Management device, management method, and management system
The management system addresses the inequity in CO2 emission burdens by dividing emissions proportionally based on battery deterioration, enabling fair allocation between manufacturers and recyclers.
Patent Information
- Application Number
- JP2022031932
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-03-02
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-03-02
AI Technical Summary
There is an inequity in the burden of CO2 emissions between automobile manufacturers and recycling businesses when secondary batteries are reused, as recycling businesses can operate without bearing the emissions from the batteries' manufacture.
A management system that includes a control unit to proportionally divide CO2 emissions based on the degree of deterioration of the secondary battery, using a communication unit to acquire information from the battery and allocate emissions accordingly between the manufacturer and the recycling business.
The system ensures that recycling businesses appropriately bear a portion of the CO2 emissions by calculating the emissions based on the battery's state of health (SOH), ensuring equitable distribution and accurate accounting.
Smart Images

Figure 0007589701000001 
Figure 0007589701000002 
Figure 0007589701000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a management device, a management method, and a management system for managing CO2 emissions caused by the manufacture of secondary batteries. [Background technology]
[0002] As awareness of environmental issues increases, interest in the amount of CO2 emissions emitted in the manufacture of products distributed in the market is growing. In response, companies may calculate and manage the amount of CO2 emissions emitted in the manufacture of products. For example, JP 2016-126372 A (Patent Document 1) discloses a method for calculating the amount of CO2 emissions in the transportation process of products (including materials and parts). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-126372 A Summary of the Invention [Problem to be solved by the invention]
[0004] In recent years, the use of vehicles equipped with secondary batteries for driving has been rapidly increasing. The secondary batteries installed in these vehicles may be reused (for example, reused, rebuilt, etc.) by recycling businesses. In this case, the recycling businesses can do business using the reused secondary batteries without bearing any of the CO2 emissions emitted to manufacture the secondary batteries (CO2 emissions from secondary batteries). This creates an unfairness in the burden of CO2 emissions between the automobile manufacturers, who bear the burden of CO2 emissions from secondary batteries, and the recycling businesses.
[0005] The present disclosure has been made to solve the above-mentioned problems, and its purpose is to appropriately apportion the CO2 emissions generated in the manufacture of secondary batteries to businesses that reuse secondary batteries. [Means for solving the problem]
[0006] (1) A management device according to one aspect of this disclosure includes a memory unit that stores an amount of CO2 emissions emitted due to the manufacture of secondary batteries, and a control unit that, when the secondary batteries are reused by a business operator that reuses secondary batteries, apportions the amount of CO2 emissions between the business operator and the secondary batteries in accordance with the degree of deterioration of the secondary batteries at the time of reuse.
[0007] According to the above configuration, when a secondary battery is reused, the CO2 emissions are apportioned between the business that reuses the secondary battery and the business that reuses the secondary battery according to the degree of deterioration of the secondary battery at the time of reuse. By apportioning the CO2 emissions according to the degree of deterioration, it is possible to have the business bear an appropriate amount of the CO2 emissions.
[0008] (2) In one embodiment, the secondary battery is mounted on a mobile object. The management device further includes a communication unit configured to be able to communicate with the mobile object. The control unit acquires information about the secondary battery from the mobile object via the communication unit, and calculates a deterioration level using the information when the secondary battery is reused.
[0009] According to the above configuration, the control unit of the management device calculates the deterioration level of the secondary battery using the information on the secondary battery acquired from the mobile object. The control unit can appropriately allocate the CO2 emissions between the management device and the business operator according to the calculated deterioration level.
[0010] (3) In one embodiment, the secondary battery is mounted on a mobile object. The management device further includes a communication unit configured to be able to communicate with the mobile object. When the secondary battery is reused, the control unit acquires the deterioration degree from the mobile object via the communication unit.
[0011] According to the above configuration, the control unit of the management device acquires the deterioration level from the mobile object. The control unit can appropriately allocate the CO2 emissions between the management device and the business operator according to the acquired deterioration level.
[0012] (4) In an embodiment, the management device further includes a communication unit configured to be able to communicate with the management device of the business operator. When the secondary battery is reused, the control unit acquires the deterioration degree from the management device of the business operator via the communication unit.
[0013] According to the above configuration, the control unit of the management device acquires the deterioration level from the management device of the business operator. The control unit can appropriately allocate the CO2 emissions between the business operator and the management device according to the acquired deterioration level.
[0014] (5) In an embodiment, the management device further includes a communication unit configured to be able to communicate with the management device of the business operator. When the secondary battery is reused, the control unit acquires, via the communication unit, from the management device of the business operator a share of the CO2 emission amount according to the degree of deterioration.
[0015] According to the above configuration, the control unit of the management device acquires the share of the CO2 emission amount according to the deterioration degree from the management device of the business operator. For example, the control unit can update the CO2 emission amount stored in the storage unit based on the acquired share. Therefore, the CO2 emission amount can be appropriately allocated between the business operator and the management device.
[0016] (6) In one embodiment, the degree of deterioration is a capacity retention rate of the secondary battery. According to the above configuration, the CO2 emissions are apportioned between the business operator and the company in accordance with the capacity maintenance rate, so that the business operator can be required to bear an appropriate amount of the CO2 emissions.
[0017] (7) In an embodiment, the control unit increases the business operator's share of CO 2 emissions as the capacity maintenance rate when the secondary battery is reused increases.
[0018] According to the above configuration, the higher the capacity maintenance rate of the secondary battery, the greater the burden of the business operator on the CO2 emission costs. Therefore, it is possible to have the business operator bear an appropriate amount of the CO2 emission costs.
[0019] (8) A management method according to another aspect of this disclosure includes the steps of: storing an amount of CO2 emissions caused by the manufacture of secondary batteries; and, when the secondary batteries are reused by a business operator that reuses secondary batteries, apportioning the amount of CO2 emissions between the business operator and the secondary batteries in accordance with the degree of deterioration of the secondary batteries at the time of reuse.
[0020] According to the above method, when a secondary battery is reused, the CO2 emissions are apportioned between the business that reuses the secondary battery and the business that reuses the secondary battery according to the degree of deterioration of the secondary battery at the time of reuse. By apportioning the CO2 emissions according to the degree of deterioration, the business can be made to bear an appropriate amount of the CO2 emissions.
[0021] (9) A management system according to another aspect of the present disclosure includes a first device that manages the amount of CO2 emissions emitted from the manufacture of secondary batteries, and a second device of a business entity that reuses secondary batteries. When a secondary battery is reused, the first device updates the amount of CO2 emissions according to the degree of deterioration of the secondary battery at the time of reuse. The second device manages the amount of CO2 emissions according to the degree of deterioration.
