Water intake and sand discharge device

The water intake and sand drainage device addresses sediment accumulation issues by using buoyancy-controlled gates and a bottom sand removal system, ensuring efficient operation and reduced maintenance, even during power outages.

JP7593226B2Active Publication Date: 2024-12-03OHBAYASHI GUMI LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2021083012
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-05-17
Publication Date
2024-12-03
Estimated Expiration
2041-05-17

AI Technical Summary

Technical Problem

Existing water intake mechanisms in small and medium-sized hydropower systems face issues with sediment accumulation, leading to increased maintenance costs and operational disruptions due to sediment removal requirements and power outages during natural disasters.

Method used

A water intake and sand drainage device that uses buoyancy-driven mechanisms to control sediment discharge and water intake operations, employing a water control gate and sand discharge gate that operate based on river water levels, without the need for electricity or human power, and includes a bottom sand removal facility with a screen and water conduit system.

Benefits of technology

Enables efficient sediment removal and continuous water intake operations, reducing maintenance costs and ensuring system functionality during power outages, while enhancing the capacity to handle large debris and maintaining system integrity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007593226000001
    Figure 0007593226000001
  • Figure 0007593226000002
    Figure 0007593226000002
  • Figure 0007593226000003
    Figure 0007593226000003
Patent Text Reader

Abstract

To control an operation related to discharge of sediment deposited at an upstream side of a dam body crossing a river such as an erosion control dam and an erosion control weir and water intake without using electric power.SOLUTION: A device for both water intake and sediment discharge which is provided in a dam body crossing a river, discharges sediment deposited at an upstream side of the dam body, and guides river water to take in, comprises: a bottom face sediment discharge facility provided at the upstream side of the dam body and taking-in sediment together with river water; a connection portion connected to the bottom face sediment discharge facility; and a water intake tower having an inflow control device opening / closing the connection portion. The inflow control device comprises a water control gate which ascends / descends by using buoyance generated by river water flowing into the water intake tower via the connection portion, and blocks the connection portion when river water level reaches a preset specified water level.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a combined water intake and sand discharge device to be installed on an embankment that crosses a river, such as an erosion control dam or an erosion control dam. [Background technology]

[0002] In order to realize a sustainable society, there is currently a demand to promote the introduction of renewable energy sources that will never run out, and small- and medium-sized hydroelectric power generation, one type of renewable energy, is attracting attention.

[0003] Small- to medium-sized hydroelectric power plants generate electricity using the potential energy of water, and do not require fuel procurement, can generate electricity continuously 24 hours a day, and are a highly efficient baseload power source, attracting attention as a regionally distributed energy source that can be introduced in small- to medium-sized rivers and waterways, dams and dams, industrial facilities, sewerage facilities, etc. When introducing small- to medium-sized hydroelectric power plants, water intake and discharge facilities are installed in small- to medium-sized rivers and waterways, dams and dams, industrial facilities, sewerage facilities, etc., to introduce the water used for power generation.

[0004] For example, Patent Document 1 discloses a water intake mechanism installed in a sabo dam. The water intake mechanism is installed on the upstream side of the sleeve of the sabo dam, and a dust removal screen into which river water containing sediment flows is arranged facing the upstream side of the river, and a water intake pipe and a sand discharge pipe equipped with an opening and closing valve are arranged to penetrate the sabo dam on the downstream side of the river.

[0005] This allows the river water containing sediment that has flowed into the intake mechanism through the dust screen to be flushed out and transported downstream by closing the intake pipe valve and opening the sand flush pipe valve. This allows a water pool to form around the intake mechanism, and by maintaining this state and opening the intake pipe valve and closing the sand flush pipe valve, continuous water intake becomes possible. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2012-046937 A Summary of the Invention [Problem to be solved by the invention]

[0007] This water intake mechanism can realize continuous water intake with a simple structure. However, in Patent Document 1, the dust removal screen into which river water containing sediment flows is placed facing the upstream side of the river, so sediment is likely to accumulate near the dust removal screen. This requires periodic removal of sediment using heavy machinery, which increases maintenance costs, and also requires power generation to be stopped during removal work.

[0008] For this reason, it was necessary to take measures such as installing the dust-removal screen, which serves as the water intake, perpendicular to the direction of the river flow. In addition, electromagnetic valves are generally used to open and close the water intake pipes and sand discharge pipes, but power outages are common during natural disasters such as floods. When this happens, problems occur such as the water intake mechanism becoming unable to be operated.

[0009] The present invention has been developed in consideration of such problems, and its main objective is to control the discharge of sediment and water intake that has accumulated upstream of embankments that cross rivers, such as sand-control dams and sand-control dams, without using electricity. [Means for solving the problem]

[0010] In order to achieve this objective, the combined water intake and sand discharge device of the present invention is a combined water intake and sand discharge device that is installed on a levee that crosses a river, and which discharges sediment accumulated on the upstream side of the levee and guides river water to take in water, and is equipped with a bottom sand discharge facility that is installed on the upstream side of the levee and takes in sediment along with the river water, a water intake tower having a connection part that connects to the bottom sand discharge facility and an inflow control device that opens and closes the connection part, and is characterized in that the inflow control device rises and falls by utilizing the buoyancy generated by the river water flowing into the intake tower through the connection part, and is equipped with a water control gate that closes the connection part when the river water level reaches a predetermined specified water level.

[0011] According to the water intake / sand discharge device of the present invention, when the river water level reaches a preset water level, a water control gate that rises and falls using the buoyancy generated by the river water can block the connection between the bottom sand discharge facility and the water intake tower, thereby restricting the inflow of sediment and river water taken in by the bottom sand discharge facility into the sand settling facility. Therefore, it is possible to control the sand discharge and water intake operations using the sand settling facility without electricity or human power, based on the river water level.

[0012] In addition, even if a power outage occurs due to a natural disaster such as a flood or an unforeseen incident, the connection can be reliably cut off when the specified water level is reached, making it possible to avoid situations where the water intake tower or sand settling equipment is damaged or destroyed by the inflow of not only river water and sediment, but also driftwood and large-diameter soil and stones.

