Loan refinancing support system

The loan refinancing support system extends repayment periods and proposes asset management strategies to optimize financial outcomes by predicting the actual refinancing period and creating assets at higher yields, addressing the lack of asset management in existing systems.

JP7576364B1Active Publication Date: 2024-10-31JOLLY FACTORY CO LTD

Patent Information

Application Number
JP2024037088
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-10-31
Estimated Expiration
2044-03-11

AI Technical Summary

Technical Problem

Existing loan refinancing systems do not consider asset management strategies to optimize financial outcomes during refinancing, particularly to prepare for future interest rate changes or lower interest rates.

Method used

A loan refinancing support system that performs current repayment simulations, extends refinancing repayment periods, calculates repayment differences, and proposes asset management strategies using the repayment difference as a reserve amount, allowing for asset management simulations based on user inputs such as withdrawal and change timings.

Benefits of technology

Enables prediction of the actual refinancing repayment period and optimization of asset management to create funds at higher yields than loan interest rates, thereby shortening the repayment period and generating assets.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007576364000001_ABST
    Figure 0007576364000001_ABST
Patent Text Reader

Abstract

To provide a refinancing support system which proposes asset management at the timing of loan refinancing. [Solution] The loan refinancing support system executes the following steps: a computer calculates and outputs a current repayment simulation and a refinancing repayment simulation based on current loan repayment information; a computer calculates an extended refinancing repayment simulation using a refinancing repayment period extended from the repayment period used in the refinancing repayment simulation, and outputs the repayment difference on the repayment date between the current repayment simulation and the extended refinancing repayment simulation; and a computer calculates an asset management simulation in which the repayment difference is the savings amount through asset management, and outputs at least one of the user's planned savings amount, planned remaining debt amount, and the difference between the planned savings amount and the planned remaining debt amount at a specified age or at a specified time.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a loan refinancing support system that can propose asset management at the time of loan refinancing. [Background technology]

[0002] Given the current financial situation around the world, Japan's future interest rate policy is attracting attention, and there is a good deal of demand for refinancing home loans. In addition, Patent Document 1 proposes a mortgage refinancing sales support system that uses IT technology utilizing GIS from a terminal to collect, exchange, and process data, construct a mortgage-related database and analysis system, extract potential customers by extracting differences in secular changes from old and new housing maps, rank the potential customers by adding a judgment on the suitability of mortgage refinancing, and extract promising candidates to efficiently support the sales activities of financial institutions. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2014-53048 A Summary of the Invention [Problem to be solved by the invention]

[0004] The purpose of refinancing a mortgage is to change to a loan with a lower interest rate or to modify the loan to prepare for future interest rate increases, but there is no intention to use the time to refinance the loan to create funds for asset management.

[0005] The present invention aims to provide a loan refinancing support system that proposes asset management at the time of loan refinancing. [Means for solving the problem]

[0006] The loan refinancing support system of the present invention described in claim 1 includes a repayment simulation output step in which a computer calculates a current repayment simulation and a refinancing repayment simulation based on current loan repayment information including a user's current loan repayment amount, a current interest rate, a future interest rate, and a repayment period, and outputs the calculated current repayment simulation and the refinancing repayment simulation; and a repayment simulation output step in which a computer calculates an extended refinancing repayment simulation using a refinancing repayment period that is an extension of the repayment period used in the refinancing repayment simulation, current situation A payment difference output step of outputting a repayment difference on a repayment date between the repayment simulation and the extended refinancing repayment simulation, and an asset management simulation output step of calculating an asset management simulation in which the repayment difference is an amount of savings through asset management and outputting the calculated asset management simulation, and in the asset management simulation output step, Planned savings amount The present invention is characterized by outputting: The present invention as set forth in claim 2 is characterized in that, in the loan refinancing support system as set forth in claim 1, the specified point in time is the time when the loan is fully repaid according to the extended refinancing repayment simulation. The present invention as set forth in claim 3 is characterized in that, in the loan refinancing support system as set forth in claim 1, the predetermined time point is set to a time when the user is scheduled to pay off his or her current loan. Claim 4 The present invention described is characterized in that, in the loan refinancing support system described in claim 1, the computer accepts input of the withdrawal time and withdrawal amount for withdrawing from the planned reserve amount, calculates the asset management simulation based on the withdrawal based on the accepted withdrawal time and withdrawal amount, and executes a withdrawal asset management simulation output step that outputs the time when the asset management will end and the total asset amount up to the end of the asset management. Claim 5The present invention described is characterized in that, in the loan refinancing support system described in claim 1, the computer accepts input of the time and amount of change to the savings amount, calculates the asset management simulation with the changes based on the accepted time and amount of change, and executes a modified asset management simulation output step of displaying a graph with the planned savings amount on one axis and the user's age on the other axis. Effect of the Invention

