Underground structures and construction methods using double pipes and expandable sheet piles

The double pipe and expandable sheet pile method addresses the weaknesses of traditional underground construction methods by using variable members to connect steel pipes, ensuring waterproofing and structural reinforcement, thus improving constructability and reducing leakage.

KR103047726B1Active Publication Date: 2026-11-11이상목
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
KR1020240149142
Authority / Receiving Office
KR · KR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2026-11-11
Estimated Expiration
2044-10-29

AI Technical Summary

Technical Problem

Existing underground construction methods, such as H-pile and CIP earth retaining walls, face issues with low rigidity, groundwater leakage, ground contamination, and structural weaknesses at connections, leading to compromised safety and increased construction complexity and cost.

Method used

The use of double pipes and expandable sheet piles, where steel pipes are connected using variable members to provide waterproofing and connection functions, allowing simultaneous ground drilling and installation, with grout or water-expanding agents injected to reinforce the structure.

Benefits of technology

This method enhances constructability, maintains structural integrity, reduces leakage, and increases construction precision by using variable members to adapt to irregular ground conditions, while providing effective waterproofing and reinforcement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 112024117859180-PAT00001_ABST
    Figure 112024117859180-PAT00001_ABST
Patent Text Reader

Abstract

The present invention relates to an underground structure and a method of constructing the same using a double pipe and an expandable sheet pile, wherein, during the construction of an underground structure for securing underground walls or underground spaces, a variable member can be actively varied according to the irregular construction spacing between steel pipes, and at the same time, structural strength reinforcement and waterproofing functions are enhanced by using grout and a water-expanding agent. More specifically, the structure comprises a central steel pipe installed behind the expansion bit and pressed in to surround an expansion bit for excavating a bore hole in the ground and a screw for excavation and soil removal, a structural steel pipe with a fastening portion formed on its outer surface, and a variable member connecting the structural steel pipes; thereby, when constructing an underground wall in the form of a waterproof wall or a structural wall or an underground structure in the form of a tunnel within the ground using a casing-shaped steel pipe, the steel pipes are connected to each other using the variable member, thereby providing the effect of having waterproofing and connecting functions.
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The present invention relates to a structure and construction method using steel pipes, and more specifically, to an underground structure and construction method using double pipes and expandable sheet piles that can be applied to underground civil engineering, underground structure construction, and underground road and facility construction industries by utilizing steel pipes to form underground walls or underground structures for securing underground spaces, while simultaneously using variable members to perform waterproofing and connection functions. Background Technology

[0002] Generally, for underground earth retaining wall construction methods or tunnel-shaped underground structures, H-piles using prefabricated steel or CIP (Cast-in-Place) earth retaining walls in which concrete is poured after drilling on-site have been mainly used, and for both methods, a grouting auxiliary method is added to the back to cut off water, and this is still the most widely applied method.

[0003] At this time, the H-pile wall method is the most widely used earth retaining method in underground excavation work. It involves inserting H-piles after drilling and then fitting wooden retaining boards or concrete retaining walls between the H-piles as excavation progresses. However, because this H-pile wall method has low rigidity and experiences significant displacement, its application is limited in soft ground or areas adjacent to buildings. Furthermore, since it is vulnerable to water cutoff, backfill grouting must be performed in sections below the groundwater level, which leads to problems such as localized ground contamination.

[0004] Furthermore, the CIP earth retaining wall construction method involves forming an earth retaining wall by connecting circular columns that have been cured after drilling, inserting H-piles or rebar mesh, and pouring concrete. The CIP method suffers from reduced constructability due to extensive on-site work, such as rebar mesh assembly and excessive concrete pouring. Additionally, the frequent formation of poor piles caused by groundwater and soil mixing during concrete pouring makes it difficult to ensure structural reliability, and the current situation involves frequent leakage and site cleanup work. Moreover, issues such as ground contamination resulting from backfill waterproofing grouting are also emerging as problems.

[0005] Various improved construction methods have been developed and are being applied to overcome the shortcomings of existing H-pile or CIP retaining wall systems and to enhance economic efficiency. These improved methods mainly consist of cast-in-place concrete retaining wall series that are modifications of the CIP wall system, and methods utilizing precast concrete piles as retaining walls. Types of these methods include the CIII method, UNI Wall method, PHC W method, e-PHC wall pile method, e-cone pile PHC retaining wall method, and Hi-PHC method.

[0006] In particular, the continuous underground wall is constructed by continuously connecting the outermost vertical walls of a building's basement, thereby securing underground space within. Since this continuous underground wall cannot be constructed all at once, it is inevitably built by sequentially pouring and curing unit concrete panels so that their boundaries are integrally connected. Although joints with an interlocking shape are formed at the connection points of each concrete panel to allow for interlocking, cases may occur where the joints are not tightly connected due to the staggered curing of the connecting panels.

[0007] Furthermore, the connection points of each panel—specifically the joints—gradually weaken over time due to various types of soil, bentonite solution used as a soil stabilizer during excavation, and various byproducts. This leads to a compromise in the safety of the retaining wall. Consequently, since these connections are not watertight, there is a problem of concentrated leakage.

