Testing method
The described liquid feeding device for chromatographs addresses the issues of increased parts and leak sources by using a simplified cylinder pump system with integrated check valves and a downstream pressure sensor, enhancing maintenance efficiency and reducing costs.
Patent Information
- Application Number
- JP2023546807
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-09-13
- Filing Date
- 2022-07-08
- Publication Date
- 2024-11-20
- Estimated Expiration
- 2042-07-08
AI Technical Summary
Existing liquid chromatograph systems face issues with increased parts count, decreased throughput, and potential leak sources due to multiple pressure sensors and complex connections, which complicate maintenance and increase costs.
A simplified liquid feeding device configuration using a single or dual cylinder pump system with integrated check valves and a pressure sensor positioned downstream to minimize the number of parts and connection points, employing a method to estimate leakage by monitoring pressure changes during specific operational phases.
This configuration reduces the number of parts and connection points, thereby minimizing maintenance complexity and leak sources, while maintaining throughput and reducing costs.
Smart Images

Figure 0007587707000001 
Figure 0007587707000002 
Figure 0007587707000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an inspection method. [Background technology]
[0002] A high performance liquid chromatograph mass spectrometer (HPLC / MS) is an instrument that can qualitatively and quantitatively determine each component in a sample by combining separation of the target substance by chemical structure and physical properties using a high performance liquid chromatograph (HPLC) with separation of the target substance by mass using a mass spectrometer (MS). Due to this feature, it is possible to qualitatively and quantitatively determine the target substance even in cases where a large number of similar substances are mixed together due to metabolism in the body, such as pharmaceuticals in biological samples, and it is expected to be applied in the field of clinical testing.
[0003] A liquid chromatograph (LC) is composed of a pump that delivers the mobile phase, an autosampler that introduces the sample, a separation column that separates the sample, a detector that detects the target components in the sample, piping that connects them, and a control device that controls the operation of the device. The liquid delivery performance of a liquid chromatograph can affect the analytical accuracy of a liquid chromatograph mass spectrometer. For example, loosening of the flow path piping or leakage from flow path parts can reduce the liquid delivery performance. Therefore, in order to ensure the liquid delivery performance, a pressure resistance test is performed on the liquid chromatograph to measure the amount of leakage from the flow path, for example.
[0004] For example, the following techniques are known for testing the pressure resistance of a liquid chromatograph.
[0005] Patent Document 1 discloses a high-pressure constant flow pump which compares the pressure detection value from the second pressure sensor with the pressure detection value from the fourth pressure sensor, and if the pressure detection value from the second pressure sensor is equal to or greater than the pressure detection value from the fourth pressure sensor, the second check valve opens and ends the process, and if the pressure detection value from the second pressure sensor is less than the pressure detection value from the fourth pressure sensor, a leak is determined, and if it is determined that no leak is occurring, the solvent is determined, and the pump drives the first plunger by adding a compression distance determined for each solvent that is pre-stored in memory.
[0006] Patent document 2 also discloses a delivery device in which, in a test mode, a control means places one of the first and second pumping chambers under pressure, and places such a delivery device in fluid communication with the pumping chamber under pressure via the opposite check valve, thereby instructing one of the two motors to go to a pumping mode that enables testing of the outlet check valve of the opposite pumping chamber, and further places one motor in the pumping mode and then the other motor in the pumping mode, enabling testing of the two outlet check valves. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2014-215125 A [Patent Document 2] JP 2008-111856 A Summary of the Invention [Problem to be solved by the invention]
[0008] Incidentally, when testing the pressure resistance of a liquid chromatograph, it is possible to arrange multiple pressure sensors in the flow path, taking into consideration components such as check valves that may have different pressures on the upstream and downstream sides. However, an increase in the number of components is likely to lead to increased component costs, more complicated maintenance, a decrease in throughput due to an increase in the flow path capacity, and an increase in leak sources due to an increase in the number of connections in the flow path.
