Power demand leveling system and program

The power demand leveling system optimizes EV battery usage by creating dynamic charging/discharging plans based on reservation information and predicted power demand, addressing versatility and capacity utilization issues to reduce peak demand and lower electricity costs.

JP7590169B2Active Publication Date: 2024-11-26HITACHI INFORMATION & TELECOMM ENG LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2020197491
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-11-27
Publication Date
2024-11-26
Estimated Expiration
2040-11-27

AI Technical Summary

Technical Problem

Existing power demand leveling technologies for electric vehicles (EVs) lack versatility and fail to fully utilize battery capacity due to mobility constraints and inflexible discharge power specifications, limiting their effectiveness in reducing peak electricity demand and optimizing electricity rates for businesses.

Method used

A power demand leveling system that includes a charging/discharging control device and a power management device, which calculates daily power demand, creates charging/discharging plans based on EV reservation information and predicted power demand curves, and instructs charging/discharging operations to optimize battery usage and reduce peak demand.

Benefits of technology

The system effectively utilizes EV battery capacity to minimize peak power demand, reduces electricity costs, and ensures flexibility in meeting mobility needs by dynamically adjusting charging and discharging plans according to predicted power usage patterns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007590169000001
    Figure 0007590169000001
  • Figure 0007590169000002
    Figure 0007590169000002
  • Figure 0007590169000003
    Figure 0007590169000003
Patent Text Reader

Abstract

To provide a power demand leveling technology that has high versatility and can fully and effectively utilize a battery of an electric vehicle.SOLUTION: A power demand leveling system 100 includes: a charge / discharge control device (PCS 310) that controls charge / discharge of a connected electric vehicle battery (EV battery 320); and a power management device 200 that controls power demands of an entire business establishment as a whole, and equalizes the electric power demands of business establishment. The power management device 200 includes: a charge / discharge planning portion 215 that creates a charge / discharge plan for the EV battery 320 to minimize a maximum daily power demand of the business establishment on the basis of a remaining capacity when the EV battery 320 is connected and reservation information of the EV battery 320; and an instruction portion 216 that gives a charge / discharge instruction to the PCS 310 according to the charge / discharge plan created by the charge / discharge plan planning portion 215.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power demand leveling technology that takes into account the charging and discharging of batteries installed in electric vehicles (EVs) in business establishments and the like. [Background technology]

[0002] There is a technology that uses batteries of EVs, etc. that are used for commuting but are not used during the daytime peak power demand to level out the power load at low cost. For example, Patent Document 1 discloses a technology that "levels out the power load by discharging the power stored in the batteries during peak power demand at a business, which is an electricity consumer that receives electricity from a power company. The batteries of multiple automobiles are charged at the business during non-peak power demand times or by using the late-night power of each automobile owner, and the power stored in the charged automobile batteries is discharged at the business during peak power demand times for the business (abstract excerpt)."

[0003] As a specific method, for example, Patent Document 2 discloses a technology in which "based on the operation schedule of an electric vehicle parked at an electric power consumer, the driver inputs the required capacity, which is the battery capacity that the power consumer wants to reserve, corresponding to multiple times before the vehicle starts to be used, and the licensed capacity for each time, calculated by subtracting the required capacity from the total battery capacity, is output to an electric power supply and demand management center. When controlling the charging and discharging of the battery to level out power supply and demand, charging and discharging are performed within the range of the licensed capacity for each time based on charging and discharging commands from the electric power supply and demand management center (summary excerpt)." [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2007-282383 A [Patent Document 2] International Publication No. 2012 / 017936 Summary of the Invention [Problem to be solved by the invention]

[0005] The electricity rate contract (basic rate) of the business operator is a metered system and is determined by the actual peak load of electricity demand. Therefore, reducing the peak load (load leveling; electricity demand leveling) directly leads to a reduction in the business operator's electricity rate contract.

[0006] The technology disclosed in Patent Document 1 is a power demand leveling method based on a specific power usage model (specifically, the "valley-peak-valley" model), and assumes that discharge power is prepared in advance or secured by charging during periods of low load. Therefore, it is difficult to apply to power usage that deviates from this model, and is not versatile. In addition, no consideration is given to the mobility needs of EVs (having the necessary remaining battery capacity when you want to use it).

[0007] The technology disclosed in Patent Document 2 is a technology that realizes power demand leveling while satisfying mobility needs. However, in order to satisfy mobility needs, the driver specifies in advance for each time period the amount of power to be used for discharging, and discharging is performed within the range of the specified upper limit of power. In other words, the amount of power available for discharging depends on the driver. Therefore, even if the EV has surplus power, it cannot be fully utilized, and there is room for further power demand leveling.

[0008] The present invention has been made in consideration of the above circumstances, and has an object to provide a power demand leveling technique that is highly versatile and allows for fully effective use of the batteries of electric vehicles. [Means for solving the problem]

[0009] The present invention provides an electric power demand leveling system that includes a charge / discharge control device that controls charging / discharging of a battery of a connected electric vehicle, and a power management device that controls the power demand of an entire business establishment, and that levels out the power demand of the business establishment, and the power management device calculates a maximum daily power demand of the business establishment based on the remaining capacity when the battery is connected and reservation information for the battery. Reducea charge / discharge plan making unit that makes a charge / discharge plan for the battery; and an instruction unit that issues a charge / discharge instruction to the charge / discharge control device according to the charge / discharge plan made by the charge / discharge plan making unit; a power demand forecasting unit that forecasts a power demand value for each predetermined time slot on a target day for which the charge / discharge plan is to be formulated as a predicted power demand curve, a reservation information acquiring unit that acquires a charging completion time of the battery and a charge amount at the completion as the reservation information, and a battery information acquiring unit that acquires specifications of the battery as battery information, wherein the charge / discharge plan formulating unit determines a charge amount and a discharge amount for the battery for each predetermined time slot using a connection time when the battery is connected detected by the charge / discharge control device, the predicted power demand curve, the reservation information, and the battery information, and formulates the charge / discharge plan according to a formulating procedure that is predetermined according to a shape of the predicted power demand curve for a chargeable / dischargeable period determined by the connection time and the charging completion time. It is characterized by: Effect of the Invention

[0010] According to the present invention, it is possible to provide a power demand leveling technique that is highly versatile and can fully and effectively utilize the battery of an electric vehicle. Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1A is an explanatory diagram for explaining a method for determining a contracted power, and FIGS. 1B and 1C are explanatory diagrams for explaining use cases of an embodiment of the present invention. [Diagram 2] 1 is an overall configuration diagram of a power leveling system according to an embodiment of the present invention. [Diagram 3] FIG. 1A is a functional block diagram of a power management apparatus according to an embodiment of the present invention, and FIG. [Figure 4] FIG. 1A is an explanatory diagram for explaining the charging state and terminology of an EV battery according to an embodiment of the present invention, and FIGS. 1B and 1C are explanatory diagrams for explaining an example of data stored in an EV reservation information database (DB) and an example of data stored in a battery information DB according to an embodiment of the present invention, respectively. [Diagram 5] 1A, 1B, and 1C are explanatory diagrams for explaining an example of data stored in a power usage history DB, a charge / discharge plan DB, and a charge / discharge history DB, respectively, according to an embodiment of the present invention. [Figure 6] 5(a) and 5(b) are explanatory diagrams for explaining a method for calculating an original power usage value and a predicted power demand value according to an embodiment of the present invention. [Figure 7] FIG. 1A is an explanatory diagram illustrating an example of a predicted power demand curve according to an embodiment of the present invention, and FIGS. 1B and 1C are explanatory diagrams illustrating an outline of an embodiment of the present invention using specific examples. [Figure 8] 1A and 1B are explanatory diagrams for explaining an outline of a charge / discharge plan formulation process according to an embodiment of the present invention. [Figure 9] 4 is a flowchart of a charge / discharge plan formulation process according to an embodiment of the present invention. [Figure 10] FIG. 2 is an explanatory diagram for explaining an overview of a charging / discharging plan formulation process for each EV battery according to an embodiment of the present invention. [Figure 11] 1A to 1H are explanatory diagrams for explaining model patterns according to an embodiment of the present invention. [Figure 12] 1A and 1B are explanatory diagrams for explaining the charge / discharge plan formulation process for model pattern a in an embodiment of the present invention, and FIG. 1C and 1D are explanatory diagrams for explaining the charge / discharge plan formulation process for model pattern h in an embodiment of the present invention, respectively. [Figure 13] 1A is a flowchart of a main process of a charge and discharge plan planning process in a planning procedure 1 according to an embodiment of the present invention, and FIG. 1B is a flowchart of a charging plan planning process in step 1 of the planning procedure 1 according to an embodiment of the present invention. [Figure 14] 1 is a flowchart of a first charging process of a planning procedure 1 according to an embodiment of the present invention. [Figure 15] 11 is a flowchart of a second charging process in the planning procedure 1 according to the embodiment of the present invention. [Figure 16] 1A and 1B are explanatory diagrams for explaining the charge / discharge plan formulation process of model pattern b according to an embodiment of the present invention, and FIG. 1C is an explanatory diagram for explaining the charge / discharge plan formulation process of model pattern h according to an embodiment of the present invention, respectively. [Figure 17] 13A is a flowchart of a main process of a charge / discharge plan formulation process in a formulation procedure 2 according to an embodiment of the present invention, and FIG. 13B is a flowchart of a charge / discharge plan formulation process in procedure 2 according to the embodiment of the present invention. [Figure 18] 13 is a flowchart of a first charging process of a planning procedure 2 according to an embodiment of the present invention. [Figure 19] 13 is a flowchart of a second charging process in a planning procedure 2 according to an embodiment of the present invention. [Figure 20] 13 is a flowchart of a charge / discharge plan planning process in step 2 of the planning procedure 2 according to the embodiment of the present invention. [Figure 21] 1A and 1B are explanatory diagrams for explaining the charge / discharge plan formulation process for model pattern d of an embodiment of the present invention, FIG. 1C is an explanatory diagram for explaining the charge / discharge plan formulation process for model pattern g of an embodiment of the present invention, and FIG. 1D and 1E are explanatory diagrams for explaining the charge / discharge plan formulation process for model pattern f of an embodiment of the present invention, respectively. [Figure 22] 13A and 13B are flowcharts showing a charge / discharge plan planning process for model pattern d according to an embodiment of the present invention, and FIG. 13C is a flowchart showing a main process of planning procedure 5 according to an embodiment of the present invention. [Figure 23] 11 is a flowchart of a first charge / discharge process of a planning procedure 5 according to the embodiment of the present invention. [Figure 24] 13(a) to 13(c) are flowcharts of a fourth charge / discharge process, a second charge / discharge process, and a third charge / discharge process, respectively, in planning procedure 5 according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the present embodiment, and any application example that meets the concept of the present invention is included in its technical scope. In addition, unless otherwise specified, each component may be plural or singular.

