Joint structure between steel wall and reinforced concrete member and its construction method
The joint structure between steel walls and reinforced concrete members achieves dense reinforcing bar arrangement and improved rigidity by using vertically extending steel joint members and folded reinforcing bars, integrated through casting, addressing stress concentration and construction efficiency.
Patent Information
- Application Number
- JP2021104013
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-23
- Publication Date
- 2024-11-20
- Estimated Expiration
- 2041-06-23
AI Technical Summary
Existing joint structures between steel walls and reinforced concrete members face challenges in densely arranging reinforcing bars, leading to potential stress concentration and breakage, and lack consideration for improving dowel performance and rigidity.
A joint structure is designed with steel joint members extending vertically and connected by a connecting member, featuring folded main reinforcing bars surrounding the connection, integrated with a reinforced concrete member through casting, allowing for dense bar arrangement and improved rigidity.
The solution enables dense placement of reinforcing bars, enhancing dowel performance and rigidity, while preventing stress concentration and breakage, and allows for efficient construction by utilizing permanent steel structures, reducing costs and time.
Smart Images

Figure 0007587156000001 
Figure 0007587156000002 
Figure 0007587156000003
Abstract
Description
[Technical Field]
[0001] The present invention relates to a joint structure between a steel wall and a reinforced concrete member and a method for constructing the same. [Background technology]
[0002] In general bridge substructure construction, underground structures for water storage, and various civil engineering structure construction, walls are sometimes constructed using steel sheet piles (sheet piles) etc. For example, Patent Document 1 discloses a technique for constructing civil engineering structures in which the exterior wall materials are made of steel sheet piles, adjacent steel sheet piles are connected to each other by waling members and connecting metal fittings attached to the steel sheet piles, and anchor materials are inserted into the waling members to impart bearing force to the hardening material (concrete).
[0003] Furthermore, in bridge substructure construction and the like, a procedure is adopted in which temporary steel sheet piles are first driven in as retaining walls, excavation is carried out, the main structure (foundation piles, etc.) is constructed, and then backfilling and the temporary steel sheet piles are removed. Because the use of such temporary steel sheet piles is wasteful in terms of effort and cost, for example, Patent Document 2 discloses a technology for constructing a bridge pier foundation structure by effectively utilizing steel sheet piles that have been used as temporary structures by using them as permanent structures.
[0004] Furthermore, Patent Document 3 discloses a technique for constructing a footing by driving a plurality of steel sheet piles, to which perforated steel plates have been welded in advance, into the ground, hanging anchor rebars on the perforated steel plates via locking members, and pouring concrete around them. Patent Document 3 aims to improve workability in a structure in which shear force and tensile force are transmitted between the steel material (steel sheet piles) and the concrete by the locking members and anchor rebars.
[0005] In recent years, in the construction of various structures, from the standpoint of ease of construction and shortening construction time, a technique has become common to use so-called precast concrete components (also simply called precast components) as concrete components, in which components pre-fabricated in factories or other locations are transported to the site and assembled to existing components. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Japanese Patent Application Laid-Open No. 2004-44119 [Patent Document 2] Japanese Patent Application Laid-Open No. 2010-216150 [Patent Document 3] Japanese Patent Application Laid-Open No. 2006-57252 Summary of the Invention [Problem to be solved by the invention]
[0007] In the above Patent Document 1, reinforcing bars as anchor materials are directly inserted into holes in the waling material to obtain bearing force between the waling material and the hardening material. In addition, in the above Patent Document 2, a shear-stop effect is obtained by directly hooking (inserting) reinforcing bars into holes in perforated steel plate dowels attached to the steel sheet pile.
[0008] In the configurations disclosed in Patent Documents 1 and 2, if long-legged reinforcing bars are to be densely arranged in order to improve dowel performance and rigidity, it is difficult from the standpoint of workability to insert the reinforcing bars directly into holes formed in steel plates, etc. Specifically, in Patent Document 1, the vertical pitch of the waling members is approximately 100 cm (= 1000 mm), which is not a configuration in which the reinforcing bars are densely arranged. Furthermore, in Patent Document 2, one perforated steel plate dowel is attached to one steel sheet pile with a width of 900 mm, and therefore the intervals between the reinforcing bars hooked thereon are thought to be approximately 900 mm, which is not a configuration in which the reinforcing bars are densely arranged.
