Combine and unworked area calculation method
Patent Information
- Application Number
- JP2020200122
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-02
- Publication Date
- 2025-02-27
- Estimated Expiration
- 2040-12-02
AI Technical Summary
【0016】 本発明によれば、簡単に未作業地を生成することができる。
Smart Images

Figure 0007636888000001 
Figure 0007636888000002 
Figure 0007636888000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a combine harvester for generating unworked land and a method for calculating unworked land. [Background technology]
[0002] There is known an external shape calculation system that calculates the external shape of unworked land inside worked land formed by mowing the perimeter (circumferential mowing) of a field (Patent Document 1). In this system, when one circumference of the field has been mowed, a reference point (center of gravity) is set inside the shape formed by connecting at least one of a plurality of first measurement positions and a plurality of second measurement positions, and the external shape of the area to be worked is calculated by connecting the measurement positions closest to the reference point with a line. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-22375 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the above system, to calculate the outer shape of the work area, it was necessary to set a reference point after completing one rotation of the field, select measurement positions based on the reference point, and connect the measurement positions with a line. In other words, it was not possible to calculate the outer shape of the work area without identifying many points (positions) and going through many processes.
[0005] The present invention provides a combine and an unworked area calculation method that can easily generate unworked areas. [Means for solving the problem]
[0006] The present invention is a combine harvester that generates unworked land in a field by circular mowing, in which the vehicle body repeatedly moves straight and turns to perform cutting work, and is equipped with a positioning unit that acquires measurement points indicating the position of the vehicle body, a straight line generation unit that generates a work line based on the measurement points acquired between the work start position and the work end position during one of the cutting operations, and an unworked land generation unit that calculates the intersection points of the work lines where they intersect with each other each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generates the unworked land that forms a polygon with at least three of the intersection points as vertices.
[0007] In this case, the unworked area generation unit sets the last calculated intersection point as the starting point, and generates a first polygon if, as a result of searching for the intersection points clockwise from the starting point, at least three intersection points including the starting point are found, and generates a second polygon if, as a result of searching for the intersection points counterclockwise from the starting point, at least three intersection points including the starting point are found, and if only one of the first polygon or the second polygon is generated, sets the one of the first polygon or the second polygon that was generated as the unworked area, and if both the first polygon and the second polygon are generated, sets the one of the first polygon or the second polygon that has the larger area as the unworked area.
[0008] In this case, the positioning unit continuously acquires the measurement points from the work start position to the work end position during one mowing operation, and the straight line generation unit generates a reference line based on the acquired multiple measurement points, and sets the work line so that it passes through the measurement point farthest from the unworked area on either side of the reference line and runs along the reference line.
[0009] In this case, when one of the mowing operations is interrupted and then resumed, the straight line generation unit generates a first work straight line based on the measurement points obtained between the work start position and the work interruption position, and generates a second work straight line based on the measurement points obtained between the work interruption position and the work end position.If the inclination angle of the second work straight line relative to the first work straight line is within a predetermined range, the straight line generation unit generates a straight line connecting the work start position and the work end position as the work straight line.If the inclination angle of the second work straight line relative to the first work straight line exceeds the predetermined range, the section from the work start position to the work interruption position and the section from the work interruption position to the work end position may be set as different mowing operations, and the first work straight line and the second work straight line may be set as different work straight lines.
[0010] In this case, the system may further include a driving route creation unit that generates a straight-line route to the unworked area, and an automatic driving control unit that automatically performs the mowing work along the straight-line route, and the work straight line may be generated by automatically performing the mowing work along the straight-line route.
[0011] The present invention is an unworked area calculation method for generating unworked areas in a field by circular mowing, in which the vehicle body performs mowing work by repeatedly moving straight and turning, and includes a straight line generation process for generating work straight lines based on measurement points indicating the position of the vehicle body obtained between the work start position and the work end position during one mowing operation, and an unworked area generation process for calculating the intersection points of the work lines where they intersect each other each time a work line is generated, and, when at least three of the work lines intersect so as to form a closed area, generating the unworked area forming a polygon with at least three of the intersection points as vertices.
[0012] In this case, in the unworked area generating process, the last calculated intersection point is set as the starting point, and a first polygon is generated if the intersection points are searched clockwise from the starting point and at least three intersection points including the starting point are found, and a second polygon is generated if the intersection points are searched counterclockwise from the starting point and at least three intersection points including the starting point are found, and if only one of the first polygon or the second polygon is generated, the one of the first polygon or the second polygon that was generated is set as the unworked area, and if both the first polygon and the second polygon are generated, the one of the first polygon or the second polygon that has the larger area is set as the unworked area.
[0013] In this case, in the straight line generation process, a reference straight line is generated based on a plurality of measurement points acquired continuously from the work start position to the work end position during one mowing operation, and the work line is set so as to pass through the measurement point farthest from the unworked land on either side of the reference line and to run along the reference line.
[0014] In this case, when one of the mowing operations is interrupted and then resumed, the straight line generation process generates a first work straight line based on the measurement points obtained between the work start position and the work interruption position, and generates a second work straight line based on the measurement points obtained between the work interruption position and the work end position.In the straight line generation process, if the inclination angle of the second work straight line relative to the first work straight line is within a predetermined range, a straight line connecting the work start position and the work end position is generated as the work straight line.If the inclination angle of the second work straight line relative to the first work straight line exceeds the predetermined range, the section from the work start position to the work interruption position and the section from the work interruption position to the work end position may be set as different mowing operations, and the first work straight line and the second work straight line may be set as different work straight lines.
[0015] In this case, the method further includes a driving route creation process for generating a straight route through the unworked area, and an automatic driving control process for automatically performing the mowing work along the straight route, and the work straight line may be generated by automatically performing the mowing work along the straight route. Effect of the Invention
[0016] According to the present invention, unworked areas can be easily generated. [Brief description of the drawings]
[0017] [Figure 1] 1 is a side view showing a combine harvester according to one embodiment of the present invention. [Diagram 2] 2 is a block diagram showing a positioning unit and a base station of a combine harvester according to one embodiment of the present invention; FIG. [Diagram 3] 1 is a block diagram showing a combine harvester according to one embodiment of the present invention; [Figure 4] 1 is a plan view showing the state in which the outline of a farm field to be worked on by a combine harvester according to one embodiment of the present invention has been generated. FIG. [Diagram 5] 1 is a plan view showing a state in which a headland and an automatic travelable area are set in a farm field that is the subject of work by a combine harvester according to one embodiment of the present invention. FIG. [Figure 6] FIG. 1 is a plan view showing a state in which one reaping operation has been performed in a farm field that is the subject of operation of a combine harvester according to one embodiment of the present invention. [Figure 7] FIG. 1 is a plan view showing a state in which two harvesting operations are performed in a farm field that is the target of operation of a combine harvester according to one embodiment of the present invention. [Figure 8] FIG. 2 is a plan view showing the state in which a second round of harvesting work has begun in a field that is the subject of work by a combine harvester according to one embodiment of the present invention. [Figure 9] 4 is a flowchart showing an unworked area calculation method according to one embodiment of the present invention. [Figure 10] FIG. 1 is a plan view showing a state in which one reaping operation has been performed in a farm field that is the target of the combine harvester according to a first modified example of one embodiment of the present invention. [Figure 11] FIG. 11 is a plan view showing a state in which a combine harvester according to a second modified example of an embodiment of the present invention has resumed harvesting work after it was interrupted. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings. In this specification, terms indicating directions and positions are used for convenience of explanation, but these terms are not intended to limit the technical scope of the present invention.
