Operation planning apparatus and method for battery system including newly installed battery
The operation plan establishment device optimizes battery system operations by balancing new and old batteries' discharge times, reducing the overall number of batteries needed and enhancing system efficiency.
Patent Information
- Application Number
- KR1020220117636
- Authority / Receiving Office
- KR · KR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-09-19
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2042-09-19
AI Technical Summary
Existing energy storage systems face inefficiencies due to performance gaps between new and old batteries, leading to imbalanced discharge and the need for excessive battery installations to meet energy demands, which increases costs and resource wastage.
An operation plan establishment device that determines the number of initially installed batteries and schedules the integration of new batteries based on degradation expectations, ensuring all batteries operate at the same discharge time to maintain balanced performance.
Minimizes the total number of batteries required and balances performance across the system, improving efficiency and reducing unnecessary installations.
Smart Images

Figure R1020220117636_ABST
Abstract
Description
Technology Field
[0001] The present invention relates to an apparatus and method for establishing an operation plan for a battery system, and more specifically, to an apparatus and method for establishing an operation plan for a battery system in which a new battery is merged with an old battery for operation. Background Technology
[0002] An Energy Storage System (ESS) is a system that connects renewable energy, batteries storing electricity, and existing grid power. Recently, with the expansion of smart grids and renewable energy adoption, and the increasing emphasis on the efficiency and stability of power systems, the demand for energy storage systems is steadily rising to improve power supply, demand control, and power quality. Depending on the intended use, the output and capacity of an energy storage system can vary, and multiple battery systems can be interconnected to form a large-capacity energy storage system.
[0003] Generally, energy storage systems are installed at specific sites and operated for extended periods. To satisfy the discharge energy requirements demanded by customers during this operating period, a larger number of batteries than necessary must be installed initially, taking into account battery performance degradation over time.
[0004] To address these cost-related issues, an energy storage system has been proposed that operates with a minimum number of installed batteries during the initial operation period and incorporates new batteries during operation. However, in the case of such an energy storage system, a performance gap develops between the existing batteries and the newly added batteries as time passes, leading to a problem where the new batteries eventually catch up to the performance of the existing batteries. For example, if the discharge of existing batteries that have already degraded ends first, the discharge of the newly installed batteries also ends, even though additional discharge is possible. This problem of imbalance between batteries intensifies as the operation period progresses, and the number of new batteries added to meet the required discharge energy may increase beyond what is necessary. Prior art literature
[0005] Korean Published Patent No. 10-2017-0062132 The problem to be solved
[0006] The objective of the present invention to solve the above-mentioned problems is to provide an apparatus for establishing an operation plan for a battery system including a newly installed battery.
[0007] Another objective of the present invention to solve the above-mentioned problems is to provide a method for establishing an operation plan for a battery system including a newly installed battery.
[0008] Another objective of the present invention to solve the above-mentioned problems is to provide a battery system including a newly installed battery that is operated according to an established operation plan. means of solving the problem
[0009] An operation plan establishment device according to one embodiment of the present invention for achieving the above objective is a device for establishing an operation plan of a battery system in which a new battery is merged into an old battery, and comprises: at least one processor; and a memory for storing at least one instruction executed through the at least one processor.
[0010] Herein, the at least one command may include: a command for deriving the number of first batteries initially installed in a battery system based on a preset minimum required discharge energy amount; and a command for deriving operation plan information including a merging time and the number of mergers per merging time for second batteries sequentially merged into the first batteries based on the minimum required discharge energy amount and the expected degradation degree of the first batteries.
[0011] The command for deriving the above operation plan information may include a command for determining the number of second batteries to be merged at each merging time, based on the above minimum required discharge energy amount and the discharge energy amount according to the expected degradation degree of the installed battery.
[0012] The command for deriving the above operation plan information may include a command for calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period, which is defined as the period during which the previously installed battery and the Nth combined second battery are operated together.
[0013] The command for calculating the discharge energy amount and discharge amount of the second battery during the above Nth combined operation period may include a command for calculating the discharge energy amount and discharge amount of the second battery to have the same discharge time (Back-up time) as the above-mentioned installed battery, based on the discharge energy amount according to the expected degradation degree of the above-mentioned installed battery and a preset total discharge amount.