[0013] First, an overview of this embodiment will be described based on a typical use case. In this embodiment, the charging and discharging of EVs used for commuting or as company cars in an office or the like is controlled to reduce and level out the peak power usage in the office as much as possible.

[0014] Generally, the contracted power is determined based on the actual amount. That is, the maximum value (maximum demand power amount) of the maximum power demand (power usage) for each month in the past year is set as the contracted power. The maximum demand power amount is the largest value in the month among the average power usage every 30 minutes. For example, it is currently July, and the maximum demand power amount for the past year (July to July) has changed as shown in Figure 1 (a). In this case, it is determined based on the value in September, when the maximum demand power amount was the largest. If the maximum demand power in September can be reduced, the contracted power will also be reduced. Since the electricity bill is proportional to the contracted power, reducing the contracted power directly leads to cost reduction.

[0015] In this embodiment, the maximum value of the power usage is reduced on a daily basis by using the charging and discharging of the battery (hereinafter referred to as the EV battery) mounted on the EV. Specifically, as shown in FIG. 1(b), the power usage in one day is assumed to change. In the example of FIG. 1(b), the maximum value is PA [kW]. In this embodiment, the charging and discharging of the EV battery is controlled to reduce the maximum value. As shown in FIG. 1(c), the EV battery is charged during a time period when the maximum value PA is not reached, and the EV is discharged during a time period when power usage is high around the peak time. This reduces the maximum value to PB by discharging, and the maximum value of the power usage for that day can be reduced. By reducing the power usage in this way every day, the maximum power demand for that month can be reduced, and the contracted power with the power company can be reduced accordingly, and the purchased power can also be reduced.

[0016] Typical use cases are as follows: 1) In the morning, employees come to work and begin charging. 2) When peak load occurs, discharge the EV battery to reduce the peak. 3) After the peak load, if the EV battery remaining capacity (required battery remaining capacity) required by each employee is not reached by the time the employee returns home, charging will be carried out to ensure the required battery remaining capacity.

[0017] The required remaining battery capacity and the charging completion time are specified by an employee, etc. Based on that information, the power management device 200, which will be described later, creates a charging and discharging plan to charge the shortage so as to ensure the specified remaining capacity by the specified charging completion time.

[0018] In this embodiment, as long as the designated remaining capacity can be secured by the designated charging completion time, the remaining capacity may be lower than the designated remaining capacity in the process prior to the designated charging completion time. This allows more power to be secured for discharging flexibly and with high flexibility.

[0019] [System Configuration] The overall configuration of the power demand leveling system 100 of this embodiment is shown in Fig. 2. As shown in the figure, the power demand leveling system 100 includes a power management device 200, a HUB 110, a power meter 120, an in-house electric system 150, and charge / discharge control devices (PCS: Power Control Systems) 311, 312, 313, and 314 that control the charging and discharging of the EV batteries (EV batteries) 321, 322, 323, and 324. Note that hereinafter, unless there is a particular need to distinguish between them, they will be represented by PCS 310 and EV battery 320. Also, the number of PCSs 310 and EV batteries 320 is not limited to this.

[0020] The power meter 120 acquires the amount of power supplied from the grid power 130, and outputs it to the power management device 200 via the HUB 110. The amount of power detected by the power meter 120 includes the power used by the in-house electrical system 150 and the power used by the PCS 310.

[0021] Power management device 200 creates a charge / discharge plan for each EV battery 320 connected to power demand leveling system 100, and controls each PCS 310 in accordance with the created charge / discharge plan to charge / discharge EV battery 320.

[0022] [Power management device functional block] Fig. 3(a) shows functional blocks of the power management device 200 of this embodiment. As shown in this figure, the power management device 200 of this embodiment includes an EV reservation information acquisition unit 211, a battery information acquisition unit 212, a power usage acquisition unit 213, a power demand prediction unit 214, a charge / discharge plan creation unit 215, and an instruction unit 216. In addition, the power management device 200 stores, as data, an EV reservation information DB 410, a battery information DB 420, a power usage history DB 430, a charge / discharge plan DB 440, a charge / discharge history DB 450, and a creation procedure DB 460.

[0023] The EV reservation information acquisition unit 211 receives and acquires, from each EV user, the charging completion time and the remaining capacity of the EV battery 320 required at that time (required remaining battery capacity) as EV reservation information. The optimal charging and discharging timing of the EV battery 320 differs for each EV battery 320. Therefore, in this embodiment, EV reservation information is received from the user. The EV reservation information is a condition that satisfies mobility needs, for example, a SOC (State of Charge) of 90% by 8 p.m.

[0024] In this embodiment, the information is received via a UI (an input / output interface, described later) included in the power management apparatus 200. The received information is stored in the EV reservation information DB 410 in association with information (EVID) that identifies each EV.

[0025] Before describing the EV reservation information DB 410, the SOC of the EV battery 320 and various terms used in this specification will be explained with reference to Fig. 4(a). Here, it is defined as a percentage when the total power Cfull of the EV battery 320 is taken as 100%.

[0026] The upper limit SOC [%] indicates the maximum amount of power that can be charged (amount of charge) and is the value that becomes the end-of-charge voltage. Charging above this value will result in overcharging. The lower limit SOC [%] indicates the minimum amount of power that can be discharged (amount of charge) and is the value that becomes the end-of-discharge voltage. Discharging below this value will result in overdischarging. The current SOC [%] is a value that indicates the amount of power (remaining capacity) at the time of connection, and the completion SOC [%] is a value that indicates the amount of power desired by the user at the time charging is completed (the required remaining battery capacity described above).

[0027] The amount of energy required for charging Cneed [kWh] is the difference between the amount of energy desired by the user at the time of charging completion and the current (connected) amount of energy in the EV battery 320. In this embodiment, this is expressed by the following formula (1) using the total amount of energy Cfull of the EV battery 320. Cneed=Cfull×{(SOC at completion - current SOC) / 100}...(1)

[0028] The surplus energy Cexed [kWh] is the difference between the maximum amount of energy that can be charged and the amount of energy desired by the user at the time when charging is completed. In this embodiment, it is expressed by the following formula (2) using the total energy Cfull of the EV battery 320. Cexed=Cfull×{(Upper SOC - SOC at completion) / 100}...(2)

[0029] 4(b) shows an example of data (reservation information) stored in the EV reservation information DB 410. As shown in this figure, the data stored in the EV reservation information DB 410 includes information 411 that identifies the EV battery 320 connected to each PCS 310, connection time 412, charge completion time 413, and completion SOC 414. In addition, the data may include information (PCSID 415) that identifies the connected PCS 310.

[0030] The EVID 411 and connection time 412 are stored as values ​​acquired by the PCS 310 to which the EV battery 320 is connected. The EVID 411 is read from the EV battery 320 to which the PCS 310 is connected. The connection time 412 is the time when the PCS 310 detected that the EV battery 320 was connected. The charging completion time 413 and required remaining battery capacity (SOC at completion 414) are stored as values ​​input by the user. Using this EV reservation information DB 410, the power management device 200 grasps the mobility needs of each EV (whether there is a required remaining battery capacity when it is desired to use the EV).

[0031] Among the EV reservation information, the charging completion time 413 and completion SOC 414 input by the user may be configured to hold default values ​​in advance and be changed as necessary for each EV battery 320. The default values ​​may be, for example, 90% by 6 p.m.

[0032] The battery information acquisition unit 212 acquires information (battery information) of each EV battery 320. In this embodiment, when the EV battery 320 is connected to the PCS 310, the PCS 310 acquires the battery information from the EV battery 320 and transmits it to the power management device 200 via the HUB 110. At this time, information (PCSID) identifying the device itself (PCS 310) and information (EVID) identifying the EV equipped with the connected EV battery 320 are also transmitted. The transmitted EV information includes, for example, the capacity of the EV battery 320 (battery capacity), the remaining capacity of the EV battery 320 at the current time (current SOC), the maximum charge / discharge power of the EV battery 320 (upper limit SOC), and the lower limit receiving power value of the EV battery 320 (lower limit SOC). The battery information acquisition unit 212 acquires the information transmitted from the PCS 310 as battery information and stores it in the battery information DB 420.