[0008] Specifically, one method for constructing a continuous underground wall is the slurry wall construction method. This method involves constructing a continuous underground wall by inserting a reinforcing mesh into an excavated underground space and then pouring concrete to form plate-shaped first and second concrete panels, which are then closely connected sequentially in a linear fashion. When the first concrete panels are cured at regular intervals underground and a space is excavated with an excavator to form the second concrete panels between them, a pair of augers rotate to process each end of the first concrete panels into an uneven shape to form joints. Due to the impact during this process, the strength of the joints between the first concrete panels may be weakened, or in severe cases, cracks may occur. Subsequently, when a reinforcing mesh is inserted into the excavated space between each first concrete panel and concrete is poured to form the second concrete panels, the second concrete panels are integrally connected to the first concrete panels to form a continuous underground wall.

[0009] In this slurry wall construction method, the first and second concrete panel connection parts are interlocked while being integrally molded, but the connection part formed with the joint is damaged, such as by cracking caused by an auger, or its strength is weakened, resulting in leakage.

[0010] Furthermore, when site conditions require high strength for the cutoff wall structure, a continuous-row cast-in-place pile method such as the aforementioned CIP method can be considered appropriate; however, since this method basically involves forming a single cast-in-place pile within a single casing, it has a fundamental problem in that it is difficult to block water flowing between independently formed piles.

[0011] To resolve these problems, methods such as an overlap arrangement method in which parts of each pile overlap each other, a method of arranging piles in a zigzag shape, and methods of forming walls with soil cement between piles or installing separate structures such as reinforcing bars have been devised.

[0012] In addition, there was a problem where the piles could not maintain perfect verticality and were constructed at an angle, resulting in gaps between them that prevented complete overlap and thus failed to achieve water cutoff.

[0013] In particular, when using PC piles, circular piles, hollow circular piles, square piles, etc. according to conventional technology as temporary earth retaining walls, water-blocking grouting is performed in the space between piles or on the back surface where the piles are installed to prevent water leakage, such as groundwater trapped behind the piles used for ground excavation. To this end, the ground is additionally excavated with a drilling machine, and while grouting is performed from the tip nozzle of the drilling machine, the pipe used for excavation is pulled up to complete the water-blocking grouting.

[0014] In addition, due to casings in pile drilling equipment, gaps inevitably occur between piles, and when grouting is performed on the back of the piles, the efficiency of filling is low due to losses and ground disturbance caused by the gap between piles, resulting in the problem of uncertain grouting construction.

[0015] In addition, since the process of performing cutoff grouting involves carrying out separate drilling work, inserting cutoff pipes, and injecting the grout using high-pressure or low-pressure injection devices, there were problems such as potential damage to piles during the drilling process, increased complexity of the process, and extended construction costs and duration.

[0016] Consequently, there is an urgent need for underground structures and construction methods utilizing double pipes and expansion sheet piles, which are improved by increasing strength by constructing the steel pipes in a double-pipe form when using circular or rectangular steel pipes, accommodating irregular pipe spacing using variable members, and injecting grout into the pipes and variable members to provide structural reinforcement or water-blocking functions using water-expanding agents. Prior art literature

[0017] 1. Registration No. 10-0752397 (Method for constructing an underground cutoff wall and auxiliary casing used therein) 2. Registered Patent No. 10-1153313 (Auxiliary casing and method for constructing an underground cutoff wall using the same) 3. Registered Patent No. 10-1219451 (Concrete structure and method for constructing the same, method for constructing an underground structural wall serving as an earth retaining wall for a building using the same) 4. Published Patent No. 10-2015-0098135 (Precast pile for cutoff) 5. Published Patent No. 10-2019-0051361 (CIP cutoff reinforcement method) The problem to be solved

[0018] Accordingly, the present invention has been devised in consideration of the problems of the conventional technology described above, and aims to provide an underground structure using double pipes and expandable sheet piles, and a method for constructing the same, in which, when constructing an underground wall in the form of a watertight wall or structural wall or an underground structure in the form of a tunnel using casing-type steel pipes, the steel pipes are connected to each other using variable members to perform watertight and connecting functions.

[0019] In addition, another objective of the present invention is to increase constructability by enabling the simultaneous injection of a central steel pipe and a structural steel pipe into the ground while drilling the ground.

[0020] In addition, another objective of the present invention is to connect two variable members to a structural steel pipe so that when the structural steel pipe is pressed into the ground, the installation spacing of the structural steel pipe varies and corresponds to the section where the spacing is irregular.

[0021] In addition, another objective of the present invention is to fill grout after press-fit construction by combining a central steel pipe and a structural steel pipe.