[0014] A command for calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period may include: a command for calculating the discharge energy amount and discharge amount of the second battery at the end of the Nth combined operation period, based on the expected discharge energy amount of the installed battery at the end of the Nth combined operation period and a preset total discharge amount, such that the second battery has the same discharge time (Back-up time) as the installed battery; and a command for determining the calculated discharge energy amount and discharge amount as the discharge energy amount and discharge amount of the second battery for the Nth combined operation period.
[0015] The above at least one command may further include a command to transmit the discharge energy amount and discharge amount of the first battery and the second battery to the battery system, such that the first battery and the second battery are operated at the same discharge time during the Nth combined operation period.
[0017] A method for establishing an operation plan according to an embodiment of the present invention for achieving the above other objectives is a method for establishing an operation plan for a battery system in which a new battery is merged into an old battery, and may include: a step of deriving the number of first batteries initially installed based on a preset minimum required discharge energy amount; and a step of deriving operation plan information including a merging time and a number of mergers per merging time for a second battery sequentially merged into the first battery based on the minimum required discharge energy amount and the expected degradation degree of the first battery.
[0018] The step of deriving the above-mentioned operation plan information may include the step of determining the number of second batteries to be merged at each merging time based on the above-mentioned minimum required discharge energy amount and the discharge energy amount according to the expected degradation degree of the installed battery.
[0019] The step of deriving the above-mentioned operation plan information may include the step of calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period, which is defined as the period during which the installed battery and the Nth combined second battery are operated together.
[0020] The step of calculating the discharge energy amount and discharge amount of the second battery for the above Nth combined operation period may include the step of calculating the discharge energy amount and discharge amount of the second battery to have the same discharge time (Back-up time) as the existing battery, based on the discharge energy amount according to the expected degradation degree of the existing battery and the preset total discharge amount.
[0021] The step of calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period may include: a step of calculating the discharge energy amount and discharge amount of the second battery at the end of the Nth combined operation period based on the expected discharge energy amount of the installed battery at the end of the Nth combined operation period and a preset total discharge amount, such that the second battery has the same discharge time (Back-up time) as the installed battery; and a step of determining the calculated discharge energy amount and discharge amount as the discharge energy amount and discharge amount of the second battery for the Nth combined operation period.
[0022] The above method for establishing an operation plan may further include the step of transmitting the discharge energy amount and discharge amount of the first battery and the second battery to the battery system, such that the first battery and the second battery are operated at the same discharge time during the Nth combined operation period.
[0024] A battery system according to an embodiment of the present invention for achieving the above-mentioned other purpose comprises: a first battery initially installed; and a second battery sequentially integrated into the first battery. Herein, the first battery is installed in a number determined based on a preset minimum required discharge energy amount, and the second battery may be sequentially integrated according to a merging time and a number of merging times determined based on the minimum required discharge energy amount and the expected degradation degree of the first battery.
[0025] The first battery and the second battery can be operated according to their respective discharge energy amounts and discharge amounts, which are predefined to have the same discharge time.
[0026] Each of the above discharge energy amounts and discharge amounts can be determined based on the discharge energy amount according to the expected degradation degree of the first battery and a preset total discharge amount. Effects of the invention
[0027] According to the embodiment of the present invention as described above, the number of batteries installed in the battery system can be minimized during the entire operating period of the battery system.
[0028] In addition, according to an embodiment of the present invention, the problem of imbalance among batteries included in the battery system during the entire operating period can be minimized to improve overall efficiency. Brief explanation of the drawing
[0029] Figure 1 is a block diagram of a conventional energy storage system. Figure 2 is a block diagram of an energy storage system including a conventional new battery. FIG. 3 is a block diagram of a battery system according to an embodiment of the present invention. FIG. 4 is a flowchart of the operation sequence of a method for establishing an operation plan for a battery system according to an embodiment of the present invention. FIG. 5 is a flowchart of the operation sequence of a method for deriving operation plan information according to an embodiment of the present invention. Figures 6 and 7 are examples of operation plan information according to an embodiment of the present invention. FIG. 8 is an example of a battery system according to a comparative example of the present invention. FIG. 9 is an example of a battery system according to an embodiment of the present invention. FIG. 10 is a block diagram of an operation plan establishment device in an embodiment of the present invention. Specific details for implementing the invention
[0030] The present invention is susceptible to various modifications and may have various embodiments; specific embodiments are illustrated in the drawings and described in detail in the detailed description. However, this is not intended to limit the invention to specific embodiments, and it should be understood that the invention includes all modifications, equivalents, and substitutions that fall within the spirit and scope of the invention. Similar reference numerals have been used for similar components in the description of each drawing.