[0033] An example of data stored in the battery information DB 420 is shown in Fig. 4(c). As shown in this figure, the data includes an EVID 421, a battery capacity 422, a current remaining battery capacity (current SOC 423), a maximum battery charge amount (upper limit SOC 424), and a minimum battery charge amount (lower limit SOC 425). When the EV battery 320 is connected, the PCS 310 obtains and transmits this information from the connected EV battery 320.

[0034] The power usage acquisition unit 213 acquires the power demand record and accumulates it in a database. In this embodiment, the value of the power meter 120 is acquired as the power demand record, and is stored in the power usage history DB 430 as a power usage history for each predetermined time segment (time period) in association with the time period.

[0035] An example of data stored in the power usage history DB 430 is shown in Fig. 5(a). As shown in this figure, the data stored in the power usage history DB 430 stores changes in power usage 433 for each day in units of predetermined time slots 432 for each date 431. Here, an example is shown in which data is stored in 30-minute units. Furthermore, the power usage history DB 430 further stores, in units of months 434, the maximum power usage, which is the maximum value of the power usage 433 for that month, as maximum value 435.

[0036] The power demand prediction unit 214 calculates, as a predicted power demand curve, a predicted power demand value for each time period on a planning date when a charge / discharge plan creation unit 215, which will be described later, creates a plan. The calculation will be described in detail later.

[0037] The charge / discharge plan creation unit 215 creates a charge / discharge plan for each (EV) EV battery 320 connected to each PCS 310. Here, the created charge / discharge plan is the charge / discharge amount for each time period of each EV battery 320. The created charge / discharge plan is stored in the charge / discharge plan DB 440.

[0038] The data stored in the charge / discharge plan DB440 is created for each planning date (planning date) 441, as shown in Fig. 5(b). Each data includes EVID 444, which is identification information for the EV battery 320, PCSID 445, which is identification information for the PCS 310 to which the EV battery 320 is connected, and planned charge / discharge energy 443 [kWh] for each predetermined time period 442. That is, the planned charge / discharge energy 443 [kWh] for each time period 442 is stored for each PCS 310. Note that in this figure, for the planned charge / discharge energy 443 [kWh], negative values ​​indicate charging and positive values ​​indicate discharging.

[0039] In this embodiment, a charge / discharge plan is created according to the mobility needs of each EV, that is, to satisfy the charge completion time 413 specified by the user and the required charge amount at that time (SOC at completion 414). In this embodiment, the charge / discharge plan creation unit 215 creates a charge / discharge plan according to the predicted power demand curve and a planning procedure corresponding to the predicted power demand curve stored in the planning procedure DB 460. The plan is created for each EV battery 320 in order according to a predetermined rule. The order of creation may be, for example, the order of connection time. If there are multiple EV batteries 320 with the same connection time, the order is the earliest reserved charging completion time. The charge / discharge plan creation process will be described later.

[0040] The instruction unit 216 issues charging and discharging instructions (charge and discharge instructions) to the PCS 310 to which the EV battery 320 is connected, according to the charge and discharge plan for each EV battery 320 formulated by the charge and discharge plan formulation unit 215. Furthermore, in this embodiment, the instruction unit 216 stores a history of the instructions as the charge and discharge history DB 450.

[0041] An example of data stored in the charge / discharge history DB 450 is shown in Fig. 5(c). The items of the data stored in the charge / discharge history DB 450 are basically the same as the items of the data stored in the charge / discharge plan DB 440. Specifically, as shown in this figure, each data includes a PCSID 455 and an amount of charge / discharge actually performed for each time period 452 on each date 451 (actual charge / discharge power amount 453). That is, for each PCS 310, the amount of charge / discharge power actually performed for each time period on each planning date is stored.

[0042] [Hardware configuration of power management device] 3(b) is a hardware configuration diagram of the power management apparatus 200 of this embodiment. As shown in this diagram, the power management apparatus 200 of this embodiment is configured as a general-purpose information processing device (computer) including a CPU 231, a memory 232, a storage device 233, a communication interface (I / F) 234, and an input / output I / F 235.

[0043] Each function of the power management apparatus 200 is realized, for example, by the CPU 231 loading a program stored in the storage device 233 into the memory 232 and executing the program. Also, each piece of data is stored in the storage device 233 or the like.

[0044] The input / output I / F 235 is, for example, a keyboard, a mouse, a display, a touch panel, etc. In this embodiment, the EV reservation information is input via the input / output I / F 235.

[0045] [Electricity demand forecast processing] Next, a description will be given of the power demand forecasting process by the power demand forecasting unit 214. The power demand forecasting process is a process of forecasting (calculating) a forecast power demand value (forecast power demand curve) for each time period on the planning date (today) from past power usage records.

[0046] First, the power demand forecasting unit 214 calculates the original power usage value of the business establishment. The power usage 433 stored in the power usage history DB 430 obtained from the power meter 120 includes the value of the charging / discharging power by the PCS 310. Therefore, from this power usage 433, excluding the actual charging / discharging power amount 453 of each PCS 310, the original power usage (=original power usage) in the case where the charging / discharging power of the PCS 310 is not performed is calculated. Specifically, the calculation is performed according to the following formula (3). Original power usage = power usage + (PCS1 charge / discharge power amount + PCS2 charge / discharge power amount +... + PCSN charge / discharge power amount) (3) It is assumed that N (N is an integer equal to or greater than 1) PCSs 310 are provided. The charge / discharge power amount of each PCS 310 uses the actual charge / discharge power amount 453 at the corresponding date and time of the data stored in the charge / discharge history DB 450. The relationship between the power usage amount 433, the actual charge / discharge power amount 453 which is the usage amount of each PCS 310, and the original power usage value 456 is shown in Fig. 6(a).

[0047] Next, the power demand prediction unit 214 calculates a predicted power demand value for the business establishment for the predicted time period (prediction time period). For example, the calculation is performed by performing statistical processing on past data for the prediction time period (past original power usage value 461). For example, the maximum and minimum values ​​are excluded from a predetermined number of sampling data, and the average value is calculated, and the obtained value is set as the predicted power demand value.

[0048] A specific example is shown in Fig. 6(b). Here, an example is shown for the case where the predicted time slot is 9:00 in Fig. 6(a). From five sampling data points at 9:00, 7 days, 14 days, 21 days, 28 days, and 35 days ago, the maximum and minimum values ​​are excluded, and the average is calculated, and the obtained value is set as the predicted power demand value 457 for this predicted time slot (9:00).

[0049] Although an example of using past data for the same day of the week has been shown here, the sampling data to be used is not limited to this. Any data can be selected, such as the same day one year ago, only weekdays of the same month, or past days when the same event was held.

[0050] The power demand forecasting unit 214 calculates the predicted power demand value 457 for each time period on the planning date, and obtains a predicted power demand curve as the predicted power demand value for the entire planning date. An example of the obtained predicted power demand curve 510 is shown in Fig. 7(a). Here, each bar graph shows the predicted power demand value 457 for each time period.

[0051] The target power amount Ptgt [kWh] is the upper limit of the power amount targeted by the business establishment. The initial value of the target power amount Ptgt may be a value determined in advance for each business establishment, or may be calculated daily from past performance. When calculated from past performance, the lower limit may be set to, for example, 30% of the upper limit of the past performance peak.

[0052] [Overall charging and discharging plan planning process] Next, a description will be given of a charging / discharging plan formulation process by the charging / discharging plan formulation unit 215 of this embodiment. An optimal charging / discharging plan that suppresses peaks in power demand as much as possible is formulated based on the predicted power demand curve 510 and mobility needs.

[0053] The charge / discharge plan making unit 215 makes a charge / discharge plan for each connected EV battery 320 using the predicted power demand curve 510 for the planning date calculated by the power demand prediction unit 214. In this embodiment, the charge / discharge plan making unit 215 makes a charge / discharge plan for each connected EV battery 320 in a predetermined order and updates the predicted power demand curve 510. The charge / discharge plan is made to minimize the maximum daily power demand of the business while satisfying mobility needs (there is sufficient remaining battery capacity when it is needed).

[0054] First, an overview will be explained using a specific example. Here, explanation will be given using the predicted power demand curve 510 shown in Fig. 7(a). Also, assume that two EV batteries 321, 322 are connected. As shown in Fig. 7(b), EV battery 321 is connected at 8:00, and 20:00 is specified as the charge completion time in the EV reservation information, and as shown in Fig. 7(c), EV battery 322 is connected at 6:00, and 9:00 is specified as the charge completion time. Hereinafter, the time when the EV battery is connected is represented as Ts, and the charge completion time specified by the user is represented as Te.

[0055] In such a case, the optimal charge / discharge plan for EV battery 321 would be to charge in time periods A and C, and discharge in time period B, as shown in Fig. 7(b). The optimal charge / discharge plan for EV battery 322 would be to charge in area A, and not discharge, as shown in Fig. 7(c). In this way, the optimal charge / discharge plan differs depending on the needs of the EV battery.

