Leak inspection method
The leak inspection method for fuel cells in space uses controlled gas pressures and disconnected electrodes to manage pressure differences, allowing effective leak detection without membrane damage and power generation interference.
Patent Information
- Application Number
- JP2022137846
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-08-31
- Publication Date
- 2024-12-05
- Estimated Expiration
- 2042-08-31
AI Technical Summary
Existing leak testing methods for fuel cells used in outer space environments face challenges due to excessive pressure differences between fuel and oxidizing gas paths, risking membrane damage and requiring resources not available in space, necessitating a method to test for leaks using limited resources.
A leak inspection method that seals fuel gas at a predetermined pressure and supplies oxidizing gas at a higher or lower pressure, while disconnecting the anode and cathode electrodes to suppress power generation, measuring pressure changes to detect membrane leaks.
This method prevents electrolyte membrane damage by managing pressure differences and suppresses power generation-related pressure changes, enabling effective leak detection using only essential gases, thus ensuring reliable leak testing in space environments.
Smart Images

Figure 0007595048000001 
Figure 0007595048000002 
Figure 0007595048000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for testing a fuel cell for leaks. [Background technology]
[0002] In recent years, research and development into fuel cells, which contribute to energy efficiency, has been conducted to ensure that more people have access to affordable, reliable, sustainable, and advanced energy. In addition, to reduce the burden on the environment, exhaust gas regulations for vehicles such as automobiles with internal combustion engines are becoming more stringent. For this reason, attempts are being made to install fuel cells in vehicles instead of internal combustion engines. Vehicles equipped with fuel cells emit less CO2, SO X and NO X Since no waste products or other substances are discharged, the burden on the environment is reduced.
[0003] A fuel cell includes an electrolyte membrane. If the electrolyte membrane is damaged to cause pinholes or the like, the power generation performance of the fuel cell will decrease. For this reason, a leak inspection method is implemented to check for leaks (cross leaks) from the electrolyte membrane.
[0004] For example, in the inspection method disclosed in Patent Document 1, a high-pressure gas is sealed in a fuel gas flow path to which a fuel gas is supplied, and an oxidant gas flow path to which an oxidant gas is supplied is opened to the atmosphere. In this state, the gas pressure of the high-pressure gas is measured, and a leak (cross leak) from the electrolyte membrane is determined based on the measurement result. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2012-133997 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, since there is no atmosphere in outer space, the pressure difference between the fuel gas flow path and the oxidant gas flow path becomes excessive when the inspection method of Patent Document 1 is used. Therefore, there is a concern that the electrolyte membrane may be damaged by the pressure difference between the fuel gas flow path and the oxidant gas flow path. In addition, since there are restrictions on transportation to outer space, there is a demand to perform leak inspection without using gases other than the gas used to generate electricity in the fuel cell. Therefore, the issue of performing leak inspection from the electrolyte membrane using limited resources has been raised.
[0007] The present invention aims to solve the above-mentioned problems. [Means for solving the problem]
[0008] An aspect of the present invention is a leak inspection method for inspecting for leakage from an electrolyte membrane in a fuel cell including an electrolyte membrane and an anode electrode and a cathode electrode sandwiching the electrolyte membrane, the leak inspection method including: a gas sealing step of sealing the fuel gas at a predetermined pressure in a fuel gas flow path for supplying the fuel gas to the anode electrode, or sealing the oxidizer gas at the predetermined pressure in an oxidizer gas flow path for supplying an oxidizer gas to the cathode electrode; a gas supply step of continuing to supply the oxidizer gas at a pressure equal to or greater than the predetermined pressure to the oxidizer gas flow path when the fuel gas is sealed in the fuel gas flow path, and continuing to supply the fuel gas at a pressure equal to or greater than the predetermined pressure to the fuel gas flow path when the oxidizer gas is sealed in the oxidizer gas flow path; and a measurement step of measuring a pressure change per unit time of the gas sealed in the gas sealing step while a switch provided in wiring connecting the anode electrode and the cathode electrode without passing through the electrolyte membrane is turned off. Effect of the Invention
[0009] According to the aspects of the present invention, damage to the electrolyte membrane due to the pressure difference between the fuel gas flow path and the oxidant gas flow path can be suppressed by using only the gas essential for power generation in the fuel cell. Furthermore, power generation in the fuel cell is suppressed when the anode electrode and the cathode electrode are not connected. Therefore, in the aspects of the present invention, even if the gas essential for power generation in the fuel cell is used, pressure changes due to power generation in the fuel cell can be suppressed. Therefore, even if the pressure difference between the fuel gas flow path and the oxidant gas flow path is small, pressure changes due to leakage from the electrolyte membrane can be captured. As a result, inspection for leakage from the electrolyte membrane can be performed using limited resources. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a schematic diagram showing a fuel cell system. [Diagram 2] FIG. 2 is a cross-sectional view showing a unit cell. [Diagram 3] FIG. 3 is a flowchart showing the steps of the leak inspection method. [Figure 4] FIG. 4 is a flow chart showing the steps involved in monitoring voltage in the leak detection method. [Diagram 5] FIG. 5 is a cross-sectional view showing a unit cell of a planar array type. [Figure 6] FIG. 6 is a graph showing the amount of pressure change. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] First Embodiment 1 is a schematic diagram showing a fuel cell system 10. The fuel cell system 10 is mounted on a mobile object capable of flying in space. The fuel cell system 10 includes a fuel gas supply device 12, an oxidizing gas supply device 14, a fuel cell 16, and a control device 18.
