Failure prediction device and program

The failure prediction device adjusts the evaluation period based on operation stop days to maintain accuracy during robot idle times, ensuring reliable failure prediction by using data from both robots and peripheral devices, addressing the challenge of prolonged inactivity in industrial settings.

WO2024201590A1PCT designated stage expired Publication Date: 2024-10-03FANUC LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/011913
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-24
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing failure prediction techniques for industrial robots are compromised in accuracy when the robots are idle for extended periods, particularly due to circumstances like infectious disease prevention measures, leading to potential inaccuracies in predicting machine failures.

Method used

A failure prediction device and program that adjusts the evaluation period based on the number of operation stop days, using operation data from both the robot and peripheral devices to ensure sufficient data for accurate failure prediction, even during prolonged idle times, by setting a longer evaluation period if operation stops occur, thereby maintaining prediction accuracy.

Benefits of technology

The solution enables accurate prediction of robot failures using operation data for at least 90 working days, regardless of idle periods, thereby suppressing fluctuations in prediction accuracy and ensuring high reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023011913_03102024_PF_FP_ABST
    Figure JP2023011913_03102024_PF_FP_ABST
Patent Text Reader

Abstract

A failure prediction device according to the present disclosure comprises a determination unit, a setting unit, and a prediction unit. The determination unit executes, when triggered by input of a failure prediction instruction, a process for determining operation stop days of an industrial machine on the basis of first operation data representing the operation of the industrial machine or second operation data representing the operation of a peripheral device that operates in cooperation with the industrial machine. The setting unit sets an evaluation period on the basis of the number of determined operation stop days. The prediction unit predicts the occurrence of a failure of the industrial machine on the basis of the first operation data generated within the set evaluation period.
Need to check novelty before this filing date? Find Prior Art

Description

Failure prediction device and program

[0001] The present disclosure relates to a failure prediction device and program having a function of predicting the occurrence of a failure in industrial machinery.

[0002] In recent years, industrial machinery such as robots have been utilized in a variety of places. In particular, robots that can repeatedly perform predetermined operations with high precision have become indispensable in production factories that produce products. A sudden robot failure is one of the most important situations to avoid when using robots, as it can cause product production to be halted for an extended period of time. To prevent sudden robot failures, a technology for predicting robot failures is known (Patent Document 1).

[0003] Japanese Patent Application Laid-Open No. 2021-022074

[0004] In recent years, there have been cases where factory operations have been suspended for long periods due to infectious disease countermeasures and other reasons. Such situations may lead to a decrease in the accuracy of robot failure prediction. Therefore, there is a need to propose a technology that does not decrease the accuracy of robot failure prediction even when robot operations are suspended for long periods of time.

[0005] The failure prediction device according to the present disclosure includes a determination unit that, in response to input of a failure prediction instruction, executes a process for determining a date on which the industrial machine will be shut down based on first operation data representing the operation of the industrial machine or second operation data representing the operation of a peripheral device that operates in conjunction with the industrial machine; a setting unit that sets an evaluation period based on the number of days until the determined date on which the operation will be shut down; and a prediction unit that predicts the occurrence of a failure in the industrial machine based on the first operation data that occurs within the set evaluation period.

[0006] FIG. 1 is a diagram showing a failure prediction system including a failure prediction device according to this embodiment. FIG. 2 is a hardware configuration diagram of the failure prediction device according to this embodiment. FIG. 3 is a functional block diagram of the failure prediction device according to this embodiment. FIG. 4 is a diagram showing an example of torque data stored in the storage unit of FIG. 3. FIG. 5 is a supplementary diagram supplementing the explanation of the processing of the determination unit of FIG. 3. FIG. 6 is a flowchart showing an example of a procedure of the failure prediction system using the failure prediction device according to this embodiment. FIG. 7 is a flowchart showing an example of a procedure for setting an evaluation period in step S1 of FIG. 6. FIG. 8 is a flowchart showing another first example of the procedure for setting an evaluation period in step S1 of FIG. 6. FIG. 9 is a diagram showing an example of a reception screen displayed by the processing of step S23 of FIG. 8. FIG. 10 is a flowchart showing another second example of the procedure for setting an evaluation period in step S1 of FIG. 6. FIG. 11 is a flowchart showing another third example of the procedure for setting an evaluation period in step S1 of FIG. 6. FIG. 12 is a flowchart showing another fourth example of the procedure for setting an evaluation period in step S1 of FIG. 6.

