Joint structure between steel wall and reinforced concrete member and its construction method

The joint structure between steel walls and reinforced concrete members addresses the challenge of dense reinforcing bar arrangement by using locked metal fittings and time-hardening concrete, improving rigidity and reducing construction time and costs.

JP7587777B2Active Publication Date: 2024-11-21GEOSTER CORP +2
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021104033
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-23
Publication Date
2024-11-21
Estimated Expiration
2041-06-23

AI Technical Summary

Technical Problem

Existing joint structures between steel walls and reinforced concrete members face challenges in densely arranging reinforcing bars, leading to issues with dowel performance and rigidity, as well as stress concentration, particularly when using temporary steel sheet piles for permanent construction.

Method used

A joint structure is devised using male and female metal fittings and reinforcing bars that are locked together, allowing for dense arrangement and improved rigidity, with reinforcing bars extending out-of-plane and connected via time-hardening concrete to integrate steel walls and reinforced concrete members.

Benefits of technology

The solution enables dense placement of reinforcing bars, enhancing dowel performance and rigidity while preventing stress concentration, reducing construction time and costs by utilizing permanent steel structures, and allowing construction in narrow areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007587777000001
    Figure 0007587777000001
  • Figure 0007587777000002
    Figure 0007587777000002
  • Figure 0007587777000003
    Figure 0007587777000003
Patent Text Reader

Abstract

To densely arrange reinforcing bars so as to exert excellent rigidity by improving the dowel performance between a steel wall and a reinforced concrete member when constructing a coupling structure by coupling the steel wall and the reinforced concrete member.SOLUTION: In a coupling structure of a steel wall 10 and a reinforced concrete member, multiple joint members 15 each constituted of a first metal fitting and a second metal fitting configured to engage with each other and a first main reinforcing bar 30 engaged with the joint member 15 are embedded in an end of the reinforced concrete member facing the steel wall 10. The first metal fitting is arranged extending vertically along the steel wall 10. One end of the first metal fitting is coupled to a wall surface of the steel wall 10 and the other end is engaged with the second metal fitting. The first main reinforcing bar 30 is locked between the first metal fitting and the second metal fitting by the engagement of the first metal fitting and the second metal fitting.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a joint structure between a steel wall and a reinforced concrete member and a method for constructing the same. [Background technology]

[0002] In general bridge substructure construction, underground structures for water storage, and various civil engineering structure construction, walls may be constructed using steel sheet piles (sheet piles) etc. For example, Patent Document 1 discloses a technique for constructing a civil engineering structure in which the exterior wall material is made of steel sheet piles, adjacent steel sheet piles are connected to each other by waling materials and connecting metal fittings attached to the steel sheet piles, and supporting force is imparted between the steel sheet piles and the hardening material (concrete) by inserting anchor materials into the waling materials.

[0003] In bridge substructure construction, a procedure is adopted in which temporary steel sheet piles are first driven in as retaining soil, excavation is carried out, the structure itself (foundation piles, etc.) is constructed, and then backfilling and removal of the temporary steel sheet piles are carried out. Because the use of such temporary steel sheet piles is wasteful in terms of effort and cost, for example, Patent Document 2 discloses a technology for constructing a bridge pier foundation structure by effectively utilizing steel sheet piles that have been used as temporary structures by using them as permanent structures.

[0004] Patent Document 3 discloses a technique for constructing a footing by driving a plurality of steel sheet piles, to which perforated steel plates have been welded in advance, into the ground, hanging anchor rebars on the perforated steel plates via locking members, and pouring concrete around them. Patent Document 3 aims to improve workability in a structure that transmits shear and tensile forces between steel materials (steel sheet piles) and concrete by locking members and anchor rebars.

[0005] Moreover, in recent years, from the standpoint of ease of construction and shortening construction time when constructing various structures, a technique has become common in which so-called precast concrete members (also simply called precast members) are used as concrete members, in which members that have been prefabricated in factories or other locations are transported to the site and assembled to existing members. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2004-44119 A [Patent Document 2] JP 2010-216150 A [Patent Document 3] JP 2006-57252 A Summary of the Invention [Problem to be solved by the invention]

[0007] In the above Patent Document 1, the reinforcing bars serving as anchor materials are directly inserted into the holes in the wale-raising material to obtain a bearing force between the hardening material and the reinforcing bars. In the above Patent Document 2, the reinforcing bars are directly hooked (inserted) into the holes in the perforated steel plate dowels attached to the steel sheet pile to obtain a slip-stop effect.

