Temporary restoration method, temporary restoration structure, permanent construction method, cable trench construction method
The use of precast concrete blocks and earth retaining members simplifies cable construction by minimizing backfill and equipment use, enhancing efficiency and reducing labor, thus shortening construction time and lowering costs.
Patent Information
- Application Number
- JP2021007193
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-01-20
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-01-20
AI Technical Summary
Existing cable construction methods require significant labor and equipment due to the need for large-scale backfilling and re-excavation of soil and sand, complicating the process and necessitating the use of heavy machinery.
A method utilizing precast concrete blocks and earth retaining members to create a temporary restoration structure, which simplifies the construction process by reducing the need for large amounts of backfill and minimizing the use of heavy equipment.
The method reduces labor requirements and eliminates the need for large cranes, allowing for efficient cable laying with minimal backfilling and re-excavation, thereby shortening construction time and lowering costs.
Smart Images

Figure 0007573238000001 
Figure 0007573238000002 
Figure 0007573238000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a temporary restoration method, a temporary restoration structure, a permanent construction method, and a cable trench construction method. In particular, the present invention relates to a temporary restoration method, a temporary restoration structure, a permanent construction method, and a cable trench construction method used when laying electric wires between a power plant and a substation. [Background technology]
[0002] When installing cables, it is necessary to temporarily backfill the open hole after laying the conduit underground, such as under a road, to restore the condition, and then re-excavate it when laying the cables. This method of installation requires moving a large amount of soil and pavement during backfilling and re-excavation, which makes the work complicated and requires a large crane, which is both advanced and labor-intensive.
[0003] Therefore, in order to simplify construction and reduce labor, a method has been proposed in which block-shaped backfill material is used instead of soil and sand (Patent Document 1, Patent Document 2). However, even in these examples, a heavy and large volume of backfill material needs to be transported in and out overall, and further simplification and labor reduction of construction are required. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2000-64315 A [Patent Document 2] Japanese Patent Application Publication No. 7-293748 Summary of the Invention [Problem to be solved by the invention]
[0005] Therefore, the present inventor sought a construction method for laying cables with further simplified or labor-saving steps. [Means for solving the problem]
[0006] As a result, the inventors have found that a temporary restoration structure in which precast concrete blocks and earth retaining members are installed in the pipeline can be adopted.
[0007] (Invention 1) A temporary restoration method comprising carrying out the following steps (1) to (6) in this order. (1) A process of opening a pipeline section surrounded by a base surface and a pair of walls, and laying a foundation on the base surface. (2) The process of placing precast concrete blocks on the above foundation. (3) A process of constructing a concrete base in a space surrounded by the base surface, the wall surface, the foundation, and the outer surface of the precast concrete block. (4) A process of fixing an earth retaining member to the concrete base. (5) A process of attaching a temporary restoration cover to the retaining member. (6) A process of backfilling the space (rear portion) sandwiched between the wall surface, the concrete base, the retaining member, and the temporary restoration cover.
[0008] (Invention 2) The precast concrete block is a U-shaped trough made of concrete, The retaining member includes a plurality of retaining plates and at least one strut, and each strut is sandwiched between a pair of opposing retaining plates, When the retaining member is fixed to the concrete base, the retaining plate is aligned along the length of the pipeline along the opposing sides of the concrete U-shaped trough, and the strut is placed across the width of the pipeline above the opening of the concrete U-shaped trough. Temporary restoration method of invention 1.
[0009] (Invention 3) A pipe section surrounded by a base surface and a pair of walls, A foundation laid on the above base surface; Precast concrete blocks installed on the foundations, a concrete base in contact with the base surface, the wall surface, the foundation, and an outer surface of the precast concrete block; a retaining member fixed on the concrete base; A temporary restoration cover attached to the retaining member; Backfill soil filled in the area sandwiched between the wall surface, the concrete base, the retaining member, and the temporary restoration cover; A temporary restoration structure having the following features:
[0010] (Invention 4) The precast concrete block is a U-shaped trough made of concrete, The retaining member includes a plurality of retaining plates and at least one strut, and each strut is sandwiched between a pair of opposing retaining plates, When the retaining member is fixed to the concrete base, the retaining plate is aligned along the length of the pipeline along the opposing sides of the concrete U-shaped trough, and the strut is placed across the width of the pipeline above the opening of the concrete U-shaped trough. Temporary restoration structure of invention 3.
