Pump installation device, pump installation method, and pump extraction method

The pump installation device addresses the safety and cost issues of existing methods by using a sealed environment and remote operation to minimize purge gas usage and ensure safe handling of submersible pumps in liquefied gas storage tanks, effectively reducing operational costs and enhancing safety.

WO2024204066A1PCT designated stage expired Publication Date: 2024-10-03EBARA CORP

Patent Information

Application Number
PCT/JP2024/011705
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-29
Filing Date
2024-03-25
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The existing methods for installing and removing submersible pumps from liquefied gas storage tanks require large amounts of expensive purge gas to prevent boil-off gas release, posing safety risks and increasing operational costs due to the need for extensive purge gas usage and handling of cold cables.

Method used

A pump installation device with a closed working space, actuator-driven door, suspension cables, and power cables that use a crane for remote operation, minimizing purge gas usage by maintaining a sealed environment and allowing for safe handling through the use of split cables and connection links, and a method for installing and removing submersible pumps using this device.

Benefits of technology

The solution reduces purge gas usage to near zero, ensuring a safe working environment by preventing boil-off gas release and allowing for remote operation of pump installation and removal, while enabling easy replacement of power cables without discharging liquefied gas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024011705_03102024_PF_FP_ABST
    Figure JP2024011705_03102024_PF_FP_ABST
Patent Text Reader

Abstract

This pump installation device is provided with a work chamber (1) that forms a closed work space (15), an actuator-driven door (12) that covers an upper opening (3a) of a pump column (3), a suspension cable (23) that is for suspending a submersible pump (2) within the pump column (3), a power cable (36) that is for supplying power to the submersible pump (2), and a crane (40) for raising and lowering the suspension cable (23) and the power cable (36). The upper opening (3a) of the pump column (3), the actuator-driven door (12), and the crane (40) are disposed within the work space (15).
Need to check novelty before this filing date? Find Prior Art

Description

Pump installation device, pump installation method, pump removal method

[0001] The present invention relates to a pump installation device for installing a submersible pump for pressurizing liquefied gas such as liquefied ammonia, liquefied natural gas (LNG), or liquefied hydrogen in a pump column and removing the submersible pump from the pump column. The present invention also relates to a method for installing a submersible pump in a pump column and a method for removing the submersible pump from the pump column using the pump installation device.

[0002] Natural gas is widely used in thermal power generation and as a chemical raw material. Ammonia and hydrogen are also expected to be energy sources that do not emit carbon dioxide, a cause of global warming. Applications of hydrogen as an energy source include fuel cells and turbine power generation. Natural gas, ammonia, and hydrogen are in a gaseous state at room temperature, so they are cooled and liquefied for storage and transportation. Liquefied gases such as liquefied natural gas (LNG), liquefied ammonia, and liquefied hydrogen are first stored in liquefied gas storage tanks and then pumped to power plants, factories, and other locations.

[0003] 23 is a schematic diagram showing a liquefied gas storage tank in which liquefied gas is stored and a conventional pump for pumping up the liquefied gas. Pump 500 is installed in a vertical pump column 505 installed in liquefied gas storage tank 501. The upper end opening of pump column 505 is closed by upper cover 510. Pump column 505 is filled with liquefied gas, and pump 500 is entirely immersed in the liquefied gas. Therefore, pump 500 is a submersible pump that can operate in liquefied gas.

[0004] When the pump 500 is operated, the liquefied gas in the liquefied gas storage tank 501 is sucked into the pump column 505, moves up the pump column 505, and is discharged from the pump column 505 through the liquefied gas discharge port 509. The pump column 505 is provided with a purge gas introduction port 512. This purge gas introduction port 512 is closed when the pump 500 is operating.

[0005] 24 is a diagram illustrating the work of carrying the pump 500 into the pump column 505 and the work of lifting the pump 500 from the pump column 505. When installing the pump 500 in the pump column 505 or when lifting the pump 500 from the pump column 505 for maintenance or other purposes, the top cover 510 is removed and the cable 508 is connected to a hoist 513. The pump 500 is suspended from the cable 508 and is raised or lowered within the pump column 505 by the hoist 513.

[0006] The liquefied gas remaining in the pump column 505 is gasified to form boil-off gas (BOG). During the loading and unloading of the pump 500, a purge gas is introduced into the pump column 505 through a purge gas inlet port 512 to prevent the boil-off gas (BOG) from being released into the atmosphere. The purge gas also serves to prevent air from entering the pump column 505. The purge gas may be N 2 An inert gas such as He gas is used.

[0007] Patent No. 3197645 Patent No. 3198248 Patent No. 3472379

[0008] However, because the top opening of the pump column 505 is larger than the width of the pump 500, a large amount of purge gas is required to prevent air from entering the pump column 505 while preventing boil-off gas (BOG) from being released outside the pump column 505. In particular, He gas is expensive, which increases the cost of transporting and retrieving the pump 500.

[0009] Furthermore, when carrying in and pulling out the pump 500, workers may be exposed to boil-off gas, which may make it difficult to ensure a safe working environment. In particular, when pulling out the cable 508 from the pump column 505, the cable 508, which has been in contact with the liquefied gas, is at an extremely low temperature, making handling the cable 508 dangerous.

[0010] Therefore, the present invention provides a pump installation device that can reduce the amount of purge gas used to prevent boil-off gas (BOG) from being released from a pump column when a submersible pump is carried into or raised from the pump column, and that can create a safe working environment. The present invention also provides a method for installing a submersible pump in a pump column and a method for removing a submersible pump from a pump column using such a pump installation device.

[0011] In one aspect, there is provided a pump installation device for installing and removing a submersible pump used to transport liquefied gas within a pump column, the pump installation device comprising: a work chamber forming an enclosed work space; an actuator-driven door covering an upper opening of the pump column; a lifting cable for suspending the submersible pump within the pump column; a power cable for supplying power to the submersible pump; and a crane for raising and lowering the lifting cable and the power cable, wherein the upper opening of the pump column, the actuator-driven door, and the crane are disposed within the work space.

[0012] In one aspect, the suspension cable has a plurality of split suspension cables and a plurality of connecting links connecting the plurality of split suspension cables, the power cable has a plurality of split power cables and a plurality of electrical connectors electrically connecting the plurality of split power cables, the plurality of electrical connectors are attached to the plurality of connecting links, and the pump installation device further includes a link operating device that operates the connecting links to connect and disconnect the plurality of split suspension cables and the plurality of split power cables. In one aspect, each of the plurality of connecting links includes a first link mechanism connected to a lower end of the respective split suspension cable, a second link mechanism connected to an upper end of the respective split suspension cable, and a connecting pin that connects and disconnects the first link mechanism and the second link mechanism, and the link operating device is configured to connect and disconnect the first link mechanism and the second link mechanism by moving the connecting pin.

[0013] In one aspect, each of the plurality of electrical connectors includes a first electrical connector connected to a lower end of each split power cable and a second electrical connector connected to an upper end of each split power cable, the first electrical connector being held by the first link mechanism and the second electrical connector being held by the second link mechanism. In one aspect, each of the plurality of connecting links further includes a positioning device that vertically positions the first link mechanism and the second link mechanism. In one aspect, the positioning device has a spring that biases the first link mechanism toward the second link mechanism. In one aspect, the working chamber includes a purge gas inlet port that communicates with the working space and a purge gas supply line connected to the purge gas inlet port.