[0008] In the configurations disclosed in Patent Documents 1 and 2, if one attempts to place long-legged reinforcing bars closely together in order to improve the dowel performance and rigidity, it is difficult in terms of workability to insert the reinforcing bars directly into holes formed in steel plates, etc. Specifically, in Patent Document 1, the vertical pitch of the wale-raising members is approximately 100 cm (=1000 mm), and the configuration is not one in which the reinforcing bars are placed closely together. In addition, in Patent Document 2, one perforated steel plate dowel is attached to one steel sheet pile with a width of 900 mm, and therefore the intervals between the reinforcing bars hooked thereon are also considered to be approximately 900 mm apart, and the configuration is not one in which the reinforcing bars are placed closely together.

[0009] In the configuration in which reinforcing bars are directly inserted into holes formed in steel plates or the like as in Patent Documents 1 and 2, it is difficult to arrange reinforcing bars in a dense state, and there is a concern that stress concentration may cause destruction, so there is a demand for further improvements in dowel performance and rigidity. Also, as mentioned above, since it is advantageous in terms of effort and cost to use steel sheet piles that have been used as temporary structures as permanent structures, there is a demand for a joint structure between a steel sheet pile (steel wall) and a reinforced concrete member that allows temporary steel sheet piles to be used as permanent steel sheet piles and allows reinforcing bars for dowels to be arranged densely.

[0010] In addition, in the technology disclosed in Patent Document 3, when hanging the anchor rebar on a perforated plate, a locking member is inserted into the hole and the anchor rebar is hooked onto the locking member, thereby improving workability. However, no consideration is given to stress concentration on the steel material and the locking member that accompanies the arrangement of the anchor rebar.

[0011] In view of the above circumstances, an object of the present invention is to provide a connection structure between a steel wall and a reinforced concrete member, which improves the dowel performance between the steel wall and the reinforced concrete member and enables the reinforcing bars to be densely arranged so as to have excellent rigidity when connecting a steel wall and a reinforced concrete member to construct a connection structure, and a method for constructing the same. [Means for solving the problem]

[0012] In order to achieve the above-mentioned object, according to the present invention, there is provided a connection structure between a steel wall and a reinforced concrete member, characterized in that a plurality of joint members consisting of a first metal fitting and a second metal fitting configured to be freely fitted together, and a first main reinforcing bar engaged with the joint members are embedded in the end of the reinforced concrete member facing the steel wall, the first metal fitting is arranged extending in the vertical direction of the steel wall, one end of the first metal fitting is connected to the wall surface of the steel wall and the other end is fitted into the second metal fitting, and the first main reinforcing bar is engaged between the first metal fitting and the second metal fitting by the fitting of the first metal fitting and the second metal fitting.

[0013] The first fitting may be a male fitting and the second fitting may be a female fitting, and the first main reinforcing bar may extend in an outward direction of the wall surface of the steel wall and be folded back along the outer peripheral shape of the female fitting on the surface of the female fitting facing the steel wall to be engaged between the male fitting and the female fitting.

[0014] The first fitting may be a male fitting and the second fitting may be a female fitting, the first main reinforcing bar may extend in an out-of-plane direction of the wall surface of the steel wall and have an expansion portion at an end facing the steel wall, and the first main reinforcing bar may be engaged with the female fitting by engaging the expansion portion between the male fitting and the female fitting on the surface of the female fitting facing the steel wall.

[0015] The other end of the male fitting may be provided with a mooring protrusion, and the female fitting may be formed with a mooring groove serving as a receiving portion for the mooring protrusion.

[0016] The first fitting may be a female fitting and the second fitting may be a male fitting, and the first main reinforcing bar may extend in an outward direction of the wall surface of the steel wall and be folded back along the outer peripheral shape of the male fitting and engaged with the female fitting on the surface of the male fitting facing the steel wall.

[0017] A mooring groove may be formed on the other end of the female fitting, and the male fitting may be provided with a mooring protrusion that can be fitted into the mooring groove with the mooring groove serving as a receiving portion.

[0018] In the reinforced concrete member, the first main reinforcing bars may be embedded in multiple places, and a second main reinforcing bar extending in a direction outward from the surface of the steel wall at a position sandwiched between the multiple first main reinforcing bars, and a distribution bar extending in a direction perpendicular to the second main reinforcing bars may be further embedded.

[0019] The steel wall is a wall body formed by connecting hat-shaped steel sheet piles, and the width length of the first metal fitting may be designed to be a width length such that the other end position of the first metal fitting is aligned in accordance with the cross-sectional uneven shape of the hat-shaped steel sheet pile.