[0013] The combined water intake and sand discharge device of the present invention is provided with a sand settling facility including a sand settling tank connected to the water intake tower, a sand discharge control device which opens and closes the sand discharge outlet provided in the sand settling tank, and a sand discharge water injection pipe which injects river water that has flowed into the water intake tower into the sand discharge control device, and is characterized in that the sand discharge control device rises and falls by utilizing buoyancy generated by the river water injected from the sand discharge water injection pipe, and is equipped with a sand discharge gate which opens the sand discharge outlet when the water level in the sand discharge control device reaches a predetermined specified height.

[0014] According to the combined water intake and sand discharge device of the present invention, when the water level of the river water injected into the sand discharge control device reaches a preset height, the sand discharge gate, which rises and falls using the buoyancy generated by the river water, can be opened from the sand discharge port. Therefore, by adjusting the water level of the river water injected into the sand discharge control device so that it reaches the specified height at the desired sand discharge time, it becomes possible to control the operation of discharging sediment that has flowed into the sand settling tank without electricity or human power.

[0015] The combined water intake and sand discharge device of the present invention is characterized in that the bottom sand discharge equipment comprises a water conduit extending along the water flow of the embankment and having a groove-shaped water intake formed at the top, a sand discharge equipment main body with the water conduit formed on its upper surface, and a screen installed at the groove-shaped water intake and provided with a permeable section, wherein at least the lower half of the sand discharge equipment main body is buried in the riverbed and the upper surface is inclined so as to rise from the upstream side to the downstream side of the river.

[0016] According to the combined water intake and sand discharge device of the present invention, by discharging sand near the main body of the sand discharge facility during periods of relatively high river flow other than flood season, the origin of sand deposits that occur on the upstream side of the embankment during floods will retreat from near the upstream wall of the embankment to the riverbed upstream of the main body of the sand discharge facility. This makes it possible to significantly increase the volume of sediment that can be retained by the sabo dam during floods.

[0017] In addition, the large-diameter soil and stones can be efficiently guided from the permeable part of the screen rolling on the bottom sand discharge equipment toward the water passage of the embankment, and can be made to flow downstream into the river. This makes it possible to reduce the amount of soil and sand that accumulates near the upstream wall of the embankment.

[0018] The combined water intake and sand discharge device of the present invention is characterized in that the water conduit has an opening at one end connected to the water intake tower and has a longitudinal gradient that descends toward the opening, and the screen is formed so that the permeable width located near one end of the water conduit in the permeable section is larger than the permeable width located near the other end.

[0019] According to the water intake and sand discharge device of the present invention, the water conduit is formed with a longitudinal gradient that descends toward the opening at one end, so that a suction force that draws river water toward the opening acts over a wide area on one end side of the water conduit. Therefore, by forming the permeable width of the permeable section provided in the screen near one end of the water conduit to be larger than that near the other end, it becomes possible to efficiently allow sediment that has accumulated near the bottom sand discharge facility to flow into the water conduit.

[0020] Therefore, by dedicating the area of ​​the screen, located near one end of the water conduit and with a large permeable width, to sediment intake, while dedicating the area of ​​the screen, located near the other end of the water conduit and with a small permeable width, to water intake, it is possible to improve both sand removal efficiency and water intake efficiency.

[0021] The water intake and sand discharge device of the present invention is characterized in that the longitudinal gradient of the water channel corresponding to the area in which the permeable width of the permeable section is large is formed to be steeper than that of other areas.

[0022] According to the water intake / sand discharge device of the present invention, the permeable width of the permeable section of the screen is made large, and the longitudinal gradient of the water conduit corresponding to the range into which sediment is actively introduced is set to a steep gradient, thereby preventing the taken-in sediment from accumulating near the opening at one end of the water conduit and making it possible to stabilize sand discharge. Effect of the Invention

[0023] According to the present invention, it is possible to control the discharge of sediment accumulated on the upstream side of a levee crossing a river, such as a sabo dam or sabo dam, and the intake of water without the use of electricity or human power. [Brief description of the drawings]

[0024] [Figure 1] 1 is a diagram showing an outline of a water intake and sand discharge device according to an embodiment of the present invention. [Diagram 2] 1 is a flow diagram of a river equipped with a water intake and sand discharge device according to an embodiment of the present invention. [Diagram 3] 4 is a diagram showing an operation pattern of the water intake and sand discharge device in the embodiment of the present invention. FIG. [Figure 4] FIG. 2 is a diagram showing details of a bottom sand discharge facility according to an embodiment of the present invention. [Diagram 5] FIG. 1 is a diagram showing the difference in the starting point of sand deposition depending on whether or not a bottom sand discharge facility is provided in an embodiment of the present invention. [Figure 6] FIG. 1 is a diagram showing details of a water intake tower according to an embodiment of the present invention (part 1). [Figure 7] FIG. 2 is a diagram showing details of a water intake tower in an embodiment of the present invention (part 2). [Figure 8] FIG. 2 is a diagram showing details of a sand-settling facility according to an embodiment of the present invention. [Figure 9] FIG. 2 is a diagram showing details of a sand discharge control device according to an embodiment of the present invention. [Figure 10] FIG. 4 is a diagram showing another example (part 1) of the bottom sand removal equipment according to the embodiment of the present invention. [Figure 11] FIG. 11 is a diagram showing another example (part 2) of the bottom sand removal equipment in the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0025] The present invention is to be installed in embankments constructed across rivers, such as sabo dams and sabo dams, and can be applied to both existing and new embankments. Details of the water intake and sand discharge device will be described below with reference to Figs. 1 to 11.

