel is adjusted when the drain valve is opened so that the liquid level of the diluted residue remaining in the flash vessel without being discharged through the drain pipe is lower than the lower end level of an opening of a manhole.
2. 2. The method for discharging residue in a flash vessel according to claim 1, wherein the drop in the internal pressure of the flash vessel when the drain valve is opened is adjusted so that the internal pressure of the flash vessel is equal to or higher than atmospheric pressure and equal to or lower than 100 kPaG.
3. 3. The method for discharging residue in a flash vessel according to claim 1 or 2, wherein the ore slurry is a slurry prepared by adding water to nickel oxide ore.
4. 4. The method for discharging residue in a flash vessel according to claim 1, wherein the wash water is introduced from the upstream side of the autoclave, and the residue includes leaching residue, scale, and brick chips.
Citation Information
Patent Citations
Method for supplying waste liquid and hydrothermal reaction treatment equipment
JP2004033915A
Hydrometallurgical process for nickel oxide ore
JP2010031341A
Method of operating flash vessel
JP2014240524A
Manufacturing method of nickel powder, manufacturing device of nickel powder
JP2017226867A
Operation method of flash vessel
JP2019203161A