[0056] The charge / discharge plan creation unit 215 first creates a charge / discharge plan for the EV battery 322. Fig. 8(a) shows the charge amount 512 according to the charge / discharge plan for the EV battery 322. Once the charge amount 512 for the EV battery 322 has been determined, the power demand value for each time period, including the charge amount 512, is set as a predicted power demand curve 510, and the charge / discharge plan creation unit 215 creates a charge / discharge plan for the EV battery 321. Fig. 8(b) shows the resulting predicted power demand curve 510, including the charge amount and discharge amount 513 according to the charge / discharge plan for the EV battery 321.

[0057] In this manner, in this embodiment, an optimal charge / discharge plan is created for each EV battery 320 in a predetermined order. A charge / discharge plan is created for the first EV battery, and the result is reflected in the predicted power demand value for each time period (the charge amount is added and the discharge amount is subtracted), and when planning the next second EV battery, an optimal charge / discharge plan is created for the predicted power demand value for each time period that reflects the plan for the first EV battery. This is repeated for each connected EV battery 320, and as a result, an optimal charge / discharge plan is created overall.

[0058] A rule is defined in advance for the order of planning the charge / discharge plans when multiple EV batteries 320 are connected. The rule is, for example, to give priority to an EV battery 320 with a shorter period between the EV connection time and the EV reservation charging completion time and an earlier EV reservation charging completion time, or to give priority to an EV battery with an earlier EV reservation charging completion time, etc.

[0059] In addition, the charge / discharge plan for the EV battery 320 is created when the EV battery 320 is connected, and is updated at regular intervals (e.g., once every 30 minutes) until the EV reserved charging is completed or the EV battery 320 is disconnected.

[0060] The above process is shown in the form of a process flow. Fig. 9 is a process flow of the charge / discharge plan planning process by the charge / discharge plan planning unit 215 of this embodiment. As described above, this process is performed at a predetermined time interval (for example, every 30 minutes).

[0061] The charge / discharge plan creation unit 215 acquires an initial predicted power demand curve and a target power amount Ptgt (step S1101). As the initial predicted power demand curve, the predicted power demand curve 510 on the planning date calculated by the power demand prediction unit 214 is used. In addition, as the target power amount Ptgt, a preset value is used.

[0062] First, the charge / discharge plan creation unit 215 determines whether there is an EV battery 320 for which a charge / discharge plan has not been created (hereinafter, simply referred to as an unplanned EV) (step S1102). Here, it determines whether there is an EV battery 320 that is connected to the PCS 310 and for which a charge / discharge plan has not been created at the time of performing this process. If there is no unplanned EV, the process ends.

[0063] On the other hand, if there are unplanned EVs, the charge / discharge plan creation unit 215 extracts from among them an EV battery (target EV) for which a charge / discharge plan is created (step S1103). The extraction is performed according to a predetermined rule. The rule may be, for example, that the EV battery 320 with the earliest connection time is given priority, and among the EV batteries 320 with the same connection time, the EV battery with the earliest charging completion time is given priority. Also, if there is only one unplanned EV, the unplanned EV is set as the target EV.

[0064] Next, the charge / discharge plan creation unit 215 creates a charge / discharge plan for the target EV (step S1104). Specifically, it determines the charge amount and discharge amount for each time period. The details of the determination will be described later.

[0065] Thereafter, the charge / discharge plan creation unit 215 adds the charge / discharge plan of the target EV to the predicted power demand curve at that time, and updates the predicted power demand curve (step S1105). Adding the charge / discharge plan means adding the change in the power demand value due to the charge / discharge plan. Then, the target EV is removed from the unplanned EVs (step S1107), and the process returns to step S1102 and repeats.

[0066] [Individual charge / discharge plan planning process] The charge / discharge plan creation process (the process of step S1104 above) for each EV battery 320 by the charge / discharge plan creation unit 215 will be described in detail below. In this embodiment, a charge / discharge plan is created according to a planning procedure stored in advance in the planning procedure DB 460 in accordance with the shape of the predicted power demand curve 510 from the EV connection time Ts to the charging completion time Te. The planning procedure DB 460 stores planning procedures in accordance with the shape of the predicted power demand curve 510.

[0067] Specifically, in this embodiment, as shown in Fig. 10, the predicted power demand curve 510 is divided into three equal parts for the period (chargeable / dischargeable period) Td between the EV connection time Ts and the charging completion time Te, and an identifier is assigned to each period X, Y, and Z. The assigned identifier is either CC, which means that the period is mainly for charging, or DD, which means that the period is mainly for discharging, in relation to the predicted power demand value of the period and the target power amount Ptgt. Then, a model pattern is determined by the arrangement of the identifiers, and a planning procedure corresponding to the determined model pattern is stored in the planning procedure DB 460.

[0068] If there is even one time period in each of the periods X, Y, and Z in which the magnitude of the predicted power demand value is greater than the target power amount Ptgt, the identifier DD is assigned to that period. The identifier CC is assigned to the other periods, i.e., periods in which there is no time period in which the predicted power demand value is greater than the target power amount Ptgt.

[0069] There are eight model patterns depending on the combinations as follows: The relationship between the predicted power demand curve 510 and the target power amount Ptgt for each model pattern is shown in Fig. 11(a) to Fig. 11(h).

[0070] A predicted power demand curve 510a of the model pattern a is shown in Fig. 11(a). In the model pattern a, identifiers (CC, CC, CC) are assigned to periods (X, Y, Z), respectively.

[0071] A predicted power demand curve 510b of the model pattern b is shown in Fig. 11(b). In the model pattern b, identifiers (CC, CC, DD) are assigned to the periods (X, Y, Z), respectively.

[0072] A predicted power demand curve 510c of the model pattern c is shown in Fig. 11(c) In the model pattern c, identifiers (CC, DD, CC) are assigned to the periods (X, Y, Z), respectively.

[0073] A predicted power demand curve 510d of the model pattern d is shown in Fig. 11(d). In the model pattern d, identifiers (DD, CC, CC) are assigned to the periods (X, Y, Z), respectively.

[0074] A predicted power demand curve 510e of the model pattern e is shown in Fig. 11(e) In the model pattern e, identifiers (CC, DD, DD) are assigned to the periods (X, Y, Z), respectively.

[0075] A predicted power demand curve 510f of the model pattern f is shown in Fig. 11(f) In the model pattern f, identifiers (DD, CC, DD) are assigned to the periods (X, Y, Z), respectively.

[0076] A predicted power demand curve 510g of the model pattern g is shown in Fig. 11(g). In the model pattern g, identifiers (DD, DD, CC) are assigned to the periods (X, Y, Z), respectively.

[0077] A predicted power demand curve 510h of the model pattern h is shown in Fig. 11(h). In the model pattern h, identifiers (DD, DD, DD) are assigned to the periods (X, Y, Z), respectively.

[0078] The planning procedures stored in the planning procedure DB 460 in association with each model pattern will be described below.

[0079] First, the planning procedure (planning procedure 1) associated with model pattern a and model pattern h will be described. As shown in Fig. 12(a) and Fig. 12(c), in these model patterns, the predicted power demand curve 510a is greater than the target power amount Ptgt, and the predicted power demand curve 510h is smaller than the target power amount Ptgt in all periods. Therefore, the same identifier, either CC or DD, is assigned to all periods X, Y, and Z.

[0080] In the planning procedure 1 applied to these model patterns, only a charging plan is planned. That is, a discharging plan is not necessary. Since the predicted power demand curve 510 is smaller than the target power amount Ptgt, an identifier DD is assigned as a region for discharging in the classification. However, since mobility needs are prioritized, discharging is not performed and only charging is performed. Hereinafter, the planning procedure 1 will be described as a flow of processing executed by the charge and discharge plan planning unit 215.

[0081] First, the process flow of the main process is shown in Fig. 13(a) As shown in this figure, the charge and discharge plan creation unit 215 performs step 1 of creating a charging plan, that is, charging plan creation process (step S1201), and ends the process.

[0082] Next, a flow of the procedure 1 charging plan creation process in step S1201 by the charging and discharging plan creation unit 215 is shown in Fig. 13(b) and will be described with reference to Figs. 12(b) and 12(d).

[0083] First, the charge / discharge plan formulation unit 215 sets the maximum power demand value Pmax_0 during the period Td from Ts to Te to Pmax_1 as shown in FIG. 12(b) and FIG. 12(d) (step S1301).

[0084] Then, the charge / discharge plan creator 215 first performs a first charging process (step S1302). Here, the first charging process is a process that is performed for a time period in which the power demand value is equal to or less than Pmax_1. The details of the process will be described later.

[0085] Next, the charge / discharge plan making unit 215 determines whether the total charge amount (total charge amount) Ctotal made in the first charging process reaches the charge required energy amount Cneed shown in Fig. 4(a), that is, whether charging is completed by the amount of Cneed (step S1303). If completed, the charging plan making process is terminated.

[0086] On the other hand, if the charging is not completed, the charge / discharge plan creation unit 215 performs a second charging process (step S1304) and ends the process. Here, the second charging process is a process performed for a time period in which the power demand value is greater than Pmax_1. The details of the process will be described later.

[0087] Next, the flow of the first charging process by the charge / discharge plan creation unit 215 will be described with reference to Fig. 14. In the first charging process, as shown by circled numbers 1 and 2 in Fig. 12(b) and Fig. 12(d), the maximum chargeable amount is assigned as the charging amount to each time slot in order from the earliest time slot until the charging required energy amount Cneed is reached.