[0022] According to the above configuration, the CO2 emissions are apportioned between the first device and the second device according to the degree of deterioration of the secondary battery. Therefore, the CO2 emissions can be appropriately apportioned between the two devices. Therefore, the business operator can be charged an appropriate amount of the CO2 emissions. Effect of the Invention
[0023] According to the present disclosure, the CO 2 emissions emitted in the manufacture of secondary batteries can be appropriately apportioned to businesses that reuse secondary batteries. [Brief description of the drawings]
[0024] [Figure 1] 1 is an overall configuration diagram of a management system 1 according to a first embodiment. [Diagram 2] FIG. 2 is a diagram for explaining an example of CO2 emissions of a vehicle stored in a database. [Diagram 3]2 is a functional block diagram of a control device 21 of a management device 2 and a control device 31 of a management device 3. FIG. [Figure 4] 10 is a flowchart showing a procedure of a process executed when reusing a battery. [Diagram 5] 5 is a flowchart showing detailed processing of S21 in FIG. 4. [Figure 6] 5 is a flowchart showing detailed processing of S21 in FIG. 4 according to Modification 1. [Figure 7] FIG. 11 is a functional block diagram of a control device 21A of a management device 2 and a control device 31A of a management device 3 according to a second embodiment. [Figure 8] 11 is a flowchart showing a procedure of a process executed when reusing a battery according to the second embodiment. [Figure 9] 13 is a flowchart showing a procedure of a process executed when reusing a battery according to Modification 3. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and their description will not be repeated.
[0026] [Embodiment 1] <Configuration> 1 is an overall configuration diagram of a management system 1 according to embodiment 1. The management system 1 is a system for managing the amount of CO2 emitted due to the manufacture of batteries. The management system 1 includes a management device 2 belonging to an automobile manufacturer (vehicle manufacturer) and a management device 3 belonging to a battery reuse business operator.
[0027] Vehicle manufacturers supply vehicles 5 manufactured in factories (including their own factories and factories of partner companies, etc.) 4 to the market via sales businesses such as dealers. Vehicle 5 is an electric vehicle equipped with a battery 51. Note that vehicle 5 may be any vehicle equipped with a battery 51 and is not limited to an electric vehicle. Vehicle 5 may be, for example, a hybrid vehicle, a plug-in hybrid vehicle, a fuel cell vehicle, etc.
[0028] Battery 51 is mounted on vehicle 5 as, for example, a driving power source (i.e., a power source). Battery 51 is configured to include a plurality of stacked batteries (cells). The battery is, for example, a secondary battery such as a nickel-metal hydride battery or a lithium-ion battery. The battery may be a battery having a liquid electrolyte between the positive and negative electrodes, or may be a battery having a solid electrolyte (all-solid-state battery). Battery 51 is assigned a "battery ID" for identifying the battery. Each of the plurality of batteries may also be assigned a "battery ID" for identifying the battery.
[0029] The management device 2 of the vehicle manufacturer manages the amount of CO2 emissions emitted by the manufacture of the vehicle 5. The amount of CO2 emissions emitted by the manufacture of the vehicle 5 includes the amount of CO2 emissions emitted by the manufacture of each part (including materials) constituting the vehicle 5, and the amount of CO2 emissions emitted by the transportation of each part (including materials). The vehicle manufacturer purchases each part constituting the vehicle 5 from an upstream company in the supply chain. The vehicle manufacturer receives a report of the amount of CO2 emissions emitted by the manufacture of the part and the transportation of the part from the upstream company together with the delivery of the part. The management device 2 calculates the amount of CO2 emissions emitted by the manufacture of the vehicle 5 (hereinafter also referred to as "CO2 of the vehicle 5"), for example, including the amount of CO2 emissions received from each upstream company and the amount of CO2 emissions emitted to complete the vehicle 5 using each part. In the following, the amount of CO2 emissions emitted by the manufacture of the part (including materials) and the amount of CO2 emissions emitted by the transportation of the part (including materials) are collectively referred to as "CO2 emissions of the part".
[0030] The management device 2 includes a control device 21, a storage device 22, a communication device 23, an input device 24, and a display device 25. The control device 21, the storage device 22, the communication device 23, the input device 24, and the display device 25 are connected to a bus 26. In addition, a database 27 is connected to the management device 2 so as to be able to communicate with each other.
[0031] The control device 21 is configured, for example, by an integrated circuit including a CPU (Central Processing Unit). The control device 21 executes various programs stored in the storage device 22. The various programs include an operating system and the like. The storage device 22 is configured, for example, by including a ROM (Read Only Memory) that stores the various programs, and a RAM (Random Access Memory) that functions as a working memory and temporarily stores various data required for executing the various programs. The control device 21 corresponds to an example of a "control unit" according to the present disclosure.
[0032] The communication device 23 is configured to be able to communicate with the management device 3 and the vehicle 5. The communication between the communication device 23 and the management device 3 and the vehicle 5 is performed, for example, via the Internet. The communication device 23 corresponds to an example of a "communication unit" according to the present disclosure.
[0033] The input device 24 includes an input device, such as a mouse, a keyboard, a touch panel, and / or other device capable of receiving a user's operation.
[0034] The display device 25 includes a display. The display device 25 displays various images on the display according to a control signal from the control device 21. The display is, for example, a liquid crystal display, an organic EL (Electro Luminescence) display, or other display device.
[0035] The database 27 stores information in accordance with a control signal from the management device 2 (control device 21). The control device 21 stores the CO2 emissions of each part constituting the vehicle 5 (i.e., reported values received from upstream companies) in the database 27. The control device 21 stores the total value of the CO2 emissions of each part constituting the vehicle 5 in the database 27 as the CO2 emissions of the vehicle 5. Note that the database 27 stores not only the CO2 emissions of the vehicle 5, but also the CO2 emissions of all vehicles supplied to the market by the vehicle manufacturer. The database 27 can also be provided as a storage device within the management device 2. Note that the database 27 corresponds to an example of a "storage unit" according to the present disclosure.
[0036] FIG. 2 is a diagram for explaining an example of CO2 emissions of a vehicle stored in database 27. The CO2 emissions of a vehicle are stored for each vehicle ID. The vehicle ID is information for identifying the vehicle, and may be, for example, a vehicle identification number (VIN). Note that the vehicle ID may be other information as long as it can uniquely identify the vehicle. In this embodiment, it is assumed that vehicle 5 has a vehicle ID of "V001".
[0037] 2 shows, as an example, a vehicle ID, a battery ID, CO2 emissions linked to the battery ID (CO2 emissions of the battery), an engine ID, CO2 emissions linked to the engine ID (CO2 emissions of the engine), and CO2 emissions of the vehicle. For example, a vehicle ID "V001" is linked to a battery 51 identified by a battery ID "B001", a CO2 emissions amount "M1" of the battery 51, an engine identified by an engine ID "E001", a CO2 emissions amount "N1" of the engine, and a CO2 emissions amount "S1" of the vehicle 5. The total value of the CO2 emissions amount "M1" of the battery 51, the CO2 emissions amount "N1" of the engine, and the CO2 emissions amount "S1" of the vehicle 5 identified by the vehicle ID "V001" is the CO2 emissions amount "S1" of the vehicle 5 identified by the vehicle ID "V001".
[0038] 1 again, when the vehicle manufacturer supplies the vehicle 5 to the market, the vehicle manufacturer reports the CO2 emissions of the vehicle 5 stored in the database 27 to, for example, a government agency or a private agency. For example, the vehicle manufacturer may be subject to a tax burden according to the CO2 emissions. In response to an input to the input device 24 by an administrator of the management device 2 (for example, an employee of the vehicle manufacturer), the control device 21 controls each part, and the above report is made via the communication device 23. The above report may be in a form that allows the CO2 emissions of each part constituting the vehicle 5 (for example, the CO2 emissions of the battery 51) to be recognized.