[0007] The failure prediction device according to this embodiment will be described below with reference to the drawings. In the following description, components having substantially the same functions and configurations are designated by the same reference numerals, and redundant description will be given only when necessary.

[0008] 1 shows a failure prediction system 1 including a failure prediction device 2 according to this embodiment. The failure prediction system 1 includes a plurality of robot systems 100 (100a, 100b) and a failure prediction device 2 connected to the plurality of robot systems 100 via a network 90 such as a LAN. The robot systems 100 (100a, 100b) are configured with robot devices 110 (110a, 110b) and conveyor devices 130 (130a, 130b) that operate in cooperation with the robot devices 110. The failure prediction device 2 is connected via the network 90 to the robot control devices that constitute the robot devices 110.

[0009] The failure prediction device 2 according to this embodiment has a failure prediction function that predicts the occurrence of a failure of the robotic device 110 using data (operation data) that represents the operation of the robotic device 110. The operation data of the robotic device 110 generated during an evaluation period is used to calculate the failure prediction of the robotic device 110. One feature of the failure prediction device 2 according to this embodiment is that the evaluation period of the operation data used to calculate the failure prediction of the robotic device 110 is set based on the suspension of operation of the robotic device 110. With this function, even if the robotic device 110 is suspended for a long period of time, it is possible to predict the occurrence of a failure of the robotic device 110 using a sufficient amount of operation data, and it is possible to prevent a decrease in the accuracy of the failure prediction due to the robotic device 110 being suspended for a long period of time.

[0010] Typically, the failure prediction device 2 according to this embodiment is configured as follows: As shown in Fig. 2, the failure prediction device 2 is a computer device in which hardware such as an operation device 4, a display device 5, a communication device 6, and a storage device 7 are connected to a processor 3 such as a CPU.

[0011] The operation device 4 is realized by a keyboard, a mouse, a jog, etc. The operation device 4 may be realized by a touch panel that also serves as the display device 5. A user can input various information to the failure prediction device 2 via the operation device 4. The display device 5 is realized by an LCD, etc. Various screens are displayed on the display device 5 under the control of the processor 3. The communication device 6 is realized by a communication module that complies with any communication standard. The communication device 6 transmits and receives various data to and from external devices such as the robot device 110 under the control of the processor 3. The storage device 7 is realized by an HDD, SSD, etc. A failure prediction program is stored in the storage device 7.

[0012] As shown in FIG. 3, the failure prediction program stored in the storage device 7 is executed by the processor 3, so that the failure prediction device 2 according to this embodiment functions as an input unit 21, a display unit 22, a receiving unit 23, a storage unit 24, a judgment unit 25, a setting unit 26, and a failure prediction unit 27.

[0013] The input unit 21 inputs user operations via the operation device 4 to the failure prediction device 2. Specifically, the input unit 21 inputs a failure prediction instruction and the number of operation downtime days used to set the evaluation period to the failure prediction device 2.

[0014] The display unit 22 is realized by the function of the display device 5 shown in Fig. 2. The display unit 22 displays various screens related to failure prediction. For example, the display unit 22 displays a screen including a software button for receiving a failure prediction instruction, a reception screen for receiving from the user the number of operation suspension days used to calculate the evaluation period, a screen for displaying the predicted results of the failure occurrence date as the result of the failure prediction, and the like.

[0015] The receiving unit 23 is realized by the function of the communication device 6 shown in Fig. 2. The receiving unit 23 receives torque data from the robot device 110 as operation data of the robot device 110. For example, the torque data is measured repeatedly at a predetermined cycle by a torque sensor provided on a motor that drives each joint of the robot device 110. The torque data received from the robot device 110 is stored in the storage unit 24 in association with date and time information generated by the robot device 110 (measured by the torque sensor) or date and time information received from the robot device 110.