[0088] First, the charge / discharge plan creation unit 215 identifies the number of time slots in the Td period (step S1401). Here, it is M. Then, the processing order is determined for all time slots in the Td period. In the planning procedure 1, it is determined that processing will be performed in order from the earliest time slot. For example, each time slot is assigned a consecutive number and processed in that order. Furthermore, the charge / discharge plan creation unit 215 calculates the available capacity Stn, which is the difference between the power demand value Ptn and Pmax_1, for each time slot tn (n is an integer between 1 and M).

[0089] The charge / discharge plan creator 215 first sets a counter n to 1 (step S1402). At this time, the total charge amount Ctotal is set to 0.

[0090] The charge / discharge plan formulation unit 215 determines whether the total charge amount Ctotal reaches the required charge power amount Cneed (step S1403), and if so, ends the process.

[0091] If not reached, the charge / discharge plan creator 215 determines whether the available capacity Stn is greater than the maximum chargeable capacity PCSmax (Stn>PCSmax) (step S1404). Here, the maximum chargeable capacity PCSmax is the maximum amount of chargeable power in a time period (30 minutes in this case) of the PCS 310 to which the target EV (EV battery 320) is connected.

[0092] If Stn>PCSmax, the maximum chargeable amount PCSmax is set as the charge amount Ctn for the time slot tn (step S1405). Then, the power demand value Ptn for the time slot tn is updated to a value that includes PCSmax, and the total charge amount Ctotal is updated to a value that includes PCSmax (step S1406). Note that the time slot tn in which the maximum chargeable amount PCSmax is set as the charge amount Ctn is excluded from the processing target of the second charging process described later (step S1409).

[0093] On the other hand, if Stn≦PCSmax, the charge amount Ctn for the time slot tn is set as the available capacity Stn (step S1407). Then, the power demand value Ptn for the time slot tn is updated to a value obtained by adding the charge amount Ctn, and the total charge amount Ctotal is updated to a value obtained by adding the charge amount Ctn (step S1408).

[0094] After updating the power demand value Ptn and the total charge amount Ctotal for the time period tn, it is determined whether processing has been completed for all periods (steps S1409 and S1410). Here, the counter n is incremented by 1, and it is determined whether M has been exceeded. If it has not been exceeded, the process returns to step S1403 and continues.

[0095] On the other hand, if the processing has been completed for all periods, the processing ends.

[0096] Next, the flow of the second charging process by the charge / discharge plan planning unit 215 will be described with reference to FIG. 15. This process is performed when the required amount of charging cannot be achieved by the first charging process alone. This process is performed when the required amount of charging cannot be achieved within the range of the target power amount Ptgt (or the maximum value Pmax_1). Therefore, as shown by the circled number 3 in FIG. 12(b) and FIG. 12(d), the maximum power demand value for the period Td is increased. In these figures, it is increased from Pmax_1 to Pmax_2. Note that in this embodiment, the time slots tn that are excluded from the processing target in the first charging process are not targeted. In other words, only the time slots tn that are not excluded are targeted.

[0097] 15, the charge / discharge plan creation unit 215 first acquires and calculates various information necessary for the second charging process (step S1501). Here, the information is the total charge amount Ctotal calculated in the first charging process, the target time slots tn of the second charging process, the number M2 of the time slots, and the chargeable free capacity Stn2 in each target time slot tn. The free capacity Stn2 is the difference between the maximum chargeable capacity PCSmax determined by the PCS 310 and the charge amount Ctn determined in the first charging process.

[0098] After calculating these pieces of information, the charge / discharge plan formulation unit 215 determines the processing order of the time slot tn to be processed, and performs the following process (step S1502). For example, the processing order is such that the time slot tn having the smaller free space Stn2 value and the earlier time slot is prioritized. n is a counter.

[0099] The charge / discharge plan formulation unit 215 determines whether the total charge amount Ctotal reaches the amount of power required for charging Cneed (step S1503), and if so, ends the process.

[0100] If the target has not been reached, the charge / discharge plan creation unit 215 adds the available capacity Stn2 to the charge amount Ctn for the time slot tn (step S1504). That is, the charge amount Ctn for the time slot tn is updated to a value obtained by adding the available capacity Stn2. Then, the power demand value Ptn for the time slot tn is updated to a value obtained by adding the available capacity Stn2, and the total charge amount Ctotal is updated to a value obtained by adding the available capacity Stn2 (step S1505). Furthermore, as shown in FIG. 12(b) and FIG. 12(d), the obtained power demand value Ptn is set as the maximum power demand value Pmax_2 for the period Td (step S1506).

[0101] Thereafter, it is determined whether or not processing has been completed for all time periods tn that are the target of the second charging processing (steps S1507, S1508). If processing has been completed, the processing ends there, and if processing has not been completed, the process returns to step S1503 and processing for the next time period is performed.

[0102] The above charge / discharge plan determines the charge amount Ctn and power demand value Ptn for the target EV during each time slot tn in the period Td. That is, the planned charge / discharge power amount 443 of the EV battery 320 during each time slot, as shown in Fig. 5(b), is determined. Additionally, the maximum power demand value Pmax_2 during the period Td after taking the charge / discharge plan into account is also determined.

[0103] Next, the planning procedure 2 stored in the planning procedure DB 460 in association with the model patterns b and e will be described. In these model patterns, as shown in Fig. 16(a) and Fig. 16(c), the predicted power demand curves 510b and 510e increase almost monotonically and exceed the target power amount Ptgt within the period Td. That is, the identifier CC is assigned to the early period, and the identifier DD is assigned to the later period. In such a model pattern, the region where the predicted power demand value is less than the target power amount Ptgt is the chargeable region, and the region where the predicted power demand value is equal to or greater than the target power amount Ptgt is the dischargeable region.

[0104] In the planning procedure 2 applied to these model patterns, first, a charging plan is created for a time period in which the predicted power demand value is smaller than the target power amount Ptgt, and then a discharging plan is created including the power amount added in the charging plan. That is, the processing is performed in the order shown by the circled numbers in FIG. 16(b). Here, circled numbers 1 to 3 indicate the processing for determining the charging amount, and circled number 4 indicates the processing for determining the discharging amount. This makes it possible to reduce the maximum power demand value in the period Td, which was initially Pmax_1, to Pmax_3.

[0105] The planning procedure 2 will be described below as a flow of processing executed by the charge / discharge plan planning unit 215 with reference to FIG. 17(a) to FIG.

[0106] First, the process flow of the main process is shown in Fig. 17(a). As shown in this figure, the charge / discharge plan making unit 215 performs a procedure 2 charge plan making process for making a charge plan (step S2201). After that, the charge / discharge plan making process for making a discharge plan (step S2202) is performed, and the process ends.

[0107] Next, the flow of the charging plan planning process of step 2 in the planning procedure 2 is basically the same as the charging plan planning process of step 1 in the planning procedure 1. However, as shown in FIG. 17(b), here, the charge / discharge plan planning unit 215 sets the target power amount Ptgt to Pmax_1 (step S2301). Also, the target charging amount includes not only the charging power amount Cneed but also the surplus power amount Cexed shown in FIG. 4(a). That is, similarly to the planning procedure 1, the first charging process is performed (step S2302), and then it is determined whether the planned total charging amount Ctotal reaches the sum of the charging power amount Cneed and the surplus power amount Cexed (step S2303), and if it does not reach the sum, the second charging process or the like is performed (step S2304).

[0108] Next, the first charging process of planning procedure 2 will be described with reference to Fig. 18. The first charging process of planning procedure 2 is basically the same as the first charging process of planning procedure 1. However, the time period tn to be processed is a time period in which the power demand value Ptn is smaller than the target power amount Ptgt (=Pmax_1). Furthermore, with regard to the processing order, the largest value of the free capacity Stn is given top priority, and the time is given the next priority.

[0109] First, the charge / discharge plan creation unit 215 identifies the number of time periods to be processed within the Td period (step S2401). Here, as described above, the time periods tn to be processed are time periods in which the power demand value Ptn is smaller than the target power amount Ptgt (=Pmax_1), so the number of such time periods is identified (assumed to be M). Then, for the time periods tn, the free space Stn, which is the difference between the power demand value Ptn and Pmax_1, is calculated. Also, as described above, the processing order is determined so that the processing is performed in descending order of the free space Stn, and within that, in ascending order of time.

[0110] The counter n is set to 1 and the total charge amount Ctotal is set to 0 (step S2402), and thereafter, the charge / discharge plan formulation unit 215 performs the following process for the determined M processing time periods tn.

[0111] The charge / discharge plan formulation unit 215 determines whether the total charge amount Ctotal reaches the sum of the amount of energy required for charging Cneed and the amount of surplus energy Cexed (step S2403), and if so, ends the process.

[0112] If the limit has not been reached, the charge / discharge plan formulation unit 215 determines whether the available capacity Stn is greater than the maximum chargeable capacity PCSmax (Stn>PCSmax) (step S2404).

[0113] If Stn>PCSmax, the maximum chargeable amount PCSmax is set as the charge amount for the time slot tn (step S2405). Then, the power demand value Ptn for the time slot tn is updated to a value obtained by adding PCSmax, and the total charge amount Ctotal is updated to a value obtained by adding PCSmax (step S2406). Note that the time slot tn in which the charge amount is the maximum chargeable amount PCSmax is excluded from the processing target of the second charging processing described later (step S2409). The time slot tn that is the target of this processing is indicated by the circled number 1 in FIG. 16(b).