[0031] Terms such as first, second, A, B, etc., may be used to describe various components, but said components shall not be limited by said terms. These terms are used solely for the purpose of distinguishing one component from another. For example, without departing from the scope of the present invention, the first component may be named the second component, and similarly, the second component may be named the first component. The term "and / or" includes a combination of a plurality of related described items or any of a plurality of related described items.
[0032] When it is stated that one component is "connected" or "connected" to another component, it should be understood that while it may be directly connected or connected to that other component, there may also be other components in between. On the other hand, when it is stated that one component is "directly connected" or "directly connected" to another component, it should be understood that there are no other components in between.
[0033] The terms used in this application are used merely to describe specific embodiments and are not intended to limit the invention. The singular expression includes the plural expression unless the context clearly indicates otherwise. In this application, terms such as "comprising" or "having" are intended to specify the presence of the features, numbers, steps, actions, components, parts, or combinations thereof described in the specification, and should be understood as not precluding the existence or addition of one or more other features, numbers, steps, actions, components, parts, or combinations thereof.
[0034] Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as generally understood by those skilled in the art to which the present invention pertains. Terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant technology, and should not be interpreted in an ideal or overly formal sense unless explicitly defined in this application.
[0036] Some terms used in this specification are defined as follows.
[0037] SOC (State of Charge) is the battery's current charged state expressed as a percentage, and SOH (State of Health) is the battery's current remaining state expressed as a percentage.
[0038] A battery rack refers to a minimum single-structure system that can be monitored and controlled through a BMS by connecting module units set by the battery manufacturer in series or parallel, and can be configured to include multiple battery modules and one BPU or protection device.
[0039] A battery bank can refer to a group of large-scale battery rack systems configured by connecting multiple racks in parallel. Monitoring and control of a rack BMS (RBMS) at the battery rack level can be performed through a battery bank-level BMS.
[0040] A BSC (Battery Section Controller) is a device that performs top-level control of a battery system, including a battery bank unit battery system, and is also used as a control device in a battery system with multiple bank-level structures.
[0041] Nominal Capacity (Nominal Capa.) may refer to the battery's set capacity [Ah] established by the battery manufacturer during development.
[0043] Hereinafter, preferred embodiments according to the present invention will be described in detail with reference to the attached drawings.
[0045] Figure 1 is a block diagram of a conventional energy storage system.
[0046] In an Energy Storage System (ESS), the smallest unit of a battery responsible for storing power is typically a battery cell. A series or parallel combination of battery cells forms a battery module, and multiple battery modules can constitute a battery rack. In other words, a battery rack can serve as the smallest unit of a battery system through a series or parallel combination of battery modules. Here, depending on the device or system in which the battery is used, a battery rack may also be referred to as a battery pack.
[0047] Referring to FIG. 1, a battery rack (10) may include a plurality of battery modules and one BPU or protection device. The battery rack can be monitored and controlled through an RBMS (Rack BMS). The RBMS can monitor the current, voltage, and temperature of each battery rack under its control, and based on the monitoring results, calculate the Status Of Charge (SOC) of the battery and control charging and discharging.
[0048] Meanwhile, a Battery Protection Unit (BPU) is a device designed to protect the battery from abnormal and fault currents at the battery rack level. The BPU may include a Main Contactor (MC), a fuse, a Circuit Breaker (CB), or a Disconnect Switch (DS). The BPU can control the battery system at the rack level by turning the Main Contactor on or off according to the control of the RBMS. The BPU can also protect the battery from short-circuit currents using a fuse in the event of a short circuit. As such, existing battery systems can be controlled through protection devices such as BPUs and switchgear.
[0049] Meanwhile, a Battery System Controller (BSC) (20) is installed in each battery section configured to include multiple batteries, peripheral circuits, devices, etc., so that it can monitor and control control targets such as voltage, current, temperature, and circuit breakers. The BSC is the top-level control device of a battery system including a bank-unit battery system including multiple battery racks, and is also used as a control device in a battery system with multiple bank-level structures.
[0050] In addition, a Power Conversion System (PCS) (40) installed in each battery section is a device that performs actual charging and discharging based on charging / discharging commands from the EMS (30), and may be configured to include a power conversion unit (DC / AC inverter) and a controller. Meanwhile, the output of each BPU may be connected to a power generation device (e.g., a solar power generation device) and the PCS (40) via a DC bus, and the PCS (40) may be connected to the grid. In addition, the Energy Management System (EMS) (30) or Power Management System (PMS) manages the ESS system as a whole.
