Large graphitization furnace and joint production method

By arranging multiple workstations and pre-graphitization bins side by side in the graphitization furnace, using waste heat to reduce the volatile content of raw materials, and adopting a production method in which power is supplied from the center to both sides in sequence, the low production efficiency and low production efficiency of the existing graphitization furnace are solved. The problem of high land cost has been solved by upsizing and reducing energy consumption.

WO2024198527A1PCT designated stage expired Publication Date: 2024-10-03CHINA ALUMINUM INT ENG CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/138645
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2023-12-14
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The existing graphitization furnace has low production efficiency and high floor space cost. The heat is wasted during the natural cooling process and cannot be effectively reused, resulting in production speed and cost problems.

Method used

Design a large-scale graphitization furnace. By setting up multiple workstations side by side in the furnace body and setting up pre-graphitization bins between adjacent bins, waste heat is used to reduce the volatile content of raw materials and the insulating carbon bricks on one side of the furnace wall are eliminated. In order to reduce heat dissipation, a production method is adopted in which power is supplied from the center to both sides.

Benefits of technology

The graphitization furnace has been enlarged, saving construction land and one-time investment costs, reducing production energy consumption, and improving production efficiency and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023138645_03102024_PF_FP_ABST
    Figure CN2023138645_03102024_PF_FP_ABST
Patent Text Reader

Abstract

A large graphitization furnace and a joint production method. The large graphitization furnace comprises a furnace body (1), wherein several material boxes (5) aligned end to end are arranged in the furnace body (1) side by side in a width direction; two ends of each material box (5) in a length direction are each provided with an electrode wall (7); one station is formed by one material box (5) and the corresponding electrode walls (7) at the two ends of the material box (5); the electrode walls (7) are conductors; an insulating carbon brick (9) is arranged between adjacent electrode walls (7); a pre-graphitization material box (6) is arranged between adjacent material boxes (5); each material box (5) is filled with a resistive material and a raw material to be graphitized; a raw material to be heated at a low temperature is arranged in each pre-graphitization material box (6); and the remaining positions inside the furnace body (1) are filled with a thermal insulation material (4). By dividing the whole furnace body (1) into several stations, the heat storage and heat dissipation losses of the furnace body (1) are reduced, a large-scale graphitization furnace is realized, and in comparison with a graphitization furnace with the same productivity, the area occupied for construction and the one-time investment cost are saved on. By arranging a pre-graphitization material box (6) between adjacent material boxes (5), the graphitization waste heat in the material boxes (5) is recycled. By means of a production method of sequentially applying electricity from the center to two sides, the waste heat during a graphitization process is fully utilized, thereby shortening the graphitization time, and improving the production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Large graphitization furnace and combined production method Technical Field

[0001] The present invention relates to the technical field of graphitization furnaces, and in particular to a large-scale graphitization furnace and a combined production method. Background Art

[0002] Anode materials are a core component of new energy power batteries. With the active guidance of national policies on the development of new energy vehicles, the demand for anode materials is also increasing. The production of anode materials primarily utilizes an Acheson graphitization furnace. The process involves applying electricity to heat the resistor material within the furnace, raising the temperature of the graphitizable carbon to 3000°C for graphitization modification to produce graphitized anode material. Once the set temperature is reached, power is turned off, and the high-temperature graphitized anode material is allowed to naturally cool within the Acheson graphitization furnace to the discharge temperature before being discharged.

[0003] The Acheson graphitization furnace is a periodic intermittent production, which takes about 20-30 days from furnace loading, production, cooling to furnace unloading. Usually, the natural cooling time of the furnace body and materials accounts for more than 2 / 3 of the entire production cycle. Therefore, the effective productivity of a single Acheson graphitization furnace is not high. In order to meet the increasing production demand for negative electrode materials, a larger graphitization furnace and a more efficient production mode are required in the production process to increase the production speed of negative electrode materials. In the prior art, on the one hand, the structural dimensions of the graphitization furnace are appropriately lengthened and widened to increase the production capacity of a single graphitization furnace. However, if a graphitization furnace that is too long and too wide is designed in pursuit of higher production speed, the internal heating of the furnace body will be uneven, thereby reducing product quality. On the other hand, multiple graphitization furnaces can be set on the same production line, as shown in Figure 2. However, due to the high power of the graphitization furnace, conventional production conditions can only power 1-2 graphitization furnaces. Therefore, each graphitization furnace needs to be energized in sequence. After the processing is completed, the graphitization furnace that is energized first begins to cool naturally. When the graphitization furnace that is energized later is producing, the graphitization furnace that is energized first can be unloaded after cooling is completed, thereby speeding up the production rhythm. However, this production model still has two disadvantages. The first is that multiple graphitization furnaces occupy a large area, and the large space required leads to high one-time investment costs, and the space between adjacent graphitization furnaces is not effectively utilized; the second is that the heat during the natural cooling process of the graphitization furnace is dissipated in vain and cannot be effectively reused.

