Utilization method for combined damming of industrial solid waste and concrete
By filling industrial solid waste in the concrete structure and using gelled materials to form a filling structure, the funding and operability problems of industrial solid waste management methods in the existing technology are solved, and the comprehensive utilization of resources and environmental protection are achieved.
Patent Information
- Application Number
- CN202411455546.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-12-03
AI Technical Summary
Existing industrial solid waste management methods such as off-site relocation and disposal and safe landfill have low fund sustainability, poor operationality in full implementation, and the use of concrete dams leads to environmental pollution and waste of resources, and a cheap alternative material is needed to reduce the Concrete dosage.
The industrial solid waste and concrete joint dam building method is adopted to form a cavity in the concrete structure to fill industrial solid waste, and use gelled materials to press into the filling area to form an industrial solid waste filling structure, and finally an anti-seepage layer is installed on the surface to seal it. Dam body.
It saves concrete usage, realizes the resource utilization of industrial solid waste, reduces environmental pollution, and improves the sustainability and economicality of governance.
Smart Images

Figure CN119061835A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of solid waste resource utilization, and in particular to a method for utilizing industrial solid waste and concrete to build a dam. Background Art
[0002] In recent years, with the increasing attention paid to the prevention and control of heavy metal and soil pollution, problems such as industrial solid waste encroaching on land, polluting the environment, and sudden environmental risks have continued to emerge, posing a serious threat to the ecological environment and human health.
[0003] Existing methods for the management of industrial solid waste include off-site relocation and disposal, safe landfill, etc. Although the above-mentioned management methods are effective, they have low sustainable financial support and poor operability for full implementation. They are greatly affected by the coordinated disposal of cement kilns and the comprehensive nature of building materials production, and it is very difficult to promote and apply them in an all-round way.
[0004] In order to save storage capacity, some landfills use concrete dams. The dam body is high and has a large concrete volume. The concrete dam itself supports solid waste by its own weight. There is an urgent need for a cheap material to replace part of the concrete. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a method for utilizing industrial solid waste and concrete to build a dam.
[0006] The invention discloses a method for utilizing industrial solid waste and concrete to build a dam, comprising:
[0007] Concrete of a preset thickness is poured at the dam bottom and dam sides to form a concrete structure with multiple cavities inside; wherein each cavity serves as a filling unit filled with industrial solid waste;
[0008] When the concrete strength on the dam side reaches the preset value, industrial solid waste is filled into the cavity formed by the concrete structure;
[0009] After the industrial solid waste filling is completed, the cementitious material is pressed into the industrial solid waste filling area through the pre-buried grouting pipe to form an industrial solid waste filling structure;
[0010] Concrete is poured on the top of the dam to seal it, and an anti-seepage layer is set on the surface of the dam body.
[0011] As a further improvement of the present invention, the filling and grouting of industrial solid waste can be carried out only when the concrete strength of the dam side reaches 70-80%.
[0012] As a further improvement of the present invention, industrial solid waste is filled into the cavity formed by the concrete structure by means of a conduit.
[0013] As a further improvement of the present invention, before pouring concrete at the dam bottom and dam sides, it is necessary to level and compact the dam foundation and to construct a cushion layer on the foundation.
[0014] As a further improvement of the present invention, the industrial solid waste filled includes at least one of blast furnace slag, steel slag, red mud, non-ferrous metal slag, fly ash, coal slag, sulfuric acid slag, waste gypsum, desulfurization ash, carbide slag, and salt mud; the cementitious material used includes cement and fly ash; and the grouting pressure of the cementitious material is 0.3 to 0.5 MPa.
[0015] As a further improvement of the present invention, an anti-seepage layer is provided on the surface of the dam body, comprising:
[0016] Anchor trenches are set on the dam top and bottom plate, and the anti-seepage material is laid on the dam surface and fixed on the anchor trenches to form an anti-seepage layer.