[0026] <<Outline of the water intake and sand discharge device>> As shown in the plan view of Figure 1, the combined water intake and sand discharge device 1 installed in a sabo dam 10 crossing a river is composed of a bottom sand discharge facility 2, a water intake tower 3, and sand settling equipment 4. These three facilities work together to provide a water intake function for directing and taking in a portion of the river water W, a sand discharge function for discharging sediment S that has accumulated on the upstream side of the sabo dam 10, and a maintenance function for maintaining the combined water intake and sand discharge device 1.

[0027] These functions are performed at appropriate times based on the flow conditions (characteristics of the river's flow rate throughout the year) of the river in which the sabo dam 10 is installed. Any method may be used to set the time when each function is performed, but it is recommended to use a flow duration curve that shows the average daily flow rate Q for 365 days in a year in descending order.

[0028] For example, in this embodiment, the flow-duration curves of the river in which the sabo dam 10 is installed are accumulated for 10 years and then averaged to create a 10-year average flow-duration curve as shown in Fig. 2. Then, based on this 10-year average flow-duration curve, the timings for performing each of the water intake function, sand flushing function, and conservation function are set.

[0029] ≪Water intake period≫ Specifically, the period when the river flow rate does not reach the 35-day flow rate (the 35th flow rate counting from the maximum flow rate) is set as the water intake period. During the water intake period, as shown in Fig. 3(a), the river water W of the river water W and sediment S that flow into the bottom sand discharge facility 2 is taken from the water intake pipe 46 installed in the sand settling facility 4 via the water intake tower 3 and the sand settling facility 4.

[0030] <Sand removal period> The period after the river flow reaches the 35-day flow rate (the 35th flow rate counting from the maximum flow rate) and before it reaches the 5th flow rate counting from the maximum flow rate is set as the sand flushing period. During the sand flushing period, as shown in Fig. 3(b), sediment S and river water W that flowed from the bottom sand flushing equipment 2 through the water intake tower 3 into the sand settling equipment 4 are flushed downstream of the river through the sand flushing pipe 45. At this time, the intake of river water W through the water intake pipe 46 is temporarily halted.

[0031] ≪Maintenance period≫ The flood period when the river flow rate reaches the fifth flow rate or more from the maximum flow rate is set as the conservation period. During the conservation period, as shown in Figure 3(c), an inflow control device 33 installed in the water intake tower 3 is used to restrict the flow of river water W and sediment S that have flowed into the bottom sand discharge facility 2, as well as driftwood and large-diameter soil and stones that have flowed into the bottom sand discharge facility 2 due to unforeseen circumstances, into the water intake tower 3 and sand settling facility 4.

[0032] <<Details of the water intake and sand discharge device>> As described above, the combined water intake and sand discharge device 1 can switch between the three functions as appropriate each time the water intake period, sand discharge period, and maintenance period that are set based on the river flow conditions arrive, without human labor or electricity. The bottom sand discharge equipment 2, water intake tower 3, and sand settling equipment 4 that make up the combined water intake and sand discharge device 1 will be described in detail below.

[0033] ≪Bottom sand removal equipment≫ The bottom sand discharge equipment 2 is equipment that takes in river water W and sediment S flowing down the river. As shown in Figures 1 and 4(a), it is installed on the upstream side of a sabo dam 10 constructed across the river, extending at least to the formation range of a water passage 103, and is equipped with a sand discharge equipment main body 21, a screen 22, and a water channel 23.

[0034] The sand discharge equipment main body 21 is a long concrete structure installed along the upstream wall surface 101 of the sabo dam 10, and at least its lower half is buried in the riverbed as shown in Fig. 4(b). The upper surface of the equipment slopes upward from the upstream side to the downstream side of the river, and a trench-shaped water conduit 23 is formed therein, extending along the water passage 103.

[0035] 4(a), the water conduit 23 is formed with a longitudinal gradient that slopes downward from the other end 232 located on the other sleeve 105 side of the sabo dam 10 to one end 231 located on one sleeve 104 side. The other end 232 is closed, whereas the one end 231 is open and connected to the water intake tower 3 described later.

[0036] 4(b), a screen 22 is installed to cover the groove-shaped intake 235 provided at the top of the headrace 23. Since the top end of the side wall 234 on the downstream side of the headrace 23 is formed higher than the side wall 233 on the upstream side of the river, the screen 22 is installed in a position where its upper surface rises from the upstream side to the downstream side of the river, similar to the upper surface of the sand discharge equipment main body 21.

[0037] As shown in Fig. 4(a), the screen 22 is a long steel plate with multiple permeable sections 221 formed therein, and is installed over the entire length of the water conduit 23. In this embodiment, the permeable sections 221 are formed in slit shapes, but the permeable width may be any size, and they should be formed to a size that is large enough to capture the sediment S (for example, up to about 100 mm of gravel) that has accumulated on the upstream side of the sabo dam 10. The permeable width refers to the size of the portion of the permeable section 221 through which the river water W and sediment S permeate.

[0038] The bottom sand discharge equipment 2 having the above-mentioned configuration causes river water W and sediment S to flow into the water conduit 23 through the permeable portion 221 of the screen 22, and causes them to flow down toward the opening at the one end side 231. However, it is known that the sediment S that has flowed into and accumulated in the water conduit 23 will not flow down if the river water W flowing down the water conduit 23 does not have a scavenging force. The scavenging force is the force that causes sediment that has accumulated on the riverbed or bottom of a pipe to flow down while rubbing against the bottom as water moves through a river, a pipeline, etc.

[0039] Therefore, in the bottom sand flushing facility 2, the longitudinal gradient of the water conduit 23 is set so that, at least before the sand flushing period, the sediment S accumulated in the water conduit 23 is swept away by the river water W flowing down the water conduit 23, which has increased in volume as the river flow rate increases.

[0040] As a result, when the river flow rate is small during the water intake season, only the river water W flows down inside the water conduit 23 toward the intake tower 3, as shown in Fig. 4(a). However, when the river flow rate increases and reaches a predetermined flow rate, the sediment S that has accumulated inside the water conduit 23 automatically flows down from the opening at one end side 231 toward the intake tower 3 together with the river water W, as shown in Fig. 6(a).