[0019] [Combine Overview]
[0020] The combine harvester 1 will be described with reference to Figures 1 and 2. Figure 1 is a side view of the combine harvester 1. Figure 2 is a block diagram showing the positioning unit 34 and the base station 39.
[0021] The combine harvester 1 performs tasks such as harvesting stalks in a field while autonomously traveling and turning in the field to be worked on, either automatically or manually. For example, the combine harvester 1 is configured to perform automatic operation in which steering is controlled by automatic driving and traveling speed is controlled by manual operation, or unmanned operation in which steering and traveling speed are controlled by automatic driving.
[0022] As shown in Fig. 1, the combine harvester 1 includes a traveling section 2, a reaping section 3, a threshing section 4, a sorting section 5, a storage section 6, a straw waste processing section 7, a power section 8, and a steering section 9. The combine harvester 1 is a so-called head-threshing type combine harvester, and while traveling on the traveling section 2, threshes the stalks (harvested material) harvested by the reaping section 3 in the threshing section 4, sorts the grains in the sorting section 5, and stores them in the storage section 6. The combine harvester 1 also processes the straw waste after threshing in the straw waste processing section 7. The combine harvester 1 drives the traveling section 2, the reaping section 3, the threshing section 4, the sorting section 5, the storage section 6, and the straw waste processing section 7 using power supplied from the power section 8.
[0023] The traveling section 2 is equipped with a pair of left and right crawler-type traveling devices 11 provided below the machine frame 10. The crawler-type traveling devices 11 are connected to an engine 27 via a transmission (not shown) and rotated by the output generated by the engine 27. As the crawler-type traveling devices 11 are driven to rotate, the combine 1 travels in the forward / rearward direction and turns in the left / right direction.
[0024] The reaping unit 3 is provided in front of the traveling unit 2. The reaping unit 3 is provided so as to be movable between a lowered position at which the culms in the field can be reaped and an elevated position at which the culms cannot be reaped. The reaping unit 3 includes a divider 13, a lifting device 14, a cutting device 15, and a conveying device 16. The divider 13 guides the culms in the field to the lifting device 14. The lifting device 14 lifts the culms guided by the divider 13. The cutting device 15 cuts the culms lifted by the lifting device 14. The conveying device 16 conveys the culms cut by the cutting device 15 to the threshing unit 4.
[0025] The threshing unit 4 is provided behind the reaping unit 3. The threshing unit 4 includes a feed chain 18 and a threshing drum 19. The feed chain 18 transports the stew transported from the transport device 16 of the reaping unit 3 for threshing, and further transports the threshed stew, i.e., waste straw, to the straw waste processing unit 7. The threshing drum 19 threshes the stew transported by the feed chain 18.
[0026] The sorting section 5 is provided below the threshing section 4. The sorting section 5 is equipped with an oscillating sorting device 21, a wind sorting device 22, a grain conveying device (not shown), and a straw dust discharge device (not shown). The oscillating sorting device 21 sifts the threshed grains that have fallen from the threshing section 4 to separate them into grains, straw dust, etc. The wind sorting device 22 further separates the threshed grains sorted by the oscillating sorting device 21 into grains, straw dust, etc. by blowing air. The grain conveying device transports the grains sorted by the oscillating sorting device 21 and the wind sorting device 22 to the storage section 6. The straw dust discharge device discharges the straw dust, etc. sorted by the oscillating sorting device 21 and the wind sorting device 22 to the outside of the machine.
[0027] The storage section 6 is provided to the right of the threshing section 4. The storage section 6 includes a grain tank 24 and a discharge device 25. The grain tank 24 stores the grains transported from the sorting section 5. The discharge device 25 is composed of an auger or the like, and discharges the grains stored in the grain tank 24 to any desired location.
[0028] The straw waste processing section 7 is provided behind the threshing section 4. The straw waste processing section 7 is equipped with a straw waste conveying device (not shown) and a straw waste cutting device (not shown). The straw waste conveying device transports the straw transported from the feed chain 18 of the threshing section 4 to the straw waste cutting device. The straw waste cutting device cuts the straw transported by the straw waste conveying device and discharges it outside the machine.
[0029] The power unit 8 is provided above the front of the traveling unit 2. The power unit 8 includes an engine 27 that generates rotational power. The power unit 8 transmits the rotational power generated by the engine 27 to the traveling unit 2, the reaping unit 3, the threshing unit 4, the sorting unit 5, the storage unit 6, and the straw waste processing unit 7.
[0030] The control unit 9 is provided above the power unit 8. The control unit 9 includes a driver's seat 29, a touch panel 30 (see FIG. 3), and a plurality of operating tools (not shown). The driver's seat 29 is provided, for example, on the right side of the vehicle body and includes a chair on which an operator sits. The touch panel 30 is provided in a position where it can be operated by an operator seated in the driver's seat 29. The touch panel 30 is a display unit that displays images captured by various cameras (described later) and is also an input unit that operates various devices by touching the displayed images. The plurality of operating tools are operated by an operator seated in the driver's seat 29 and include a handle for steering the combine 1, an accelerator for adjusting the rotation speed of the engine 27 (the traveling speed of the vehicle body), a lift switch for lifting and lowering the reaping unit 3, and the like.
[0031] The combine harvester 1 includes a machine body camera 32 (see FIG. 3) and a positioning unit 34 (see FIG. 2). The machine body camera 32 photographs the field. The positioning unit 34 acquires measurement points 71 (position information) indicating the position of the vehicle body (combine harvester 1) using a satellite positioning system such as a GPS (Global Positioning System).
[0032] <Positioning section> As shown in Fig. 1 and Fig. 2, the positioning unit 34 includes a mobile communication device 35, a mobile GPS antenna 36, and a data receiving antenna 37. The mobile communication device 35 and other components are housed in a case and unitized. The mobile communication device 35 acquires position information of the vehicle body (more precisely, the mobile GPS antenna 36) by communicating with a GPS satellite via the mobile GPS antenna 36. The mobile communication device 35 acquires measurement points 71 from the satellite positioning system (GPS satellite) at a predetermined time interval. The mobile GPS antenna 36 is disposed, for example, on the front side of the upper part of the control unit 9.
[0033] <Base station> A base station 39 is installed on the ridges around the field where the combine harvester 1 is to work. The base station 39 includes a fixed communication device 40, a fixed GPS antenna 41, a data transmission antenna 42, and a fixed camera 43. The fixed communication device 40 acquires the position information of the base station 39 by communicating with a GPS satellite via the fixed GPS antenna 41. The fixed communication device 40 transmits correction information based on the position information of the base station 39 to the mobile communication device 35 via the data transmission antenna 42. The fixed camera 43 photographs the field. The fixed communication device 40 acquires an image (field image) photographed by the fixed camera 43, and transmits the field image to the mobile communication device 35 via the data transmission antenna 42. The mobile communication device 35 of the positioning unit 34 receives the correction information and the field image transmitted from the fixed communication device 40 of the base station 39 via the data reception antenna 37. The mobile communication device 35 corrects the position information of the vehicle body (combine 1) based on the correction information. Note that the base station 39 does not need to be installed, and the base station 39 does not need to correct the position information.
