Ozone water spraying device

The ozone water spraying device addresses electrolytic cell damage by ensuring water presence before energizing electrodes and providing user alerts, enhancing device protection and efficiency.

JP7572673B2Active Publication Date: 2024-10-24QINGDAO HAIER WASHING MASCH CO LTD +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2020156201
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-17
Publication Date
2024-10-24
Estimated Expiration
2040-09-17

AI Technical Summary

Technical Problem

Existing ozone sprays face issues where the electrolytic cell becomes submerged in water, leading to potential damage of the anode and cathode due to lack of water or difficult configurations that prevent proper electrolysis.

Method used

The ozone water spraying device includes a detection unit to ensure water is present in the flow path before energizing the anode and cathode, with a control unit managing the electrolysis and water supply to prevent damage, and a notification unit to alert users of water shortages.

Benefits of technology

Prevents damage to the anode and cathode by ensuring water is present before electrolysis, allows for user intervention to replenish water, and avoids unnecessary operation, thus protecting the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007572673000001
    Figure 0007572673000001
  • Figure 0007572673000002
    Figure 0007572673000002
  • Figure 0007572673000003
    Figure 0007572673000003
Patent Text Reader

Abstract

To provide an ozone water spraying device in which an anode and a cathode are hardly damaged when forming a configuration which generates ozone water using an electrolysis part having an anode and a cathode.SOLUTION: There is provided an ozone spray 1 which has a shower discharge part 40 for discharging ozone water in which ozone is contained in water in a shower state, a mist discharge part 50 for discharging ozone water in a mist state, a container 21 in which water is stored, a flow channel in which an anode and a cathode are arranged and comprises an electrolysis part 23 which electrolyzes water flowing in the flow channel to generate ozone water, a pump 22 which passes water sucked from the container 21 through a flow channel 131 to supply to the shower discharge part 40 and the mist discharge part 50 and a control part for controlling the electrolysis part 23 and the pump 22. The control part energizes the anode and the cathode after the second time has elapsed since the operation of the pump 22 is started.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an ozone water spraying device that sprays ozone water in the form of a shower or mist. [Background technology]

[0002] For example, Patent Document 1 describes an ozone spray that generates ozone by electrolyzing water stored in a container and sprays ozone water in which the generated ozone is contained in the water.

[0003] The ozone spray of Patent Document 1 includes a container for storing raw water, a head attached to the container, a first tube and a second tube communicating between the head and the container, and an electrolytic cell attached to the second tube. The head is provided with a nozzle, a trigger, and a piston-cylinder mechanism. The electrolytic cell has an anode and a cathode inside, is placed at the bottom of the container, and is submerged when raw water is stored in the container. When the trigger is operated, a voltage is applied between the anode and cathode of the electrolytic cell, and the raw water is electrolyzed to generate ozone water. The generated ozone water is sent to a nozzle by the piston-cylinder mechanism, and the ozone water is sprayed from the nozzle. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 6249200 Summary of the Invention [Problem to be solved by the invention]

[0005] In the above ozone spray, unless the amount of water in the container is reduced to the level that requires replenishment, the electrolytic cell will be submerged in water, and therefore it is difficult for electricity to flow between the anode and the cathode when there is no water inside the electrolytic cell.

[0006] On the other hand, depending on the configuration of the ozone sprayer, the electrolytic cell may be disposed in a position that is difficult to be immersed in the water stored in the container. In such a configuration, if a current is passed between the anode and the cathode when there is no water inside the electrolytic cell, the anode and the cathode may be damaged.

[0007] The present invention has been made in consideration of such problems, and aims to provide an ozone water spraying device in which the anode and cathode are less likely to be damaged when the device is configured to generate ozone water using an electrolysis unit having an anode and a cathode. [Means for solving the problem]

[0008] The present invention 1. The ozone water spraying device according to the embodiment includes a discharge section that discharges ozone water, which is water containing ozone, in the form of a shower or mist; a water storage section that stores water; an electrolysis section that has a flow path in which an anode and a cathode are arranged and that electrolyzes the water flowing through the flow path to generate ozone water; a water supply device that sends water drawn from the water storage section through the flow path to the discharge section; and a control section that controls the electrolysis section and the water supply device. A detection unit for detecting whether water is present in the flow path, and a notification unit; Here, the control unit is configured to The water sucked up from the water storage section reaches the electrolysis section. After a predetermined time has elapsed, the anode and the cathode are energized. stomach , After the predetermined time has elapsed, the presence or absence of water in the flow path is detected, and the notification unit is made to give a notification based on the absence of water in the flow path. The ozone water spraying device according to the second aspect of the present invention includes a discharge section that discharges ozone water, which is water containing ozone, in the form of a shower or mist, a water storage section that stores water, an electrolysis section that has a flow path in which an anode and a cathode are arranged and that generates ozone water by electrolyzing the water flowing in the flow path, a water supplying device that passes water drawn up from the water storage section through the flow path and sends it to the discharge section, a control section that controls the electrolysis section and the water supplying device, a detection section that detects whether water is present in the flow path, and an operation section that is operated when spraying ozone. Here, the control section energizes the anode and the cathode after a predetermined time has elapsed since the operation of the water supplying device was started, during which the water drawn up from the water storage section reaches the electrolysis section, and detects the presence or absence of water in the flow path after the predetermined time has elapsed, and does not operate the water supplying device or energize the anode and the cathode based on the absence of water in the flow path even if the operation section is operated. For example, the detection unit may detect a current when a current is applied to the anode and the cathode. In this case, the control unit determines that no water is present in the flow path when the current value detected by the detection unit is smaller than a threshold value.

[0009] According to the above configuration, the water drawn up from the water storage section can be sent into the flow path before the anode and cathode are energized. This makes it difficult for the anode and cathode to be energized when there is no water in the flow path, and therefore makes it difficult for these electrodes to be damaged. 。

[0011] According to the above configuration, when water is not normally supplied to the electrolysis unit, it is possible to prevent the ozone water spraying device from being left in such an abnormal state.

[0013] Furthermore, according to the ozone water spraying device according to the first aspect, The user can know that water is not being supplied normally to the electrolysis unit, and can take appropriate measures, such as refilling the water storage unit if there is no water in it.