[0009] In the configurations in which reinforcing bars are inserted directly into holes formed in steel plates or the like, as in Patent Documents 1 and 2, it is difficult to arrange the reinforcing bars in a dense state, and there is a concern that stress concentration may cause fracture, so there is a need for further improvements in dowel performance and rigidity. Also, as mentioned above, since it is advantageous in terms of effort and cost to use steel sheet piles that have been used for temporary construction as permanent construction, there is a need for a connection structure between a steel sheet pile (steel wall) and a reinforced concrete member that allows temporary steel sheet piles to be used as permanent steel sheet piles and that allows reinforcing bars for dowels to be arranged densely.
[0010] Furthermore, in the technology disclosed in Patent Document 3, when hanging an anchor rebar on a perforated plate, a locking member is inserted into the hole and the anchor rebar is hooked onto the locking member, thereby improving workability. However, no consideration is given to the concentration of stress on the steel material and the locking member that accompanies the placement of the anchor rebar.
[0011] In view of the above circumstances, an object of the present invention is to provide a connection structure between a steel wall and a reinforced concrete member, which, when connecting a steel wall and a reinforced concrete member to construct a connection structure, improves the dowel performance between the steel wall and the reinforced concrete member and enables the reinforcing bars to be densely arranged so as to have excellent rigidity, and a method for constructing the same. [Means for solving the problem]
[0012] In order to achieve the above-mentioned object, according to the present invention, there is provided a connection structure between a steel wall and a reinforced concrete member, characterized in that a plurality of steel coupling members are embedded in the end of the reinforced concrete member facing the steel wall, the plurality of coupling members extend in the vertical direction of the steel wall and are arranged so as to be parallel to one another, one end of each coupling member is joined to the wall surface of the steel wall, the plurality of coupling members are connected to one another at the portion where they are embedded in the reinforced concrete member by connecting members that pass through through holes provided in each coupling member, and main reinforcing bars extending in a direction perpendicular to the wall surface of the steel wall are embedded inside the reinforced concrete member in a state where they are folded back so as to surround the connecting members.
[0013] Furthermore, according to the present invention, there is provided a method for constructing a connection structure between the above-described steel wall and reinforced concrete member, wherein the reinforced concrete member is a precast reinforced concrete member manufactured so that the end face of the joint member is exposed at the end facing the steel wall, the end face of the joint member exposed from the precast reinforced concrete member is joined to the steel wall, a time-dependent hardening material is poured into the gap between the steel wall and the precast reinforced concrete member to form a connecting concrete member, and the steel wall and the precast reinforced concrete member are integrated together.
[0014] Furthermore, according to the present invention, there is provided a method for constructing a connection structure between the above-described steel wall and reinforced concrete member, characterized in that the plurality of joint members are connected to the wall surface of the steel wall, the plurality of joint members are connected to each other by connecting members that pass through through holes provided in each joint member, the main reinforcing bars are arranged in a state where they are folded back so as to surround the connecting members, and cast-in-place concrete is poured as a time-hardening material to produce the reinforced concrete member integrated with the steel wall. [Effects of the Invention]
[0015] According to the present invention, when connecting a steel wall and a reinforced concrete member to construct a joint structure, it is possible to improve the dowel performance between the steel wall and the reinforced concrete member and to arrange the reinforcing bars closely so as to have excellent rigidity. [Brief explanation of the drawings]
[0016] [Figure 1] 1 is a schematic explanatory diagram of a joining structure between a steel wall and a reinforced concrete member according to an embodiment of the present invention. [Figure 2] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to the present embodiment. [Figure 3]1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to the present embodiment. [Figure 4] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to the present embodiment. [Figure 5] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to the present embodiment. [Figure 6] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to the present embodiment. DETAILED DESCRIPTION OF THE INVENTION
[0017] Hereinafter, embodiments of the present invention will be described with reference to the drawings. In this specification and the drawings, components having substantially the same functional configurations are designated by the same reference numerals, and redundant description may be omitted. For the sake of explanation, this specification may omit some illustrations of the reinforcing bar structure and reinforcing bar arrangement, or may illustrate the reinforcing bar structure inside concrete, which is not normally visible.