[0039] After the vehicle 5 is supplied to the market, the management device 2 acquires information about the battery 51 (hereinafter also referred to as "battery information") from the vehicle 5 supplied to the market. Specifically, when the vehicle 5 is started up, the control device 21 acquires battery information from the vehicle 5 via the communication device 23 at every predetermined control period until the vehicle 5 goes into a sleep state. The battery information includes information on the voltage of the battery 51 (battery voltage), information on the current input / output to / from the battery 51 (battery current), and information on the temperature of the battery 51 (battery temperature). The control device 21 stores the battery information in the database 27 in association with the battery ID.
[0040] Among the parts constituting the vehicle 5, there are parts that are likely to be removed from the vehicle 5 and reused. An example of such a part is the battery 51. When the vehicle 5 is scrapped or the like after a predetermined number of years have passed since it was distributed on the market, the battery 51 is collected from the vehicle 5 by a recycling business operator, and the collected battery 51 is reused. The reuse of the battery includes, for example, reuse and rebuilding.
[0041] Reuse means that the battery 51 collected (removed) from the vehicle 5 is supplied (distributed) again with the same functions and performance as when it was collected. The collected battery 51 is subjected to necessary inspections, and the battery 51 that satisfies the requirements in the inspections is distributed in the market as a reused product.
[0042] Rebuilt means that the structure and / or performance of the battery 51 recovered from the vehicle 5 is changed while restoring or maintaining the function and performance of the battery 51 and then supplied. The recovered battery 51 is once disassembled into batteries (cells). Then, among the disassembled batteries, usable batteries (which may be usable after performance recovery) are combined to manufacture a new battery.
[0043] The recycling business operator according to this embodiment is an operator that collects batteries 51 from vehicles 5 and reuses the collected batteries 51. The recycling business operator is not limited to an operator that performs reuse, but may be an operator that performs at least one of reuse and rebuilding. The recycling business operator may be an operator that performs reuse or rebuilding depending on the condition of the collected batteries 51.
[0044] Here, the vehicle manufacturer bears the burden of the CO2 emissions (CO2 emissions of the battery 51) emitted during the manufacture of the battery 51 when the vehicle 5 is manufactured. When the recycling business reuses the battery 51, the recycling business can do business using the reused battery 51 without bearing any of the CO2 emissions of the battery 51 borne by the vehicle manufacturer. Therefore, an inequality occurs between the vehicle manufacturer and the recycling business in terms of the burden of the CO2 emissions.
[0045] Therefore, the management system 1 according to the first embodiment makes the reuse operator bear part of the CO2 emission of the battery 51, which was previously borne by the vehicle manufacturer, depending on the deterioration level of the battery 51 at the time when the battery 51 is reused. That is, in the management system 1, the CO2 emission of the battery 51 is apportioned between the vehicle manufacturer and the reuse operator depending on the deterioration level of the battery 51 at the time when the battery 51 is reused. The deterioration level is, for example, SOH (State Of Health). SOH is a capacity maintenance rate, and is expressed as a ratio [unit: %] of the current full charge capacity C of the battery 51 to the full charge capacity C0 in the initial state of the battery 51. SOH can be calculated, for example, by the following formula (1).
[0046] SOH = C / C0 × 100…(1) As the initial value C0 of the full charge capacity, a full charge capacity measured at the time of manufacturing the battery 51 (or the vehicle 5) may be used, or a specification value (catalog value) of the full charge capacity of the battery 51 may be used. Although details will be described later, in the first embodiment, the SOH is calculated by the management device 2 of the vehicle manufacturer.
[0047] The management device 3 of the reuse business operator manages the amount of CO2 emissions from the reused battery 51. The amount of CO2 emissions from the reused battery 51 includes the amount of CO2 emissions apportioned according to the SOH of the battery 51 at the time of reuse and the amount of CO2 emissions emitted in the process for reuse.
[0048] The management device 3 includes a control device 31, a storage device 32, a communication device 33, an input device 34, and a display device 35. The control device 31, the storage device 32, the communication device 33, the input device 34, and the display device 35 are connected to a bus 36. In addition, a database 37 is connected to the management device 3 so as to be able to communicate with each other.
[0049] The control device 31 is configured, for example, by an integrated circuit including a CPU. The control device 31 executes various programs stored in the storage device 32. The various programs include an operating system and the like. The storage device 32 is configured, for example, by including a ROM that stores the various programs, and a RAM that functions as a working memory and temporarily stores various data required for executing the various programs.
[0050] The communication device 33 is configured to be able to communicate with the management device 2. The communication between the communication device 33 and the management device 2 (communication device 23) is performed, for example, via the Internet or the like.
[0051] The input device 34 includes an input device, such as a mouse, a keyboard, a touch panel, and / or other device capable of receiving a user's operation.
[0052] The display device 35 includes a display. The display device 35 displays various images on the display according to control signals from the control device 31. The display is, for example, a liquid crystal display, an organic EL display, or other display devices.
[0053] The database 37 stores information in accordance with a control signal from the management device 3 (control device 31). The control device 31 stores the CO2 emission amount (share) of the reused battery 51 in the database 37. The CO2 emission amount of the battery 51 stored in the database 37 is the CO2 emission amount of the battery 51 that is the share of the reuse business operator. The database 37 can also be provided as a storage device within the management device 3.
[0054] When a recycling business operator reuses the battery 51, the administrator of the management device 3 (for example, an employee of the recycling business operator) first removes (collects) the battery 51 from the vehicle 5. A battery ID is attached to the battery 51. The administrator of the management device 3 operates the input device 34 to display a screen for applying for battery reuse on the display device 35. The administrator of the management device 3 operates the input device 34 to input the battery ID of the battery 51 in a battery ID input field displayed on the display device 35, and clicks an application button displayed on the display device 35. As a result, a reuse notification of the battery 51 is transmitted to the management device 2 of the vehicle manufacturer that has supplied the vehicle 5 equipped with the battery 51 identified by the battery ID to the market. The reuse notification includes the battery ID for identifying the battery 51 to be reused.
[0055] The management device 2, which has received the reuse notification from the management device 3, identifies the battery 51 based on the battery ID, and reads out the battery information of the battery 51 from the database 27. The management device 2 then calculates the SOH of the battery 51 using the battery information, and determines an apportionment ratio of the CO2 emissions of the battery 51 according to the calculated SOH. In accordance with this apportionment ratio, the management device 2 updates the amount of CO2 emissions emitted due to the manufacture of the battery 51 (CO2 emissions of the battery 51), and notifies the management device 3 of the amount of CO2 emissions of the battery 51 that is to be borne by the reuse operator.
[0056] The management device 3 stores and manages the CO2 emission amount of the battery 51 received from the management device 2 in the database 37 as the CO2 emission amount of the reused battery 51. For example, the CO2 emission amount of the battery 51 is reported to a purchaser who purchased the battery from the recycling business operator as the CO2 emission amount of the reused product.