[0007] According to the present invention, although the refinancing repayment period is extended, the effective refinancing repayment period through asset management can be predicted, so that asset management can be proposed at the timing of loan refinancing. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a flow chart showing the process flow of a loan refinancing support system according to an embodiment of the present invention. [Diagram 2] Image of input information for S1 to input current loan repayment information into the computer [Diagram 3] Output image of current repayment simulation from start of loan repayment to full repayment by S21 [Figure 4] Output image of current repayment simulation for the current remaining balance excluding the end of repayment by S21 [Diagram 5] Output image of refinancing repayment simulation for the current remaining balance excluding the end of repayment due to S22 [Figure 6] Comparison output image of current repayment and refinancing repayment by S23 [Figure 7] Output image of the payment difference output step by S41 [Figure 8] Asset management simulation output image [Figure 9] Output image of the simulation of asset management by withdrawal [Figure 10] Output image of the modified asset management simulation DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] The loan refinancing support system according to the first embodiment of the present invention includes a repayment simulation output step in which a computer calculates a current state repayment simulation and a refinancing repayment simulation based on current loan repayment information including a user's current loan repayment amount, a current interest rate, a future interest rate, and a repayment period, and outputs the calculated current state repayment simulation and the refinancing repayment simulation; and calculates an extended refinancing repayment simulation using a refinancing repayment period that is an extension of the repayment period used in the refinancing repayment simulation. current situation A payment difference output step is executed to output the repayment difference on the repayment date between the repayment simulation and the extended repayment simulation, and an asset management simulation output step is executed to calculate an asset management simulation in which the repayment difference is set as the amount of savings through asset management, and to output the calculated asset management simulation. In the asset management simulation output step, Planned savings amount According to this embodiment, an extended refinancing repayment simulation is calculated by using a refinancing repayment period that is an extension of the repayment period used in the refinancing repayment simulation, the repayment difference on the repayment date between the refinancing repayment simulation and the extended refinancing repayment simulation is output, an asset management simulation is calculated in which the repayment difference is the savings amount by asset management, and at least one of the planned savings amount, the planned remaining balance amount, and the difference between the planned savings amount and the planned remaining balance amount at the user's specified age or specified time is output, so that the user can know the assets that can be expected at the specified age or specified time and the remaining balance minus the planned savings amount, and can grasp the merits of asset management in which the repayment difference is the savings amount. In other words, although the refinancing repayment period is extended, the effective refinancing repayment period by asset management can be predicted, so that asset management can be proposed at the timing of loan refinancing.

[0010] In the second embodiment of the present invention, the predetermined time is set to the time of full repayment of the loan by the extended repayment simulation in the loan refinancing support system according to the first embodiment. According to this embodiment, it is possible to predict the assets that can be expected at the time of full repayment of the loan by performing asset management.

[0011] In the third embodiment of the present invention, the predetermined time is set to the time when the user plans to pay off the current loan in the loan refinancing support system according to the first embodiment. According to this embodiment, if asset management is not performed, the user will simply have no remaining debt when the loan is paid off, but by performing asset management, the assets that can be expected at the time when the user plans to pay off the current loan can be predicted.

