Deck installation device and deck installation method
The floor slab installation device addresses safety concerns by using a frame with vertical legs and a cantilevered beam to lift and rotate slabs, ensuring loads are transmitted as vertical forces, thereby stabilizing the installation process and minimizing deck damage.
Patent Information
- Application Number
- JP2023044483
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-03-20
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2043-03-20
AI Technical Summary
Existing floor slab replacement devices are large, heavy, and apply significant loads to the gate-shaped structure, posing safety concerns due to their substantial weight and potential instability.
A floor slab installation device with a frame body having four vertical legs forming a rectangular parallelepiped shape, a cantilevered ceiling beam, and a transport mechanism that supports the slab using a connecting member, allowing the slab to be lifted, rotated, and installed with minimal bending moment on the new deck.
The solution provides a safer and more stable installation process by transmitting loads as vertical forces, reducing adverse effects on the new deck, and enabling installation without generating bending moments, thus enhancing safety and structural integrity.
Smart Images

Figure 0007586213000001 
Figure 0007586213000002 
Figure 0007586213000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a deck slab installation device and a deck slab installation method, and more particularly to a deck slab installation device and a deck slab installation method that take safety into consideration. [Background technology]
[0002] There are an increasing number of cases where the existing concrete deck of a bridge is replaced with a new deck, and in the construction work for replacing the existing concrete deck with a new deck, a deck replacement device or deck installation device consisting of portal frames arranged in the bridge axis direction is sometimes used (for example, see Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6677628 Summary of the Invention [Problem to be solved by the invention]
[0004] However, the deck replacement device disclosed in Patent Document 1 is composed of a gate-shaped structure formed by connecting gate-shaped frames at the front and rear in the bridge axis direction, two sets of rails arranged in the bridge axis direction along the ceiling part of the gate-shaped structure, a first lifting device suspended from one set of rails and capable of lifting a new deck slab to a carry-in / carry-out position set away from the deck replacement position in the bridge axis direction and moving it to the replacement position, a second lifting device suspended from the other set of rails and capable of lifting the old deck slab from the replacement position and moving it to the carry-in / carry-out position, and a rotation mechanism provided on each of the first and second lifting devices and capable of rotating the lifted deck in a horizontal plane to change its orientation, and is therefore a large device with a large total weight.
[0005] In addition, in the deck replacement device disclosed in Patent Document 1, the gate-shaped structure formed by connecting the gate-shaped frames has two sets of rails arranged in the bridge axis direction along the ceiling, a first lifting device is suspended from one set of rails, and a second lifting device is suspended from the other set of rails, and each of the first and second lifting devices is provided with a rotation mechanism. Furthermore, the first lifting device lifts the new deck, and the second lifting device lifts the old deck. For this reason, it is considered that a fairly large load is applied to the gate-shaped structure of the deck replacement device disclosed in Patent Document 1.
[0006] For this reason, the inventors have considered that in order to improve safety, it is necessary to take measures to deal with the large total weight of the entire device and to improve the structural stability of the frame main body, which is the skeleton of the device, against the loads applied to the frame main body, for deck slab replacement devices and deck installation devices which have an approximately rectangular parallelepiped shape and have portal frames at the front and rear in the bridge axis direction.
[0007] The present invention has been made in consideration of the above points, and an object of the present invention is to provide a deck slab installation device and a deck slab installation method that take safety into greater consideration. [Means for solving the problem]
[0008] The present invention is an invention that solves the above-mentioned problems, and provides a deck slab installation device and a deck slab installation method as described below.
[0009] That is, a first aspect of the deck installation device of the present invention is a deck installation device for installing a bridge deck, comprising: a frame main body having four legs erected in an approximately vertical direction, the four legs being located on the sides so that the overall shape is approximately rectangular prism-shaped; and a ceiling long beam supported by the frame main body and extending through the frame main body in an approximately horizontal direction, wherein both ends of the ceiling long beam are cantilevered from the frame main body to form two cantilevered protrusions, the ceiling long beam is provided with a transport mechanism that can move from one of the two cantilevered protrusions of the ceiling long beam to the other of the two cantilevered protrusions while supporting the deck, and a leg connecting member is provided between the lower parts of two legs of the frame main body that are located on adjacent sides that form the side surfaces of the approximately rectangular prism-shaped legs between which the ceiling long beam is located, to connect the lower parts of the two legs.
[0010] In this application, the term "side" refers to a side of a substantially rectangular parallelepiped shape, and refers to an intersection line of side surfaces of the substantially rectangular parallelepiped shape.
[0011] In addition, the phrase "supported by the frame main body" includes not only the case where the frame main body is directly contacted and supported, but also the case where the frame main body is indirectly supported via another member supported by the frame main body. Similar descriptions in other parts of this application shall be interpreted in the same manner.
[0012] A second aspect of the deck installation device of the present invention is a deck installation device of the first aspect, wherein a second leg connecting member is provided between the lower parts of two of the four legs of the frame main body that are located on adjacent sides that form the side surfaces of the approximately rectangular parallelepiped shape and between which the ceiling long beam is not located, to connect the lower parts.
[0013] A third aspect of the deck installation device of the present invention is a deck installation device of the first aspect, wherein the bridge has at least two bridge girders extending in the bridge axis direction and adjacent to each other in a direction perpendicular to the bridge axis, and the leg portions of the frame main body are located directly above the two bridge girders adjacent to each other in the direction perpendicular to the bridge axis.