[0022] In addition, another objective of the present invention is to inject grout or a water-expanding agent for structural reinforcement or for the fastening portion of a structural steel pipe. means of solving the problem

[0024] To achieve the above-mentioned purpose, the present invention provides an underground structure using a double pipe and an expandable sheet pile, wherein the steel pipe is installed vertically or horizontally for construction of an underground space in the form of a watertight wall or a tunnel, and the structure is characterized by: a central steel pipe that is pressed into the interior of a bore hole in the ground; a structural steel pipe that surrounds the central steel pipe and is pressed into the interior of the bore hole, with a plurality of fastening parts formed facing each other on its outer surface; a variable member formed as a pair of two, which is pressed into the fastening parts to be connected in a variable corresponding manner according to the installation spacing between the structural steel pipes; and the variable member having a function of connecting the structural steel pipes and a function of blocking the space between them, wherein the variable member is formed as a pair, and a coupling end connected to the fastening part is formed in a ring shape or a circular shape at one end of each, and a ring-shaped hook part is formed at each end of a variable body that extends integrally with the coupling end, so that the hooking spacing of the hook part is adjusted according to the installation spacing between the structural steel pipes.

[0025] To achieve the above-mentioned objective, the present invention relates to a method for constructing an underground structure using a double pipe and an expandable sheet pile, wherein the steel pipe is installed vertically or horizontally to construct a structure for an underground space in the form of a cutoff wall or a tunnel, wherein a central steel pipe is installed inside bore holes that are constructed at equal intervals in the ground using a drilling device, a structural steel pipe is pressed into the bore holes surrounding the central steel pipe and having a fastening portion formed on its outer surface, and the structural steel pipe is pressed into the ground while being positioned between the structural steel pipes and the fastening portion and a variable member are connected, grout is injected into the internal space of the central steel pipe and the space between the central steel pipe and the structural steel pipe, grout is injected or a water-expanding agent is filled into the fastening portion and the variable member of the structural steel pipe, and a finishing material is installed inside the structure in the form of a cutoff wall or a tunnel for securing an underground space, wherein the variable member is formed as a pair, and a connecting end connected to the fastening portion is formed in a ring or circular shape at one end of each, and extends integrally with the connecting end A method for constructing an underground structure using a double pipe and an expandable sheet pile is provided, characterized in that a ring-shaped hook portion is formed at each end of a variable body, and a sealing portion is formed at the end of the hook portion in the form of a hollow tube with multiple discharge holes formed along the longitudinal direction, or a hook end is formed at the end of the hook portion of the variable member so as to interlock with each other along the longitudinal direction, so that the interlocking spacing of the hook portion is adjusted according to the spacing between the structural steel pipes and the structural steel pipes during ground injection construction of the variable member, and grout or a water-expanding agent is inserted into the hook space formed between the sealing portion and the hook end, between the sealing portion and the hook end, and between the hook end and the hook end. Effects of the invention

[0027] As described above, the present invention utilizes casing-shaped steel pipes to construct underground walls in the form of waterproofing walls or structural walls, or underground structures in the form of tunnels within the ground. By connecting the steel pipes to each other using variable members, it has the effect of providing waterproofing and connecting functions.

[0028] In addition, since the core steel pipe and structural steel pipe can be driven into the ground simultaneously with the drilling of the ground, it has the effect of increasing constructability, shortening the construction period, and maintaining consistent construction precision.

[0029] In addition, by connecting two variable members to the structural steel pipe as a set, the installation spacing of the structural steel pipe varies and corresponds to the irregular section when driven into the ground, thereby making construction easy and enabling stable fastening.

[0030] In addition, combining the central steel pipe and the structural steel pipe and filling with grout after press-fit construction has the effect of increasing structural strength.

[0031] In addition, injecting grout or a water-expanding agent into the joints of structural steel pipes or for structural reinforcement has the effect of reinforcing structural strength and preventing groundwater inflow into underground walls or underground structures. Brief explanation of the drawing