[0009] The present invention has been made in view of the above, and has an object to provide a method for inspecting a liquid delivery device that can suppress an increase in the number of parts, a decrease in throughput, and an increase in sources of leaks. [Means for solving the problem]
[0010] The present application includes a plurality of means for solving the above-mentioned problems. One example of the means is a resistance test for a liquid delivery device including a first cylinder, a first plunger that reciprocates within the first cylinder, a fluid tank that is connected to the upstream side of the first cylinder and stores a fluid that is a target for delivery, a first check valve that is connected to the upstream side of the first cylinder and suppresses backflow of the target for delivery from the first cylinder to the fluid tank, a second check valve that is connected to the downstream side of the first cylinder and suppresses backflow of the target for delivery from a downstream flow path to the first cylinder, and a pressure sensor connected to the downstream side of the second check valve. A pressure testing method comprising: a suction step of suctioning fluid from the fluid tank into the first cylinder by driving the first plunger in a suction direction; a first step of driving the first plunger in a discharge direction after the suction step; a second step of stopping the first plunger for a predetermined first time period; a third step of driving the first plunger in the discharge direction; and a fourth step of estimating the amount of leakage in the flow path upstream of the second check valve based on detection values of pressure detected by the pressure sensor from the start of the second step to the end of the third step. Effect of the Invention
[0011] According to the present invention, it is possible to suppress an increase in the number of parts, a decrease in throughput, and an increase in sources of leaks. [Brief description of the drawings]
[0012] [Figure 1] 1 is a diagram illustrating an overall configuration of a liquid chromatograph including a liquid delivery device according to a first embodiment. [Diagram 2] 5 is a flowchart showing the processing contents of a withstand voltage test according to the first embodiment. [Diagram 3] 4 is a diagram showing the relationship between the position of the first plunger in the first cylinder and the pressure in the first cylinder. FIG. [Figure 4] 5 is a diagram showing an example of a change over time in a detection value of a pressure sensor; FIG. [Diagram 5] FIG. 13 is a diagram illustrating an overall configuration of a liquid chromatograph including a liquid delivery device according to a second embodiment. [Figure 6] 5A and 5B are diagrams illustrating the relationship between the liquid delivery operation of a cylinder pump and the positions of first and second plungers relative to the first and second cylinders. [Figure 7] 10 is a flowchart showing the processing contents of a withstand voltage test according to a second embodiment. [Figure 8] 5 is a diagram showing an example of a change over time in a detection value of a pressure sensor; FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0014] In this embodiment, a liquid chromatograph (LC: Liquid Chromatograph) will be described as an example, but the present invention is not limited to this, and can also be applied to other chromatographs such as a high performance liquid chromatograph (HPLC: High Performance Liquid Chromatograph) and an ultra-high performance liquid chromatograph (UHPLC: Ultra-High Performance Liquid Chromatograph).
[0015] <First embodiment> A first embodiment of the present invention will be described in detail with reference to FIGS.
[0016] FIG. 1 is a diagram showing a schematic overall configuration of a liquid chromatograph including a liquid delivery device according to the present embodiment.
[0017] 1, the liquid chromatograph is configured with a liquid delivery device that delivers a liquid (solvent) to a liquid delivery destination 130. The liquid (solvent) delivery destination 130 in the liquid chromatograph is, for example, a separation column, a measurement unit such as a mass spectrometer (MS) or a diode array detector (DAD), an injection unit, a piping to be cleaned, or other location that requires delivery of the liquid (solvent).
[0018] The liquid delivery device is roughly composed of a cylinder pump 100 that sucks up and delivers solvent from solvent bottle 110 containing the liquid (solvent) to be delivered, cylinder pumps 200 and 300 that have a configuration similar to that of cylinder pump 100 and suck up and deliver solvent from solvent bottles 210 and 310, respectively, containing the liquid (solvent) to be delivered, a valve 120 that switches the delivery path of the liquid delivered from cylinder pumps 100, 200, and 300 between destination 130 and waste bottles 121, 122, and 123, and a control device 140 that controls the overall operation of the liquid chromatograph including the liquid delivery device.