[0041] In this way, the bottom sand discharge facility 2 can sequentially discharge the sediment S accumulated in the water conduit 23 to the sand settling facility 4 via the water intake tower 3 starting from the stage before the sand discharge period. The longitudinal gradient of the water conduit 23 should be appropriately adjusted to an appropriate longitudinal gradient, taking into consideration the soil quality of the river basin, etc.

[0042] In addition, since the water conduit 23 has a longitudinal gradient that descends toward the opening of the one end side 231, a suction force that draws the river water W into the intake tower 3 acts over a wide area of ​​the one end side 231. Therefore, it becomes possible to efficiently take in the sediment S that has accumulated near the one end side of the water conduit 23 together with the river water S into the water conduit 23 and discharge it into the water intake tower 3.

[0043] Furthermore, the sand discharge equipment main body 21 is installed on the riverbed upstream of the sabo dam 10, with its upper surface inclined upward from the upstream side to the downstream side of the river. As a result, as shown in Fig. 5, while the starting point O' of sand deposition when no upward incline is provided is near the upstream wall surface 101 of the sabo dam 10, when an upward incline is provided, the starting point O of sand deposition retreats to the riverbed upstream of the sand discharge equipment main body 21.

[0044] Therefore, by discharging sand near the sand discharge equipment main body 21 during the sand discharge period, the volume of sediment S that can be retained upstream of the sand control dam 10 in the event of a river flood is increased by securing the difference ΔL in height at the starting point, thereby making it possible to increase the amount of sediment in the sediment gradient.

[0045] In addition, the upper surfaces of the sand discharge equipment main body 21 and the screen 22 are formed like a slope toward the water passage 103, as shown in Fig. 5. This makes it possible to efficiently guide large-diameter soil and rocks G that cannot pass through the screen 22 and roll on its upper surface toward the water passage 103 of the sabo dam 10, allowing it to flow downstream to the river. This makes it possible to further reduce the volume of soil and sand S that accumulates near the upstream wall surface 101 of the sabo dam 10.

[0046] ≪Water intake tower≫ As shown in Figure 1, the water intake tower 3 is a device that connects the above-mentioned bottom sand discharge equipment 2 with the sand settling equipment 4 described later, and is composed of a tower-like concrete structure installed on one side of the sleeve 104 of the sand-control dam 10, close to the upstream wall surface 101.

[0047] The tower height is at least formed to a height exceeding the planned high water level (HWL), as shown in Figure 6, and is equipped inside with a connecting flow path 31, a connecting water tank 32 connected to the connecting flow path 31, and an inflow control device 33 that blocks the connecting flow path 31.

[0048] The connecting flow path 31 is a flow path that connects the water conduit 23 of the bottom sand discharge equipment 2 and the connecting tank 32, and its shape may be constructed in any shape as long as it can allow the river water W and sediment S flowing in from the water conduit 23 to flow smoothly down toward the connecting tank 32.

[0049] As shown in Fig. 8, the connecting tank 32 is a water tank with a height exceeding the planned high water level (HWL), and has an opening in its side wall facing the sabo dam 10, to which a levee-crossing drainage channel 106 that penetrates the sabo dam 10 is connected. The levee-crossing drainage channel 106 is provided so as to penetrate one of the sleeves 104 from the upstream wall surface 101 of the sabo dam 100 to the downstream wall surface 102.

[0050] In this way, the connecting tank 32 is provided so as to connect the headrace channel 23 and the connecting flow path 31, which are provided substantially parallel to the sabo dam 10, to the embankment crossing drainage channel 106, which is provided substantially perpendicular to the sabo dam 10. The river water W and sediment S that flow down the headrace channel 23 and the connecting flow path 31 can be temporarily stored in the connecting tank 32. This allows the flow direction of the river water W and sediment S to be efficiently diverted to the perpendicular direction, allowing them to smoothly flow into the sand settling facility 4 to which the embankment crossing drainage channel 106 is connected.

[0051] <Inflow control device> The inflow control device 33 is a device that controls the behavior of river water W and sediment S flowing from the water conduit 23 into the water intake tower 3 and the sand settling equipment 4 by opening or blocking the connecting flow path 31, as shown in Figures 6(a) and 7.

[0052] Any configuration may be adopted as long as it can open or block the connecting flow path 31, but in this embodiment, it is composed of a water control gate 331, a gate chamber 332, a counterweight chamber 333, a weight 334, a wire 335, a fixed pulley 336, and a water injection pipe 337.

[0053] 6 and 7, the water control gate 331 is made of a plate having an area larger than the cross section of the connecting flow path 31. The thickness, shape, material, etc. of the member may be any as long as it can sufficiently withstand the impact of the river water W, earth and sand S, etc. flowing down from the connecting flow path 31 colliding with it.

[0054] The gate chamber 332 is an elevation space for the water control gate 331, and is disposed on the bottom sand discharge equipment 2 side of the connecting water tank 32 so as to intersect with the connecting flow path 31. The shape of the gate chamber 332 is a cylinder extending vertically, with its upper end located above the planned high water level (HWL) of the river and its lower end located below the connecting flow path 31.

[0055] In this manner, the gate chamber 332 communicates with the connecting flow path 31. Therefore, the river water W that flows into the water intake tower 30 via the connecting flow path 31 flows into the gate chamber 332 and the above-mentioned connecting water tank 32. As a result, the water level inside the gate chamber 332 is always maintained at the same level as the river water level.

[0056] 6(b), a guide portion 3321 that guides the elevation and lowering of the water control gate 331 is provided on the inner wall surface of the gate chamber 332. The guide portion 3321 is formed by arranging a pair of grooves, into which both side ends of the water control gate 331 can fit, extending in the height direction of the gate chamber 332. However, the guide portion 3321 is not limited to this and may be configured in any shape.

[0057] 6(a), the gate chamber 332 having the above-mentioned configuration is connected to the counterweight chamber 333 via a water injection pipe 337. In addition, the water control gate 331 that moves up and down in the gate chamber 332 is connected by a wire 335 to a weight 334 that moves up and down in the counterweight chamber 333.