[0014] In this application, the term "bridge girder" refers to a girder member that is arranged to extend in the bridge axis direction and supports the deck, and includes the main girders and vertical girders of the bridge in question, as well as temporary girders for construction work.
[0015] A fourth aspect of the deck installation device according to the present invention is a deck installation device for installing a deck of a bridge having at least two bridge girders extending in the bridge axis direction and adjacent to each other in the direction perpendicular to the bridge axis, the deck installation device comprising: a frame main body having four legs erected in a substantially vertical direction, the four legs being located on the sides and having an overall shape of a substantially rectangular parallelepiped; a ceiling long beam supported by the frame main body and extending through the frame main body in a substantially horizontal direction; and a transport vehicle for transporting the deck to be installed, wherein both ends of the ceiling long beam are each cantilevered out from the frame main body to form two cantilevered protruding portions, and the ceiling long beam has a support for the deck. a transport mechanism is provided that can move from one of the two cantilever protrusions of the ceiling long beam to the other of the two cantilever protrusions in the above-mentioned state, the transport vehicle has a first running section and a second running section that are supported on the bridge surface of the bridge and can move over the bridge surface, the first running section and the second running section are spaced a predetermined distance apart in a direction perpendicular to the direction of travel, the four legs of the frame main body are located directly above the two adjacent bridge girders in the direction perpendicular to the bridge axis, and the predetermined distance between the first running section and the second running section of the transport vehicle is longer than the distance between the two adjacent bridge girders in the direction perpendicular to the bridge axis.
[0016] Here, "supported on the bridge surface" includes not only the case where the bridge surface is directly supported, but also the case where the bridge surface is indirectly supported via another member supported on the bridge surface. Similar descriptions in other parts of this application shall be interpreted in the same manner.
[0017] In addition, in this application, the leg of the frame main body being located directly above the bridge girder means that, when viewed from above in the vertical direction, at least a portion of the leg of the frame main body overlaps with the center position of the cross section of the bridge girder (the centroid of the cross section obtained by cutting the bridge girder by a plane perpendicular to the longitudinal direction).
[0018] A fifth aspect of the deck installation device of the present invention is a deck installation device of the first aspect, wherein the first running section and the second running section of the transport vehicle are positioned directly above the two bridge girders adjacent to each other in a direction perpendicular to the bridge axis.
[0019] A sixth aspect of the deck installation device of the present invention is an aspect in which, in the deck installation device of any of the first to fifth aspects, the four legs are each configured to be extendable and contractible in the longitudinal direction.
[0020] A seventh aspect of the deck slab installation device of the present invention is an aspect in which, in the deck slab installation device of any of the first to fifth aspects, the transport mechanism is configured to include a means for lifting and lowering the deck slab.
[0021] An eighth aspect of the deck installation device of the present invention is a deck installation device according to any one of the first to fifth aspects, wherein the four legs of the frame main body are each attached with a moving means that is supported on the bridge surface of the bridge and can move over the bridge surface.
[0022] A ninth aspect of the deck slab installation device of the present invention is a deck slab installation device according to any one of the first to fifth aspects, wherein the transport mechanism is equipped with a rotating means capable of rotating the supported deck in a horizontal plane to change its orientation.
[0023] A first aspect of the deck installation method according to the present invention is a method for installing a deck of a bridge using a deck installation device including: a frame main body having four legs erected in a substantially vertical direction, the four legs being located on the sides so that the overall shape is substantially rectangular parallelepiped; and a ceiling long beam supported by the frame main body, extending through the frame main body in a substantially horizontal direction, and having two cantilevered protruding portions at both ends protruding from the frame main body in a cantilever manner, the method including a transporting step of transporting the deck to below one of the two cantilevered protruding portions of the ceiling long beam; This deck installation method is characterized by comprising: a lifting and supporting process in which the deck slab that has been transported to below one of the two cantilever protrusions in the lifting and supporting process is raised and supported by the one cantilever protrusion of the ceiling long beam; a moving process in which the deck slab that has been raised and supported in the lifting and supporting process is moved along the ceiling long beam from one of the two cantilever protrusions to the other of the two cantilever protrusions; and an installation process in which the deck slab that has been moved to the other of the two cantilever protrusions in the moving process is lowered and installed at a predetermined position on the bridge.
[0024] A second aspect of the deck installation method of the present invention is an installation method for installing the deck of the bridge using the deck installation device of the first aspect, comprising: a transporting step of transporting the deck to below one of the two cantilever protrusions of the ceiling long beam; a lifting and supporting step of raising the deck that has been transported to below one of the two cantilever protrusions in the transporting step and supporting the deck on the one cantilever protrusion of the ceiling long beam; a moving step of moving the deck that has been raised and supported in the lifting and supporting step along the ceiling long beam from one of the two cantilever protrusions to the other of the two cantilever protrusions; and an installation step of lowering the deck that has been moved to the other of the two cantilever protrusions in the moving step and installing it at a predetermined position of the bridge.