[0004] Summary of the Invention

[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a large-scale graphitization furnace and a joint production method. By arranging a plurality of workstations side by side along the width direction of the furnace body and providing a pre-graphitization material box between adjacent material boxes, the graphitization furnace can be large-scaled, while saving construction space and one-time investment costs, and reducing product energy consumption while ensuring the compactness of production rhythm.

[0006] A large graphitization furnace comprises a furnace body, wherein a plurality of material boxes aligned end to end are arranged side by side in the width direction of the furnace body, and electrode walls are provided at both ends of each material box along the length direction. A material box and the electrode walls corresponding to its two ends constitute a work station, wherein the electrode walls are conductors, and insulating carbon bricks are provided between adjacent electrode walls. Pre-graphitization material boxes are provided between adjacent material boxes, and the material boxes are filled with resistance materials and raw materials to be graphitized. The pre-graphitization material boxes contain raw materials to be heated at low temperatures, and the rest of the furnace body is filled with insulation materials.

[0007] By eliminating one side of the furnace wall in the structure and setting insulating carbon bricks between adjacent electrode walls, the entire furnace body is divided into several workstations, which reduces the heat storage and heat dissipation losses of the furnace body and makes the graphitization furnace larger. Compared with graphitization furnaces with the same production capacity, it saves construction space and one-time investment costs.

[0008] The pre-graphitization material box contains raw materials to be heated at low temperature. The waste heat generated by graphitization can be used to remove volatiles from the graphitization raw materials or produce low-temperature carbon products, such as recarburizers.

[0009] Furthermore, the height and length of the pre-graphitization bin are smaller than the corresponding height and length of the feed box, and the pre-graphitization bin is placed at the center of the gap between two adjacent feed boxes. This ensures that the temperature of the insulation material at the top, bottom, and both ends of the pre-graphitization bin is not affected by heat loss and reaches the required production temperature.

[0010] Furthermore, the gap width between adjacent material bins is a, and the width of the two side walls of the furnace body from the nearest material bin along the width direction is b, where a = 2b. The width of a is selected based on the current width of b. When a is twice as wide as b, the waste heat utilization efficiency is the highest. If a is too small, insufficient space will result in an inability to place pre-graphitizing materials. If a is too large, heat transfer is slow and heat dissipation is high, resulting in low temperatures in the pre-graphitizing area and insufficient waste heat utilization.

[0011] Furthermore, the outer wall of the furnace body is a steel structure, which ensures the strength of the outer wall of the furnace body.

[0012] Furthermore, furnace head electrodes are provided in the electrode wall, and the furnace head electrodes on both sides of the furnace body are energized to carry out graphitization production.

[0013] Furthermore, the raw materials to be heated at low temperatures within the pre-graphitization bin are graphitization raw materials whose volatiles are to be removed. The graphitization station is a rapidly heating zone. Excessive volatile content in the raw materials can easily cause safety accidents such as furnace explosions. Therefore, low-volatile raw materials are preferred for production. The pre-graphitization bin is located between adjacent bins, and the temperature rises relatively slowly. This allows the waste heat generated by graphitization to be utilized to reduce the volatile content. The resulting product is then used for graphitization, facilitating rapid temperature rise during the graphitization process, ultimately reducing graphitization production time and energy consumption.

[0014] A combined production method for a large graphitization furnace comprises the following steps:

[0015] S01: Power on the central station and graphitize the material box.

[0016] S02: After graphitization is completed in the material box of the central station, power is turned off.

[0017] S03: While stopping the power supply in the previous step, the stations on both sides of the graphitization completion station are powered on, and graphitization is performed in the material boxes of the stations on both sides.

[0018] S04: After graphitization of both sides of the workstation is completed, power is turned off;

[0019] Repeat S03 and S04 until all stations are graphitized.

[0020] By adopting the production method of sequentially applying electricity from the center to both sides, the waste heat in the graphitization process is fully utilized, the graphitization time is shortened, and the production efficiency is improved.

[0021] Furthermore, if the number of workstations is an odd number, there is one central workstation; if the number of workstations is an even number, there are two powered workstations.

[0022] Furthermore, the method further includes step S05: after the cooling of the material box and the pre-graphitized material box is completed, the materials are taken out of the furnace, and are sequentially taken out from the central station to the stations on both sides.

