Control device, control method, and working machine

The control device for loading machines optimizes movement by setting reference points to avoid interference, reducing unnecessary operations and improving efficiency in loading and excavation processes.

WO2024204413A1PCT designated stage expired Publication Date: 2024-10-03KOMATSU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/012390
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2024-03-27
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing control devices for loading machines, such as hydraulic excavators, often result in unnecessary operations due to detours taken to avoid interference between the loading target and the bucket, leading to inefficiencies in movement between loading and excavation positions.

Method used

A control device and method that includes an operation command signal generation section and a reference point setting section, allowing for precise control of the working machine's movement to a target position, avoiding interference by setting a reference point and executing control based on it, thereby minimizing unnecessary operations.

Benefits of technology

The solution effectively prevents interference between the loading target and the bucket, reducing unnecessary operations and enhancing the usability of the working machine by optimizing its movement paths.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024012390_03102024_PF_FP_ABST
    Figure JP2024012390_03102024_PF_FP_ABST
Patent Text Reader

Abstract

This control device is for a work machine which is provided with: a revolving body that revolves about a revolving center; and a work implement that has a work tool and is attached to the revolving body. The control device is provided with: an operation command signal generation unit for executing control for moving the work tool to a target position; and a reference point setting unit for setting a reference point. The operation command signal generation unit executes the control on the basis of the reference point.
Need to check novelty before this filing date? Find Prior Art

Description

Control device, control method and work machine

[0001] This application claims priority to Japanese Patent Application No. 2023-056912, filed on March 31, 2023, the contents of which are incorporated herein by reference.

[0002] Patent Document 1 describes a control device for a loading machine that includes a revolving body and a work implement, and that can automate the movement of the work implement between a loading position and an excavation position.

[0003] Japanese Patent Application Publication No. 2020-41352

[0004] According to the technology described in Patent Document 1, an interference avoidance point is set to prevent interference between the loading target and the bucket, and control is executed to automatically move to the excavation position via the interference avoidance point. However, due to position changes caused by loading work, unnecessary operations may occur, such as a detour to move via the interference avoidance point to the excavation position.

[0005] An object of the present disclosure is to provide a control device, a control method, and a work machine that can prevent interference between a loading target and a bucket and suppress unnecessary operation of the work machine.

[0006] One aspect of the present disclosure is a control device for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a work tool and is attached to the rotating body, the control device including: an operation command signal generation unit that executes control to move the work tool to a target position; and a reference point setting unit that sets a reference point, and the operation command signal generation unit executes the control based on the reference point.

[0007] One aspect of the present disclosure is a control method for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a work tool and is attached to the rotating body, the control method including the steps of setting a reference point and executing control to move the work tool to a target position based on the reference point.

[0008] One aspect of the present disclosure is a work machine comprising: a rotating body that rotates around a rotation center; a work machine having a work implement attached to the rotating body; and a control device that controls the rotating body and the work implement, wherein the control device comprises an operation command signal generation unit that executes control to move the work implement to a target position, and a reference point setting unit that sets a reference point, and the operation command signal generation unit executes the control based on the reference point.

[0009] The control device, control method, and work machine disclosed herein can prevent interference between the loading target and the bucket, and can also suppress unnecessary operation of the work machine.

[0010] FIG. 1 is a schematic diagram illustrating a configuration of a work machine according to an embodiment of the present disclosure. FIG. 2 is a diagram illustrating a configuration of the interior of a cab according to an embodiment of the present disclosure. FIG. 3 is a block diagram illustrating an example configuration of a control system according to an embodiment of the present disclosure. FIG. 4 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 5 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 6 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 7 is a flowchart illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 8 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 1 is a flowchart illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 2 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 3 is a flowchart illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 4 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 5 is a flowchart illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 6 is a flowchart illustrating an example operation of a control device according to an embodiment of the present disclosure.