[0019] A solvent bottle (fluid tank) 110 that stores the fluid to be sent is connected to the upstream side of the cylinder pump 100 (more precisely, a first cylinder 101 described later). The cylinder pump 100 is a so-called one-cylinder pump that is configured with one cylinder, and is configured with the first cylinder 101, a first plunger 102 that reciprocates in the first cylinder 101, a first check valve 103 that is connected to the upstream side of the first cylinder 101 and suppresses backflow of the fluid to be sent from the first cylinder 101 to the solvent bottle 110, a second check valve 104 that is connected to the downstream side of the first cylinder 101 and suppresses backflow of the fluid to be sent from the downstream flow path to the first cylinder 101, and a pressure sensor 105 that is connected to the downstream side of the second check valve 104. The cylinder pumps 200 and 300 have a similar configuration.
[0020] In the cylinder pump 100, by moving the first plunger 102 in a direction to pull it out of the first cylinder 101 (to the right in FIG. 1), the volume of the first cylinder 101 increases and the internal pressure of the first cylinder 101 decreases. At this time, the second check valve 104 closes due to the pressure difference between the upstream and downstream sides, and the first check valve 103 opens due to the pressure difference between the upstream and downstream sides, and the solvent is sucked from the solvent bottle 110 into the first cylinder 101.
[0021] Furthermore, by moving the first plunger 102 in a direction to push it into the first cylinder 101 (to the left in FIG. 1), the volume of the first cylinder 101 decreases and the internal pressure of the first cylinder 101 increases. At this time, the first check valve 103 closes due to the pressure difference between the upstream and downstream sides, and the second check valve 104 opens due to the pressure difference between the upstream and downstream sides, so that the solvent in the first cylinder 101 is sent to the downstream side.
[0022] In this way, the first plunger 102 slides back and forth within the first cylinder 101 to increase or decrease the volume of the first cylinder 101. The solvent in the solvent bottle 110 is sucked into the first cylinder 101 via the first check valve 103 and is delivered downstream via the second check valve.
[0023] The pressure sensor 105 detects the pressure in the flow path downstream of the second check valve 104, and transmits the detection result (pressure value) to the control device 140.
[0024] The valve 120 selectively switches the connection relationship of the flow paths connected to each port by rotating clockwise or counterclockwise. For example, in the example shown in Fig. 1, the solvent delivered from the cylinder pump 100 is delivered to the delivery destination 130. In addition, by rotating the flow paths of the valve 120 counterclockwise by 120° from the state shown in Fig. 1, for example, it is possible to switch so that the solvent delivered from the cylinder pump 100 is delivered to the waste bottle 121 and so that the solvent is delivered from another cylinder pump 300 to the delivery destination 130.
[0025] The control device 140 has an input device 141 such as a keyboard or a mouse, and an output device 142 such as a display device such as a monitor, or a printer. The input device 141 and the output device 142 provided in the control device 140 may have both an input function and a display function, such as a touch panel. The control device 140 acquires the detection result (pressure value) from the pressure sensor 105 while controlling the operation of the liquid delivery device, and performs a pressure resistance test using the acquired pressure value.
[0026] Fig. 2 is a flow chart showing the processing contents of the pressure resistance test, and Fig. 3 is a diagram showing the relationship between the position of the first plunger in the first cylinder and the pressure in the first cylinder.
[0027] The control device 140 performs a pressure test when starting up a liquid chromatograph including a liquid delivery device or before measurement.
[0028] In the pressure resistance test, the control device 140 first seals the flow path to be tested (step S100). For example, this is done by rotating the valve 120 counterclockwise by 30° from the state shown in FIG. 1 to remove the connection destination of the flow path to be tested (here, the flow path connected to the cylinder pump 100).
[0029] Next, liquid delivery from the cylinder pump 100 is started (step S110), and the pressure (the value detected by the pressure sensor 105) is increased to a predetermined target pressure P1 (Phase_A).