[0023] The beneficial effects of the present invention are:

[0024] The large-scale graphitization furnace of the present invention eliminates one side of the furnace wall in structure, and arranges insulating carbon bricks between adjacent electrode walls to divide the entire furnace body into several workstations, thereby reducing the heat storage and heat dissipation losses of the furnace body, making the graphitization furnace large-scale, and saving construction land and one-time investment costs compared with graphitization furnaces with the same production capacity.

[0025] By setting a pre-graphitization box between adjacent boxes, the waste heat of graphitization in the box is fully utilized, the volatile content of the raw materials in the pre-graphitization box is reduced, and the obtained product is used for graphitization in the later stage, which is conducive to the rapid heating of the graphitization process, and ultimately reduces the graphitization production time and reduces production energy consumption.

[0026] Through the combined production method of sequentially electrifying from the center to both sides, the waste heat in the graphitization process is fully utilized, the graphitization time is shortened, and the production efficiency is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] FIG1 is a schematic structural diagram of a single graphitization furnace along the width direction in the prior art;

[0028] FIG2 is a side view of a configuration of multiple graphitization furnaces in the prior art;

[0029] FIG3 is a top view of a plurality of graphitization furnaces arranged in the prior art;

[0030] FIG4 is a side view of a large graphitization furnace of the present invention;

[0031] FIG5 is a top view of a large graphitization furnace of the present invention.

[0032] In the figure: 1. Furnace body; 2. Steel structure; 3. Concrete foundation; 4. Insulation material; 5. Material box; 6. Pre-graphitization material box; 7. Electrode wall; 8. Furnace head electrode; 9. Insulating carbon bricks. DETAILED DESCRIPTION

[0033] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation methods in conjunction with the accompanying drawings.

[0034] A large graphitization furnace comprises a furnace body 1, wherein a plurality of material boxes 5 aligned end to end are arranged side by side in the width direction of the furnace body 1, and electrode walls 7 are provided at both ends of each material box 5 along the length direction. A material box 5 and the electrode walls 7 corresponding to its two ends constitute a workstation, wherein the electrode walls 7 are conductors, and insulating carbon bricks 9 are provided between adjacent electrode walls 7. A pre-graphitization material box 6 is provided between adjacent material boxes 5, and the material boxes 5 are filled with resistor materials and raw materials to be graphitized. The pre-graphitization material box 6 contains raw materials to be heated at low temperature. The remaining positions inside the furnace body 1 are filled with insulation materials 4, forming a multi-station combined graphitization furnace.

[0035] By eliminating one side of the furnace wall in the structure and setting insulating carbon bricks 9 between adjacent electrode walls 7, the entire furnace body 1 is divided into several workstations, reducing the heat storage and heat dissipation losses of the furnace body 1, and making the graphitization furnace large-scale. Compared with graphitization furnaces with the same production capacity, the construction area and one-time investment costs are saved.

[0036] The pre-graphitization material box 6 contains raw materials to be heated at low temperature. The waste heat generated by graphitization can be used to remove volatile components in the graphitized raw materials or produce low-temperature carbon products such as recarburizers.

[0037] Specifically, the height and length of the pre-graphitization bin 6 are smaller than the corresponding height and length of the bin 5, and the pre-graphitization bin 6 is arranged at the center of the gap between two adjacent bins 5. This ensures that the temperature of the insulation material 4 at the top, bottom, and both ends of the pre-graphitization bin 6 is not affected by heat loss and reaches the required production temperature.

[0038] Specifically, the gap width between adjacent material bins 5 is a, and the width of the two side walls of the furnace body 1 from the nearest material bin 5 along the width direction is b, where a=2b. The width of a is selected based on the current width b. When a is twice as wide as b, the waste heat utilization efficiency is the highest. If a is too small, insufficient space will result in an inability to place pre-graphitizing materials. If a is too large, heat transfer is slow and heat dissipation is high, resulting in a low temperature in the pre-graphitizing area and insufficient waste heat utilization.

[0039] Specifically, the outer wall of the furnace body 1 is a steel structure 2. The steel structure 2 ensures the strength of the outer wall of the furnace body 1. The bottom of the furnace body 1 is a concrete foundation 3.

[0040] Specifically, furnace head electrodes 8 are provided in the electrode wall 7 , and the furnace head electrodes 8 on both sides of the furnace body 1 are energized to perform graphitization production.

[0041] Specifically, the raw materials to be heated at low temperatures within the pre-graphitization bin 6 are graphitization raw materials from which volatiles are to be removed. The graphitization station is a rapidly heating zone. Excessive volatile content in the raw materials can easily cause safety accidents such as furnace explosions. Therefore, low-volatile raw materials are preferred for production. The pre-graphitization bin 6 is located between adjacent bins 5 and heats up relatively slowly. This allows the waste heat generated by graphitization to be utilized to reduce the volatile content. The resulting product is then used for graphitization, facilitating rapid temperature increases during the graphitization process, ultimately reducing graphitization production time and energy consumption.

