Gas supply device and semiconductor manufacturing device

The gas supply device addresses unequal path lengths in semiconductor manufacturing by using symmetric and tournament-shaped channels to deliver stable mixed gases efficiently and compactly to the processing chamber.

JP7583415B2Active Publication Date: 2024-11-14TOKYO ELECTRON LTD +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023506965
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2021-03-19
Filing Date
2022-03-04
Publication Date
2024-11-14
Estimated Expiration
2042-03-04

AI Technical Summary

Technical Problem

Conventional gas supply devices in semiconductor manufacturing face challenges in supplying a mixed gas with stable concentration components to a processing chamber in a short period of time due to unequal path lengths from multiple fluid control units to the process chamber, requiring large installation space.

Method used

A gas supply device with symmetrically arranged connection parts and tournament-shaped channels ensures equal path lengths from fluid control units to the process chamber, using merging flow paths and on-off valves to control gas flow, thereby saving space and achieving rapid delivery of stable mixed gases.

Benefits of technology

The device efficiently supplies a mixed gas with stable concentration components to the processing chamber in a short time while minimizing space requirements, ensuring consistent gas delivery and reducing installation space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007583415000001
    Figure 0007583415000001
  • Figure 0007583415000002
    Figure 0007583415000002
  • Figure 0007583415000003
    Figure 0007583415000003
Patent Text Reader

Abstract

[Problem] To provide a gas supply apparatus capable of saving space and supplying, to a processing chamber, a mixed gas having a stable concentration component in a short time. [Solution] The present invention comprises: a plurality of fluid control units A1-D2 each including a flow path CH through which gas G flows and fluid control devices V1, FC, V2 provided in the middle of the flow path CH and controlling the flow of the gas G flowing through the flow path; and a merging flow path MCH1 including a plurality of connection portions LC1, LC2, RC1, RC2 which are fluidly connected to the plurality of fluid control units A1-D2, and a single gas outlet portion K1 through which the gas introduced through the plurality of connection portions LC1, LC2, RC1, RC2 is emitted, wherein the plurality of connection portions LC1, LC2, RC1 RC2 are arranged symmetrically with respect to the gas outlet portion K1 in the flow path direction of the merging flow path MCH1, and two or more fluid control units are fluidly connected to each of the plurality of connection portions LC1, LC2, RC1 RC2.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a gas supply device for use in a semiconductor manufacturing device or the like, and to the semiconductor manufacturing device. [Background technology]

[0002] In various manufacturing processes such as semiconductor manufacturing processes, a gas supply device called a gas box, which houses a fluid control device in a box, is used to supply a mixture of accurately measured amounts of multiple process gases to a process chamber (see, for example, Patent Documents 1 and 2). In conventional fluid control devices, a fluid control unit is configured for each gas, and these fluid control units are arranged in parallel (see Patent Document 3, etc.). Each fluid control unit is provided with various fluid control devices such as an on-off valve, a regulator, and a mass flow controller. The outlet flow path of each fluid control unit is connected to a manifold block, where multiple process gases are merged, and the mixed gas is drawn out from one end of the manifold block and supplied to a process chamber. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-98387 A [Patent Document 2] JP 2018-88336 A [Patent Document 3] JP 2019-152234 A [Patent Document 4] U.S. Patent No. 10,022,689 [Patent Document 5] Patent No. 5037510 Summary of the Invention [Problem to be solved by the invention]

[0004] In semiconductor manufacturing equipment, it is required that a mixed gas with a stable concentration of components is supplied to a processing chamber from a gas supply device in a short time. However, in the fluid control device of the conventional structure described above, multiple fluid control units are arranged in parallel and the outlet side flow paths are connected to a manifold block, so the flow path lengths from each fluid control unit to the process chamber are different, making it difficult to supply a mixed gas with a stable concentration component from the gas supply device to the processing chamber in a short period of time. In order to solve the above problems, Patent Documents 4 and 5 propose a technology in which multiple fluid control units are radially arranged to equalize the flow path lengths to the process chambers of the fluid control units; however, the installation space for the fluid control equipment is large, making it difficult to save space.