[0017] As a further improvement of the present invention, the anti-seepage material is a geomembrane.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] The invention not only saves the amount of concrete required for building the dam body, but also utilizes waste to build the dam, thereby achieving the purpose of comprehensive utilization. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a flow chart of the method for utilizing industrial solid waste and concrete combined damming disclosed in the present invention;
[0021] Figure 2 It is a structural schematic diagram of the dam body formed by the combined construction of industrial solid waste and concrete disclosed in the present invention.
[0022] In the figure:
[0023] 1. Bottom plate; 2. Dam surface anti-seepage layer; 3. Concrete structure; 4. Anchor ditch; 5. Industrial solid waste filling structure; 6. Grouting pipe. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] The present invention provides a method for utilizing industrial solid waste and concrete to build a dam, comprising:
[0026] Step 1: pouring concrete of a preset thickness at the dam bottom and dam sides to form a concrete structure with multiple cavities inside; wherein each cavity serves as a filling unit for filling industrial solid waste, and the cavity is an independent cavity separated by a partition wall;
[0027] Step 2: When the concrete strength on the dam side reaches 70-80%, fill the cavity formed by the concrete structure with industrial solid waste using a conduit;
[0028] Step 3: Set the cementitious material of industrial solid waste according to the height of the dam body. After the industrial solid waste is filled, press the cementitious material into the industrial solid waste filling area through the pre-buried grouting pipe to form an industrial solid waste filling structure;
[0029] Step 4: Pour concrete on the top of the dam to seal it, and set an anti-seepage layer on the surface of the dam body.
[0030] The present invention is further described in detail below in conjunction with the accompanying drawings:
[0031] like Figure 1 , 2 As shown, the present invention provides a method for utilizing industrial solid waste and concrete to build a dam, comprising:
[0032] S1. Measurement and laying out
[0033] According to the size requirements of the drawings, a total station is used on site to measure and lay out the concrete pouring range line and detailed structure control points, and marked with red spray paint.
[0034] S2. Site leveling
[0035] The dam foundation is leveled and compacted. The bedrock surface is cleaned without water accumulation, pollution, loose blasting, or weathered rock. Geological defects have been dealt with. High-pressure water guns are mainly used for cleaning the bedrock surface.
[0036] S3. Construction of dam foundation cushion
[0037] Carry out pad construction on the foundation.
[0038] S4. Template making
[0039] The formwork is manufactured in a formwork processing plant, transported to the construction site by trucks, and erected on site. To ensure the appearance quality of the concrete pouring, sleeve bolts are used as the formwork reinforcement for the exposed concrete surface and water-passing sections.
[0040] S5. Mixing and transportation of concrete
[0041] Concrete is mixed using mixers and concrete is transported mainly using concrete tank trucks.
[0042] S6. Concrete pouring at the dam bottom and dam sides
[0043] Concrete of a preset thickness is poured at the dam bottom and dam sides to form a bottom plate 1 and a concrete structure 3 having multiple cavities inside; wherein,
[0044] Each cavity serves as a filling unit filled with industrial solid waste;
[0045] The pouring of concrete at the dam bottom and dam sides is mainly done by manual leveling, and manual leveling must be used near the formwork and water stop. The leveling should ensure that the concrete is evenly distributed, avoid aggregate concentration, and avoid curling of the water stop and the bottom concrete being suspended.
[0046] Vibration mode: according to different parts of the structure, appropriate concrete vibration mode and method shall be adopted. When using inserted vibrator for vibration, the insertion order of the vibrator shall be arranged in a plum blossom shape. The moving distance of the vibrator shall not exceed 1.5 times of its effective radius, and it shall be inserted into the lower layer for 5 to 10 cm to ensure good bonding between the upper and lower layers of concrete. The vibration time shall be based on the concrete no longer sinking significantly, no more bubbles appearing, and the slurry begins to overflow.