[0020] Furthermore, according to the present invention, there is provided a method for constructing a connection structure between a steel wall and a reinforced concrete member described above, wherein the reinforced concrete member is a precast reinforced concrete member manufactured so that one end of the first metal fitting is exposed at the end facing the steel wall, the end of the first metal fitting exposed from the precast reinforced concrete member is joined to the steel wall, a time-dependent hardening material is poured into the gap between the steel wall and the precast reinforced concrete member to form a connecting concrete member, and the steel wall and the precast reinforced concrete member are integrated together.

[0021] Furthermore, according to the present invention, there is provided a method for constructing a connection structure between a steel wall and a reinforced concrete member described above, characterized in that one end of the first metal fitting is connected to a wall surface of the steel wall, the first main reinforcing bar is engaged with the second metal fitting by fitting the first metal fitting with the second metal fitting, and cast-in-place concrete is poured as a time-hardening material to integrate the steel wall and the reinforced concrete member. Effect of the Invention

[0022] According to the present invention, when a steel wall and a reinforced concrete member are joined to construct a joint structure, it is possible to improve the dowel performance between the steel wall and the reinforced concrete member and to arrange the reinforcing bars closely so as to have excellent rigidity. [Brief description of the drawings]

[0023] [Figure 1] 1 is a schematic explanatory diagram of a joint structure between a steel wall and a reinforced concrete member according to an embodiment of the present invention. FIG. [Diagram 2] FIG. 4 is a schematic explanatory diagram of the shape of a female metal fitting and a first main reinforcing bar. [Diagram 3] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to an embodiment of the present invention. [Figure 4]1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to an embodiment of the present invention. [Diagram 5] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to an embodiment of the present invention. [Figure 6] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to an embodiment of the present invention. [Figure 7] 1A to 1C are schematic explanatory diagrams showing a method for constructing a bonded structure according to an embodiment of the present invention. [Figure 8] FIG. 2 is a schematic explanatory view of a connection structure according to a first alternative embodiment of the present invention. [Figure 9] FIG. 11 is a schematic explanatory diagram showing the shape of a female metal fitting and a first main reinforcing bar according to the first alternative embodiment of the present invention. [Figure 10] FIG. 11 is a schematic explanatory view of a connection structure according to a second alternative embodiment of the present invention. [Figure 11] FIG. 11 is a schematic explanatory diagram showing the shapes of a female fitting as a first fitting and a male fitting as a second fitting according to a second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0024] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In this specification and the drawings, components having substantially the same functional configuration may be denoted by the same reference numerals to avoid repetitive explanation. In addition, in this specification, for the purpose of explanation, some illustrations of the reinforcing bar structure and reinforcing bar arrangement may be omitted, or the reinforcing bar arrangement inside the concrete, which is not usually visible, may be illustrated.

[0025] (Configuration of the joint structure according to the embodiment of the present invention) FIG. 1 is a schematic explanatory diagram of a joint structure (hereinafter, also simply referred to as a joint structure) 1 between a steel wall and a reinforced concrete member according to an embodiment of the present invention. As shown in FIG. 1, the joint structure 1 has a steel wall 10 and a joint member 15 joined to the steel wall 10. The steel wall 10 may be, for example, a hat-shaped steel sheet pile, a U-shaped steel sheet pile, or a steel pipe sheet pile extending in the vertical direction (up and down direction, Z direction in the figure). One end of the joint member 15 is joined to the wall surface (inner surface) of the steel wall 10 by a fixing means. The joint member 15 is composed of a male fitting 17 as a first fitting and a female fitting 20 as a second fitting, and at the other end, the female fitting 20 as a receiver and the male fitting 17 are configured to be freely fitted together. In this embodiment, as shown in FIG. 1, a plurality of coupling members 15 (for example, 15a to 15c in the figure) are arranged parallel to one another at a predetermined interval, and each coupling member 15a to 15c includes male fittings 17a to 17c and female fittings 20a to 20c.

[0026] Here, the width length (length in the X direction in the figure) of the joint member 15 (or the male metal fitting 17) may be adjusted depending on the position of the steel wall 10 to which each joint member 15 (15a to 15c) is fixed. For example, when the steel wall 10 is a hat-shaped steel sheet pile or a wall formed by connecting multiple hat-shaped steel sheet piles, the width length may be designed so that the other end positions of each joint member 15 (15a to 15c) are aligned when fixed to the steel wall 10, depending on the unevenness of the cross-sectional shape. Also, the means for fixing the joint member 15 to the steel wall 10 may be, for example, welding or bolting.

[0027] The configuration of male fitting 17 (17a-17c) can be designed arbitrarily according to the shape of female fitting 20 serving as a receiver, and may be configured, for example, to be substantially T-shaped in plan view, shaped like a rib extending in the vertical direction, and provided with mooring protrusions 22 (22a-22c) at the other end that can be fitted by being inserted into mooring grooves 21 (21a-21c) serving as a receiver of female fitting 20. In other words, male fitting 17 may be manufactured by welding rib-shaped mooring protrusions 22 to a plate-like member.