[0018] (Configuration of the coupling structure according to the embodiment of the present invention) FIG. 1 is a schematic explanatory diagram of a connection structure 1 between a steel wall and a reinforced concrete member according to an embodiment of the present invention (hereinafter, also referred to simply as a connection structure). As shown in FIG. 1, the connection structure 1 has a steel wall 10 and a joint member 15 fixed to the steel wall 10. The steel wall 10 may be, for example, a steel sheet pile extending in the vertical direction (up and down direction, Z direction in the figure). The joint member 15 may be a steel plate-like member, one end of which may be connected to the wall surface (inner surface) of the steel wall 10 by a fixing means. As shown in FIG. 1, a plurality of joint members 15 (for example, 15a to 15c in the figure) may be arranged parallel to each other at a predetermined interval. Furthermore, the width length of the joint member 15 (length in the X direction in the drawing) may be adjusted depending on the position of the steel wall 10 to which each joint member 15 (15a to 15c) is fixed, and may be designed to be such that the other end positions of each joint member 15 (15a to 15c) are aligned when fixed to the steel wall 10. Furthermore, the means for fixing the joint member 15 to the steel wall 10 may be, for example, welding or bolting. Note that in this embodiment, a configuration in which three joint members 15 (15a to 15c) are connected to a single steel wall 10 that is a steel sheet pile is illustrated as an example.
[0019] Each of the joint parts 15 (15a to 15c) is provided with a through hole 17 (17a to 17c in the figure), and the joint parts 15a to 15c are connected to one another by connecting members 20 that are arranged to pass through the through holes 17 across the joint parts 15a to 15c. The number and arrangement of the through holes 17 are arbitrary. For example, the arrangement may be such that connecting members 20 extending in the horizontal direction (Y direction in the figure) can be inserted into the through holes 17 provided in each of the joint parts 15a to 15c. Furthermore, a plurality of connecting members 20 may be arranged to match the number of through holes 17. The cross-sectional shape of the connecting members 20 and the shape of the through holes 17 are arbitrary. When the connecting members 20 are made of various steel bars, the shape of the through holes 17 may be selected to match the cross-sectional shape of the connecting members 20. In the configuration of this embodiment, the connecting members 20 are round bars having a predetermined diameter and extending horizontally, and the illustration shows an example in which two connecting members 20 are arranged to pass through through holes 17 provided at two locations, above and below, of each joint member 15a to 15c.
[0020] The connection structure 1 also includes first main reinforcing bars 30, which extend in a direction perpendicular to the wall surface (inner surface) of the steel wall 10 (the X direction in the figure), are folded back to surround the connecting member 20, and are configured to form a so-called U-shape at the folded back portion (U-shaped portion) 31. As shown in FIG. 1 , the first main reinforcing bars 30 may be arranged parallel to each other at a predetermined interval, for example, the interval a may be 150 mm to 300 mm. It is preferable that the first main reinforcing bars 30 are folded back evenly from the folding back point (the center of the folding back portion 31) so that the extension lengths (lengths in the X direction in the figure) to both ends are the same. This is because when an external force is applied to the first main reinforcing bars 30, the external force is uniform, thereby preventing breakage of the reinforcing bars. The type of the first main reinforcing bars 30 is not particularly limited; for example, deformed reinforcing bars may be used.