[0014] In one aspect, there is provided a method for installing a submersible pump used to transfer liquefied gas within a pump column, the method comprising the steps of opening an actuator-driven door located within an enclosed work space formed by a working chamber, the actuator-driven door being coupled to an upper portion of the pump column, connecting a lifting cable and a power cable to the submersible pump within the work space, and lowering the lifting cable, the power cable, and the submersible pump within the pump column by a crane located within the work space, wherein an upper opening of the pump column is located within the work space.

[0015] In one aspect, the lifting cable has a plurality of split lifting cables and a plurality of connecting links connecting the plurality of split lifting cables, the power cable has a plurality of split power cables and a plurality of electrical connectors electrically connecting the plurality of split power cables, the plurality of electrical connectors being attached to the plurality of connecting links, respectively, and the step of lowering the lifting cable, the power cable, and the submersible pump within the pump column is a step of lowering the plurality of split lifting cables, the plurality of split power cables, and the submersible pump within the pump column by the crane while operating the connecting links with a link operating device to connect the plurality of split lifting cables one by one and while connecting the plurality of split power cables one by one. In one aspect, the method further includes the step of supplying a purge gas into the workspace and exposing the submersible pump to the purge gas within the workspace before carrying the submersible pump into the pump column.

[0016] In one aspect, there is provided a method for removing a submersible pump used to transfer liquefied gas from a pump column, the method comprising the steps of opening an actuator-driven door located in an enclosed work space formed by a working chamber, the actuator-driven door being connected to an upper part of the pump column, lifting a lifting cable and a power cable connected to the submersible pump with a crane located in the work space to raise the lifting cable, the power cable, and the submersible pump within the pump column, disconnecting the lifting cable and the power cable from the submersible pump, and lifting the submersible pump from the pump column into the work space with the crane, wherein an upper opening of the pump column is located within the work space.

[0017] In one aspect, the lifting cable has a plurality of split lifting cables and a plurality of connecting links connecting the plurality of split lifting cables, the power cable has a plurality of split power cables and a plurality of electrical connectors electrically connecting the plurality of split power cables, the plurality of electrical connectors being attached to the plurality of connecting links, respectively, and the step of raising the lifting cable, the power cable, and the submersible pump within the pump column is a step of raising the plurality of split lifting cables, the plurality of split power cables, and the submersible pump within the pump column by the crane while operating the connecting links with a link operating device to detach the plurality of split lifting cables one by one and detaching the plurality of split power cables one by one. In one aspect, the method further includes the step of supplying a purge gas into the workspace after lifting the submersible pump from the pump column into the workspace and exposing the submersible pump to the purge gas within the workspace.

[0018] According to the present invention, a submersible pump can be automatically installed on a pump column and lifted from the pump column by remotely operating a crane and an actuator-driven door from outside the work chamber. Therefore, workers are not exposed to a hazardous atmosphere. Furthermore, because the top opening of the pump column is located within a closed work space, boil-off gas (BOG) is not released into the atmosphere. As a result, the amount of purge gas used to prevent boil-off gas (BOG) from being released into the atmosphere can be reduced to virtually zero. Furthermore, by filling the work space with a gas consisting of the same components as the liquefied gas when the submersible pump is loaded into the pump column, gases containing other components, such as air, can be prevented from entering the pump column.

[0019] The power cable is not permanently installed in the liquefied gas storage tank, but is carried into and out of the pump column together with the hanging cable. Therefore, when the power cable deteriorates, it can be replaced with a new one without discharging the liquefied gas from the liquefied gas storage tank.

[0020] 1 is a diagram illustrating an embodiment of a pump system for transferring liquefied gas; FIG. 1 is a cross-sectional view illustrating an embodiment of a connecting link; FIG. 2 is a diagram illustrating a state in which a first link mechanism is connected to a second link mechanism; FIG. 3 is a diagram illustrating a state in which a first link mechanism is connected to a second link mechanism; FIG. 4 is a diagram illustrating a state in which a first link mechanism is connected to a second link mechanism; FIG. 5 is a diagram illustrating a state in which a first link mechanism is connected to a second link mechanism; FIG. 6 is a diagram illustrating a state in which a first link mechanism is disconnected from a second link mechanism; FIG. 7 is a top view of an embodiment of the support plate shown in FIG. 1; FIG. 8 is a diagram illustrating a state in which a lifting cable, a power cable, and a submersible pump are not yet carried into a pump column; FIG. 9 is a diagram illustrating an embodiment of a method for installing a submersible pump in a pump column; FIG. 10 is a diagram illustrating an embodiment of a method for installing a submersible pump in a pump column; FIG. 11 is a diagram illustrating an embodiment of a method for installing a submersible pump in a pump column; FIG. 1 is a diagram illustrating an embodiment of a method for installing a submersible pump in a pump column. FIG. 2 is a diagram illustrating an embodiment of a method for removing a submersible pump from a pump column. FIG. 3 is a diagram illustrating an embodiment of a method for removing a submersible pump from a pump column. FIG. 4 is a diagram illustrating an embodiment of a method for removing a submersible pump from a pump column. FIG. 5 is a diagram illustrating an embodiment of a method for removing a submersible pump from a pump column. FIG. 6 is a diagram illustrating an embodiment of a method for removing a submersible pump from a pump column. FIG. 7 is a schematic diagram illustrating a conventional example of a liquefied gas storage tank in which liquefied gas is stored, and a pump for pumping up the liquefied gas. FIG. 8 is a diagram illustrating an operation for carrying a pump into a pump column and an operation for lifting the pump from the pump column.

[0021] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Fig. 1 is a diagram showing one embodiment of a pump system for transporting liquefied gas. Examples of liquefied gas that can be transported by the pump system shown in Fig. 1 include liquefied ammonia, liquefied hydrogen, liquefied nitrogen, liquefied natural gas, liquefied ethylene gas, and liquefied petroleum gas.

[0022] As shown in Figure 1, the pump system includes a submersible pump 2 for transferring liquefied gas, a pump column 3 that houses the submersible pump 2, and a head plate 10 that closes an upper opening 3a of the pump column 3. The pump column 3 is installed in a liquefied gas storage tank 5 that stores liquefied gas. The pump column 3 is a hollow container that extends vertically, and its upper portion protrudes upward from the liquefied gas storage tank 5. The pump column 3 has a purge gas inlet port 8 and a discharge port 9. The discharge port 9 is connected to a liquefied gas transfer pipe (not shown).

[0023] A suction valve 6 is provided at the bottom of the pump column 3. The submersible pump 2 is installed on the suction valve 6 of the pump column 3. The suction valve 6 has a valve element 6A that covers the bottom opening of the pump column 3 and multiple springs 6B that urge the valve element 6A upward. When the submersible pump 2 is not placed on the valve element 6A, the valve element 6A is pressed against the bottom end of the pump column 3 by the multiple springs 6B, closing the bottom opening of the pump column 3. When the submersible pump 2 is placed on the valve element 6A, the weight of the submersible pump 2 moves the valve element 6A downward against the force of the springs 6B, thereby opening the suction valve 6. The suction valve 6 may be an actuator-driven valve (e.g., an electric valve).