[0028] As shown in Fig. 1, the joint structure 1 is provided with a first main reinforcing bar 30 that is engaged by a female metal fitting 20. The first main reinforcing bar 30 extends in an out-of-plane direction of the wall surface (inner surface) of the steel wall 10, for example, in a direction perpendicular to the wall surface (X direction in the figure), and is engaged in a folded-back state between the male metal fitting 17 and the female metal fitting 20. This folded-back portion 31 may be folded back along the outer peripheral shape of the female metal fitting 20, for example, may be folded back so as to form a so-called U-shape in plan view. Here, a groove (not shown in Fig. 1, see groove portion 18 in Fig. 3) for engaging the first main reinforcing bar 30 may be formed in a part of the male metal fitting 17.

[0029] As shown in FIG. 1, the first main reinforcing bars 30 may be arranged in parallel with each other at a predetermined interval. The interval a between the folded reinforcing bars may be 150 mm to 300 mm. The first main reinforcing bars 30 are preferably folded back evenly from the folding point (the center of the folding part 31) so that the extension lengths to both ends (length L in the X direction in the figure) are the same. This is because when an external force is applied to the main reinforcing bars 30, the external force is uniform, which suppresses breakage of the reinforcing bars. The length L here is preferably 950 mm to 1150 mm, for example. The type of reinforcing bar of the first main reinforcing bars 30 is not particularly limited, and may be, for example, a deformed reinforcing bar.

[0030] In the combined structure 1, second main reinforcing bars 40 extending in a direction outside the wall surface (inner surface) of the steel wall 10, for example, in a direction perpendicular to the wall surface (X direction in the figure), and distribution bars 42 extending in a direction perpendicular to the second main reinforcing bars 40 (Y direction in the figure) may be provided at a position sandwiched between the multiple first main reinforcing bars 30. These second main reinforcing bars 40 and distribution bars 42 may be provided in multiple locations parallel to each other at a predetermined interval, for example. The second main reinforcing bars 40 and distribution bars 42 are not essential, and the positions at which they are provided may be arbitrary, but providing them improves the rigidity and strength of the combined structure 1 as a whole.

[0031] Note that the various members and reinforcing bars (joint member 15, first main reinforcing bar 30, second main reinforcing bar 40, and distribution bar 42) that make up the joint structure 1 are embedded (contained) in a time-dependent hardening material (e.g., concrete) not shown in FIG. 1 by application of the time-dependent hardening material, and become a reinforced concrete member (reinforced concrete member 50 described below). For example, at the end of the reinforced concrete member that faces the steel wall 10, the joint member 15 is embedded in an exposed state, and the joint member 15 is joined to the wall surface (inner surface) of the steel wall 10 to form an integrated structure. Note that the reinforced concrete member may be made of, for example, either cast-in-place concrete or precast concrete.

[0032] In addition, in order to integrate the steel wall 10 and the reinforced concrete member in the joint structure 1, a time-hardening material (not shown) may be poured into the wall surface (inner surface) of the steel wall 10 to serve as a connecting concrete member (connecting concrete member 52 described later). The connecting concrete member includes the joint member 15 and a part of the first main reinforcing bar 30 (for example, a part of the folded-back portion 31).

[0033] (Female metal fitting, shape of first main rebar) 2 is a schematic explanatory diagram of the shapes of the female metal fitting 20 and the first main reinforcing bar 30, where (a) is an overhead view of the female metal fitting 20 and (b) is a plan view of the first main reinforcing bar 30. Note that Fig. 2(a) is a diagram of the female metal fitting 20 as viewed from the side facing the steel wall 10 when the joint member 15 is constructed.

[0034] 2(a), the female metal fitting 20 is a member having a semi-cylindrical shape with a substantially semicircular cross section in plan view, and is formed with a so-called slit-like anchoring groove portion 21 that extends in the vertical direction with its curved surface side as the open side. The cross-sectional shape of the anchoring groove portion 21 in plan view may be any shape that is compatible with the male metal fitting 17, for example, a substantially T-shape as shown in the figure.

[0035] 2(b), the first main reinforcing bar 30 is a member in which a single reinforcing bar is folded back at a folded back portion 31 to have a so-called U-shape in plan view. When constructing the joint member 15 as shown in FIG. 1, the female metal fitting 20 is arranged so that the outer periphery of the curved side (the side facing the steel wall 10) is surrounded by the folded back portion 31 of the first main reinforcing bar 30, and the first main reinforcing bar 30 is locked. Therefore, it is preferable that the shape of the curved side of the female metal fitting 20 and the shape of the folded back portion 31 of the first main reinforcing bar 30 are designed to be approximately semicircular so as to match each other.