[0051] In a conventional energy storage system as illustrated in Fig. 1, multiple battery racks serve as voltage sources, and a PCS charges and discharges the battery racks through CC (Constant Current) control or CP (Constant Power) control. At the time of initial installation, the performance of the battery racks is nearly similar (similar resistance values appear when expressed as equivalent resistance), and the charging and discharging currents of each rack appear at similar levels. However, over time, performance degradation may occur in some racks. In this case, new racks are added to compensate for the performance, which is called augmentation.
[0053] Figure 2 is a block diagram of an energy storage system including a conventional new battery.
[0054] FIG. 2 illustrates a system in which a plurality of new battery racks (10') (New Racks) are augmented to an energy storage system (e.g., the energy storage system shown in FIG. 1) that includes an existing battery rack (10) (Old Racks).
[0055] The new battery rack (10') is electrically connected to the existing battery rack (10) and can be charged and discharged together with the existing battery rack (10) by the control device of the energy storage system. At this time, there may be a performance difference between the new battery rack (10') and the existing battery rack (10), and a problem arises in which the new battery rack (10') follows the degraded performance of the existing battery rack (10). That is, even though a new rack has been added, the maximum performance (e.g., rated capacity, usage period, etc.) possessed by the new rack cannot be fully utilized.
[0056] The problem of imbalance among these battery racks intensifies as the operating period progresses, requiring the addition of new battery racks to meet the required discharge energy, which can ultimately lead to an increase in the number of battery racks installed in the energy storage system beyond what is necessary over the entire operating period.
[0057] The present invention was devised to resolve problems arising from such existing energy storage systems and proposes a method to improve power efficiency by minimizing the number of batteries installed in the battery system during the entire operating period of the energy storage system and simultaneously minimizing the imbalance between new batteries and existing batteries.
[0058] Hereinafter, with reference to FIGS. 3 to 10, a method of an operation planning device for a battery system according to various embodiments of the present invention and a battery system operated according to established operation planning information will be described.
[0060] FIG. 3 is a block diagram of a battery system according to an embodiment of the present invention.
[0061] Referring to FIG. 3, a battery system according to an embodiment of the present invention is configured to include a plurality of batteries and may be located within an energy storage system illustrated in FIG. 1 or 2. Meanwhile, in the present invention, [battery] may mean a battery cell, a battery module, a battery rack, or a battery bank.
[0062] The battery system is configured to include an initial installed battery (100) (first battery) and a battery (200) (second battery) that is merged during the operation of the battery system.
[0063] Here, the second battery (200) can be sequentially merged into the first battery (100) over N times. Referring to FIG. 3, the second battery (200) may include a first merged battery (200-1) to an Nth merged battery (200-N) that are sequentially merged from the first to the Nth time.
[0064] The battery system may be operated based on operation plan information derived by an operation plan establishment device described below. The operation plan information according to an embodiment of the present invention may include the number of installed first batteries, the merging time of the second batteries, the number of merged second batteries at each merging time, and the discharge energy amount (Wh) and discharge amount (W) of the first and second batteries at each operation interval.
[0065] The number of installed first batteries, that is, the number of initially installed batteries in the battery system, can be determined based on a preset minimum required discharge energy amount (e.g., customer required discharge energy amount).
[0066] In addition, the timing of the merging of the second battery and the quantity of the second battery to be merged at each merging timing can be determined based on the minimum required discharge energy amount and the expected degradation degree of the battery.
[0067] Additionally, the discharge energy amount and discharge amount of the first and second batteries can be defined for each of the Nth combined operation periods and can be determined as values such that the first and second batteries have the same discharge time during each of the Nth combined operation periods. Here, the Nth combined operation period refers to the period during which the installed battery and the Nth combined second battery are operated together. For example, the first combined operation period is the period during which the first battery (100) and the first combined battery (200-1) are operated together, the second combined operation period is the period during which the first battery (100), the first combined battery (200-1), and the second combined battery (200-2) are operated together, and the Nth combined operation period refers to the period during which the first battery (100) and the 1st to Nth combined batteries (200-1 to 200-N) are operated together.
[0068] In the battery system, the first battery is installed and operated according to the number of initial installed batteries included in the operation plan information, and the second batteries (200-1 to 200-N) can be sequentially merged according to the Nth merging time and merging quantity included in the operation plan information. Subsequently, during the Nth merging operation period, the first and second batteries can be controlled according to the discharge energy amount and discharge amount for each operation period included in the operation plan information. Here, since the discharge energy amount and discharge amount included in the operation plan information are values derived in advance so that the first battery and the second battery have the same discharge time in each operation period, the performance imbalance between the first battery and the second battery can be minimized during the merging operation period.