[0005] The present invention has been made in consideration of the above problems, and has an object to provide a gas supply device and a semiconductor manufacturing apparatus which are space-saving and capable of supplying a mixed gas with a stable concentration component to a processing chamber from the gas supply device in a short period of time. [Means for solving the problem]

[0006] A gas supply device according to a first aspect of the present invention includes a plurality of fluid control units each including a flow path through which a gas flows from an upstream to a downstream and a fluid control device provided in the middle of the flow path and controlling the flow of the gas flowing through the flow path; A junction flow path including a plurality of connection parts fluidly connected to the plurality of fluid control units and a single gas outlet part that outlets the gas introduced through the plurality of connection parts, The plurality of connection parts are disposed symmetrically with respect to the gas outlet part in the flow direction of the junction flow path, and two or more of the fluid control units are fluidly connected to each of the plurality of connection parts.

[0007] Preferably, the plurality of connection portions are provided on one side and the other side of the gas outlet portion in a flow direction of the junction flow path, and the number of the connection portions is the same.

[0008] Preferably, the junction passage has an on-off valve provided near both sides of the gas outlet portion, and is configured so that the upstream side of each on-off valve can be isolated from other portions.

[0009] A gas supply device according to a second aspect of the present invention includes a plurality of fluid control units each including a flow path through which a gas flows from an upstream to a downstream and a fluid control device provided in the middle of the flow path and controlling the flow of the gas flowing through the flow path; A gas supply device having a tournament-shaped connection flow path that is fluidly connected to the plurality of fluid control units, introduces gases discharged from the plurality of fluid control units, merges the gases in a tournament shape, and discharges the gases to the outside, The tournament-shaped connecting flow path is Two inlets each having an inlet connectable to the fluid control unit N a first stage partial channel (N is an integer of 2 or more); The k-th stage partial channel is formed by merging two k-1 stage partial channels (k is an integer from 2 to N), and one (N+1)th stage partial flow path formed by merging the Nth stage partial flow paths and having an outlet for discharging the gas to the outside. A tournament-shaped flow path with N+1 stages of partial flow paths. The tournament-shaped connecting flow paths have flow path lengths or internal volumes from the inlets to the outlets that are equal to or substantially equal to each other.

[0010] One or more of the fluid control units are connected directly to each gas inlet of the tournament-shaped connection flow path, or a plurality of the fluid control units are connected via a junction pipe that fluidly connects the downstream sides of the fluid control units to each other. do.

[0011] Preferably, the tournament-shaped connecting flow paths have opening and closing valves provided in the vicinity of the upstream side of the joining point, and are configured so that the upstream side of each opening and closing valve can be isolated from other parts.

[0012] The semiconductor manufacturing apparatus of the present invention uses the above-described gas supply apparatus for controlling the supply of a process gas in a manufacturing process of a semiconductor device which requires a processing step using a process gas in a sealed process chamber. Effect of the Invention

[0013] According to the first aspect of the present invention, the connection parts between the confluence flow path, which joins multiple gases, and the multiple fluid control units are arranged symmetrically in the flow direction of the confluence flow path with respect to the position of the gas outlet part, and each of the multiple connection parts is fluidly connected to two or more of the fluid control units.Therefore, the flow path lengths of the flow paths to the process chambers of the multiple fluid control units connected to the symmetrically arranged connection parts can be made equal, making it possible to save space and supply a mixed gas with a stable concentration component to the processing chamber in a short period of time.

[0014] According to a second aspect of the present invention, a tournament-shaped connecting flow path having the same or substantially the same flow path length or internal volume from each inlet to the outlet is used, and gases discharged from multiple fluid control units are introduced and joined in a tournament shape and discharged to the outside. This makes it possible to make the flow path lengths from the multiple fluid control units to the process chamber equal, making it possible to save space and to supply a mixed gas with a stable concentration component to the processing chamber in a short period of time. [Brief description of the drawings]

[0015] [Figure 1] 1 is a schematic configuration diagram of a gas supply device according to a first embodiment of the present invention. [Diagram 2] 2 is a diagram for explaining the relationship of flow path lengths from each fluid control unit of the gas supply device in FIG. 1 to a process chamber. [Diagram 3] FIG. 5 is a schematic configuration diagram of a gas supply device according to a second embodiment of the present invention. [Figure 4] 4 is a diagram for explaining the relationship of flow path lengths to process chambers of each fluid control unit of the gas supply device of FIG. 3. [Diagram 5]FIG. 11 is a schematic configuration diagram of a gas supply device according to a third embodiment of the present invention. [Figure 6] 13A and 13B are schematic diagrams showing an example of flow path switching in another gas supply device according to the third embodiment of the present invention, where (a) shows an example of the configuration at the development stage, and (b) shows an example of the configuration at the mass production stage. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. (First embodiment) FIG. 1 shows a schematic configuration of a gas supply device 1 according to a first embodiment of the present invention. The gas supply device 1 includes a plurality of fluid control units A1-H2, a plurality of confluence channels MHC1, MHC2, a single main channel M, and a plurality of connection channels P1, P2. By applying this gas supply device 1 to a process chamber 100, a semiconductor manufacturing apparatus according to one embodiment of the present invention is configured.