[0012] The present invention Fourth In this embodiment, in the loan refinancing support system according to the first embodiment, a computer receives input of the withdrawal time and withdrawal amount for withdrawing from the planned savings amount, calculates an asset management simulation by withdrawal based on the received withdrawal time and withdrawal amount, and executes an output step of withdrawn asset management simulation for outputting the end time of the asset management and the total asset amount until the end of the asset management. According to this embodiment, by outputting an asset management simulation by withdrawing from the planned savings amount, it is possible to carry out asset management that matches the user's lifestyle.

[0013] The present invention Fifth In this embodiment, in the loan refinancing support system according to the first embodiment, a computer receives input of the time and amount of change of the savings amount, calculates an asset management simulation with the change based on the received time and amount of change, and executes a changed asset management simulation output step of displaying a graph with one axis representing the planned savings amount and the other axis representing the user's age. According to this embodiment, by outputting an asset management simulation with the change of the savings amount, it is possible to manage assets according to the user's lifestyle. EXAMPLES

[0014] A loan refinancing support system according to an embodiment of the present invention will be described below with reference to Figures 1 to 10. In this embodiment, refinancing of a housing loan is shown. FIG. 1 is a flow chart showing the process flow of the loan refinancing support system in this embodiment. When current loan repayment information is inputted (S1), the computer calculates a repayment simulation (S2). Here, the current loan repayment information includes personal information and borrowing information. The personal information is personal identification information such as name and address, and preferably includes date of birth. The borrowing information includes the user's current loan repayment amount, current interest rate, future interest rate, and repayment period.

[0015] FIG. 2 is an image diagram of input information for inputting current loan repayment information to a computer by S1. In the repayment simulation calculation step in S2, a current status repayment simulation is calculated based on the current loan repayment information, and the calculated current status repayment simulation is output (S21). In the current status repayment simulation in S21, it is preferable to output a current status repayment simulation from the start of loan repayment to the end of repayment, and a current status repayment simulation for the remaining balance in the current status excluding the end of repayment. Note that the current status repayment simulation may take into account future expected interest rate fluctuations, etc.

[0016] Figure 3 is an image of the output of the current status repayment simulation from the start of loan repayment by S21 to full repayment, and Figure 4 is an image of the output of the current status repayment simulation for the remaining balance in the current state excluding the end of repayment by S21. In Figure 3, the total loan amount (32,400,000 yen), repayment period (420 installments (36 years)), and full repayment date (2051 / 06 / 17) are fixed items, while the interest rate (stepwise fixed (1.200%)), total repayment amount (42,108,113 yen), total interest (9,708,113 yen), and total payment amount (42,108,113 yen) are items that will change depending on future interest rate trends. As shown in Figure 3, it is preferable to display a graph showing the ratio of principal and interest in the annual repayment amount, and the increase or decrease between the principal balance and accumulated interest. Figure 4 displays the total loan amount (26,851,133 yen), repayment period (335 installments (27 years and 11 months)), repayment date (2051 / 06 / 17), interest rate (step-by-step fixed (1.200%)), total repayment amount (43,561,056 yen), total interest (16,709,923 yen), and total payment amount (43,561,056 yen).