[0030] Next, it is determined whether the pressure has risen to pressure P1 within a predetermined time (step S120), and if the determination result is NO, the pressure resistance test is deemed to be a failure and the process is terminated. If the determination result in step S120 is YES, the liquid transfer from the cylinder pump 100 is stopped (step S130). In the process of step S120, a limit may be set on the liquid transfer time (∝ the movement amount of the first plunger 102) in consideration of the amount of leakage permitted in the flow path area from the cylinder pump 100 to the sealed portion (valve 120).
[0031] After the process of step S130 is completed, the cylinder pump 100 is not operated and the system waits for a predetermined time (Phase_B), and the leakage amount in the flow path downstream of the second check valve 104 is calculated from the pressure drop during the wait (step S140).
[0032] Next, it is determined whether the calculated leakage amount in the flow path downstream of the second check valve 104 is within a predetermined allowable range (step S150), and if the determination result is NO, the result of the pressure resistance test is deemed to be a failure and the process is terminated. If the determination result in step S150 is YES, the liquid supply from the cylinder pump 100 is resumed to supply additional liquid (step S160), and an attempt is made to increase the pressure to an arbitrary pressure (for example, pressure P1) (Phase_C), and the leakage amount in the flow path upstream of the second check valve 104 is calculated (step S170).
[0033] Next, it is determined whether the calculated leakage amount in the flow path upstream of the second check valve 104 is within a predetermined allowable range (step S180), and if the determination result is YES, the result of the pressure resistance test is deemed to be pass, and the process is terminated. On the other hand, if the determination result in step S180 is NO, the result of the pressure resistance test is deemed to be fail, and the process is terminated.
[0034] Here, a method for calculating the amount of leakage in the flow path upstream of the second check valve 104 will be described with reference to FIG.
[0035] In the following description, the leakage amount per unit time in the flow path upstream of the second check valve 104 is denoted as V'L1, and the leakage amount per unit time in the flow path downstream of the second check valve 104 is denoted as V'L2. Fig. 4 shows a state in which the leakage amount V'L1 is greater than the leakage amount V'L2, and an increase in the pressure value is observed due to additional liquid delivery (step S160 in Fig. 2).
[0036] 4, the detection value of the pressure sensor 105 is indicated by a solid line, and the slope of the pressure drop from the start of Phase_B to when a pressure rise is observed in Phase_C is designated as P'12. Also, the estimated pressure value of the flow path upstream of the second check valve 104 is indicated by a dotted line, and the estimated slope of the pressure drop from the start of Phase_B to when additional liquid transfer (step S160 in FIG. 2) begins as P'13, and the estimated slope of the pressure rise from when additional liquid transfer (step S160 in FIG. 2) begins as when a pressure rise is observed is designated as P'23.
[0037] Also, the target pressure value to be reached in Phase_A is P1, the pressure value when the pressure starts to rise due to additional liquid supply (step S160 in FIG. 2) is P2, and the estimated pressure in the flow path upstream of the second check valve 104 at the start of Phase_C is P3.
[0038] The volume from the first check valve 103 to the second check valve 104 is V1, and the volume from the second check valve 104 to the sealed stopper (here, valve 120) is V2. The liquid transfer flow rate per unit time in the additional liquid transfer (step S160 in FIG. 2) is F.
[0039] In this case, the amount of pressure change P' per unit time in a closed flow path is expressed by the following (Equation 1) using the bulk modulus k, the volume V of the flow path, and the leak volume V'L per unit time.
[0040] P'=(k / V)×V'L (Formula 1) Therefore, the following relationships (Equation 2) to (Equation 4) are derived.
[0041] P'12=(k / V2)×V'L2 (Formula 2) P'13=(k / V1)×V'L1 (Formula 3) P'23=(k / V1)×(F+V'L1) (Formula 4) Rearranging the above (Equations 2) to (Equation 4), the following (Equation 5) is obtained for the leakage amount V'L1 per unit time in the flow path upstream of the second check valve 104, using only design values, physical property values, and observable measured values.
[0042] V'L1=(V1P'12) / k-(t2F) / (t1+t2)=(V1V'L2) / V2-(t2F) / (t1+t2) (Formula 5) When V'L1≦V'L2, the calculation of the leakage amount (step S140 in FIG. 2) can evaluate the leakage amount in the flow path upstream of the second check valve 104. Furthermore, when no increase in pressure value is observed during additional liquid delivery (step S160 in FIG. 2), the minimum leakage amount can be estimated.