[0017] Each of the fluid control units A1 to H2 includes a flow path CH, an on-off valve V1, a flow rate controller FC, an on-off valve V2, a flow path Cp, and an on-off valve Vp. The on-off valve V1, the flow rate controller FC, and the on-off valve V2 are provided in the middle of the flow path CH, the on-off valve Vp is provided in the middle of the flow path Cp for the purge gas PG, and the flow path Cp is fluidly connected to the flow path CH between the on-off valve V1 and the flow rate controller FC.

[0018] A process gas G is supplied to each flow channel CH from the upstream, and a purge gas PG is supplied to the flow channel Cp from the upstream. The types of process gas G supplied to the fluid control units A1 to H2 may be different from each other or may be the same as each other. The flow channels CH and Cp may be formed of pipes or blocks. The on-off valves V1 and V2 open and close the flow path CH, and the on-off valve Vp opens and closes the flow path Cp. The flow rate controller FC is configured by, for example, a mass flow controller, and controls the flow rate of the gas flowing from the upstream to the downstream in the flow channel CH.

[0019] The above-mentioned on-off valve V1, flow rate controller FC, on-off valve V2, and on-off valve Vp are examples of fluid control devices of the present invention, and the "fluid control devices" of the present invention are devices used for fluid control to control the flow of gas, and include, but are not limited to, on-off valves (two-way valves), regulators, pressure gauges, on-off valves (three-way valves), mass flow controllers, etc. In the present embodiment, the fluid control units A1 to H2 have the same configuration, but are not limited to this and may have different configurations, and fluid devices that do not control fluids, such as pressure gauges, can also be included in each of the fluid control units A1 to H2. Also, it is preferable that the components of each of the fluid control units A1 to H2 are arranged in a line from upstream to downstream, and it is also preferable that the fluid control units A1 to H2 are arranged in parallel. Furthermore, it is preferable that the fluid control units A1 to H2 are arranged in a direction perpendicular to the merging flow paths MHC1 and MHC2. By arranging them in this way, it is possible to minimize the space required for arranging the multiple fluid control units A1 to H2.

[0020] The junction channels MHC1 and MHC2 are channels with closed ends, and are formed of pipes, manifold blocks, or the like, and preferably have the same structure and dimensions. The confluence channels MHC1, MHC2 each have a plurality of connection portions LC1-RC2 to which the downstream ends of the respective channels CH of the plurality of fluid control units A1-H2 are fluidly connected, and a single gas outlet portion K1 that outlets the mixed gas that is joined in the confluence channel MHC1.

[0021] The gas outlet portions K1 of the junction channels MHC1, MHC2 are disposed at the center in the flow direction of the junction channels MHC1, MHC2. The junction channels MHC1, MHC2 can be formed linearly, but may be curved as long as they are symmetrical about the center. The multiple connection parts LC1-RC2 of the junction channels MHC1, MHC2 are arranged symmetrically with respect to the center position in the flow path direction. That is, the multiple connection parts LC1-RC2 are arranged symmetrically with respect to the gas outlet part K1. The connection parts LC1, RC1 and the connection parts LC2, RC2 are respectively arranged symmetrically with respect to the gas outlet part K1. That is, the multiple connection parts LC1-RC2 are provided in the same number on one side and the other side of the gas outlet part K1 in the flow path direction of the junction channels MHC1, MHC2. (Note that the portions of the junction channels MHC1 and MHC2 from the gas outlet portion K1 to the connection portions LC1 and RC1 on both sides are also referred to as first-stage partial channel T1, and the portions on both sides thereof are also referred to as junction pipes J.)