[0012] The fuel gas supplying device 12 is a device capable of supplying high-pressure fuel gas. The fuel gas is a gas containing hydrogen. The fuel gas supplying device 12 may include an electrochemical hydrogen pump and a fuel gas tank. The electrochemical hydrogen pump compresses hydrogen through an oxidation-reduction reaction of hydrogen to generate high-pressure fuel gas. The fuel gas tank stores the high-pressure fuel gas generated by the electrochemical hydrogen pump.
[0013] The oxidant gas supplying device 14 is a device capable of supplying high-pressure oxidant gas. The oxidant gas is a gas containing oxygen. The oxidant gas may be air. The oxidant gas supplying device 14 may include a water electrolysis device and an oxidant gas tank. The water electrolysis device compresses oxygen by electrolysis of water to generate high-pressure oxidant gas. The oxidant gas tank stores the high-pressure oxidant gas.
[0014] In addition, when the fuel gas supplying device 12 includes an electrochemical hydrogen pump and the oxidizing gas supplying device 14 includes a water electrolysis device, the electrochemical hydrogen pump may compress hydrogen generated by electrolysis of water by the water electrolysis device. In this case, the utilization efficiency of hydrogen can be improved.
[0015] The fuel cell 16 includes a fuel gas inlet 16_F1, a fuel gas outlet 16_F2, an oxidant gas inlet 16_O1, and an oxidant gas outlet 16_O2.
[0016] The fuel gas inlet 16_F1 is connected to a first end of a fuel gas supply pipe 20. A second end of the fuel gas supply pipe 20 is connected to the fuel gas supply device 12. When a first on-off valve 22 provided in the fuel gas supply pipe 20 is closed, high-pressure fuel gas is not supplied from the fuel gas supply device 12 to the fuel cell 16. On the other hand, when the first on-off valve 22 is open, high-pressure fuel gas is supplied from the fuel gas supply device 12 to the fuel cell 16. In this case, the fuel gas flows into the fuel cell 16 from the fuel gas inlet 16_F1. The opening and closing of the first on-off valve 22 is controlled by the control device 18.
[0017] The fuel gas outlet 16_F2 is connected to a first end of the fuel gas discharge pipe 24. The second end of the fuel gas discharge pipe 24 may be disposed in the external space. The second end of the fuel gas discharge pipe 24 may be connected to a predetermined portion of the fuel gas supply pipe 20. In this case, the fuel gas can be circulated without being purged, so that the utilization efficiency of the fuel gas can be improved. When the second on-off valve 26 provided in the fuel gas discharge pipe 24 is closed, the flow of the fuel gas inside the fuel cell 16 is suppressed. On the other hand, when the second on-off valve 26 is open, the flow of the fuel gas inside the fuel cell 16 is not suppressed, and the off-gas containing the fuel gas is discharged from the fuel gas outlet 16_F2 and flows through the fuel gas discharge pipe 24. The opening and closing of the second on-off valve 26 is controlled by the control device 18.
[0018] The oxidant gas inlet 16_O1 is connected to a first end of the oxidant gas supply pipe 28. A second end of the oxidant gas supply pipe 28 is connected to the oxidant gas supply device 14. When a third on-off valve 30 provided in the oxidant gas supply pipe 28 is closed, high-pressure oxidant gas is not supplied from the oxidant gas supply device 14 to the fuel cell 16. On the other hand, when the third on-off valve 30 is open, high-pressure oxidant gas is supplied from the oxidant gas supply device 14 to the fuel cell 16. In this case, the oxidant gas flows into the fuel cell 16 from the oxidant gas inlet 16_O1. The opening and closing of the third on-off valve 30 is controlled by the control device 18.