[0043] In the present embodiment as described above, the apparatus includes a first cylinder 101, a first plunger 102 that reciprocates within the first cylinder 101, a solvent bottle 110 (fluid tank) that is connected to the upstream side of the first cylinder 101 and stores the fluid to be transferred, a first check valve 103 that is connected to the upstream side of the first cylinder 101 and prevents the fluid to be transferred from the first cylinder 101 to the solvent bottle 110, a second check valve 104 that is connected to the downstream side of the first cylinder 101 and prevents the fluid to be transferred from the downstream flow path to the first cylinder 101, and a pressure sensor 105 that is connected to the downstream side of the second check valve 104. The pressure resistance testing method for a liquid delivery device is configured to include an suction step of suctioning fluid from a solvent bottle 110 into a first cylinder 101 by driving a first plunger 102 in a suction direction, a first step of driving the first plunger 102 in a discharge direction after the suction step, a second step of stopping the first plunger 102 for a predetermined first time, a third step of driving the first plunger 102 in the discharge direction, and a fourth step of estimating the amount of leakage in the flow path upstream of the second check valve 104 based on the pressure detection value detected by a pressure sensor 105 from the start of the second step to the end of the third step.
[0044] In other words, pressure sensor 105 is placed only upstream of second check valve 104, and the detection value of pressure sensor 105 is used to perform pressure resistance testing on the upstream and downstream sides of second check valve 104, thereby preventing an unnecessary increase in the number of parts (number of pressure sensors), and preventing an increase in parts costs and complicated maintenance.
[0045] Furthermore, since an increase in the number of pressure sensors can be suppressed, an increase in the flow passage capacity can be suppressed, and a decrease in throughput can be suppressed.
[0046] Furthermore, an increase in the number of connection points in the flow path, that is, points that can become the source of leakage, can be suppressed.
[0047] <Second embodiment> The second embodiment of the present invention will be described in detail with reference to FIGS.
[0048] This embodiment shows a case where the present invention is applied to a so-called two-cylinder pump configured with two cylinders.
[0049] 5 is a diagram showing the overall configuration of a liquid chromatograph including a liquid delivery device according to this embodiment, in which the same members as those in the first embodiment are given the same reference numerals and their explanations are omitted.
[0050] 5, the liquid chromatograph is configured with a liquid delivery device that delivers a liquid (solvent) to a liquid delivery destination 130. The liquid (solvent) delivery destination 130 in the liquid chromatograph is, for example, a separation column, a measurement unit such as a mass spectrometer (MS) or a diode array detector (DAD), an injection unit, a piping to be cleaned, or other location that requires delivery of the liquid (solvent).
[0051] The liquid delivery device is generally composed of a cylinder pump 100A that draws in and delivers a solvent from a solvent bottle 110 containing the liquid (solvent) to be delivered, a cylinder pump 400 that draws in and delivers a solvent from a solvent bottle 410 containing the liquid (solvent) to be delivered, a valve 120 that switches the delivery path of the liquid delivered from the cylinder pumps 100A and 400 between the delivery destination 130 and the waste liquid bottle 124, a mixer (mixer) 150 that mixes the solvent supplied from the cylinder pumps 100A and 400 via the valve 120 and delivers the mixture to the delivery destination 130, and a control device 140 that controls the overall operation of the liquid chromatograph including the liquid delivery device. The cylinder pump 400 has a similar configuration to the cylinder pump 100A.