[0022] Fluid control units A1 and C1 are fluidly connected to a connection portion LC1 of the junction flow path MHC1, fluid control units A2 and C2 are fluidly connected to a connection portion LC2 of the junction flow path MHC1, fluid control units B1 and D1 are fluidly connected to a connection portion RC1 of the junction flow path MHC1, and fluid control units B2 and D2 are fluidly connected to a connection portion RC2 of the junction flow path MHC1. Similarly, fluid control units E1 and G1 are connected to connection portion LC1 of the junction flow path MHC2, fluid control units E2 and G2 are connected to connection portion LC2 of the junction flow path MHC1, fluid control units F1 and H1 are connected to connection portion RC1 of the junction flow path MHC2, and fluid control units F2 and H2 are connected to connection portion RC2 of the junction flow path MHC2. The two flow paths CH connected to each of the connection parts LC1 to RC2 may be connected to face each other, or may be connected to face in different directions. Note that, in this embodiment, an example is given in which two fluid control units are connected to each of the connection parts LC1 to RC2 of the junction flow paths MHC1 and MHC2, but this is not limited thereto, and it is also possible to fluidly connect three or more fluid control units to each of the connection parts LC1 to RC2.

[0023] The gas outlet portions K1 of the junction channels MHC1, MHC2 are fluidly connected to the junction portion R of the main channel M by connection channels P1, P2, respectively. The connection channels P1, P2 are preferably formed by piping or the like having the same structure and dimensions. The main flow path M is a flow path for supplying a mixed gas of a plurality of process gases G or a purge gas PG to the process chamber 100, and is formed by piping or the like.

[0024] Here, the junction channels MHC1, MHC2 are arranged symmetrically with respect to the junction R of the main channel M. The symmetric arrangement of the junction channels MHC1, MHC2 includes left-right symmetry, top-bottom symmetry, plane symmetry, and line symmetry with respect to the junction R, and any of these may be used. Also, they may be point symmetric with respect to the center point of the junction R. In this embodiment, two junction channels MHC1, MHC2 are illustrated, but three or more junction channels may be provided, and in that case, the three or more junction channels are arranged point symmetric with respect to the center point of the junction R.

[0025] By arranging the multiple connection parts LC1-RC2 symmetrically with respect to the gas outlet part K1, the flow path length from the connection part LC1 to the gas outlet part K1 can be made equal to the flow path length of the flow path from the connection part RC1 to the gas outlet part K1, and the flow path length from the connection part LC2 to the gas outlet part K1 can be made equal to the flow path length of the flow path from the connection part RC2 to the gas outlet part K1. In addition, by arranging the confluence flow paths MHC1, MHC2 symmetrically with respect to the confluence portion R of the main flow path M, the flow path length from the gas outlet portion K1 of the confluence flow path MHC1 to the confluence portion R of the main flow path M can be made equal to the flow path length from the gas outlet portion K1 of the confluence flow path MHC2 to the confluence portion R of the main flow path M.

[0026] By configuring the gas supply device 1 as described above, as shown in FIG. 2, the flow path lengths (or internal volumes) of the flow paths from the on-off valve V2, which is a fluid control device arranged on the most downstream side of the flow paths CH of the multiple fluid control units A1, B1, C1, D1, E1, F1, G1, and H1, to the process chamber 100 can be made equal to each other, and the flow path lengths (or internal volumes) of the flow paths from the on-off valve V2, which is a fluid control device arranged on the most downstream side of the flow paths CH of the multiple fluid control units A2, B2, C2, D2, E2, F2, G2, and H2, to the process chamber 100 can be made equal to each other. If all of the fluid control units A1 to H2 were arranged in parallel, the flow path lengths from each opening / closing valve V2 to the process chamber 100 would be different, but in this embodiment, the flow path lengths from each opening / closing valve V2 to the process chamber 100 of the fluid control units that are symmetrically arranged can be made equal. As a result, the space required for the gas supply device 1 can be reduced, and a mixed gas with a stable concentration of components can be supplied to the process chamber 100 from the gas supply device 1 in a short time. Furthermore, according to this embodiment, it is possible to shorten the length of the flow path to the process chamber 100 of each of the fluid control units A1 to H2, compared to the case where all of the fluid control units A1 to H2 are arranged in parallel.

[0027] In the above embodiment, a case has been described in which two junction flow paths MHC1 and MHC2 are provided, but the present invention is not limited to this, and an embodiment of the present invention also includes a case in which only one junction flow path MHC1 is used.