[0034] [Control device] Next, the control device 45 of the combine harvester 1 will be described with reference to Fig. 3. Fig. 3 is a block diagram showing the combine harvester 1.
[0035] The control device 45 includes an arithmetic processing unit 50, a storage unit 51, and a communication unit 52. The arithmetic processing unit 50, the storage unit 51, and the communication unit 52 are electrically connected to each other. In addition, the various components of the combine harvester 1 described above are electrically connected to the control device 45 via an interface. The control device 45 controls the various components of the combine harvester 1 in response to input operations from an operator via the operation unit 9.
[0036] The storage unit 51 is, for example, a Read Only Memory (ROM), a Random Access Memory (RAM), a hard disk drive, a flash memory, etc., and stores programs and data for controlling various components and various functions of the combine harvester 1. The calculation processing unit 50 controls various components and various functions of the combine harvester 1 by executing calculation processing based on the programs and data stored in the storage unit 51. Note that the control device 45 may be realized by a logic circuit (hardware) formed in an integrated circuit, etc., instead of a processor, etc. that executes programs, etc.
[0037] The communication unit 52 performs wireless communication with a mobile terminal 53 held by the worker. The mobile terminal 53 is, for example, a tablet terminal equipped with a touch panel, and is a terminal for remotely operating the combine harvester 1. The mobile terminal 53 is equipped with a mobile camera 54 that photographs the field. The communication unit 52 also performs wireless communication with an aerial photography device 56 such as a drone. The aerial photography device 56 is equipped with an aerial photography camera 57 that photographs the field. When the worker inputs an operation instruction to the aerial photography device 56 to the touch panel 30 or the mobile terminal 53, the aerial photography device 56 operates according to the operation instruction transmitted from the communication unit 52. Note that the aerial photography device 56 may perform wireless communication with the mobile terminal 53 instead of / in addition to the communication unit 52.
[0038] When the worker inputs an instruction to each of the cameras 32, 43, 57 to shoot images on the touch panel 30 or the mobile terminal 53 (hereinafter referred to as the touch panel 30, etc.), the control device 45 controls each of the cameras 32, 43, 57 to shoot images of the field. The control device 45 displays the field images shot by each of the cameras 32, 43, 57 on the touch panel 30, etc. When the worker inputs an instruction to display the field image shot by the mobile camera 54 on the touch panel 30, etc., the control device 45 controls the mobile terminal 53 via the communication unit 52 to display the field image on the touch panel 30, etc. The mobile terminal 53 and the aerial photography device 56 may be omitted, and the mobile terminal 53 and the aerial photography device 56 may not acquire field information.
[0039] The control device 45 acquires (stores in the memory unit 51) the position information (measurement points 71) of the combine harvester 1 from the mobile communication device 35 of the positioning unit 34. The control device 45 displays, for example, a field information setting screen on the touch panel 30 or the like, on which field information including the outline 70 of the field (shape of the outer edge of the field) can be set. In addition, the control device 45 displays, on the touch panel 30 or the like, a field map based on the field information and a travel route showing the traveling direction of the combine harvester 1 on the field map.
[0040] [Control device functions] Next, the function of the control device 45 will be described with reference to Fig. 3 to Fig. 5. Fig. 4 is a plan view showing a state in which an outline 70 of a farm field has been generated. Fig. 5 is a plan view showing a state in which a headland 72A and an automatic travelable area 73A have been set in the farm field.
[0041] 3, the control device 45 includes a field information setting unit 60, a travel route creation unit 62, and an automatic driving control unit 63. The field information setting unit 60, the travel route creation unit 62, and the automatic driving control unit 63 are provided as functions of the control device 45, and specifically, are realized by the calculation processing unit 50 executing calculation processing in accordance with the programs and data stored in the memory unit 51.
[0042] <Field information setting section> The field information setting unit 60 generates the outline 70 of the field and the unworked land 73 (area where no mowing work has been done) by circular mowing, in which the vehicle body (combine 1) repeats going straight and turning to perform mowing work. Note that the four arrows shown by dashed dotted lines in Figures 4 and 5 indicate the traveling direction (circling direction) of the combine 1, and each arrow indicates one mowing work (one straight process).
[0043] To generate the field outline 70, the operator manually drives the combine harvester 1 along the outer edge of the field (not shown). The combine harvester 1 repeatedly moves straight while changing direction, and cuts while going around the field (circumferential cutting), whereby the field information setting unit 60 generates the field outline 70 based on the position information (measurement points 71) acquired via the positioning unit 34.
[0044] After the field outline 70 is generated, the operator manually drives the combine harvester 1 to generate an unworked area 73. In the example shown in FIG. 4, the field outline 70 is roughly rectangular, so the combine harvester 1 alternates between moving straight ahead and changing direction (turning) at the corners of the field. After the first rotation (second rotation if the rotation to generate the field outline 70 is included) of the field is completed, a worked area 72 is formed in a roughly rectangular ring shape, and an unworked area 73 is formed within the area surrounded by the worked area 72 (inside the worked area 72). The field information setting unit 60 stores (causes storage) in the memory unit 51 the position information indicating the field outline 70 and the unworked area 73.
[0045] As shown in FIG. 5, the already worked land 72 becomes wider by repeatedly cutting the field in a spiral shape on the inside. When the field cutting is repeated a predetermined number of times, the already worked land 72 becomes a headland 72A for turning (changing direction) the combine harvester 1 during automatic operation. In the example shown in FIG. 5, the already worked land 72 formed when cutting the field twice (the third round if cutting for generating the field outline 70 is included) is set as the headland 72A. The unworked land 73 surrounded by the headland 72A is set as an automatically travelable area 73A for setting a travel path for automatic operation by the travel path creation unit 62 described later. The field information setting unit 60 stores position information indicating the headland 72A and the automatically travelable area 73A in the storage unit 51. In this specification, the expressions "first round" and "second round" do not include the cutting for generating the field outline 70. In addition, from the second lap onwards, the mowing of the field is carried out either manually or automatically.
[0046] The field information setting unit 60 may acquire field information such as the field outline 70 based on information manually input by an operator to a field information setting screen displayed on the touch panel 30 or the like. Alternatively, the field information setting unit 60 may acquire at least one field image captured by the various cameras 32, 43, 54, 57, and automatically acquire field information by performing image analysis on the at least one field image.
[0047] <Route Planning Division> The travel path creation unit 62 creates a straight path S that the combine harvester 1 references when automatically traveling straight (traveling straight along the headland) to form the headland 72A (perform peripheral mowing of the field for the second round) (see FIG. 5 ) and stores the created path in the memory unit 51. The travel path creation unit 62 creates the straight path S so as to follow the outer periphery of the unworked land 73 inside the unworked land 73 formed after peripheral mowing of the field for the first round, based on the outline 70 of the field and the position information of the unworked land 73. The travel path creation unit 62 forms the straight path S so as to be adjacent to the already worked land 72, so that no uncut areas are left between the already worked land 72 and the combine harvester 1 when the combine harvester 1 performs mowing work while automatically traveling straight.