[0070] FIG. 4 is a flowchart of the operation sequence of a method for establishing an operation plan for a battery system according to an embodiment of the present invention.
[0071] The operation planning device can determine the number of first batteries initially installed in the battery system (S410). Here, the operation planning device can determine the number of first batteries based on a preset minimum required discharge energy amount. For example, if the minimum required discharge energy amount is set to 1000 [MWh] and each battery rack has a capacity of 335 [KWh], the number of first batteries can be determined to be 3420 so as to satisfy the minimum required discharge energy amount during the initial operation period (the period during which the first batteries are operated alone).
[0072] In an embodiment, the operation planning device can determine the number of first batteries by considering the minimum required discharge energy amount and the expected degradation of the first battery. For example, the number of first batteries is determined as the minimum value of a natural number exceeding (minimum required discharge energy amount / discharge energy amount per battery) * a, where a can be defined as a specific value between 1.1 and 1.2. That is, considering the degradation of the first battery during the initial operation period (e.g., 5 years), the number of first batteries can be determined as a quantity that allows for discharging more than the minimum required discharge energy amount even at the end of the initial operation period (e.g., after 5 years).
[0073] The operation planning device can determine the merging time of the second battery, which is sequentially merged into the first battery, and the number of mergers per merging time (S420). Here, the operation planning device can determine the merging time of the second battery and the number of mergers per merging time based on the minimum required discharge energy amount and the expected degradation degree of the first battery.
[0074] FIG. 6 is an example of operation plan information according to an embodiment of the present invention. Referring to FIG. 6, the operation plan establishment device can calculate the expected discharge energy amount (1145.284, 1144.138, ..., 789.100) of the first battery (initial installed battery) for each unit period (year) of the preset total operation period (20 years). Here, the expected discharge energy amount can be calculated based on the capacity of each first battery (335 kWh), the total number of first batteries (3420), and the preset expected degradation degree of the first battery. The expected degradation degree can be experimentally derived in advance or derived in advance using a degradation model and stored in a storage device.
[0075] As shown in FIG. 6, the operation planning device can determine the point in time (6th year) when the expected discharge energy amount of the first battery becomes less than the minimum required discharge energy amount (1000 MHh) as the first merging point.
[0076] The operation planning device can determine the quantity of primary merged batteries to be merged at the time of the primary merger. Here, the operation planning device can determine the quantity of primary merged batteries based on the minimum required discharge energy amount and the expected discharge energy amount according to the expected degradation degree of the battery. Referring to FIG. 6, the primary merger operation period can be predefined as 5 years, and at this time, the operation planning device can determine the number of secondary batteries (270) such that the expected total discharge energy amount at the end of the primary merger operation period (10th year) exceeds the minimum required discharge energy amount (1000 [MHh]).
[0077] Subsequently, the operation planning device can determine the quantity of Nth merged batteries to be merged at the time of the Nth merger in the manner described above. In the example illustrated in FIG. 6, it can be confirmed that the time of the 1st merger is determined to be the 6th year and the number of 1st mergers is determined to be 270, the time of the 2nd merger is determined to be the 11th year and the number of 2nd mergers is determined to be 270, and the time of the 3rd merger is determined to be the 16th year and the number of 3rd mergers is determined to be 235.
[0078] The operation plan establishment device can generate operation plan information including the number of first batteries determined in steps S410 and S420, the merging time of the second batteries (1st to Nth merging time), and the merging quantity of the second batteries for each merging time (S430).
[0079] The operation plan establishment device can transmit the generated operation plan information to the manager terminal, so that the battery system can be initially designed and operated according to the operation plan information.
[0081] FIG. 5 is a flowchart of the operation sequence of a method for deriving operation plan information according to an embodiment of the present invention. Hereinafter, with reference to FIG. 5, a method for calculating the discharge energy amount (Wh) and discharge amount (W) of the first and second batteries for each of the Nth combined operation sections will be described in detail.
[0082] The operation planning device can check the Nth merge operation period (S510). Specifically, the operation planning device can check the pre-set merge operation period for each stage. For example, the 1st merge operation period to the Nth merge operation period can each be set to 5 years, as shown in FIG. 6.