[0057] <Function block> Fig. 3 is a functional block diagram of the control device 21 of the management device 2 and the control device 31 of the management device 3. Referring to Fig. 3, the control device 21 of the management device 2 includes an information acquisition unit 211, a registration unit 212, a reception unit 213, a readout unit 214, a SOH calculation unit 215, a determination unit 216, a CO2 emission calculation unit 217, an update unit 218, and a notification unit 219. The control device 21 functions as the information acquisition unit 211, the registration unit 212, the reception unit 213, the readout unit 214, the SOH calculation unit 215, the determination unit 216, the CO2 emission calculation unit 217, the update unit 218, and the notification unit 219, for example, by executing a program stored in the storage device 22. In addition, the information acquisition unit 211, the registration unit 212, the reception unit 213, the reading unit 214, the SOH calculation unit 215, the determination unit 216, the CO2 emission calculation unit 217, the update unit 218, and the notification unit 219 may be realized, for example, by dedicated hardware (electronic circuitry).
[0058] The information acquisition unit 211 acquires battery information (battery voltage, battery current, battery temperature) from the vehicle 5 via the communication device 23. The information acquisition unit 211 acquires the battery information from the vehicle 5 at a predetermined control period when the vehicle 5 is started. The information acquisition unit 211 outputs the acquired battery information to the registration unit 212.
[0059] The registration unit 212 stores the battery information acquired by the information acquisition unit 211 in the database 27. The registration unit 212 stores the battery information in the database 27 in association with the battery ID of the battery 51 mounted on the vehicle 5.
[0060] The receiving unit 213 receives a reuse notification from the management device 3 of the reuse operator. Upon receiving the reuse notification, the receiving unit 213 outputs the reuse notification to the reading unit 214.
[0061] The reading unit 214 identifies the battery ID from the reuse notification. The reading unit 214 reads out battery information linked to the battery ID from the database 27. Note that the reading unit 214 does not read out all battery information linked to the battery ID, but reads out battery information for the most recently stored predetermined period (for example, several weeks or several months). The reading unit 214 outputs the read out battery information to the SOH calculation unit 215.
[0062] The SOH calculation unit 215 extracts battery information that satisfies a condition from the battery information received from the reading unit 214. The condition is, for example, that the battery temperature is within a reference temperature range for a predetermined time (several minutes to several tens of minutes) and that discharging has been performed continuously. If the battery information received from the reading unit 214 does not satisfy the above condition, the SOH calculation unit 215 may relax the condition. For example, the SOH calculation unit 215 may relax the condition so that the predetermined time (several minutes to several tens of minutes) becomes shorter. The reading unit 214 may read out battery information that satisfies the condition from the database 27 and output the battery information to the SOH calculation unit 215.
[0063] The SOH calculation unit 215 calculates the SOC of the battery 51 using the battery information that is the earliest in time among the battery information that satisfies the conditions. This SOC is referred to as a "first SOC" and is also written as SOC1. As a method for estimating the SOC, for example, a method of finding the SOC from the OCV by referring to an OCV (Open Circuit Voltage)-SOC curve of the battery 51 that has been acquired in advance can be used. The OCV-SOC curve can be stored in advance in the storage device 22, for example. Next, the SOH calculation unit 215 calculates the SOC of the battery 51 using the battery information that is the latest in time among the battery information that satisfies the conditions. This SOC is referred to as a "second SOC" and is also written as SOC2.
[0064] The SOH calculation unit 215 calculates the charge / discharge power amount ΔAh charged / discharged to the battery 51 during the period from the first SOC to the second SOC. The charge / discharge power amount ΔAh can be calculated by integrating the current values included in the battery information during the period from the first SOC to the second SOC. The unit of the charge / discharge power amount ΔAh is not limited to ampere-hours, and may be watt-hours.
[0065] The SOH calculation unit 215 calculates the full charge capacity C of the battery 51 using the first SOC, the second SOC, and the charge / discharge power amount ΔAh according to the following formula (2).
[0066] C = ΔAh / |SOC1-SOC2|×100…(2) Then, the SOH calculation unit 215 calculates the SOH of the battery 51 by dividing the full charge capacity C by the initial value C0 of the full charge capacity of the battery 51 according to the above-mentioned equation (1). The SOH calculation unit 215 outputs the calculated SOH to the determination unit 216.
[0067] The determination unit 216 determines the allocation ratio (burden ratio) of the CO2 emissions of the battery 51 according to the SOH. For example, when the SOH is 40%, the determination unit 216 determines the allocation ratio of the CO2 emissions of the battery 51 between the vehicle manufacturer and the recycling business operator to be 60:40. Taking the battery 51 with the battery ID "B001" as an example, when the SOH is 40%, the determination unit 216 determines that the vehicle manufacturer will continue to bear 60% of the CO2 emissions "M1" of the battery 51 that the vehicle manufacturer was responsible for when the vehicle 5 was supplied to the market (for example, at the time of shipment), and that the recycling business operator will bear 40% of the CO2 emissions "M1" of the battery 51. The determination unit 216 outputs the determined allocation ratio to the CO2 emission amount calculation unit 217.
[0068] The CO2 emission calculation unit 217 calculates the amount of CO2 emission from the battery 51 borne by the vehicle manufacturer (M1×0.6 in the above example) and the amount of CO2 emission from the battery 51 borne by the reuse operator (M1×0.4 in the above example) in accordance with the apportionment ratio determined by the determination unit 216. Then, the CO2 emission calculation unit 217 outputs the amount of CO2 emission from the battery 51 borne by the vehicle manufacturer to the update unit 218, and outputs the amount of CO2 emission from the battery 51 borne by the reuse operator to the notification unit 219.
[0069] The update unit 218 updates the information on the CO2 emission amount of the vehicle stored in the database 27 (FIG. 2). In the above example, the update unit 218 updates the CO2 emission amount "M1" of the battery ID "B001" to "M1×0.6". Along with this update, the update unit 218 also updates the CO2 emission amount "S1" of the vehicle.
[0070] The notification unit 219 notifies the management device 3 of the reuse business operator of the amount of CO 2 emission of the battery 51 borne by the reuse business operator via the communication device 23.
[0071] The control device 31 of the management device 3 includes a receiving unit 311, a notification unit 312, an information acquisition unit 313, and a registration unit 314. The control device 31 functions as the receiving unit 311, the notification unit 312, the information acquisition unit 313, and the registration unit 314, for example, by executing a program stored in the storage device 32. Note that the receiving unit 311, the notification unit 312, the information acquisition unit 313, and the registration unit 314 may be realized by, for example, dedicated hardware (electronic circuitry).
[0072] The accepting unit 311 accepts a reuse request from the input device 34. The reuse request includes a battery ID. When the accepting unit 311 accepts a reuse request, it outputs a notification to that effect to the notification unit 312 together with the battery ID.
[0073] The notification unit 312 generates a reuse notification and transmits the generated reuse notification to the management device 2 of the vehicle manufacturer via the communication device 33. This reuse notification is acquired by the reception unit 213 of the control device 21. As a result, the management device 2 notifies the amount of CO2 emissions from the battery 51 that is borne by itself (the reuse business operator).
[0074] The information acquisition unit 313 acquires the amount of CO2 emission of the battery 51 borne by itself (the recycling business operator) from the management device 2 of the vehicle manufacturer via the communication device 33. The information acquisition unit 313 outputs the acquired amount of CO2 emission of the battery 51 to the registration unit 314.
[0075] The registration unit 314 stores the amount of CO 2 emissions from the battery 51 in the database 37 in association with the battery ID of the battery 51.