[0033] FIG. 1 is an exploded perspective view of an underground structure using conventional steel pipes, FIG. 2 shows an underground structure using a steel pipe according to the present invention, where Figure a is a perspective view in which an expansion bit and a screw are inserted and installed in the underground structure, and Figure b is a combined perspective view in which the underground structure and a variable member are connected. FIG. 3 shows a central steel pipe applied to an underground structure using a steel pipe according to the present invention, where Figure a is a perspective view of a central steel pipe in the shape of a pipe, and Figure b is a perspective view of a central steel pipe in the shape of a pipe with a flow hole formed therein. FIG. 4 shows a structural steel pipe applied to an underground structure using a steel pipe according to the present invention, where Figure a is a perspective view of a pipe-shaped structural steel pipe with a protrusion-shaped fastening part formed thereon, Figure b is a perspective view of a pipe-shaped structural steel pipe with a groove-shaped fastening part formed thereon. FIG. 5 shows a structural steel pipe applied to an underground structure using a steel pipe according to the present invention, where Figure a is a plan view with two fastening parts formed, Figure b is a plan view showing a square and a rectangular shape, Figure c is a plan view in which a central steel pipe and a structural steel pipe are integrally connected with a connecting rod, Figure d is a process plan view showing the manufacturing process of a protrusion-shaped fastening part on a pipe-shaped structural steel pipe, and Figure e is a process plan view showing the manufacturing process of a groove-shaped fastening part on a pipe-shaped structural steel pipe. FIG. 6 shows a variable member applied to an underground structure using a steel pipe according to the present invention, having a hook-shaped connecting end formed therein, where Figure a is an exploded perspective view of a variable member having a sealing end formed therein, Figure b is an exploded perspective view of a variable member having a drainage hole formed therein, and Figure c is a diagram of the connection and spacing adjustment process of a variable member having a sealing end formed therein. FIG. 7 shows a variable member having a hook-shaped connecting end formed thereon, which is applied to an underground structure using a steel pipe according to the present invention, where Figure a is an exploded perspective view of the variable member having a cutoff end and a hook end formed thereon, and Figure b is a diagram of the connection and spacing adjustment process of the variable member having a cutoff end and a hook end formed thereon. FIG. 8 shows a variable member having a hook-shaped connecting end formed thereon, which is applied to an underground structure using a steel pipe according to the present invention, where Figure a is an exploded perspective view of the variable member having the hook end formed thereon, and Figure b is a diagram of the connection and spacing adjustment process of the variable member having the hook end formed thereon. FIG. 9 shows a variable member having a pipe-shaped connecting end formed thereon, which is applied to an underground structure using a steel pipe according to the present invention, wherein FIG. a is an exploded perspective view of a variable member having a sealing member formed thereon, FIG. b is an exploded perspective view of a variable member having a drainage hole formed thereon, FIG. c is a diagram showing the connection and spacing adjustment process of a variable member having a sealing member formed thereon. FIG. 10 shows a variable member having a pipe-shaped connecting end formed thereon, which is applied to an underground structure using a steel pipe according to the present invention, where Figure a is an exploded perspective view of a variable member having a sealing end and a hook end formed thereon, and Figure b is a diagram of the connection and spacing adjustment process of a variable member having a sealing end and a hook end formed thereon. FIG. 11 shows a variable member having a pipe-shaped connecting end formed thereon, which is applied to an underground structure using a steel pipe according to the present invention, where Figure a is an exploded perspective view of a variable member having a hook end formed thereon, and Figure b is a diagram showing the connection and spacing adjustment process of a variable member having a hook end formed thereon. FIG. 12 shows a variable member according to another embodiment, wherein Figure a is a perspective view of various forms, Figure b is a plan view and cross-sectional view of various forms, FIG. 13 is a flowchart showing a construction method using an underground structure utilizing steel pipes, FIG. 14 illustrates a construction method using an underground structure utilizing steel pipes, wherein Drawing a is a process diagram illustrating the construction method using an underground structure, and Drawing b is a side view of an example of construction according to the construction method using an underground structure. FIGS. 15 and 16 are a perspective view and a construction cross-section view of a watertight wall constructed using an underground structure utilizing steel pipes. Figures 15 and 16 are a perspective view and a cross-sectional view of a construction method using an underground structure utilizing steel pipes to create an underground space. Specific details for implementing the invention

[0034] Hereinafter, specific details for implementing the present invention will be described with reference to the attached drawings. Furthermore, in describing the present invention, detailed descriptions of related known functions are omitted if they are deemed obvious to a person skilled in the art and could unnecessarily obscure the essence of the invention.

[0035] The terms used herein are merely for describing specific embodiments and are not intended to limit the invention. Singular expressions include plural expressions unless the context clearly indicates otherwise, and distributed components may be implemented in a combined form unless specifically limited. In this specification, terms such as "comprising" or "having" are intended to indicate the presence of the features, numbers, steps, actions, components, parts, or combinations thereof described in the specification, and should be understood as not precluding the existence or addition of one or more other features, numbers, steps, actions, components, parts, or combinations thereof.

[0036] Accordingly, a preferred embodiment of the present invention as described above will be explained in detail with reference to the attached drawings as follows.

[0037] As illustrated in FIGS. 1 and 2, the underground structure using the steel pipe of the present invention relates to a structure constructed for an underground space in the form of a watertight wall or a tunnel by installing the steel pipe in a vertical or horizontal direction. The underground structure (100) is composed of a central steel pipe (10) that surrounds an expansion bit (2) for excavating a hole (1) in the ground and a screw (3) for excavating and removing soil, and is installed behind the expansion bit (2) and pressed into place, a structural steel pipe (30) having a fastening part (20) formed on its outer surface, and a variable member (40) connecting the structural steel pipe (30) and the structural steel pipe (30).

[0038] Here, the expansion bit (2) is configured to allow the excavation diameter to be adjusted within the structural operating range due to its structural features, and it is preferable that the excavation be constructed to be about 1 to 2 cm larger than the diameter formed by the connecting part (20) of the structural steel pipe (30).

[0039] In addition, the screw (3) is fastened to the rear surface of the expansion bit (2), and is formed so that compressed air and high-pressure water are supplied through the screw shaft (4) to increase the excavation power of the expansion bit (2) and to smoothly discharge crushed material and soil generated during excavation.

[0040] The above-mentioned central pipe (10) is connected to the rear of the expansion bit (2) for constructing a drill hole (1) in the ground and is formed to surround a screw (3) for drilling and removing soil, and to be pressed into the drill hole (1) simultaneously with drilling.

[0041] As shown in FIG. 3, the central pipe (10) is configured in the form of a casing, and a flow hole (11) may be formed along the pipe shape or length direction.