[0011] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. Note that the same or corresponding components in each drawing will be designated by the same reference numerals, and descriptions thereof will be omitted as appropriate. FIG. 1 is a schematic diagram showing the configuration of a work machine according to an embodiment of the present disclosure. FIG. 2 is a diagram showing the internal configuration of a cab according to an embodiment of the present disclosure. FIG. 3 is a block diagram showing an example configuration of a control system according to an embodiment of the present disclosure. FIGS. 4 to 11 are schematic diagrams for explaining an example operation of a control device according to an embodiment of the present disclosure. FIG. 12 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure. FIGS. 15, 21, 23, 25, and 27 to 30 are flowcharts showing an example operation of a control device according to an embodiment of the present disclosure. FIGS. 13, 14, 16 to 20, 22, 24, and 26 are schematic diagrams for explaining an example operation of a control device according to an embodiment of the present disclosure.

[0012] (Configuration of work machine 100) Figure 1 shows the configuration of a work machine 100 according to an embodiment of the present disclosure. The work machine 100 operates at a construction site and works on a construction target such as earth and sand. The work machine 100 according to an embodiment of the present disclosure is, for example, a hydraulic excavator. However, the work machine according to the present disclosure is not limited to any work machine provided that it is equipped with a rotating body and a work implement, and may be, for example, another work machine such as a face shovel or a rope shovel. The work machine 100 includes a traveling body 110, a rotating body 120, a work implement 130, and a cab 140.

[0013] The running body 110 supports the work machine 100 so that it can travel. The running body 110 is equipped with two tracks 111 provided on the left and right, and two travel motors 112 for driving each track 111. The rotating body 120 is supported on the running body 110 so that it can rotate about a rotation center.

[0014] The work implement 130 is hydraulically driven. The work implement 130 is supported on the front part of the revolving unit 120 so that it can be driven in the vertical direction. The cab 140 is a space where an operator sits and operates the work machine 100. The cab 140 is provided on the left front part of the revolving unit 120. In this embodiment, as shown in FIG. 1 , the up-down direction (Z direction), left-right direction (Y direction), and front-to-back direction (X direction) are defined with the revolving unit 120 as the reference. In this embodiment, this coordinate system is called the excavator coordinate system. Furthermore, the part of the revolving unit 120 to which the work implement 130 is attached is called the front part. Furthermore, with respect to the revolving unit 120, the opposite part from the front part is called the rear part, the left part is called the left part, and the right part is called the right part.

[0015] (Configuration of the Swing Unit 120) The swing unit 120 includes an engine 121, a hydraulic pump 122, an EPC (Electromagnetic Proportional Control) valve 123-1, a main valve 123-2, a swing motor 124, and a fuel injection device 125. The engine 121 is a prime mover that drives the hydraulic pump 122. The engine 121 is an example of a power source. A starter 1211 is provided on the engine 121. The engine 121 is started by rotation of the starter 1211. The EPC valve 123-1 controls the hydraulic oil flowing to the main valve 123-2 based on an operation command signal output by the control device 61.

[0016] The hydraulic pump 122 is a variable displacement pump driven by the engine 121. The hydraulic pump 122 supplies hydraulic oil to each actuator via a main valve 123-2. Each actuator includes a boom cylinder 131C, an arm cylinder 132C, a bucket cylinder 133C, a travel motor 112, and a swing motor 124. The main valve 123-2 controls the flow rate of hydraulic oil supplied from the hydraulic pump 122.

[0017] The swing motor 124 is driven by hydraulic oil supplied from the hydraulic pump 122 via a main valve 123-2, and causes the swing body 120 to swing around a swing axis 120C (center of swing). The fuel injection device 125 injects fuel into the engine 121.

[0018] (Configuration of work machine 130) The work machine 130 includes a boom 131, an arm 132, a bucket 133 as a work tool, a boom cylinder 131C, an arm cylinder 132C, and a bucket cylinder 133C. The boom cylinder 131C, the arm cylinder 132C, and the bucket cylinder 133C are included in the cylinder 130C shown in Fig. 3. In addition to the bucket, examples of work tools that are attachments include a slope bucket, a tiltrotator, a quick coupler, a grapple, a magnet, and a breaker.

[0019] The base end of the boom 131 is attached to the revolving unit 120 via a boom pin. The arm 132 connects the boom 131 and the bucket 133. The base end of the arm 132 is attached to the tip of the boom 131 via an arm pin. The bucket 133 includes a blade for excavating earth and sand and a storage section for storing the excavated earth. The base end of the bucket 133 is attached to the tip of the arm 132 via a bucket pin 133P.

