COKE PLANT OPERATION METHODS

VN10062244BActive Publication Date: 2026-11-02PAUL WURTH SA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
VN1202403702
Authority / Receiving Office
VN · VN
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-10-20
Publication Date
2026-11-02
Estimated Expiration
2042-10-20
Patent Text Reader

Abstract

The invention relates to a method of operating a coke plant, which includes the following steps: (a) supplying (B) vertical furnace gas stream and coke production gas stream (C); (b) treating a portion (B1) of the vertical furnace gas stream (B) in a CO conversion device (30) to obtain a treated gas stream; (c) feeding the treated vertical furnace gas stream in a CO2 removal device (40) to obtain a primary CO2-removed vertical furnace gas stream (D); (d) mixing the CO2-removed vertical furnace gas stream (D) with a portion (B2) of the vertical furnace gas stream (B) in a first mixing device (60) to obtain a secondary CO2-removed vertical furnace gas stream (E); (d) mixing the secondary CO2-removed vertical furnace gas stream (E) with a portion of the coke production gas stream (C) in a secondary mixing device (70) to obtain a third CO2-removed gas stream (F); (e) feeding the CO-removed gas stream; three (F) into the coke oven's (80) heating system from the coke plant to convert coal into coke, thereby producing coke oven gas (H) and exhaust gas (G); in which the characteristics of the CO-removed vertical furnace gas stream;Test level (E) is determined by the first analyzer (65) behind the first mixer (60) determined by the characteristics of the CO-removed gas stream; the third (F) in the second analyzer (75) behind the second mixer (70); in which part (B2) of the vertical furnace gas stream (B) and part of the coke smelting gas stream (C) are controlled based on the characteristics determined by the second analyzer (65) and the second (75) to adjust at least one of the CO2 content, CO content, H content, Wobbe index, combustion air demand, fire balance and lower heating value of the third CO-removed gas stream (F) thereby controlling the operation of the non-fired smelting system.;
Need to check novelty before this filing date? Find Prior Art