[0015] Furthermore, according to the ozone water spraying device according to the second aspect, This can prevent the water conveying device from operating unnecessarily, and also makes the anode and cathode less susceptible to damage. Effect of the Invention

[0016] According to the present invention, when an ozone water spraying device is configured to generate ozone water using an electrolysis section having an anode and a cathode, it is possible to provide an ozone water spraying device in which the anode and the cathode are less likely to be damaged.

[0017] The effects and significance of the present invention will become clearer from the following description of the embodiments. However, the following embodiment is merely an example of how the present invention can be put into practice, and the present invention is not limited to the embodiment described below. [Brief description of the drawings]

[0018] [Figure 1] FIG. 1 is a perspective view of an ozone sprayer according to an embodiment. [Diagram 2] FIG. 2 is a side view of an ozone sprayer according to an embodiment, with the inside seen through. [Diagram 3] FIG. 3 is a front view of the pump according to the embodiment. [Figure 4] FIG. 4(a) is a perspective view of an electrolysis unit according to an embodiment, and FIG. 4(b) is a cross-sectional view of the electrolysis unit taken along line AA' in FIG. 4(a). [Diagram 5] FIG. 5(a) is a front view of an ozone electrode unit fixed to a sealing member according to an embodiment, and FIG. 5(b) is a cross-sectional view of an anode covered with an ion exchange membrane according to an embodiment. [Figure 6] 6(a) and (b) are respectively a front view and a cross-sectional side view of a shower outlet according to an embodiment. [Figure 7] 7(a) and (b) are a front view and a side cross-sectional view, respectively, of a mist emitting portion according to an embodiment. [Figure 8] FIG. 8 is a block diagram showing a configuration of an ozone sprayer according to an embodiment. [Figure 9] FIG. 9 is a flowchart showing a control process of ozone spray by the control unit according to the embodiment. [Figure 10] FIG. 10 is a flowchart showing an ozone shower release process according to the embodiment. [Figure 11] FIG. 11 is a flowchart showing an ozone mist releasing process according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Hereinafter, an ozone sprayer, which is one embodiment of the ozone water spraying device of the present invention, will be described with reference to the drawings.

[0020] Fig. 1 is a perspective view of the ozone sprayer 1. Fig. 2 is a side view of the ozone sprayer 1 with the inside seen through.

[0021] 1 and 2, the ozone sprayer 1 includes a generating section 20, a water guide section 30, a shower discharge section 40, a mist discharge section 50, an operating section 60, and a power supply section 70 in a housing 10. The shower discharge section 40 and the mist discharge section 50 correspond to the discharge section of the present invention.

[0022] The housing 10 is composed of a body 10a, a neck 10b, and a head 10c. The body 10a has a generally bottomed cylindrical shape whose upper portion is tapered inward toward the neck 10b. A long and narrow display window 11 is formed in the body 10a. The body 10a is also provided with a mode switching button 12 and a mode display unit 13. Each time the mode switching button 12 is pressed, the operation mode is switched between an ozone shower mode in which ozone water is released in a shower from the shower release unit 40 and an ozone mist mode in which mist containing ozone is released from the mist release unit 50. The mode display unit 13 includes an LED that can be lit in multiple colors, and lights up in a color corresponding to the operation mode. In this embodiment, the mode display unit 13 also functions as a notification unit for notifying an abnormality. The mode display unit 13 corresponds to the notification unit of the present invention.

[0023] The neck 10b has a substantially cylindrical shape and extends in the vertical direction. An operation button 61 protrudes forward from the front side of the neck 10b. The head 10c has a predetermined shape and extends in the front-rear direction. On the front surface of the head 10c, a circular outlet 14 corresponding to the shower outlet 40 is formed on the lower side, and a circular outlet 15 corresponding to the mist outlet 50 is formed on the upper side.

[0024] The generating unit 20 includes a container 21 for storing water, an electric pump 22 for selectively sending water drawn from the container 21 to the shower discharge unit 40 and the mist discharge unit 50, and an electrolysis unit 23 for passing the water sent out from the pump 22, electrolyzing the passing water to generate ozone, and incorporating the generated ozone into the water. The container 21 is disposed at the rear side within the body 10a, and the electrolysis unit 23 is disposed in front of the container 21 within the body 10a. The pump 22 is disposed above the container 21 within the neck 10b. The container 21 corresponds to the water storage unit of the present invention, and the pump 22 corresponds to the water supply device of the present invention.

[0025] Container 21 is translucent. Container 210 stores water such as pure water or tap water. Container 21 is formed with protrusion 211 having a shape corresponding to display window 11. Protrusion 211 is exposed to the outside from display window 11. A user can check the amount of water in container 21 through display window 11. Container 21 is also provided with a water supply port 212 at the rear of the upper part for adding water to container 21.

[0026] An opening 16 corresponding to the water supply port 212 is formed in the body 10a. A cap 17 is removably fitted into the opening 16, and the water supply port 212 is closed by this cap 17.

[0027] FIG. 3 is a front view of pump 22.

[0028] Referring to FIG. 3, pump 22 is a small pump of a diaphragm drive type, and includes head portion 221, suction port 222, discharge port 223, and drive portion 224. Inside head portion 221, pump chamber 226 having diaphragm 225 is provided. Suction port 222 and discharge port 223 are connected to pump chamber 226. Inside suction port 222, check valve 227 is provided, which opens only when water is sucked into pump chamber 226. Inside discharge port 223, check valve 228 is provided, which opens only when water is discharged from pump chamber 226. Drive portion 224 includes a plunger, a solenoid, etc., and drives diaphragm 225 to perform reciprocating motion. As diaphragm 225 reciprocates, water is sucked into pump chamber 226 through suction port 222, and water is discharged from pump chamber 226 through discharge port 223.

[0029] A water suction pipe 24 is connected to the suction port 222. A water suction port 241 at the tip of the water suction pipe 24 is located at the bottom inside the container 21. One end of a discharge pipe 25 is connected to the discharge port 223.

[0030] Fig. 4(a) is a perspective view of the electrolysis unit 23, and Fig. 4(b) is a cross-sectional view of the electrolysis unit 23 taken along line AA' in Fig. 4(a). Fig. 5(a) is a front view of the ozone electrode unit 110 fixed to the sealing body 120, and Fig. 5(b) is a cross-sectional view of the anode 111 covered with the ion exchange membrane 113.