[0042] As illustrated in FIGS. 1 and 2, FIGS. 4 and 5, the structural steel pipe (30) is connected to surround the central steel pipe (10) at the rear of the expansion bit (2), and is pressed into the interior of the drilling hole (1) together with the central steel pipe (10) at the same time as the drilling, and a plurality of fastening parts (20) are formed along the longitudinal direction on the outer surface.

[0043] The above-mentioned fastening portion (20) is formed on the outer surface along the longitudinal direction of the structural steel pipe (30) and can be formed in the form of a fastening projection (21) or a fastening groove (22), and the number of fastening portions (20) can be formed in various numbers such as 2, 3, 4, 5, 6, etc. depending on the design and construction conditions.

[0044] The above fastening projection (21) may be formed in the shape of a pipe or a steel rod, and the fastening groove (22) may be formed in the shape of a circle or an ellipse, and the fastening projection (21) and the fastening groove (22) may be manufactured in advance and welded to the structural steel pipe (30).

[0045] A plurality of connecting members (31) that are supported on the outer surface of the central steel pipe (10) may be formed on the inner surface of the structural steel pipe (30) in a circular arrangement. When the connecting members (31) are formed, the connecting members (31) are integrated by welding after being placed at equal intervals between the central steel pipe (10) and the structural steel pipe (30) to improve the precision of insertion into the interior of the drilled hole (1), increase structural strength, and increase reaction strength against vertical loads so that sagging does not occur.

[0046] In addition, the above connecting member (31) is in the shape of a 'T' when projected from a plane, and the vertical member (31a) performs the function of supporting or dispersing loads generated from the outside, while the horizontal member (31b) contacts and supports the outer surface of the central steel pipe (10) to distribute the load transmitted through the vertical member (31a) over a wide area, thereby preventing stress concentration at a specific point of the central steel pipe (10). The connecting member (31) may be configured to be applied or not applied in the design or construction, taking into consideration construction conditions, allowable strength, rebound stress, etc.

[0047] The above central steel pipe (10) or structural steel pipe (30) may be formed in a square or rectangular shape, and if a rectangular shape is adopted, it is formed to be suitable for application to a large area.

[0048] The above central steel pipe (10) or structural steel pipe (30) may be formed with the same length, but the lengths may be configured differently depending on the construction conditions.

[0049] The above structural steel pipe (30) can be adopted for connection construction at the rear of the expansion bit (2) alone, and the central steel pipe (10) can be selectively applied depending on the construction conditions or design.

[0050] Grout may be injected between the central steel pipe (10) and the structural steel pipe (30).

[0051] As shown in FIGS. 6 to 11, additionally, a variable member (40) is formed in pairs, which is connected to the fastening part (20) and press-fitted to be connected in a variable corresponding manner according to the installation spacing of the structural steel pipe (30) and the structural steel pipe (30).

[0052] The above variable member (40) is formed as a pair, and at each end, a connecting end (41) connected to the fastening part (20) is formed in a ring shape or a circular shape.

[0053] If the above connecting member (41) is in the shape of a ring, it can be configured in a 'C' shape that is open to the outside, and if it is in the shape of a circle, it can be formed in the shape of a steel pipe or a steel rod.

[0054] A ring-shaped hook portion (43) is formed at each end of the variable body (42) that extends integrally with the above-mentioned connecting portion (41).

[0055] The hook portion (43) is formed so that the catch spacing is adjusted according to the installation spacing between the structural steel pipes (30).

[0056] The end of the hook portion (43) of the variable member (40) may be in the form of a hollow tube, and a barrier portion (45) may be formed with a plurality of discharge holes (44) formed along the length direction.

[0057] The above discharge hole (44) is formed to facilitate the injection of grout (G) or the discharge of water expansion agent (W).

[0058] A hook end (46) may be formed along the length direction at the end of the hook portion (43) of the variable member (40) so as to be hooked together.

[0059] The above-mentioned variable member (40) may be combined with the above-mentioned variable member (40) having the above-mentioned variable member (40) having the above-mentioned variable member (45) having the above-mentioned variable member (40) having the above-mentioned hook member (46) having the above-mentioned hook member (46) having the above-mentioned variable member (40

[0060] It is preferable that the length of the variable member (40) be equal to the length of the structural steel pipe (30) or be formed to be longer than the length of the structural steel pipe (30).

[0061] The above variable member (40) is connected to the fastening part (20) of the structural steel pipe (30) and is formed to have a pointed front end (42a) that is pressed into the ground.

[0062] The above inclined section (42a) is formed by bending the front end of the press-in section at an angle to facilitate smooth installation on the ground.

[0063] The cutoff portion (45) and hook portion (46) of the above hook portion (43) may be formed to have grout (G) or a water-expanding agent (W) inserted therein.

[0064] The hook space (47) formed between the sealing member (45) and the sealing member (45), between the sealing member (45) and the hook member (46), and between the hook member (46) and the hook member (46) of the above hook portion (43) may be formed so that grout (G) or a water-expanding agent (W) is inserted.

[0065] As illustrated in FIG. 12, in another embodiment, the variable member (40) is formed with a connecting body (48) that extends integrally with the connecting end (41) formed at both ends.

