Coal mining method for mining extremely thin coal seam
By using a push-type coal mining method with two shearers and long-arm boxes alternately used on extremely thin coal seams, the problems of high waste extraction rate and serious equipment loss in ultra-thin coal seam mining have been solved, and the coal mining efficiency and efficiency have been improved. Resource utilization rate reduces mining costs.
Patent Information
- Application Number
- PCT/CN2023/103000
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-28
- Filing Date
- 2023-06-28
- Publication Date
- 2024-10-03
AI Technical Summary
It is difficult to efficiently mine extremely thin coal seams less than 0.9m thick with existing technology, especially when the coal seam has a hard roof and floor, resulting in high waste extraction rate, serious equipment loss, high washing costs, low coal mining efficiency, and existing mechanized mining The equipment cannot adapt to the mining of coal seams smaller than 0.7m and requires manual blasting to drop coal.
Two power-front shearers and long-arm boxes are used to mine extremely thin coal seams through the push-type coal mining method. The mining zones are parallel to each other. After one shearer is used to complete the work of one mining zone, the other The shearer opens a new mining zone, and simultaneously withdraws and docks the long-arm box to achieve alternate use, avoiding space occupied by the long-arm box and equipment loss.
It effectively avoids the destruction of ultra-thin coal seams and rock walls, reduces waste mining rates and equipment losses, improves coal mining efficiency and resource utilization, reduces washing costs, and reduces mining accident rates.
Smart Images

Figure CN2023103000_03102024_PF_FP_ABST
Abstract
Description
Coal mining method for mining extremely thin coal seams Technical Field
[0001] The invention belongs to the technical field of thin coal seam mining, and in particular provides a coal mining method for mining extremely thin coal seams. Background Art
[0002] In terms of industrial production, my country uses coal as its main energy source. Coal seams mined in underground operations are considered thin if they are less than 1.3m thick, while those less than 0.9m thick are often called extremely thin coal seams.
[0003] According to industry standards, coal seams mined in underground operations are considered thin if they are less than 1.3m thick, and extremely thin if they are less than 0.9m thick.
[0004] At present, for the mining of thin coal seams, when the coal seams have soft rock roof or soft rock floor, most mines will choose to increase the mining height and cut the top or bottom of the comprehensive mining technology and equipment for mining. Although this increases equipment wear, material consumption and raw coal washing costs, the overall process technology is mature and the cost is predictable, so most companies are more likely to accept this mining plan.
[0005] Common coal mining machines include drum shearers, plows and auger shearers.
[0006] Among them, when using drum shearers and plows to mine thin coal seams, the thickness of the thin coal seams is smaller than the mining scale of the mining equipment. The mining process will damage the hard roof and floor of the coal seams, resulting in a large amount of mining waste, an increase in the waste content of the mined coal, serious equipment wear and tear, and a significant increase in washing costs.
[0007] The auger shearer is a type of mining equipment capable of mining extremely thin coal seams. However, the drilling process is susceptible to varying geological conditions, the weight of the drill bit and drill rod, and unbalanced torque, which often causes the drill bit and drill rod to deflect during drilling, limiting the depth of the drill. The loading and unloading of the drill rod takes a long time, seriously affecting coal mining efficiency. During drilling, small coal pillars must be left between holes according to the roof conditions, resulting in a narrow mining width and low mining efficiency and resource recovery. In particular, due to the incompleteness of the drilling technology in preventing and controlling hazards such as gas, it has now been removed from the safety standards.
[0008] Therefore, the currently used comprehensive mechanized mining equipment for thin coal seams is only suitable for mining coal seams with a mining height greater than 0.9m, and the working conditions are difficult. Even with the use of intelligent control mining technology, personnel still need to enter the working face for maintenance or accident handling. This increases the mining accident rate, material consumption, mining costs and washing costs, resulting in low economic benefits. Comprehensive mechanized mining is not yet feasible for coal seams with hard roof and floor thickness less than 0.85m. Even with high-end general mining technology, it is only applicable to coal seams above 0.7m. For coal seams with a mining height less than 0.7m thick in coal-deficient areas or small mines mining scarce coal varieties, the only option is to use the original method of blasting and manually removing coal.
[0009] In summary, for the mining of coal seams with hard roof and floor conditions or extremely thin coal seams, especially to solve the problem of protective layer mining under coal seam hard roof and floor conditions, it is urgent to develop a complete set of intelligent mining technologies and equipment for thin and ultra-thin coal seams.