[0016] The storage unit 24 is realized by the function of the storage device 7 shown in FIG. 2. The storage unit 24 stores torque data received from the robot device 110. For example, as shown in FIG. 4, the torque data is organized into a text file for each date on which the torque data was generated. The text file contains the torque data (Tr1, Tr2, ..., Tr2784) as well as date and time information for specifying the date and time on which the torque data was generated. The torque data is written in the order received from the robot device 110. The date and time information includes the start date and time of torque data measurement, the end date and time of torque data measurement, the measurement period, etc.

[0017] The determination unit 25 determines an operation shutdown date of the robotic device 110 based on the torque data. Typically, the determination unit 25 determines a day on which no torque data is generated as an operation shutdown date of the robotic device 110. For example, as shown in FIG. 5 , the determination unit 25 assigns an operation flag of "0" to a day determined to be an operation shutdown date, and an operation flag of "1" to a day not determined to be an operation shutdown date, i.e., an operation day. Through the operation shutdown date determination process performed by the determination unit 25, each past day is classified as an operation shutdown date or an operation day.

[0018] The setting unit 26 sets an evaluation period according to the number of days on which the robot device 110 is out of operation. The evaluation period represents the period from the start date of the evaluation period to the end date of the evaluation period, and the number of evaluation days represents the length of the evaluation period. An initial evaluation period (hereinafter referred to as the initial period) is set in advance for the evaluation period setting process by the setting unit 26. Typically, the initial period is a period whose end date is the day before the day on which the failure prediction instruction is input, and whose start date is a date that predates the end date by a preset initial number of evaluation days (hereinafter referred to as the initial number of days). The end date may be a date specified by the user. The initial number of evaluation days may be changeable by the user.

[0019] If there are no operation downtime days within the initial period, the setting unit 26 sets the initial period as the evaluation period. On the other hand, if there are operation downtime days within the initial period, the setting unit 26 sets the length of the evaluation period to the number of days obtained by adding the number of operation downtime days to the initial number of days. Specifically, the setting unit 26 sets the evaluation period to a period in which the end date is the day before the day on which the failure prediction instruction is input and the start date is the number of days obtained by adding the number of operation downtime days to the initial number of days. For example, if the initial period is 90 days long, from April 5, 2023 (start date) to June 6, 2023 (end date), and there are three operation downtime days during that period, the evaluation period is set to the number of evaluation days, 93 days, from April 2, 2023 (start date) to June 6, 2023 (end date). Since the evaluation period includes three days of downtime, the number of operating days included in the initial period when there are no downtime days within the initial period will be the same as the number of operating days included in the evaluation period set when there are downtime days within the initial period.

[0020] The failure prediction unit 27 predicts the occurrence of a failure of the robotic device 110 based on the operation data generated during the evaluation period set by the setting unit 26. For example, the failure prediction unit 27 creates an evaluation formula that represents the change in torque data over time based on the torque data generated during the evaluation period, and calculates the time required for the torque value represented by the torque data to reach a preset threshold. Based on the time required for the torque value to reach the threshold and the current time, the failure prediction unit 27 predicts the date on which a failure will occur in the robotic device 110.

[0021] An outline of the failure prediction process performed by the failure prediction device 2 according to this embodiment will be described below with reference to Fig. 6. The failure prediction process is executed when a failure prediction instruction is input by the user. As shown in Fig. 6, the failure prediction device 2 sets an evaluation period (S1), executes failure prediction processing for the robot device 110 based on torque data generated during the evaluation period (S2), and displays the prediction results (S3).

[0022] An example of the evaluation period setting process in step S1 of FIG. 6 will be described below with reference to FIG. 7 . As shown in FIG. 7 , when there is no operation downtime date within an initial period of M initial days (S11; No), the failure prediction device 2 sets the initial period as the evaluation period (S12). Through the process of step S12, for example, the evaluation period is set to a period in which the end date is the day before the day on which the failure prediction instruction is input and the start date is the day counted back M days from the end date. On the other hand, when there is an operation downtime date within an initial period of M initial days (S11; Yes), the failure prediction device 2 identifies the number N of operation downtime days within the initial period (S13) and sets an evaluation period with an evaluation period of (M + N) days (S14). Through the process of step S14, for example, the evaluation period is set to a period in which the end date is the day before the day on which the failure prediction instruction is input and the start date is the day counted back M days from the end date, which is the number M of operation downtime days plus N days.