[0011] (Invention 5) A pipe section surrounded by a base surface and a pair of walls, A foundation laid on the above base surface; Precast concrete blocks installed on the foundations, a concrete base in contact with the base surface, the wall surface, the foundation, and an outer surface of the precast concrete block; a retaining member fixed on the concrete base; A temporary restoration cover attached to the retaining member; Backfill soil filled in the area sandwiched between the wall surface, the concrete base, the retaining member, and the temporary restoration cover; This is a permanent construction method in which cables are laid in a temporary restoration structure by carrying out the following steps (7) to (10) in this order. (7) The process of removing the temporary restoration cover and placing and connecting cables inside the precast concrete block. (8) A process of filling the inside of the precast concrete block. (9) A process of removing the retaining member and the soil from the rear portion. (10) A step of attaching a concrete cover to the precast concrete block, and backfilling and paving the pipeline.
[0012] (Invention 6) The precast concrete block is a U-shaped trough made of concrete, The retaining member includes a plurality of retaining plates and at least one strut, and each strut is sandwiched between a pair of opposing retaining plates, When the retaining member is fixed to the concrete base, the retaining plate is aligned along the length of the pipeline along the opposing sides of the concrete U-shaped trough, and the strut is placed across the width of the pipeline above the opening of the concrete U-shaped trough. Invention 5: Permanent construction method.
[0013] (Invention 7) The following steps (1) to (6) are carried out in this order to temporarily restore the pipeline; (1) a step of opening a pipeline portion surrounded by a base surface and a pair of walls, and laying a foundation on the base surface; (2) The process of placing precast concrete blocks on the above foundation. (3) A process of constructing a concrete base in a space surrounded by the base surface, the wall surface, the foundation, and the outer surface of the precast concrete block. (4) A process of fixing an earth retaining member to the concrete base. (5) A process of attaching a temporary restoration cover to the retaining member. (6) A process of backfilling the space (rear portion) sandwiched between the wall surface, the concrete base, the retaining member, and the temporary restoration cover. Then, the following steps (7) to (10) are carried out in this order to lay the cables: cable trench method. (7) The process of removing the temporary restoration cover and placing and connecting cables inside the precast concrete block. (8) A process of filling the inside of the precast concrete block. (9) A process of removing the retaining member and the soil from the rear portion. (10) A step of attaching a concrete cover to the precast concrete block, and backfilling and paving the pipeline.
[0014] (Invention 8) The precast concrete block is a U-shaped trough made of concrete, The retaining member includes a plurality of retaining plates and at least one strut, and each strut is sandwiched between a pair of opposing retaining plates, When the retaining member is fixed to the concrete base, the retaining plate is aligned along the length of the pipeline along the opposing sides of the concrete U-shaped trough, and the strut is placed across the width of the pipeline above the opening of the concrete U-shaped trough. Invention 7: Cable trench construction method. Effect of the Invention
[0015] In the present invention, there is no need to backfill a large amount of soil during temporary restoration, and the labor required to remove soil during the permanent installation process of laying cables is reduced. In addition, the precast concrete blocks and retaining members used in the present invention are relatively light, so a large crane is not required to install them. Furthermore, even after the retaining members are installed, cables can be laid and the precast concrete blocks can be filled with soil while maintaining a working space. [Brief description of the drawings]
[0016] [Figure 1] 1 is a schematic diagram showing steps (1), (2), and (3) of the present invention. [Diagram 2] Schematically shows how step (4) of the present invention is carried out. [Diagram 3] 1 is a schematic diagram showing steps (5) and (6) of the present invention. [Figure 4] Schematic diagram showing step (7) of the present invention. [Diagram 5]Schematic diagram showing step (8) of the present invention. [Figure 6] Schematic diagram showing step (9) of the present invention. [Figure 7] 1 shows a schematic diagram of step (10) of the present invention. [Figure 8] 1 is a schematic diagram showing a top view of the retaining member fixed to the concrete base in step (4) of the present invention, with dotted lines indicating the boundaries between the individual U-shaped concrete troughs. [Figure 9] The figure shows a schematic diagram of a temporary restoration structure created using a conventional general construction method. [Figure 10] Schematic diagram of cable laying using a conventional general construction method. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] [Temporary recovery method] In the temporary restoration method of the present invention, the following steps (1) to (6) are carried out in this order.