[0024] A lifting cable 23 for suspending the submersible pump 2 within the pump column 3 and a power cable 36 for supplying power to the electric motor 2a of the submersible pump 2 extend vertically within the pump column 3. A head plate 10 is placed at the upper end of the pump column 3. The head plate 10 is covered by an actuator-driven door 12. The lifting cable 23, the power cable 36, and a connecting structure 28 are suspended from the head plate 10. The lifting cable 23 extends vertically within the pump column 3. The lifting cable 23 has a plurality of divided lifting cables 23B connected by connecting links 24. The power cable 36 extends vertically within the pump column 3 along the lifting cable 23.

[0025] The first electrical terminal 35A is fixed to the actuator-driven door 12, and the second electrical terminal 35B is fixed to the wall of the working chamber 1. The second electrical terminal 35B is connected to a power source (not shown). The first electrical terminal 35A is electrically connected to the second electrical terminal 35B by a connecting cable 34. The connecting cable 34 extends between the first electrical terminal 35A and the second electrical terminal 35B and is detachably connected to the first electrical terminal 35A and the second electrical terminal 35B.

[0026] A first electrical terminal 35A fixed to the outer surface of the actuator-driven door 12 is electrically connected to a first electrical contact 33A fixed to the inner surface of the actuator-driven door 12. The first electrical terminal 35A and the first electrical contact 33A move as the actuator-driven door 12 opens and closes. A second electrical contact 33B is fixed to the upper surface of the head plate 10, and a power cable 36 is connected to the second electrical contact 33B. When the actuator-driven door 12 is closed, the first electrical contact 33A comes into contact with the second electrical contact 33B on the head plate 10, thereby establishing an electrical connection between the first electrical contact 33A and the second electrical contact 33B. Power is supplied to the power cable 36 from a power source (not shown) via the second electrical terminal 35B, the connecting cable 34, the first electrical terminal 35A, the first electrical contact 33A, and the second electrical contact 33B. When the actuator-driven door 12 is opened, the first electrical contact 33A is disconnected from the second electrical contact 33B on the head plate 10, thereby cutting off the power supply.

[0027] The upper end of the power cable 36 is electrically connected to the first electrical terminal 35A via the first electrical contact 33A and the second electrical contact 33B, and the lower end of the power cable 36 is electrically connected to the electric motor 2a of the submersible pump 2. The power cable 36 has a plurality of split power cables 37. These multiple split power cables 37 are also connected by the connecting link 24. The uppermost split power cable 37 is connected to the second electrical contact 33B on the head plate 10.

[0028] The connecting structure 28 is attached to the submersible pump 2. The connecting structure 28 is connected to the lower ends of the suspension cable 23 and the power cable 36. More specifically, the connecting structure 28 includes a link mechanism 28A connected to the suspension cable 23 and the power cable 36, a connecting member 28B connecting the link mechanism 28A to the submersible pump 2, and a conductive member 28C electrically connecting the link mechanism 28A to the electric motor 2a of the submersible pump 2. The connecting member 28B may be a cable, a rod-shaped member, or the like. The conductive member 28C may be composed of a power cable, or the like.

[0029] The link mechanism 28A has a width greater than that of the connecting member 28B and the conductive member 28C. The hoisting cable 23 is connected to the submersible pump 2 via the link mechanism 28A and the connecting member 28B. The power cable 36 is electrically connected to the electric motor 2a of the submersible pump 2 via the conductive member 28C.

[0030] When the submersible pump 2 is in operation, the liquefied gas in the liquefied gas storage tank 5 is introduced into the pump column 3 through the suction valve 6, and the pump column 3 is filled with liquefied gas. When the submersible pump 2 is in operation, the entire submersible pump 2 is immersed in liquefied gas. Therefore, the submersible pump 2 is configured to be able to operate in liquefied gas. The liquefied gas pressurized by the submersible pump 2 is transferred to the outside through the discharge port 9 and a liquefied gas transfer pipe (not shown). When the submersible pump 2 is in operation, the purge gas introduction port 8 is closed by a valve (not shown).

[0031] Next, a pump installation device for installing the submersible pump 2 in and removing it from the pump column 3 will be described. The pump system includes the pump installation device described below. The pump installation device includes the work chamber 1 forming an enclosed work space 15, the actuator-driven door 12 covering the top opening 3a of the pump column 3, the hoisting cable 23 for suspending the submersible pump 2 in the pump column 3, the power cable 36 for supplying power to the submersible pump 2, and a crane 40 for raising and lowering the hoisting cable 23. The top opening 3a of the pump column 3, the actuator-driven door 12, and the crane 40 are arranged within the work space 15. The work chamber 1 has a work door 16 for carrying the submersible pump 2, the hoisting cable 23, the power cable 36, etc. into and out of the work space 15. This work door 16 is normally closed.

[0032] The working chamber 1 is fixed to the upper wall 5A of the liquefied gas storage tank 5. The working chamber 1 has a purge gas inlet port 17 and a gas outlet port 18 that communicate with its working space 15. A purge gas supply line 71 extending from a purge gas supply source 70 is connected to the purge gas inlet port 17, and a vacuum line 74 is connected to the gas outlet port 18. The vacuum line 74 is connected to a vacuum source (not shown), such as a vacuum pump. Examples of the purge gas supply source 70 include a nitrogen gas supply source, a helium gas supply source, a hydrogen gas supply source, or a combination thereof. In one embodiment, the purge gas supply source 70 may include multiple purge gas sources of different types, such as at least two of a nitrogen gas supply source, a helium gas supply source, and a hydrogen gas supply source. In this case, the multiple purge gas sources may be selectively connected to the purge gas supply line 71.

[0033] The purge gas used is a gas composed of components with a boiling point lower than the boiling point of the liquefied gas to be pumped by the submersible pump 2. This is to prevent the purge gas from liquefying when it comes into contact with the liquefied gas. Examples of purge gases include inert gases such as nitrogen gas and helium gas. For example, if the liquefied gas to be pumped by the submersible pump 2 is liquefied natural gas, nitrogen gas, which is a gas composed of nitrogen and has a boiling point (-196°C) lower than the boiling point of liquefied natural gas (-162°C), is used as the purge gas. As another example, if the liquefied gas to be pumped by the submersible pump 2 is liquid hydrogen, helium gas, which is a gas composed of helium and has a boiling point (-269°C) lower than the boiling point of hydrogen (-253°C), is used as the purge gas.

[0034] A portion of the purge gas may be a gas having the same components as the liquefied gas. If the gas outlet port 18 is connected to a gas processing device, all of the purge gas may be a gas having the same components as the liquefied gas. For example, if the liquefied gas is liquefied hydrogen, some or all of the purge gas may be hydrogen gas. As another example, if the liquefied gas is liquefied ammonia, some or all of the purge gas may be ammonia gas.