[0019] The oxidant gas outlet 16_O2 is connected to a first end of the oxidant gas discharge pipe 32. A second end of the oxidant gas discharge pipe 32 may be disposed in the external space. The second end of the oxidant gas discharge pipe 32 may be connected to a predetermined portion of the oxidant gas supply pipe 28. In this case, the oxidant gas can be circulated without being purged, so that the utilization efficiency of the oxidant gas can be improved. When the fourth on-off valve 34 provided in the oxidant gas discharge pipe 32 is closed, the flow of the oxidant gas inside the fuel cell 16 is suppressed. On the other hand, when the fourth on-off valve 34 is open, the flow of the oxidant gas inside the fuel cell 16 is not suppressed, and the off-gas containing the oxidant gas is discharged from the oxidant gas outlet 16_O2 and flows through the oxidant gas discharge pipe 32. The opening and closing of the fourth on-off valve 34 is controlled by the control device 18.
[0020] The fuel cell 16 further includes a fuel gas flow path 36, an oxidant gas flow path 38, and one or more unit cells 40. In Fig. 1, an example in which the fuel cell 16 includes a plurality of unit cells 40 is shown.
[0021] The fuel gas flow path 36 is formed inside the fuel cell 16. A first end of the fuel gas flow path 36 is connected to the fuel gas inlet 16_F1. A second end of the fuel gas flow path 36 is connected to the fuel gas outlet 16_F2. The fuel gas flow path 36 passes through a unit cell 40. When there are multiple unit cells 40, the fuel gas flow paths 36 branch out inside the fuel cell 16 and merge after passing through each unit cell 40 without intersecting with each other.
[0022] The oxidant gas flow path 38 is formed inside the fuel cell 16 without intersecting with the fuel gas flow path 36. A first end of the oxidant gas flow path 38 is connected to the oxidant gas inlet 16_O1. A second end of the oxidant gas flow path 38 is connected to the oxidant gas outlet 16_O2. The oxidant gas flow path 38 passes through a unit cell 40. When there are multiple unit cells 40, the oxidant gas flow paths 38 branch out inside the fuel cell 16 and merge after passing through each unit cell 40 without intersecting with each other.
[0023] The unit cell 40 generates electricity through an electrochemical reaction between a fuel gas and an oxidant gas. FIG. 2 is a cross-sectional view showing the unit cell 40. The unit cell 40 has a membrane electrode assembly 42 and a pair of separators 44. When the fuel cell 16 includes a plurality of unit cells 40, the plurality of unit cells 40 are stacked. In this case, the plurality of unit cells 40 are electrically connected in series. The membrane electrode assembly 42 has an electrolyte membrane 46, an anode electrode 48, and a cathode electrode 50.
[0024] The electrolyte membrane 46 is, for example, a solid polymer electrolyte membrane (cation exchange membrane) such as a thin film of perfluorosulfonic acid containing moisture. The electrolyte membrane 46 may be a fluorine-based electrolyte membrane or a HC (hydrocarbon)-based electrolyte membrane. The electrolyte membrane 46 is sandwiched between an anode electrode 48 and a cathode electrode 50.
[0025] The anode electrode 48 faces one surface of the electrolyte membrane 46. The second surface of the anode electrode 48, which is opposite to the first surface of the anode electrode 48 facing the electrolyte membrane 46, faces the separator 44. A part of the fuel gas flow channel 36 is formed between the anode electrode 48 and the separator 44. The fuel gas flow channel 36 formed between the anode electrode 48 and the separator 44 extends along the second surface of the anode electrode 48. A part of the fuel gas passing through the second surface of the anode electrode 48 is decomposed into hydrogen ions and electrons at the anode electrode 48. The anode electrode 48 may include an anode catalyst layer and an anode diffusion layer. The anode catalyst layer is a layer containing a catalyst for the oxidation reaction of hydrogen in the fuel gas. The anode diffusion layer is a layer for diffusing the fuel gas flowing through the fuel gas flow channel 36 and supplying it to the anode catalyst layer.
[0026] The cathode electrode 50 faces the other surface of the electrolyte membrane 46. The second surface of the cathode electrode 50, which is opposite to the first surface of the cathode electrode 50 facing the electrolyte membrane 46, faces a separator 44 other than the separator 44 to which the second surface of the anode electrode 48 faces. A part of the oxidant gas flow passage 38 is formed between the cathode electrode 50 and the separator 44. The oxidant gas flow passage 38 formed between the cathode electrode 50 and the separator 44 extends along the second surface of the cathode electrode 50. A part of the oxidant gas passing through the second surface of the cathode electrode 50 reacts with the hydrogen ions that have permeated the electrolyte membrane 46 at the cathode electrode 50 to generate water. The cathode electrode 50 may include a cathode catalyst layer and a cathode diffusion layer. The cathode catalyst layer is a layer containing a catalyst for the reduction reaction of oxygen. The cathode diffusion layer is a layer for diffusing the oxidant gas flowing through the oxidant gas flow passage 38 and supplying it to the cathode catalyst layer.