[0083] Here, the operation planning device can determine the Nth merger time based on the Nth merger operation period. For example, the merger time for each stage can be determined as the 6th year (1st merger time), the 11th year (2nd merger time), and the 16th year (3rd merger time), as shown in FIG. 6.
[0084] The operation planning device can calculate the quantity of mergers at the time of the Nth merger (S520). Here, the operation planning device can determine the quantity of merged batteries based on the minimum required discharge energy amount and the expected discharge energy amount according to the expected degradation degree of the installed batteries.
[0085] The operation planning device can calculate the discharge energy amount and discharge amount of the first and second batteries for the Nth combined operation period (S530). Here, the operation planning device can calculate the discharge energy amount and discharge amount of the first and second batteries such that the first and second batteries have the same discharge time, based on the expected discharge energy amount of the installed battery and the total discharge amount set in advance.
[0086] In an embodiment, the operation planning device can calculate the discharge energy amount and discharge amount of the first and second batteries for the Nth combined operation period based on the following mathematical formula 1.
[0087] [Mathematical Formula 1]
[0088] (E_(n-1) / T_backup) + (E_(n) / T_backup) = P_total
[0089] Here, E_(n-1) is the expected discharge energy of the installed battery at the end of the Nth combined operation period, E_(n) is the discharge energy of the Nth combined battery at the end of the Nth combined operation period, T_backup is the discharge time, and P_total represents the total discharge amount.
[0090] The operation planning device can derive the discharge energy amount (E_(n)) and discharge time (T_backup) of the Nth combined battery, satisfying the condition that the total discharge energy amount in the Nth combined operation period exceeds the minimum required discharge energy amount, based on the above mathematical formula 1. The operation planning device can calculate the discharge energy amount and discharge amount of the first and second batteries for the Nth combined operation period using the derived values.
[0091] FIG. 7 is an example of operation plan information according to an embodiment of the present invention. Referring to FIG. 7, the total discharge amount in all combined operation sections can be pre-set to 300 [MW]. The number of primary combined batteries can be determined to be 270, as described with reference to FIG. 4 and 6.
[0092] The operation planning device can calculate the discharge energy amount and discharge amount of the first and second batteries for the first combined operation period based on the above mathematical formula 1.
[0093] (E_(0) / T_backup) + (E_(1) / T_backup) = P_total
[0094] Here, E_(0) is 925.389 [MWh], which is the expected discharge energy of the installed battery (i.e., the initial installed battery) at the end of the first combined operation period, and P_total is 300 [MW].
[0095] The operation planning device derives the discharge energy amount (E_(1)) and discharge time (T_backup) of the first combined battery, which satisfy the condition that the total discharge energy amount (sum of the discharge energy amounts of the initial installed battery and the first combined battery) during the first combined operation period exceeds the minimum required discharge energy amount (1000 [MWh]), as a value satisfying the above mathematical formula 1. Here, the operation planning device repeats the process of changing E_(1) and T_backup and substituting them into the above mathematical formula 1 and conditions, and can terminate the calculation process when a value satisfying the above mathematical formula 1 and conditions is derived.
[0096] Referring to Figures 6 and 7, it can be seen that according to the above calculation process, the discharge energy amount (E_(1)) of the primary combined battery is 80.923 [MWh] and the discharge time (T_backup) is 3.35 [hr].
[0097] The operation planning device can calculate the discharge amount of the first battery (275.87537 [MW]) (E_(0) / T_backup) and the discharge amount of the first combined battery (24.12463 [MW]) (E_(1) / T_backup) using the derived value.
[0098] Subsequently, the operation planning device can calculate the discharge energy amount and discharge amount of the first battery (initial installation battery) and the second battery (first to third combined battery) for the second and third combined operation periods in the manner described above (see FIG. 7).
[0099] The operation planning device can generate operation planning information including the discharge energy amount and discharge amount of the first and second batteries for each of the 1st to Nth combined operation periods, and transmit it to the control device of the battery system so that the battery system operates according to the operation planning information. Accordingly, the battery system is controlled so that the old battery and the new battery have the same discharge time during all combined operation periods, thereby minimizing performance imbalance between the batteries and improving power efficiency.
[0101] FIG. 8 is an example of a battery system according to a comparative example of the present invention, and FIG. 9 is an example of a battery system according to an embodiment of the present invention.
[0102] The battery system of Fig. 8 is a battery system that operates using only the initially installed batteries without merging new batteries. In order to satisfy the minimum required discharge energy amount (1000 [MHh]) per unit period during the total operating period (20 years) according to the comparative example, 4500 battery racks, each with a capacity of 335 [KWh], must be initially installed.