[0048] In addition, the travel path creation unit 62 generates a travel path (not shown) to be referred to when the combine harvester 1 performs automatic operation (automatic travel and automatic reaping) in the automatically travelable area 73A set inside the headland 72A, and stores the travel path in the storage unit 51. The travel path creation unit 62 may set a path for reaping while traveling in a straight line, and set a travel path by combining a plurality of straight lines for the automatically travelable area 73A. The travel path creation unit 62 may generate a travel path so that reaping proceeds from the periphery toward the center of the automatically travelable area 73A. The travel path creation unit 62 may generate a travel path so that the automatically travelable area 73A is located on the left side of the vehicle body. In addition, the travel path creation unit 62 may select a travel path with good work efficiency from a plurality of provisionally generated travel paths when creating or correcting a travel path. Here, the work efficiency is determined in consideration of not only travel accompanied by reaping, but also free running distance, turning, and the like.
[0049] The travel path creation unit 62 may set a travel path based on information manually input by an operator using the touch panel 30 or the like, or may automatically set a travel path based on the field information set by the field information setting unit 60. The travel path creation unit 62 sets a travel path for a predetermined travel pattern such as reciprocating mowing travel or circular mowing travel. The travel path includes a free travel path for moving from one straight line path to another straight line path in addition to a straight line path for mowing the stalks, and the travel path creation unit 62 may generate a travel path so as to shorten the free travel path (free travel distance).
[0050] The straight path S and the travel path include travel settings related to travel and work settings related to work such as mowing. The travel settings include the travel position in the field as well as the travel speed and direction of travel (steering direction, forward, reverse) at each travel position. The work settings include information on whether mowing is started or stopped at each travel position, the mowing speed and mowing height, and other work.
[0051] <Automatic driving control unit> The automatic operation control unit 63 controls the power unit 8, the traveling unit 2, and the reaping unit 3 based on the traveling settings and work settings generated by the traveling path creation unit 62, and automatically performs reaping work (automatic operation) while automatically traveling along the straight path S and the traveling path. The automatic operation control unit 63 also controls the threshing unit 4, the sorting unit 5, the storage unit 6, and the straw waste processing unit 7 to automatically perform threshing of the stalks after reaping, sorting of the grains and straw chips after threshing, storage of the grains after sorting, processing of the straw waste after threshing, etc. The combine harvester 1 is equipped with a gyro sensor and a direction sensor (geomagnetic sensor) (both not shown). The automatic operation control unit 63 may obtain displacement information and direction information from these sensors, and adjust the automatic operation of the combine harvester 1 based on the position information, displacement information, and direction information using a satellite positioning system.
[0052] [Field information setting section configuration] Next, the configuration of the field information setting unit 60 will be described with reference to Figures 3 to 8. Figure 6 is a plan view showing a state in which one reaping operation has been performed in the field. Figure 7 is a plan view showing a state in which two reaping operations have been performed in the field. Figure 8 is a plan view showing a state in which a second reaping operation has started in the field.
[0053] Incidentally, the outline 70 of the field and the row direction of the culms are preset, and the headland 72A and the automatically travelable area 73A (travel route) are calculated based on the preset outline 70 of the field. If the actual row direction of the culms is inclined with respect to the preset row direction, the combine harvester 1 performs the harvesting work along the actual row direction of the culms, and the actually formed headland 72A and the automatically travelable area 73A do not match the calculated headland 72A and the automatically travelable area 73A. Therefore, when automatic operation is performed in the automatically travelable area 73A calculated from the preset outline 70 of the field, there is a risk of leaving some of the culms uncut. Therefore, the combine harvester 1 according to this embodiment has a function of generating the unworked area 73 (automatically travelable area 73A) based on information when the vehicle body is actually driven straight.
[0054] 3, the field information setting unit 60 includes a straight line generating unit 65 and an unworked area generating unit 66. The straight line generating unit 65 and the unworked area generating unit 66 are realized by the calculation processing unit 50 executing calculation processing in accordance with the programs stored in the memory unit 51.
[0055] <Line generation section> The straight line generating unit 65 determines that the reaping unit 3 has been lowered from the raised position to the lowered position as the start of one reaping operation (one straight process), and stores the position in the memory unit 51 as the work start position P1. The straight line generating unit 65 also determines that the reaping unit 3 has been raised from the lowered position to the raised position as the end of one reaping operation, and stores the position in the memory unit 51 as the work end position P2. Alternatively, the straight line generating unit 65 may determine that automatic driving along the straight path S has started and ended as the start and end of one reaping operation, and store these positions in the memory unit 51 as the work start position and work end position P1, P2. Alternatively, the straight line generating unit 65 may store the positions at which the operator inputs the start and end of the reaping operation from the touch panel 30 or the like as the work start position and work end position P1, P2 in the memory unit 51. Here, the positioning unit 34 acquires measurement points 71 successively (at predetermined time intervals) from the work start position P1 to the work end position P2 in one harvesting operation.
[0056] As shown in FIG. 6, the straight line generating unit 65 generates a work straight line 75 based on the measurement points 71 acquired between the work start position P1 and the work end position P2 in one harvesting operation performed manually or automatically. That is, the straight line generating unit 65 generates the work straight line 75 for each straight movement process. Specifically, the straight line generating unit 65 calculates the work straight line 75 by linearly approximating the travel trajectory consisting of the acquired multiple measurement points 71. The work straight line 75 is formed on the boundary between the already worked land 72 (headland 72A) and the unworked land 73 (autonomously travelable area 73A) (see FIG. 4 and FIG. 5). Since the travel trajectory (multiple measurement points 71) is the travel trajectory of the mobile GPS antenna 36, the straight line generating unit 65 calculates the work straight line 75 while reflecting the deviation between the mobile GPS antenna 36 and the left end of the divider 13 in the calculation result. The work straight line 75 is composed of position information (coordinate data) of two points (start point and end point). The straight line generating unit 65 stores position information (coordinate data) of the work straight line 75 in the memory unit 51. Note that, taking into account calculation errors, the work straight line 75 is calculated so as to be extended beyond the distance determined from the actual position information between the two points, and the memory unit 51 stores position information indicating the work straight line 75 extended beyond the actual distance.
[0057] As a specific example of a method for generating (calculating) the work line 75, the line generating unit 65 may set a line passing through more measurement points 71 as the work line 75, or may set a line approximated using the least squares method as the work line 75. In addition, the line generating unit 65 may set a line connecting the work start position P1 and the work end position P2 as the work line 75, or may set a line connecting multiple measurement points 71 selected manually or automatically as the work line 75. In addition, in the work line 75 other than the work line 75 connecting the work start position P1 and the work end position P2, the start point and end point of the work line 75 may not coincide with the work start position and the work end position P1, P2.
[0058] <Unworked land generation part> As shown in FIG. 7, each time the straight line generating unit 65 generates a work straight line 75, the unworked land generating unit 66 calculates an intersection 76 between the work straight lines 75 that intersect with each other. The unworked land generating unit 66 also stores the position information (coordinate data) of the intersection 76 and the order in which the intersection 76 was calculated in the memory unit 51. In the example shown in FIG. 7, the combine 1 moves straight from the lower right corner to the upper right corner of the field, changes direction (turns) at the upper right corner of the field, and then moves straight from the upper right corner to the upper left corner of the field. When the straight line generating unit 65 generates the work straight line 75 for each straight line movement, the first intersection 76 is set at the upper right corner of the field. After that, as shown in FIG. 4, the combine 1 alternately turns and moves straight around the field to make one revolution in a counterclockwise direction, thereby generating the work straight lines 75 in sequence, and the intersection 76 is set at the intersection of the work straight lines 75. In other words, when the first round of circular mowing of the field is completed, four intersection points 76 are set in counterclockwise order from the upper right corner of the field.