[0031] 4(a) to 5(b), the electrolysis section 23 includes an ozone electrode unit 110, a sealing body 120, and a case 130.

[0032] The ozone electrode unit 110 includes a round bar-shaped anode 111, a linear cathode 112 wound in a spiral shape around the outer periphery of the anode 111, and an ion exchange membrane 113 interposed between the anode 111 and the cathode 112. The ion exchange membrane 113 is attached to the outer periphery of the anode 111 and covers the outer periphery.

[0033] The ozone electrode unit 110 has a base end connected to a cylindrical bracket 140. An anode lead terminal 141 and a cathode lead terminal 142 extend upward from the bracket 140. Inside the bracket 140, the anode 111 is connected to the anode lead terminal 141, and the cathode 112 is connected to the cathode lead terminal 142.

[0034] The sealing body 120 includes a cylindrical screw portion 121 having a male screw and a hexagonal column-shaped head portion 122. An O-ring 123 made of rubber or the like is attached to the base of the screw portion 121. A cylindrical recess 124 is provided in the screw portion 121, and two through holes 125, 126 connected to the recess 124 are provided in the head portion 122. A bracket 140 is inserted and fixed in the recess 124, and the anode lead terminal 141 and the cathode lead terminal 142 protrude above the head portion 122 through the corresponding through holes 125, 126, respectively. In this way, the ozone electrode unit 110, i.e., the base end of the anode 111 covered with the ion exchange membrane 113 and wound with the cathode 112, is fixed to the sealing body 120 via the bracket 140.

[0035] The case 130 has a cylindrical shape with one end closed and the other end open. The ozone electrode unit 110 is housed in the case 130, and the open end of the case 130 is closed by the screw portion 121 of the sealing body 120. A female screw portion is formed on the inner wall surface of the case 130 corresponding to the screw portion 121, and this female screw portion engages with the male screw portion. The gap between the sealing body 120 and the case 130 is water-sealed by an O-ring 123.

[0036] The inside of the case 130 is a flow path 131 except for a portion blocked by the screw portion 121 of the sealing body 120. The flow path 131 is long in the direction in which the anode 111 extends. The ozone electrode unit 110 is disposed at the center of the flow path 131. A recess 132 is provided at the closed end of the case 130 at the center position of the flow path 131. The tip of the anode 111 fits into the recess 132 and is held by the recess 132. As a result, the anode 111, i.e., the ozone electrode unit 110, is held in a double-supported state by the sealing body 120 and the recess 132, and is in a straight state with respect to the flow path 131.

[0037] The case 130 has smaller inner and outer diameters of the other parts constituting the flow path 131 than the inner and outer diameters of the part closed by the screw part 121 of the sealing body 120. This allows the diameter of the flow path 131 to be kept small, and the flow rate of water flowing through the flow path 131 to be reduced. For example, when the diameter R1 of the ozone electrode unit 110 is set to about 4.0 mm, the inner diameter of the other parts, i.e., the diameter R2 of the flow path 131, can be set to 5.0 mm.

[0038] An inlet 133 is formed at the position of the tip end of the ozone electrode unit 110 on the peripheral surface of the case 130, and an outlet 134 is formed at the position of the base end of the ozone electrode unit 110. The inlet 133 and the outlet 134 open in a second direction perpendicular to the first direction in which the anode 111 extends. In the first direction, the flow path 131 becomes longer, and the case 130 becomes longer. In addition, the inlet 133 and the outlet 134 protrude in the second direction from the peripheral surface of the case 130. The diameters of the inlet 133 and the outlet 134 are smaller than the diameter of the flow path 131. The diameters of the inlet 133 and the outlet 134 may be approximately equal to the diameter of the flow path 131.

[0039] The inlet 133 is connected to a discharge pipe 25 leading to the pump 22. The outlet 134 is connected to a common pipe 31 leading to the shower discharge part 40 and the mist discharge part 50.

[0040] The electrolysis unit 23 is disposed in the housing 10 so that the long direction is the up-down direction of the ozone sprayer 1, that is, vertically.

[0041] When the pump 22 operates in the generation section 20, water in the container 21 is sucked in through the water inlet 241 and sent to the electrolysis section 23 through the water inlet pipe 24, the pump 22, and the discharge pipe 25. In the electrolysis section 23, electricity is applied between the anode 111 and the cathode 112. The water that flows into the flow path 131 from the inlet 133 hits the wall of the flow path 131 and is turned at a right angle, and flows through the flow path 131 along the ozone electrode unit 110. A part of the water flowing through the flow path 131 comes into contact with the ion exchange membrane 113 between the anode 111 and the cathode 112, and the water that comes into contact is electrolyzed to generate ozone. The generated ozone dissolves in water, and ozone water is generated. At this time, when the water that flows in from the inlet 133 hits the wall and is turned at a right angle, the flow is disturbed and turbulence is generated in the flow path 131. This allows water to easily reach the valleys of the spirally wound cathode 112 and make contact with the ion exchange membrane 113, increasing the efficiency of ozone generation. Also, the generated ozone is easily broken down into fine particles by the turbulent flow and is easily dissolved in water. This makes it easier to generate ozone water with a high ozone concentration.

[0042] The ozone water that has flowed through flow path 131 is changed in direction at a substantially right angle when it hits sealing body 120 , and flows out from outlet 134 .

[0043] With reference to FIG. 2, the water guide section 30 includes a common pipe 31, a shower pipe 32, a mist pipe 33, a shower valve 34, and a mist valve 35.

[0044] The common pipe 31 is connected to the outlet 134 of the electrolysis unit 23. The shower pipe 32 and the mist pipe 33 branch off from the common pipe 31 and are connected to the shower discharge unit 40 and the mist discharge unit 50, respectively. The shower pipe 32 and the mist pipe 33 are each composed of two pipes, and a shower valve 34 and a mist valve 35 are disposed between the two pipes. The shower valve 34 and the mist valve 35 are electromagnetic valves, and constitute a switching unit 36 ​​that switches whether the ozone water flowing out of the generation unit 20 is to flow to the shower pipe 32 or the mist pipe 33. The switching unit 36 ​​is disposed in the head 10c of the housing 10.