[0103] On the other hand, the battery system according to the embodiment of the present invention of FIG. 9 is operated with 3,420 battery racks during the initial operation period, so the initial system design can be done with a number of battery racks 24% lower than the comparative example.
[0104] In addition, the battery system according to the embodiment of the present invention is operated with 270 units installed in the 6th year, 270 units in the 11th year, and 235 units in the 16th year, and 4,195 battery racks are installed during the total operation period, making it possible to operate with a number of battery racks 6.7% lower than the comparative example.
[0106] FIG. 10 is a block diagram of an operation plan establishment device in an embodiment of the present invention.
[0107] An operation plan establishment device (1000) according to an embodiment of the present invention may include at least one processor (1010), a memory (1020) that stores at least one command executed through the processor, and a transmission / reception device (1030) that is connected to a network and performs communication.
[0108] The at least one command performed by the at least one processor may include: a command to derive the number of first batteries initially installed in the battery system based on a preset minimum required discharge energy amount; and a command to derive operation plan information including a merging time and the number of mergers per merging time for second batteries sequentially merged into the first batteries based on the minimum required discharge energy amount and the expected degradation degree of the first batteries.
[0109] The command for deriving the above operation plan information may include a command for determining the number of second batteries to be merged at each merging time, based on the above minimum required discharge energy amount and the discharge energy amount according to the expected degradation degree of the installed battery.
[0110] The command for deriving the above operation plan information may include a command for calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period, which is defined as the period during which the previously installed battery and the Nth combined second battery are operated together.
[0111] The command for calculating the discharge energy amount and discharge amount of the second battery during the above Nth combined operation period may include a command for calculating the discharge energy amount and discharge amount of the second battery to have the same discharge time (Back-up time) as the above-mentioned installed battery, based on the discharge energy amount according to the expected degradation degree of the above-mentioned installed battery and a preset total discharge amount.
[0112] A command for calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period may include: a command for calculating the discharge energy amount and discharge amount of the second battery at the end of the Nth combined operation period, based on the expected discharge energy amount of the installed battery at the end of the Nth combined operation period and a preset total discharge amount, such that the second battery has the same discharge time (Back-up time) as the installed battery; and a command for determining the calculated discharge energy amount and discharge amount as the discharge energy amount and discharge amount of the second battery for the Nth combined operation period.
[0113] The above at least one command may further include a command to transmit the discharge energy amount and discharge amount of the first battery and the second battery to the battery system, such that the first battery and the second battery are operated at the same discharge time during the Nth combined operation period.
[0114] The operation planning device (1000) may also further include an input interface device (1040), an output interface device (1050), a storage device (1060), etc. Each component included in the operation planning device (1000) may be connected by a bus (1070) to communicate with one another.
[0115] Here, the processor (1010) may mean a central processing unit (CPU), a graphics processing unit (GPU), or a dedicated processor on which methods according to embodiments of the present invention are performed. The memory (or storage device) may be composed of at least one of a volatile storage medium and a non-volatile storage medium. For example, the memory may be composed of at least one of read-only memory (ROM) and random access memory (RAM).
[0117] The operation of the method according to an embodiment of the present invention can be implemented as a computer-readable program or code on a computer-readable recording medium. A computer-readable recording medium includes all types of recording devices in which data that can be read by a computer system is stored. Additionally, the computer-readable recording medium may be distributed across networked computer systems, allowing computer-readable programs or code to be stored and executed in a distributed manner.
[0119] Some aspects of the invention have been described in the context of a device, but may also be described according to a corresponding method, wherein a block or device corresponds to a method step or a feature of a method step. Similarly, aspects described in the context of a method may also be described according to a corresponding block or item or a feature of a corresponding device. Some or all of the method steps may be performed by (or using) a hardware device, such as, for example, a microprocessor, a programmable computer, or an electronic circuit. In some embodiments, one or more of the most important method steps may be performed by such a device.