[0076] When there is an amount of CO2 emissions due to reuse of the battery 51, the amount of CO2 emissions is added to the amount of CO2 emissions (M1×0.4 in the above example) of the battery 51 stored in the database 37, and the information in the database 37 is updated. The timing at which the amount of CO2 emissions due to reuse of the battery 51 is added is arbitrary.
[0077] <Flowchart> Fig. 4 is a flowchart showing the procedure of processing executed when reusing a battery. This flowchart is executed by the control device 21 of the management device 2 and the control device 31 of the management device 3 when reusing a battery. Each step (hereinafter, steps are abbreviated as "S") of the flowchart shown in Fig. 4 will be described as being realized by software processing by the control device 21 of the management device 2 and the control device 31 of the management device 3, but a part or all of it may be realized by hardware (electrical circuitry) created in the control devices 21, 31.
[0078] In S10, upon receiving an application for reuse of the battery 51 from the input device 34, the control device 31 generates a reuse notification for the battery 51 and transmits the generated reuse notification to the management device 2.
[0079] In S20, when the control device 21 receives the reuse notification, based on the battery ID (for example, battery ID "B001") included in the reuse notification, the control device 21 reads out battery information linked to the battery ID (for example, battery ID "B001") from the database 27. Note that the battery information read out at this time is the battery information for the most recently stored predetermined period, as described above.
[0080] In S21, the control device 21 calculates the SOH of the battery 51. Fig. 5 is a flowchart showing the detailed process of S21.
[0081] In S2101, the control device 21 extracts battery information that satisfies a condition from the read battery information.
[0082] In S2102, the control device 21 calculates the first SOC using the oldest battery information among the battery information that satisfies the condition.
[0083] In S2103, the control device 21 calculates the second SOC by using the most recent battery information in terms of time among the battery information that satisfies the condition.
[0084] In S2104, the control device 21 integrates the current value from the first SOC to the second SOC, and calculates the amount of charge / discharge power ΔAh charged to and discharged from the battery 51.
[0085] In S2105, the control device 21 calculates the full charge capacity C of the battery 51 according to the above formula (2) using the first SOC, the second SOC, and the charge / discharge power amount ΔAh.
[0086] In S2106, the control device 21 reads out the initial full charge capacity C0 of the battery 51 from the database 27. The full charge capacity C0 may be stored in the storage device 22.
[0087] In S2107, the control device 21 calculates the SOH of the battery 51 by dividing the full charge capacity C by the initial value C0 of the full charge capacity of the battery 51 according to the above formula (1).
[0088] Referring again to FIG. 4, in S22, the control device 21 determines the allocation ratio (burden ratio) of the CO2 emissions between the vehicle manufacturer and the recycling operator in accordance with the SOH.
[0089] In S23, the control device 21 calculates the amount of CO2 emission from the battery 51 borne by the vehicle manufacturer and the amount of CO2 emission from the battery 51 borne by the recycling operator according to the determined allocation ratio. Then, the control device 21 notifies the management device 3 via the communication device 23 of the amount of CO2 emission from the battery 51 borne by the recycling operator (the burden).
[0090] In S24, the control device 21 updates the CO2 emission amount of the battery 51 included in the CO2 emission amount of the vehicle stored in the database 27 to the CO2 emission amount of the battery 51 that is the share of the control device 21 (the vehicle manufacturer) and ends this process. In the above example (when the battery 51 with the battery ID "B001" and SOH of 40% is reused), the control device 21 updates the CO2 emission amount "M1" of the battery 51 included in the CO2 emission amount "S1" of the vehicle stored in the database 27 to the CO2 emission amount of the battery 51 that is the share of the control device 21 (the vehicle manufacturer) and ends this process.
[0091] In S11, the control device 31 acquires, via the communication device 33, from the management device 2, the amount of CO 2 emissions from the battery 51 that is the share of the control device 31 itself (the recycling operator).
[0092] In S12, the control device 31 stores the amount of CO2 emission of the battery 51 in the database 37 in association with the battery ID of the battery 51. The stored amount of CO2 emission of the battery 51 is reported, for example, to a business entity that purchased the battery 51 from the recycling business entity as the amount of CO2 emission of a reused product.
[0093] As described above, in the management system 1 according to the present embodiment, the management device 2 of the vehicle manufacturer apportions the CO2 emissions of the battery 51 that were borne by the vehicle manufacturer between the management device 2 of the recycling operator and the management device 3 of the recycling operator according to the SOH of the battery 51 at the time of reuse of the battery 51. Since the CO2 emissions of the battery 51 are apportioned according to the SOH at the time of reuse, the CO2 emissions of the battery 51 can be borne fairly by both parties.
[0094] [Variation 1] In the first embodiment, it is assumed that the vehicle 5 is an electric vehicle, a hybrid vehicle, a plug-in hybrid vehicle, a fuel cell vehicle, or the like. In the first modification, it is assumed that the vehicle 5 is a vehicle capable of external charging, in which the battery 51 is charged using power supplied from an external power source. That is, examples of the vehicle 5 include an electric vehicle, a plug-in hybrid vehicle, and a plug-in fuel cell vehicle. Note that the external charging may be alternating current (AC) charging, in which the battery 51 is charged by receiving AC power supplied from an external AC power source, or direct current (DC) charging, in which the battery 51 is charged by receiving DC power supplied from an external DC power source.
[0095] In the first modification, a condition that the battery information is used for calculating the SOH can be that the battery information is acquired during external charging. In the first modification, the process shown in FIG. 6 can be adopted as details of the process of S21 (calculation process of the SOH) shown in FIG.
[0096] FIG. 6 is a flowchart showing detailed processing of the processing of S21 in FIG.
[0097] In S2111, the control device 21 extracts battery information that satisfies a condition from the read battery information. The condition is that the battery information is obtained during external charging. Whether the battery information is obtained during external charging can be determined based on, for example, a charging start flag and a charging end flag included in the battery information.
[0098] In S2112, the control device 21 calculates the SOC at the start of external charging (start SOC) by using the battery information at the start of external charging.
[0099] In S2113, the control device 21 calculates the SOC at the end of external charging (end SOC) using the battery information at the end of external charging.
[0100] In S2114, the control device 21 integrates the current value from the start to the end of external charging (that is, from the start SOC to the end SOC) and calculates the amount of charge / discharge power ΔAh charged to and discharged from the battery 51.
[0101] In S2115, the control device 21 calculates the full charge capacity C of the battery 51 according to the above formula (2) using the start SOC, the end SOC, and the charge / discharge power amount ΔAh.
[0102] In S2116, the control device 21 reads out the initial full charge capacity C0 of the battery 51 from the database 27. The full charge capacity C0 may be stored in the storage device 22.
[0103] In S2117, the control device 21 calculates the SOH of the battery 51 by dividing the full charge capacity C by the initial value C0 of the full charge capacity of the battery 51 according to the above formula (1).
[0104] As described above, in the first modification, the SOH of the battery 51 is calculated using the battery information acquired during external charging. The battery information acquired during external charging can be said to be data acquired in a more stable environment than battery information acquired while the vehicle 5 is traveling. Therefore, by calculating the SOH of the battery 51 using the battery information acquired during external charging, it is possible to improve the accuracy of the SOH calculation.
[0105] [Variation 2] In the first embodiment and the first modification, an example has been described in which the management device 2 of the vehicle manufacturer calculates the SOH of the battery 51. However, the vehicle 5 may calculate the SOH, and the management device 2 may obtain information indicating the SOH from the vehicle 5.