[0021] When reinforcing bars, such as deformed reinforcing bars, are folded back into a U-shape, for example, a standard bending diameter is specified based on various conditions, such as the diameter and length of the reinforcing bars, in order to ensure strength and yield strength. To satisfy this standard, the radius of curvature of the bend of the first main reinforcing bars 30 at the folded back portion 31 must be equal to or greater than a specified value. Therefore, in the configuration of this embodiment, an adjustment jig 23 is installed to position the first main reinforcing bars 30 so that they reliably surround the connecting member 20 when the radius of curvature of the bend at the folded back portion 31 of the first main reinforcing bars 30 arranged to surround the connecting member 20 falls below the specified value. The adjustment jig 23 may be, for example, a member having an arc cross section that is attached to the connecting member 20 to adjust its outer diameter.
[0022] Furthermore, in the combined structure 1, second main reinforcing bars 40 extending in a direction perpendicular to the wall surface (inner surface) of the steel wall 10 (X direction in the figure) and distribution bars 42 extending in a direction perpendicular to the second main reinforcing bars 40 (Y direction in the figure) may be provided, for example, at a position sandwiched between the folded-back first main reinforcing bars 30. These second main reinforcing bars 40 and distribution bars 42 may be arranged in parallel with each other at a predetermined interval, for example. Although the second main reinforcing bars 40 and distribution bars 42 are not essential, providing them improves the rigidity and strength of the combined structure 1 as a whole.
[0023] The various components and reinforcing bars that make up the joint structure 1 (joint member 15, connecting member 20, adjusting jig 23, first main reinforcing bar 30, second main reinforcing bar 40, distribution bar 42) are embedded (enclosed) in a time-hardening material (e.g., concrete) not shown in FIG. 1 , to form a reinforced concrete member (reinforced concrete member 50, described below). For example, at the end of the reinforced concrete member facing the steel wall 10, the joint member 15 is embedded in an exposed state, and the joint member 15 is joined to the wall surface (inner surface) of the steel wall 10 to form an integrated structure. The reinforced concrete member may be made of either cast-in-place concrete or precast concrete.
[0024] Furthermore, in order to integrate the steel wall 10 and the reinforced concrete member in the combined structure 1, a time-hardening material (not shown) may be poured into the wall surface (inner surface) of the steel wall 10 to serve as a connecting concrete member (connecting concrete member 52, described later). This connecting concrete member contains the joint member 15 and a part of the first main reinforcing bar 30 (for example, a part of the folded portion 31).
[0025] (Method of constructing bonded structures) 2 to 6 are schematic explanatory diagrams showing a method for constructing a connection structure 1 according to this embodiment. First, as shown in FIG. 2, a steel wall 10 having one end of a coupling member 15 (15a to 15c) fixed to a wall surface (inner surface) is driven into the ground or the like (not shown) in a state of extending in the vertical direction (up and down direction, Z direction in the figure). Here, the steel wall 10 is, for example, a steel sheet pile, and the coupling members 15 (15a to 15c) are plate-like members with through holes 17 (17a to 17c) formed at predetermined locations. Note that the coupling members 15 may be fixed to the steel wall 10 in advance in a factory or the like, or may be fixed during construction on site.
[0026] Next, as shown in Fig. 3, a plurality of first main reinforcing bars 30 are placed parallel to one another at predetermined intervals. The first main reinforcing bars 30 are reinforcing bars that have been folded back in advance to form a so-called U-shape at their folded back portions 31, and are placed so that the folded back portions 31 are at predetermined positions. Here, the predetermined positions are preferably positions that correspond to the positions of the through holes 17 formed in the cast joint members 15, and are preferably positions such that when a connecting member 20 (see Fig. 1) is inserted through the through holes 17, the folded back portions 31 of the first main reinforcing bars 30 surround the connecting member 20.
[0027] As shown in FIG. 4, multiple (two in this example) connecting members 20 extending in the horizontal direction (Y direction in the figure) are arranged so as to pass through the through holes 17 provided in each of the joint members 15 (15a to 15c). The connecting members 20 connect the joint members 15 (15a to 15c). At this time, the connecting members 20 are arranged so as to be positioned inside the folded-back portions 31 of the first main reinforcing bars 30 (see FIG. 3), which have been arranged in advance. An adjusting jig 23 is installed between the connecting members 20 and the first main reinforcing bars 30 so that the first main reinforcing bars 30 can surround the connecting members 20. By installing the adjusting jig 23, the first main reinforcing bars 30 and the connecting members 20 can be reliably joined via the adjusting jig 23, and the bending diameter of the first main reinforcing bars 30 can be kept within the specified range.