[0066] The above variable member (40) may be formed such that a connecting body (48) extending integrally with a connecting end (41) formed at both ends, and a hollow space (49) is formed in the center of the connecting end (41) and the connecting body (48), so that grout (G) or a water-expanding agent (W) is filled inside the hollow space (49).

[0067] The variable member (40) of the above underground structure (100) is configured to include a function of connecting structural steel pipes (30) and a function of blocking the space between them.

[0069] The construction method, operation, and effects of a structure constructed for an underground space in the form of a watertight wall or a tunnel by installing the steel pipe of the present invention, configured as described above, in a vertical or horizontal direction are explained as follows.

[0070] As illustrated in FIGS. 13 to 17, an installation step (S1) is performed in which a structural steel pipe (30) is installed to surround a central steel pipe (10) that is installed to surround a screw (3) connected to the rear of an expansion bit (2) for constructing a bore hole (1) in the ground using a separate vertical or horizontal bore hole equipment (200).

[0071] The above vertical or horizontal insertion equipment (200) is equipment capable of performing non-excavation or horizontal steel pipe excavation methods, and can be used for construction by applying and installing different installation methods or locations depending on construction conditions.

[0072] In the above installation step (S1), the diameter of the expansion bit (2) is designed to be about 1 to 2 cm larger than the connecting part (20) of the structural steel pipe (30) and installed.

[0073] After the above installation step (S1), an excavation and steel pipe construction step (S2) is performed in which a central steel pipe (10) and a structural steel pipe (30) are simultaneously driven into the interior of a drilled hole (1) constructed in the ground by an expansion bit (2) and a screw (3) through the rotation and driving operation of a vertical or horizontal driving equipment (200).

[0074] In the above installation step (S1), when a connecting member (31) is applied to the structural steel pipe (30), it is supported by the vertical member (31a) and the horizontal member (31b) to the central steel pipe (10), thereby evenly distributing loads or stresses generated from the outside across the entire surface of the central steel pipe (10) to prevent stress concentration.

[0075] The above excavation and steel pipe construction step (S2) is characterized by the fact that the expansion bit (2) and the screw (3) are spirally connected, the screw shaft (4) of the screw (3) is connected to the rotation and insertion part of the vertical or horizontal insertion equipment (200), and the rear ends of the central steel pipe (10) and the structural steel pipe (30) are installed to be pushed and moved by the insertion part of the vertical or horizontal insertion equipment (200), thereby allowing the excavation of the ground and the insertion construction of the steel pipe to be carried out simultaneously, which increases constructability.

[0076] In the above excavation and steel pipe construction step (S2), if the length of the drilled hole (1) increases, another screw (3) is screwed to the screw (3) to extend it, and the central steel pipe (10) and structural steel pipe (30) are extended by welding another central steel pipe (10) and structural steel pipe (30) to apply to construction.

[0077] The above central steel pipe (10) may adopt a casing-shaped steel pipe, and if a flow hole (11) is formed, it is discharged when grout is injected.

[0078] The above structural steel pipe (30) is manufactured by installing a fastening part (20) on the outer surface at a separate manufacturing plant. If a fastening projection (21) is adopted, the fastening part (20) can be manufactured by attaching a member in the form of a steel pipe or steel rod by welding. It is desirable to manufacture the length to be the same as the length of the structural steel pipe (30) and to apply various shapes and sizes according to construction conditions.

[0079] The above-mentioned fastening part (20) may be manufactured by attaching a member, which is a steel plate bent into a groove shape when a fastening groove (22) is adopted, to a cut portion of the structural steel pipe (30) by welding. It is desirable to manufacture the length to be the same as the length of the structural steel pipe (30) and to apply various shapes and sizes according to construction conditions.

[0080] When the above central steel pipe (10) or structural steel pipe (30) is adopted in a square or rectangular shape, it can be applied to construction using a retaining wall method, and it is preferable to construct on soft ground using separate construction equipment with vibration and pressing functions without the process of drilling holes.

[0081] Next, a variable member construction step (S3) is performed, in which the variable member is installed by pressing it into the ground while being placed between the structural steel pipes (30) and the structural steel pipes (30) and the fastening part (20) and the variable member (40) are connected.

[0082] The above variable member (40) is manufactured in a separate manufacturing plant, and the connecting part (41) and the variable body (42) are attached by welding, and the hook part (43) of the variable body (42) is manufactured by bending the blocking part (45) and the hook part (46) and then applied to construction.

[0083] More specifically, the variable member (40) is formed as a pair, and a connecting end (41) connected to the fastening part (20) is manufactured in a ring or circular shape at each end and installed.

[0084] A ring-shaped hook portion (43) is manufactured and installed at each end of the variable body (42) that extends integrally with the above-mentioned connecting portion (41).

[0085] The end of the above hook portion (43) is in the form of a hollow tube, and a barrier portion (45) is manufactured and installed in which a plurality of discharge holes (44) are formed along the length direction.

[0086] At the end of the hook portion (43) of the above variable member (40), a hook portion (46) is manufactured and installed along the length direction so that they interlock with each other.