[0106] For example, the vehicle 5 calculates the SOH of the battery 51 when a predetermined calculation condition is met. The calculation condition may be a condition that external charging is performed, a condition that discharging is performed for a certain period of time while traveling, etc. After calculating the SOH, the vehicle 5 transmits the calculated SOH to the management device 2 together with the battery ID.
[0107] When the control device 21 of the management device 2 receives the SOH and the battery ID via the communication device 23, the control device 21 links the received SOH with the battery ID and stores it in the database 27. Every time the control device 21 receives the SOH from the vehicle 5, the control device 21 links the received SOH with the battery ID and stores it in the database 27.
[0108] When the battery 51 is to be reused (when a reuse notification is received), the control device 21 reads out the most recently received SOH from the database 27. Then, the control device 21 determines the proportional division ratio of the CO2 emissions of the battery 51 between itself (the vehicle manufacturer) and the reuse business operator according to the read-out SOH.
[0109] The above-described configuration can also achieve the same effects as those of the first embodiment and the first modification.
[0110] [Embodiment 2] In the first embodiment and the first modification, an example has been described in which the management device 2 of the vehicle manufacturer calculates the SOH of the battery 51. In the second modification, an example has been described in which the vehicle 5 calculates the SOH of the battery 51 and transmits the SOH to the management device 2 of the vehicle manufacturer. In the second embodiment, an example will be described in which the management device 3 of the reuse company calculates the SOH of the battery 51.
[0111] 1 again, the management system 1A according to the second embodiment is configured by replacing the control device 21 of the management device 2 with a control device 21A and replacing the control device 31 of the management device 3 with a control device 31A in comparison with the management system 1 according to the first embodiment. The other configurations of the management system 1A are basically the same as those of the management system 1.
[0112] In the management system 1A, the management device 3 of the recycling company calculates the SOH of the battery 51, and determines the proportional distribution ratio of the CO2 emissions emitted in the manufacture of the battery 51 according to the calculated SOH. Then, the management device 3 of the recycling company notifies the management device 2 of the vehicle manufacturer of the amount of CO2 emissions from the battery 51 that the vehicle manufacturer is responsible for (the share of the burden).
[0113] 7 is a functional block diagram of the control device 21A of the management device 2 and the control device 31A of the management device 3 according to the second embodiment. Referring to FIG. 7, the control device 21A of the management device 2 includes an information acquisition unit 611, a registration unit 612, a reception unit 613, a read unit 614, a notification unit 615, an information acquisition unit 616, and an update unit 617. The control device 21A functions as the information acquisition unit 611, the registration unit 612, the reception unit 613, the read unit 614, the notification unit 615, the information acquisition unit 616, and the update unit 617 by executing a program stored in the storage device 22, for example. Note that the information acquisition unit 611, the registration unit 612, the reception unit 613, the read unit 614, the notification unit 615, the information acquisition unit 616, and the update unit 617 may be realized by, for example, dedicated hardware (electronic circuitry).
[0114] Information acquisition unit 611 and registration unit 612 have the same functions as information acquisition unit 211 and registration unit 212 according to the first embodiment, respectively, and therefore the description thereof will not be repeated.
[0115] The receiving unit 613 receives a reuse notification from the management device 3 of the reuse operator. Upon receiving the reuse notification, the receiving unit 613 outputs the reuse notification to the reading unit 614.
[0116] The reading unit 614 identifies the battery ID from the reuse notification. The reading unit 614 reads out from the database 27 the amount of CO2 emissions emitted during the manufacture of the battery 51 (the CO2 emissions of the battery 51) based on the battery ID. In the example shown in FIG. 2, if the battery ID of the battery 51 is "B001", the reading unit 614 reads out the amount of CO2 emissions "M1" of the battery 51. The reading unit 614 outputs the read amount of CO2 emissions "M1" of the battery 51 to the notification unit 615.
[0117] The notification unit 615 notifies the management device 3 of the reuse operator of the amount of CO 2 emission “M1” of the battery 51 via the communication device 23.
[0118] The information acquisition unit 616 acquires the amount of CO2 emission from the battery 51 that the reuse operator (the vehicle manufacturer) will continue to bear from the management device 3 of the reuse operator. The information acquisition unit 616 outputs the received amount of CO2 emission to the update unit 617.
[0119] The update unit 617 updates the vehicle's CO2 emission information (FIG. 2) stored in the database 27 based on the share of CO2 emission received from the information acquisition unit 616. Here, as an example, it is assumed that information indicating that the share for battery ID "B001" is 60% is received from the information acquisition unit 616. In this case, the update unit 617 updates the CO2 emission amount "M1" for battery ID "B001" to "M1×0.6". With this update, the update unit 617 also updates the vehicle's CO2 emission amount "S1".
[0120] The control device 31A of the management device 3 includes a reception unit 711, a notification unit 712, an information acquisition unit 713, a registration unit 714, a SOH calculation unit 715, a determination unit 716, a CO2 emission calculation unit 717, an update unit 718, and a notification unit 719. The control device 31A functions as the reception unit 711, the notification unit 712, the information acquisition unit 713, the registration unit 714, the SOH calculation unit 715, the determination unit 716, the CO2 emission calculation unit 717, the update unit 718, and the notification unit 719, for example, by executing a program stored in the storage device 32. Note that the reception unit 711, the notification unit 712, the information acquisition unit 713, the registration unit 714, the SOH calculation unit 715, the determination unit 716, the CO2 emission calculation unit 717, the update unit 718, and the notification unit 719 may be realized by, for example, dedicated hardware (electronic circuit).
[0121] Receiving unit 711 and notifying unit 712 have the same functions as receiving unit 311 and notifying unit 312 according to the first embodiment, respectively, and therefore description thereof will not be repeated.
[0122] The information acquisition unit 713 acquires the amount of CO2 emissions from the battery 51 from the management device 2 of the vehicle manufacturer via the communication device 33. The information acquisition unit 713 outputs the acquired amount of CO2 emissions from the battery 51 to the registration unit 714 and the SOH calculation unit 715. Here, it is assumed that the battery 51 identified by the battery ID "001" is reused. That is, the information acquisition unit 713 outputs the amount of CO2 emissions "M1" from the battery 51 to the registration unit 714 and the SOH calculation unit 715.
[0123] The registration unit 714 associates the CO2 emission amount of the battery 51 acquired by the information acquisition unit 713 with the battery ID of the battery 51 and stores the amount in the database 37. Specifically, information on the CO2 emission amount "M1" of the battery 51 is associated with the battery ID "B001" and stored in the database 37. The above information is stored in the database 37 as temporary information before the CO2 emission amount is apportioned.
[0124] The SOH calculation unit 715 calculates the SOH of the battery 51. The recycling business operator performs an inspection process for checking the SOH of the battery 51 collected from the vehicle 5. In the inspection process, for example, the battery 51 is charged to full charge, and then the battery 51 is discharged until the battery 51 reaches a specified SOC. Then, an integrated value of the current value discharged from the battery 51 from full charge to the specified SOC is obtained. In the inspection process, inspection information including information such as the voltage of the battery 51 when fully charged, the voltage of the battery 51 at the specified SOC, and the integrated value of the current value is obtained. The inspection information is stored in the database 37. The SOH calculation unit 715 reads out the inspection information from the database 37. The SOH calculation unit 715 calculates the SOH of the battery 51 based on the inspection information. The SOH calculation unit 715 outputs the calculated SOH and the CO2 emission amount "M1" of the battery 51 received from the information acquisition unit 713 to the determination unit 716. The inspection process may be performed, for example, using a dedicated or general-purpose charge / discharge device.