[0036] (Method of constructing bond structure) 3 to 7 are schematic explanatory diagrams showing a method for constructing the joint structure 1 according to this embodiment. First, as shown in FIG. 3, the steel wall 10, in which one end of the male metal fittings 17 (17a to 17c) constituting the joint members 15 (15a to 15c) is fixed to the wall surface (inner surface), is driven into the ground or the like (not shown) in a state of being extended in the vertical direction (up and down direction, Z direction in the figure). Here, the steel wall 10 is, for example, a hat-shaped steel sheet pile, and the male metal fittings 17 (17a to 17c) are plate-like members having mooring protrusions 22 (22a to 22c) at the other end. In addition, in the configuration according to this embodiment, grooves 18 (18a to 18c) for locking the first main reinforcing bars 30 described later are formed in some locations of the male metal fittings 17 (two locations each in the up and down directions of the mooring protrusions 22). The male metal fittings 17 may be fixed to the steel wall 10 in advance in a factory or the like, or may be fixed during construction on site.

[0037] 4, a plurality of first main reinforcing bars 30 are arranged parallel to each other. The first main reinforcing bars 30 are reinforcing bars that are folded back in advance at the folded back portions 31 to form a so-called U-shape in plan view, and are arranged at positions where the folded back portions 31 are engaged with the groove portions 18.

[0038] 5, the joint member 15 (15a to 15c) is constructed by fitting the anchoring protrusion 22 of the male metal fitting 17 (17a to 17c) into the anchoring groove 21 of the female metal fitting 20 (20a to 20c). At this time, the first main reinforcing bar 30 is placed in a predetermined position by fitting the female metal fitting 20 (20a to 20c) into the male metal fitting 17 (17a to 17c) so as to cover the groove 18 with the folded portion 31 of the first main reinforcing bar 30 engaged in the groove 18. Here, the first main reinforcing bar 30 may be fixed in a predetermined position, or may be loosely fitted so as to be movable to a certain extent.

[0039] 6, second main reinforcing bars 40 extending in a direction perpendicular to the wall surface (inner surface) of the steel wall 10 (X direction in the figure) and distribution bars 42 extending in a direction perpendicular to the second main reinforcing bars 40 (Y direction in the figure) are arranged between the multiple first main reinforcing bars 30. The second main reinforcing bars 40 and distribution bars 42 may be arranged at a predetermined interval as shown in the figure, or the second main reinforcing bars 40 and distribution bars 42 may be prepared in a state where they are both fixed together in advance.

[0040] Then, as shown in Fig. 7, a time-curing hardening material U, for example concrete, is cast so that the joint member 15 (male metal fitting 17 and female metal fitting 20), the first main reinforcing bar 30, the second main reinforcing bar 40, and the reinforcing bar 42 are embedded (contained) therein. The time-curing hardening material U cast here may be cast separately into a time-curing hardening material U1 cast to form a reinforced concrete member 50 by embedding (contains) the joint member 15, the first main reinforcing bar 30, the second main reinforcing bar 40, and the reinforcing bar 42 and integrating them, and a time-curing hardening material U2 cast to form a connecting concrete member 52 for fixing the reinforced concrete member 50 to the steel wall 10 and integrating the entire joint structure 1. Alternatively, the time-curing hardening material U may be cast so as to integrally form the reinforced concrete member 50 and the connecting concrete member 52.

[0041] In this manner, the joint member 15, the first main reinforcing bar 30, the second main reinforcing bar 40, and the reinforced concrete member 50 containing the distribution bar 42, the steel wall 10 driven into the ground (not shown), and the connecting concrete member 52 for connecting them are integrated to construct the connection structure 1 of this embodiment.

[0042] (Action and effect) According to the connection structure 1 and its construction method of the present embodiment, when the first main reinforcing bars 30 with multiple long legs (long length) are provided inside the connection structure 1, the reinforcing bars are arranged in such a configuration that the stress generated between the reinforced concrete member 50 and the steel wall 10 is transmitted via the joint member 15 consisting of the male metal fitting 17 and the female metal fitting 20. This realizes a connection structure 1 in which the reinforcing bars are densely arranged so as to have excellent rigidity and strength, improving the dowel performance between the steel wall 10 and the reinforced concrete member 50 or the connecting concrete member 52 while preventing breakage of the members or reinforcing bars due to stress concentration without adopting a configuration in which the reinforcing bars are directly passed through holes formed in the steel plate or the like.