[0047] S7, Industrial solid waste filling
[0048] When the concrete strength on the dam side reaches 70-80%, preferably 75%, the strength is too low, the finished product is easy to be damaged, and the poured concrete is easy to be damaged; the strength is too high, which affects the construction period; then the filling of industrial solid waste can be carried out; at this time, the industrial solid waste can be filled into the cavity formed by the concrete structure through the conduit. Among them, industrial waste refers to various waste residues, dust and other wastes discharged into the environment during industrial production. Mainly blast furnace slag, steel slag, red mud, non-ferrous metal slag, fly ash, coal slag, sulfuric acid slag, waste gypsum, desulfurization ash, carbide slag, salt mud, etc.
[0049] S8, Post-grouting of industrial solid waste
[0050] After the industrial solid waste filling is completed, cementitious materials are pressed into the industrial solid waste filling area through the grouting pipe 6 pre-buried on the cavity partition wall to form an industrial solid waste filling structure 5; wherein, the grouting process adopts dual control of grouting volume and pressure, and different post-grouting grouting volumes are designed according to the height of the dam body; the cementitious materials are mainly cement and fly ash, etc., and the proportion is determined by on-site tests, and the grouting pressure is 0.3~0.5MPa.
[0051] S9. Pouring of concrete on dam top
[0052] Concrete is poured on the top of the dam to seal the dam;
[0053] S10. Set up an anti-seepage layer
[0054] Anchor trenches 4 are arranged on the dam top and bottom plate, and anti-seepage materials are laid on the dam body surface and fixed on the anchor trenches to form an anti-seepage layer 2 on the dam surface; wherein the anti-seepage material is a geomembrane.
[0055] The advantages of the present invention are:
[0056] The invention not only saves the amount of concrete required for building the dam body, but also utilizes waste to build the dam, thereby achieving the purpose of comprehensive utilization.
[0057] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for utilizing industrial solid waste and concrete to build a dam, characterized in that: include: Concrete of a preset thickness is poured at the bottom and sides of the dam to form a concrete structure with multiple cavities inside; When the concrete strength on the dam side reaches the preset value, industrial solid waste is filled into the cavity formed by the concrete structure; After the industrial solid waste filling is completed, the cementitious material is pressed into the industrial solid waste filling area through the pre-buried grouting pipe to form an industrial solid waste filling structure; Concrete is poured on the top of the dam to seal it, and an anti-seepage layer is set on the surface of the dam body.
2. The method for utilizing industrial solid waste and concrete combined damming as claimed in claim 1, characterized in that: Industrial solid waste filling and grouting can only be carried out when the concrete strength on the dam side reaches 70-80%.
3. The method for utilizing industrial solid waste and concrete combined damming as claimed in claim 1, characterized in that: The cavity formed by the concrete structure is filled with industrial solid waste using a conduit.
4. The method for utilizing industrial solid waste and concrete combined damming as claimed in claim 1, characterized in that: Before pouring concrete at the dam bottom and dam sides, the dam foundation needs to be leveled and compacted and a cushion layer needs to be constructed on the foundation.
5. The method for utilizing industrial solid waste and concrete combined damming as claimed in claim 1, characterized in that: The industrial solid waste used for filling includes at least one of blast furnace slag, steel slag, red mud, non-ferrous metal slag, fly ash, coal cinder, sulfuric acid slag, waste gypsum, desulfurization ash, carbide slag, and salt mud. The cementitious materials used include cement and fly ash. The grouting pressure of the cementitious material is 0.3 to 0.5 MPa.
6. The method for utilizing industrial solid waste and concrete combined damming as claimed in claim 1, characterized in that: An anti-seepage layer is set on the surface of the dam body, including: Anchor trenches are set on the dam top and bottom plate, and the anti-seepage material is laid on the dam surface and fixed on the anchor trenches to form an anti-seepage layer.
7. The method for utilizing industrial solid waste and concrete combined damming as claimed in claim 6, characterized in that: The anti-seepage material is a geomembrane.
Citation Information
Cited By
Solid waste storage yard construction method and solid waste storage yard
CN121776212A
Solid waste treatment method and solid waste treatment system
CN122032982A
Construction material for dam building, containing filtration sludge from liquid effluents composed of fly ash and metal slag.
MA71199A1