[0018] In the temporary restoration method of the present invention, in step (1), the pipeline section surrounded by the base surface and a pair of wall surfaces is opened, and a foundation is laid on the base surface. In this step, general earthwork, temporary construction, and foundation work can be adopted. Typically, floor excavation or excavation is performed to open the pipeline section, and foundation work is performed. Here, the pipeline section is retained by the sheet pile method as necessary. For the foundation work, a spread foundation is preferable, and generally, a crushed stone foundation is constructed, and a concrete foundation is constructed by pouring leveling concrete on top of the crushed stone foundation.
[0019] In the temporary restoration method of the present invention, in the next step (2), a precast concrete block is placed on the foundation. Preferably, the precast concrete block and the foundation are firmly fixed via mortar. The precast concrete block typically has an opening, a side surface, and a bottom surface. The precast concrete block is preferably one that is relatively light in weight individually in order to reduce the labor required for construction. As such a precast concrete block, a U-shaped concrete trough is particularly preferable. Depending on the shape and inclination of the pipeline section, precast concrete blocks of other shapes can be attached to the U-shaped concrete trough as appropriate. The precast concrete blocks are aligned and connected along the pipeline section to form a path for laying cables, etc.
[0020] In the temporary restoration method of the present invention, in the next step (3), a concrete pedestal is constructed in the space surrounded by the base surface, the wall surface, the foundation, and the outer surface of the precast concrete block. Here, it is preferable to perform in-situ construction with a strut member installed in the opening of the precast concrete block. The concrete pedestal is provided on the outside of the precast concrete block of the pipeline portion, in a portion below the opening of the precast concrete block.
[0021] In the temporary restoration method of the present invention, in the next step (4), an earth retaining member is fixed to the concrete base. The earth retaining member typically includes a plurality of earth retaining plates and at least one strut, and each strut is sandwiched between a pair of opposing earth retaining plates. Therefore, the portion of the earth retaining member consisting of the pair of opposing earth retaining plates and the strut between them is formed by connecting one earth retaining plate to each end of the strut in a T-shape.
[0022] When the retaining member is fixed to the concrete base, the retaining plates are aligned along the length of the pipeline along the opposing sides of the U-shaped concrete trough, and the struts are placed across the width of the pipeline above the opening of the U-shaped concrete trough. That is, when the pipeline section is viewed from above, the retaining members are generally ladder-shaped and are arranged extending in the longitudinal direction of the pipeline, sandwiching the openings of the precast concrete blocks aligned in the pipeline section. In this case, the aligned parts of the retaining plates correspond to the two posts of the ladder, and the struts correspond to the ladder rails. The intervals and distribution of the struts are determined by the intervals and distribution of the pair of opposing retaining plates to which the struts are fixed. The intervals and distribution are appropriately adjusted according to the conditions at the construction site. Since the retaining member is made of a relatively small and lightweight member, it is not necessary to use a large crane in the step (4). This leads to labor saving in construction.
[0023] In the temporary restoration method of the present invention, in the next step (5), a temporary restoration cover is attached to the retaining member. The temporary restoration cover is appropriately selected according to the site conditions, and there are no particular limitations on the structure or material. A steel cover material is preferably used. A paving fastener can be attached to the side of the temporary restoration cover.
[0024] In the temporary restoration method of the present invention, in the next step (6), the space (back portion) between the wall surface, the concrete base, the retaining member, and the temporary restoration cover is backfilled. That is, only a small space (back portion) of the pipeline portion along the wall surface above the concrete base is backfilled. As a result, the pipeline portion is in a temporary restoration state, with a space remaining between the bottom surface of the precast concrete block and the temporary restoration cover.