[0027] The anode electrode 48 and the cathode electrode 50 are connected by a wiring 52. The wiring 52 electrically connects the anode electrode 48 and the cathode electrode 50 without passing through the electrolyte membrane 46. When a switch 54 provided on the wiring 52 is on, electrons decomposed at the anode electrode 48 are guided to the cathode electrode 50. When the switch 54 provided on the wiring 52 is off, electrons decomposed at the anode electrode 48 are not guided to the cathode electrode 50.
[0028] The control device 18 includes a processor and a storage medium. The storage medium may be configured by a volatile memory and a non-volatile memory. The volatile memory may include a RAM, etc. The non-volatile memory may include a ROM, a flash memory, etc.
[0029] The control device 18 controls the fuel gas supply device 12. In this case, the control device 18 can start the supply of the fuel gas to the fuel cell 16 and stop the supply of the fuel gas that has been started. The control device 18 controls the oxidizing gas supply device 14. In this case, the control device 18 can start the supply of the oxidizing gas to the fuel cell 16 and stop the supply of the oxidizing gas that has been started. The control device 18 controls the first on-off valve 22, the second on-off valve 26, the third on-off valve 30, and the fourth on-off valve 34. In this case, the control device 18 can open and close at least one of the first on-off valve 22, the second on-off valve 26, the third on-off valve 30, and the fourth on-off valve 34. The control device 18 can turn on the switch 54 to electrically connect the anode electrode 48 and the cathode electrode 50, and turn off the switch 54 to electrically disconnect the connection between the anode electrode 48 and the cathode electrode 50.
[0030] Next, a description will be given of a leak inspection method for inspecting for leaks (cross leaks) from the electrolyte membrane 46 in the unit cell 40. Fig. 3 is a flow chart showing the procedure of the leak inspection method.
[0031] The leak inspection method includes a gas sealing step P1, a gas supplying step P2, a measuring step P3, and a judging step P4.
[0032] The gas sealing step P1 is a step of sealing the fuel gas in the fuel gas flow path 36. In the gas sealing step P1, the control device 18 opens the first on-off valve 22 and closes the second on-off valve 26. Thereafter, the control device 18 controls the fuel gas supply device 12 to start supplying the fuel gas to the fuel cell 16. When the pressure of the fuel gas in the fuel gas flow path 36 reaches a predetermined pressure, the control device 18 closes the first on-off valve 22. The pressure of the fuel gas in the fuel gas flow path 36 is measured using a pressure sensor.
[0033] The pressure sensor is provided in the fuel gas flow passage 36. When the fuel cell 16 includes a plurality of unit cells 40, the number and arrangement of the pressure sensors in the fuel gas flow passage 36 may be appropriately selected. For example, one pressure sensor may be provided in the fuel gas flow passage 36 upstream of the branching portion BP (FIG. 1). Alternatively, one pressure sensor may be provided in the fuel gas flow passage 36 downstream of the merging portion CP (FIG. 1). Alternatively, one pressure sensor may be provided in each of the fuel gas flow passages 36 formed between the anode electrode 48 and the separator 44 of each unit cell 40. The location where the pressure sensor is provided is not limited to the fuel gas flow passage 36. For example, the pressure sensor may be provided in the fuel gas supply pipe 20 downstream of the first on-off valve 22, or in the fuel gas discharge pipe 24 upstream of the second on-off valve 26.
[0034] The gas supply step P2 is a step of continuously supplying the oxidant gas to the oxidant gas flow path 38. In the gas supply step P2, the control device 18 opens the third on-off valve 30 and the fourth on-off valve 34. Thereafter, the control device 18 controls the oxidant gas supply device 14 to start supplying the oxidant gas to the fuel cell 16. In this embodiment, the oxidant gas is supplied at a pressure higher than the pressure of the fuel gas sealed in the fuel gas flow path 36. For example, the fuel gas at a pressure of 30 kPa is sealed in the fuel gas flow path 36, and the oxidant gas at a pressure of 40 kPa is continuously supplied to the oxidant gas flow path 38.