[0087] When the above variable member (40) is installed in the ground, the hooking spacing of the hook portion (43) is adjusted according to the spacing between the structural steel pipe (30) and the structural steel pipe (30) in the ground, allowing for active corresponding installation. This feature enables smooth installation by varying the fastening spacing even if the spacing of the structural steel pipe (30) is irregular.

[0088] The above variable member (40) has the characteristic of expanding the ground between structural steel pipes (30) and structural steel pipes (30) and being constructed in a straight line, by bending the front end at an angle to create a pointed angled end (42a) in order to improve the penetration ability when constructed on the ground and prevent leakage of grout (G) and water expansion agent (W).

[0089] Next, after the variable member construction step (S3) is performed, a steel pipe grouting step (S4) is performed in which grout (G) is injected into the internal space of the central steel pipe (10) and the space between the central steel pipe (10) and the structural steel pipe (30).

[0090] The above steel pipe grouting step (S4) can be constructed by combining the central steel pipe (10) and the structural steel pipe (30), but depending on the construction conditions or design, only the structural steel pipe (30) may be selected for construction.

[0091] After the above steel pipe grouting step (S4), a water-blocking step (S5) is performed in which grout (G) is injected or a water-expanding agent (W) is filled into the fastening part (20) and variable member (40) of the structural steel pipe (30).

[0092] The above water-blocking step (S5) is characterized by injecting grout (G) when the fastening protrusion (21) of the fastening part (20) is adopted in the form of a steel pipe, thereby sealing the gap between the fastening part (20) and the connecting end (41) of the variable member (40) while simultaneously increasing structural strength.

[0093] When the fastening portion (20) is adopted in the form of a steel pipe, grout (G) or a water-expanding agent (W) is injected into the hook space (47) formed between the sealing portion (45) and the hook portion (46) of the hook portion (43), the sealing portion (45) and the hook portion (46), and the hook portion (46) and the hook portion (46), thereby reinforcing strength with the grout (G) and expanding with moisture with the water-expanding agent (W), sealing the gaps between the sealing portion (45) and the hook portion (46) of the hook portion (43), the sealing portion (45) and the hook portion (46), and the hook portion (46) and the hook portion (46), preventing groundwater or underground moisture from penetrating.

[0094] Next, a finishing step (S6) is performed in which a finishing material is applied to the inside of the above-mentioned watertight wall or tunnel-shaped structure for securing underground space.

[0095] Although the present invention has been illustrated and described above with reference to specific preferred embodiments, the present invention is not limited to the embodiments described above, and various changes and modifications may be made by those skilled in the art without departing from the spirit of the invention. Explanation of the symbols

[0097] 1 : Drill hole 2 : Expansion bit 3 : Screw 4 : Screw shaft 10 : Central steel pipe 11 : Flow hole 20 : Fastening part 21 : Fastening projection 22 : Fastening groove 30 : Structural steel pipe 31 : Connecting member 40 : Variable member 41: Connecting part 42: Variable body 42a: Inclined section 43: Hook section 44 : Discharge hole 45 : Blocking device 46 : Hook section 47 : Hook space 48 : Connecting body 49 : Hollow space 100: Underground structure 200: Vertical or horizontal jacking equipment S1: Installation phase S2: Excavation and steel pipe construction phase S3: Variable member construction stage S4: Steel pipe grouting stage S5: Stage S6: Final Stage G: Grout W: Water-expanding agent