[0025] [Temporary restoration structure] The temporary restoration structure of the present invention is in a completed construction state by the temporary restoration method. That is, the temporary restoration structure of the present invention includes a pipeline section surrounded by a base surface and a pair of wall surfaces, a foundation containing one or more materials selected from mortar, concrete, and crushed stone laid on the base surface, a precast concrete block installed on the foundation, a concrete pedestal in contact with the base surface, the wall surfaces, the foundation, and the outer surface of the precast concrete block, a retaining member fixed on the concrete pedestal, a temporary restoration cover attached to the retaining member, and backfill soil filled in the area sandwiched between the wall surfaces, the concrete pedestal, the retaining member, and the temporary restoration cover.
[0026] In the temporary restoration structure of the present invention, only a relatively small amount of backfill soil is present in the pipeline. Such a temporary restoration structure reduces the labor required for the permanent installation process of laying cables.
[0027] [Permanent construction method] The permanent construction method of the present invention is a construction method in which the temporary restoration structure is excavated again and a cable is laid in the pipeline section. The permanent construction method is a construction method in which the following steps (7) to (10) are carried out in this order in the temporary restoration structure to lay a cable.
[0028] In the permanent construction method of the present invention, in step (7), the temporary restoration cover is removed, and cables are arranged and connected inside the precast concrete block. Here, "cables" refers not only to the cable itself, but also to all parts and members attached to the cable itself. For example, the cables include members used to bundle, fix, and connect cables. In addition, "cable" typically refers to electric cables, but also includes cable-like, tubular, and linear products that can be laid in the same pipeline as electric cables. This step (7) can be performed intermittently multiple times. In this case, after the cables are arranged and / or connected inside the precast concrete block, the temporary restoration cover is attached again to the original position, construction is interrupted, and the step (7) is performed again. In this manner, the step (7) of the present invention can be performed repeatedly.
[0029] Such step (7) is performed while leaving the retaining member under the temporary restoration cover. By adjusting the arrangement of the struts in the retaining member, a larger working space can be secured in step (7). An appropriate working space can be secured in advance in the temporary restoration state, or by removing some of the struts in step (7).
[0030] In the present construction method, the inside of the precast concrete block is filled in the next step (8). The material used for filling is generally earth and sand, preferably sand. At this time, the filling material such as sand passes through the gaps between the struts of the retaining member from above the pipe and reaches the inside of the precast concrete block.
[0031] In the permanent construction method of the present invention, the retaining member and the soil on the back surface are removed in the next step (9). The amount of soil to be removed is relatively small, which contributes to labor saving in construction.
[0032] In the main construction method of the present invention, in the next step (10), a concrete cover is attached to the precast concrete block, and the pipeline is backfilled and paved. The concrete cover is appropriately selected according to the precast concrete block. The backfilling and paving are not particularly limited and follow conventional methods. After the backfilling, compaction is performed as appropriate. Thus, the laying of the cables is completed.
[0033] [Cable trench method] The cable trench method of the present invention is a method in which the above-mentioned permanent construction method is carried out after the above-mentioned temporary restoration. That is, the cable trench method of the present invention is a method in which the above-mentioned steps (1) to (6) are carried out in this order to put the pipeline into a temporary restoration state, and then the above-mentioned steps (7) to (10) are carried out in this order to complete the cable trench. The cable trench method of the present invention requires less frequent use of large cranes than conventional methods, and does not require large-scale backfilling and re-excavation. EXAMPLES
[0034] [Example] The manner in which steps (1) to (10) of the present invention are carried out will be described with reference to Figures 1 to 8. Figures 1 to 7 show schematic cross sections of a pipeline section cut along a plane perpendicular to the base surface. Figure 8 shows schematic top view of the pipeline. In Figures 1 to 8, the size, shape, and details of each part have been exaggerated or omitted to make it easier to understand the construction process.