[0023] According to the failure prediction device 2 of this embodiment, if there are no operation downtime days in a preset initial period, it is possible to predict the occurrence of a failure of the robotic device 110 based on the operation data generated in the initial period. On the other hand, if there are operation downtime days in the preset initial period, it is possible to predict the occurrence of a failure of the robotic device 110 based on the operation data generated in an evaluation period obtained by adding the number of operation downtime days to the initial period.

[0024] For example, if the number of operation downtime days within a 90-day initial period is zero, the failure prediction device 2 performs failure prediction using operation data generated during the initial period. On the other hand, if the number of operation downtime days within the 90-day initial period is three, the failure prediction device 2 performs failure prediction based on operation data generated during an evaluation period of 93 days, which is the sum of the 90 initial days and the three operation downtime days. That is, in either case, failure prediction can be performed using operation data for at least 90 operation days. Therefore, regardless of whether or not there are operation downtime days within the initial period, it is possible to predict the occurrence of a failure of the robotic device 110 using operation data for 90 operation days. This reduces fluctuations in prediction accuracy due to the presence or absence of operation downtime days, thereby achieving highly accurate predictions.

[0025] According to the evaluation period setting process shown in FIG. 6, if an operation downtime date exists within the initial period, an evaluation period longer than the initial period is automatically set. However, if there are unplanned, unintended, consecutive operation downtime dates, the number of operation downtime dates to be used in setting the evaluation period may be received from the user. Examples of unplanned, unintended, consecutive operation downtime dates include days when a factory operation is suspended for an extended period to prevent the spread of infectious diseases.

[0026] Another example of the evaluation period setting process in step S1 of FIG. 6 will be described below with reference to FIGS. 8 and 9 . As shown in FIG. 8 , when there are no consecutive operation suspension days exceeding a preset number within an initial period of M days (S21; No), the failure prediction device 2 according to a first modification of this embodiment sets the initial period as the evaluation period (S22). Through the process of step S22, for example, the evaluation period is set to a period whose end date is the day before the day on which the failure prediction instruction is input and whose start date is the day counted back by M days from the end date. On the other hand, when there are consecutive operation suspension days exceeding a preset number within an initial period of M days (S21; Yes), the failure prediction device 2 displays a reception screen for receiving from the user the number of consecutive operation suspension days to be used in setting the evaluation period (S23). FIG. 9 shows an example of the reception screen. As shown in FIG. 9 , the reception screen 200 displays the number of consecutive operation suspension days and the days of the week on which the consecutive operation suspension days are included as information about the consecutive operation suspension days included in the initial period. The reception screen 200 is also configured to accept the number of operation downtime days to be used in calculating the evaluation period. When the OK button is clicked, the operation downtime days specified by the user are input to the failure prediction device 2. When the failure prediction device 2 accepts the number of operation downtime days P (S24), it sets an evaluation period with an evaluation period of (M+P) evaluation days (S25). Through the processing of step S25, for example, the evaluation period is set to a period whose end date is the day before the day on which the failure prediction instruction is input, and whose start date is the number of days (M+P) obtained by adding the number of operation downtime days P input by the user to the initial number of days M from the end date.

[0027] According to the failure prediction device 2 of the first modification of this embodiment, when a factory is shut down for an extended period to prevent the spread of infection, the evaluation period for the operational data used to predict failures of the robotic device 110 installed in the factory can be set in accordance with a user's instructions. For example, if the number of consecutive days of downtime is 30, the user can input a number of days greater than 30 to perform failure prediction for the robotic device 110 based on a larger amount of operational data than is used in normal prediction processing, thereby improving the accuracy of the failure prediction. Furthermore, if the number of consecutive days of downtime is six, including two days (Saturday and Sunday) that are normal holidays, the user may input four days as the number of downtimes in the evaluation period setting process, taking into account the normal holidays. This allows failure predictions that include long-term downtimes to be compared under the same conditions with failure predictions that do not include long-term downtimes.

[0028] 6 , the evaluation period is set so that failure prediction of the robotic device 110 can be performed using operation data for an initial number of days (number of operating days) M, regardless of whether or not there is an operation downtime day within the initial period. However, when there is an operation downtime day within the initial period, the evaluation period may be set so that failure prediction of the robotic device 110 can be performed using operation data for more than the initial number of days M.