[0035] The actuator-driven door 12 is connected to the top of the pump column 3. The actuator-driven door 12 covers the top opening 3a of the pump column 3 and the head plate 10 that closes this top opening 3a. The actuator-driven door 12 is equipped with an actuator 13 such as an electric motor or an air cylinder. The actuator-driven door 12 is configured to open and close in response to a command signal transmitted from outside the working chamber 1. During operation of the submersible pump 2, the actuator-driven door 12 is closed, as shown in FIG. 1 .

[0036] When the actuator-driven door 12 is closed, a sealed space is formed between the actuator-driven door 12 and the top of the pump column 3. The head plate 10 is located within this sealed space. The actuator-driven door 12 can prevent boil-off gas (BOG) that passes through a small gap between the head plate 10 and the top of the pump column 3 from leaking into the working space 15 of the working chamber 1.

[0037] The crane 40 is configured to be movable within the work space 15. More specifically, the crane 40 is movable on a support rail 41 arranged within the work space 15, as indicated by the arrow. The crane 40 can move between a position above the pump column 3 and a position spaced apart from the pump column 3. The crane 40 includes a gripping mechanism (gripper) 44, a wire 45 for suspending the gripping mechanism 44, and a hoist 46 for reeling in and paying out the wire 45. The gripping mechanism 44 is configured to be able to grip the head plate 10, the lifting cable 23, the connecting link 24, the connecting structure 28, and the like. Examples of the hoist 46 include a hoist and a winch. The crane 40 is configured to operate in response to a command signal transmitted from outside the work chamber 1.

[0038] The suspension cable 23 includes a plurality of split suspension cables 23B and a plurality of connecting links 24 that connect these split suspension cables 23B. Only one connecting link 24 is shown in FIG. 1 . The length of each split suspension cable 23B is shorter than the length of the pump column 3. The multiple split suspension cables 23B are connected in series by the connecting links 24. Similarly, the power cable 36 includes a plurality of split power cables 37. These multiple split power cables 37 are connected in series by the connecting links 24.

[0039] The pump installation device further includes a link operation device 50 that operates each connecting link 24 to connect and disconnect the split suspension cable 23B and the split power cable 37, a support plate 55 that supports the link operation device 50, and a plate actuator 58 that moves the support plate 55 between a position directly above the pump column 3 and a retracted position. The link operation device 50 is disposed on the support plate 55, and the support plate 55 is connected to the plate actuator 58. The plate actuator 58 can move the link operation device 50 and the support plate 55 together. The link operation device 50 has an actuator 52 such as a linear motor or an air cylinder, and is configured to be movable on the support plate 55. In other words, the link operation device 50 is movable relative to the support plate 55.

[0040] The link operating device 50 has an operating pin 51 that protrudes toward the connecting link 24. When the connecting link 24 is operated by this operating pin 51, the connecting link 24 is configured to connect or disconnect the split suspension cable 23B and the split power cable 37.

[0041] Fig. 2 is a cross-sectional view showing one embodiment of the connecting link 24. As shown in Fig. 2, the connecting link 24 includes a first link mechanism 62, a second link mechanism 63, and a connecting pin 68 that connects and disconnects the first link mechanism 62 and the second link mechanism 63. The link operating device 50 shown in Fig. 1 is configured to connect and disconnect the first link mechanism 62 and the second link mechanism 63 by moving the connecting pin 68.

[0042] The first link mechanism 62 and the second link mechanism 63 are connected to both ends of each divided suspension cable 23B. In the embodiment shown in Fig. 2, the first link mechanism 62 is connected to the lower end of each divided suspension cable 23B, and the second link mechanism 63 is connected to the upper end of each divided suspension cable 23B. The link mechanism 28A of the connecting structure 28 shown in Fig. 1 has the same configuration as the second link mechanism 63, so the following description also applies to the link mechanism 28A of the connecting structure 28.

[0043] The power cable 36 has a first electrical connector 21 and a second electrical connector 22 connected to either end of each split power cable 37. In the embodiment shown in Figure 2, the first electrical connector 21 is connected to the bottom end of each split power cable 37, and the second electrical connector 22 is connected to the top end of each split power cable 37.

[0044] The first electrical connector 21 is held by a first link mechanism 62, and the second electrical connector 22 is held by a second link mechanism 63. When the first electrical connector 21 connected to the lower end of one split power cable 37 is connected to the second electrical connector 22 connected to the upper end of the other split power cable 37, these two split power cables 37 are electrically connected by the first electrical connector 21 and the second electrical connector 22. The plurality of first electrical connectors 21 and the plurality of second electrical connectors 22 are attached to the plurality of connecting links 24, respectively.

[0045] The first link mechanism 62 has an insertion portion 64A and a flange portion 64B protruding outward from the insertion portion 64A. The insertion portion 64A has a horizontally extending horizontal hole 62a. The first electrical connector 21 is held by the flange portion 64B. The second link mechanism 63 has a housing 66 having a vertical hole 65 into which the insertion portion 64A is inserted, and a connecting pin 68 housed in a horizontal hole 67 formed in the housing 66. The connecting pin 68 is movable within the horizontal hole 67. The horizontal hole 67 passes horizontally through the housing 66. The diameter of the horizontal hole 62a of the first link mechanism 62 is larger than the diameter of the connecting pin 68, allowing the connecting pin 68 to pass through the horizontal hole 62a of the first link mechanism 62.

[0046] The second link mechanism 63 has a tapered guide surface 75 formed on the upper surface of the housing 66. The tapered guide surface 75 is connected to the upper end of the vertical hole 65 and is inclined downward toward the vertical hole 65. The tapered guide surface 75 is provided to guide the insertion portion 64A of the first link mechanism 62 into the vertical hole 65.

[0047] The upper end of the split suspension cable 23B is connected to the lower part of the housing 66. The upper part of the split power cable 37 extends vertically within the housing 66 and is held by the housing 66. That is, both the split suspension cable 23B and the split power cable 37 are connected to the housing 66 of the second link mechanism 63. Therefore, the split suspension cable 23B and the split power cable 37 can move integrally with the second link mechanism 63. The second electrical connector 22 is fixed to the upper part of the housing 66. The split power cable 37 extends within the housing 66 and is connected to the second electrical connector 22.

[0048] 2, when the connecting pin 68 is disposed across the horizontal hole 62a of the first link mechanism 62, the first link mechanism 62 and the second link mechanism 63 are connected to each other. On the other hand, when the connecting pin 68 is outside the horizontal hole 62a of the first link mechanism 62, the first link mechanism 62 can be disconnected from the second link mechanism 63.

[0049] The second link mechanism 63 further includes a positioning device 80 that positions the first link mechanism 62 and the second link mechanism 63 in the vertical direction. The positioning device 80 in this embodiment is a ball plunger that includes a ball 82 disposed in a horizontal hole 81 formed in the housing 66 and a spring 83 that presses the ball 82 against the insertion portion 64A of the first link mechanism 62. In this embodiment, two pairs of balls 82 and springs 83 are provided, but one pair, or three or more pairs of balls 82 and springs 83 may be provided. The insertion portion 64A has a recess 86 on its outer surface. The spring 83 presses the ball 82 against the recess 86, thereby fixing the relative vertical position of the insertion portion 64A with respect to the housing 66.