[0035] FIG. 1 shows a schematic diagram of steps (1), (2), and (3) of the present invention. In step (1), a pipe section (3) surrounded by a base surface (1) and a pair of walls (2) is opened by digging a floor, and a foundation (4) is laid. The foundation (4) has a layered structure of a crushed stone foundation and a concrete foundation. The walls (2) are retained by sheet piles (21). In the next step (2), a concrete U-shaped trough (hereinafter referred to as a U-shaped trough) (6) is installed on the foundation (4) via mortar (5). The U-shaped trough (6) has an opening (601), sides (602), and a bottom (603). The U-shaped trough (6) is aligned and closely arranged along the pipe (3) (on the line connecting the front and back on the paper). In the next step (3), a concrete base (7) is cast in place. Although strut members supporting the opening (601) of the U-shaped trough are attached where the concrete is poured, these strut members are omitted in each drawing. Thus, in the pipeline section (3), on the outside of the U-shaped trough (6), a concrete base (7) is installed in the space below the opening (601). The concrete base (7) is a concrete wall that extends in the longitudinal direction of the pipeline (3) along the wall surface (2) and the sheet piles (21). The highest part of the concrete base (7) coincides with the upper end of the opening (601) of the U-shaped trough.
[0036] 2 and 8 show a schematic diagram of the subsequent step (4). In step (4), an earth retaining member (8) is fixed to the concrete base (7). The earth retaining member (8) includes an earth retaining plate (801) and a strut (802), and one strut (802) is sandwiched between a pair of opposing earth retaining plates (801) and fixed to each of the pair of earth retaining plates (801) by fixing members (803). As shown in Figs. 2 and 8, the earth retaining member (8) has a shape in which two T-shaped structures are connected. As shown in Fig. 8, when the retaining member (8) is fixed to the concrete base (7), the multiple retaining plates (801) are arranged in two rows along the opposing side surfaces (602) of the U-shaped trough (6) in the longitudinal direction of the pipeline (3), and the struts (802) are arranged above the opening (801) of the U-shaped trough in the width direction of the pipeline (3) so as to straddle the bottom surface (603) and the side surfaces (602). Note that in Fig. 8, each of the multiple retaining plates (801) is shown partially separated in order to exaggerate the arrangement of the multiple retaining plates (801). In reality, the multiple retaining plates (801) are fixed in almost close contact with each other.
[0037] FIG. 3 shows a schematic diagram of the subsequent steps (5) and (6). In step (5), a steel temporary restoration cover (9) is attached to the top of the retaining member (8). The connecting members between the retaining member (8) and the temporary restoration cover (9) are omitted in the drawing. In the next step (6), the space (back portion) (10) between the wall surface and the sheet piles (2, 21), the concrete base (7), the retaining member (8), and the temporary restoration cover (9) is backfilled with sand. The backfill soil (10) in the back portion is leveled and compacted to complete the temporary restoration structure shown in FIG. 3. The temporary restoration structure is maintained until the start of the actual construction process.
[0038] FIG. 4 shows a schematic diagram of the state where the step (7) of the present invention is performed on the temporary restoration structure. In the step (7), the temporary restoration cover (9) is removed, and the cable (11) is arranged and connected inside the U-shaped trough (6). With the temporary restoration cover (9) removed, the U-shaped trough (6), the concrete base (7), and the retaining member (8) are firmly connected to each other, so there is no need to attach a supporting strut member to the inner wall of the U-shaped trough (6). When the cable (11) is delivered, the retaining member (8) remains fixed to the concrete base (7), so there is no need to remove the backfilled soil (10). The cable (11) is delivered into the U-shaped trough (6) through the gap between the struts (802) of the retaining member (8). In order to secure a working space, it is possible to widen the interval between the struts (802) by removing a part of the struts (802) of the retaining member (8). Since the interval between the struts (802) can be freely changed in the present invention, it is possible to secure a working space according to the situation.
[0039] Figure 5 shows a schematic diagram of the next step (8), in which sand (12) is filled into the gap between the cable (10) and the U-shaped trough (6) that has been laid in a predetermined position.
[0040] Figure 6 shows a schematic diagram of the next step (9). In step (9), the retaining member (8) and the soil (10) on the back side are removed. The surface of the sand (12) is leveled.