[0058] As shown in Fig. 7(a), the water injection pipe 337 is connected to the gate chamber 332 at an arbitrary height position between the connecting flow path 31 and the designed high water level (HWL), and a part of the river water W that flows in from the connecting flow path 31 and rises inside the gate chamber 322 is injected into the counterweight chamber 333. Since the river water W inside the gate chamber 322 contains fine particles, it is advisable to provide a water injection screen 3371 for collecting fine particles at the connection between the water injection pipe 337 and the gate chamber 332, as shown in Fig. 6(a).

[0059] As shown in Fig. 6(a), the counterweight chamber 333 is arranged in parallel with the gate chamber 332 with the connecting water tank 32 in between. Its shape is formed into a cylindrical shape extending in the vertical direction, and is structured to be able to store river water W supplied from a water injection pipe 337. An opening is provided at a predetermined height position on the wall of the counterweight chamber 333 to function as an overflow weir 3331. As a result, the installation height of the overflow weir 3331 becomes the uppermost water level in the counterweight chamber 333.

[0060] The weight 334 is connected to one end of a wire 335 that is wound around a fixed pulley 336 disposed at the top end of the water intake tower 30. The other end of the wire 335 is connected to a water control gate 331, and the weight is set to be heavier than the water control gate 331 so that the weight 334 is kept in a bottomed state until river water W flows into the counterweight chamber 333, as shown in Fig. 6(a).

[0061] As shown in FIG. 7, the weight 334 is configured to rise and fall by utilizing buoyancy caused by river water W flowing into and stored in the counterweight chamber 333, and is provided with casters 3341 on its outer surface.

[0062] The casters 3341 are provided so as to come into contact with the inner wall surface of the counterweight chamber 333, thereby suppressing the swinging or rotating behavior of the weight 334 when it is raised or lowered. Note that the casters 3341 do not necessarily have to be provided, and other structures may be adopted as a means for suppressing the swinging or rotating behavior of the weight 334.

[0063] 6(a), before the river water W flows into the counterweight chamber 333, the inflow control device 33 configured as described above is balanced with the weight 334 on the bottom and the water control gate 331 positioned above the connecting flow path 31. Therefore, the connecting flow path 31 is opened and the river water W and sediment S flow into the connecting water tank 32.

[0064] Then, when the water level in the gate chamber 332 rises to the installation height of the water injection pipe 337 with an increase in the river flow rate, river water W flows into the counterweight chamber 333. As a result, the weight 334 starts to rise, and the water control gate 331 descends.

[0065] When the river flow rate further increases and the water level (river water level) in the gate chamber 332 becomes sufficiently higher than the installation height of the water injection pipe 337, river water W flows continuously into the counterweight chamber 333 from the water injection pipe 337. Then, when it reaches the preset specified water level WL1, the water level in the counterweight chamber 333 reaches the installation height of the overflow weir 3331, and thereafter the water level stops rising.

[0066] Accordingly, the weight 334 also stops rising, so that the weight 334 is held at a height corresponding to the installation position of the overflow weir 3331, and the length of the wire 335 is adjusted so that the water control gate 331 touches the bottom. Therefore, the connecting flow path 31 is blocked by the water control gate 331. In this way, the water control gate 331 provided in the inflow control device 33 rises and falls by utilizing the buoyancy generated by the river water flowing from the water conduit 23 into the water intake tower 3, and can block the connecting flow path 31 when the river water level reaches the preset specified water level WL.

[0067] Therefore, the river water level corresponding to the river flow rate set as the conservation time is set to the specified water level WL1, and when the river water level reaches the specified water level WL1, the water level in the counterweight chamber 333 is adjusted to reach the installation height of the overflow weir 3331. As a result, when the conservation time arrives, it is possible to suppress the inflow of sediment S and river water taken in by the bottom sand discharge equipment 2 into the water intake tower 3 and sand settling equipment 4 without using electricity.

[0068] Therefore, even if a power outage occurs due to a natural disaster such as a flood or an unforeseen incident, the connecting flow path 31 can be reliably shut off when the river water level reaches the specified water level WL1 corresponding to the conservation period. This makes it possible to avoid a situation in which the water intake tower 3 and the grit settling equipment 4 are damaged or destroyed by the inflow of not only river water W and sediment S, but also driftwood and large-diameter earth and stones.

[0069] Furthermore, for example, as shown in Figure 7, if a gate-side watertight rubber 3311 is provided on the outer peripheral edge of the water control gate 331 and a space-side watertight rubber 3322 abutting against it is provided in the gate chamber 332, the connection flow path 31 and the connection water tank 32 can be more reliably blocked off.

[0070] ≪Sand settling equipment≫ The grit settling facility 4 is a facility for taking in river water W taken in by the bottom grit discharge facility 2 and discharging sediment S, and as shown in Fig. 1, is composed of a roughly rectangular parallelepiped concrete structure installed on one side of the sleeve 104 of the sabo dam 10 and adjacent to the downstream wall surface 102. As shown in Figs. 8 and 9, a partition wall 43 is provided in the inner space, and a grit settling tank 41 is provided on the upstream river side facing the sabo dam 10, and a water tank 42 is provided on the downstream river side.

[0071] The water tank 42 is connected to the sand settling tank 41 via a strainer 44 provided on the upper part of the partition wall 43, and river water W that flows into the sand settling tank 41 and overflows the partition wall 43 flows in through the strainer 44. An opening is provided near the bottom of the side wall of the water tank 42 on the downstream side of the river, and an intake pipe 46 that drains water into the river water W stored in the water tank 42 is connected to it.

[0072] The intake pipe 46 is connected to, for example, a head tank provided in a small- to medium-sized hydroelectric power generation facility, and the river water W that flows down the intake pipe 46 is stored in this head tank and then used for power generation.