[0028] Second Embodiment FIG. 3 is a schematic configuration diagram of a gas supply device 10 according to a second embodiment of the present invention. In this embodiment, a tournament-shaped connecting flow path T is used, in which the flow path length or internal volume from each inlet TC to the outlet TO is equal or substantially equal to each other, and gases discharged from multiple fluid control units A1 to H6 are introduced and merged in a tournament shape and discharged to the outside. The gas supply device 10 of this embodiment is composed of fluid control units A1 to H6, a tournament-shaped connection flow path T, and a junction pipe J.

[0029] Each of the fluid control units A1 to H6 is similar to the fluid control units A1 to H2 of the first embodiment, and includes a flow path CH, an on-off valve V1 (see FIG. 1), a flow rate controller FC, an on-off valve V2, and an on-off valve Vp (see FIG. 1), and is a unit that opens and closes the flow path CH and controls the flow rate of gas flowing from upstream to downstream through the flow path CH. For simplification, in FIG. 3, the flow path CH, the on-off valve V1, and the on-off valve Vp are not shown, and the flow rate controller FC and the on-off valve V2 are shown only for the fluid control unit A1.

[0030] The tournament-shaped connecting flow path T is Two fluid control units each having an inlet TC that can be connected to the fluid control units A1 to H6. N a first stage partial flow passage T1 (N is an integer of 2 or more); The k-th stage partial channel Tk is formed by merging two k-1 stage partial channels Tk-1 (k is an integer from 2 to N), and one (N+1)-th stage partial flow passage TN+1 formed by merging the N-th stage partial flow passages TN and having an outlet TO for discharging the gas to the outside. The flow path is a tournament-shaped flow path with N+1 stages of partial flow paths. Further, the tournament-shaped connecting flow paths T are formed so that their flow path lengths (or internal volumes) from the inlets TC to the outlets TO are (substantially) equal to each other. This configuration can be realized, for example, by making the flow path lengths of all the partial flow paths Tk (k is an integer from 1 to N) in each stage (substantially) equal and forming the flow paths with the same inner diameter. The tournament-shaped connection flow path T in this embodiment is an example where N=3, and includes eight first-stage partial flow paths T1, four second-stage partial flow paths T2 formed by two first-stage partial flow paths T1 joining together at a joining portion U1, two third-stage partial flow paths T3 formed by two second-stage partial flow paths T2 joining together at a joining portion U2, and one fourth-stage partial flow path T4 formed by joining the joining portions of the two third-stage partial flow paths T3 at U3. step and partial flow path T4. Each of the partial flow paths T1 to T4 may be formed by piping, or may be configured by a manifold or a flow path block. In addition, it is preferable that the flow path diameters of all the partial flow paths in each stage are equal.

[0031] The inlet TC is provided at the upstream end of each first-stage partial flow path T1, and is configured so that one or more fluid control units A1-H6 can be connected to each inlet TC directly or via a junction pipe J. The junction pipe J is a pipe that fluidly connects the downstream sides of the multiple fluid control units to each other, and corresponds to the outer portion of the connection parts LC1, RC1 of the junction flow paths MHC1 or MHC2 in the first embodiment. In FIG. 3, the fluid control units A1 to H6 are shown divided into groups A to H connected to the respective inlets TC. In group A, fluid control units A2 and A3 are directly connected to an inlet TC, and fluid control units A1 and A4 are connected to the inlet TC via a junction pipe J. In group H, fluid control units H3 and H4 are directly connected to an inlet TC, and fluid control units H1, H2, H5, and H6 are connected to the inlet TC via a junction pipe J. On the other hand, in group B, fluid control units B1 and B2 are directly connected to the inlet TC, and similarly in groups C, D, F, and G, two fluid control units are directly connected to the inlet TC. Also, in group E, one fluid control unit E1 is directly connected to the inlet TC.

[0032] As described above, the flow path length (or internal volume) from each inlet TC to the outlet TO of the tournament-shaped connecting flow path T is formed (substantially) equal to each other, so that the flow path lengths from the fluid control units A2, A3, B1, B2, C1, C2, D1, D2, E1, F1, F2, G1, G2, H3 and H4 directly connected to each inlet TC to the outlet TO are (substantially) equal to each other. Furthermore, if the distance from the inlet TC in group A to the connection JC of the junction pipe J is the same as the distance from the inlet TC in group H to the first connection JC of the junction pipe J, the flow path lengths from the fluid control units A1, A4, H2, and H5 connected to the connection JC to the outlet TO will be (substantially) equal to each other. FIG. 4 is a chart for explaining the relationship of the flow path length from each of the fluid control units A1 to H6 of the gas supply device of FIG. 3 to the process chamber 100 (outlet TO).