[0010] In order to solve the above problems, the present invention provides a coal mining method for mining extremely thin coal seams.
[0011] Summary of the Invention
[0012] To achieve the above-mentioned objectives, the present invention adopts a technical solution: a coal mining method for mining extremely thin coal seams, which uses two front-powered coal shearers and long-arm boxes as main coal mining equipment to carry out push-type coal mining in extremely thin coal seams, with the mining zones parallel to each other. After one coal shearer completes coal mining in one mining zone, another coal shearer is used to operate on the adjacent coal body to open another new mining zone. As excavation work in the new mining zone progresses, the long-arm boxes are synchronously withdrawn from the previous mining zone and directly docked with the coal shearer in the new mining zone.
[0013] The specific steps of this coal mining method are as follows:
[0014] Step 1: Make openings on the metal mesh on the side of the tunnel;
[0015] Step 2: Do the preparatory work before coal mining construction;
[0016] Step 3: Excavating the first mining zone. When the shearer advances to the maximum stroke, the excavation of the first mining zone is completed.
[0017] Step 4: After the excavation work in the first mining zone is completed, the excavation work in the second mining zone is carried out;
[0018] Step 5: withdraw the first coal mining machine, move the rail transport equipment, prepare for the coal mining operation of the next mining belt, and process the goaf of the first mining belt;
[0019] Step 6: Repeat steps 4 and 5 until all mining work of the extremely thin coal seam is completed.
[0020] Furthermore, in step 1, the specific method of making an opening treatment on the metal mesh of the laneway side is: cutting an opening in the metal mesh of the laneway side.
[0021] Furthermore, in step 2, the preparatory work before coal mining construction is specifically as follows: move the rail transport equipment to the opening, lay the transfer machine along the tunnel on the side close to the mining tunnel wall, and use the hoist to lift the first coal mining machine to the opening position and adjust the angle of the coal mining machine.
[0022] Furthermore, in step 3, the specific process of excavating the first mining zone is as follows: starting the first coal mining machine, and the first coal mining machine advances along the current mining zone;
[0023] At the same time, the long arm box is transported into the tunnel, and as the first coal mining machine advances, the long arm box is connected section by section at the tail of the first coal mining machine.
[0024] Furthermore, in step 4, the specific process of excavating the second mining zone is as follows: after completing the excavation of the first mining zone, repeat the opening process in step 1, and call the second coal mining machine to excavate the second mining zone;
[0025] The second shearer is started and advanced along the current mining zone;
[0026] At the same time, the long arm box in the first mining zone is withdrawn and the withdrawn long arm box is docked to the tail of the second coal mining machine.
[0027] Furthermore, in step 4, before the excavation work of the second mining zone begins, the long arm box in the first mining zone is withdrawn by one section for standby use.
[0028] Furthermore, in step five, the goaf is treated by plugging and grouting.
[0029] Furthermore, in step six, after the mining of the extremely thin coal seam is completed, the coal mining machine and the long arm box are completely withdrawn from the tunnel, and the processing of the last goaf is completed.
[0030] The beneficial effects of using the present invention are:
[0031] This method uses a horizontal drum shearer with a small drum radius to carry out coal mining operations. The rock wall of the extremely thin coal seam will not be damaged during the mining process, thereby avoiding problems such as large-scale gangue mining, increased gangue content in mined coal, serious equipment wear and tear, and a significant increase in washing costs.
[0032] The long-arm boxes are used alternately in two adjacent mining zones. The large number of long-arm boxes used in coal mining work will not stay in the tunnel, avoiding the problem of long-arm boxes occupying a large amount of tunnel space, affecting other work and even causing safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] FIG1 is an axial schematic diagram of the present invention;
[0034] FIG2 is a schematic diagram of the sidewall and sidewall metal mesh in the AA direction in FIG1;
[0035] FIG3 is a schematic diagram of the alternating coal mining working state in the BB direction in FIG1 .
[0036] The reference numerals include: 1-tunnel; 101-tunnel metal mesh; 2-rock mass; 3-extremely thin coal seam; 301-mining zone; 302-coal pillar; 401-conveyance mechanism; 402-long arm box; 403-first coal mining machine; 404-second coal mining machine; P-coal seam inclination direction; Q-tunnel direction. DETAILED DESCRIPTION
[0037] The present invention is described in detail below with reference to the accompanying drawings.
[0038] 1 to 3 , the tunnel 1 is a workspace for construction, the extremely thin coal seam 3 is a coal reservoir to be excavated, and the upper and lower sides of the extremely thin coal seam 3 are both rock masses 2. During the construction of the tunnel 1, a metal mesh 101 is built on the tunnel side for support.