Claims

Claim 1 For the construction of a structure for an underground space in the form of a watertight wall or a tunnel by installing steel pipes in a vertical or horizontal direction, a central steel pipe (10) is connected to the rear of an expansion bit (2) for constructing a drilling hole (1) in the ground, surrounds a screw (3) for drilling and soil removal, and is pressed into the drilling hole (1) simultaneously with drilling; a structural steel pipe (30) is connected to the rear of the expansion bit (2) and surrounds the central steel pipe (10), is pressed into the interior of the drilling hole (1) together with the central steel pipe (10) simultaneously with drilling, and has a plurality of fastening parts (20) formed along the length direction on its outer surface; a variable member (40) is fastened to the fastening part (20) and pressed into the structural steel pipe (30) to be connected in a variable corresponding manner according to the installation spacing between the structural steel pipes (30), and is formed as a set of two; the variable member (40) is a double pipe having a function of connecting between the structural steel pipes (30) and a function of sealing the space between them. An underground structure using a retractable sheet pile, wherein the variable member (40) is formed in pairs, and a connecting end (41) connected to a fastening part (20) is formed in a ring or circular shape at each end, and a hook part (43) in the shape of a ring is formed at each end of a variable body (42) that extends integrally with the connecting end (41), and the hook part (43) is formed at each end of the variable body (42) so that the hooking spacing of the hook part (43) is adjusted according to the installation spacing between the structural steel pipes (30). Claim 2 An underground structure using a double pipe and an expandable sheet pile, characterized in that, in the first paragraph, a plurality of connecting members (31) supported on the outer surface of the central pipe (10) are formed to be connected in a circular arrangement on the inner surface of the structural pipe (30), the central pipe (10) or the structural pipe (30) is formed in a square or rectangular shape, the structural pipe (30) is formed to be connected to the rear of the expansion bit (2) alone, and the connecting part (20) is formed on the outer surface along the longitudinal direction of the structural pipe (30) and is configured in the form of a connecting projection (21) or a connecting groove (22). Claim 3 delete Claim 4 An underground structure using a double pipe and an expandable sheet pile, characterized in that, in the first paragraph, the end of the hook portion (43) of the variable member (40) is in the form of a hollow tube and a sealing member (45) is formed with a plurality of discharge holes (44) formed along the longitudinal direction, or a hook portion (46) is formed along the longitudinal direction at the end of the hook portion (43) of the variable member (40) so as to be caught on each other, and is composed of a pair of variable members (40) having the sealing member (45) formed therein, a variable member (40) having the sealing member (45) formed therein and a variable member (40) having the hook portion (46) formed therein, or a pair of variable members (40) having the hook portion (46) formed therein. Claim 5 An underground structure using a double pipe and an expandable sheet pile, characterized in that, in claim 4, grout (G) or a water-expanding agent (W) is inserted into the cutoff portion (45) and the hook portion (46) of the hook portion (43). Claim 6 An underground structure using a steel pipe, characterized in that, in claim 4, a grout (G) or a water-expanding agent (W) is inserted into the hook space (47) formed between the sealing member (45) and the sealing member (45), between the sealing member (45) and the hook member (46), and between the hook member (46) and the hook member (46) of the above-mentioned hook portion (43). Claim 7 An underground structure using a double pipe and an expandable sheet pile, characterized in that, in claim 1, the variable member (40) has a connecting body (48) that extends integrally with the connecting end (41) formed at both ends, or the variable member (40) has a connecting body (48) that extends integrally with the connecting end (41) formed at both ends, and a hollow space (49) is formed in the center of the connecting end (41) and the connecting body (48), so that grout (G) or a water-expanding agent (W) is filled inside the hollow space (49). Claim 8 An underground structure using a double pipe and an expandable sheet pile, characterized in that, in the first paragraph, the variable member (40) is connected to the fastening part (20) of the structural steel pipe (30) and the front end that is pressed into the ground is formed with an inclined end (42a) so as to be pointed. Claim 9 An underground structure using a double pipe and an expandable sheet pile, characterized in that, in claim 1, the central pipe (10) has a flow hole (11) formed along the longitudinal direction, and grout is injected between the central pipe (10) and the structural pipe (30). Claim 10 In order to construct a structure for an underground space in the form of a watertight wall or a tunnel by installing steel pipes in a vertical or horizontal direction, a structural steel pipe (30) is installed by being fitted into a central steel pipe (10) that is installed to surround a screw (3) connected to the rear of an expansion bit (2) for constructing a bore hole (1) in the ground, and the central steel pipe (10) and the structural steel pipe (30) are simultaneously pressed into the interior of the bore hole (1) constructed in the ground by the expansion bit (2) and the screw (3) by the rotation and pressing operation of a vertical or horizontal pressing equipment, and the structural steel pipe (30) is pressed into the ground while being positioned between the structural steel pipe (30) and the fastening part (20) and the variable member (40) are connected, and grout (G) is injected into the internal space of the central steel pipe (10) and the space between the central steel pipe (10) and the structural steel pipe (30), and the fastening part (20) of the structural steel pipe (30) and In a method for constructing an underground structure using a double pipe and an expandable sheet pile, in which grout (G) is injected or a water-expanding agent (W) is filled into the variable member (40) and a finishing material is installed inside the tunnel-shaped structure for securing the water-blocking wall or underground space, the variable member (40) is formed as a pair, and a connecting end (41) connected to a fastening part (20) is formed in a ring or circular shape at each end of each variable body (42) that extends integrally with the connecting end (41), a ring-shaped hook part (43) is formed at each end of the hook part (43), and a water-blocking part (45) is formed at the end of the hook part (43) in the shape of a hollow pipe and has a plurality of discharge holes (44) formed along the length direction, or a hook part (46) is formed along the length direction at the end of the hook part (43) of the variable member (40) so as to be caught on each other, and when the variable member (40) is driven into the ground, the structural steel pipe (30) and The hook section (43) is adjusted according to the ground construction spacing of the structural steel pipe (30), and the sealing section (45) and hook section (46) of the hook section (43), and the sealing section (45) and sealing section (45), and the sealing section (45) and hook section (46),A method for constructing an underground structure using a double pipe and an expandable sheet pile, characterized in that a grout (G) or a water-expanding agent (W) is inserted into the hook space (47) formed between the hook sections (46) and the hook sections (46). Claim 11 delete Claim 12 A method for constructing an underground structure using a double pipe and an expandable sheet pile, characterized in that, in claim 10, the variable member (40) has a connecting body (48) that extends integrally with the connecting end (41) formed at both ends, or the variable member (40) has a connecting body (48) that extends integrally with the connecting end (41) formed at both ends, and a hollow space (49) is formed in the center of the connecting end (41) and the connecting body (48), so that grout (G) or a water-expanding agent (W) is filled inside the hollow space (49).

Citation Information

Patent Citations

  • 3-Layered cutoff wall structure with pile of wall steel pipe and variabld linking body, and construction method of cutoff wall using the same