[0025] A third aspect of the deck installation method of the present invention is a method for installing the deck of the bridge using the deck installation device of the fourth aspect, comprising: a transporting process for transporting the deck by the transport vehicle to below one of the two cantilever protrusions of the ceiling long beam; a lifting and supporting process for raising the deck that has been transported to below the one of the two cantilever protrusions in the transporting process and supporting the deck on the one cantilever protrusion of the ceiling long beam; a moving process for moving the deck that has been raised and supported in the lifting and supporting process along the ceiling long beam from one of the two cantilever protrusions to the other of the two cantilever protrusions; and an installation process for lowering the deck that has been moved to the other of the two cantilever protrusions in the moving process and installing it at a predetermined position of the bridge.
[0026] A fourth aspect of the deck installation method of the present invention is a deck installation method according to any one of the first to third aspects, further comprising a rotation step of rotating the deck, which has been moved to the other of the two cantilevered extension portions in the moving step, within a horizontal plane to change its orientation to a predetermined direction, and in the installation step, the deck, which has been changed to the predetermined direction in the rotation step, is lowered and installed at a predetermined position on the bridge.
[0027] A fifth aspect of the deck installation method of the present invention is a deck installation method according to any one of the first to third aspects, further comprising a removal step of removing an existing deck of the bridge, and the predetermined position at which the deck is installed in the installation step is the position from which the existing deck of the bridge was removed in the removal step. Effect of the Invention
[0028] According to the present invention, it is possible to provide a deck slab installation device and a deck slab installation method that take safety into consideration. [Brief description of the drawings]
[0029] [Figure 1] FIG. 3 is a front view of the deck installation device 10 according to the first embodiment of the present invention as seen from the bridge axis direction (as seen from the direction of the arrow I in FIG. 2). [Diagram 2] FIG. 1 is a side view of a deck installation device 10 according to a first embodiment of the present invention, as viewed perpendicular to the bridge axis (as viewed from the direction of the arrow II in FIG. 1). [Diagram 3] FIG. 2 is a front view of the transport vehicle 24 of the deck installation device 10 according to the first embodiment of the present invention, as viewed from the bridge axis direction (as viewed from the direction of the arrow III in FIG. 2). [Figure 4] 1 is a plan view of a deck installation device 10 according to a first embodiment of the present invention as viewed from above (a plan view as viewed from the direction of an arrow IV in FIG. 2). [Diagram 5] FIG. 1 is a schematic diagram showing one step (step S1) of a procedure for installing a new deck 30 using a deck installation device 10 according to a first embodiment of the present invention. [Figure 6]FIG. 1 is a schematic diagram showing one step (step S2) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 7] FIG. 1 is a schematic diagram showing one step (step S3) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 8] FIG. 1 is a schematic diagram showing one step (step S4) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 9] FIG. 1 is a schematic diagram showing one step (step S5) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 10] FIG. 1 is a schematic diagram showing one step (step S6) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 11] FIG. 1 is a schematic diagram showing one step (step S7) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 12] FIG. 1 is a schematic diagram showing one step (step S8) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 13] FIG. 1 is a schematic diagram showing one step (step S9) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 14] FIG. 1 is a schematic diagram showing one step (step S10) of a procedure for installing a new deck 30 using a deck installation device 10 according to a first embodiment of the present invention. [Figure 15] FIG. 1 is a schematic diagram showing one step (step S11) of a procedure for installing a new deck 30 using the deck installation device 10 according to the first embodiment of the present invention. [Figure 16] 17 is a front view of a deck installation device 40 according to a second embodiment of the present invention as seen from the bridge axis direction (as seen from the direction of the arrow XVI in FIG. 17). [Figure 17]16A and 16B are side views of a deck installation device 40 according to a second embodiment of the present invention, as viewed perpendicular to the bridge axis (as viewed from the direction of the arrow XVII in FIG. 16). [Figure 18] A front view of a transport vehicle 48 used when installing a deck slab using a deck installation device 40 according to a second embodiment of the present invention, as viewed from the bridge axis direction (a front view as viewed from the direction of an arrow XVIII in FIG. 17). [Figure 19] 17 is a plan view of a deck installation device 40 according to a second embodiment of the present invention as viewed from above (as viewed from the direction of an arrow XIX in FIG. 17). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0030] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. (1) First embodiment (1-1) Configuration Fig. 1 is a front view of the deck installation device 10 according to the first embodiment of the present invention as seen from the bridge axis direction (front view as seen from the direction of arrow I in Fig. 2), Fig. 2 is a side view of the deck installation device 10 according to the first embodiment of the present invention as seen from the direction perpendicular to the bridge axis (side view as seen from the direction of arrow II in Fig. 1), Fig. 3 is a front view of the transport vehicle 24 of the deck installation device 10 according to the first embodiment of the present invention as seen from the bridge axis direction (front view as seen from the direction of arrow III in Fig. 2), and Fig. 4 is a plan view of the deck installation device 10 according to the first embodiment of the present invention as seen from above (plan view as seen from the direction of arrow IV in Fig. 2). Note that the transport vehicle 24 is omitted in Fig. 1, and only the transport vehicle 24 of the deck installation device 10 is shown in Fig. 3.