[0045] When the pump 22 and the electrolysis unit 23 are not operating, the shower valve 34 and the mist valve 35 are closed, and one of the valves is opened when the pump 22 and the electrolysis unit 23 are operating. The ozone water that flows out of the generation unit 20, i.e., the electrolysis unit 23 and flows through the common pipe 31 by the water supply pressure of the pump 22 is sent to the shower discharge unit 40 through the shower pipe 32 if the shower valve 34 is open, and is sent to the mist discharge unit 50 through the mist pipe 33 if the mist valve 35 is open.

[0046] 6(a) and (b) are front and side cross-sectional views, respectively, of the shower outlet 40.

[0047] 2, 6(a) and 6(b), the shower outlet 40 is disposed on the front side of the head 10c of the housing 10. A circular recessed outlet 41 is provided on the front side of the shower outlet 40. The outlet 41 has approximately the same size as the outlet 14 on the front side of the head 10c and communicates with the outlet 14.

[0048] A circular discharge plate 42 is attached to the discharge port 41. A plurality of holes 42a are formed and dispersed in the discharge plate 42. A connection port 43 is provided at the rear of the shower discharge part 40, and the shower pipe 32 is connected to this connection port 43. Inside the shower discharge part 40, a flow path 44 is formed from the connection port 43 to the discharge port 41. As indicated by the dashed-dotted arrow in FIG. 6(b), the ozone water sent to the shower discharge part 40 by the shower pipe 32 is forcefully discharged in a shower-like manner from the plurality of holes 42a in the discharge plate 42, i.e., sprayed.

[0049] 7(a) and (b) are a front view and a side cross-sectional view of the mist emitting portion 50, respectively.

[0050] 2, 7(a) and (b), the mist emission part 50 is disposed on the front side of the head part 10c of the housing 10 and above the shower emission part 40. The mist emission part 50 includes a housing 51, an ultrasonic vibrator 52 and a water tank 53.

[0051] A circular recess 511 is formed on the front surface of the housing 51, and a disk-shaped ultrasonic transducer 52 is attached to this recess 511. The ultrasonic transducer 52 has a vibration surface 521 that has a large number of micropores and vibrates ultrasonically.

[0052] The water tank 53 is disposed in the upper part of the housing 51. The volume of the water tank 53 is significantly smaller than the volume of the container 21. An inflow pipe 531 is formed on the top surface of the water tank 53. The inflow pipe 531 protrudes rearward from the rear surface of the housing 51. The mist pipe 33 is connected to the inflow pipe 531.

[0053] The water tank 53 has a portion that extends obliquely downward toward the recess 511 of the housing 51, and an outlet 532 is provided at the tip of the portion. The outlet 532 is connected to the vibration surface 521 of the ultrasonic transducer 52 in the recess 511. The vibration surface 521 serves as an outlet for the ozone water, and is connected to the outlet 15 on the front surface of the head 10c.

[0054] The water tank 53 stores ozone water sent to the mist emission section 50 by the mist pipe 33. When the ultrasonic vibrator 52 operates, the vibration surface 521 vibrates ultrasonically. As a result, the ozone water that comes into contact with the vibration surface 521 at the outlet 532 of the water tank 53 is atomized and emitted from a large number of micropores, as shown in FIG. 7(b).

[0055] 2, the operation unit 60 is provided on the front side of the neck portion 10b of the housing 10, and is operated when spraying ozone water with the ozone sprayer 1. The operation unit 60 includes an operation button 61, and when the operation button 61 is pressed, an internal contact opening and closing switch is turned on.

[0056] The power supply unit 70 includes a rechargeable battery 71 and a charging device 72. The rechargeable battery 71 is, for example, a lithium ion battery, and outputs power for driving electrical components such as the pump 22, the electrolysis unit 23, and the switching unit 36. When the ozone sprayer 1 is placed on a charger (not shown), power is supplied from the charger to the charging device 72, and the rechargeable battery 71 is charged by the charging device 72.

[0057] FIG. 8 is a block diagram showing the configuration of the ozone sprayer 1.

[0058] In addition to the above-mentioned components, the ozone sprayer 1 includes a control unit 81, a memory unit 82, an operation detection unit 83, a display drive unit 84, a pump drive unit 85, an electrode current supply unit 86, a valve drive unit 87, a transducer drive unit 88, and a current detection unit 89.

[0059] When the operation button 61 of the operation unit 60 or the mode switching button 12 is pressed, the operation detection unit 83 outputs to the control unit 81 an operation signal corresponding to the pressed button.

[0060] The display drive unit 84 lights up the mode display unit 13 in accordance with a control signal from the control unit 81. The pump drive unit 85 drives the pump 22 in accordance with a control signal from the control unit 81. The electrode current supply unit 86 applies a voltage for electrolysis between the anode 111 and the cathode 112 of the electrolysis unit 23 in accordance with a control signal from the control unit 81.

[0061] The valve driver 87 drives the shower valve 34 and the mist valve 35, i.e., the switching unit 36, in accordance with a control signal from the control unit 81. The transducer driver 88 drives the ultrasonic transducer 52 in accordance with a control signal from the control unit 81.

[0062] The current detection unit 89 includes a current sensor, and detects the current flowing between the anode 111 and the cathode 112 when a current is applied between these electrodes, and outputs a detection signal according to the current value to the control unit 81. The current detection unit 89 corresponds to the detection unit of the present invention.

[0063] The storage unit 82 includes a ROM, a RAM, etc. The storage unit 82 stores a program for causing the control unit 81 to execute a predetermined process. The storage unit 82 also stores various parameters and various control flags used in executing the program.

[0064] The control unit 81 controls the display driving unit 84, the pump driving unit 85, the electrode current supply unit 86, the valve driving unit 87, the vibrator driving unit 88, etc. in accordance with the program stored in the memory unit 82 based on each signal from the operation detection unit 83, the current detection unit 89, etc.

[0065] Now, in the ozone spray 1, the operation mode can be switched by the mode switching button 12, and an operation in either the ozone shower mode or the ozone mist mode can be selected.

[0066] In the ozone shower mode, the ozone water generated in the generation unit 20 is sent to the shower discharge unit 40, and the ozone water is sprayed in a shower-like form from the discharge port 41 of the shower discharge unit 40. A user can clean an object such as a toilet bowl or a kitchen sink by spraying the ozone water onto the object.