[0029] Another example of the evaluation period setting process of step S1 in FIG. 6 will be described below with reference to FIG. 10 . As shown in FIG. 10 , when there is no operation downtime date within an initial period of M initial days (S31; No), the failure prediction device 2 according to a second modification of this embodiment sets the initial period as the evaluation period (S32). Through the process of step S32, for example, the evaluation period is set to a period in which the end date is the day before the day on which the failure prediction instruction is input and the start date is the day counted back M initial days from the end date. On the other hand, when there is an operation downtime date within the initial period of M initial days (S31; Yes), the failure prediction device 2 identifies the number N of operation downtime days within the initial period (S33) and sets an additional number Q corresponding to the identified number N of operation downtime days (S34). The failure prediction device 2 then sets an evaluation period with an evaluation number of (M + N + Q) days (S35). By processing step S35, for example, the evaluation period is set to a period in which the end date is the day before the day on which the failure prediction instruction was input, and the start date is the total number of days (M+N+Q) going back from the end date, which is the initial number of days M, the number of days on which operation was stopped N, and the additional number of days Q.

[0030] According to the failure prediction device 2 of the second modification of this embodiment, when an operation downtime exists in the initial period, it is possible to predict the occurrence of a failure of the robotic device 110 using operation data for more days than when there is no operation downtime in the initial period. For example, if the initial period is 90 days and there are three operation downtime days in the initial period, the evaluation period setting process shown in FIG. 6 goes back three days in the start date of the initial period, making it possible to predict the occurrence of a failure of the robotic device 110 using a total of 90 days of operation data. On the other hand, according to the evaluation period setting process shown in FIG. 10 goes back six days in the start date of the initial period, making it possible to predict the occurrence of a failure of the robotic device 110 using a total of 93 days of operation data, even taking into account the three operation downtime days in the initial period. Thus, according to the failure prediction device 2 of the second modification, when there is an operation downtime in the initial period, it is possible to perform failure prediction using operation data for more days than the failure prediction device 2 of this embodiment, thereby further reducing the possibility of reducing the accuracy of failure prediction.

[0031] 7, 8, and 10, whether or not there will be a day when the robot device 110 will be down during the initial period is determined based on torque data, which is operation data of the robot device 110. However, whether or not there will be a day when the robot device 110 will be down during the initial period may also be determined based on operation data representing the operation of the conveyor device 130 that operates in cooperation with the robot device 110.

[0032] The receiving unit 23 receives torque data from the robot device 110 as operation data representing the operation of the robot device 110. The receiving unit 23 also receives speed data from the conveyor device 130 as operation data representing the operation of the conveyor device 130. The speed data represents the transport speed of the conveyor device 130 and is repeatedly measured by a speed sensor mounted on the conveyor device 130. The operation data of the conveyor device 130 is stored in the storage unit 24 in association with date and time information generated by the conveyor device 130 or date and time information received from the conveyor device 130. Note that the operation data representing the operation of the robot device 110 and the operation data representing the operation of the conveyor device 130 may be received from an overall control device that controls the robot device 110 and the conveyor device 130 in an overall manner.

[0033] The storage unit 24 stores the torque data received from the robot device 110 and the operation data of the conveyor device 130 received from the conveyor device 130 .

[0034] The determination unit 25 determines operation shutdown days for the robot device 110 based on the operation data of the conveyor device 130. Specifically, the determination unit 25 calculates the operation shutdown time for the conveyor device 130 based on the daily operation data of the conveyor device 130, and converts the calculated operation shutdown time for the conveyor device 130 into operation shutdown days for the robot device 110. For example, 24 hours of operation shutdown time for the conveyor device 130 is converted into 1 operation shutdown day for the robot device 110, and 12 hours of operation shutdown time for the conveyor device 130 is converted into 0.5 operation shutdown days for the robot device 110. Of course, the ratio for converting the operation shutdown time for the conveyor device 130 into operation shutdown days for the robot device 110 does not have to be 1:1.

[0035] The conversion method may be changed depending on the maximum daily operating time of the robotic device 110. For example, if the maximum daily operating time of the robotic device 110 is set to 8 hours, an operation downtime of the conveyor device 130 of less than 16 hours is converted into 0 operation downtime days of the robotic device 110, and an operation downtime of the conveyor device 130 of 20 hours is converted into 0.5 operation downtime days of the robotic device 110.