[0114] On the other hand, if Stn≦PCSmax, the charge amount Ctn for the time slot tn is set as the available capacity Stn (step S2407). Then, the power demand value Ptn for the time slot tn is updated to a value to which the charge amount Ctn has been added, and the total charge amount Ctotal is updated to a value to which the charge amount Ctn has been added (step S2408). The time slot tn that is the subject of this process is indicated by the circled number 2 in FIG. 16(b).

[0115] After updating the power demand value Ptn and the total amount of charge for the time period tn, it is determined whether processing has been completed for all periods (steps S2409 and S2410). Here, the counter n is incremented by 1, and it is determined whether M has been exceeded. If it has not been exceeded, the process returns to step S2403 and continues.

[0116] On the other hand, if the processing has been completed for all periods, the processing ends.

[0117] Next, the flow of the second charging process by the charge / discharge plan planning unit 215 in the case of planning procedure 2 will be described with reference to FIG. 19. As with planning procedure 1, this process is performed when the required amount of charging cannot be achieved by the first charging process alone. Only the time slot tn that was not excluded in the first charging process is targeted. The process flow is basically the same as the flow of the second charging process in planning procedure 1. The time slot tn targeted by this process is indicated by the circled number 3 in FIG. 16(b).

[0118] First, various information required for the second charging process is acquired and calculated (step S2501). Here, the information is the total charge amount Ctotal calculated in the first charging process, the target time slots tn of the second charging process, the number M2 of the time slots, and the free space Stn2 of each target time slot tn. The free space Stn2 is the difference between the maximum chargeable amount PCSmax and the charge amount Ctn determined in the first charging process.

[0119] After calculating these pieces of information, the charge / discharge plan formulation unit 215 determines the processing order of the time slot tn to be processed, and performs the following process (step S2502). For example, the processing order is such that the time slot tn having the smaller free space Stn2 value and the earlier time slot is prioritized. n is a counter.

[0120] The charge / discharge plan formulation unit 215 determines whether the total charge amount Ctotal reaches the sum of the charge required energy amount Cneed and the surplus energy amount Cexed (step S2503), and if it reaches the sum, ends the process.

[0121] If not reached, the charge / discharge plan creation unit 215 adds the free capacity Stn2 to the charge amount Ctn of the time slot tn (step S2504). Then, the power demand value Ptn of the time slot tn is updated to the value obtained by adding the free capacity Stn2, and the total charge amount Ctotal is updated to the value obtained by adding the free capacity Stn2 (step S2505). In addition, as shown in FIG. 16(b), the obtained power demand value Ptn is set as the maximum power demand value Pmax_2 of the period Td (step S2506).

[0122] Thereafter, it is determined whether or not processing has been completed for all time periods tn that are the target of the second charging processing (steps S2507, S2508). If processing has been completed, the processing ends there, and if processing has not been completed, the flow returns to step S2503 and processing for the next time period is performed.

[0123] In the planning procedure 2, since a discharging process is also performed, the surplus energy Cexed is also allocated to charging in the second charging process. However, the surplus energy Cexed does not have to be allocated to charging. That is, when Ctotal reaches Cneed in the above step S2503, the process may be ended.

[0124] Next, the flow of the discharge plan formulation process of procedure 2 by the charge / discharge plan formulation unit 215 in the case of formulation procedure 2 will be described with reference to Fig. 20. The discharge plan is allocated only when there is surplus energy Cexed. The time period tn targeted for this process is indicated by the circled number 4 in Fig. 16(b).

[0125] First, the charge / discharge plan formulation unit 215 sets the maximum power demand value Pmax_0 within the period Td to Pmax_1 (step S2601).

[0126] First, time periods tn in which the initial power demand value Ptn is large are extracted from the target power amount Ptgt (step S2602). The number of such time periods is also identified. Here, this is set to M3. The processing order is also determined so that processing is performed in descending order of power demand value Ptn. If there are multiple time periods with the same power demand value, the processing order is also determined so that processing is performed in ascending order of time. The following processing is performed according to the determined processing order (step S2603).

[0127] First, the charge / discharge plan formulation unit 215 determines whether or not the surplus energy Cexed remains (step S2604). If there is no surplus energy Cexed, the process ends.

[0128] The difference ΔPtn1 between the power demand value Ptn of the time slot tn in which the power demand value is the highest and the power demand value of the time slot in which the power demand value is the second highest is calculated, and this is set as the discharge amount Dtn of the time slot tn in which the power demand value Ptn is the highest (step S2605).

[0129] Then, the power demand value Ptn for the time slot tn is updated to a value excluding Dtn, and the surplus power amount Cexed is updated to a value excluding the discharge amount Dtn (step S2606). As shown in Fig. 16(b), the obtained power demand value Ptn is set as the maximum power demand value Pmax_3 for the period Td (step S2607). Note that, for example, if there are multiple time slots with the highest power demand value, the power demand value Ptn is set as the maximum power demand value Pmax_3 for the period Td when processing for all of these time slots is completed.

[0130] Then, it is determined whether or not all of the M3 time slots have been processed (steps S2608 and S2609). If so, the surplus power amount Cexed is left and the process ends. On the other hand, if there is an unprocessed time slot tn, the process returns to step S2604 and processes the next time slot determined in the processing order.

[0131] Planning procedure 3 associated with model pattern d and model pattern g, and planning procedure 4 associated with model pattern f are basically the same as planning procedure 2. However, when determining the processing order of the first charging process, planning procedure 2 gives priority to the earlier one, whereas planning procedure 3 gives priority to the later one. In the case of planning procedure 4, either is acceptable.

[0132] As shown in Fig. 21(a) and Fig. 21(c), in model patterns d and g, the predicted power demand curves 510d, 510g decrease almost monotonically and become smaller than the target power amount Ptgt within a period Td. That is, an identifier of DD is assigned to an early period, and an identifier of CC is assigned to a later period. In such model patterns, the region of the predicted power demand value equal to or greater than the target power amount Ptgt is a dischargeable region, and the region of the predicted power demand value less than the target power amount Ptgt is a chargeable region.

[0133] In the planning procedure 3 applied to these model patterns, first, a charging plan is created for a time period in which the predicted power demand value is smaller than the target power amount Ptgt, and then a discharging plan is created including the power amount added in the charging plan. That is, the processing is performed in the order shown by the circled numbers in FIG. 21(b). Here, circled numbers 1 to 3 indicate the processing for determining the charging amount, and circled number 4 indicates the processing for determining the discharging amount. This makes it possible to reduce the maximum power demand value in the period Td, which was initially Pmax_1, to Pmax_3.

[0134] In addition, in the model pattern f, the predicted power demand curve 510f changes from decreasing to increasing within the period Td. In this model pattern f, as shown in Fig. 21(d), the region of the predicted power demand value equal to or greater than the target power amount Ptgt is the dischargeable region, and the region of the predicted power demand value less than the target power amount Ptgt is the chargeable region, as in the other model patterns.

[0135] In the planning procedure 4 applied to this model pattern f, first, a charging plan is created for a time period in which the predicted power demand value is smaller than the target power amount Ptgt, and then a discharging plan is created including the power amount added in the charging plan. That is, the processing is performed in the order shown by the circled numbers in FIG. 21(e). Here, circled numbers 1 to 3 indicate the processing for determining the charging amount, and circled number 4 is the processing for determining the discharging amount. This makes it possible to reduce the maximum power demand value in the period Td, which was initially Pmax_1, to Pmax_3.

[0136] Next, the planning procedure 5 associated with the model pattern c will be described. As shown in Fig. 22(a), in this model pattern c, the predicted power demand curve 510c changes from increasing to decreasing during the period Td, and the minimum value is smaller than the target power amount Ptgt, and the maximum value is larger than the target power amount Ptgt. As shown in this figure, in the model pattern c, as in the other model patterns, the region where the predicted power demand value is less than the target power amount Ptgt is the chargeable region, and the region where the predicted power demand value is equal to or greater than the target power amount Ptgt is the dischargeable region.

[0137] In planning procedure 5 applied to model pattern c, first, a charging plan is created for a later time period (circled numbers 1 and 2 in FIG. 22(b)), then a charging plan is created for an earlier time period (circled numbers 3 and 4 in FIG. 22(b)), and finally a discharging plan is created for the dischargeable region (circled number 5 in FIG. 22(b)). This makes it possible to reduce the maximum power demand value for period Td, which was initially Pmax_1, to Pmax_3. Below, planning procedure 5 will be described as the flow of processing executed by charge and discharge plan creation unit 215.

[0138] First, the flow of the main process of the planning procedure 5 by the charge / discharge plan planning unit 215 is shown in FIG. 22(c).

[0139] First, the charge / discharge plan formulation unit 215 performs a period Z charging process for formulating a charging plan for period Z (step S5101).

[0140] Thereafter, the charge / discharge plan planning unit 215 determines whether the planned total charging amount Ctotal reaches the sum of the charging required energy Cneed and the surplus energy Cexed (step S5102), and if it reaches the sum, performs a first charge / discharge process (step S5103) and terminates the process.

[0141] On the other hand, if the target has not been reached, the charge / discharge plan planning unit 215 determines whether the planned total charging amount Ctotal has reached the charging required energy amount Cneed (step S5104), and if so, performs a second charge / discharge process (step S5105) and terminates the process.