[0059] 4, when four work lines 75 intersect to form a closed area, the unworked area generating unit 66 generates an unworked area 73 that forms a quadrangle with four intersections 76 as vertices. In other words, the unworked area 73 is generated within the range connecting the four intersections 76 in the calculation order.
[0060] In detail, the unworked area generating unit 66 judges whether or not a closed area is formed by at least three work straight lines 75. If the number of work straight lines 75 generated is less than three, or if the work straight lines 75 do not form a closed area, the unworked area generating unit 66 waits for the generation of the next work straight line 75. On the other hand, if three or more work straight lines 75 form a closed area, the unworked area generating unit 66 sets the last calculated intersection point 76 as the starting point 76A. The unworked area generating unit 66 generates a first polygon 77 when it finds at least three intersection points 76 including the starting point 76A as a result of searching for intersection points 76 clockwise from the starting point 76A, and generates a second polygon 78 when it finds at least three intersection points 76 including the starting point 76A as a result of searching for intersection points 76 counterclockwise from the starting point 76A. Then, when only one of the first polygon 77 and the second polygon 78 is generated, the unworked area generating unit 66 sets the one of the first polygon 77 and the second polygon 78 that was generated as the unworked area 73. On the other hand, when both the first polygon 77 and the second polygon 78 are generated, the unworked area generating unit 66 sets the one of the first polygon 77 and the second polygon 78 that has the larger area as the unworked area 73.
[0061] The unworked area generating unit 66 stores the set unworked area 73 (intersections 76) in the memory unit 51, and deletes the intersections 76 that do not constitute the unworked area 73 from the memory unit 51. As already explained, when the second rotation of the field is completed, the unworked area generating unit 66 sets the already worked area 72 as the headland 72A, and sets the unworked area 73 having the three or more intersections 76 that have not been deleted as vertices as an automatically travelable area 73A, and stores these in the memory unit 51. The outline 70 of the field, the already worked area 72 (headland 72A), the unworked area 73 (automatically travelable area 73A), the work straight line 75, the intersections 76, etc. are displayed on the touch panel 30, etc. as part of the field information.
[0062] For example, as shown in FIG. 4, when the first round of circular mowing of the field is completed, the last calculated intersection 76 (start point 76A) is the intersection 76 in the lower right corner of the field. In this case, even if the intersection 76 is searched for clockwise from the start point 76A, the intersection 76 is not found, and the first polygon 77 is not generated. On the other hand, when the intersection 76 is searched for counterclockwise from the start point 76A, four intersections 76 including the start point 76A are found, and a second polygon 78 with the four intersections 76 as vertices is generated, and this is set as the unworked area 73. Note that when the first round of circular mowing of the field is completed, the search for the intersection 76 described above may be omitted, and a closed area consisting of the four work straight lines 75 may be set as the unworked area 73. In other words, the unworked area 73 may be calculated simply by reading out the four intersections 76 stored in the memory unit 51.
[0063] Furthermore, for example, as shown in Fig. 8, when circular mowing of the second round of the field is started and a new work straight line 75 is generated, this new work straight line 75 intersects with the second generated work straight line 75 and the fourth generated work straight line 75, and two new intersection points 76 are calculated in the lower right and upper right of the field. In this case, intersection point 76 in the upper right corner of the field becomes start point 76A, and when intersection point 76 is searched for clockwise from start point 76A, four intersection points 76 including start point 76A are found (see the four white circles shown in Fig. 8), and when intersection points 76 are searched counterclockwise from start point 76A, four intersection points 76 including start point 76A are found (see the two white circles and two black circles shown in Fig. 8). For this reason, the unworked area generating unit 66 generates a first polygon 77 and a second polygon 78, calculates and compares the areas of the first polygon 77 and the second polygon 78, and sets the second polygon 78, which has the larger area, as the unworked area 73. Note that the two intersections 76 (two black circles shown in Figure 8) at the lower right corner and upper right corner of the field that no longer constitute the unworked area 73 are deleted.
[0064] 5, when the second rotation of the field is completed, headland 72A is formed and unworked land 73 having four intersections 76 remaining at that point as vertices is set as an automatic travelable area 73A. Note that the work straight line 75 for the first rotation of the field and the work straight line 75 for the second rotation of the field adjacent to the first rotation on the inside are formed approximately parallel to each other.
[0065] [Unworked land calculation method] Next, an unworked area calculation method for generating unworked area 73 (automatic travelable area 73A) by peripheral mowing of a farm field will be described with reference to Figures 4 to 9. Figure 9 is a flow chart showing the unworked area calculation method.
[0066] For example, an operator sits in the driver's seat 29 of the combine harvester 1 and mows the field counterclockwise (see Figs. 4 and 5). As already explained, the first round of mowing of the field is performed by the operator manually driving the combine harvester, and the second round of mowing of the field is performed by the operator manually driving the combine harvester or automatically driving the combine harvester. The positioning unit 34 acquires position information (measurement points 71) of the vehicle body (combine harvester 1) from a satellite positioning system at a predetermined time interval.
[0067] As shown in FIG. 9, the unworked area calculation method includes a straight line generation step S1 and an unworked area generation step S2.
[0068] <Straight line generation process> In the line generating step S1, the line generating unit 65 generates a work line 75 based on the measurement points 71 acquired between the work start position P1 and the work end position P2 of one process (see FIG. 6).
[0069] <Unworked land generation process> As shown in FIG. 9, the unworked area generating step S2 includes an intersection determining step S21, an intersection point calculating step S22, a closed area determining step S23, and a generation executing step S24.
[0070] (Intersection determination process, intersection calculation process) In the intersection determination process S21, each time a work line 75 is generated, the unworked area generation unit 66 determines whether or not there are any intersecting work lines 75. If intersecting work lines 75 exist (YES in the intersection determination process S21), the unworked area generation unit 66 calculates the intersection 76 between the work lines 75 in the intersection calculation process S22. On the other hand, if there are no intersecting work lines 75 (NO in the intersection determination process S21), the process returns to the line generation process S1, and the unworked area generation unit 66 waits for the generation of the next work line 75.
[0071] (Closed region determination process, generation execution process) After the intersections 76 are calculated, in the closed area determination step S23, the unworked area generation unit 66 determines whether or not at least three work lines 75 intersect to form a closed area. If a closed area (see Figures 4 and 5) is formed (YES in the closed area determination step S23), the unworked area generation unit 66 generates an unworked area 73 that forms a polygon with at least three intersections 76 as vertices. On the other hand, if a closed area is not formed (NO in the closed area determination step S23), the process returns to the line generation step S1, and the unworked area generation unit 66 waits for the generation of the next work line 75.
[0072] (Details of the generation execution process) As shown in FIG. 9, the generation execution step S24 includes a search step S31, a polygon generation step S32, a generation determination step S33, a setting step S34, and a comparison setting step S35.
[0073] (Search process) In the search step S31, the unworked area generating unit 66 sets the last calculated intersection 76 as the starting point 76A, and searches for intersections 76 clockwise from the starting point 76A and also searches for intersections 76 counterclockwise from the starting point 76A.