[0052] A solvent bottle 110 that stores the fluid to be sent is connected to the upstream side of the cylinder pump 100A (more precisely, a first cylinder 101 described later). The cylinder pump 100A is a so-called two-cylinder pump that is composed of two cylinders, and is composed of the first cylinder 101, a first plunger 102 that reciprocates in the first cylinder 101, a first check valve 103 that is connected to the upstream side of the first cylinder 101 and suppresses backflow of the fluid to be sent from the first cylinder 101 to the solvent bottle 110, a second check valve 104 that is connected to the downstream side of the first cylinder 101 and suppresses backflow of the fluid to be sent from the downstream flow path to the first cylinder 101, a second cylinder 106 that is connected to the downstream side of the second check valve 104, a second plunger 107 that reciprocates in the second cylinder 106, and a pressure sensor 105 that is connected to the downstream flow path of the second cylinder 106.
[0053] Here, the liquid delivery operation of the cylinder pump 100A will be described. Fig. 6 is a diagram showing the relationship between the liquid delivery operation of the cylinder pump and the positions of the first and second plungers relative to the first and second cylinders.
[0054] In Fig. 6, the position of the first plunger 102 is indicated by a solid line, and the position of the second plunger 107 is indicated by a dotted line. In Fig. 6, the vertical axis indicates the position of the plunger relative to the cylinder, and the horizontal axis indicates time, with the upward direction along the vertical axis being the insertion direction relative to the cylinder (the left side in Fig. 5), that is, the direction in which the liquid is delivered.
[0055] As shown in FIG. 6, the first plunger 102 slides from the initial position (the position where the capacity of the first cylinder 101 is the smallest) in the suction direction (the direction of pulling out from the first cylinder 101) to suction (during suction) the solvent from the solvent bottle 110 into the first cylinder 101, and the second plunger 107 slides from the initial position (the position where the capacity of the second cylinder 106 is the largest) in the liquid delivery direction (the direction of pushing the second plunger 107 into the second cylinder 106) to deliver the solvent from the second cylinder 106 to the downstream side. At this time, the first check valve 103 is closed due to the pressure difference between the upstream side and the downstream side, and the second check valve 104 is closed due to the pressure difference between the upstream side and the downstream side. That is, the first cylinder 101 is filled with the solvent supplied from the solvent bottle 110, and the solvent in the second cylinder 106 is delivered to the downstream side.
[0056] When the filling of the solvent by suction into the first cylinder 101 is completed, the first plunger 102 is then slid in the liquid sending direction in parallel with the continued liquid sending from the second cylinder 106 to the downstream side, thereby compressing the solvent in the first cylinder 101 and increasing the pressure in the first cylinder 101 to the same as the pressure in the second cylinder 106. At this time, the first check valve 103 and the second check valve 104 are each closed due to the pressure difference between the upstream and downstream sides.
[0057] Once compression is complete, the second plunger 107 is then slid in the suction direction to suck in the solvent delivered from the first cylinder 101. At this time, the amount of liquid delivered downstream from the first cylinder 101 (the amount of movement of the first plunger 102 in the delivery direction) is made greater than the amount of liquid suction by the second cylinder 106 (the amount of movement of the second plunger 107 in the suction direction), so that the suction of the solvent by the second cylinder 106 and the delivery of the solvent from the second cylinder 106 to the downstream side are covered by the delivery of the solvent downstream by the first cylinder 101. This operation is called crossing. At this time, the first check valve 103 Upstream The first check valve 104 is closed due to the pressure difference between the upstream and downstream sides, and the second check valve 104 is open due to the pressure difference between the upstream and downstream sides.
[0058] When the solvent filling (crossing) from the first cylinder 101 to the second cylinder 106 is completed and the second plunger 107 reaches the initial position, the second plunger 107 stops and waits, while the first plunger 102, which is only responsible for sending the liquid downstream, sends the liquid at a slower speed than when crossing and returns to the initial position. At this time, the first check valve 103 is closed due to the pressure difference between the upstream and downstream sides, and the second check valve 104 is open due to the pressure difference between the upstream and downstream sides.
[0059] By repeating the above operations, i.e., the suction, compression, crossing, and discharge of the first plunger 102, and the discharge, suction, and standby operations of the second plunger 107, the cylinder pump 100A, which is a two-cylinder pump, seamlessly delivers liquid to the downstream flow path.
[0060] The pressure sensor 105 detects the pressure in the flow path downstream of the second check valve 104, and transmits the detection result (pressure value) to the control device 140.