[0073] 8, the sand settling tank 41 has an opening formed near the lower part of the side wall adjacent to the sabo dam 10, to which the above-mentioned embankment crossing drainage channel 106 is connected. This allows river water W and sediment S from the connecting tank 32 of the intake tower 3 to flow into the water tank 42 via the embankment crossing drainage channel 106. In addition, a sand reservoir section 411 formed in a downwardly convex bowl shape is provided at the bottom of the water tank 42.

[0074] The sand reservoir 411 is a facility for storing the river water W and sediment S that flow in from the embankment crossing drainage channel 106, and for settling fine particles suspended in the river water W. The sediment S and fine particles that have settled in the sand reservoir 411 are discharged from a sand discharge port 412 formed in the center thereof.

[0075] One end of a sand discharge pipe 45 is connected to the sand discharge outlet 412, and the other end of the sand discharge pipe 45 is disposed in the river. As a result, as shown in Fig. 9, the soil S and fine particles that have flowed down the sand discharge outlet 412 are discharged to the downstream side of the sabo dam 10 in the river via the sand discharge pipe 45. The settling tank 41 configured in this way is provided with a sand discharge control device 5 that opens and closes the sand discharge outlet 412.

[0076] <Sand discharge control device> Any sand discharge control device 5 may be used as long as it can open or close the sand discharge outlet 412, but in this embodiment, as shown in Figure 9, it is equipped with a sand discharge gate 51 that can be inserted into the sand discharge outlet 412, a lifting rod 52, a connecting plate 53, a hanging rod 54, a lifting plate 55, a float 56, a float tank 57, and a sand discharge water injection pipe 58.

[0077] 8, the sand discharge water injection pipe 58 is connected to the connecting water tank 32 of the water intake tower 3, and injects river water W that flows into the connecting water tank 32 into the float tank 57. The float tank 57 is a water tank located above the sand discharge outlet 412, and stores the river water W injected through the sand discharge water injection pipe 58. A float 56 is inserted inside the float tank 57.

[0078] The float 56 has a lifting plate 55 installed on the top, and multiple hanging rods 54 are suspended from the lifting plate 55. A sand discharge gate 51 that can be inserted into the sand discharge port 412, a lifting rod 52 that suspends the sand discharge gate 51, and a connection plate 53 to which the lifting rod 52 is fixed are suspended via the multiple hanging rods 54. The float 56 is configured to rise and fall by utilizing buoyancy generated by the river water W that has flowed into the float tank 57 while supporting these, as shown in Fig. 9.

[0079] 8, in the sand discharge control device 5 having such a configuration, before the river water W flows into the float tank 57, the float 56 has reached the bottom and the sand discharge gate 51 is inserted into the sand discharge port 412. Moreover, the sand discharge gate 51 is formed in a spindle shape whose outer circumferential surface precisely contacts the sand discharge port 412 so that the connection between the sand reservoir section 411 and the sand discharge pipe 45 can be securely cut off when inserted into the sand discharge port 412.

[0080] Then, when the river flow rate increases and the water level in the connecting water tank 32 rises to the installation height of the sand flushing water injection pipe 58, the river water W flows into the float tank 57. This generates buoyancy, causing the float 56 to start rising, and accompanying this, the sand flushing gate 51 also gradually rises.

[0081] 9, when the water level of the river water W stored in the float tank 57 reaches a preset specified height WL2, the float 56 rises to this water level, and the sand discharge gate 51 comes out of the sand discharge port 412. In this embodiment, the connection height between the float tank 57 and the sand discharge water injection pipe 58 is set lower so that the specified height WL2 is the same as the connection height between the connecting water tank 32 and the sand discharge water injection pipe 58.

[0082] Therefore, when the river flow rate reaches the river flow rate set as the sand flushing period, the water level of the river water W stored in the float tank 57 is adjusted to reach the specified water level WL2. In this way, it becomes possible to control the operation of discharging the sediment S and river water W that have flowed into the sand settling tank 41 without electricity or human power.

[0083] <<Examples of water intake and sand discharge using a combined water intake and sand discharge device>> An example of water intake and sand discharge using the combined water intake and sand discharge device 1 having the above configuration will be described below.

[0084] In this embodiment, as shown in Figure 2, an example is taken in which the water intake period is set to a period when the river flow rate does not reach the 35-day flow rate, the sand removal period is set to a period after the river flow rate reaches the 35-day flow rate but does not reach the fifth flow rate counting from the maximum flow rate, and the conservation period is set to a period after the river flow rate reaches the fifth flow rate counting from the maximum flow rate.

[0085] <Setting up the water intake and sand discharge device> First, for the inflow control device 33 of the water intake tower 3, the expected river water level when the river flow reaches the fifth flow rate from the maximum flow rate is set as the specified water level WL1 so that the connecting flow path 31 is blocked by the water control gate 331 when it is time for maintenance.

[0086] Furthermore, the longitudinal gradient of the headrace 23 of the bottom sand flushing equipment 2 is adjusted so that the sediment S accumulated in the headrace 23 is discharged sequentially toward the intake tower 3 during the sand flushing period. In this embodiment, the longitudinal gradient of the headrace 23 is set to about 1 / 20 as the optimum longitudinal gradient at which the sediment S slides due to the action of a sweeping force caused by the flow rate of the river water flowing down the headrace 23 at the time when the river flow rate reaches a predetermined flow rate before the sand flushing period, taking into consideration the properties of the sediment S flowing down the river.

[0087] Furthermore, for the sand discharge control device 5 of the sand settling equipment 4, the water level in the connected water tank 32 expected when the river flow rate reaches the 35-day flow rate is set as the prescribed height WL2 of the water surface of the river water W stored in the float tank 57 so that the sand discharge gate 51 will be released and opened through the sand discharge outlet 412 when it is time for sand discharge.