[0033] In this manner, in the present embodiment as in the first embodiment, the flow path lengths from each on-off valve V2 of the symmetrically arranged fluid control units to the process chamber 100 can be made equal, and the flow path lengths from each of the fluid control units A1-H2 to the process chamber 100 can be shortened compared to the case where all of the fluid control units A1-H6 are arranged in parallel. As a result, the gas supply device 10 can be made compact, and a mixed gas with a stable concentration of components can be supplied from the gas supply device 10 to the process chamber 100 in a short time.

[0034] In the above embodiment, a case has been described in which 21 fluid control units A1 to H6 are connected to a tournament-shaped flow path with a stage number N=3, but the present invention is not limited to this. By increasing the stage number N of the tournament-shaped connection flow path T, more fluid control units can be connected while maintaining the same flow path length to the process chamber 100.

[0035] (Relationship between the first and second embodiments) 1 corresponds to the tournament-shaped connecting flow path in the second embodiment where N=2. That is, the portions from the gas outlet portion K1 of the junction flow paths MHC1 and MHC2 in the first embodiment to the connecting portions LC1 and RC1 on both sides correspond to the first-stage partial flow path T1, the portions on both sides correspond to the junction pipe J, the connecting portions LC2 and RC2 correspond to the connecting portion JC, the connecting flow paths P1 and P2 correspond to the second-stage partial flow path T2, and the main flow path M corresponds to the third-stage partial flow path T3.

[0036] (Third embodiment) FIG. 5 is a schematic configuration diagram of a gas supply device 20 according to a third embodiment of the present invention. In this embodiment, in the second embodiment, an opening / closing valve VS is provided near the upstream side of each of the junctions U1, U2, and U3 of the tournament-shaped connecting flow path T, so that the upstream side of each opening / closing valve VS can be isolated from other parts.

[0037] Without this on-off valve VS, for example, when group A (fluid control units A1 to A4) is not in use, the flow path from the junction U1 downstream of group A to each on-off valve V2 of these fluid control units A1 to A4 would become a so-called dead space, and problems may occur in that it takes a long time to switch or purge the type of process gas supplied to the process chamber 100 due to residual gas, etc. that is present there. Examples of cases in which any one of the groups A to H of the fluid control units is not used include the following cases. 1) When the gas supply device 20 is configured to supply different process gases to each of the groups A to H, a certain process gas is no longer used due to switching of the treatment process, and the corresponding group is no longer used. 2) A group that was included in the configuration of the process equipment including the gas supply device 20 during the development stage is deleted during the mass production stage of the process equipment. In this case, if the piping system during the development stage is reused in the process equipment during the mass production stage, the part connected to the deleted group becomes a cecal piping.

[0038] In this embodiment, an opening / closing valve VS is provided near the upstream side of each of the junctions U1, U2, and U3. Therefore, by closing the opening / closing valve VS upstream of the junctions U1, U2, and U3 downstream of an unused group, the piping system upstream of the opening / closing valve VS can be isolated from other parts, thereby preventing the formation of a cecal piping. These on-off valves VS (also called gate valves) may be automatic valves, but if they are not frequently opened or closed, they may be manual valves. In addition, these on-off valves VS are placed as close as possible to the confluences U1, U2, and U3 to prevent the occurrence of cecal piping.

[0039] 6 is a schematic diagram showing an example of flow path switching of another gas supply device 30 of this embodiment, where (a) shows an example of a configuration at the development stage and (b) shows an example of a configuration at the mass production stage. Here, the "development stage" and "mass production stage" refer to the development stage and mass production stage of a process device that employs the gas supply device. The device at the development stage shown in Fig. 6(a) included fluid control units C1 to D2 of groups C and D in its configuration, but the device at the mass production stage shown in Fig. 6(b) has deleted the fluid control units C1 to D2 of groups C and D. In this case, if the piping system at the development stage is reused in the device at the mass production stage, the part connected to groups C and D (shown by the dashed line) becomes a cecal piping.