[0067] In the ozone mist mode, the ozone water generated in the generation unit 20 is sent to the mist emission unit 50, and the mist containing ozone is emitted from the vibration surface 521, which is the emission port of the mist emission unit 50. The user can deodorize the room by diffusing the mist containing ozone in the room. In addition, the user can deodorize the object such as clothing by contacting the mist containing ozone with the object.

[0068] Fig. 9 is a flowchart showing the control process of the ozone sprayer 1 by the control unit 81. The control process of Fig. 9 is repeatedly executed by the control unit 81 while power supply from the rechargeable battery 71 is possible.

[0069] 9, the control unit 81 judges whether or not an abnormality flag is set (S101). The abnormality flag is provided in the control unit 81, and is set based on the occurrence of a water supply abnormality in which water is not supplied to the electrolysis unit 23 even when the pump 22 operates in the ozone spray 1 during the ozone shower emission process or the ozone mist emission process described later. The abnormality flag is reset when the user performs a release operation based on the fact that the abnormality has been resolved.

[0070] If the abnormality flag is not set (S101: YES), the control unit 81 monitors whether the operation button 61 is pressed (S102). If the operation button 61 is pressed (S102: YES), the control unit 81 determines whether the operation mode is set to the ozone shower mode or the ozone mist mode (S103).

[0071] When the operation mode is set to the ozone shower mode (S103: YES), the control unit 81 executes the ozone shower emission process (S104). On the other hand, when the operation mode is set to the ozone mist mode (S103: NO), the control unit 81 executes the ozone mist emission process (S105).

[0072] FIG. 10 is a flowchart showing the ozone shower release process.

[0073] 10, control unit 81 opens shower valve 34 (S201). When a first time (for example, 0.3 seconds) has elapsed since shower valve 34 was opened (S202: YES), control unit 81 operates pump 22 (S203).

[0074] The control unit 81 determines whether or not a second time (for example, 0.5 seconds) has elapsed since the operation of the pump 22 was started (S204). Usually, before the second time has elapsed, the water pumped from the container 21 reaches the electrolysis unit 23, the water flows in the flow path 131, and the anode 111 and the cathode 112 are immersed in the water present in the flow path 131.

[0075] When the second time period has elapsed (S204: YES), the control unit 81 operates the electrolysis unit 23, i.e., energizes the anode 111 and the cathode 112 (S205). Then, the control unit 81 detects the current flowing between the anode 111 and the cathode 112 by the current detection unit 89 (S206), and determines whether the detected current value is greater than a predetermined threshold value (S207). When water is present in the flow path 131, the current flows smoothly between the anode 111 and the cathode 112, and the detected current value is greater than the threshold value.

[0076] When the detected current value is greater than the threshold value (S207: YES), the control unit 81 waits for a third time (e.g., 1.5 seconds) to elapse after operating the electrolysis unit 23 (S208). By the operation of the pump 22 and the electrolysis unit 23, the ozone water generated in the electrolysis unit 23 is sent to the shower discharge unit 40, and the ozone water is discharged from the discharge port 14 of the housing 10 in the form of a shower.

[0077] When the third time has elapsed (S208: YES), if the operation button 61 is not being pressed (S209: NO), the control unit 81 stops the operation of the pump 22 and the operation of the electrolysis unit 23, i.e., stops the supply of electricity to the anode 111 and the cathode 112 (S210). This stops the release of ozone water from the outlet 14.

[0078] On the other hand, if the operation button 61 is kept pressed when the third time has elapsed (S209: YES), the control unit 81 stops the operation of the electrolysis unit 23 while continuing the operation of the pump 22 (S217). After that, the process returns to S204, and when the second time has elapsed since the electrolysis unit 23 was stopped (S204: YES), the control unit 81 operates the electrolysis unit 23 again (S205). In this way, the control unit 81 repeats the processes of S204 to S209 and S217 until the operation button 61 is released. As a result, the pump 22 continues to operate, and the electrolysis unit 23 repeats the stop for the second time and the operation for the third time. As a result, while the operation button 61 is being pressed, the shower-like ozone water continues to be discharged from the discharge port 14 of the housing 10. When the operation button 61 is released (S209: NO), the control unit 81 stops the operation of the pump 22 and the electrolysis unit 23 (S210).

[0079] Although not shown in the flowchart of Figure 10, if the operation button 61 is continuously pressed, when a time limit (e.g., 10 seconds) has elapsed since the operation button 61 was first pressed, the control unit 81 proceeds to S210 and stops the operation of the pump 22 and the electrolysis unit 23.

[0080] When a fourth time (for example, 0.3 seconds) has elapsed since the operation of the pump 22 and the electrolysis unit 23 was stopped (S211: YES), the control unit 81 closes the shower valve 34 (S212). In this way, the ozone shower release process ends.

[0081] In S203, it is considered that water is not sent to the electrolysis unit 23 even after the second time has elapsed since the operation of the pump 22 was started. Also, it is considered that water is sent to the electrolysis unit 23 once after the operation of the pump 22 is started, but water is not sent to the electrolysis unit 23 while the operation button 61 is continuously pressed and the pump 22 and the electrolysis unit 23 are operating. Possible causes of this include, for example, the water in the container 21 decreasing to a water level that cannot be sucked up by the pump 22, the pump 22 not operating normally due to a malfunction or the like, the intake pipe 24 or the discharge pipe 25 coming loose, and the like.

[0082] In this case, water is no longer present in the flow path 131 of the electrolysis unit 23, so that when electricity is applied to the anode 111 and the cathode 112 in S205, it becomes difficult for a current to flow between the anode 111 and the cathode 112. As a result, the current value detected by the current detection unit 89 in S206 becomes smaller than the threshold value.

[0083] In S207, when the control unit 81 determines that the current value is equal to or less than the threshold value (S207: NO), it stops the operation of the electrolysis unit 23 (S213). Thereafter, until the number of times that the current value is determined to be equal to or less than the threshold value in S207 reaches a predetermined number (for example, three times) (S214: NO), the control unit 81 repeats the processes of S204 to S207 and S213, and intermittently applies electricity to the anode 111 and the cathode 112 while keeping the pump 22 in operation.