[0074] (Polygon generation process) In the polygon generation step S32, if the result of the clockwise search is that at least three intersections 76 including the starting point 76A are found, the unworked area generation unit 66 generates a first polygon 77 (see FIG. 8). Also, in the polygon generation step S32, if the result of the counterclockwise search is that at least three intersections 76 including the starting point 76A are found, the unworked area generation unit 66 generates a second polygon 78 (see FIG. 8). Note that in the polygon generation step S32, if the result of the clockwise or counterclockwise search is that at least three intersections 76 are not found, the unworked area generation unit 66 does not generate the first polygon 77 or the second polygon 78.
[0075] (Generation judgment process, setting process, comparison setting process) In the generation determination step S33, the unworked area generating unit 66 determines whether or not both the first polygon 77 and the second polygon 78 have been generated. If only one of the first polygon 77 and the second polygon 78 has been generated (NO in the generation determination step S33), in the setting step S34, the unworked area generating unit 66 sets the one of the first polygon 77 and the second polygon 78 that has been generated as the unworked area 73. On the other hand, if both the first polygon 77 and the second polygon 78 have been generated (YES in the generation determination step S33), in the comparison setting step S35, the areas of the first polygon 77 and the second polygon 78 are calculated, and the one of the first polygon 77 and the second polygon 78 that has the larger area is set as the unworked area 73.
[0076] (Route planning process, automatic driving control process) When automatic straight driving is performed during the second rotation of the field, the unworked area calculation method includes a travel route creation step S4 and an automatic driving control step S5. The travel route creation step S4 and the automatic driving control step S5 are executed prior to the straight line generation step S1. Note that, since the second rotation of the field may be performed manually, the travel route creation step S4 and the automatic driving control step S5 are indicated by dashed lines in FIG. 9.
[0077] In the travel path creation step S4, the travel path creation unit 62 generates a straight path S inside the unworked land 73 so as to follow at least one side of the unworked land 73 (or the outline 70 of the field) (see FIG. 5). In the travel path creation step, the straight path S is generated so as to be approximately parallel to the work straight line 75. In the automatic driving control step, the automatic driving control unit 63 automatically performs the mowing work along the straight path S. The work straight line 75 is generated by automatically performing the mowing work along the straight path S. Note that the travel path creation step S4 may generate the straight path S based on the work start position and work end position P1, P2 input by the operator from the touch panel 30 or the like. In addition, even in the first round of circular mowing, when automatic straight travel (straight travel on the headland) is performed along the outline 70 (outer edge) of the field, as described above, the travel path creation step S4 and the automatic driving control step S5 may be executed prior to the straight line generation step S1.
[0078] As a result, an unworked area 73 (an area where automatic driving is possible 73A) is generated by the circular mowing of the field (see FIG. 5). After that, the travel route creation unit 62 generates a travel route that is referenced for automatic driving inside the area where automatic driving is possible 73A. Before generating the travel route, the travel route creation unit 62 determines whether the travel route can be generated in the unworked area 73, and if the travel route can be generated, enables the function of a button displayed on a touch panel or the like. When the operator touches a button displayed on a touch panel or the like, the combine harvester 1 switches to automatic driving mode. The travel route creation unit 62 also sets a travel route by combining a plurality of straight routes that are approximately parallel to the straight route S and the work straight line 75. Also, information (area where route generation is possible) indicating how far the travel route needs to be mowed beforehand to be generated is stored in the memory unit 51, and the area where route generation is possible is displayed on the touch panel or the like. The operator can check the area where route generation is possible displayed on the touch panel or the like. It is also possible to notify the operator of the extent to which the grass needs to be mowed in order to make it possible to generate the driving route.
[0079] According to the combine harvester 1 (method of calculating an unworked area) of the present embodiment described above, a work line 75 can be generated each time one reaping operation is completed, and an unworked area 73 can be generated with an intersection 76 between the work lines 75 as a vertex. This makes it easier to determine the unworked area 73 than, for example, determining the unworked area 73 by setting a large number of points (positions) after one rotation of the field and connecting these positions with lines. In addition, according to the combine harvester 1 (method of calculating an unworked area) of the present embodiment, the headland 72A and the automatically travelable area 73A can be set by performing the reaping operation along the actual row direction of the stalk. As a result, a travel route according to the actual row direction is set in the automatically travelable area 73A, so that automatic operation with minimal uncut areas can be realized.
[0080] Furthermore, according to the combine harvester 1 (method of calculating unworked land) of this embodiment, the latest unworked land 73 can be calculated using the last calculated intersection 76 as a reference (start point 76A). This allows the unworked land 73, which shrinks as the harvesting work continues, to be updated to the latest unworked land 73 at all times.
[0081] Furthermore, with the combine harvester 1 (method of calculating unworked land) according to this embodiment, the harvester can perform the cutting work while moving automatically in a straight line (moving in a straight line around the headland) for the peripheral cutting of the second round of the field, and the work straight line 75 can be obtained for each automatically performed cutting work. This makes it possible to easily determine the unworked land 73. Furthermore, since the work straight line 75 can be obtained based on a plurality of measurement points 71 that are continuously acquired from the start to the end of the cutting work, the work straight line 75 with little deviation from the actual straight line movement of the combine harvester 1 can be obtained.
[0082] [First Modification] Next, the combine harvester 1 (unworked land calculation method) according to the first modified example of this embodiment will be described with reference to Fig. 10. Fig. 10 is a plan view showing a state in which one harvesting operation has been performed in a farm field. In the following description, the same or corresponding components as those of the combine harvester 1 (unworked land calculation method) already described will be given the same reference numerals, and the description thereof will be omitted.
[0083] The stalks may not be planted straight along the row direction at the outer edge of the unworked land 73. In other words, the outer edge of the unworked land 73 may be uneven. In such a case, the combine harvester 1 performs the harvesting operation while meandering so that the outer edge of the unworked land 73 follows the unevenness. When the work line 75 is generated by linearly approximating the multiple measurement points 71 acquired during the harvesting operation, the work line 75 may overlap with a part of the unworked land 73. In other words, an area that has not actually been harvested may be set as the already-worked land 72, and the unharvested stalks may remain in the already-worked land 72. Therefore, the combine harvester 1 (the method for calculating the unworked land) according to the first modified example has a function of preventing the already-worked land 72 from being left unharvested.
[0084] In the combine harvester 1 according to the first modified example (straight line generating step S1), the straight line generating unit 65 generates a reference straight line 80 based on a plurality of measurement points 71 acquired continuously from the work start position P1 to the work end position P2 in one harvesting operation. The calculation method of the reference straight line 80 is the same as the calculation method of the work straight line 75. Next, in the straight line generating step S1, the straight line generating unit 65 determines the measurement point 71 that is the furthest from the unworked land 73 across the reference straight line 80. In other words, the measurement point 71 located the outermost from the unworked land 73 is identified. Next, in the straight line generating step S1, the straight line generating unit 65 sets a work straight line 75 that passes through the identified measurement point 71 and is along (approximately parallel to) the reference straight line 80.
[0085] In the combine harvester 1 (unworked land calculation method) according to the first modified example of this embodiment described above, the work straight line 75 is set to pass through the measurement point 71 that is the farthest from the unworked land 73. With this configuration, the worked land 72 is reliably formed outside the unworked land 73, preventing an area that has not actually been cut from being set as the worked land 72. This prevents the actual unworked land 73 from extending into the worked land 72, preventing any stalks from being left uncut. In addition, based on the multiple measurement points 71 that are continuously acquired during the harvesting operation, a reference straight line 80 with little deviation along the actual movement of the combine harvester 1 can be obtained.