[0088] ≪Water intake period≫ When the water intake and sand discharge device 1 is constructed as described above, during the intake season when the river flow rate does not reach the 35-day flow rate, as shown in Fig. 4(a), when the river water W and sediment S flow into the water headrace 23 through the screen 22 of the bottom sand discharge equipment 2, first, only the river water W flows down the water headrace 23 and into the water intake tower 3. Note that because the flow rate of the river water W flowing down the water headrace 23 does not exert a tractive force, the sediment S remains deposited in the water headrace 23.

[0089] When the river flow rate increases due to rainfall or the like, a tractive force acts on the increased river water W flowing down the headrace 23. As a result, in the headrace 23 of the bottom sand discharge facility 2, the sediment S that has accumulated in the headrace 23 automatically flows down together with the river water W, as shown in Fig. 6(a).

[0090] In addition, in a wide range of one end side 231 of the water conduit 23 connected to the intake tower 3, a suction force acts to draw the river water W into the intake tower 3, so that sediment on the bottom sand discharge equipment 2 that does not flow down into the water conduit 23 is also efficiently taken into the water conduit 23. And, since the connecting flow path 31 is open in the water intake tower 3, the river water W and sediment S flow into the sand settling equipment 4 via the connecting water tank 32 and the embankment crossing drainage channel 106.

[0091] 8, in the grit settling facility 4, the sand discharge port 412 is blocked by the sand discharge gate 51, so that the inflowing river water W and sediment S are temporarily stored in the grit settling tank 41. After this, when the stored amount increases and the river water W overflows the partition wall 43, it flows into the water storage tank 42 and is taken in through the water intake pipe 46.

[0092] <Sand removal period> When the sand removal season arrives due to heavy rain or the like, the water level of the river water W stored in the float tank 57 of the sand removal control device 5 reaches the specified height WL2, and as shown in Figure 9, the sand removal gate 51 comes out of the sand removal outlet 412 without using electricity, and the sand removal outlet 412 is opened.

[0093] Therefore, the river water W and sediment S that flow into the grit settling tank 41 are discharged into the river together with the sediment S through the sand discharge pipe 45 from the sand discharge port 412. Therefore, the river water W does not flow into the water tank 42, and is not taken in through the water intake pipe 46.

[0094] ≪Maintenance period≫ When the river flow rate further increases and reaches the conservation period, the river water level exceeds the specified water level WL1 as the river flow rate reaches the fifth flow rate from the maximum flow rate. Then, as shown in Figure 7, the connecting flow path 31 is blocked by the water control gate 331 without using electricity. Therefore, neither the sediment S in the water conduit 23 nor the river water W flows into the water intake tower 3.

[0095] During the sand discharge period, the sediment S that has accumulated near the bottom sand discharge equipment 2 and in the water conduit 23 is discharged, so as explained with reference to Figure 5, the volume of sediment S that can be retained upstream of the erosion control dam 10 can be significantly increased compared to the case where the bottom sand discharge equipment 2 is not provided in the water intake and sand discharge device 1.

[0096] <After the conservation period has passed> Once the conservation period has passed and the river flow has decreased to a level equivalent to the intake period, preparations for the intake period are made as follows:

[0097] First, in the water intake tower 3, the river water W that has flowed into the counterweight chamber 333 is drained. As a result, as shown in Fig. 6(a), the weight 334 is landed on the bottom and the water control gate 331 is raised, opening the connecting flow passage 31. As shown in Fig. 7, the river water W in the counterweight chamber 333 is drained through the water discharge hole 3332 provided at the bottom, the river water level drops, the amount of water flowing into the counterweight chamber 333 decreases, the inflow amount and the discharge amount are balanced, and the weight 334 descends. In addition, in the sand settling equipment 4, as shown in Fig. 8, the river water W that has flowed into the float tank 57 of the sand discharge control device 5 is drained by the drainage equipment 59. As a result, the sand discharge gate 51 is lowered to close the sand discharge port 412.

[0098] According to the above-mentioned water intake / sand discharge device 1, the water control gate 331, which is provided in the inflow control device 33 of the water intake tower 3 and rises and falls using the buoyancy generated by the river water W, can block the connecting flow path 31 between the bottom sand discharge equipment 2 and the water intake tower 3, and restrict the inflow of the sediment S and river water W taken in by the bottom sand discharge equipment 2 into the sand settling equipment 4. Therefore, it becomes possible to control the sand discharge and water intake operations using the sand settling equipment 4 without electricity or human power, based on the river water level.

[0099] The water intake and sand discharge device 1 of the present invention is not limited to the above embodiment, and various modifications are possible without departing from the spirit of the present invention.

[0100] For example, in this embodiment, as shown in Fig. 4, a uniform screen 22 with a slit-shaped permeable portion 221 is used in the bottom sand discharge equipment, and covers the upper surface of the water conduit 23. However, this is not necessarily limited to this, and various types of screens 22 can be used.

[0101] 10(a), in the screen 22 covering the entire length of the water conduit 23, a permeable portion 221' having a larger permeable width than the permeable portion 221 is provided in the vicinity of one end side 231 of the water conduit 23. The permeable portion 221' having a larger permeable width is preferably provided in a range of about 1 / 3 to 1 / 4 of the screen 22 from the one end side 231.

[0102] As described above, the water conduit 23 has a longitudinal gradient that descends toward the opening of the one end side 231, so that a suction force that draws the river water W into the water intake tower 3 acts over a wide area in the vicinity of the one end side 231. For this reason, by employing a permeable section 221' with a large permeable width in the vicinity of the one end side 231, the sediment S that accumulates on the screen 22 and in the vicinity of the bottom sand discharge equipment 2 can be efficiently made to flow into the water conduit 23, and the sand discharge efficiency can be improved.

[0103] 10(b), for example, the range of the screen 22, the permeable section 221 (for example, with a permeable width that can allow up to about 100 mm of gravel to pass through) located on the other end 232 of the water conduit 23, is given priority for water intake. On the other hand, the range of the permeable section 221' (with a larger permeable width than the permeable section 221) located on the one end 231 is given priority for sand discharge. By sharing the functions in this way, it is possible to greatly contribute to the sand discharge efficiency and water intake efficiency of the water intake and sand discharge device 1 as a whole.