[0084] If the predetermined number of times is reached without water being sent into the flow path 131 and without a determination in S207 that the current value is greater than the threshold (S214: YES), the control unit 81 stops the operation of the pump 22 (S215). Then, the control unit 81 sets an abnormality flag (S216). After that, when the fourth time has elapsed (S211: YES), the control unit 81 closes the shower valve 34 (S212).

[0085] FIG. 11 is a flowchart showing the ozone mist releasing process.

[0086] 11, the control unit 81 opens the mist valve 35 (S301), and then when a first time (for example, 0.3 seconds) has elapsed (S302: YES), operates the pump 22 (S303).

[0087] When a second time (e.g., 0.5 seconds) has elapsed since the start of the operation of the pump 22 (S304: YES), the control unit 81 operates the electrolysis unit 23, i.e., energizes the anode 111 and the cathode 112 (S305). Then, the control unit 81 detects the current flowing between the anode 111 and the cathode 112 by the current detection unit 89 (S306). If the detected current value is greater than the threshold value (S307: YES), the control unit 81 waits for a third time (e.g., 1 second) to elapse since the operation of the electrolysis unit 23 (S308). By the operation of the pump 22 and the electrolysis unit 23, the ozone water generated in the electrolysis unit 23 is sent to the mist release unit 50 and stored in the water tank 53.

[0088] When the third time period has elapsed (S308: YES), the control unit 81 operates the ultrasonic vibrator 52 (S309). As a result, mist containing ozone is emitted from the vibration surface 521 of the mist emission unit 50, and the mist is emitted from the emission port 15 of the housing 10.

[0089] If the operation button 61 is not being pressed (S310: NO), the control unit 81 stops the operation of the pump 22 and the supply of electricity to the anode 111 and the cathode 112 (S311). This stops the supply of ozone water to the mist emitting unit 50.

[0090] On the other hand, if the operation button 61 is still being pressed when the third time has elapsed (S310: YES), the control unit 81 stops the operation of the electrolysis unit 23 while continuing the operation of the pump 22 (S320). After that, the process returns to S304, and the control unit 81 repeats the processes of S304 to S310 and S320 until the operation button 61 is released. As a result, ozone water continues to be supplied to the mist release unit 50 while the operation button 61 is being pressed. In addition, in S309, the operation of the ultrasonic vibrator 52 continues. When the operation button 61 is released (S310: NO), the control unit 81 stops the operation of the pump 22 and the electrolysis unit 23 (S311).

[0091] Although not shown in the flowchart of Figure 11, if the operation button 61 is continuously pressed, when a time limit (e.g., 10 seconds) has elapsed since the operation button 61 was first pressed, the control unit 81 transitions to S311 and stops the operation of the pump 22 and the electrolysis unit 23.

[0092] When a fourth time (for example, 0.3 seconds) has elapsed since the operation of the pump 22 and the electrolysis unit 23 was stopped (S312: YES), the control unit 81 closes the mist valve 35 (S313).

[0093] When the fifth time has elapsed since the operation of the ultrasonic transducer 52 was started (S314: YES), the control unit 81 stops the operation of the ultrasonic transducer 52 (S315). The fifth time is set to the time required for all of the ozone water stored in the water tank 53 to be released, and is set to be longer the longer the operation button 61 is pressed and the greater the amount of ozone water supplied to the water tank 53.

[0094] Thus, the ozone mist release process is completed.

[0095] Now, as in the ozone shower release process, it is possible that the operation of the pump 22 does not send water to the electrolysis unit 23. In this case, the current value detected by the current detection unit 89 in S306 becomes smaller than the threshold value.

[0096] In S307, when the control unit 81 determines that the current value is equal to or less than the threshold value (S307: NO), it stops the operation of the electrolysis unit 23 (S316). Thereafter, until the number of times that the current value is determined to be equal to or less than the threshold value in S307 reaches a predetermined number (for example, three times), the control unit 81 repeats the processes of S304 to S307 and S316 and intermittently applies electricity to the anode 111 and the cathode 112 while keeping the pump 22 in operation.

[0097] If the predetermined number of times is reached without determining in S307 that the current value is greater than the threshold (S317: YES), the control unit 81 stops the operation of the pump 22 (S318). Then, the control unit 81 sets an abnormality flag (S319). Thereafter, when a fourth time has elapsed (S312: YES), the control unit 81 closes the mist valve 35 (S313). Furthermore, if the ultrasonic transducer 52 is operating, the control unit 81 stops the operation of the ultrasonic transducer 52 after a fifth time has elapsed (S314: YES) (S315).

[0098] In the ozone shower release process and the ozone mist release process, electricity is applied to the anode 111 and the cathode 112 of the electrolysis unit 23 after the second time has elapsed since the pump 22 started operating (S203 to S205 in Figure 10 and S303 to S305 in Figure 11), so that it is unlikely that electricity will be applied to the anode 111 and the cathode 112 when there is no water present in the flow path 131 of the electrolysis unit 23, and these electrodes 111, 112 are unlikely to be damaged.

[0099] Furthermore, when the value of the current flowing due to the application of electricity to the anode 111 and the cathode 112 is below the threshold value and it is deemed that no water is present in the flow path 131, the operation of the pump 22 and the electrolysis unit 23 is stopped (S206, S207, S213 to S215 in FIG. 10 and S306, S307, S316 to S318 in FIG. 11), so that the anode 111 and the cathode 112 are even less likely to be damaged.

[0100] Furthermore, the shower valve 34 and the mist valve 35 are opened before the pump 22 operates (S201 to S203 in FIG. 10 and S301 to S303 in FIG. 11), and the shower valve 34 and the mist valve 35 are closed after the operation of the pump 22 stops (S210 to S212 in FIG. 10 and S311 to S313 in FIG. 11), so that the water pressure of the pump 22 can be prevented from causing the common pipe 31 to come out of the outlet 134 of the electrolysis section 23, or the discharge pipe 25 to come out of the discharge port 223 of the pump 22.

[0101] 9, when any of the discharge processes is executed (S104, S105), the control unit 81 judges whether or not the abnormality flag is set (S106). If the abnormality flag is not set (S106: NO), the control unit 81 ends the control process once and starts it from the beginning.