[0086] In the combine harvester 1 (unworked land calculation method) according to the first modified example of this embodiment, the work line 75 is set approximately parallel to the reference line 80. In this specification, however, the work line 75 being set along the reference line 80 is not limited to the work line 75 being parallel to the reference line 80, but is a concept that allows some inclination. For example, the line generating unit 65 may set the work line 75 passing through the specified measurement point 71 and inclined with respect to the reference line 80 (not shown) so long as no uncut grass is left behind. Also, for example, in the line generating step S1, the line generating unit 65 may move the reference line 80 so that it passes through the specified measurement point 71 (to be precise, calculate the coordinates when the reference line 80 is moved), and set the reference line 80 as the work line 75.
[0087] [Second modified example] Next, a combine harvester 1 (unworked area calculation method) according to a second modified example of this embodiment will be described with reference to Fig. 11. Fig. 11 is a plan view showing a state in which the combine harvester 1 resumes harvesting work after interrupting it. In the following description, the same or corresponding components as those in the combine harvester 1 (unworked area calculation method) already described will be given the same reference numerals, and the description thereof will be omitted.
[0088] For example, if a stalk becomes clogged in the reaping section 3 or the threshing section 4, one reaping operation (one straight line process) may be interrupted and resumed after the clog is cleared. In this case, the direction of travel of the resumed reaping operation may be slightly tilted from the direction of travel of the reaping operation before it was interrupted. Therefore, the combine harvester 1 according to the second modified example (method of calculating untouched area) has a function for generating an appropriate work straight line 75 even if one reaping operation is stopped midway.
[0089] In the combine 1 (straight line generation process S1) of the second modified example, when a harvesting operation is interrupted and then resumed, the straight line generation unit 65 generates a first work straight line 81 based on measurement points 71 (not shown in Figure 11) acquired between the work start position P1 and the work interruption position P3, and generates a second work straight line 82 based on measurement points 71 (not shown in Figure 11) acquired between the work interruption position P3 and the work end position P2.
[0090] Also, in the straight line generating step S1, if the inclination angle θ of the second work straight line 82 relative to the first work straight line 81 is within a predetermined range, the straight line generating unit 65 generates a straight line connecting the work start position P1 and the work end position P2 as the work straight line 75 (see the thick dashed line in FIG. 11). On the other hand, in the straight line generating step S1, if the inclination angle θ of the second work straight line 82 relative to the first work straight line 81 exceeds the predetermined range, the straight line generating unit 65 sets the section from the work start position P1 to the work interruption position P3 and the section from the work interruption position P3 to the work end position P2 as different mowing operations, and sets the first work straight line 81 and the second work straight line 82 as different work straight lines 75. The predetermined range of the inclination angle θ of the second work straight line 82 relative to the first work straight line 81 is set to a range of 1 to 10 degrees. The predetermined range of the inclination angle θ may be freely set depending on the size and shape of the field, the experience of the worker, etc., and the worker may freely input a value via the touch panel 30 or the like.
[0091] According to the combine harvester 1 (unworked area calculation method) of the second modified example of this embodiment described above, even if one harvesting operation is stopped midway, it can be treated as one work line 75 if the inclination angle θ of the second work line 82 relative to the first work line 81 is within a predetermined range. This makes it possible to easily determine the unworked area 73 with a small amount of calculation. Note that the features of the combine harvester 1 (unworked area calculation method) of the second modified example may be applied to the combine harvester 1 (unworked area calculation method) of the first modified example.
[0092] In the combine harvester 1 (method of calculating unworked area) according to the present embodiment (including the first and second modified examples; the same applies below) described above, the headland 72A and the automatically travelable area 73A are formed by making two rotations of the field, but the present invention is not limited to this. The headland 72A and the automatically travelable area 73A may be formed by making one rotation or three or more rotations of the field.
[0093] Furthermore, in the combine harvester 1 (unworked land calculation method) according to this embodiment, the travel path creation unit 62 generates four straight paths S to follow the outer periphery (four sides) of the unworked land 73, but the present invention is not limited to this. The travel path creation unit 62 may generate a straight path S inside the unworked land 73 to follow at least one side of the unworked land 73. In a route (area) where no straight path S has been generated, the operator may manually move the combine harvester 1 straight.
[0094] In the combine harvester 1 according to the present embodiment (method of calculating unworked land), a travel path is generated in the automatically travelable area 73A formed by making two rounds of the field. The automatically travelable area 73A and the travel path are generated by calculating a range in which the combine harvester 1 will not collide with obstacles in the field (for example, an entrance to the field, a water valve, a drainage outlet, or a culvert exhaust outlet) during automatic operation. However, if an operator cuts a part of the automatically travelable area 73A by manual driving after the travel path is generated in the automatically travelable area 73A, the travel path may be changed to one in which the rotating combine harvester 1 will collide with an obstacle. In this case, the control device 45 may display on the touch panel 30 or the like that there is a possibility of contact with an obstacle, and may execute a warning or a call for attention to the operator. Alternatively, the farm field information setting unit 60 may reduce (change the shape of) the automatically travelable area 73A to a range where the turning combine harvester 1 does not collide with an obstacle, and the travel path creation unit 62 may generate a travel path in the reduced automatically travelable area 73A. Note that, in areas where there is a possibility of colliding with an obstacle, it is preferable for the operator to manually travel the combine harvester 1.
[0095] Furthermore, in the combine harvester 1 (unworked land calculation method) according to this embodiment, in order to mow a rectangular field, four work straight lines 75 form a rectangular closed area, and an unworked land 73 is formed that forms a rectangle with four intersections 76 as vertices, but the present invention is not limited to this. When at least three work straight lines 75 intersect to form a closed area, the unworked land generating unit 66 only needs to generate an unworked land 73 that forms a polygon with at least three intersections 76 as vertices.
[0096] In the combine harvester 1 according to this embodiment, the display unit that displays information and the input unit that accepts manual operations are the touch panel 30 and the touch panel of the mobile terminal 53 (tablet terminal), but the present invention is not limited to this. For example, the operation unit 9 may be provided with a laptop computer instead of the touch panel 30 (not shown). Similarly, for example, the mobile terminal 53 may be a laptop computer (not shown). In these cases, the liquid crystal display is an example of the display unit, and the keyboard and mouse are examples of the input unit.
[0097] In addition, in the combine harvester 1 according to this embodiment, the touch panel 30 is provided separately from the portable terminal 53. However, this is not limited to the above, and the touch panel 30 may be provided detachably and used as the portable terminal 53.
[0098] In the combine harvester 1 according to the present embodiment, the touch panel 30 and the like serve both as a display unit for displaying information and as an input unit for inputting manual operations, but the present invention is not limited to this. For example, a display unit such as a liquid crystal display and an input unit such as a keyboard, mouse, buttons, and switches may be provided separately (not shown).