[0041] FIG. 7 shows a schematic diagram of the next step (10). In step (10), a concrete cover (14) is attached to the U-shaped trough (6). The connecting member between the U-shaped trough (6) and the concrete cover (14) is omitted in the drawing. Next, soil (12) is backfilled to cover the concrete base (7) and the concrete cover (14), the backfill soil (12) is leveled and compacted, and a pavement (15) is constructed on the backfill soil (12). The construction method of the pavement (15) is the usual method. FIG. 7 shows the construction of the lower roadbed (1501), upper roadbed (1502), base layer (1503), and surface layer (1504) as the pavement (15) from the bottom. In this way, the cable trench (30) is completed in the pipe section (3).
[0042] [Comparative Example] A conventional general construction method is shown as a comparative example in Fig. 9 and Fig. 10. In Fig. 9 and Fig. 10, the size, shape, and details of each part are exaggerated or omitted.
[0043] Fig. 9 shows a schematic diagram of a temporary restoration structure using a conventional general construction method. In this example, a cable manhole (610) is fixed to the base surface (1) of the pipe section, and a concrete cover (620) is attached to the cable manhole (610). Next, the entire exterior (100) of the cable manhole (610) and cover (620) is backfilled. The backfill soil (100) is leveled and compacted, and temporary pavement (200) is constructed. In this case, a large amount of soil must be poured into the backfill area (100).
[0044] FIG. 10 shows a schematic diagram of cable laying by a conventional general construction method. In this case, permanent installation is started on the temporary restoration structure shown in FIG. 9. First, a part of the temporary pavement (200) and a part of the backfill soil (100) are removed, and then the cover (620) is removed. Thus, the cable box (610) opens to the pipe section (3). Next, the supporting struts (700) are attached to the opening of the cable box (610). The supporting struts (700) are placed across the opposing inner walls of the cable box (610) in the width direction of the pipe (3) at regular intervals. In this example, the cable (10) is arranged and connected in the cable box (610) by utilizing the intervals of the supporting struts (700). However, since a certain interval is generally required for the supporting struts (700), the intervals of the supporting struts (700) cannot be freely increased, and the working space is inevitably relatively small. When the placement or connection of the cable (10) is interrupted, the temporary pavement (200), backfill soil (100), and lid (620) must be restored, and when the placement or connection of the cable (10) is resumed, the temporary pavement (200), backfill soil (100), and lid (620) must be removed again. This causes a problem that the construction period for laying the cable is extended. In addition, there is a problem that the concrete lid (620) is easily damaged due to repeated removal and installation. [Industrial Applicability]
[0045] The temporary restoration method, temporary restoration structure, permanent construction method, and cable trench construction method of the present invention can reduce the frequency of use of large cranes, reduce the labor required for backfilling and re-excavation, secure a large work space, and complete each process quickly. With the present invention, cables such as electric wires can be laid in a shorter construction period and at a lower cost than before. [Explanation of symbols]
[0046] 1 base 2. Wall 21 Yaita 3 Pipe section 4 Basics 5. Mortar 6 U-shaped trough 601 U-shaped trough opening 602 Side of U-shaped trough 603 Bottom of U-shaped trough 7 Concrete Pedestal 8 Earth retaining materials 801 Earth retaining plate 802 Strand beam 803 Fixing member 9 Temporary restoration cover 10 Back part, backfill soil 11 Cable 12. Sand 13 Backfill soil 14 Concrete lid 15. Pavement 1501 Lower roadbed 1502 Upper roadbed 1503 Base layer 1504 Surface layer 100 Backfill soil (conventional method) 200 Temporary pavement (conventional method) 610 Cable manhole (conventional method) 620 Concrete lid (conventional method) 700 Support strut (conventional method)
Claims
1. A temporary restoration method applied to the construction of cables that require re-excavation when laying cables by temporarily backfilling an open hole to create a temporary restoration state after constructing a conduit underground, comprising: A temporary restoration method that performs the following steps (1) to (6) in this order. Step (1): A step of excavating or digging the pipeline to open the pipeline section surrounded by a base surface and a pair of walls, and laying a foundation on the base surface. Step (2): A step of installing a U-shaped concrete trough having an opening, sides and a bottom as a precast concrete block on the foundation so that it is aligned, connected and tightly attached along the pipeline, thereby forming a path for laying the cables. - Step (3): constructing a concrete pedestal in the space surrounded by the base surface, the wall surface, the foundation, and the outer surface of the U-shaped trough, so that the concrete pedestal is installed in the space outside the U-shaped trough and below the opening in the pipeline section, the concrete pedestal forms a concrete wall extending in the longitudinal direction of the pipeline along the wall surface, and the highest point of the concrete pedestal coincides with the upper end of the opening of the U-shaped trough. Step (4): A step of fixing an earth retaining member to