[0102] If a water supply abnormality occurs in the executed release process, an abnormality flag is set. If the abnormality flag is set (S106: YES), the control unit 81 causes the mode display unit 13 to notify the abnormality (S107). For example, the mode display unit 13 flashes in one of the colors corresponding to the two operation modes or in a different color. Alternatively, the mode display unit 13 lights up in a color different from the colors corresponding to the two operation modes.

[0103] When the abnormality flag is set and an abnormality is notified, it is determined in S101 that the abnormality flag is set in the subsequent control processing (S101: YES). Therefore, the control unit 81 does not perform the processing from S102 onwards, that is, it does not accept the operation of the operation unit 60, and does not execute the ozone shower release process and the ozone mist release process even if the operation button 61 is pressed by the user. As a result, the pump 22 and the electrolysis unit 23 do not operate, and the ozone water is not sprayed by the ozone sprayer 1.

[0104] If the water supply abnormality is due to, for example, a shortage of water in container 21, the user performs a release operation after refilling water into container 21. Control unit 81 stops the abnormality notification on mode display unit 13 and resets the abnormality flag. This allows operations on operation unit 60 to be accepted in the control process of FIG. 9.

[0105] In this embodiment, the pump 22 is a diaphragm-driven pump and has a check valve 228 at the discharge port 223. When the pump 22 stops operating and the water discharge from the pump 22 is stopped, the check valve 228 is closed. This prevents water such as ozone water that is not sent to the shower discharge part 40 or the mist discharge part 50 and is present in the flow path 131 of the electrolysis part 23 from flowing toward the pump 22, and the water remains in the flow path 131. This makes it easier for water to be present in the flow path 131 when the operation button 61 is pressed next time. Therefore, even with such a configuration in which the check valve 228 functions as a blocking part that blocks the flow of water toward the pump 22, it is possible to prevent current from being applied between the anode 111 and the cathode 112 when there is no water in the flow path 131, so that the anode 111 and the cathode 112 are even less likely to be damaged.

[0106] <Effects of the embodiment> According to this embodiment, in the ozone shower release process and the ozone mist release process, electricity is applied to the anode 111 and the cathode 112 of the electrolysis unit 23 after the second time has elapsed since the pump 22 started operating. This makes it possible to send water drawn up from inside the container 21 into the flow path 131 of the electrolysis unit 23 before electricity is applied to the anode 111 and the cathode 112. This makes it difficult for electricity to be applied to the anode 111 and the cathode 112 when there is no water in the flow path 131, and therefore makes it difficult for these electrodes 111, 112 to be damaged.

[0107] Furthermore, according to this embodiment, when it is determined that there is no water in the flow path 131 after the operation of the pump 22, an abnormality is reported by the mode display unit 13 as an abnormality process based on this determination result. This allows the user to know that water is not being normally supplied to the electrolysis unit 23, and when there is no water in the container 21, the user can take appropriate measures, such as refilling the container 21 with water.

[0108] Furthermore, according to this embodiment, even if the operation unit 60 is operated as abnormality processing, the operation of the pump 22 and the supply of electricity to the anode 111 and the cathode 112 are stopped. This makes it possible to prevent the pump 22 from operating unnecessarily, and also makes the anode 111 and the cathode 112 even less susceptible to damage.

[0109] Furthermore, according to this embodiment, by detecting the current that flows when a current is applied to anode 111 and cathode 112 with current detection section 89, it is possible to determine whether water is present in flow channel 131 or not.

[0110] Although the embodiment of the present invention has been described above, the present invention is not limited to the above embodiment, and various modifications of the embodiment of the present invention are possible in addition to those described above.

[0111] For example, in the above embodiment, the diaphragm-type pump 22 is used as a water supply device for passing water drawn up from the container 21 through the flow path 131 of the electrolysis unit 23 and sending it to the shower discharge unit 40 and the mist discharge unit 50. When the pump 22 is used, the check valve 228 provided at the discharge port 223 functions as a blocking unit that blocks water from flowing from the flow path 131 of the electrolysis unit 23 to the pump 22 side. However, a piston-type pump in which a check valve can function as a blocking unit like the pump 22 may be used, or a pump of another type that does not have a configuration that functions as a blocking unit may be used.

[0112] In the above embodiment, in order to generate ozone water, an ozone electrode unit 110 including a rod-shaped anode 111, a linear cathode 112 wound in a spiral shape around the outer periphery of the anode 111, and an ion exchange membrane 113 interposed between the anode 111 and the cathode 112 is disposed in a flow path 131 of a case 130 as an electrolysis unit 23. However, as an electrolysis unit having another configuration, for example, as shown in Japanese Patent No. 5710691, an electrolysis unit including a membrane-electrode assembly as an ozone electrode unit, the membrane-electrode assembly including a rod-shaped anode, a cathode having curved cathode claws for gripping the anode, a diaphragm disposed on the cathode claws for separating the anode and the cathode, and an anode terminal connected to the anode may be used.

[0113] Furthermore, in the above embodiment, the ozone spray 1 is provided with the shower discharge part 40 that discharges ozone water in a shower shape. However, instead of the shower discharge part 40, the ozone spray 1 may be provided with a discharge part having a nozzle with a hole diameter that discharges ozone water in a mist shape with a larger particle size than the mist discharge part 50.

[0114] Furthermore, in the above embodiment, the mist emission unit 50 is configured to include a water tank 53 that stores the ozone water from the generation unit 20, and an ultrasonic vibrator 52 that uses ultrasonic vibration to atomize the ozone water stored in the water tank 53. However, the mist emission unit 50 is not limited to the above configuration, and may be configured to have a nozzle that emits the ozone water in a mist form, for example.

[0115] Furthermore, in the above embodiment, the ozone spray 1 is provided with both the shower emission part 40 and the mist emission part 50 as emission parts that emit ozone water in a shower or mist form, but it may be provided with only one of them. If the shower emission part 40 is not provided, the ozone shower emission process of Fig. 10 is not performed, and if the mist emission part 50 is not provided, the ozone mist emission process of Fig. 11 is not performed.

[0116] Furthermore, in the above embodiment, the abnormality is notified by the mode display unit 13, but a display unit dedicated to notifying the abnormality may be provided in the ozone sprayer 1. Moreover, the abnormality may be notified by a display but by a voice from a speaker or a sound from a buzzer.