[0036] Of course, since the actual operating time of the robot device 110 per unit time, such as one cycle or one hour, differs from the operating time of the conveyor device 130 (peripheral device), the conversion method may be changed based on the actual operating times per unit time of the robot device 110 and the conveyor device 130 (peripheral device).

[0037] Another example of the evaluation period setting process of step S1 in FIG. 6 will be described below with reference to FIG. 11 . As shown in FIG. 11 , when there is no downtime of the conveyor device 130 within the initial period of M initial days (S41; No), the failure prediction device 2 according to the third modification sets the initial period as the evaluation period (S42). Through the process of step S42, for example, the evaluation period is set to a period in which the end date is the day before the day on which the failure prediction instruction is input and the start date is the day counted back M initial days from the end date. On the other hand, when there is downtime of the conveyor device 130 within the initial period of M initial days (S41; Yes), the failure prediction device 2 converts the daily downtime of the conveyor device 130 into R days of downtime of the robot device 110 (S43), and sets an evaluation period with (M + R) evaluation days (S44). By the processing of step S44, for example, the evaluation period is set to a period in which the end date is the day before the day on which the failure prediction instruction was input, and the start date is the number of days (M+R) prior to the end date, calculated by adding the number of days R on which the robot device 110 was down, calculated from the downtime of the conveyor device 130, to the initial number of days M from the end date.

[0038] The failure prediction device 2 according to the third modification of this embodiment has the same effect as the failure prediction device 2 according to this embodiment, and can determine the stop date of the robot device 110 based on the operation data of the peripheral devices that cooperate with the robot device 110, thereby improving the degree of freedom in the operation data that can be handled.

[0039] 7, 8, 10, and 11, the evaluation period is set based on the number of days on which the robot device 110 is out of operation, with the focus on the days on which the robot device 110 is out of operation. This has the effect of preventing a decrease in the accuracy of failure prediction due to a reduction in the number of days (amount) of operational data used for failure prediction. Another method of setting the evaluation period that has a similar effect is to set the evaluation period based on the number of days on which the robot device 110 is in operation, with the focus on the days on which the robot device 110 is in operation.

[0040] Another example of the evaluation period setting process of step S1 in FIG. 6 will be described below with reference to FIG. 12 . As shown in FIG. 12 , the failure prediction device 2 according to the fourth modification initializes the number of operating days a to the value 0 (S51) and initializes the number of retroactive days b to the value 1 (S52). The failure prediction device 2 determines whether b days prior to the day on which the failure prediction instruction was received was an operating day (S53). If b days prior to the day on which the failure prediction instruction was received was an operation shutdown day (S53; No), the failure prediction device 2 increments the value of the number of retroactive days b (S54) and returns to the determination process of step S53. If b days prior to the day on which the failure prediction instruction was received was an operating day (S53; Yes), the failure prediction device 2 increments the value of the number of operating days a (S55) and determines whether the number of operating days a has reached a predetermined number of days (S56). If the number of working days a has not reached the predetermined number of days (S56; No), the value of the number of days b to go back is incremented (S54), and the process returns to the judgment process of step S53. The processes of steps S53 to S56 are repeatedly executed until the number of working days a reaches the predetermined number of days. If the number of working days a reaches the predetermined number of days (S56; Yes), the failure prediction device 2 sets the evaluation period to a period in which the day before the day on which the failure prediction instruction was input is the end date and the day b days prior to the end date is the start date (S57).

[0041] One feature of the failure prediction device 2 according to this embodiment is that the evaluation period of the operation data used in the calculation of the failure prediction of the robot device 110 is set based on the fact that the operation of the robot device 110 has stopped. Therefore, the object for which a failure is predicted is not limited to the robot device 110. For example, the object for which a failure is predicted can be industrial machinery such as a machine tool, a lathe, a conveyance device, or a welding device.

[0042] In this embodiment, the conveyor device 130 is used as a peripheral device that operates in cooperation with the robot device 110, and the operation stop date of the robot device 110 is determined based on the operation stop time of the conveyor device 130. However, as long as the operation stop date of the robot device 110 can be determined, the peripheral device that operates in cooperation with the robot device 110 is not limited to the conveyor device 130. For example, the peripheral device may be various other devices, such as another robot device 110 that executes a predetermined process in cooperation with the robot device 110.