[0039] The mining zone 301 is a strip of space left on the coal body during the coal mining operation. When the coal mining operation in the current mining zone 301 is completed and the coal mining machine withdraws from the mining zone 301, the mining zone 301 becomes a goaf.
[0040] The mining equipment mainly includes rail transport equipment 401, a long arm box 402 and two coal mining machines. The tunnel 1 is paved with tracks for the rail transport equipment 401 to travel.
[0041] The rail transport equipment 401 mainly consists of a rail vehicle and two propulsion mechanisms;
[0042] The long arm box body 402 is mainly composed of two spiral conveying rods and a steel box body. Multiple sections of the long arm box body 402 can be connected end to end.
[0043] The coal mining machine mainly consists of a machine head, a machine body and a travel mechanism. The machine head is a cutting device, and the machine body is a conveying device. The travel mechanism is assembled at the bottom of the machine head and the machine body to provide power to drive the coal mining machine. The machine body can be docked with the long arm box 402 to form a continuous conveying mechanism.
[0044] Preferably, the coal mining machine adopts a horizontal axis drum structure, with a head width of 2400mm and a cutting head diameter of 500mm. The cutting head is provided with a height adjustment cylinder with an adjustable range of 500mm to 1200mm.
[0045] A coal mining method for mining extremely thin coal seams, comprising the following steps:
[0046] Step 1: Cut an opening in the metal mesh 101 of the tunnel 1, which is the opening of the mining zone 301;
[0047] The height of the metal mesh 101 cut on the side of the roadway should be greater than the thickness of the coal seam, and the width of the cut should be greater than the width of the coal mining machine head;
[0048] Step 2: Move the rail transport equipment 401 to the opening, lay a transfer machine along the side of the tunnel 1 close to the mining tunnel wall, and use a hoist to lift the first coal mining machine 403 to the opening position;
[0049] Adjust the body angle to ensure that when the first coal mining machine 403 is in operation, the propulsion direction is consistent with the coal seam inclination direction P.
[0050] Step 3: Start the first coal mining machine 403 to excavate the first mining zone;
[0051] During the excavation process, as the first shearer 403 advances, the long arm boxes 402 are transported one by one into the tunnel 1 by the hoist, and the long arm boxes 402 are docked with the tail of the first shearer 403 using the propulsion mechanism (when the long arm boxes 402 are docked, the first shearer 403 temporarily stops operating);
[0052] The coal cut from the very thin coal seam 3 by the first shearer 403 is transported to the opening of the mining zone 301 by the body or long arm box 402 of the first shearer 403. The coal falls onto the transfer machine, which then transports the coal to the belt conveyor laid in the roadway and finally to the coal bunker in the mining area.
[0053] The excavation depth needs to be determined according to the coal seam and the surrounding geological environment. The first coal mining machine 403 stops after excavating to the specified depth, completing the excavation work of the first mining zone 301.
[0054] Step 4: Excavation of the second mining zone;
[0055] Repeat step 1 to cut an opening for the second mining zone on one side of the first mining zone along the lane, and then hoist the second shearer 404 to the opening position using a hoist;
[0056] The second shearer 404 is started to excavate the second mining zone;
[0057] According to the excavation speed of the second mining zone, the long arm box 402 in the first mining zone is synchronously withdrawn, and the withdrawn long arm box 402 is docked to the tail of the second coal mining machine 404;
[0058] When the excavation work of the second mining zone is completed, the long arm box 402 in the first mining zone is completely withdrawn and assembled into the second mining zone;
[0059] Before the excavation work of the second mining zone begins, the long arm box 402 in the first mining zone is withdrawn by one section to ensure the smoothness of the docking operation of the long arm box 402.
[0060] Step 5: withdraw the first coal mining machine 403, move the rail transport equipment 401, and process the goaf;
[0061] After the excavation work in the second mining zone is completed, the first coal shearer 403 in the first mining zone is withdrawn, and the rail transport device 401 is moved along the lane by the distance of one coal shearer position. Then, the first coal shearer 403 is moved from one side of the second mining zone to the other side of the second mining zone by the hoist. The coal mining operation process of the second mining zone and the docking process of the long arm box 402 in step 4 are repeated to carry out the excavation work in the third mining zone.
[0062] The goaf is treated by plugging and grouting.