[0050] The positioning device 80, which is made up of a ball plunger, also has the function of pressing the first electrical connector 21 held by the first link mechanism 62 against the second electrical connector 22 held by the second link mechanism 63. In other words, the spring 83 urges the first link mechanism 62 toward the second link mechanism 63. Therefore, the positioning device 80 can ensure a reliable electrical connection between the first electrical connector 21 held by the first link mechanism 62 and the second electrical connector 22 held by the second link mechanism 63.

[0051] 3 to 6 are diagrams illustrating how the first link mechanism 62 is connected to the second link mechanism 63. As shown in Fig. 3, when the connecting pin 68 is positioned outside the vertical hole 65, the insertion portion 64A of the first link mechanism 62 enters the vertical hole 65 of the second link mechanism 63. The tip of the insertion portion 64A is guided by the tapered guide surface 75 and enters the vertical hole 65. As shown in Fig. 4, when the insertion portion 64A of the first link mechanism 62 comes into contact with the ball 82 of the positioning device 80, the insertion portion 64A pushes the ball 82 outward against the force of the spring 83.

[0052] 5 , when the ball 82 is pressed against the recess 86 of the insertion portion 64A by the spring 83, the relative position of the insertion portion 64A in the vertical direction with respect to the second link mechanism 63 is maintained. At this time, the first electrical connector 21 held by the first link mechanism 62 is pressed against the second electrical connector 22 held by the second link mechanism 63, whereby the split power cable 37 connected to the first electrical connector 21 is electrically connected to the other split power cable 37 connected to the second electrical connector 22. The horizontal hole 62a formed in the insertion portion 64A is aligned in a straight line with the horizontal hole 67 of the second link mechanism 63.

[0053] 6 , with the horizontal hole 62a of the first link mechanism 62 and the horizontal hole 67 of the second link mechanism 63 aligned in a straight line, the link operating device 50 moves toward the second link mechanism 63 of the connecting link 24, and the operating pin 51 of the link operating device 50 pushes the connecting pin 68 into the horizontal hole 62a. The connecting pin 68 moves into the horizontal hole 62a, thereby connecting the first link mechanism 62 and the second link mechanism 63 via the connecting pin 68. As a result, the upper split suspension cable 23B is connected to the lower split suspension cable 23B, and the upper split power cable 37 is connected to the lower split power cable 37.

[0054] 7 and 8 are diagrams illustrating how the first link mechanism 62 is disconnected from the second link mechanism 63 by the link operating device 50. As shown in Fig. 7, the link operating device 50 moves toward the second link mechanism 63 of the connecting link 24, and the operating pin 51 of the link operating device 50 pushes the connecting pin 68 out of the horizontal hole 62a. Thereafter, as shown in Fig. 8, the operating pin 51 of the link operating device 50 is pulled out of the horizontal hole 62a and the horizontal hole 67, and the first link mechanism 62 is disconnected from the second link mechanism 63. As a result, the upper split suspension cable 23B is disconnected from the lower split suspension cable 23B, and the upper split power cable 37 is disconnected from the lower split power cable 37.

[0055] 9 is a top view showing one embodiment of the support plate 55 shown in FIG. The support plate 55 has a horizontally elongated notch 55a. The width of this notch 55a is greater than the widths of the split suspension cable 23B, the split power cable 37, and the connecting member 28B and conductive member 28C of the connecting structure 28, but is smaller than the widths of the second link mechanism 63 of the connecting link 24 and the link mechanism 28A of the connecting structure 28. Therefore, the split suspension cable 23B, the split power cable 37, the connecting member 28B, and the conductive member 28C can pass through the notch 55a, but the second link mechanism 63 of the connecting link 24 and the link mechanism 28A of the connecting structure 28 cannot pass through the notch 55a.

[0056] 10 is a diagram showing the state before the lifting cable 23, the power cable 36, and the submersible pump 2 are carried into the pump column 3. As shown in FIG. 10, the multiple divided lifting cables 23B that make up the lifting cable 23, the multiple divided power cables 37 that make up the power cable 36, and the submersible pump 2 are disposed in a location away from the pump column 3 within the working space 15 of the working chamber 1. A first link mechanism 62 and a second link mechanism 63 of the connecting link 24 are pre-connected to each divided lifting cable 23B and each divided power cable 37. A head plate 10 is pre-attached to one of the multiple divided lifting cables 23B and one of the multiple divided power cables 37. A valve body 6A of the suction valve 6 is pressed against the lower end of the pump column 3 by multiple springs 6B, closing the lower opening of the pump column 3.

[0057] Next, one embodiment of a method for installing the submersible pump 2 in the pump column 3 will be described with reference to FIGS. 10 to 16 . The series of operations shown in FIGS. 10 to 16 includes an operation for lowering the submersible pump 2 in the pump column 3, an operation for connecting the multiple divided lifting cables 23B one by one, and an operation for connecting the multiple divided power cables 37 one by one. Prior to the operations described below, liquefied gas is discharged from the pump column 3. Specifically, with the actuator-driven door 12 open, purge gas is supplied into the workspace 15 through the purge gas inlet port 17 to increase the pressure in the pump column 3, thereby discharging the liquefied gas from the pump column 3 through the suction valve 6. Then, the actuator-driven door 12 is closed.

[0058] In step 101, as shown in FIG. 10 , with the top opening 3 a of the pump column 3 closed by the actuator-driven door 12, an operator connects the connecting cable 34 to the first electrical terminal 35A and the second electrical terminal 35B. Then, the working space 15 in the working chamber 1 housing the submersible pump 2 is evacuated through the gas outlet port 18. Then, a purge gas (e.g., an inert gas and / or a gas having the same components as the liquefied gas) is supplied to the working space 15 through the purge gas inlet port 17, filling the working space 15 with the purge gas. The submersible pump 2 is exposed to (comes into contact with) the purge gas within the working space 15, thereby removing air and moisture from the surface of the submersible pump 2. This process is a drying process that expels air and moisture from the submersible pump 2. The evacuation of the working space 15 and the supply of purge gas to the working space 15 may be repeated.

[0059] In step 102, the actuator-driven door 12 is opened, and the submersible pump 2 is transported by the crane 40 to a position above the pump column 3. More specifically, the gripping mechanism 44 of the crane 40 grips the link mechanism 28A of the connecting structure 28 connected to the submersible pump 2, and the crane 40 transports the submersible pump 2 and the connecting structure 28 together to a position above the pump column 3. In step 103, the crane 40 lowers the submersible pump 2 and the connecting structure 28 together, moving the submersible pump 2 into the pump column 3 while positioning the link mechanism 28A of the connecting structure 28 above the pump column 3.

[0060] In step 104, with link mechanism 28A of connecting structure 28 located above pump column 3, plate actuator 58 (see FIG. 1) moves support plate 55 and link operating device 50 toward pump column 3, causing support plate 55 to cover upper opening 3a of pump column 3. As described with reference to FIG. 9 , support plate 55 has notch 55a, and the width of notch 55a is greater than the width of connecting member 28B and conductive member 28C of connecting structure 28, but smaller than the width of link mechanism 28A. In step 104, support plate 55 moves onto pump column 3 so that connecting member 28B and conductive member 28C are positioned within notch 55a of support plate 55.