[0061] The valve 120 selectively switches the connection relationship of the flow paths connected to each port by rotating clockwise or counterclockwise. For example, in the example shown in Fig. 5, the solvent delivered from the cylinder pump 100A, 400 is delivered to the delivery destination 130 via the mixer 150. In addition, by rotating the flow paths of the valve 120 60° counterclockwise from the state shown in Fig. 5, the solvent delivered from the cylinder pump 100A, 400 can be switched to be delivered to the waste liquid bottle 124.
[0062] The control device 140 has an input device 141 such as a keyboard or a mouse, and an output device 142 such as a display device such as a monitor, or a printer. The input device 141 and the output device 142 provided in the control device 140 may have both an input function and a display function, such as a touch panel. The control device 140 acquires the detection result (pressure value) from the pressure sensor 105 while controlling the operation of the liquid delivery device, and performs a pressure resistance test using the acquired pressure value.
[0063] Fig. 7 is a flowchart showing the processing contents of the pressure resistance test according to this embodiment, and Fig. 8 is a diagram showing an example of the change over time in the detection value of the pressure sensor.
[0064] The control device 140 performs a pressure test when starting up a liquid chromatograph including a liquid delivery device or before measurement.
[0065] In the pressure resistance test, the control device 140 first seals the flow path to be tested (step S200).
[0066] Next, liquid delivery from the cylinder pump 100A is started (step S210), and the pressure (the value detected by the pressure sensor 105) is increased to a predetermined target pressure P1 (Phase_A).
[0067] Next, it is determined whether the pressure has risen to pressure P1 within a predetermined time (step S220), and if the determination result is NO, the pressure resistance test is deemed to be a failure and the process is terminated. If the determination result in step S220 is YES, the first plunger 102 and the second plunger 107 are stopped to stop the liquid delivery from the cylinder pump 100A (step S230). In the process of step S220, a limit may be set on the liquid delivery time (∝ compression efficiency of the second cylinder 106) in consideration of the amount of leakage permitted in the flow path area from the cylinder pump 100A to the sealed location (valve 120).
[0068] Next, in order to allow some margin in the movement of the first plunger 102 when additional liquid is delivered by the first plunger 102 later (step S310), the first plunger 102 is returned to the HP and the second plunger 107 is stopped (step S240), and compression by the first plunger 102 and stopping of the second plunger 107 are performed (step S250).
[0069] Next, in order to accurately determine the capacity of the second cylinder 106, the second plunger 107 is returned from the HP while the first plunger 102 is performing a cross motion (step S260), and then the first plunger 102 is returned from the HP and the second plunger 107 is stopped (step S270), after which compression by the first plunger 102 is performed and the second plunger 107 is stopped (step S280).
[0070] After the process of step S280, the cylinder pump 100A is not operated and the system waits for a predetermined time (Phase_B), and the leakage amount in the flow path downstream of the second check valve 104 is calculated from the pressure drop during the wait (step S290).
[0071] Next, it is determined whether the calculated leakage amount in the flow path downstream of the second check valve 104 is within a predetermined allowable range (step S300), and if the determination result is NO, the result of the pressure resistance test is determined to be a failure and the process is terminated.
[0072] If the determination result in step S300 is YES, the first plunger 102 is driven to deliver additional liquid, and the second plunger 107 is stopped (step S310), and an attempt is made to increase the pressure to an arbitrary pressure (for example, pressure P1) (Phase_C), and the leakage amount in the flow path upstream of the second check valve 104 is calculated (step S320). The method of calculating the leakage amount in the flow path upstream of the second check valve 104 is the same as in the first embodiment (see FIG. 4).
[0073] Next, it is determined whether the calculated leakage amount in the flow path upstream of the second check valve 104 is within a predetermined allowable range (step S330), and if the determination result is YES, the result of the pressure resistance test is deemed to be pass, and the process is terminated. On the other hand, if the determination result in step S330 is NO, the result of the pressure resistance test is deemed to be fail, and the process is terminated.