[0028] 5, second main reinforcing bars 40 extending in a direction perpendicular to the wall surface (inner surface) of the steel wall 10 (X direction in the figure) and distribution bars 42 extending in a direction perpendicular to the second main reinforcing bars 40 (Y direction in the figure) are placed between the folded-back first main reinforcing bars 30. The second main reinforcing bars 40 and distribution bars 42 may be placed at a predetermined interval as shown in the figure, or the second main reinforcing bars 40 and distribution bars 42 may be prepared in a state where they are both fixed together in advance.
[0029] 6 , a time-curing hardening material U, such as concrete, is poured so that the joint members 15, connecting members 20, adjusting jigs 23, first main reinforcing bars 30, second main reinforcing bars 40, and distribution bars 42 are embedded (enclosed). The time-curing hardening material U may be poured in two parts: a time-curing hardening material U1 poured to embed (enclose) and integrate the joint members 15, connecting members 20, adjusting jigs 23, first main reinforcing bars 30, second main reinforcing bars 40, and distribution bars 42 to form a reinforced concrete member 50; and a time-curing hardening material U2 poured to form a connecting concrete member 52 that fastens the reinforced concrete member 50 to the steel wall 10 and integrates the entire combined structure 1. Alternatively, the time-curing hardening material U may be poured to integrally form the reinforced concrete member 50 and the connecting concrete member 52.
[0030] In this way, the reinforced concrete member 50, which is composed of the joint member 15, connecting member 20, adjustment jig 23, first main reinforcing bar 30, second main reinforcing bar 40, and distribution bar 42, the steel wall 10 driven into the ground (not shown), and the connecting concrete member 52 for connecting them are integrated to construct the connection structure 1 of this embodiment.
[0031] (Action and effect) According to the connection structure 1 and its construction method of this embodiment, when multiple first main reinforcing bars 30 with long legs (long length) are provided inside the connection structure 1, the reinforcing bars are arranged in a configuration that transmits stress to the joint member 15 via connecting members 20 that are arranged to penetrate the joint member 15. This prevents breakage of members or reinforcing bars due to stress concentration without adopting a configuration in which the reinforcing bars are directly passed through holes formed in steel plates or the like, improves the performance of the dowels between the steel wall 10 and the reinforced concrete member 50 or connecting concrete member 52, and realizes a connection structure 1 in which the reinforcing bars are densely arranged to have excellent rigidity and strength.
[0032] Furthermore, in bridge substructure construction and the like, temporary steel sheet piles are first driven in as retaining walls, and then excavation is carried out, followed by the construction of the main structure (foundation piles, etc.), after which the temporary steel sheet piles are removed. However, in the construction method according to this embodiment, the steel walls 10 and joint members 15 are permanently used to construct the connected structure 1. This shortens the construction period and reduces costs. Furthermore, when temporary steel sheet piles are used, a distance must be ensured between the temporary steel sheet piles and the structure, but the construction method according to this embodiment does not use temporary steel sheet piles, making it possible to carry out construction in narrow areas.
[0033] While one embodiment of the present invention has been described above, the present invention is not limited to the illustrated embodiment. It is clear that a person skilled in the art can conceive of various modifications and alterations within the scope of the ideas set forth in the claims, and it is understood that these modifications and alterations also fall within the technical scope of the present invention.
[0034] (Other methods of building bonded structures) For example, in the construction method according to the above embodiment, the case where the time-dependent hardening material U1 is poured on-site to construct the reinforced concrete member 50 containing the joint member 15, the connecting member 20, the adjustment jig 23, the first main reinforcing bar 30, the second main reinforcing bar 40, and the distribution bar 42 is described, but the construction method of the connection structure 1 according to the present invention is not limited to this.