[0104] Furthermore, when the functions are divided as described above, it is also possible to narrow the depth (length in the downstream direction of the river) of the screen 22 at the other end 232 of the water conduit 23, which has priority for water intake, as shown in Fig. 11(a). In this way, the shape of the sand discharge equipment main body 21, which is a concrete structure, can be slimmed down, making it possible to make the bottom sand discharge equipment 2 an equipment with high economic efficiency and ease of construction.

[0105] 11(b), in the water conduit 23, below the area where the permeable section 221' with a large permeable width is provided to prioritize sand flushing, a separate water conduit 23' with a steeper longitudinal gradient than the other end 232 is preferably provided. In this way, by actively directing the sediment S through the permeable section 221' with a large permeable width, it is possible to prevent the sediment S from accumulating near the opening provided on one end 231 of the water conduit 23, and to stabilize sand flushing.

[0106] In Fig. 11(b), the longitudinal gradient of the steep headrace 23' is set to about 1 / 15, but this is not limiting and may be set to an appropriate longitudinal gradient taking into consideration the soil quality of the river basin. Also, the headrace 23 and the steep headrace 23' each flow down separately toward the connecting flow path 31 of the intake tower 3. However, for example, they may be structured to merge just before the intake tower 3 and then flow down toward the connecting flow path 31 of the intake tower 3.

[0107] Furthermore, in the screen 22, a small amount of sediment S may flow into the water conduit 23 facing the area where the permeable section 221 that has a smaller permeable width than the permeable section 221' and prioritizes water intake is provided, but it may not amount to deposition. In such a case, since there is no need to consider the sweep force, the longitudinal gradient of the water conduit 23 may be set to a gentle gradient (approximately 1 / 40 in normal design) required to allow only the river water W to flow downstream. [Explanation of symbols]

[0108] 10 Erosion control dam 101 Upstream wall 102 Downstream wall 103 Watering 104 One sleeve 105 The other sleeve 106 Embankment Cross Drainage Canal 1. Water intake and sand discharge device 2 Bottom sand removal equipment 21 Sand discharge equipment body 22 Screens 221 Transparent part 221' Transparent section (large transparent width) 23 Waterway 23' Waterway (steep) 231 One end side 232 Other end side 233 River upstream side wall 234 Downstream river wall 235 Groove-shaped intake 3 Water intake tower 31 Connection flow path (connection part) 32 Connected water tank 33 Inflow control device 331 Water Gate 3311 Gate side watertight rubber 332 Gate Room 3321 Guide part 3322 Space side watertight rubber 333 Counterweight Room 3331 Overflow weir 3332 Water discharge hole 334 Pyramid 3341 Caster 335 Wire 336 Fixed pulley 337 Water injection pipe 3371 Inlet Screen 4 Sand settling equipment 41 Sand settling tank 411 Sand basin 412 Sand exhaust port 413 Aperture 42 Water tank 43 Partition Wall 44 Strainer 45 Sand discharge pipe 46 Water intake pipe 5. Sand discharge control device 51 Sand discharge gate 52 Lifting rod 53 Connection plate 54 Hanging Rod 55 Lifting Plate 56 Float 57 Float tank 58 Water injection pipe for sand removal 59 Drainage equipment S. Soil W River water WL1 Specified water level WL2 Standard Height Q Average flow rate O Origin of sediment O' Starting point of sediment (without bottom sand discharge facility 2)

Claims

1. A combined water intake and sand discharge device is installed on a bank crossing a river, and discharges sediment deposited on the upstream side of the bank and guides river water to take in water. a bottom sand discharge facility provided on the upstream side of the embankment and taking in sediment together with river water; A water intake tower having a connection part connected to the bottom sand discharge facility and an inflow control device for opening and closing the connection part, The inflow control device is a water intake and sand discharge device that rises and falls by utilizing the buoyancy generated by the river water flowing into the water intake tower through the connection part, and is characterized by being equipped with a water control gate that blocks the connection part when the river water level reaches a predetermined specified water level.

2. The water intake and sand discharge device according to claim 1, A grit settling tank connected to the water intake tower; a sand discharge control device that opens and closes a sand discharge port provided in the sand settling tank; A sand flushing water injection pipe that injects river water flowing into the water intake tower into the sand flushing control device; A sand settling facility is provided, The sand discharge control device rises and falls by utilizing the buoyancy generated by the river water injected from the sand discharge water injection pipe, and is characterized in that it is equipped with a sand discharge gate that opens the sand discharge outlet when the water level inside the sand discharge control device reaches a predetermined specified height.

3. The water intake and sand discharge device according to claim 1 or 2, The bottom sand discharge equipment, a water channel extending along the water passage of the embankment and having a groove-shaped water intake formed at an upper portion thereof; a sand discharge equipment body having the water channel formed on an upper surface thereof; A screen is provided at the grooved water intake and has a permeable portion. A combined water intake and sand discharge device characterized in that at least the lower half of the sand discharge equipment body is buried in the riverbed and the upper surface is inclined upward from the upstream side to the downstream side of the river.

4. The water intake and sand discharge device according to claim 3, The water conduit has an opening on one end side connected to the water intake tower and has a longitudinal gradient descending toward the opening, A water intake and sand discharge device, characterized in that the screen is formed so that the permeable width located near one end of the water channel in the permeable section is larger than the permeable width located near the other end.

5. The water intake and sand discharge device according to claim 4, A water intake and sand discharge device, characterized in that the longitudinal gradient of the water conduit facing the area in which the permeable width of the permeable section is large is formed steeper than that of other areas.

Citation Information

Patent Citations

  • Sand discharger for intake equipment in mountain stream

    JP1987153409A

  • JP1988112529U

  • Sand scouring structure for river

    JP1999350462A

  • Water-intake mechanism of check dam

    JP2012046937A

  • Erosion control dam

    JP2012188829A