[0120] Although the present invention has been described with reference to preferred embodiments, those skilled in the art will understand that various modifications and changes can be made to the invention without departing from the spirit and scope of the invention as described in the following claims. Explanation of the symbols
[0121] 100: 1st Battery (Initial Installation Battery) 200: Second Battery (Merged Battery) 200-N: N-series merged battery 1000: Operation planning device
Claims
Claim 1 A device for establishing an operation plan for a battery system in which a new battery is merged into an old battery, comprising: at least one processor; and a memory for storing at least one command executed through the at least one processor; wherein the at least one command is a command for deriving the number of first batteries initially installed in the battery system based on a preset minimum required discharge energy amount; A battery system operation plan establishment device comprising: a command for deriving operation plan information including a merging time and the number of mergers per merging time for a second battery that is sequentially merged into the first battery, based on the minimum required discharge energy amount and the expected degradation degree of the first battery; wherein the command for deriving operation plan information includes a command for calculating the discharge energy amount and discharge amount of the second battery for an Nth merged operation period, which is defined as the period during which the installed battery and the Nth merged second battery are operated together; and wherein the command for calculating the discharge energy amount and discharge amount of the second battery for the Nth merged operation period includes a command for calculating the discharge energy amount and discharge amount of the second battery to have the same discharge time (Back-up time) as the installed battery, based on the discharge energy amount according to the expected degradation degree of the installed battery and a preset total discharge amount. Claim 2 A battery system operation plan establishment device according to claim 1, wherein the command for deriving the operation plan information includes a command for determining the number of merged second batteries at each merging point based on the minimum required discharge energy amount and the discharge energy amount according to the expected degradation degree of the installed battery. Claim 3 delete Claim 4 delete Claim 5 A battery system operation plan establishment device according to claim 1, wherein the command for calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period comprises: a command for calculating the discharge energy amount and discharge amount of the second battery at the end of the Nth combined operation period, based on the expected discharge energy amount of the installed battery at the end of the Nth combined operation period and a preset total discharge amount, such that the second battery has the same discharge time (Back-up time) as the installed battery; and a command for determining the calculated discharge energy amount and discharge amount as the discharge energy amount and discharge amount of the second battery for the Nth combined operation period. Claim 6 A battery system operation plan establishment device according to claim 1, further comprising a command to transmit the discharge energy amount and discharge amount of the first battery and the second battery to the battery system, such that the first battery and the second battery are operated at the same discharge time during the Nth combined operation period. Claim 7 A method for establishing an operation plan for a battery system in which a new battery is merged with an old battery, comprising: a step of deriving the number of first batteries initially installed based on a preset minimum required discharge energy amount; and a step of deriving operation plan information including a merger time and the number of mergers per merger time for second batteries sequentially merged with the first battery based on the preset minimum required discharge energy amount and the expected degradation degree of the first battery; wherein the step of deriving the operation plan information includes a step of calculating the discharge energy amount and discharge amount of the second battery for an Nth merger operation period defined as a period in which the installed battery and the Nth merged second battery are operated together; and the step of calculating the discharge energy amount and discharge amount of the second battery for the Nth merger operation period includes a step of calculating the discharge energy amount and discharge amount of the second battery such that they have the same discharge time (Back-up time) as the installed battery, based on the discharge energy amount according to the expected degradation degree of the installed battery and a preset total discharge amount. Claim 8 A method for establishing an operation plan for a battery system according to claim 7, wherein the step of deriving the operation plan information includes the step of determining the number of merged second batteries at each merging time based on the minimum required discharge energy amount and the discharge energy amount according to the expected degradation degree of the installed battery. Claim 9 delete Claim 10 delete Claim 11 A method for establishing an operation plan for a battery system according to claim 7, wherein the step of calculating the discharge energy amount and discharge amount of the second battery for the Nth combined operation period comprises: a step of calculating the discharge energy amount and discharge amount of the second battery at the end of the Nth combined operation period based on the expected discharge energy amount of the installed battery at the end of the Nth combined operation period and a preset total discharge amount, such that the second battery has the same discharge time (Back-up time) as the installed battery; and a step of determining the calculated discharge energy amount and discharge amount as the discharge energy amount and discharge amount of the second battery for the Nth combined operation period. Claim 12 A method for establishing an operation plan for a battery system according to claim 7, further comprising the step of transmitting the discharge energy amount and discharge amount of the first battery and the second battery to the battery system so that the first battery and the second battery are operated at the same discharge time during the Nth combined operation period. Claim 13 delete Claim 14 delete Claim 15 delete
Citation Information
Patent Citations
Battery pack, electronic apparatus, and remaining capacity display deriving method
JP2012120438A
Storage battery transfer support device and storage battery transfer support method
JP2013140631A
Battery management system and method controlling battery
KR1020170062132A
Apparatus and method for designing of specification of energy storage system
KR102030872B1