[0125] The timing of performing the inspection process is arbitrary. For example, the inspection process may be performed before or after the reuse notification is transmitted from the management device 3 to the management device 2. If the inspection information has not yet been registered in the database 37, the SOH calculation unit 715 waits for the inspection information to be registered, for example.
[0126] The determination unit 716 determines the allocation ratio (burden ratio) of the CO2 emissions of the battery 51 according to the SOH using a method similar to that of the determination unit 216 according to the first embodiment. Here, it is assumed that the SOH is 40%, and the allocation ratio of the CO2 emissions of the battery 51 between the vehicle manufacturer and the recycling operator is determined to be 60:40. The determination unit 716 outputs the determined allocation ratio to the CO2 emission amount calculation unit 717. The determination unit 716 also outputs the CO2 emission amount "M1" of the battery 51 to the CO2 emission calculation unit 717.
[0127] The CO2 emission calculation unit 717 calculates the amount of CO2 emission from the battery 51 borne by the vehicle manufacturer (M1×0.6 in the above example) and the amount of CO2 emission from the battery 51 borne by the recycling operator (M1×0.4 in the above example) in accordance with the apportionment ratio determined by the determination unit 716. Then, the CO2 emission calculation unit 717 outputs the amount of CO2 emission from the battery 51 borne by the recycling operator, "M1×0.4", to the update unit 718, and outputs the amount of CO2 emission from the battery 51 borne by the vehicle manufacturer, "M1×0.6", to the notification unit 719.
[0128] The update unit 718 updates the amount of CO2 emission from the battery 51 stored in the database 37 (the information registered by the registration unit 714). In the above example, the update unit 718 updates the amount of CO2 emission "M1" for the battery ID "B001" to "M1×0.4". If there is an amount of CO2 emission due to reuse of the battery 51, the update unit 718 adds the amount of CO2 emission to the amount of CO2 emission from the battery 51 stored in the database 37 (M1×0.4 in the above example).
[0129] The notification unit 719 notifies the management device 2 of the vehicle manufacturer of the amount of CO2 emissions "M1 x 0.6" of the battery 51 borne by the vehicle manufacturer together with the battery ID "001" via the communication device 33.
[0130] 8 is a flowchart showing a procedure of a process executed when a battery is reused according to embodiment 2. This flowchart is executed by the control device 21A of the management device 2 and the control device 31A of the management device 3 when the battery is reused.
[0131] In S30, upon receiving an application for reusing the battery 51 from the input device 34, the control device 31A generates a reuse notification for the battery 51 and transmits the generated reuse notification to the management device 2 via the communication device 33. Here, it is assumed that the battery 51 identified by the battery ID "B001" is to be reused.
[0132] In S40, when the control device 21A receives the reuse notification via the communication device 23, it reads out the CO2 emissions emitted during the manufacture of the battery 51 (the CO2 emissions of the battery 51) "M1" from the database 27 based on the battery ID "B001" included in the reuse notification.
[0133] In S41, the control device 21A transmits to the management device 3 via the communication device 23 the amount of CO2 emission "M1" of the battery 51 read out in S40.
[0134] In S31, the control device 31A acquires the amount of CO2 emission “M1” of the battery 51 from the management device 2 via the communication device 33. The control device 31A associates the amount of CO2 emission “M1” of the battery 51 with the battery ID “B001” and stores them in the database 37.
[0135] In S32, the control device 31A reads out the inspection information from the database 37. Then, the control device 31A calculates the SOH of the battery 51 based on the inspection information. Here, it is assumed that the SOH of the battery 51 is 40%. The inspection information is acquired by an inspection process for the battery 51, as described above. The inspection process may be performed in advance, or may be performed at the timing of S32. The inspection information acquired by the inspection process is stored in the database 37.
[0136] In S33, the control device 31A determines the allocation ratio (burden ratio) of the CO2 emissions between the vehicle manufacturer and the recycling operator in accordance with the SOH.
[0137] In S34, the control device 31A calculates the amount of CO2 emissions from the battery 51 borne by the vehicle manufacturer, "M1×0.6", and the amount of CO2 emissions from the battery 51 borne by the recycling operator, "M1×0.4", according to the determined apportionment ratio. Then, the control device 31A notifies the management device 2 via the communication device 33 of the amount of CO2 emissions from the battery 51 borne by the vehicle manufacturer (the burden).
[0138] In S35, the control device 31A updates the amount of CO2 emissions from the battery 51 "M1" stored in the database 37 in S31 to the amount of CO2 emissions from the battery 51 "M1 x 0.4" that is the share of the battery (recycling business operator) calculated in S34, and ends this process.
[0139] In S42, the control device 21A acquires from the management device 3 via the communication device 23 the amount of CO2 emissions from the battery 51, which is the share borne by the control device 21A (the recycling business operator), "M1 x 0.6".
[0140] In S43, the control device 21A updates the CO2 emission amount "M1" of the battery 51, which is included in the CO2 emission amount of the vehicle stored in the database 27, to the CO2 emission amount of the battery 51 which is the share of the control device 21A (the vehicle manufacturer), "M1×0.6", and ends this process.
[0141] As described above, in the management system 1A according to the second embodiment, the management device 3 of the recycling business determines the allocation ratio of the CO2 emissions between the vehicle manufacturer and the recycling business, depending on the SOH of the battery 51 at the time when the battery 51 is reused. Then, the management device 3 bears part of the CO2 emissions of the battery 51 that was previously borne by the vehicle manufacturer, based on the allocation ratio. Since the CO2 emissions of the battery 51 are allocated between the two parties depending on the SOH at the time when the battery 51 is reused, the CO2 emissions of the battery 51 can be borne fairly by both parties.
[0142] [Variation 3] In the second embodiment, the management device 3 of the reuse business operator calculates the SOH of the battery 51 and determines the proportional allocation ratio of the CO2 emission of the battery 51 according to the SOH. However, the management device 3 of the reuse business operator may send the calculated SOH of the battery 51 to the management device 2 of the vehicle manufacturer, and the management device 2 of the vehicle manufacturer may determine the proportional allocation ratio of the CO2 emission of the battery 51 according to the SOH. That is, in the functional block diagram shown in FIG. 7, the functions of the determination unit 716 and the CO2 emission calculation unit 717 of the control device 31A of the management device 3 may be provided to the control device 21A of the management device 2.
[0143] Fig. 9 is a flowchart showing the procedure of the process executed when reusing the battery according to the modified example 3. This flowchart is obtained by deleting the processes of S33 and S34 from the process executed by the control device 31A, adding the processes of S51 and S52 to the process executed by the control device 31A, and adding the processes of S61 and S62 to the process executed by the control device 21A, compared to the flowchart of Fig. 8. The other processes in the flowchart of Fig. 9 are the same as those in the flowchart of Fig. 8, so the same step numbers are used and description thereof will not be repeated.