[0017] In addition, in the repayment simulation calculation step in S2, a refinancing repayment simulation is calculated based on the current loan repayment information, by adding interest rate information after refinancing, and the calculated refinancing repayment simulation is output (S22). The interest rate information after refinancing includes the choice of fixed or floating rate and the selected current and future interest rates. Figure 5 is an image of the output of a refinancing repayment simulation for the current remaining balance, excluding the completion of repayment by S22. In the refinancing repayment simulation shown in FIG. 5, the repayment period is the same as that in the current repayment simulation for the current remaining balance shown in FIG. Figure 5 displays the total loan amount (28,500,000 yen), repayment period (335 installments (27 years and 11 months)), repayment date (2051 / 06 / 17), interest rate (fixed (1.150%)), total repayment amount (33,332,597 yen), total interest (4,832,597 yen), and total payment amount (33,332,597 yen). The total borrowing amount shown in Figure 5 is greater than the total borrowing amount shown in Figure 4 because refinancing costs (bank fees, registration fees, brokerage fees) are included in the remaining balance. In Figure 5, compared to Figure 4, the repayment period and full repayment date are the same, but the interest rate is different due to refinancing, so the total repayment amount, total interest, and total payment amount are different.

[0018] The current repayment and the refinancing repayment are compared and displayed based on the current repayment simulation for the current remaining balance calculated in the repayment simulation calculation step in S2 and the refinancing repayment simulation for the current remaining balance (S23). Figure 6 is an image diagram of the comparison output of current repayment and refinancing repayment by S23. Note that Figure 6 shows the case where refinancing repayment is selected as a lump sum with a fixed interest rate for the entire term. As shown in Figure 6, it is preferable to display the change in the remaining balance for current repayment and refinancing repayment on a graph with one axis (vertical axis) representing the repayment amount and the other axis (horizontal axis) representing the user's repayment age. Also, a comparison of the loan amount, total repayment amount, and total interest for current repayment and refinancing repayment is displayed.

[0019] The output of the current repayment simulation in S21, the output of the refinancing repayment simulation in S22, and the comparison output of the current repayment and the refinancing repayment in S23 are repayment simulation output steps.

[0020] When the refinancing repayment period extension information is input (S3), the computer calculates an extended refinancing repayment simulation using a refinancing repayment period that is an extension of the repayment period used in the refinancing repayment simulation, and can calculate the difference in repayments on the repayment date between the current repayment simulation and the extended refinancing repayment simulation (S4). Note that the current repayment simulation in S4 may take into account future expected interest rate fluctuations, etc. Also, S4 may calculate the difference in repayments on the repayment date between the refinancing repayment simulation and the extended refinancing repayment simulation. The refinancing repayment period extension information is entered as a period that exceeds the repayment period in the current repayment simulation for the current remaining balance shown in Figure 4. The refinancing repayment period extension information is entered by entering the number of times until repayment, the date of completion of repayment, and the user's age. When the computer judges the appropriateness of the input refinancing repayment period extension information, the computer judges whether the period is set to exceed the current repayment period, and judges whether the user's age at the time of full repayment due to the extension of the refinancing repayment period will exceed a set age (e.g., 82 years old). If the period is set to not exceed the current repayment period, the computer displays to the user a period setting condition that exceeds the repayment period, and if the user's age at the time of full repayment due to the extension of the refinancing repayment period will exceed the set age, the computer can support the user in inputting the refinancing repayment period extension information.

[0021] The computer outputs the difference in payment due to the extension of the term calculated in S4 (S41). FIG. 7 is an image diagram of the output in the payment difference output step in S41. The upper and lower tables in Figure 7 assume the same total loan amount (29,100,000 yen) and the same interest rate (fixed (0.950%)). The upper table assumes a repayment period of 335 installments (27 years and 11 months), while the lower table assumes a repayment period of 420 installments (35 years). The repayment amounts for each repayment date are displayed so that they can be compared. Then, as shown in Figure 7, the first repayment amount in the upper table (98,927 yen) and the first repayment amount in the lower table (81,468 yen) are displayed. In this way, the payment amounts at the same time before and after the period extension are displayed. The calculated payment difference may also be displayed. Figure 7 shows the case of a fixed interest rate, but the repayment amounts at the same time or for the same period are displayed in the same way even if the interest rate is variable.