[0035] The measurement step P3 is a step of measuring the pressure change amount per unit time of the gas sealed in the gas sealing step P1. In the measurement step P3, the control device 18 first turns off the switch 54 provided on the wiring 52. The control device 18 may turn off the switch 54 before the gas sealing step P1 or the gas supply step P2. When the switch 54 is in the off state, the power generation of the unit cell 40 is suppressed. Therefore, a drop in the pressure of the fuel gas sealed in the fuel gas flow path 36 due to the power generation of the unit cell 40 is suppressed. When the control device 18 turns off the switch 54, the control device 18 stores the pressure detected by the pressure sensor described above in the storage medium. In addition, the control device 18 acquires the pressure change amount when a predetermined time has elapsed since the switch 54 was turned off, for example, based on the pressure stored in the storage medium.
[0036] If the electrolyte membrane 46 is not damaged and pinholes or the like are not formed in the electrolyte membrane 46, the pressure of the fuel gas sealed in the fuel gas flow passage 36 is approximately constant. On the other hand, if a pinhole or the like is formed in the electrolyte membrane 46, the pressure of the gas sealed in the gas sealing step P1 changes depending on the pressure difference between the fuel gas flow passage 36 and the oxidant gas flow passage 38. In this embodiment, the pressure of the oxidant gas that continues to be supplied to the oxidant gas flow passage 38 is higher than the pressure of the fuel gas sealed in the fuel gas flow passage 36. Therefore, The oxidant in the oxidant gas flow passage 38 The gas flows through the electrolyte membrane 46. Fuel gas passage 36 As a result, the pressure of the fuel gas sealed in the fuel gas flow passage 36 increases.
[0037] The determination step P4 is a step of determining whether or not there is a leak from the electrolyte membrane 46 based on the amount of pressure change per unit time of the gas measured in the measurement step P3. In the determination step P4, the control device 18 compares the amount of pressure change measured in the measurement step P3 with a predetermined threshold value. If the amount of pressure change does not exceed the threshold value, the control device 18 determines that there is no leak from the electrolyte membrane 46. In this case, the control device 18 may operate an alarm device such as a display device connected to the control device 18 to present that there is no leak from the electrolyte membrane 46. On the other hand, if the amount of pressure change exceeds the threshold value, the control device 18 determines that there is a leak from the electrolyte membrane 46. In this case, the control device 18 may operate an alarm device such as a display device connected to the control device 18 to warn that there is a leak from the electrolyte membrane 46.
[0038] As described above, the leak testing method of the present embodiment seals the fuel gas at a predetermined pressure in the fuel gas flow path 36, and continues to supply the oxidant gas at a pressure higher than the pressure of the sealed fuel gas to the oxidant gas flow path 38. As a result, the leak testing method of the present embodiment can perform a leak test using only gas essential for power generation of the fuel cell 16, while reducing the pressure difference between the fuel gas flow path 36 and the oxidant gas flow path 38. Therefore, damage to the electrolyte membrane 46 caused by an excessive pressure difference between the fuel gas flow path 36 and the oxidant gas flow path 38 can be suppressed.
[0039] Moreover, the leak inspection method of this embodiment measures the pressure change amount of the sealed fuel gas per unit time when the switch 54 provided on the wiring 52 connecting the anode electrode 48 and the cathode electrode 50 without passing through the electrolyte membrane 46 is in an off state. When the anode electrode 48 and the cathode electrode 50 are in a disconnected state, power generation in the unit cell 40 is suppressed. Therefore, the leak inspection method of this embodiment can suppress the pressure change due to power generation even when a gas essential for power generation is used. Therefore, even if the pressure difference between the fuel gas flow path 36 and the oxidant gas flow path 38 is small, the pressure drop due to leakage from the electrolyte membrane 46 can be detected.
[0040] In the leak inspection method, after fuel gas is sealed in the fuel gas flow path 36 and oxidant gas is supplied to the oxidant gas flow path 38, the voltage applied to the fuel cell 16 is monitored. When the fuel cell 16 includes one unit cell 40, the voltage applied to one unit cell 40 is monitored. On the other hand, when the fuel cell 16 includes a plurality of unit cells 40, the voltage applied across the plurality of unit cells 40 electrically connected in series may be monitored, or the voltage applied to each unit cell 40 may be monitored.
[0041] 4 is a flowchart showing the procedure of steps related to voltage monitoring in the leak testing method. The leak testing method further includes a voltage measuring step P11 and a release step P12.
[0042] The voltage measurement step P11 is a step of measuring the voltage applied to the fuel cell 16. In the voltage measurement step P11, the control device 18 starts measuring the voltage value applied to the fuel cell 16 after the fuel gas is sealed in the fuel gas flow path 36 and the oxidant gas starts to be supplied to the oxidant gas flow path 38.