[0144] In S51, the control device 31A transmits the SOH of the battery 51 calculated in S32 to the management device 2 via the communication device 33.
[0145] In S61, the control device 21A determines the proportional division ratio of the CO2 emissions between the vehicle manufacturer and the recycling operator in accordance with the SOH.
[0146] In S62, the control device 21A calculates the amount of CO2 emission from the battery 51 borne by the vehicle manufacturer and the amount of CO2 emission from the battery 51 borne by the recycling operator, according to the determined proportional division ratio. Then, the control device 21A notifies the management device 3 via the communication device 23 of the amount of CO2 emission from the battery 51 borne by the recycling operator (the burden).
[0147] In S52, the control device 31A acquires, via the communication device 33, from the management device 2, the amount of CO 2 emissions from the battery 51 that is the share of the control device 31A (the recycling operator).
[0148] As described above, the configuration of the third modification can also achieve the same effects as those of the second embodiment.
[0149] [Variation 4] In the first embodiment, an example has been described in which the management device 2 of the vehicle manufacturer calculates the SOH of the battery 51. In the second modification, an example has been described in which the vehicle 5 calculates the SOH of the battery 51 and transmits the SOH to the management device 2 of the vehicle manufacturer. In the second embodiment and the second modification, an example has been described in which the management device 3 of the recycling company calculates the SOH of the battery 51. The SOH of the battery 51 may be calculated by a neutral third party different from the vehicle manufacturer and the recycling company. Both the vehicle manufacturer and the recycling company may wish to calculate the SOH of the battery 51, which is related to the amount of CO2 emissions they are responsible for, by themselves. Thus, the calculation of the SOH of the battery 51 may be delegated to a service provider (third party) that provides a service for acting on behalf of the calculation of the SOH of the battery 51.
[0150] For example, the management device 2 of the vehicle manufacturer may transmit battery information to the service provider and, as a reply, obtain from the service provider the SOH of the battery 51. Also, the management device 3 of the reuse provider may transmit inspection information to the service provider and, as a reply, obtain from the service provider the SOH of the battery 51.
[0151] By having a third party service provider calculate the SOH of the battery 51, it becomes possible to more appropriately allocate the CO2 emissions of the battery 51 between the vehicle manufacturer and the reuse business operator.
[0152] [Variation 5] In the first and second embodiments and the first to fourth variations, an example has been described in which a recycling business reuses a battery. In the case where a recycling business rebuilds a battery, the term "battery" can be read as "cell" in the methods described in the first and second embodiments and the first to fourth variations. Each of the multiple cells included in the battery is also assigned a battery ID for identifying the battery. Therefore, if the CO2 emissions are apportioned on a battery (cell) basis in the same manner as in the first and second embodiments and the first to fourth variations, the CO2 emissions emitted in the manufacture of the battery can be appropriately apportioned between the vehicle manufacturer and the recycling business when the battery is rebuilt.
[0153] Furthermore, when a recycling business operator performs both reuse and rebuilding, the management device 3 of the recycling business operator may determine whether to reuse or rebuild the battery 51 based on, for example, the SOH of the battery 51 collected from the vehicle 5. For example, the management device 3 may reuse the battery 51 if the SOH of the battery 51 is greater than a reference value, and may rebuild the battery 51 if the SOH of the battery 51 is equal to or less than the reference value. The reference value may be set as appropriate based on, for example, the specifications of the battery 51, the business content of the recycling business operator, or the intended use of the reseller.
[0154] [Variation 6] In the first and second embodiments and the first to fifth modifications, the case where a battery mounted on an automobile is reused has been described as an example. However, the object on which the battery to be reused is mounted is not limited to an automobile. The object on which the battery to be reused is mounted may be any moving object equipped with a battery, such as a motorcycle, a train, a ship, or an airplane.
[0155] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0156] 1,1A Management system, 2,3 Management device, 4 Factory, 5 Vehicle, 21,21A Control device, 22 Storage device, 23 Communication device, 24 Input device, 25 Display device, 26 Bus, 27 Database, 31,31A Control device, 32 Storage device, 33 Communication device, 34 Input device, 35 Display device, 36 Bus, 37 Database, 51 Battery, 211 Information acquisition unit, 212 Registration unit, 213 Acceptance unit, 214 Read unit, 215 Calculation unit, 216 Determination unit, 217 CO2 emission calculation unit, 218 Update unit, 219 Notification unit, 311 Acceptance unit, 312 Notification unit, 313 Information acquisition unit, 314 Registration unit, 611 Information acquisition unit, 612 Registration unit, 613 Acceptance unit, 614 Read unit, 615 Notification unit, 616 Information acquisition unit, 617 update unit, 711 reception unit, 712 notification unit, 713 information acquisition unit, 714 registration unit, 715 calculation unit, 716 determination unit, 717 emission amount calculation unit, 718 update unit, 719 notification unit.
Claims
1. A storage unit that stores an amount of CO2 emitted in the manufacture of the secondary battery; A management device comprising: a control unit that, when the secondary battery is reused by a business operator that reuses the secondary battery, apportions the CO2 emissions between the business operator and the secondary battery according to the degree of deterioration of the secondary battery when the secondary battery is reused.
2. The secondary battery is mounted on a moving object, The management device further includes a communication unit configured to be able to communicate with the mobile object, The control unit is acquiring information about the secondary battery from the mobile object via the communication unit; The management device according to claim 1 , wherein the deterioration level is calculated using the information when the secondary battery is reused.
3. The secondary battery is mounted on a moving object, The management device further includes a communication unit configured to be able to communicate with the mobile object, The management device according to claim 1 , wherein the control unit is configured to obtain the deterioration level from the mobile object via the communication unit when the secondary battery is reused.
4. A communication unit configured to be able to communicate with the management device of the carrier, The management device according to claim 1 , wherein the control unit is configured to obtain the deterioration level from a management device of the business operator via the communication unit when the secondary battery is reused.
5. A communication unit configured to be able to communicate with the management device of the carrier, The management device according to claim 1 , wherein the control unit, when the secondary battery is reused, acquires a share of the CO 2 emission amount corresponding to the deterioration level from the management device of the business operator via the communication unit.
6. The management device according to claim 1 , wherein the degree of deterioration is a capacity maintenance rate of the secondary battery.
7. The management device according to claim 6 , wherein the control unit increases the share of the CO 2 emissions borne by the business operator as the capacity maintenance rate when the secondary battery is reused increases.
8. Storing an amount of CO2 emitted by manufacturing the secondary battery; and when the secondary battery is reused by a business operator who reuses the secondary battery, apportioning the CO2 emissions between the business operator and the secondary battery according to the degree of deterioration of the secondary battery at the time of reuse.
9. A first device for managing CO2 emissions emitted in the manufacture of secondary batteries; a second device of a business entity that reuses the secondary battery, When the secondary battery is reused, the first device updates the amount of CO2 emissions in accordance with a deterioration level of the secondary battery at the time of reuse; The second device is a management system that manages CO2 emissions according to the degree of deterioration.
Citation Information
Patent Citations
Environmental load management device and system therefor
JP2003167953A
Carbon traceability management system
JP2010191832A
Operation planning system
JP2013158153A
Estimation device, estimation method, and estimation program
JP2016126372A
Environmental load information management system and environmental load information management method
JP2016134151A