[0043] In bridge substructure construction and the like, temporary steel sheet piles are first driven in as retaining soil, excavation is then carried out, the structure itself (foundation piles, etc.) is constructed, and then the temporary steel sheet piles are removed. In the construction method according to this embodiment, the steel walls 10 and joint members 15 are permanently used to construct the joint structure 1. This shortens the construction period and reduces costs. In addition, when temporary steel sheet piles are used, a distance must be ensured between the temporary steel sheet piles and the structure, but the construction method according to this embodiment does not use temporary steel sheet piles, making it possible to carry out construction in narrow areas.

[0044] Although an example of an embodiment of the present invention has been described above, the present invention is not limited to the illustrated embodiment. It is clear that a person skilled in the art can come up with various modified or revised examples within the scope of the ideas described in the claims, and it is understood that these also naturally belong to the technical scope of the present invention.

[0045] (First Alternative Embodiment of the Present Invention) Fig. 8 is a schematic explanatory diagram of a joint structure 1a according to a first alternative embodiment of the present invention. Here, components having the same functional configuration as those in the above embodiment are illustrated with the same reference numerals, and their explanation may be omitted. Fig. 9 is a schematic explanatory diagram of the shape of a female metal fitting 60 and a first main reinforcing bar 70 according to another embodiment, where (a) is an overhead view of the female metal fitting 60 and (b) is a plan view of the first main reinforcing bar 70. Fig. 9(a) is a view of the female metal fitting 60 as viewed from the side facing the steel wall 10 when the joint member 15 is constructed.

[0046] As shown in FIG. 8, in the joint structure 1a according to the first alternative embodiment, female metal fittings 60 (60a to 60c) having a different shape and configuration from those in the above embodiment are used, and accordingly, the shape and configuration of the first main reinforcing bar 70 are also different. As shown in FIG. 9(a), the female metal fitting 60 is a member having a substantially rectangular shape in a plan view, and the same anchoring groove portion 21 as in the above embodiment is formed in the female metal fitting 60, and in addition, a side groove 61 for locking the reinforcing bar is formed on the side. Also, as shown in FIG. 9(b), the first main reinforcing bar 70 has an expansion portion 72 at the end of the straight reinforcing bar 71, and the expansion portion 72 has a shape that has a thickness or bulge that is extremely large compared to the diameter of the reinforcing bar 71. When a plurality of first main reinforcing bars 70 are arranged, two first main reinforcing bars 70 may be locked by one and the same female metal fitting 60, and the interval at that time may be, for example, the predetermined interval a as in the above embodiment.

[0047] 8, in the joint structure 1a according to this embodiment, the first main reinforcing bar 70 is arranged so that the expanded portion 72 at the end faces the steel wall 10, and the mooring protrusion 22 of the male metal fitting 17 (17a-17c) is fitted into the mooring groove portion 21 (21a-21c) of the female metal fitting 60 (60a-60c) to form the joint member 15 (15a-15c). At that time, the straight reinforcing bar 71 of the first main reinforcing bar 70 may be engaged with the side groove 61.

[0048] 8 and 9, the joint structure 1a according to the first alternative embodiment of the present invention has the advantages described in the above embodiment, and the shape of the male metal fitting 17 is simplified, and there is no need to form the first main reinforcing bar 70 into a shape with a curvature such as a U-shape, thereby reducing the load of machining the components. Also, by designing the side groove 61 formed in the female metal fitting 60 to have a deep shape in advance, it is possible to adjust the interval a between the reinforcing bars without changing the shape of the female metal fitting 60.

[0049] (Second Alternative Embodiment of the Present Invention) In the above embodiment, the joint member 15 is illustrated and described as being composed of the male fitting 17 as the first fitting and the female fitting 20 as the second fitting, but the scope of application of the present invention is not limited to this. For example, the first fitting constituting the joint member 15 may be a female fitting, and the second fitting may be a male fitting. FIG. 10 is a schematic explanatory diagram of a coupling structure 1b according to a second alternative embodiment of the present invention. FIG. 11 is a schematic explanatory diagram of the shapes of a female fitting 80 as the first fitting and a male fitting 90 as the second fitting according to the second alternative embodiment, where (a) is an explanatory diagram of the female fitting 80 and (b) is an explanatory diagram of the male fitting 90. Here, components having the same functional configuration as those in the above embodiment are illustrated with the same reference numerals, and their explanation may be omitted.

[0050] 10, in a connection structure 1b according to this embodiment, a joint member 15 is composed of female fittings 80 (80a-80c) as a first fitting and male fittings 90 (90a-90c) as a second fitting. One end of the joint member 15 is connected to a steel wall 10, and the other end of the joint member 15 is configured so that the female fittings 80 and the male fittings 90 can be freely fitted together.