[0043] The release step P12 is a step of releasing the seal on the fuel gas when the voltage value measured in the voltage measurement step P11 becomes less than a predetermined voltage threshold. In the release step P12, the control device 18 compares the voltage value measured in the voltage measurement step P11 with the voltage threshold stored in the storage medium.
[0044] In the event of a leak from the electrolyte membrane 46, the fuel gas and the oxidant gas may react directly, eventually resulting in ignition. If the direct reaction between the fuel gas and the oxidant gas continues, the voltage value applied to the fuel cell 16 decreases. When the voltage value measured in the voltage measurement step P11 falls below the voltage threshold, the control device 18 opens the second on-off valve 26 to release the seal on the fuel gas. This makes it possible to prevent ignition of the unit cell 40 before it occurs.
[0045] The control device 18 may control the oxidant gas supply device 14 to stop the supply of the oxidant gas to the oxidant gas flow path 38, and then open the second on-off valve 26 to unblock the fuel gas. In this case, damage to the electrolyte membrane 46 due to the pressure difference between the fuel gas flow path 36 and the oxidant gas flow path 38 can be prevented.
[0046] Second Embodiment In this embodiment, the unit cell 40 of the first embodiment is replaced with a planar array type unit cell 60 (FIG. 1). FIG. 5 is a cross-sectional view showing the planar array type unit cell 60. In FIG. 5, the same reference numerals are used to designate configurations equivalent to those described in the first embodiment. Note that in this embodiment, descriptions that overlap with those in the first embodiment will be omitted.
[0047] In the planar array type unit cell 60, a plurality of cell blocks 62 are formed. In Fig. 5, for ease of understanding, a part of the cell block 62 is surrounded by a dashed line. Each cell block 62 includes, as components, one anode electrode portion 48PT, one cathode electrode portion 50PT, and an electrolyte membrane 46 disposed between these electrode portions.
[0048] The anode electrode portion 48PT is a part of the anode electrode 48. The anode electrode portion 48PT is formed by a dividing groove 64. That is, the anode electrode 48 is divided into a plurality of anode electrode portions 48PT by the dividing grooves 64. The dividing groove 64 extends along the fuel gas flow field 36 between the anode electrode 48 and the separator 44 from a first edge of the anode electrode 48 to a second edge opposite the first edge. The anode electrode portion 48PT may be rectangular in shape with its long side extending in the direction in which the dividing grooves 64 extend and its short side extending between the two dividing grooves 64.
[0049] The cathode electrode portion 50PT is a part of the cathode electrode 50. The cathode electrode portion 50PT is formed by a dividing groove 66. That is, the cathode electrode 50 is divided into a plurality of cathode electrode portions 50PT by the dividing grooves 66. The dividing groove 66 extends from a first edge of the cathode electrode 50 to a second edge opposite the first edge along the oxidant gas flow field 38 between the cathode electrode 50 and the separator 44. The cathode electrode portion 50PT may be rectangular in shape with the extension direction of the dividing grooves 66 as the long side and the space between the two dividing grooves 66 as the short side.
[0050] The cell blocks 62 are connected in series by the interconnector portion 68. The interconnector portion 68 electrically connects the anode electrode portion 48PT and the cathode electrode portion 50PT. The interconnector portion 68 connects one anode electrode portion 48PT of the cell blocks 62 adjacent to each other along the surface direction of the electrolyte membrane 46 to the other cathode electrode portion 50PT of the adjacent cell block 62. The interconnector portion 68 is formed on the electrolyte membrane 46. The interconnector portion 68 is formed, for example, by heating a local portion of the electrolyte membrane 46 to carbonize the local portion. The interconnector portion 68 may be a conductive charcoal derived from a proton-conductive resin. Examples of the proton-conductive resin include aromatic polymer compounds in which sulfonic acid groups are introduced into hydrocarbon polymers such as aromatic polyarylene ether ketones and aromatic polyarylene ether sulfones.
[0051] In the planar array type unit cell 60, the anode electrode portion 48PT and the cathode electrode portion 50PT are electrically connected by the interconnector portion 68. Therefore, the unit cell 60 tends to generate a small amount of electricity even when the switch 54 provided on the wiring 52 is turned off. When the unit cell 60 generates electricity, it is impossible to distinguish whether the pressure change amount measured in the measurement step P3 is due to the power generation of the unit cell 60 or due to leakage from the electrolyte membrane 46.