[0074] The other configurations are similar to those of the first embodiment.
[0075] In the present embodiment configured as described above, the same configuration as in the first embodiment can be obtained.
[0076] <Additional Notes> The present invention is not limited to the above-described embodiments, and includes various modifications and combinations within the scope of the gist of the present invention. The present invention is not limited to those having all the configurations described in the above-described embodiments, and includes those in which some of the configurations are deleted. The above-described configurations, functions, etc. may be realized by designing some or all of them as an integrated circuit, for example. The above-described configurations, functions, etc. may be realized by software, in which a processor interprets and executes a program that realizes each function. [Explanation of symbols]
[0077] 100, 100A, 200, 300, 400... cylinder pump, 101... first cylinder, 102... first plunger, 103... first check valve, 104... second check valve, 105... pressure sensor, 106... second cylinder, 107... second plunger, 110, 210, 310, 410... solvent bottle, 120... valve, 121, 122, 123, 124... waste liquid bottle, 130... liquid delivery destination, 140... control device, 141... input device, 142... output device, 150... mixer
Claims
1. A first cylinder; a first plunger that reciprocates within the first cylinder; a fluid tank connected to the upstream side of the first cylinder and configured to store a fluid to be delivered; a first check valve connected to the upstream side of the first cylinder and configured to suppress a backflow of a liquid to be transferred from the first cylinder to the fluid tank; A second check valve connected to the downstream side of the first cylinder and configured to suppress a backflow of a liquid to be fed from a downstream flow path to the first cylinder; a pressure sensor connected to the downstream side of the second check valve; A pressure resistance inspection method for a liquid delivery device comprising: a suction step of suctioning fluid from the fluid tank into the first cylinder by driving the first plunger in a suction direction; a first step of driving the first plunger in a discharge direction after the suction step; a second step of stopping the first plunger for a first predetermined time period; a third step of driving the first plunger in the discharge direction; and a fourth step of estimating the amount of leakage in the flow path upstream of the second check valve based on the pressure detection value detected by the pressure sensor from the start of the second step to the end of the third step.
2. The pressure resistance inspection method for a liquid delivery device according to claim 1, In the first step, the first plunger is driven in a discharge direction so that a detection value of the pressure sensor reaches a first target pressure value; The pressure resistance inspection method, wherein in the third step, the first plunger is driven in a discharge direction so that the detection value of the pressure sensor reaches a second target pressure value.
3. The pressure resistance inspection method for a liquid delivery device according to claim 1, the liquid delivery device includes a second cylinder provided downstream of the first cylinder and between the first cylinder and the pressure sensor, and a second plunger that reciprocates within the second cylinder; driving the first plunger and the second plunger so that a pressure in the first cylinder and a pressure in the second cylinder become equal at the completion of the first step; In the second step, the first plunger and the second plunger are stopped for the first time, The pressure resistance inspection method for a liquid delivery device, wherein in the third step, the second plunger is fixed, and only the first plunger is driven in the discharge direction.
4. The pressure resistance inspection method for a liquid delivery device according to claim 3, A pressure resistance testing method for a liquid delivery device, comprising the step of driving the second plunger so as to move the second plunger to a predetermined position upon completion of the first step.
5. The pressure resistance inspection method for a liquid delivery device according to claim 1, A pressure resistance testing method for a liquid delivery device, comprising a fifth step of issuing an alarm when the amount of leakage estimated in the fourth step exceeds a predetermined threshold value.
6. The pressure resistance inspection method for a liquid delivery device according to claim 1, A pressure resistance inspection method for a liquid delivery device, comprising carrying out the first to fourth steps when the liquid delivery device is started up.
Citation Information
Patent Citations
Device for detecting internal leakage rate of check valve and test method thereof
CN109282953A
Methods and apparatus for determining presence of fluid leak
JP2008111856A
High pressure constant flow rate pump and method for feeding liquid of high pressure constant flow rate
JP2014215125A
Switching valve, binary pump, and liquid chromatograph provided with binary pump
WO2018055866A1
Liquid feed device
WO2019008617A1