[0051] As shown in Fig. 11(a), the configuration of the female fitting 80 (80a-80c) can be designed as desired, and for example, a mooring groove 81 (81a-81c) that is substantially T-shaped in a plan view and extends vertically as a receiving portion may be provided at an end. The mooring groove 81 (81a-81c) is configured to be able to fit a mooring protrusion 91 formed on a male fitting 90 shown in Fig. 11(b).

[0052] 11(b), the male fitting 90 may be configured such that the above-mentioned anchoring protrusion 91 is attached to a main body 92 having a substantially semicircular shape in a plan view. As shown in the figure, the anchoring protrusion 91 may be configured such that a rib-shaped member having a substantially T-shaped cross section in a plan view is attached to the main body 92 at multiple locations (two locations, one above and one below, in this case).

[0053] In the connection structure 1b according to this embodiment, the female fitting 80 and the male fitting 90 are fitted together to form the joint member 15 (15a to 15c) in a manner basically the same as the connection method described in the above embodiment. In this case, the first main reinforcing bar 30 can be fixed by fitting it into a predetermined position (for example, a position sandwiched between two anchoring protrusions 91) in the same manner as in the above embodiment. According to the connection structure 1b according to this embodiment, the same action and effect can be obtained even if the component configuration is partially different from that of the above embodiment.

[0054] (Other methods of constructing bonded structures) For example, in the construction method of the above embodiment, a case has been described in which the time-dependent hardening material U1 is poured on-site to construct a reinforced concrete member 50 containing a joint member 15, a first main reinforcing bar 30, a second main reinforcing bar 40, and a distribution bar 42, but the construction method of the joint structure 1 of the present invention is not limited to this.

[0055] Specifically, the reinforced concrete member 50 may be a member previously fabricated in a factory or the like (hereinafter, referred to as a precast reinforced concrete member), and the steel wall 10 and the reinforced concrete member 50, which is a precast reinforced concrete member, may be arranged on-site, and a time-dependent hardening material U2 serving as a connecting concrete member 52 may be poured into the gap between the two to connect them to construct the joint structure 1. In this case, the joint member 15 is not fixed to the steel wall 10 in advance, and the reinforced concrete member 50 as a precast reinforced concrete member is fabricated in a state in which the joint member 15, the first main reinforcing bar 30, the second main reinforcing bar 40, and the distribution bar 42 are included therein. In this case, the reinforced concrete member 50 as a precast reinforced concrete member may be fabricated in a state in which a part of the end face of the joint member 15 is exposed, and may also be fabricated so that a part of the first main reinforcing bar 30 (for example, the folded-back portion 31) is exposed.

[0056] By constructing the joint structure 1 using the reinforced concrete members 50 as precast reinforced concrete members, in addition to the effects described in the above embodiment, it is possible to improve workability on site and shorten the construction period. In other words, it is possible to achieve both efficient workability and securing strength.

[0057] In the above embodiment and other embodiments, the configuration of the joint member 15 has been illustrated and described as being such that the male metal fitting 17 fixed to the steel wall 10 is provided with the mooring protrusion 22, and the female metal fitting 20, which is a separable member, is formed with the mooring groove 21, but the present invention is not limited to this. For example, the metal fitting fixed to the steel wall 10 may be provided with a mooring groove to form a so-called female member, and the metal fitting that fits into the female member may be provided with a mooring protrusion to form a so-called male member, in which case the gender of the metal fittings is reversed from that of the above embodiment.

[0058] In the above embodiment, the steel sheet piles are used as the steel walls 10, but the present invention is not limited to this. For example, various pile members that can be driven into the ground to form a wall body, such as steel pipe piles and various shaped steels, may be used as the steel walls 10. [Industrial Applicability]

[0059] The present invention can be applied to a joint structure between a steel wall and a reinforced concrete member and a method for constructing the same. [Explanation of symbols]

[0060] 1, 1a…bond structure 10...Steel wall 15 (15a to 15c)...Joint members 17(17a~17c)…Male fitting 18(18a~18c)…Groove 20(20a~20c)…Female fitting 21 (21a to 21c)…Mooring groove section 22(22a~22c)...Mooring protrusion 30…First main rebar 31…Folded part 40…Second main rebar 42…Distribution bar 50…Reinforced concrete members 52...Connecting concrete member 60 (60a to 60c)... (related to the first alternative embodiment) female fitting 70...First main reinforcing bar (according to the first alternative embodiment) 80... Female fitting (according to the second alternative embodiment) 90...Male fitting (according to the second alternative embodiment) U, U1, U2...Age-hardening materials

Claims

1. A joint structure between a steel wall and a reinforced concrete member, A plurality of joint members each consisting of a first metal fitting and a second metal fitting that can be fitted together, and a first main reinforcing bar that is engaged with the joint members are embedded in an end portion of the reinforced concrete member that faces the steel wall, The first metal fitting is disposed to extend in the vertical direction of the steel wall, one end of the first metal fitting is coupled to a wall surface of the steel wall, and the other end is fitted into the second metal fitting, A connection structure between a steel wall and a reinforced concrete member, wherein the first main reinforcing bar is engaged between the first metal fitting and the second metal fitting by fitting the first metal fitting and the second metal fitting together.