[0142] On the other hand, if the target has not been reached, the charge / discharge plan formulation unit 215 performs a third charge / discharge process (step S5106) and ends the process.

[0143] The charging process during period Z will now be described.

[0144] The period Z charging process is basically the same as the first charging process of the planning procedure 2. However, the order of processing is such that the later one has priority. The other processes are the same as the first charging process, so the explanation will be omitted here.

[0145] Next, the first charge / discharge process in step S5103 will be described below. Fig. 23 is a process flow of the first charge / discharge process.

[0146] The charge / discharge plan formulation unit 215 sets the maximum power demand value in the period Y as Pmax_1 (step S5201). The period Y is the only region among the three regions that has a time period in which the amount of power is equal to or greater than the target amount of power Ptgt. Therefore, this is equivalent to setting the maximum power demand value (Pmax_0) in the period Td as Pmax_1.

[0147] Next, among the time periods in period Y, time periods in which the power demand value is greater than the target power amount Ptgt are set as discharge target periods, the number of such time periods is identified, and a processing order is determined (step S5202). The number is set to M3. The processing order is also determined so that processing is performed in descending order of power demand value Ptn. If there are multiple time periods with the same power demand value, the processing order is determined so that processing is performed in ascending order of time. The following processing is performed according to the determined processing order (step S5203).

[0148] First, the charge / discharge plan creator 215 determines whether the difference ΔSOC1 between the current SOC and the lower limit SOC is equal to or greater than the surplus energy Cexed (step S5204). The current SOC and the lower limit SOC are obtained from the battery information DB 420.

[0149] If the difference ΔSOC1 is equal to or greater than the surplus energy Cexed, a discharge plan is created with the smaller surplus energy Cexed as the upper limit. The flow of the discharge plan creation process is basically the same as the discharge plan creation process in the creation procedure 2.

[0150] That is, first, it is determined whether or not surplus power Cexed remains (step S5205). If so, in accordance with the processing order determined in step S5202, the difference ΔPtn1 between the power demand value Ptn of the time slot tn in which the power demand value is the greatest and the power demand value of the time slot in which the power demand value is the second greatest is calculated, and this is set as the discharge amount Dtn of the time slot tn in which the power demand value Ptn is the greatest (step S5206).

[0151] Then, the power demand value Ptn for the time slot tn is updated to a value excluding Dtn, and the surplus power amount Cexed is updated to a value excluding the discharge amount Dtn (step S5207). The maximum power demand value Ptn at that time point is set as the maximum power demand value Pmax_3 for the period Y (step S5208).

[0152] Then, it is determined whether or not the processing has been completed for all M3 time periods (steps S5209, S5210). If not, the process returns to step S5205.

[0153] On the other hand, if the process has been completed for all target discharge time periods, the process proceeds to S5221 described below in the case of planning procedure 5. Also, if there is no surplus energy Cexed remaining in step S5205, the process proceeds to S5221.

[0154] In step S5204, if the difference ΔSOC1 is less than the surplus energy Cexed, a discharge plan is created with the smaller difference ΔSOC1 as the upper limit. The flow of the discharge plan creation process is basically the same as the discharge plan creation process in the creation procedure 2 and the above-mentioned case where the surplus energy Cexed is used as the upper limit.

[0155] That is, while the difference ΔSOC1 remains or until processing is completed for all M3 time periods tn (steps S5215, S5219, S5220), the discharge amount Dtn of tn is determined (step S5216), the power demand value Ptn is updated to a value excluding Dtn, and the difference ΔSOC1 is updated to a value excluding the discharge amount Dtn (step S5217), and the maximum power demand value Ptn at that time point is set as the maximum power demand value Pmax_3 for the period Y (step S5218).

[0156] Thereafter, the charge / discharge plan formulation unit 215 determines whether or not there is an unprocessed discharge target time period (step S5221), and if there is an unprocessed time period, performs the fourth charge / discharge process (step S5222), and ends the process. Note that there is an unprocessed time period when the surplus energy Cexed or the difference ΔSOC1 disappears and the process proceeds to step S5221.

[0157] Here, the flow of this fourth charge / discharge process will be explained with reference to Fig. 24(a). This fourth charge / discharge process creates a charging plan using the time slot of period X and the time slot in which the power demand value is smaller than the target power amount Ptgt of period Y, with the smaller of the dischargeable power amount PD of the unprocessed target discharge time slot and the difference ΔSOC2 between the upper limit SOC and the current SOC as the upper limit. After that, the charging amount is added and the discharge amount of the unprocessed target discharge time slot is determined.

[0158] As shown in the figure, the charge / discharge plan creation unit 215 calculates the dischargeable amount of power PD and determines whether the amount of power PD is greater than the difference ΔSOC2 (step S5301). If the amount of power PD is greater, a charging plan is created with the smaller difference ΔSOC2 as the upper limit (step S5302). Otherwise, a charging plan is created with the amount of power PD as the upper limit (step S5303).

[0159] In this case, the time periods for which the charging plan is created are the time periods included in period X and the time periods other than the discharge target time periods in period Y. The creation of the charging plan is basically the same as the first charging process described above. However, whereas in the first charging process, the upper limit is the amount of energy required for charging Cneed, here, it is the difference ΔSOC2 or the amount of energy PD, respectively.

[0160] Next, a discharge plan is made for the unprocessed time period with the charge amount secured in step S5302 or step S5303 as the upper limit (step S5304), and the process ends.

[0161] This discharge plan is basically the same as the discharge plan formulation process in the above-mentioned formulation procedure 2. However, whereas in the discharge plan formulation process in the formulation procedure 2, the upper limit value is the surplus energy amount Cexed, here, the upper limit value is the charge amount secured in step S5302 or step S5303.

[0162] Next, the second charge / discharge process in step S5105 will be described. Fig. 24(b) is a process flow of the second charge / discharge process.

[0163] The charge / discharge plan formulation unit 215 sets the maximum power demand value (=Pmax_0) in the period Y as Pmax_1, similarly to the first charge / discharge process (step S5401).

[0164] Thereafter, similarly to the first charging / discharging process, among the time periods in the period Y, the time period in which the power demand value is greater than the target power amount Ptgt is set as the discharging target period, and the fourth charging / discharging process is executed (step S5402).

[0165] Next, the third charge / discharge process in step S5106 will be described. Fig. 24(c) is a process flow of the third charge / discharge process.

[0166] The charge / discharge plan formulation unit 215 sets the maximum power demand value in the period Y as Pmax_1, similarly to the first charge / discharge process (step S5501).

[0167] The charge / discharge plan creation unit 215 creates a charging plan with the sum of the amount of energy required for charging Cneed and the amount of surplus energy Cexed as the upper limit (step S5502). Here, the time period for which the charging plan is created is the time period included in period X and the time period other than the time period targeted for discharging in period Y. The creation of the charging plan is basically the same as the first charging process described above. However, whereas in the first charging process, the upper limit is the amount of energy required for charging Cneed, here, it is the sum of the amount of energy required for charging Cneed and the amount of surplus energy Cexed.

[0168] Then, the charge / discharge plan creation unit 215 creates a discharge plan with the surplus power amount Cexed obtained in step S5502 as an upper limit (step S5503). This discharge plan is also basically the same as the discharge plan creation process in the above-mentioned creation procedure 2.

[0169] As described above, in this embodiment, the power demand leveling system 100 includes a charge / discharge control device (PCS310) that controls the charging and discharging of the battery (EV battery 320) of a connected electric vehicle (EV), and a power management device 200 that controls the power demand of the entire business establishment, and levels out the power demand of the business establishment. The power management device 200 includes a charge / discharge plan formulation unit 215 that formulates a charge / discharge plan for the EV battery 320 so as to minimize the maximum daily power demand of the business establishment based on the current SOC, which is the remaining capacity when the EV battery 320 is connected, and reservation information for the EV battery 320, and an instruction unit 216 that issues charge / discharge instructions to the PCS310 in accordance with the charge / discharge plan formulated by the charge / discharge plan formulation unit 215.

[0170] In this embodiment, a charge / discharge plan is created based only on the remaining capacity at the time of connection and the reservation information. As long as there is no limit to the amount of discharge and the specified remaining capacity can be secured by the specified charging completion time, the remaining capacity may be lower than the specified remaining capacity in the process before that. This allows a larger amount of power to be used for discharging, and allows a more flexible and effective charge / discharge plan to be created.

[0171] In this embodiment, a comprehensive planning procedure is determined and stored in advance according to a predicted power demand curve, which is a power demand value for each predetermined time period on a target day predicted in advance. Then, when planning a charge / discharge plan, the charge / discharge plan planning unit 215 plans the charge / discharge plan according to the planning procedure.

[0172] Therefore, according to this embodiment, a charge / discharge plan can be created regardless of the shape of the predicted power demand curve or the change in the predicted power demand value. In other words, it is possible to achieve power demand leveling suitable for the model curve of power demand that differs from one business operator to another. At this time, mobility needs are not sacrificed. In this way, according to this embodiment, a plan procedure that is optimal for a wide variety of power demand curves can be used to maximize the reduction in peak load without sacrificing the mobility needs of electric vehicles.

[0173] For example, according to this embodiment, the EV battery 320 installed in an electric vehicle used by employees for commuting can be charged in the morning or evening when the power usage in the office is low, and discharged in the daytime when the power usage is at its peak, thereby reducing the peak power demand of the office without sacrificing mobility needs. In other words, the EV battery 320 can be effectively used as a storage battery and power supply source, and the power demand can be optimized.