[0022] When the asset management information is input (S5), the computer calculates an asset management savings amount simulation using the payment difference due to the extension of the period calculated by S4 (S6). The asset management information is the management period (savings period) and the investment yield (annual interest rate). The investment yield can be selected by the user from among those preset based on past data and future prospects depending on the asset management method. Note that the asset management method includes, for example, investment trusts, and it is preferable to use investment trusts using a NISA account as the asset management method. According to the savings NISA from 2024 onwards, there are no restrictions on the management period or withdrawal of funds, profits during management are tax-free, and investment yields that exceed the interest rate on loans can be fully expected.

[0023] The computer calculates an asset management simulation in which the repayment difference in S6 is set as the savings amount through asset management, and outputs the calculated asset management simulation (S7). Figure 8 shows an image of the output of an asset management simulation. In FIG. 8, one axis (vertical axis) is a graph showing the scheduled repayment amount and the scheduled savings amount, and the other axis (horizontal axis) is the user's age. The scheduled repayment amount is the remaining debt amount, and the scheduled savings amount is the savings amount plus investment profits. Note that year information may be displayed together with or instead of the user's age. Year information may be, for example, the year, year and month, or fiscal year.

[0024] In FIG. 8, "A" indicates the timing when the planned repayment amount based on the extended refinancing repayment simulation calculated in S4 becomes equal to the planned savings amount based on the asset management simulation. In this way, by outputting the timing A when the planned repayment amount based on the extended refinancing repayment simulation and the planned savings amount based on the asset management simulation become equal, it is possible to know the timing A when the loan repayment will effectively end, and to grasp the merits of asset management that uses the difference in repayment amount as the savings amount. In other words, although the refinancing repayment period is extended, the actual refinancing repayment period through asset management can be predicted. Then, by outputting the user's age or year information at time A when the planned repayment amount and the planned savings amount become the same, it is possible to ascertain the age or year when the loan repayment will effectively end.

[0025] In addition, in FIG. 8, "B" indicates the time when the loan is fully paid off according to the extended refinancing repayment simulation, and the planned savings amount at the time B when the loan is fully paid off is output. If asset management is not performed, there will simply be no remaining debt at the time the loan is paid off. However, by performing asset management, it is possible to predict the assets that can be expected at the time the loan is paid off. In addition, by outputting the user's age or year information at time B when the loan is fully repaid, it is possible to know the age or year when the loan repayment will be completed. As shown in Figure 8, by displaying the yearly fluctuations in the planned balance of debt and the planned savings amount in one graph, the changes in the remaining loan amount and the savings amount can be understood. As shown in "C" in Figure 8, it is preferable to output at least one of the planned savings amount, the planned balance of debt, and the difference between the planned savings amount and the planned balance of debt at the user's specified age or specified time. For example, by setting the user's specified age or specified point in time C as the time when the user plans to pay off his / her current loan, if asset management is not performed, there will simply be no remaining balance when the loan is paid off. However, by performing asset management, it is possible to predict the assets that can be expected when the user plans to pay off his / her current loan.

[0026] When the withdrawal information is input (S8), the computer uses the withdrawal information to calculate an asset management savings amount simulation (S9). The withdrawal information is the withdrawal time and withdrawal amount from the planned savings amount. The withdrawal time includes the user's age at the time of withdrawal. In the asset management reserve amount simulation calculation step S9, an asset management simulation based on withdrawal is calculated based on the accepted withdrawal time and withdrawal amount. Then, an asset management simulation based on the calculated withdrawal is output (S10). In the withdrawal asset management simulation output step in S10, the time of end of the asset management and the total asset amount until the end of the asset management are output. Figure 9 shows an image of the output of the withdrawal asset management simulation. In FIG. 9, one axis (vertical axis) is the planned savings amount, and the other axis (horizontal axis) is the user's age. Note that year information may be displayed together with the user's age or instead of the user's age. The year information may be, for example, the year, the year and month, or the fiscal year. Figure 9 shows the case where the user's age is C and the withdrawal amount is entered as 200,000 yen / month, the total assets saved are 24,358,356 yen, and the user can receive 200,000 yen / month until age 82. As shown in FIG. 9, by outputting an asset management simulation based on withdrawals from the planned savings amount, the user can manage assets in accordance with their lifestyle.