[0043] In this embodiment, a day on which no torque data is generated is determined to be an operation down day. However, a day on which the operation time per day based on the torque data is short may be determined to be an operation down day. For example, a day with a short operation time may be a day on which the operation time is intentionally shortened, a day on which maintenance of the robotic device 110 is performed, a day on which the robotic device 110 is test run, a day on which the robotic device 110 is not operated normally, or a day on which the robotic device 110 is unstable and only operates for a short time.

[0044] For example, assume that the initial period is 90 days, the maximum operating time per day is 12 hours, and there is one day during the initial period when the system operates for only two hours. In this case, the day when the system operates for only two hours is counted as a downday, and the evaluation period is set to 91 days. Because operation data within the evaluation period is used for failure prediction, operation data for a day when the system operates for only two hours can also be used for failure prediction. Operation data for a day when the system operates for only two hours may have a significant impact on failure prediction. According to this embodiment, in addition to securing operation data for 90 operating days, failure prediction can be performed using operation data from downdays when the operating time is less than a predetermined time. This may improve the accuracy of failure prediction compared to failure prediction using operation data only from operating days when the operating time is greater than a predetermined time.

[0045] In this embodiment, torque data relating to torque values ​​is used as data used in calculating failure prediction for the robotic device 110, but the data is not limited to torque data as long as it can be used to calculate failure prediction for the robotic device 110. For example, any data representing the operation of the robotic device 110, such as data relating to the current value flowing through the motor or data relating to disturbance torque, can be used.

[0046] Various data such as the failure prediction program stored in the storage device may be recorded on removable media and distributed to users, or may be distributed by being downloaded to the failure prediction device 2 via a network.

[0047] The following supplementary notes are further disclosed regarding this embodiment and the modified examples. (Supplementary Note 1) The failure prediction device 2 includes a determination unit 25 that, in response to input of a failure prediction instruction, executes a process for determining an operation downtime date for the industrial machine based on first operation data representing the operation of the industrial machine or second operation data representing the operation of a peripheral device operating in cooperation with the industrial machine; a setting unit 26 that sets an evaluation period based on the number of days of the determined operation downtime; and a prediction unit 27 that predicts the occurrence of a failure of the industrial machine based on the first operation data that occurs within the set evaluation period. (Supplementary Note 2) The evaluation period described in Supplementary Note 1 is set to a length obtained by adding the number of days of operation downtime to a preset initial number of evaluation days. (Supplementary Note 3) The setting unit 26 described in Supplementary Note 2 sets an evaluation period with an end date being the day before the day on which the failure prediction instruction was input and a start date being the day that is back from the end date by the number of days obtained by adding the preset initial number of evaluation days to the number of days of operation downtime. (Supplementary Note 4) The setting unit 26 described in Supplementary Note 1 sets the length of the evaluation period to the number of days obtained by adding the number of days specified by the user to the preset initial number of evaluation days when the number of consecutive days of operation suspension exceeds a preset threshold, and sets the length of the evaluation period to the initial number of evaluation days when the number of consecutive days of operation suspension does not exceed the preset threshold. (Supplementary Note 5) The setting unit 26 described in Supplementary Note 1 sets the evaluation period so that the number of operation days of the industrial machinery within the evaluation period is the preset number of days. (Supplementary Note 6) The determination unit 25 described in any one of Supplements 1 to 5 converts the operation suspension time per day for the peripheral device into operation suspension days of the industrial machinery based on the second operation data. (Supplementary Note 7) The determination unit 25 described in any one of Supplements 1 to 5 determines a day on which no first operation data is generated or a day on which the first operation data is generated for less than a predetermined period of time as an operation suspension day of the industrial machinery. (Appendix 8) The industrial machine described in any one of Appendices 1 to 7 is a robot device 110, the first operation data is data relating to a load torque on a drive shaft of a motor that drives a joint of the robot device 110, and the prediction unit 27 predicts the occurrence of a failure of the drive shaft based on the data relating to the load torque generated within a set evaluation period.(Supplementary Note 9) The program causes the computer to function as: a means for executing, upon input of a failure prediction instruction, a process for determining the days on which the industrial machine will be shut down based on first operation data representing the operation of the industrial machine or second operation data representing the operation of a peripheral device that operates in conjunction with the industrial machine; a means for setting an evaluation period based on the number of days on which the operation will be shut down; and a means for predicting the occurrence of a failure of the industrial machine based on the first operation data that occurs within the set evaluation period.