[0117] Furthermore, in the above embodiment, whether or not water is present in the flow path 131 is determined based on the current detected by the current detection unit 89. However, the electrolysis unit 23 may be provided with a flow sensor as a detection unit that detects the flow rate of water flowing in the flow path 131, and whether or not water is present in the flow path 131 may be determined based on the flow rate detected by this flow sensor.

[0118] Furthermore, in the above embodiment, in the ozone shower release process of Fig. 10 and the ozone mist release process of Fig. 11, it is determined whether the number of times that the current value detected by the current detection unit 89 is determined to be equal to or less than the threshold value has reached a predetermined number of times (S214, S317). However, it may be possible to move to a process (S215, S318) in which the operation of the pump 22 is stopped once it is determined that the detected current value is equal to or less than the threshold value without determining whether the number of times has reached the predetermined number of times.

[0119] Furthermore, in the above embodiment, the switching unit 36 ​​for switching whether the ozone water flowing out from the generation unit 20 flows into the shower pipe 32 or the mist pipe 33 is composed of two electromagnetic valves, the shower valve 34 and the mist valve 35. However, the switching unit 36 ​​may be composed of a three-way valve. In this case, the common pipe 31 is connected to the inlet of the three-way valve. Also, the shower pipe 32 and the mist pipe 33 are composed of one pipe, and are respectively connected to one outlet and the other outlet of the three-way valve. In the ozone shower release process of FIG. 10, the pump 22 is operated after the three-way valve is switched so that the ozone water flows into the shower pipe 32. In the ozone mist release process of FIG. 11, the pump 22 is operated after the three-way valve is switched so that the ozone water flows into the mist pipe 33.

[0120] Furthermore, in the above embodiment, the container 21, the electrolysis unit 23, and the power supply unit 70 are disposed inside the body 10a of the housing 10. However, the entire body 10a may be used as the container, i.e., the water storage unit, and the electrolysis unit 23 and the power supply unit 70 may be disposed in the neck 10b or head 10c of the housing 10. In this case, the electrolysis unit 23 and the power supply unit 70 are sized so that they can be disposed in the neck 10b or head 10c.

[0121] Furthermore, in the above embodiment, a water level detection unit capable of detecting the water level in the container 21 may be provided, and when the water level detection unit detects that the water level has dropped to such an extent that the pump 22 cannot pump up the water, the pump 22 and the electrolysis unit 23 may not operate even if the operation button 61 is operated. In this way, it is possible to prevent current from flowing between the anode 111 and the cathode 112 in a state in which water does not pass through the flow path 131 of the electrolysis unit 23, and the anode 111 and the cathode 112 can be further protected.

[0122] Furthermore, in the above embodiment, the electrolysis unit 23 is disposed downstream of the pump 22, and the water pumped up from within the container 21 and delivered from the pump 22 is taken into the electrolysis unit 23. However, the electrolysis unit 23 may be disposed upstream of the pump 220, and the water in the container 21 may pass through the electrolysis unit 23 before being sucked into the pump 22. In either configuration, the water pumped up from the container 21 by the pump 22 passes through the flow path 131 of the electrolysis unit 23 and is delivered to the shower discharge unit 40 and the mist discharge unit 50.

[0123] In addition, the embodiments of the present invention can be modified in various ways as appropriate within the scope of the technical ideas set forth in the claims. [Explanation of symbols]

[0124] 13 Mode display section (alarm section) 40 Shower outlet (outlet) 50 Mist emission section (emission section) 21 Container (water storage section) 22 Pump (water supply device) 23 Electrolytic section 60 Control section 81 Control Unit 89 Current detection unit (detection unit) 111 Anode 112 Cathode 131 Flow Path

Claims

1. An emission unit that emits ozone water, which is water containing ozone, in the form of a shower or mist; A water storage section for storing water; an electrolysis unit having a flow path in which an anode and a cathode are disposed, and electrolyzing water flowing through the flow path to generate ozone water; a water supply device that sends water drawn up from the water storage section through the flow path to the discharge section; A control unit that controls the electrolysis unit and the water supply device; a detection unit for detecting whether water is present in the flow path; A notification unit, The control unit is After a predetermined time has elapsed since the operation of the water supply device was started, during which the water pumped from the water storage section reaches the electrolysis section, current is applied to the anode and the cathode; detecting the presence or absence of water in the flow path after the predetermined time has elapsed, and causing the notification unit to give a notification based on the absence of water in the flow path. An ozone water spraying device.

2. An emission section that emits ozone water, which is water containing ozone, in the form of a shower or mist; A water storage section for storing water; an electrolysis unit having a flow path in which an anode and a cathode are disposed, and electrolyzing water flowing through the flow path to generate ozone water; a water supply device that sends water drawn up from the water storage section through the flow path to the discharge section; A control unit that controls the electrolysis unit and the water supply device; a detection unit for detecting whether water is present in the flow path; and an operating unit that is operated when dispersing ozone, The control unit is After a predetermined time has elapsed since the operation of the water supply device was started, during which the water pumped from the water storage section reaches the electrolysis section, current is applied to the anode and the cathode; After the predetermined time has elapsed, the presence or absence of water in the flow path is detected, and based on the absence of water in the flow path, even if the operation unit is operated, the operation of the water supply device and the supply of electricity to the anode and the cathode are not performed. An ozone water spraying device.

3. 3. The ozone water spraying device according to claim 1, The detection unit detects a current when a current is applied to the anode and the cathode, The control unit determines that water is not present in the flow path when the current value detected by the detection unit is smaller than a threshold value. An ozone water spraying device.

4. The ozone water spraying device according to any one of claims 1 to 3, a pipe through which water from the flow path flows toward the discharge portion; A valve disposed in the pipe for opening and closing the pipe, The control unit opens the valve before starting the operation of the water supply device. An ozone water spraying device.

Citation Information

Patent Citations

  • Steering gear for guided missile

    JP1987049200A

  • Circulation purifying device for contaminated liquid

    JP1997141285A

  • Sterilizing device

    JP1997294987A

  • Electrolytic water producing apparatus

    JP2007007656A

  • A device having an electrolytic cell and an indicator light that illuminates through the liquid.

    JP2012501385A