[0052] Therefore, when inspecting for leakage from the electrolyte membrane 46 in the planar array type unit cell 60, a reference pressure change amount is used as a threshold value to be compared with the pressure change amount in the judgment step P4. The reference pressure change amount is set in advance as a reference indicating the amount by which the enclosed gas pressure drops per unit time due to power generation when there is no leakage from the electrolyte membrane 46. The reference pressure change amount is obtained by carrying out the above-mentioned gas sealing step P1, gas supply step P2, and measurement step P3 on a fuel cell 16 that has been determined to have no leakage from the electrolyte membrane 46. The reference pressure change amount may be obtained on the ground. The reference pressure change amount may be a map (graph) indicating the change in the enclosed gas pressure due to power generation when there is no leakage from the electrolyte membrane 46.
[0053] In the determination step P4 of this embodiment, the control device 18 compares the amount of pressure change measured in the measurement step P3 with a reference amount of pressure change stored in the storage medium. If there is a leak from the electrolyte membrane 46, the change in gas pressure measured in the measurement step P3 will be greater than the change in gas pressure due to power generation (reference pressure change) (see FIG. 6). Therefore, the amount of pressure change measured in the measurement step P3 will be greater than the reference amount of pressure change.
[0054] If the difference between the pressure change amount measured in the measurement step P3 and the reference pressure change amount does not exceed a predetermined threshold, the control device 18 determines that there is no leakage from the electrolyte membrane 46. On the other hand, if the difference between the pressure change amount and the reference pressure change amount exceeds the threshold, the control device 18 determines that there is leakage from the electrolyte membrane 46.
[0055] In this manner, when the fuel cell 16 includes the planar array type unit cells 60, the pressure change amount measured in the measurement process P3 is compared with the reference pressure change amount. This makes it possible to distinguish whether the pressure change amount measured in the measurement process P3 is due to power generation of the unit cells 40 or due to leakage from the electrolyte membrane 46.
[0056] The above embodiment may be modified as follows.
[0057] In the gas sealing step P1, the oxidant gas may be sealed in the oxidant gas flow field 38. In this case, the fuel gas continues to be supplied to the fuel gas flow field 36 in the gas supplying step P2.
[0058] Furthermore, the pressure of the gas (oxidant gas or fuel gas) that is continuously supplied in the gas supplying step P2 may be lower than the pressure of the gas (fuel gas or oxidant gas) sealed in the gas sealing step P1.
[0059] In addition, when the fuel cell 16 includes a planar array type unit cell 60, the pressure of the gas (fuel gas or oxidant gas) sealed in the gas sealing process P1 may be the same as the pressure of the gas (oxidant gas or fuel gas) continuously supplied in the gas supply process P2.
[0060] The invention understood based on the above will be described below.
[0061] (1) The present invention relates to a leak inspection method for inspecting for leaks from an electrolyte membrane (46) in a fuel cell (16) including an electrolyte membrane (46), and an anode electrode (48) and a cathode electrode (50) sandwiching the electrolyte membrane (46), the method including a gas sealing step (P1) of sealing the fuel gas at a predetermined pressure in a fuel gas flow path (36) for supplying fuel gas to the anode electrode (48), or sealing the oxidizer gas at the predetermined pressure in an oxidizer gas flow path (38) for supplying oxidizer gas to the cathode electrode (50), and a gas sealing step (P2) of sealing the oxidizer gas at the predetermined pressure in an oxidizer gas flow path (38) for supplying oxidizer gas to the cathode electrode (50) when the fuel gas is sealed in the fuel gas flow path (36), a gas supplying step (P2) of continuously supplying the oxidant gas at a pressure equal to or lower than the predetermined pressure to the oxidant gas flow path (38) and, when the oxidant gas is sealed in the oxidant gas flow path (38), continuously supplying the fuel gas at a pressure equal to or higher than the predetermined pressure or equal to or lower than the predetermined pressure to the fuel gas flow path (36); and a measuring step (P3) of measuring an amount of pressure change per unit time of the gas sealed in the gas sealing step (P1) in a state in which a switch (54) provided in a wiring (52) connecting the anode electrode (48) and the cathode electrode (50) without passing through the electrolyte membrane (46) is turned off.
[0062] According to the present invention, damage to the electrolyte membrane caused by the pressure difference between the fuel gas flow path and the oxidant gas flow path can be suppressed by using only the gas essential for the power generation of the fuel cell. Furthermore, power generation of the fuel cell is suppressed when the anode electrode and the cathode electrode are not connected. Therefore, according to the present invention, even if the gas essential for the power generation of the fuel cell is used, pressure changes caused by power generation of the fuel cell can be suppressed. Therefore, even if the pressure difference between the fuel gas flow path and the oxidant gas flow path is small, pressure changes caused by leakage from the electrolyte membrane can be captured. As a result, inspection for leakage from the electrolyte membrane can be performed using limited resources.