the concrete base, wherein the earth retaining member includes a plurality of earth retaining plates and at least one strut, each of the struts is sandwiched between a pair of the earth retaining plates facing each other, and the portion of the earth retaining member consisting of the pair of facing earth retaining plates and the strut therebetween is formed by connecting one earth retaining plate to each end of the strut in a T-shape. When the retaining member has been fixed to the concrete base after this process, the retaining plates are aligned along the length of the pipeline along the opposing sides of the U-shaped trough, and the struts are stretched across the width of the pipeline above the opening of the U-shaped trough, so that when the pipeline section is viewed from above, the retaining member has an overall ladder-like shape, and is positioned extending in the longitudinal direction of the pipeline, sandwiching the opening of the U-shaped trough which is aligned in the pipeline section (however, the parts where the retaining plates are aligned contact the two posts of the ladder, and the struts contact the ladder rungs), and as a result, when the pipeline section is viewed from the side, the retaining member has a shape of two connected T-structures. Step (5): Attaching a temporary restoration cover to the top of the retaining member. Step (6): A step of backfilling the back portion, which is the space between the wall surface, the concrete pedestal, the retaining member, and the temporary restoration cover. However, in this step, only the back portion, which is the space of the pipeline portion above the concrete pedestal and along the wall surface, is backfilled, and as a result, the pipeline portion is in the temporary restoration state while leaving a space between the bottom surface of the U-shaped trough and the cover.
2. A temporary restoration structure used for the construction of cables that require re-excavation when laying cables by temporarily backfilling an open hole after constructing a conduit underground, A pipe section in the above-mentioned pipe, the pipe section being surrounded by a base surface and a pair of wall surfaces; - A foundation laid on the above base surface; - a concrete U-shaped trough having an opening, sides and a bottom, which is installed on the foundation so as to be aligned, connected and in close contact with the pipeline, thereby forming a path for laying the cables; a concrete pedestal in contact with the base surface, the wall surface, the foundation, and an outer surface of the U-shaped trough, the concrete pedestal being installed in the space below the opening outside the U-shaped trough in the pipeline section, the concrete pedestal forming a concrete wall extending in the longitudinal direction of the pipeline along the wall surface, and the highest part of the concrete pedestal coinciding with the upper end of the opening of the U-shaped trough; - A retaining member fixed on the concrete pedestal, the retaining member including a plurality of retaining plates and at least one strut, each of the struts being sandwiched between a pair of opposing retaining plates, the portion of the retaining member consisting of the pair of opposing retaining plates and the strut therebetween being a retaining member in which one retaining plate is connected in a T-shape to each end of the strut, and when the retaining member is fixed on the concrete pedestal, the retaining plates extend along the length of the pipeline along the opposing sides of the U-shaped trough. a retaining member, wherein the retaining plates are aligned in a direction such that the struts are disposed above the openings of the U-shaped troughs in the width direction of the pipeline, so that when the pipeline section is viewed from above, the retaining members are generally ladder-shaped and are disposed extending in the longitudinal direction of the pipeline, sandwiching the openings of the U-shaped troughs aligned in the pipeline section (wherein the parts where the retaining plates are aligned correspond to the two posts of the ladder, and the struts correspond to the rungs of the ladder), and as a result, when the pipeline section is viewed from the side, the retaining members have a shape in which two T-shaped structures are connected; - A temporary restoration cover attached to the top of the retaining member; - Backfill soil filled in the area sandwiched between the wall surface, the concrete base, the retaining member, and the temporary restoration cover; A space in the pipe section between the bottom surface of the U-shaped trough and the lid, A temporary restoration structure having the following features:
3. This is applicable to the construction of cables that require re-excavation when laying cables by temporarily backfilling the open hole after constructing the underground conduit and restoring it to a temporary restored state. A construction method for laying a cable in the pipeline section by re-excavating the temporary restoration structure according to claim 2, This is a permanent construction method in which the following steps (7) to (10) are carried out in the listed order to lay cables on the temporary restoration structure. Step (7): removing the temporary recovery cover and arranging and connecting cables inside the U-shaped trough. Step (8): filling the inside of the U-shaped trough. Step (9): removing the retaining member and the soil from the rear portion. Step (10): A step of attaching a concrete cover to the U-shaped trough, and backfilling and paving the pipeline portion.