[0031] The deck slab installation device 10 according to the first embodiment of the present invention comprises a frame main body 12, a long ceiling beam 14, a transport mechanism 16, a transport vehicle 24, etc. As shown in Figures 1, 3 and 4, the size of the frame main body 12 and the transport vehicle 24 of the deck slab installation device 10 in the width direction of the bridge 80 is approximately the same as the distance between adjacent main girders 82 (usually about 3 to 4 m), and the size of the frame main body 12 and the transport vehicle 24 of the deck slab installation device 10 in the width direction of the bridge 80 is approximately the same.
[0032] The frame body 12 has four legs 12A, a ceiling 12B, and four beams 12C, and the frame body 12 is a part that forms the framework of the deck installation device 10 excluding the transport vehicle 24. The frame body 12 has four legs 12A that are erected in a substantially vertical direction, and the four legs 12A are located on the sides, so that the overall shape is a substantially rectangular parallelepiped shape. In the frame body 12, beams 12C are connected to the upper parts of the four legs 12A, and the inner ends (ends opposite to the legs 12A) of the beams 12C are connected to the ceiling 12B via a hinge mechanism so as to be rotatable within a horizontal plane, and the beams 12C can be rotated within a horizontal plane via the hinge mechanism to adjust the interval between the adjacent legs 12A. Of the four legs 12A of the frame main body 12, the distance between two legs 12A located on adjacent sides forming the side surface of the approximately rectangular parallelepiped shape and between which the ceiling long beam 14 is located (the distance between two legs 12A adjacent in the direction perpendicular to the bridge axis) is adjusted to be approximately the same as the distance between two main girders 82 adjacent in the direction perpendicular to the bridge axis. Therefore, the four legs 12A of the frame main body 12 can be positioned directly above the adjacent main girders 82 as shown in Figures 1 and 4, and in the deck slab installation device 10 according to the first embodiment, the four legs 12A of the frame main body 12 are positioned directly above the adjacent main girders 82 as shown in Figures 1 and 4. Therefore, the load applied to the bridge surface of the bridge 80 from the frame main body 12 (when the ceiling long beam 14 supports the new deck 30, the load is the total weight of the frame main body 12 plus the weight of the new deck 30) is transmitted as a vertical force to the main girder 82 without generating a bending moment in the new deck 30, and therefore has almost no adverse effect on the new deck 30.
[0033] Each of the four legs 12A is internally equipped with a hydraulic jack (not shown), and each of the four legs 12A is configured to be extendable and retractable. The deck installation device 10 is also provided with a control mechanism that controls the four legs 12A to extend and retract in unison, and the frame body 12 is configured to extend and retract uniformly up and down as a whole. A commonly used control mechanism can be used as the control mechanism that extends and retracts the four legs 12A in unison. In the deck installation device 10, the four legs 12A extend and retract in unison, and the frame body 12 as a whole extends and retracts uniformly up and down, so that the connecting member 20 connected to the transport mechanism 16 attached to the ceiling long beam 14 via the rotating means 18 moves up and down, and the new deck 30 connected to the connecting member 20 can rise and fall. Therefore, it can be said that the deck installation device 10 equipped with the frame main body portion 12 is not a crane device that lifts and suspends the newly constructed deck 30, but a lifter device that raises and lowers the newly constructed deck 30.
[0034] In addition, as shown in Figs. 1, 2 and 4, the moving means 22 that can be supported on the bridge surface of the bridge 80 and move on the bridge surface is detachably attached to each lower end of the four legs 12A, and the frame body 12 of the deck installation device 10 according to the first embodiment is configured to be able to move on the bridge surface of the bridge 80. Therefore, the frame body 12 of the deck installation device 10 according to the first embodiment is configured to be able to move in response to changes in the deck installation position as the deck installation work progresses. The moving means 22 can be configured using, for example, rubber tires. In addition, the moving means 22 may be provided with a self-propelling function to be able to move on its own. In addition, in the deck installation device 10 according to the first embodiment, as shown in Figs. 1 and 4, the four moving means 22 attached to the lower ends of the four legs 12A of the frame body 12 move directly above the main girder 82.
[0035] The long ceiling beam 14 is a long steel member that is supported by the ceiling portion 12B of the frame main body 12 and extends through the frame main body 12 in a substantially horizontal direction, and extends in the bridge axis direction of the bridge 80. Both ends of the long ceiling beam 14 protrude from the frame main body 12 in a cantilever manner, forming a delivery-side cantilever protrusion 14A that protrudes toward the delivery side where the new deck 30 is delivered, and an installation-side cantilever protrusion 14B that protrudes toward the installation side where the new deck 30 is to be installed.
[0036] As shown in Fig. 1, the ceiling long beam 14 is composed of two I-shaped steels 14X arranged in parallel, and the upper flanges of the two I-shaped steels 14X are attached to the ceiling section 12B. As shown in Fig. 1, wheels of a transport mechanism (here, an electric trolley) 16 are arranged on the upper surface of the lower flange of the I-shaped steel 14X, so that the transport mechanism 16 can move along the longitudinal direction of the ceiling long beam 14. A rotating means 18 is connected to the lower part of the transport mechanism 16, and the transport mechanism 16 is equipped with the rotating means 18, and a connecting member 20 is connected to the lower part of the rotating means 18.
[0037] Therefore, the deck installation device 10 of this first embodiment is configured so that the new deck 30 connected to the connecting member 20 can rise, fall and move (move along the longitudinal direction of the ceiling long beam 14 and rotate in a horizontal plane).