[0174] <Variation 1> In the above embodiment, the period Td from the EV connection time Ts to the charging completion time Te is divided into three equal parts, and the pattern is determined and processed, but this is not limiting. For example, processing may be performed without classifying into patterns. In this case, basically, a charging plan is created starting from the earlier time, and then a discharging plan is created.

[0175] Then, for example, a charging plan is devised with a predetermined time period tn during which the power demand value Ptn within the chargeable / dischargeable period Td, determined by the connection time Ts and the charging completion time Te, is smaller than the target power amount Ptgt, which is a predetermined target value, as the charging period, and a discharging plan is devised with a predetermined time period tn during which the power demand value Ptn within the chargeable / dischargeable period Td is equal to or greater than the target power amount Ptgt.

[0176] <Variation 2> Furthermore, the power demand leveling system 100 of the above embodiment and modified examples may be provided with a mode (charge / discharge count reduction mode) in which, when there is no impact on the contracted power (basic charge), the peak load is not reduced by discharging the EV battery 320, and a charge / discharge plan is created so as not to unnecessarily increase the number of times the EV battery 320 is charged / discharged.

[0177] It is generally known that an increase in the number of times the EV battery 320 is charged and discharged leads to the deterioration of the EV battery 320. As described above, the contracted power (basic charge) is determined by the maximum power demand value for each month in the past year. Therefore, if the maximum power demand value up to the planning date is not exceeded during the same month, there is no impact on the contracted power (basic charge). In such a case, there is no need to create a discharge plan to discharge and reduce peak loads, and only a charging plan needs to be created.

[0178] Specifically, for example, the power management device 200 further includes a reception unit that receives an instruction for a charge / discharge plan creation mode from the business operator, and receives an instruction from the business operator via the reception unit as to whether to create a charge / discharge plan in a normal mode or in a charge / discharge frequency reduction mode. The normal mode is a mode in which the charge / discharge plan creation process described in the above embodiment is performed.

[0179] Then, when an instruction for the charge / discharge count reduction mode is received, the charge / discharge plan creation unit 215 creates a charge / discharge plan in the charge / discharge count reduction mode. In the charge / discharge count reduction mode, the target power amount Ptgt in the above embodiment is set to the maximum power demand value in the same month up to the planning date, and a model pattern of the forecast power demand curve 510 for the planning date is determined. The subsequent processing is the same as in the above embodiment.

[0180] The present invention is not limited to the above-mentioned embodiment, but includes various modified examples. The above-mentioned embodiment has been described in detail to easily explain the present invention, and is not necessarily limited to those including all of the configurations described. It is also possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to add, delete, or replace a part of the configuration of each embodiment with another configuration.

[0181] In addition, each of the above configurations, functions, processing units, processing means, etc. may be realized in hardware, for example, by designing a part or all of them in an integrated circuit. In addition, each of the above configurations, functions, etc. may be realized in software by a processor interpreting and executing a program that realizes each function. Information such as a program, table, file, etc. that realizes each function may be placed in a memory, a recording device such as a hard disk or SSD, or a recording medium such as an IC card, SD card, or optical disk. In addition, the control lines and information lines are shown as those considered necessary for explanation, and not all control lines and information lines are necessarily shown in the product. For example, it may be considered that almost all of the configurations are actually connected to each other. [Explanation of symbols]

[0182] 100: power demand leveling system, 110: HUB, 120: power meter, 130: system power, 150: business electric system, 200: power management device, 211: EV reservation information acquisition unit, 212: battery information acquisition unit, 213: power usage acquisition unit, 214: power demand forecasting unit, 215: charge / discharge planning unit, 216: instruction unit, 231: CPU, 232: memory, 233: storage device, 235: input / output I / F, 310: PCS, 311: PCS, 312: PCS, 313: PCS, 314: PCS, 320: EV battery, 321: EV battery, 322: EV battery, 323: EV battery, 324: EV battery, 410: EV reservation information DB, 411: EVID, 412: Connection time, 413: Charging completion time, 414: SOC at completion, 415: PCSID, 420: Battery information DB, 421: EVID, 422: Battery capacity, 423: Current SOC, 424: Lower limit SOC, 425: Upper limit SOC, 430: Power usage history DB, 431: Date, 432: Time zone, 433: Power usage Usage, 434: month, 435: maximum value, 440: charge / discharge plan DB, 441: planning date, 442: time period, 443: planned charge / discharge power amount, 444: EVID, 445: PCSID, 450: charge / discharge history DB, 451: date, 452: time period, 453: actual charge / discharge power amount, 455: PCSID, 456: original power usage amount, 457: predicted power demand value, 460: planning procedure DB, 510: predicted power demand curve, 510a: predicted power demand curve, 510b: predicted power demand curve, 510c: predicted power demand curve, 510d: predicted power demand curve, 510e: predicted power demand curve, 510f: predicted power demand curve, 510g: predicted power demand curve, 510h: predicted power demand curve, 512: charging amount, 513: discharging amount, Cexed: surplus energy, Cfull: total energy, Cneed: energy required for charging, Ctotal: total charging amount, Ctn: charging amount, Dtn: discharge amount, PA: maximum value, PD: dischargeable energy amount, PCSmax: maximum chargeable amount, Pmax_0: power demand value, Pmax_1: maximum power demand value, Pmax_2: maximum power demand value, Pmax_3: maximum power demand value, Ptgt: target energy amount, Ptn: power demand value, Stn: available capacity, Stn2: available capacity, Td: period, Te: charging completion time, Ts: EV connection time, X: period, Y: period, Z: period, tn: time zone

Claims

1. A power demand leveling system comprising: a charge / discharge control device that controls charging / discharging of a battery of an electric vehicle connected thereto; and a power management device that controls power demand of an entire business establishment, and the system levels out the power demand of the business establishment, The power management device includes: a charge / discharge plan creation unit that creates a charge / discharge plan for the battery that reduces a maximum value of a daily power demand of the business establishment based on a remaining capacity of the battery when the battery is connected and reservation information for the battery; An instruction unit that issues a charge / discharge instruction to the charge / discharge control device according to the charge / discharge plan formulated by the charge / discharge plan formulation unit; an electric power demand forecasting unit that forecasts an electric power demand value for each predetermined time period on a target day for which the charge / discharge plan is to be created as a forecast electric power demand curve; a reservation information acquisition unit that acquires, as the reservation information, a charging completion time of the battery and a charging amount at the completion; a battery information acquisition unit that acquires the specifications of the battery as battery information; the charge / discharge plan formulation unit determines a charge amount and a discharge amount for the battery for each of the predetermined time periods using a connection time when the battery is connected, the connection time being detected by the charge / discharge control device, the predicted power demand curve, the reservation information, and the battery information; creating the charge / discharge plan according to a predetermined planning procedure according to a shape of the predicted power demand curve in a chargeable / dischargeable period determined by the connection time and the charge completion time; A power demand leveling system characterized by the above.

2. 2. The power demand leveling system according to claim 1, The charge / discharge plan creation unit creates a charging plan by setting a charging period to the predetermined time period during which the power demand value is smaller than a predetermined target value within a chargeable / dischargeable period determined by the connection time and the charging completion time. A power demand leveling system characterized by the above.

3. 3. The power demand leveling system according to claim 2, The charge / discharge plan creation unit defines the predetermined time period during which the power demand value within the chargeable / dischargeable period is equal to or greater than the target value as a discharge period, and creates a discharge plan. A power demand leveling system characterized by the above.

4. 2. The power demand leveling system according to claim 1, the battery is a plurality of batteries; the charge / discharge plan creation unit creates the charge / discharge plan for each of the plurality of batteries in a predetermined order, and after creating a charge / discharge plan for one of the batteries, updates the predicted power demand curve by adding a change in the power demand value due to the charge / discharge plan to the predicted power demand curve, and creates a charge / discharge plan for the next battery. A power demand leveling system characterized by the above.

5. A computer comprising: a charge and discharge plan creating unit that creates a charge and discharge plan for a battery of an electric vehicle connected to a charge and discharge control device, the charge and discharge plan creating unit creating a charge and discharge plan for the battery that reduces a maximum value of a daily power demand of a business establishment equipped with the charge and discharge control device based on a remaining capacity of the battery when the battery is connected and reservation information for the battery; An instruction unit that issues a charge / discharge instruction to the charge / discharge control device according to the charge / discharge plan; an electric power demand forecasting unit that forecasts an electric power demand value for each predetermined time period on a target day for which the charge / discharge plan is to be created as a forecast electric power demand curve; a reservation information acquisition unit that acquires, as the reservation information, a charging completion time of the battery and a charging amount at the completion; a battery information acquisition unit that acquires the specifications of the battery as battery information; The charge / discharge plan planning unit, determining a charge amount and a discharge amount for the battery for each of the predetermined time periods using a connection time when the battery was connected, the connection time detected by the charge / discharge control device, the predicted power demand curve, the reservation information, and the battery information; The charge / discharge plan is created according to a predetermined planning procedure according to a shape of the predicted power demand curve in a chargeable / dischargeable period determined by the connection time and the charge completion time. A program characterized by:

Citation Information

Patent Citations

  • Method and system for levelling power load

    JP2007282383A

  • Electric power management system

    JP2012196028A

  • Charging device, charging system and charging method