[0048] Although the embodiments of the present disclosure have been described in detail, the present disclosure is not limited to the individual embodiments described above. Various additions, substitutions, modifications, partial deletions, etc. are possible in these embodiments without departing from the gist of the invention or the concept and spirit of the present invention derived from the content of the claims and their equivalents. For example, in the above-described embodiments, the order of each operation and the order of each process are shown as examples and are not limited to these. The same applies when numerical values ​​or mathematical expressions are used in the description of the above-described embodiments.

[0049] 1...failure prediction system, 2...failure prediction device, 3...processor, 4...operation device, 5...display device, 6...communication device, 7...storage device, 21...input section, 22...display section, 23...receiving section, 24...storage section, 25...determination section, 26...setting section, 27...failure prediction section, 90...network, 100...robot system, 110...robot device, 130...conveyor device

Claims

1. A failure prediction device comprising: a determination unit that, in response to input of a failure prediction instruction, executes a process for determining a date when the industrial machine will be shut down based on first operation data representing the operation of the industrial machine or second operation data representing the operation of a peripheral device that operates in conjunction with the industrial machine; a setting unit that sets an evaluation period based on the number of days of the operation shutdown determined by the determination process; and a prediction unit that predicts the occurrence of a failure of the industrial machine based on the first operation data that occurs within the set evaluation period.

2. The failure prediction device according to claim 1, wherein the evaluation period is set to a length obtained by adding the number of days on which the operation is stopped to a preset initial number of evaluation days.

3. The failure prediction device according to claim 2, wherein the setting unit sets the evaluation period with the day before the failure prediction instruction is input as the end date and the day going back a number of days from the end date obtained by adding the number of days on which the operation was stopped to a preset initial evaluation number of days.

4. The failure prediction device of claim 1, wherein the setting unit sets the length of the evaluation period to a number of days obtained by adding a number of days specified by a user to a preset initial evaluation number of days when the number of consecutive days of operation suspension exceeds a preset threshold, and sets the length of the evaluation period to the initial evaluation number of days when the number of consecutive days of operation suspension does not exceed the preset threshold.

5. A failure prediction device according to claim 1, wherein said setting unit sets said evaluation period so that the number of days on which said industrial machine operates within said evaluation period is a preset number.

6. The failure prediction device according to any one of claims 1 to 5, wherein the determination unit converts the amount of downtime per day for the peripheral device into days the industrial machine is down, based on the second operation data.

7. A failure prediction device as described in any one of claims 1 to 5, wherein the determination unit determines a day on which the first operation data is not generated or a day on which the first operation data is generated for a period of time that does not reach a predetermined period of time as a day on which the industrial machinery will be shut down.

8. A failure prediction device as claimed in any one of claims 1 to 7, wherein the industrial machine is a robotic device, the first operation data is data relating to a load torque on a drive shaft of a motor that drives a joint of the robotic device, and the prediction unit predicts the occurrence of a failure in the drive shaft based on the data relating to the load torque generated within the set evaluation period.

9. A program for causing a computer to function as a means for executing a process of determining a date when the industrial machinery will be shut down based on first operation data representing the operation of the industrial machinery or second operation data representing the operation of a peripheral device operating in conjunction with the industrial machinery, in response to input of a failure prediction instruction; a means for setting an evaluation period based on the number of days of the operation shutdown determined by the process; and a means for predicting the occurrence of a failure of the industrial machinery, based on the first operation data occurring within the set evaluation period.

Citation Information

Patent Citations

  • Handling data management server system

    JP2009211279A

  • Abnormality sign notification system, method, and program

    JP2019096155A

  • Work machine component deterioration estimation system and work machine component deterioration estimation method

    JP2021076389A

  • Control method, controller, mechanical equipment, control program, and storage medium

    JP2021096639A

  • Lifetime prediction device, industrial machine, program creation system, and program

    WO2021261368A1