[0061] In step 105, the crane 40 further lowers the connecting structure 28 and the submersible pump 2 until the link mechanism 28A of the connecting structure 28 contacts the support plate 55. The submersible pump 2 is suspended from the support plate 55 by the connecting structure 28. In other words, the weight of the submersible pump 2 is supported by the support plate 55.

[0062] In step 106, the gripping mechanism 44 of the crane 40 releases the link mechanism 28A of the connecting structure 28, and then the crane 40 transports one of the plurality of split lifting cables 23B prepared in advance in the working chamber 1 and one of the plurality of split power cables 37 prepared in advance in the working chamber 1 to a position above the pump column 3. A second link mechanism 63 of the connecting link 24 is pre-connected to the upper ends of the split lifting cable 23B and the split power cable 37, and a first link mechanism 62 of the connecting link 24 is pre-connected to the lower ends of the split lifting cable 23B and the split power cable 37. By gripping the second link mechanism 63 connected to the upper ends of the split lifting cable 23B and the split power cable 37, the gripping mechanism 44 of the crane 40 can transport the split lifting cable 23B, the split power cable 37, and the second link mechanism 63 together and move them up and down.

[0063] In step 107, the split suspension cables 23B and the split power cables 37 are lowered by the crane 40 until the insertion portion 64A of the first link mechanism 62 attached to the lower end of the split suspension cables 23B enters the vertical hole 65 of the link mechanism 28A on the support plate 55 (see FIGS. 2 to 5). In step 108, the link operating device 50 moves toward the link mechanism 28A on the support plate 55, and the operating pin 51 of the link operating device 50 moves the connecting pin 68 of the link mechanism 28A into the horizontal hole 62a (see FIG. 6). As a result, the first link mechanism 62 is connected to the link mechanism 28A, and the split suspension cables 23B and the split power cables 37 are connected to the connecting structure 28.

[0064] In step 109, the link operating device 50 is moved away from the link mechanism 28A until the operating pin 51 of the link operating device 50 is positioned outside the link mechanism 28A. The crane 40 then slightly lifts the split lifting cable 23B, the split power cable 37, the connecting structure 28, and the submersible pump 2. The load of the submersible pump 2 is supported by the crane 40. In step 110, the plate actuator 58 (see FIG. 1 ) moves the support plate 55 and the link operating device 50 in a direction away from the pump column 3. The crane 40 then lowers the split lifting cable 23B, the split power cable 37, the connecting structure 28, and the submersible pump 2, moving the submersible pump 2 within the pump column 3 while positioning the second link mechanism 63 of the connecting link 24 above the pump column 3. As the submersible pump 2 is lowered, the load of the submersible pump 2 is applied only to the split lifting cable 23B, not to the split power cable 37.

[0065] In step 111, before the second link mechanism 63 attached to the uppermost split suspension cable 23B enters the pump column 3, the plate actuator 58 (see FIG. 1) moves the support plate 55 and the link operating device 50 toward the pump column 3, and the support plate 55 covers the upper opening 3a of the pump column 3. As described with reference to FIG. 9, the width of the notch 55a in the support plate 55 is greater than the width of the split suspension cable 23B and the width of the split power cable 37, but is smaller than the width of the second link mechanism 63. In this step 111, the support plate 55 moves onto the pump column 3 so that the split suspension cable 23B and the split power cable 37 are positioned within the notch 55a in the support plate 55.

[0066] In step 112, the crane 40 further lowers the split lifting cables 23B, the split power cables 37, the connecting structure 28, and the submersible pump 2 within the pump column 3 until the second link mechanism 63 connected to the uppermost split lifting cables 23B and the split power cables 37 contacts the support plate 55. The submersible pump 2 is suspended from the support plate 55 by the split lifting cables 23B and the connecting structure 28. In other words, the load of the submersible pump 2 is supported by the support plate 55.

[0067] Then, steps similar to those in step 106 to step 112 are repeated while adding the remaining multiple divided lifting cables 23B one by one and while adding the remaining multiple divided power cables 37 one by one until the submersible pump 2 approaches the bottom of the pump column 3. That is, while the link operating device 50 operates the connecting links 24 to connect the multiple divided lifting cables 23B one by one and while connecting the multiple divided power cables 37 one by one, the crane 40 lowers the multiple divided lifting cables 23B, the multiple divided power cables 37, and the submersible pump 2 within the pump column 3.

[0068] In step 113, when the submersible pump 2 approaches the bottom of the pump column 3, the final segmented lifting cable 23B and segmented power cable 37 are added to the lifting cable 23 and the power cable 36, respectively. The head plate 10 has been previously connected to the upper ends of this final segmented lifting cable 23B and segmented power cable 37. In step 114, the crane 40 lowers the head plate 10 and the segmented lifting cable 23B and segmented power cable 37 connected thereto, and as described with reference to Figures 3 to 6, the first link mechanism 62 attached to the lower end of the uppermost segmented lifting cable 23B is connected to the second link mechanism 63 on the support plate 55.

[0069] In step 115, the plate actuator 58 (see FIG. 1) moves the support plate 55 and the link operating device 50 in a direction away from the pump column 3. Next, the crane 40 lowers the head plate 10, the split lifting cable 23B, the split power cable 37, the connecting structure 28, and the submersible pump 2, so that the top opening 3a of the pump column 3 is closed with the head plate 10 and the submersible pump 2 is placed on the suction valve 6. The suction valve 6 opens due to the weight of the submersible pump 2.

[0070] In step 116, the gripping mechanism 44 of the crane 40 moves away from the head plate 10. Furthermore, the actuator-driven door 12 is closed, and the first electrical contact 33A fixed to the actuator-driven door 12 comes into contact with the second electrical contact 33B fixed to the head plate 10. This completes the installation of the submersible pump 2 on the pump column 3.

[0071] A worker can automatically install the submersible pump 2 on the pump column 3 by remotely operating the crane 40, link operating device 50, and actuator-driven door 12 from outside the work chamber 1. Therefore, the worker is not exposed to a hazardous atmosphere. Furthermore, because the upper opening 3 a of the pump column 3 is located within the enclosed work space 15, boil-off gas (BOG) is not released into the atmosphere. As a result, the amount of purge gas used to prevent boil-off gas (BOG) from being released into the atmosphere can be reduced to virtually zero. Furthermore, by filling the work space 15 with a gas containing the same components as the liquefied gas when the submersible pump 2 is delivered to the pump column 3, gas containing other components, such as air, can be prevented from entering the pump column 3.

[0072] The power cable 36 (including the multiple split power cables 37) is not permanently installed in the liquefied gas storage tank 5, but is carried into the pump column 3 together with the hanging cable 23. Therefore, when the power cable 36 deteriorates, the deteriorated power cable 36 can be replaced with a new one without discharging the liquefied gas in the liquefied gas storage tank 5.