[0027] When the savings amount change information is input (S11), the computer uses the savings amount change information to calculate an asset management savings amount simulation (S12). The savings amount change information is the time of change to the savings amount and the change amount. The time of change to the savings amount includes the user's age at the time of the change. In the asset management reserve amount simulation calculation step in S12, an asset management simulation based on the change is calculated based on the accepted change time and change amount. Then, the calculated modified asset management simulation is output (S13). In the modified asset management simulation output step in S13, a graph is displayed with one axis representing the planned savings amount and the other axis representing the user's age. Figure 10 shows an image of the output of the modified asset management simulation. In FIG. 10, one axis (vertical axis) is the planned savings amount, and the other axis (horizontal axis) is the user's age. Note that year information may be displayed together with the user's age or instead of the user's age. The year information may be, for example, the year, the year and month, or the fiscal year. In Fig. 10, the time of change is set to year D (65 years old), and for example, the savings amount can be changed to zero or halved from the retirement age of 64. In Fig. 10, it is shown that savings are withdrawn from the year C when the user reaches age. As shown in FIG. 10, by outputting an asset management simulation with changes in the savings amount, the user can manage assets in accordance with their lifestyle. [Industrial Applicability]

[0028] According to the loan refinancing support system of the present invention, by extending the borrowing period, it is possible to generate funds through asset management, and by managing assets at a rate of return higher than the loan interest rate, it is possible to shorten the actual refinancing repayment period and predict the generation of assets.

Claims

1. The computer a repayment simulation output step of calculating a current status repayment simulation and a refinancing repayment simulation based on current loan repayment information including the user's current loan repayment amount, current interest rate, future interest rate, and repayment period, and outputting the calculated current status repayment simulation and the refinancing repayment simulation; A payment difference output step of calculating an extended refinancing repayment simulation by an extended refinancing repayment period obtained by extending the repayment period used in the refinancing repayment simulation, and outputting the repayment difference on the repayment date between the current repayment simulation and the extended refinancing repayment simulation; an asset management simulation output step of calculating an asset management simulation in which the repayment difference is set as a savings amount through asset management, and outputting the calculated asset management simulation; Run In the asset management simulation output step, a planned savings amount of the user at a predetermined age or at a predetermined time is output. A loan refinancing support system.

2. The predetermined time is set to the time when the loan is fully repaid according to the extended refinancing repayment simulation.

2. The loan refinancing support system according to claim 1 .

3. The predetermined time is set to the time when the user plans to pay off his / her current loan.

2. The loan refinancing support system according to claim 1 .

4. The computer, a withdrawal asset management simulation output step of receiving an input of a withdrawal time and withdrawal amount for withdrawing from the planned accumulation amount, calculating the asset management simulation by the withdrawal based on the received withdrawal time and withdrawal amount, and outputting a withdrawal asset management end time and a total asset amount until the end of the asset management; Execute 2. The loan refinancing support system according to claim 1 .

5. The computer, a modified asset management simulation output step of receiving an input of a time and amount of change to the savings amount, calculating the asset management simulation according to the time and amount of change received, and displaying a graph with one axis representing the planned savings amount and the other axis representing the user's age; Execute 2. The loan refinancing support system according to claim 1 .

Citation Information

Patent Citations

  • Self-financial planning system

    JP2009163592A

  • Financial product simulation program and financial product simulation system

    JP2010113611A

  • Support device for life design, and life design support system

    JP2011209890A

  • Housing loan refinancing business support system

    JP2014053048A

  • Asset management / debt repayment simulation generation device, program and method

    JP2017188111A

Cited By

  • Business support device, business support method, and business support program

    JP2026120970A