[0038] The new floor slab 30 is carried under the carry-in side cantilever overhang 14A by the transport vehicle 24. The legs 12A of the frame body 12 are contracted, and the new floor slab 30 on the transport vehicle 24 is connected to the upper connecting member 20 below the carry-in side cantilever overhang 14A. Then, the legs 12A of the frame body 12 are extended to raise the new floor slab 30 above the transport vehicle 24. Then, with the new floor slab 30 supported via the connecting member 20, the transport mechanism 16 is moved from the carry-in side cantilever overhang 14A to the installation side cantilever overhang 14B along the longitudinal direction of the ceiling long beam 14, whereby the new floor slab 30 can be moved above the target installation position. After the new deck 30 is moved above the target installation position, the new deck 30 is rotated in a horizontal plane by the rotating means 18 to change its orientation to an appropriate orientation, and the legs 12A of the frame main body 12 are contracted to lower the new deck 30, so that the new deck 30 can be installed at the target installation position. The new deck 30 moved to the installation side cantilever protruding portion 14B is lowered and installed at a predetermined position on the main girder 82 of the bridge 80, so that the installed new deck 30 is installed closer to the installation side (to the right in Figs. 2 and 4) than the installation side legs 12A (reference number 12A1 is added in parentheses in Figs. 2 and 4), so that the installed new deck 30 can be used as a foothold to move forward to the next installation position (to the right in Figs. 2 and 4).
[0039] The transport vehicle 24 is equipped with a first running section 24A and a second running section 24B, and has a role of traveling on the bridge surface of the bridge 80 and transporting the newly constructed deck 30 to below the cantilever protruding section 14A on the delivery side of the ceiling long beam 14. The first running section 24A and the second running section 24B of the transport vehicle 24 are not particularly limited, and may be specialized for each site, and the transport vehicle 24 may be a dedicated cart specialized for each site, but the first running section 24A and the second running section 24B of the transport vehicle 24 may be configured to use rubber tires. In this case, the transport vehicle 24 does not have to be configured as a dedicated cart that travels only on the bridge 80, which is the site where the work is performed, and its surrounding area, and can be configured to be capable of traveling on public roads. Specifically, for example, a trailer or a truck can be used as the transport vehicle 24.
[0040] In the deck installation device 10 according to the first embodiment, the transport vehicle 24 has the first running section 24A and the second running section 24B spaced apart at a predetermined interval (the interval between two adjacent main girders 82 in the direction perpendicular to the bridge axis) in a direction perpendicular to the traveling direction. As shown in FIG. 3, the first running section 24A and the second running section 24B of the transport vehicle 24 can travel directly above the main girders 82, and in the deck installation device 10 according to the first embodiment, the first running section 24A and the second running section 24B of the transport vehicle 24 travel directly above the main girders 82. For this reason, the load applied from the transport vehicle 24 to the bridge surface of the bridge 80 (when the transport vehicle 24 supports the new deck 30, the load is the total weight of the transport vehicle 24 plus the weight of the new deck 30) is transmitted as a vertical force to the main girders 82 without generating a bending moment in the new deck 30, and therefore has almost no adverse effect on the new deck 30.
[0041] As described above, the four legs 12A of the frame main body 12 are each attached to the lower end of the four legs 12A, which are supported on the bridge surface of the bridge 80 and can move on the bridge surface, and the four moving means 22 move directly above the main girders 82. Therefore, the load applied from the frame main body 12 to the bridge surface of the bridge 80 (when the ceiling long beams 14 support the new deck 30, the load is the sum of the total weight of the frame main body 12 and the weight of the new deck 30) is transmitted as a vertical force to the main girders 82 without generating a bending moment in the new deck 30, and therefore has almost no adverse effect on the new deck 30. In addition, the first running section 24A and the second running section 24B of the transport vehicle 24 run directly above the main girders 82. For this reason, the load applied from the transport vehicle 24 to the bridge surface of the bridge 80 (when the transport vehicle 24 is supporting the new deck 30, the load is the sum of the total weight of the transport vehicle 24 and the weight of the new deck 30) is transmitted as a vertical force to the main girders 82 without generating a bending moment in the new deck 30, and therefore has almost no adverse effect on the new deck 30. Therefore, the total weight obtained by adding the total weight of the deck slab installation device 10 according to the first embodiment to the weight of the new deck slab 30 supported by the deck slab installation device 10 is transmitted as a vertical force to the main girders 82 without generating a bending moment in the new deck slab 30, and therefore has almost no adverse effect on the new deck 30.
[0042] In the deck installation device 10 of this first embodiment, the moving means 22 provided at the lower ends of the four legs 12A of the frame main body 12 and the first running section 24A and second running section 24B of the transport vehicle 24 can be configured to move in contact with the bridge surface of the bridge 80 (for example, in a configuration in which rubber tires are used as described above), but it may also be configured so that two rails are installed on the bridge surface directly above two adjacent main girders 82, and the moving means 22 provided at the lower ends of the four legs 12A of the frame main body 12 and the first running section 24A and second running section 24B of the transport vehicle 24 run along the two rails.