[0040] However, in the gas supply device 30 of this embodiment, by closing the opening / closing valve VS1 provided near the upstream side of the junction U2 where the flow paths from groups C and D merge with the flow paths from groups A and B, the portion connected to groups C and D (shown by the dashed line) can be separated from the other portions, thereby preventing the occurrence of appendicitis. In this manner, by employing the gas supply device 30 of this embodiment in a process apparatus, even if a part of the fluid control unit included in the development stage is removed in the mass production stage, the piping system of the gas supply device 30 can be used as is in the mass production stage apparatus while preventing the above-mentioned problem of the appended piping, thereby reducing development costs such as design changes to the piping system.

[0041] The present invention is not limited to the above-described embodiment, and those skilled in the art can make various additions and modifications within the scope of the present invention. [Explanation of symbols]

[0042] 1, 10, 20, 30: Gas supply device 100: Process chamber A1~H6: Fluid control unit CH: Flow path Cp: ​​Flow path FC:Flow controller G: Process gas J: Junction pipe JC: (Confluence pipe J) Connection K1: Gas outlet LC1, LC2, RC1, RC2: Connection parts M: Main flow path MHC1, MHC2: Confluence channel P1, P2: Connection flow path PG: Purge gas R: Confluence T: Tournament-shaped connecting channel TC: Inlet TC T1: 1st stage partial flow path T2: 2nd stage partial flow path TO: Outlet U1, U2, U3: Junction V1: Open / close valve V2: Open / close valve Vp: Opening and closing valve VS: Open / close valve

Claims

1. A plurality of fluid control units each including a flow path through which gas flows from upstream to downstream and a fluid control device provided in the middle of the flow path and controlling the flow of gas flowing through the flow path; A junction flow path including a plurality of connection parts fluidly connected to the plurality of fluid control units and a single gas outlet part that outlets the gas introduced through the plurality of connection parts, At least one of the plurality of connection parts is disposed symmetrically with respect to the gas outlet part in a flow direction of the junction flow path, and two or more of the fluid control units are fluidly connected to each of the plurality of connection parts, The gas supply device, wherein the junction flow path has on-off valves provided near both sides of the gas outlet portion, and the upstream side of each on-off valve can be shut off from other portions.

2. 2 . The gas supply device according to claim 1 , wherein the plurality of connection portions are provided on one side and the other side of the gas outlet portion in a flow direction of the junction flow path, and the number of the connection portions is the same.

3. A plurality of fluid control units each including a flow path through which gas flows from upstream to downstream and a fluid control device provided in the middle of the flow path and controlling the flow of gas flowing through the flow path; A gas supply device having a tournament-shaped connection flow path that is fluidly connected to the plurality of fluid control units, introduces gases discharged from the plurality of fluid control units, merges the gases in a tournament shape, and discharges the gases to the outside, The tournament-shaped connecting flow path is Two inlets each having an inlet connectable to the fluid control unit N a first stage partial flow passage (N is an integer of 2 or more); a k-th stage partial flow passage formed by merging two k-1 stage partial flow passages (k is an integer from 2 to N); and one (N+1)th stage partial flow passage formed by merging the Nth stage partial flow passages and having an outlet for discharging the gas to the outside. A tournament-shaped flow path having N+1 stages of partial flow paths; The tournament-shaped connecting flow paths have flow path lengths or internal volumes from the inlets to the outlets that are equal or substantially equal to each other, The tournament-shaped connecting flow path has an opening / closing valve provided near the upstream side of each point where two of the k-stage partial flow paths (k is an integer from 1 to N) join together, and is configured so that the upstream side of each opening / closing valve can be isolated from other parts.

4. The gas supply device described in claim 3, wherein each gas inlet of the tournament-shaped connecting flow path is connected to one or more of the fluid control units directly, or via a junction pipe that fluidly connects the downstream sides of the fluid control units to each other.

5. 5. A semiconductor manufacturing apparatus, in a manufacturing process of a semiconductor device which requires a processing step using a process gas in a sealed process chamber, using the gas supply apparatus according to claim 1 for supply control of the process gas.

Citation Information

Patent Citations

  • JP1975037510A

  • Gas supplying apparatus and facility for gas-phase growth

    JP1998028855A

  • Plasma processing apparatus and shower head

    JP2018088336A

  • Substrate processing device

    JP2018098387A

  • Fluid control device

    JP2019152234A