4. A cable trench method used in the construction of cables that require re-excavation when laying cables by temporarily backfilling an open hole to create a temporary restored state after constructing a conduit underground, comprising: The following steps (1) to (6) are carried out in this order to temporarily restore the pipeline. Then, the following steps (7) to (10) are carried out in this order to lay the cables. Cable trench construction method. Step (1): A step of excavating or digging the pipeline to open the pipeline section surrounded by a base surface and a pair of walls, and laying a foundation on the base surface. Step (2): A step of installing a U-shaped concrete trough having an opening, sides and a bottom as a precast concrete block on the foundation so that it is aligned, connected and tightly attached along the pipeline, thereby forming a path for laying the cables. - Step (3): constructing a concrete pedestal in the space surrounded by the base surface, the wall surface, the foundation, and the outer surface of the U-shaped trough, so that the concrete pedestal is installed in the space outside the U-shaped trough and below the opening in the pipeline section, the concrete pedestal forms a concrete wall extending in the longitudinal direction of the pipeline along the wall surface, and the highest point of the concrete pedestal coincides with the upper end of the opening of the U-shaped trough. Step (4): A step of fixing an earth retaining member to the concrete base, wherein the earth retaining member includes a plurality of earth retaining plates and at least one strut, each of the struts is sandwiched between a pair of the earth retaining plates facing each other, and the portion of the earth retaining member consisting of the pair of facing earth retaining plates and the strut therebetween is formed by connecting one earth retaining plate to each end of the strut in a T-shape. When the retaining member has been fixed to the concrete base after this process, the retaining plates are aligned along the length of the pipeline along the opposing sides of the U-shaped trough, and the struts are stretched across the width of the pipeline above the opening of the U-shaped trough, so that when the pipeline section is viewed from above, the retaining member has an overall ladder-like shape, and is positioned extending in the longitudinal direction of the pipeline, sandwiching the opening of the U-shaped trough which is aligned in the pipeline section (however, the parts where the retaining plates are aligned contact the two posts of the ladder, and the struts contact the ladder rungs), and as a result, when the pipeline section is viewed from the side, the retaining member has a shape of two connected T-structures. Step (5): Attaching a temporary restoration cover to the top of the retaining member. Step (6): A step of backfilling the back portion, which is the space between the wall surface, the concrete pedestal, the retaining member, and the temporary restoration cover. However, in this step, only the back portion, which is the space of the pipeline portion above the concrete pedestal and along the wall surface, is backfilled, and as a result, the pipeline portion is in the temporary restoration state while leaving a space between the bottom surface of the U-shaped trough and the cover. Step (7): removing the temporary recovery cover and arranging and connecting cables inside the U-shaped trough. Step (8): filling the inside of the U-shaped trough. Step (9): removing the retaining member and the soil from the rear portion. Step (10): A step of attaching a concrete cover to the U-shaped trough, and backfilling and paving the pipeline portion.
Citation Information
Patent Citations
Steel plate U-shaped channel trough
JP1987135525U
Laying construction method for pipe body
JP1995293748A
Temporary back-filling and restoring method for cut and cover hole in installation of pipe or the like, and covering device therefor