[0073] Next, one embodiment of a method for removing the submersible pump 2 from the pump column 3 will be described with reference to Figures 1 and 17 to 22. When removing the submersible pump 2, the steps described with reference to Figures 10 to 16 are basically performed in reverse order. The series of operations shown in Figures 1 and 17 to 22 includes an operation of raising the submersible pump 2 within the pump column 3, an operation of disconnecting the multiple divided lifting cables 23B one by one, and an operation of disconnecting the multiple divided power cables 37 one by one.

[0074] In step 201, with the top opening 3a of the pump column 3 closed by the head plate 10 and the actuator-driven door 12, an operator removes the connecting cable 34 shown in FIG. 1 from the first electrical terminal 35A and the second electrical terminal 35B. Then, the working space 15 in the working chamber 1 is evacuated through the gas outlet port 18. Then, a purge gas (e.g., an inert gas and / or a gas having the same components as the liquefied gas) is supplied into the working space 15 from the purge gas inlet port 17, filling the working space 15 with the purge gas. The evacuation of the working space 15 and the supply of the purge gas to the working space 15 may be repeated.

[0075] 17 , the actuator-driven door 12 is opened, thereby disconnecting the first electrical contact 33A on the actuator-driven door 12 from the second electrical contact 33B on the head plate 10. Next, the head plate 10 is grasped by the gripping mechanism 44 of the crane 40, and the head plate 10, the multiple split lifting cables 23B, the multiple split power cables 37, the connecting structure 28, and the submersible pump 2 are slightly pulled up by the crane 40, and the suction valve 6 is closed. Furthermore, purge gas is supplied into the working chamber 1 through the purge gas inlet port 17 to increase the pressure in the pump column 3. As the pressure in the pump column 3 increases, liquefied gas is discharged from the pump column 3 through the suction valve 6.

[0076] In step 203, the head plate 10, the multiple split lifting cables 23B, the multiple split power cables 37, the connecting structure 28, and the submersible pump 2 are lifted up by the crane 40 until the entire uppermost split lifting cable 23B and split power cable 37 are positioned above the pump column 3. Thereafter, the plate actuator 58 (see FIG. 1 ) moves the support plate 55 and the link operating device 50 toward the pump column 3, and the support plate 55 covers the upper opening 3 a of the pump column 3.

[0077] In step 204, the crane 40 slightly lowers the multiple split lifting cables 23B, the multiple split power cables 37, the connecting structure 28, and the submersible pump 2 until the second link mechanism 63 of the connecting link 24 directly above the support plate 55 comes into contact with the support plate 55. The submersible pump 2 is suspended from the support plate 55 by the split lifting cables 23B and the connecting structure 28. In other words, the weight of the submersible pump 2 is supported by the support plate 55.

[0078] In step 205, the link operating device 50 moves toward the second link mechanism 63 on the support plate 55, and the operating pin 51 of the link operating device 50 moves the connecting pin 68 of the second link mechanism 63 out of the horizontal hole 62a (see FIG. 7 ). In step 206, the operating pin 51 of the link operating device 50 moves away from the second link mechanism 63 on the support plate 55. This separates the first link mechanism 62 from the second link mechanism 63, allowing the uppermost split suspension cable 23B to be separated from the other split suspension cables 23B, and the uppermost split power cable 37 to be separated from the other split power cables 37.

[0079] In step 207, the crane 40 lifts up the uppermost split lifting cable 23B and the split power cable 37, and moves them to a position (see FIG. 10 ) away from the pump column 3. In step 208, the gripping mechanism 44 of the crane 40 grips the second link mechanism 63 on the support plate 55.

[0080] In step 209, the crane 40 slightly lifts up the remaining split lifting cable 23B, the remaining split power cable 37, the connecting structure 28, and the submersible pump 2, and then the plate actuator 58 (see FIG. 1 ) moves the support plate 55 and the link operating device 50 in a direction away from the pump column 3. Furthermore, the crane 40 lifts up the multiple split lifting cables 23B, the multiple split power cables 37, the connecting structure 28, and the submersible pump 2 until the entire uppermost split lifting cable 23B and split power cable 37 are positioned above the pump column 3.

[0081] In step 210, the plate actuator 58 (see FIG. 1) moves the support plate 55 and the link operating device 50 toward the pump column 3, and the support plate 55 covers the upper opening 3a of the pump column 3. Furthermore, the crane 40 slightly lowers the multiple split lifting cables 23B, the multiple split power cables 37, the connecting structure 28, and the submersible pump 2 until the second link mechanism 63 of the connecting link 24 directly above the support plate 55 comes into contact with the support plate 55.

[0082] Then, steps similar to those in step 205 to step 210 are repeated while detaching the multiple split suspension cables 23B one by one and while detaching the multiple split power cables 37 one by one, until all of the split suspension cables 23B and all of the split power cables 37 have been removed by the crane 40. That is, while the link operating device 50 operates the connecting links 21 to detach the multiple split suspension cables 23B one by one and while detaching the multiple split power cables 37 one by one, the crane 40 raises the multiple split suspension cables 23B, the multiple split power cables 37, and the submersible pump 2 within the pump column 3. When all of the split suspension cables 23B and all of the split power cables 37 have been removed, the link mechanism 28A of the connecting structure 28 attached to the submersible pump 2 is supported by the support plate 55.

[0083] In step 211, the link mechanism 28A of the connecting structure 28 is grasped by the gripping mechanism 44, and the connecting structure 28 and the submersible pump 2 are slightly raised by the crane 40. Next, the support plate 55 and the link operating device 50 are moved in a direction away from the pump column 3 by the plate actuator 58 (see FIG. 1). In step 212, the connecting structure 28 and the submersible pump 2 are entirely raised by the crane 40 from the pump column 3 and further transported to a position away from the pump column 3 within the work space 15 (see FIG. 10). In step 213, the actuator-driven door 12 is closed.

[0084] In step 214, as shown in FIG. 10 , purge gas (e.g., containing an inert gas and / or a gas having the same components as the liquefied gas) is supplied to the working space 15 of the working chamber 1 through the purge gas inlet port 17, filling the working space 15 with the purge gas. The submersible pump 2 is exposed to (comes into contact with) the purge gas in the working space 15, thereby heating the submersible pump 2. This process is a hot-up process for heating the submersible pump 2. This completes the removal of the submersible pump 2 from the pump column 3.

[0085] An operator can automatically remove the submersible pump 2 from the pump column 3 by remotely operating the crane 40, the link operating device 50, and the actuator-driven door 12 from outside the work chamber 1. Therefore, the operator is not exposed to a hazardous atmosphere. Furthermore, because the upper opening 3 a of the pump column 3 is located within the closed work space 15, boil-off gas (BOG) is not released into the atmosphere. As a result, the amount of purge gas used to prevent boil-off gas (BOG) from being released into the atmosphere can be reduced to substantially zero. Furthermore, by filling the work space 15 with a gas having the same components as the liquefied gas when the submersible pump 2 is raised from the pump column 3, gas containing other components, such as air, can be prevented from entering the pump column 3.

[0086] The power cable 36 (including the multiple split power cables 37) is not permanently installed in the liquefied gas storage tank 5, but is carried out from the pump column 3 together with the hanging cable 23. Therefore, when the power cable 36 deteriorates, the deteriorated power cable 36 can be replaced with a new one without discharging the liquefied gas in the liquefied gas storage tank 5.