[0063] Step 6: Repeat the operation of step 5 repeatedly to continue excavating multiple mining zones 301 until all mining work of the very thin coal seam 3 is completed;
[0064] After the mining work of the extremely thin coal seam 3 is completed, the two coal mining machines and the entire long arm box body 402 are withdrawn, and the coal mining machines and the long arm box body 402 are transported out of the tunnel using a spreader and a rail car.
[0065] During the coal mining operation, it should be noted that a coal pillar 302 is left between two adjacent mining zones 301;
[0066] The width of the coal pillar shall not be less than 500mm.
[0067] The above content is only a preferred embodiment of the present invention. For ordinary technicians in this field, according to the concept of the present invention, many changes can be made in the specific implementation method and application scope. As long as these changes do not deviate from the concept of the present invention, they all fall within the scope of protection of the present invention.
Claims
1. A method for mining extremely thin coal seams, characterized in that: Two front-powered coal mining machines and long-arm boxes are used as the main coal mining equipment to carry out push-type coal mining on extremely thin coal seams. The mining belts are parallel to each other. After one coal mining machine completes the coal mining work in one mining belt, another coal mining machine is used to operate on the adjacent coal body to open another new mining belt. As the excavation work in the new mining belt progresses, the long-arm box is synchronously withdrawn from the previous mining belt and directly connected to the coal mining machine in the new mining belt. The specific steps of this coal mining method are as follows: Step 1: Make openings on the metal mesh on the side of the tunnel; Step 2: Do the preparatory work before coal mining construction; Step 3: Carry out excavation work on the first mining zone. When the coal mining machine advances to the maximum stroke, the excavation work on the first mining zone is completed; Step 4: After the excavation work in the first mining zone is completed, the excavation work in the second mining zone is carried out; Step 5: withdraw the first coal mining machine, move the rail transport equipment, prepare for the coal mining operation of the next mining belt, and process the goaf of the first mining belt; Step 6: Repeat steps 4 and 5 until all mining work of the extremely thin coal seam is completed.
2. A method for mining extremely thin coal seams according to claim 1, characterized in that: In step 1, the specific method of making an opening treatment on the metal mesh on the side of the tunnel is: cutting an opening in the metal mesh on the side of the tunnel.
3. A method for mining extremely thin coal seams according to claim 1, characterized in that: In step two, the preparatory work before coal mining construction is specifically as follows: move the rail transport equipment to the opening, lay the transfer machine along the tunnel on the side close to the mining tunnel wall, and use the hoist to lift the first coal mining machine to the opening position and adjust the angle of the coal mining machine.
4. A method for mining extremely thin coal seams according to claim 1, characterized in that: In step 3, the specific process of excavating the first mining zone is as follows: starting the first coal mining machine, and the first coal mining machine advances along the current mining zone; At the same time, the long arm box is transported into the tunnel, and as the first coal mining machine advances, the long arm box is docked section by section at the tail of the first coal mining machine.
5. A method for mining extremely thin coal seams according to claim 1, characterized in that: In step 4, the specific process of excavating the second mining zone is as follows: after completing the excavation of the first mining zone, repeat the opening process in step 1, and call the second coal mining machine to excavate the second mining zone; The second coal mining machine is started, and the second coal mining machine advances along the current mining zone; At the same time, withdraw the long arm box in the first mining zone and dock the withdrawn long arm box to the tail of the second coal mining machine.
6. A method for mining extremely thin coal seams according to claim 1, characterized in that: In step 4, before the excavation work of the second mining zone begins, the long arm box in the first mining zone is withdrawn by one section for standby use.
7. A method for mining extremely thin coal seams according to claim 1, characterized in that: In step five, the goaf is treated by plugging and grouting.
8. A method for mining extremely thin coal seams according to claim 1, characterized in that: In step six, after the mining of the extremely thin coal seam is completed, the coal mining machine and the long arm box are completely withdrawn from the tunnel, and the processing of the final goaf is completed.
Citation Information
Patent Citations
Extra-thin coal seam bottom climbing type comprehensive exploitation technology
CN103195428A
Extension arm type combined coal mining machine
CN113482609A
Modularized thin seam mining machine and use method thereof
CN115822589A
Coal mining method for mining ultra-thin coal seam
CN116025355A
Mobile mine roof support with mining apparatus
US3891275A
Cited By
Coal mining in-situ identification method and system based on element and spectral characteristics
CN119164901A
Scraper-free coal mining method for self-sliding coal seam by steel wire rope traction digging and mining machine
CN120487093A
Method for developing powerful steeply inclined seam with release of coal from overlying strata
RU2852075C1