[0042] A combined production method for a large graphitization furnace comprises the following steps:

[0043] S01: The central station is powered on and graphitization is carried out in the material box 5.

[0044] S02: After graphitization is completed in the material box 5 of the central station, power is turned off.

[0045] S03: While stopping the power supply in the previous step, the stations on both sides of the graphitization completion station are powered on, and graphitization is performed in the material boxes 5 of the stations on both sides.

[0046] S04: After graphitization of both sides of the workstation is completed, power is turned off;

[0047] Repeat S03 and S04 until all stations are graphitized.

[0048] After the power supply to the above-mentioned workstation is stopped, it enters the natural cooling state, and the natural cooling and the power supply heating of the subsequent workstation are carried out simultaneously.

[0049] Through the combined production method of sequentially electrifying from the center to both sides, the waste heat in the graphitization process is fully utilized, the graphitization time is shortened, and the production efficiency is improved.

[0050] Specifically, if the number of workstations is an odd number, there is one central workstation; if the number of workstations is an even number, there are two powered workstations.

[0051] Specifically, the process also includes step S05: after the cooling of the material box 5 and the pre-graphitization material box 6 is completed, they are taken out of the furnace, and are sequentially taken out of the furnace from the central station to the stations on both sides.

[0052] Although the embodiments of the present invention have been shown and described above, it will be understood that the above embodiments are illustrative and are not to be construed as limitations on the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A large graphitization furnace, comprising a furnace body (1), characterized in that: A plurality of material boxes (5) aligned end to end are arranged side by side in the width direction of the furnace body (1); each material box (5) is provided with electrode walls (7) at both ends in the length direction; a material box (5) and the electrode walls (7) corresponding to the two ends thereof form a work station; the electrode walls (7) are conductors; insulating carbon bricks (9) are provided between adjacent electrode walls (7); a pre-graphitization material box (6) is provided between adjacent material boxes (5); the material boxes (5) are filled with resistor materials and raw materials to be graphitized; the pre-graphitization material box (6) contains raw materials to be heated at low temperature; the remaining positions inside the furnace body (1) are filled with heat-insulating materials (4), thereby forming a multi-station joint graphitization furnace.

2. A large graphitization furnace according to claim 1, characterized in that: The height and length of the pre-graphitization material box (6) are smaller than the corresponding height and length of the material box (5), and the pre-graphitization material box (6) is arranged at the center position of the gap between two adjacent material boxes (5).

3. A large graphitization furnace according to claim 1, characterized in that: The gap width between adjacent material boxes (5) is a, and the width of the two side walls of the furnace body (1) along the width direction from the nearest material box (5) is b, and a=2b.

4. A large graphitization furnace according to claim 1, characterized in that: The outer wall of the furnace body (1) is a steel structure (2).

5. A large graphitization furnace as claimed in claim 1, characterized in that: The electrode wall (7) is provided with a furnace head electrode (8), and the furnace head electrodes (8) on both sides of the furnace body are energized to carry out graphitization production.

6. A large graphitization furnace according to claim 1, characterized in that: The raw material to be heated at low temperature in the pre-graphitization material box (6) is a graphitization raw material from which volatile components are to be removed.

7. A combined production method using a large graphitization furnace as described in claims 1-6, characterized in that: The steps include: S01: The central station is powered on, and graphitization is carried out in the material box (5); S02: After graphitization is completed in the material box (5) at the central station, power is turned off; S03: while stopping the power supply in the previous step, the stations on both sides of the graphitization station are powered on, and graphitization is carried out in the material boxes (5) of the stations on both sides; S04: After graphitization of the two sides of the workstation is completed, power is turned off; Repeat S03 and S04 until all stations have completed graphitization.

8. A joint production method of a large graphitization furnace as described in claim 7, characterized in that if the number of workstations is an odd number, the number of the central workstation is one, and if the number of workstations is an even number, the number of the powered workstations is two.

9. The combined production method of a large graphitization furnace according to claim 7, characterized in that: The step S05 is also included: after the cooling of the material box (5) and the pre-graphitization material box (6) is completed, they begin to be taken out of the furnace, and are taken out of the furnace from the central station to the stations on both sides in sequence.

Citation Information

Patent Citations

  • Phi 800mm general power graphite electrode and production method thereof

    CN102158999A

  • Large-size movable type graphitization system

    CN107188165A

  • Large graphitization furnace and joint production method

    CN116040623A

  • Acheson graphitization furnace capable of removing intervals

    CN216764340U

  • Continuous pre-graphitization furnace

    CN217516686U