[0043] Naturally, the adverse effects on the newly constructed deck 30 would be reduced if the first running section 24A and the second running section 24B of the transport vehicle 24 were to run directly above the two adjacent main girders 82; however, since the weight of the transport vehicle 24 is not as heavy as the weight of the frame main body 12, this configuration may be adopted if it can be confirmed that there are no safety issues with making the distance between the first running section 24A and the second running section 24B of the transport vehicle 24 (the distance in the direction perpendicular to the direction of travel) greater than the distance between the two adjacent main girders 82. If the distance between the first running portion 24A and the second running portion 24B of the transport vehicle 24 is made larger than the distance between two adjacent main girders 82, at least one of the first running portion 24A and the second running portion 24B will not be able to be positioned directly above the main girders 82. However, both the first running portion 24A and the second running portion 24B will not be positioned above the portion of the new deck 30 that is located between two adjacent main girders 82, and the full weight of the transport vehicle 24 will not be applied to the portion of the new deck 30 that is located between two adjacent main girders 82. In this respect, the adverse effects of the weight of the transport vehicle 24 on the new deck 30 are reduced to some extent. However, if the distance between the first running section 24A and the second running section 24B of the transport vehicle 24 is made larger than the distance between two adjacent main girders 82, at least one of the first running section 24A and the second running section 24B may apply load to the cantilever structure portion of the newly constructed deck 30, so careful confirmation must be made to ensure that there are no safety issues.
[0044] As shown in Figures 1, 3 and 4, the size of the deck installation device 10 in the width direction of the bridge 80 is approximately the width of one lane, and the deck installation device 10 may be used for half-section construction in which only one lane is restricted and construction is performed lane by lane. Therefore, as shown in Figure 1, construction may be performed using the deck installation device 10 while one lane of the existing deck 32 is in service to general vehicles 100. In Figure 1, reference numeral 30A denotes a new ground guard, and reference numeral 32A denotes an existing ground guard.
[0045] In the above explanation of the deck slab installation device 10 of this first embodiment, attention has been focused on the two main girders 82 of the bridge 80. However, if the bridge 80 has not only the main girders 82 but also vertical girders and erection girders extending in the bridge axis direction, the girder components extending in the bridge axis direction (main girders 82, vertical girders, erection girders) can be broadly regarded as bridge girders, and the deck slab installation device 10 of this first embodiment can be used in the same manner as described above, focusing on two of the bridge girders.
[0046] (1-2) Floor slab installation method The procedure for installing a new deck 30 at a target installation point using the deck installation device 10 according to the first embodiment of the present invention will be described with reference to Figures 5 to 15. Here, the case of installing a new deck 30 at a target installation point on a bridge 80 will be described.
[0047] (Step S1) First, the deck installation device 10 is placed at a predetermined location on the bridge 80 (a location near the target installation point) so that the loading side cantilever extension 14A is located on the loading side and the installation side cantilever extension 14B is located on the installation side, as shown in Figure 5 (step S1).
[0048] (Step S2) As shown in FIG. 6, a new deck 30 is delivered by a transport vehicle 24 below the delivery-side cantilever protrusion 14A of the ceiling long beam 14 of the deck installation device 10 placed at a predetermined location on the bridge 80 in step S1 (step S2).
[0049] (Step S3) The legs 12A of the frame body 12 of the deck installation device 10 are contracted, and the new deck 30 on the transport vehicle 24 brought in in step S2 is fixed and connected to the connecting members 20 as shown in FIG. 7 (step S3).
[0050] (Step S4) The legs 12A of the frame main body 12 of the deck installation device 10 are extended to raise the frame main body 12, and the newly constructed deck 30 on the transport vehicle 24 brought in in step S2 is raised with the connecting member 20 connected from above, as shown in Figure 8 (step S4).
[0051] (Step S5) In step S4, the new deck 30 on the transport vehicle 24 is raised with the connecting member 20 connected from above, and then the transport vehicle 24 is moved from below the loading side cantilever extension 14A to a loading point (not shown) for the new deck 30 located at the rear of the loading side (left side in Figure 9), and the transport mechanism 16 is moved along the ceiling long beam 14 to move the new deck 30, which has been raised via the connecting member 20, to the installation side cantilever extension 14B of the ceiling long beam 14 (step S5).
[0052] (Step S6) After the newly constructed deck 30, which has been raised via the connecting member 20, is moved to the installation side cantilever protrusion 14B of the ceiling long beam 14, the newly constructed deck 30, which has been raised via the connecting member 20, is rotated 90° in the horizontal plane by the rotating means 18, as shown in Figure 10, so that the direction of the main reinforcing bars of the newly constructed deck 30 is perpendicular to the bridge axis of the bridge 80 (step S6).
[0053] (Step S7) The legs 12A of the frame main body 12 of the deck installation device 10 are contracted to contract the frame main body 12 downward, and the new deck 30 is rotated so that the main rebar direction is perpendicular to the bridge axis of the bridge 80.The new deck 30 is then placed at the desired installation point on the bridge 80 as shown in Figure 11.The new deck 30 is then released from its attachment to the connecting member 20, the connection between the new deck 30 and the connecting member 20 is released, and the new deck 30 is installed at the desired installation point (step S7).
[0054] (Step S8) As shown in FIG. 12, the legs 12A of the frame body 12 of the deck slab installation device 10 are extended to raise the frame body 12 (step S8).
[0055] (Step S9) As shown in FIG. 13, the connecting member 20 is rotated by 90° in a horizontal plane by the rotating means 18 so that the long side direction of the connecting member 20 is aligned with the bridge axis direction of the bridge 80 (step S9).