[0020] The boom cylinder 131C is a hydraulic cylinder for operating the boom 131. A base end of the boom cylinder 131C is attached to the revolving unit 120. A tip end of the boom cylinder 131C is attached to the boom 131. The arm cylinder 132C is a hydraulic cylinder for driving the arm 132. A base end of the arm cylinder 132C is attached to the boom 131. A tip end of the arm cylinder 132C is attached to the arm 132. The bucket cylinder 133C is a hydraulic cylinder for driving the bucket 133. A base end of the bucket cylinder 133C is attached to the arm 132. A tip end of the bucket cylinder 133C is attached to a link member connected to the bucket 133.

[0021] 2 shows the internal configuration of the driver's cab 140 according to the embodiment of the present disclosure. Inside the driver's cab 140, a driver's seat 142, an operating device 143, and the like are provided.

[0022] The operation device 143 is a device that is manually operated by the operator to drive the traveling body 110, the revolving body 120, and the work implement 130, set and change various setting values, and provide information to the operator. The operation device 143 is composed of, for example, levers, switches, and pedals. The operation device 143 includes a left operation lever 143LO, a right operation lever 143RO, a left foot pedal 143LF, a right foot pedal 143RF, a left travel lever 143LT, a right travel lever 143RT, and a display input device 143D. Various switches may be used, for example, push button switches, rocker switches, toggle switches, and the like. Furthermore, the switches may be located within a range that the operator can operate. The switches are located in the cab 140 or near the driver's seat located in a remote control room or the like. For example, the switches may be located on a console to the side of the driver's seat 142 or on a transmitter that outputs operation commands to the work machine 100 from outside the work machine 100.

[0023] The left operating lever 143LO is provided on the left side of the driver's seat 142. The right operating lever 143RO is provided on the right side of the driver's seat 142.

[0024] The left operation lever 143LO is an operation mechanism for performing the swing operation of the revolving unit 120 and the excavation / dump operation of the arm 132. Specifically, when the operator of the work machine 100 tilts the left operation lever 143LO forward, the arm 132 performs a dump operation. When the operator of the work machine 100 tilts the left operation lever 143LO rearward, the arm 132 performs an excavation operation. When the operator of the work machine 100 tilts the left operation lever 143LO to the right, the revolving unit 120 swings to the right. When the operator of the work machine 100 tilts the left operation lever 143LO to the left, the revolving unit 120 swings to the left. Note that in other embodiments, the revolving unit 120 may swing to the right or left when the left operation lever 143LO is tilted forward or backward, and the arm 132 may perform an excavation or dump operation when the left operation lever 143LO is tilted left or right. The left operating lever 143LO is provided with an operating switch 1433. The operating switch 1433 may be disposed so as to be located near the operator seated in the driver's seat 142. The operating switch 1433 is provided above or to the side of the operating lever.

[0025] The right operating lever 143RO is an operating mechanism for performing the excavation / dumping operation of the bucket 133 and the raising / lowering operation of the boom 131. Specifically, when the operator of the work machine 100 tilts the right operating lever 143RO forward, the boom 131 is lowered. When the operator of the work machine 100 tilts the right operating lever 143RO rearward, the boom 131 is raised. When the operator of the work machine 100 tilts the right operating lever 143RO to the right, the bucket 133 is dumped. When the operator of the work machine 100 tilts the right operating lever 143RO to the left, the bucket 133 is excavated. Note that in other embodiments, when the right operating lever 143RO is tilted forward or backward, the bucket 133 may be dumped or excavated, and when the right operating lever 143RO is tilted left or right, the boom 131 may be raised or lowered. The right operation lever 143RO is provided with, for example, operation switches 1431 and 1432. In this embodiment, the operation switch 1431 is set to function as a teaching switch, and the operation switch 1432 is set to function as an automatic start switch (hereinafter, each switch will be referred to as the teaching switch 1431 and the automatic start switch 1432 (or simply as the "switch")). The switches 1431 and 1432 are provided on the top or side of the operation lever. The teaching switch and the automatic start switch are examples of switches for automatic control. For example, the automatic start switch outputs an instruction signal to start an automatic operation when turned ON. The switch is not limited to automatic start, and may output any signal related to automatic operation, such as an automatic stop signal. Furthermore, the switch functions may be assigned not only to automatic control of loading swing and return swing, but also to automatic control of automatic earth removal, which automatically performs an earth removal operation using the bucket 133, or automatic excavation, which automatically performs an excavation operation. For example, two or more switches may be assigned to each of the automatic operations of automatic excavation, loading swing, return swing, and automatic soil removal. Also, multiple switches may be provided on one operating lever, or the operating levers may be divided into multiple operating levers, with one or more switches provided on each operating lever.