[0035] Specifically, the reinforced concrete member 50 may be a member prefabricated in a factory or the like (hereinafter, referred to as a precast reinforced concrete member), and the steel wall 10 and the precast reinforced concrete member 50 may be placed on-site. A connecting concrete member 52, called a time-hardening material U2, may be poured into the gap between the two to connect them, thereby constructing the combined structure 1. In this case, the joint member 15 is not pre-fixed to the steel wall 10, and the precast reinforced concrete member 50 is fabricated with the joint member 15, connecting member 20, adjusting jig 23, first main reinforcing bar 30, second main reinforcing bar 40, and distribution bar 42 embedded therein. In this case, the precast reinforced concrete member 50 may be fabricated with a partial end face of the joint member 15 exposed, or may be fabricated so that a portion of the first main reinforcing bar 30 (e.g., folded portion 31) is exposed.
[0036] Constructing the joint structure 1 using the reinforced concrete members 50 as precast reinforced concrete members not only achieves the effects described in the above embodiment, but also improves workability on site and shortens the construction period. In other words, it is possible to achieve both efficient workability and ensure bearing capacity.
[0037] In the above embodiment, the steel wall 10 is illustrated and described as a steel sheet pile, but the present invention is not limited to this. For example, various pile members that can be driven into the ground to form a wall, such as steel pipe piles or various types of shaped steel, may be used as the steel wall 10. [Industrial Applicability]
[0038] The present invention can be applied to a joint structure between a steel wall and a reinforced concrete member and a method for constructing the same. [Explanation of symbols]
[0039] 1…bond structure 10...Steel wall 15 (15a to 15c)... Joint member 17(17a~17c)...Through hole 20...Connecting member 23...Adjustment jig 30...First main rebar 31...Folded part 40...Second main rebar 42...Distribution reinforcement 50...Reinforced concrete members 52...Connecting concrete member U, U1, U2...Age-hardening materials
Claims
1. A joint structure between a steel wall and a reinforced concrete member, A plurality of steel joint members are embedded in the end of the reinforced concrete member facing the steel wall, The plurality of joint members extend in the vertical direction of the steel wall and are arranged so as to be parallel to each other, and one end of each of the joint members is connected to a wall surface of the steel wall, The plurality of joint members are connected to each other by connecting members passing through through holes provided in each of the joint members at portions embedded in the reinforced concrete member, A connection structure between a steel wall and a reinforced concrete member, characterized in that a main reinforcing bar extending in a direction perpendicular to the wall surface of the steel wall is embedded inside the reinforced concrete member in a folded state so as to surround the connecting member.
2. A method for constructing a joint structure between a steel wall and a reinforced concrete member according to claim 1, the reinforced concrete member is a precast reinforced concrete member manufactured so that an end surface of the joint member is exposed at an end portion facing the steel wall, The end surface of the joint member exposed from the precast reinforced concrete member is joined to the steel wall, A time-dependent hardening material is poured into the gap between the steel wall and the precast reinforced concrete member to form a connecting concrete member; A method for constructing a joint structure between a steel wall and a reinforced concrete member, comprising integrating the steel wall and the precast reinforced concrete member.
3. A method for constructing a joint structure between a steel wall and a reinforced concrete member according to claim 1, The plurality of joint members are joined to a wall surface of the steel wall, and the plurality of joint members are connected to each other by connecting members that pass through through holes provided in each of the joint members, A method for constructing a connection structure between a steel wall and a reinforced concrete member, characterized in that the main reinforcing bars are arranged in a folded state so that the main reinforcing bars surround the connecting member, and cast-in-place concrete is poured as a time-hardening material to produce the reinforced concrete member integrated with the steel wall.
Citation Information
Patent Citations
Underground structure and asymmetric u-shaped steel sheet-pile
JP1997100541A
Construction method for banking reinforced earth wall for constructing vertical wall surface with sheet pile as wall surface material
JP1997302665A
Banking reinforcing material fixing metal fitting and reinforced earth structure
JP1999021896A
Civil engineering structure and construction method for it
JP2004044119A
Construction method for power transmission mechanism, and power transmission mechanism
JP2006057252A