[0056] (Step S10) As shown in FIG. 14, the transport mechanism 16 is moved along the ceiling long beam 14, and the connecting member 20 is moved to the loading side cantilever protruding portion 14A of the ceiling long beam 14 in preparation for the installation of the next new floor slab 30 (step S10).
[0057] (Step S11) As shown in Figure 15, the entire deck installation device 10 is advanced by the moving means 22 in the direction of the installation side cantilever extension portion 14B of the ceiling long beam 14, so that the installation side cantilever extension portion 14B of the ceiling long beam 14 is positioned above the targeted installation position of the next new deck slab 30, in preparation for the installation of the next new deck slab 30 (step S11).
[0058] (2) Second embodiment Fig. 16 is a front view of the deck installation device 40 according to the second embodiment of the present invention as seen from the bridge axis direction (front view seen from the arrow XVI direction in Fig. 17), Fig. 17 is a side view of the deck installation device 40 according to the second embodiment of the present invention as seen from the bridge axis direction (side view seen from the arrow XVII direction in Fig. 16), Fig. 18 is a front view of the transport vehicle 48 used when installing the deck using the deck installation device 40 according to the second embodiment of the present invention as seen from the bridge axis direction (front view seen from the arrow XVIII direction in Fig. 17), and Fig. 19 is a plan view of the deck installation device 40 according to the second embodiment of the present invention as seen from above (plan view seen from the arrow XIX direction in Fig. 17). Note that Fig. 16 omits the description of the transport vehicle 48, and Fig. 18 only illustrates the transport vehicle 48 used when installing the deck using the deck installation device 40, and omits the description of the deck installation device 40 itself.
[0059] 16, 17 and 19, a deck slab installation device 40 according to a second embodiment of the present invention is a deck slab installation device in which the lower ends of adjacent legs 42A in the direction perpendicular to the bridge axis are connected by leg connecting members 44, and the lower ends of adjacent legs 42A in the bridge axis direction are connected by leg connecting members 46, and which does not include a transport vehicle for transporting the newly constructed deck. Other than these points, it is the same as the deck slab installation device 10 according to the first embodiment, so corresponding members, parts, etc. are given the same reference numerals and descriptions thereof are generally omitted.
[0060] In the deck installation device 40 according to the second embodiment of the present invention, the lower parts of the legs 42A adjacent to each other in the direction perpendicular to the bridge axis are connected to each other by the leg connecting member 44, and the lower parts of the legs 42A adjacent to each other in the direction parallel to the bridge axis are connected to each other by the leg connecting member 46. Therefore, the frame main body 42, which is substantially rectangular parallelepiped in shape, has a very stable structure, and the safety of the frame main body 42 itself is improved. Note that the "legs 42A adjacent to each other in the direction perpendicular to the bridge axis" can also be expressed as "two legs 42A that are located on adjacent sides forming the side surface of the frame main body 42, which is substantially rectangular parallelepiped, and have the long ceiling beam 14 between them, out of the four legs 42A of the frame main body 42, and the "legs 42A adjacent to each other in the direction parallel to the bridge axis" can also be expressed as "two legs 42A that are located on adjacent sides forming the side surface of the frame main body 42, which is substantially rectangular parallelepiped, and have the long ceiling beam 14 not between them, out of the four legs 42A of the frame main body 42".
[0061] Furthermore, as in the case of the deck installation device 10 of the first embodiment, in the deck installation device 40 of the second embodiment, the legs 42A of the frame main body 42 are positioned directly above the main girders 82, and the first running section 48A and the second running section 48B of the transport vehicle 48 (transport vehicle 48 that transports the new deck 30) used when using the deck installation device 40 run directly above the main girders 82, thereby reducing the adverse effects of the weight of the frame main body 42 and the transport vehicle 48 on the new deck 30 (the new deck 30 installed on the bridge 80), and further improving safety.
[0062] The procedure for installing the new deck 30 at the target installation location using the deck installation device 40 of this second embodiment can be performed in the same manner as the procedure for installing the new deck 30 at the target installation location using the deck installation device 10 of the first embodiment (the procedure described above in "(1-2) Deck installation method").
[0063] (3) Supplementary Information The deck installation devices 10, 40 of the first and second embodiments described above are configured so that the entire frame main body 12, 42 expands and contracts up and down due to the extension and contraction of the legs 12A, 42A of the frame main body 12, 42, whereby the connecting members 20 that connect and fix the newly constructed deck 30 move up and down, causing the newly constructed deck 30 to rise and lower. However, for example, the transport mechanism 16 may be connected to a lifting means (e.g., an electric chain block) having a lifting and suspending function, and the newly constructed deck 30 may be raised and lowered by the lifting means.