[0099] The above embodiment shows one aspect of the combine harvester and the unworked land calculation method according to the present invention, and the technical scope of the present invention is not limited to the above embodiment. The technical scope of the present invention is not limited to the above embodiment. The present invention may be modified, substituted, or altered in various ways without departing from the spirit of the technical idea, and the claims include all embodiments that may be included within the scope of the technical idea. [Explanation of symbols]
[0100] 1. Combine Harvester 34 Positioning unit 62 Driving route creation section 63 Automatic driving control unit 65 Straight line generator 66 Unworked land generation part 71 Measurement points 73 Unworked Area 75 Working Line 76 intersection 77 First Polygon 78 Second Polygon 80 Reference Line 81 First working line 82 Second Working Line P1 Work start position P2 Work end position θ Tilt angle S1 Straight line generation process S2 Unworked land generation process S4 Route creation process S5 Automatic driving control process
Claims
1. A combine harvester that generates unworked land in a field by circular mowing, in which the vehicle body repeats straight and turning movements to perform a mowing operation, a positioning unit for acquiring measurement points indicating the position of the vehicle body; a straight line generating unit that generates a work straight line based on the measurement points acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating unit that calculates the intersection points of the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generates the unworked area forming a polygon having at least three of the intersection points as vertices; The unworked area generation unit includes: The last calculated intersection point is set as the starting point; generating a first polygon when at least three intersection points including the starting point are found as a result of searching for the intersection points clockwise from the starting point; generating a second polygon when at least three intersections including the starting point are found as a result of searching for the intersections counterclockwise from the starting point; When only one of the first polygon and the second polygon is generated, the generated one of the first polygon and the second polygon is set as the unworked area; A combine harvester characterized in that, when both the first polygon and the second polygon are generated, the one having the larger area of the first polygon or the second polygon is set as the unworked area.
2. A combine harvester that generates unworked land in a field by circular mowing, in which the vehicle body repeats straight-line movement and turning to perform mowing work, a positioning unit for acquiring measurement points indicating the position of the vehicle body; a straight line generating unit that generates a work straight line based on the measurement points acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating unit that calculates the intersection points of the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generates the unworked area forming a polygon having at least three of the intersection points as vertices; The positioning unit continuously acquires the measurement points from the work start position to the work end position in one of the reaping operations, The straight line generation unit generates a reference straight line based on the acquired multiple measurement points, and sets the work straight line so that it passes through the measurement point farthest from the unworked area on either side of the reference straight line and follows the reference straight line.
3. A combine harvester that generates unworked land in a field by circular mowing, in which the vehicle body repeats straight-line movement and turning to perform mowing work, a positioning unit for acquiring measurement points indicating the position of the vehicle body; a straight line generating unit that generates a work straight line based on the measurement points acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating unit that calculates the intersection points of the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generates the unworked area forming a polygon having at least three of the intersection points as vertices; When one of the reaping operations is interrupted and then resumed, the straight line generation unit generates a first work straight line based on the measurement points acquired between the work start position and the work interruption position, and generates a second work straight line based on the measurement points acquired between the work interruption position and the work end position, The straight line generating unit When an inclination angle of the second work straight line with respect to the first work straight line is within a predetermined range, a straight line connecting the work start position and the work end position is generated as the work straight line; A combine harvester characterized in that, when the inclination angle of the second work straight line relative to the first work straight line exceeds a predetermined range, the section from the work start position to the work interruption position and the section from the work interruption position to the work end position are set as different cutting operations, and the first work straight line and the second work straight line are set as different work straight lines.
4. A combine harvester that generates unworked land in a field by circular mowing, in which the vehicle body repeats straight-line movement and turning to perform mowing work, a positioning unit for acquiring measurement points indicating the position of the vehicle body; a straight line generating unit that generates a work straight line based on the measurement points acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating unit that calculates the intersection points between the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generates the unworked area forming a polygon having at least three of the intersection points as vertices; A travel route creation unit that creates a straight route to the unworked area; and an automatic driving control unit that automatically performs the mowing work along the straight path, A combine harvester characterized in that the work straight line is generated by automatically performing the harvesting work along the straight path.
5. An unworked area calculation method for generating unworked areas of a field by circular mowing, in which a vehicle body performs mowing work while repeatedly moving straight and turning, comprising: a line generating step of generating a work line based on measurement points indicating the positions of the vehicle body acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating process for calculating the intersection points of the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generating the unworked area forming a polygon having at least three of the intersection points as vertices; In the unworked area generation process, The last calculated intersection point is set as the starting point; generating a first polygon when at least three intersection points including the starting point are found as a result of searching for the intersection points clockwise from the starting point; generating a second polygon when at least three intersections including the starting point are found as a result of searching for the intersections counterclockwise from the starting point; When only one of the first polygon and the second polygon is generated, the generated one of the first polygon and the second polygon is set as the unworked area; An unworked area calculation method characterized in that, when both the first polygon and the second polygon are generated, the one having the larger area of the first polygon or the second polygon is set as the unworked area.
6. An unworked area calculation method for generating unworked areas of a field by circular mowing, in which a vehicle body performs mowing work while repeatedly moving straight and turning, comprising: a line generating step of generating a work line based on measurement points indicating the positions of the vehicle body acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating process for calculating the intersection points of the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generating the unworked area forming a polygon having at least three of the intersection points as vertices; This unworked area calculation method is characterized in that in the straight line generation process, a reference straight line is generated based on a plurality of measurement points acquired continuously from the work start position to the work end position during one mowing operation, and the work line is set so that it passes through the measurement point farthest from the unworked area on either side of the reference straight line and follows the reference straight line.
7. An unworked area calculation method for generating unworked areas of a field by circular mowing, in which a mowing operation is performed while a vehicle body repeatedly moves straight and turns, comprising: a line generating step of generating a work line based on measurement points indicating the positions of the vehicle body acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating process for calculating the intersection points of the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generating the unworked area forming a polygon having at least three of the intersection points as vertices; When one of the reaping operations is interrupted and then resumed, in the line generation step, a first work line is generated based on the measurement points acquired between the work start position and the work interruption position, and a second work line is generated based on the measurement points acquired between the work interruption position and the work end position, In the straight line generating step, When an inclination angle of the second work straight line with respect to the first work straight line is within a predetermined range, a straight line connecting the work start position and the work end position is generated as the work straight line; An unworked area calculation method characterized in that, when the inclination angle of the second work line relative to the first work line exceeds a predetermined range, the section from the work start position to the work interruption position and the section from the work interruption position to the work end position are set as different mowing works, and the first work line and the second work line are set as different work lines.
8. An unworked area calculation method for generating unworked areas of a field by circular mowing, in which a mowing operation is performed while a vehicle body repeats straight-line movement and turning, comprising: a line generating step of generating a work line based on measurement points indicating the positions of the vehicle body acquired between a work start position and a work end position in one of the harvesting operations; an unworked area generating process for calculating the intersections of the work lines each time the work lines are generated, and when at least three of the work lines intersect to form a closed area, generating the unworked area forming a polygon having at least three of the intersections as vertices; A travel route creation process for generating a straight route to the unworked area; and an automatic driving control step of automatically performing the reaping work along the straight path, An unworked area calculation method, characterized in that the work straight line is generated by automatically performing the mowing work along the straight route.
Citation Information
Patent Citations
DPF regeneration control device of working vehicle, and combine harvester including the same
JP2013096291A
Area determination system
JP2019106927A
Outer shape calculation system and outer shape calculation method
JP2020022375A
Automatic travel control system
JP2020022429A
Controller for automatic travel service car
JP2020087340A