[0087] The above-described embodiments have been described for the purpose of enabling a person of ordinary skill in the art to practice the present invention. Various modifications of the above-described embodiments would be obvious to a person skilled in the art, and the technical concept of the present invention may be applied to other embodiments. Therefore, the present invention is not limited to the described embodiments, but is to be interpreted in the broadest scope in accordance with the technical concept defined by the claims.

[0088] The present invention can be used in a pump installation device for installing a submersible pump for pressurizing liquefied gas such as liquefied ammonia, liquefied natural gas (LNG), or liquid hydrogen in a pump column and removing the submersible pump from the pump column. Furthermore, the present invention can be used in a method for installing a submersible pump in a pump column and a method for removing a submersible pump from a pump column using such a pump installation device.

[0089] REFERENCE SIGNS LIST 1 Working chamber 2 Submersible pump 2a Electric motor 3 Pump column 5 Liquefied gas storage tank 6 Suction valve 8 Purge gas inlet port 9 Discharge port 10 Head plate 12 Actuator-driven door 13 Actuator 15 Working space 16 Working door 17 Purge gas inlet port 18 Gas outlet port 21 First electrical connector 22 Second electrical connector 23 Lifting cable 23B Split lifting cable 24 Connecting link 28 Connecting structure 28A Link mechanism 28B Connecting member 28C Conductive member 33A, 33B Electrical contact 34 Connecting cable 35A, 35B Electrical terminal 36 Power cable 37 Split power cable 40 Crane 41 Support rail 44 Grip mechanism 45 Wire 46 Hoist 50 Link operating device 51 Operating pin 52 Actuator 55 Support plate 58 Plate actuator 62 First link mechanism 62a Horizontal hole 63 Second link mechanism 65 Vertical hole 66 Housing 67 Horizontal hole 68 Connecting pin 70 Purge gas supply source 71 Purge gas supply line 74 Vacuum line 75 Tapered guide surface 80 Positioning device 81 Horizontal hole 82 Ball 83 Spring 86 Recess

Claims

1. A pump installation device for installing and removing a submersible pump used to transport liquefied gas into and from a pump column, the pump installation device comprising: a work chamber forming an enclosed work space; an actuator-driven door covering an upper opening of the pump column; a lifting cable for suspending the submersible pump in the pump column; a power cable for supplying power to the submersible pump; and a crane for raising and lowering the lifting cable and the power cable, wherein the upper opening of the pump column, the actuator-driven door, and the crane are disposed within the work space.

2. The pump installation device described in claim 1, wherein the suspension cable has a plurality of split suspension cables and a plurality of connecting links connecting the plurality of split suspension cables, the power cable has a plurality of split power cables and a plurality of electrical connectors electrically connecting the plurality of split power cables, the plurality of electrical connectors being respectively attached to the plurality of connecting links, and the pump installation device further comprises a link operating device that operates the connecting links to cause the connecting links to connect and disconnect the plurality of split suspension cables and the plurality of split power cables.

3. The pump installation device described in claim 2, wherein each of the multiple connecting links includes a first link mechanism connected to the lower end of each split suspension cable, a second link mechanism connected to the upper end of each split suspension cable, and a connecting pin that connects and disconnects the first link mechanism and the second link mechanism, and the link operating device is configured to move the connecting pin to connect and disconnect the first link mechanism and the second link mechanism using the connecting pin.

4. The pump installation device of claim 3, wherein each of the plurality of electrical connectors includes a first electrical connector connected to a lower end of each split power cable and a second electrical connector connected to an upper end of each split power cable, the first electrical connector being held by the first link mechanism and the second electrical connector being held by the second link mechanism.

5. The pump installation device according to claim 3, wherein each of the plurality of connecting links further includes a positioning device for vertically positioning the first link mechanism and the second link mechanism.

6. The pump installation device of claim 5, wherein the positioning device includes a spring that biases the first link mechanism toward the second link mechanism.

7. The pump installation apparatus of claim 1, wherein the working chamber includes a purge gas inlet port communicating with the working space and a purge gas supply line connected to the purge gas inlet port.

8. A method of installing a submersible pump used to transport liquefied gas in a pump column, comprising the steps of: opening an actuator-driven door located in an enclosed working space formed by a working chamber, the actuator-driven door being connected to an upper portion of the pump column; connecting a lifting cable and a power cable to the submersible pump in the working space; and lowering the lifting cable, the power cable and the submersible pump in the pump column by a crane located in the working space, the upper opening of the pump column being located in the working space.

9. The method of claim 8, wherein the suspension cable has a plurality of split suspension cables and a plurality of connecting links connecting the plurality of split suspension cables, the power cable has a plurality of split power cables and a plurality of electrical connectors electrically connecting the plurality of split power cables, the plurality of electrical connectors being respectively attached to the plurality of connecting links, and the step of lowering the suspension cable, the power cable, and the submersible pump within the pump column is a step of lowering the plurality of split suspension cables, the plurality of split power cables, and the submersible pump within the pump column by the crane while operating the connecting links with a link operating device to connect the plurality of split suspension cables one by one, and while connecting the plurality of split power cables one by one.

10. The method of claim 8, further comprising the step of providing a purge gas into said working space prior to loading said submersible pump into said pump column to expose said submersible pump to said purge gas within said working space.

11. A method for removing a submersible pump used to transport liquefied gas from a pump column, the method comprising the steps of: opening an actuator-driven door located in an enclosed working space formed by a working chamber, the actuator-driven door being connected to an upper part of the pump column; lifting a lifting cable and a power cable connected to the submersible pump with a crane located in the working space, thereby raising the lifting cable, the power cable and the submersible pump within the pump column; disconnecting the lifting cable and the power cable from the submersible pump; and lifting the submersible pump from the pump column into the working space with the crane, the upper opening of the pump column being located within the working space.

12. The method of claim 11, wherein the suspension cable has a plurality of split suspension cables and a plurality of connecting links connecting the plurality of split suspension cables, the power cable has a plurality of split power cables and a plurality of electrical connectors electrically connecting the plurality of split power cables, the plurality of electrical connectors being respectively attached to the plurality of connecting links, and the step of raising the suspension cable, the power cable, and the submersible pump within the pump column is a step of raising the plurality of split suspension cables, the plurality of split power cables, and the submersible pump within the pump column by the crane while operating the connecting links with a link operating device to detach the plurality of split suspension cables one by one and while detaching the plurality of split power cables one by one.

13. The method of claim 11, further comprising the step of supplying a purge gas into the working space after raising the submersible pump from the pump column into the working space to expose the submersible pump to the purge gas within the working space.

Citation Information

Patent Citations

  • Submerged pump device for liquefied gas tank

    JP3197645B2

  • Submerged pump device for liquefied gas tank and its lifting jig

    JP3198248B2

  • Installation equipment for submerged motor pumps

    JP3472379B2

  • JP1992073699U

  • Lifting device, pump delivery method, and pump raising method

    WO2023022059A1

Cited By

  • Connectors and submerged pumps

    JP7940069B1