[0064] Also, the deck slab installation method using the deck slab installation device 10 according to the first embodiment was explained in "(1-2) Deck slab installation method" above, but after the removal process of removing the existing deck slab, if a deck slab is installed at the position where the existing deck slab was removed using the deck slab installation device 10 according to the first embodiment or the deck slab installation device 40 according to the second embodiment, this will result in deck replacement. In other words, the deck slab installation device 10 according to the first embodiment and the deck slab installation device 40 according to the second embodiment can be used not only for installing deck slabs, but also for replacing deck slabs. [Explanation of symbols]
[0065] 10, 40…Floor slab installation equipment 12, 42…Frame body 12A, 42A…legs 12A1…Installation side leg 12B…Ceiling 12C…beam part 14…Long ceiling beam 14A…Cantilevered protruding part on the loading side 14B…Installation side cantilever protrusion 14X…I-shaped steel 16...Transport mechanism 18...Rotation means 20...Connecting member 22...Transportation 24, 48…Transport vehicle 24A, 48A…First running section 24B, 48B…Second running section 30…New deck 30A…New construction site cover 32...Existing deck 32A…Existing ground cover 44, 46...Leg connecting members 80…Bridge 82…Main digit 100…Regular vehicles
Claims
1. A deck installation device for installing a bridge deck, a frame body having four legs extending in a substantially vertical direction, the four legs being located on the sides, and the frame body having an overall shape of a substantially rectangular parallelepiped; a ceiling long beam supported by the frame main body and extending through the frame main body in a substantially horizontal direction; having Both ends of the ceiling long beam are cantilevered from the frame body to form two cantilevered protrusions, The ceiling long beam is provided with a transport mechanism that can move from one of the two cantilever protrusions of the ceiling long beam to the other of the two cantilever protrusions while supporting the floor slab; Between the lower parts of two legs of the frame body that are located on adjacent sides forming a side surface of the approximately rectangular parallelepiped shape and between which the ceiling long beam is located, a leg connecting member is provided to connect the lower parts, A deck installation device characterized in that a second leg connecting member is provided between the lower parts of two of the four legs of the frame main body that are located on adjacent sides that form the side of the approximately rectangular parallelepiped shape and between which the ceiling long beam is not located.
2. The deck installation device according to claim 1, wherein each of the four legs is extendable and retractable in the longitudinal direction.
3. The deck installation device according to claim 1, wherein the transport mechanism includes means for lifting and lowering the deck.
4. The deck installation device according to claim 1, characterized in that a moving means is attached to each of the four legs of the frame main body, the moving means being supported on the bridge surface of the bridge and capable of moving over the bridge surface.
5. 2. The deck installation device according to claim 1, wherein the transport mechanism is provided with a rotating means capable of rotating the supported deck within a horizontal plane to change its orientation.
6. A method for installing a bridge deck using the deck installation device according to claim 1, comprising: A transporting process of transporting the floor slab to below one of the two cantilevered protruding portions of the ceiling long beam; a lifting and supporting step of lifting the floor slab that has been transported to below one of the two cantilever protruding portions in the transporting step, and supporting the floor slab on the one cantilever protruding portion of the ceiling long beam; a moving process of moving the floor slab, which has been raised and supported in the raising and supporting process, along the ceiling long beam from the one of the two cantilever protruding portions to the other of the two cantilever protruding portions; an installation process in which the deck slab that has been moved to the other of the two cantilever protruding portions in the moving process is lowered and installed at a predetermined position of the bridge; A deck installation method comprising the steps of:
7. A deck installation device for installing a deck of a bridge, comprising: a frame main body having four legs erected in a substantially vertical direction, the four legs being located on the sides so that the overall shape is substantially rectangular prism-shaped; and a ceiling long beam supported on the frame main body and extending through the frame main body in a substantially horizontal direction, both ends of the ceiling long beam protruding from the frame main body at one end to form two cantilevered protrusions, the ceiling long beam being provided with a transport mechanism capable of moving from one of the two cantilevered protrusions of the ceiling long beam to the other of the two cantilevered protrusions while supporting the deck, and a leg connecting member connecting the lower parts of two legs located on adjacent sides forming the side surfaces of the substantially rectangular prism-shaped frame and between which the ceiling long beam is located, of the four legs of the frame main body, A transporting process of transporting the floor slab to below one of the two cantilevered protruding portions of the ceiling long beam; a lifting and supporting step of lifting the floor slab that has been transported to below one of the two cantilever protruding portions in the transporting step, and supporting the floor slab on the one cantilever protruding portion of the ceiling long beam; a moving step of moving the floor slab, which has been raised and supported in the raising and supporting step, along the ceiling long beam from the one of the two cantilever protruding portions to the other of the two cantilever protruding portions; an installation process in which the deck slab that has been moved to the other of the two cantilever protruding portions in the moving process is lowered and installed at a predetermined position of the bridge; A deck installation method comprising the steps of:
8. A rotating step of rotating the deck slab, which has been moved to the other of the two cantilever protruding portions in the moving step, in a horizontal plane to change it to a predetermined orientation, 8. The deck installation method according to claim 6 or 7, wherein in the installation step, the deck that has been turned to a predetermined orientation in the rotation step is lowered and installed at a predetermined position on the bridge.
9. A removal process of removing an existing deck of the bridge, 8. The deck installation method according to claim 6, wherein the predetermined position at which the deck is installed in the installation step is a position at which the existing deck of the bridge is removed in the removal step.
Citation Information
Patent Citations
Floor board replacing machine for concrete bridge
JP1999131427A
Self-propelled PC floor slab erecting machine and PC floor slab erecting method
JP2006028881A
Device and method of floor slab rebuilding
JP2018100564A
Floor system replacement method and floor system replacement device
JP2019173435A
Floor slab erection machine
JP2019214858A