2. The first metal fitting is a male metal fitting and the second metal fitting is a female metal fitting, 2. The connection structure between a steel wall and a reinforced concrete member as described in claim 1, characterized in that the first main reinforcing bar extends in an out-of-plane direction of the wall surface of the steel wall, and is folded back and engaged between the female metal fitting and the male metal fitting on the surface of the female metal fitting facing the steel wall, along the outer circumferential shape of the female metal fitting.

3. The first metal fitting is a male metal fitting and the second metal fitting is a female metal fitting, The first main reinforcing bar extends in an out-of-plane direction of the wall surface of the steel wall and has an expansion portion at an end portion facing the steel wall, 2. The connection structure between a steel wall and a reinforced concrete member as described in claim 1, characterized in that the first main reinforcing bar is engaged with the female metal fitting by engaging the expansion portion between the female metal fitting and the male metal fitting on the surface of the female metal fitting facing the steel wall.

4. The other end of the male fitting is provided with a captive protrusion, 4. A joining structure between a steel wall and a reinforced concrete member according to claim 2 or 3, wherein the female metal fitting is formed with a mooring groove portion as a receiving portion for the mooring protrusion.

5. The first fitting is a female fitting and the second fitting is a male fitting, 2. The connection structure between a steel wall and a reinforced concrete member as described in claim 1, characterized in that the first main reinforcing bar extends in an out-of-plane direction of the wall surface of the steel wall, and is folded back and engaged between the male metal fitting and the female metal fitting on the surface of the male metal fitting facing the steel wall, along the outer peripheral shape of the male metal fitting.

6. A retaining groove is formed on the other end of the female fitting, 6. A joining structure between a steel wall and a reinforced concrete member according to claim 5, wherein the male fitting is provided with a mooring protrusion that can be fitted into the mooring groove with the mooring groove serving as a receiving portion.

7. In the reinforced concrete member, the first main reinforcing bars are embedded in a plurality of places, 7. A joint structure between a steel wall and a reinforced concrete member as described in any one of claims 1 to 6, further comprising: a second main reinforcing bar extending in an out-of-plane direction of the wall surface of the steel wall at a position sandwiched between a plurality of the first main reinforcing bars; and a distribution bar extending in a direction perpendicular to the second main reinforcing bars.

8. The connection structure between a steel wall and a reinforced concrete member according to any one of claims 1 to 7, characterized in that the steel wall is a wall body formed by connecting hat-shaped steel sheet piles, and a width length of the first metal fitting is designed to be a width length such that the other end positions of the first metal fittings are aligned in accordance with a cross-sectional uneven shape of the hat-shaped steel sheet piles.

9. A method for constructing a joint structure between a steel wall and a reinforced concrete member according to any one of claims 1 to 8, the reinforced concrete member is a precast reinforced concrete member manufactured so that one end of the first metal fitting is exposed at an end facing the steel wall, an end portion of the first metal fitting exposed from the precast reinforced concrete member is coupled to the steel wall; A time-dependent hardening material is poured into the gap between the steel wall and the precast reinforced concrete member to form a connecting concrete member; A method for constructing a joint structure between a steel wall and a reinforced concrete member, comprising integrating the steel wall and the precast reinforced concrete member.

10. A method for constructing a joint structure between a steel wall and a reinforced concrete member according to any one of claims 1 to 8, One end of the first metal fitting is coupled to a wall surface of the steel wall; The first main reinforcing bar is engaged with the second metal fitting by fitting the first metal fitting with the second metal fitting, A method for constructing a joint structure between a steel wall and a reinforced concrete member, comprising pouring in-situ concrete as a time-hardening material to integrate the steel wall and the reinforced concrete member.

Citation Information

Patent Citations

  • Underground structure and asymmetric u-shaped steel sheet-pile

    JP1997100541A

  • Civil engineering structure and construction method for it

    JP2004044119A

  • Construction method for power transmission mechanism, and power transmission mechanism

    JP2006057252A

  • Pier foundation structure and pier foundation construction method

    JP2010216150A

  • Shear force transmission mechanism and construction method of steel pipe sheet pile foundation

    JP2020169467A