[0063] (2) The present invention is a leak inspection method, in which, when an anode electrode portion (48PT), which is a part of the anode electrode (48), and a cathode electrode portion (50PT), which is a part of the cathode electrode (50), are connected by an interconnector portion (68) formed on the electrolyte membrane (46), the amount of pressure change measured in the measurement step (P3) is compared with a preset reference amount of pressure change, and the reference amount of pressure change indicates an amount of pressure drop per unit time of the gas sealed in the gas sealing step (P1) due to power generation in the absence of leakage from the electrolyte membrane (46). This makes it possible to distinguish whether the amount of pressure change measured in the measurement step is due to power generation or leakage from the electrolyte membrane.
[0064] (3) The present invention is a leak inspection method that further includes a release step (P12) of releasing the gas sealed in the gas sealing step (P1) when the voltage value applied to the fuel cell (16) becomes less than a predetermined voltage threshold, thereby making it possible to prevent a direct reaction between the fuel gas and the oxidant gas and ignition from occurring in the event of leakage from the electrolyte membrane.
[0065] (4) The present invention is a leak inspection method, in which the releasing step (P12) releases the sealing of the gas sealed in the gas sealing step (P1) after stopping the supply of the gas supplied in the gas supplying step (P2), thereby preventing damage to the electrolyte membrane due to an excessive pressure difference between the fuel gas flow path and the oxidant gas flow path. [Explanation of symbols]
[0066] 10... fuel cell system 12... fuel gas supply device 14...Oxidant gas supply device 16...Fuel cell 18...Control device 36...Fuel gas flow path 38...oxidant gas flow path 40...unit cell 42...Membrane electrode assembly 46...Electrolyte membrane 48...anode electrode 50...cathode electrode 48PT…Anode electrode part 50PT…Cathode electrode part 52…Wiring 54…Switch 68...Interconnector part P1...Gas sealing process P2: Gas supply process P3: Measurement process P4…Judgment process P12…Cancellation process
Claims
1. A leak inspection method for inspecting a leak from an electrolyte membrane in a fuel cell including an electrolyte membrane, and an anode electrode and a cathode electrode sandwiching the electrolyte membrane, comprising: a gas sealing step of sealing a fuel gas at a predetermined pressure in a fuel gas flow passage inside the fuel cell formed between a fuel gas inlet of the fuel cell and a fuel gas outlet of the fuel cell, or sealing an oxidant gas at the predetermined pressure in an oxidant gas flow passage inside the fuel cell formed between an oxidant gas inlet of the fuel cell and an oxidant gas outlet of the fuel cell; a gas supplying process, in which, when the fuel gas is sealed in the fuel gas flow path, the oxidant gas at a pressure equal to or higher than the predetermined pressure is continuously supplied to the oxidant gas flow path, and, when the oxidant gas is sealed in the oxidant gas flow path, the fuel gas at a pressure equal to or higher than the predetermined pressure is continuously supplied to the fuel gas flow path; a measuring step of measuring a pressure change per unit time of the gas sealed in the gas sealing step while a switch provided in a wiring that connects the anode electrode and the cathode electrode without passing through the electrolyte membrane is in an off state; a determination step of determining whether or not there is a leak from the electrolyte membrane based on the amount of pressure change measured in the measurement step; Including, an anode electrode portion that is a part of the anode electrode and a cathode electrode portion that is a part of the cathode electrode are connected by an interconnector portion formed on the electrolyte membrane, In the determination step, the control device compares the amount of pressure change measured in the measurement step with a preset reference amount of pressure change, and if the difference between the amount of pressure change and the reference amount of pressure change does not exceed a predetermined threshold, the control device determines that there is no leakage from the electrolyte membrane, and if the difference between the amount of pressure change and the reference amount of pressure change exceeds the threshold, the control device determines that there is leakage from the electrolyte membrane, The leak inspection method, wherein the reference pressure change amount indicates an amount by which the pressure of the gas sealed in the gas sealing step drops per unit time due to power generation when there is no leakage from the electrolyte membrane.
2. 2. The leak inspection method according to claim 1, The leak inspection method further comprises a releasing step of releasing the sealing of the gas sealed in the gas sealing step when the voltage value applied to the fuel cell becomes less than a predetermined voltage threshold value.
3. 3. The leak inspection method according to claim 2, The releasing step is a step of releasing the sealing of the gas sealed in the gas sealing step after stopping the supply of the gas supplied in the gas supplying step.
Citation Information
Patent Citations
Device for evaluating characteristics of unit fuel cell
JP1993205762A
Gas leakage detection method in fuel cell
JP2003045466A
Fuel cell control device
JP2003217631A
Airtightness test method in fuel cell system
JP2005190764A
Fuel cell cross leakage determination method and fuel cell system
JP2012133997A