[0026] The left foot pedal 143LF is located on the left side of the floor in front of the driver's seat 142. The right foot pedal 143RF is located on the right side of the floor in front of the driver's seat 142. The left travel lever 143LT is pivotally supported by the left foot pedal 143LF, and is configured so that tilting the left travel lever 143LT and pushing down the left foot pedal 143LF are linked. The right travel lever 143RT is pivotally supported by the right foot pedal 143RF, and is configured so that tilting the right travel lever 143RT and pushing down the right foot pedal 143RF are linked.

[0027] The left foot pedal 143LF and left travel lever 143LT correspond to the rotational drive of the left crawler belt of the running body 110. Specifically, when the operator of the work machine 100 pushes the left foot pedal 143LF or the left travel lever 143LT forward, the left crawler belt rotates in the forward direction. Conversely, when the operator of the work machine 100 pushes the left foot pedal 143LF or the left travel lever 143LT backward, the left crawler belt rotates in the reverse direction.

[0028] The right foot pedal 143RF and the right travel lever 143RT correspond to the rotational drive of the right crawler of the running body 110. Specifically, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right travel lever 143RT forward, the right crawler rotates in the forward direction. Conversely, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right travel lever 143RT backward, the right crawler rotates in the reverse direction.

[0029] The display / input device 143D is a device that combines a display device with a sensor that detects touch operations on the display screen. For example, an operator can use the display / input device 143D to set or change various setting values. For example, the display / input device 143D may be configured such that the display device having a display unit and the input unit that accepts operator operations are separate units.

[0030] (Sensors, etc.) As shown in Fig. 3, the control system 60 of the work machine 100 includes a control device 61, an operation device 143, etc., and various sensors. Note that in Fig. 3, the hydraulic system circuit is indicated by a thick line. In the example shown in Fig. 3, the control system 60 includes an attitude angle sensor 151, a GNSS (Global Navigation Satellite System) sensor 152, and an IMU (Inertial Measurement Unit) 153.

[0031] The attitude angle sensor 151 includes a boom attitude angle sensor, an arm attitude angle sensor, and a bucket attitude angle sensor. The boom attitude angle sensor measures the attitude angle of the boom 131. The arm attitude angle sensor measures the attitude angle of the arm 132. The bucket attitude angle sensor measures the attitude angle of the bucket 133.

[0032] The GNSS sensor 152 calculates the position of the revolving unit 120 and the azimuth in which the revolving unit 120 faces. The GNSS sensor 152 includes two receivers 161 and 162 that receive positioning signals from artificial satellites that make up the GNSS. The two receivers 161 and 162 are installed at different positions on the revolving unit 120. The GNSS sensor 152 detects the position of a representative point of the revolving unit 120 in the site coordinate system (the origin of the excavator coordinate system) based on the positioning signals received by the receivers 161 and 162. The GNSS sensor 152 uses the positioning signals received by the two receivers 161 and 162 to calculate the azimuth in which the revolving unit 120 faces as the relationship between the installation position of one receiver and the installation position of the other receiver. The azimuth angle (also called the vehicle azimuth angle) of the rotating body 120 is the front direction (X direction) of the rotating body 120 and is equal to the horizontal component of the extension direction of the straight line extending from the boom 131 of the work implement 130 to the bucket 133.

[0033] The IMU 153 measures the acceleration and angular velocity of the rotating unit 120, and detects the attitude (for example, roll angle and pitch angle) of the rotating unit 120 based on the measurement results. The IMU 153 is installed on the underside of the rotating unit 120, for example.

[0034] Examples of other sensors that the work machine 100 is equipped with include a stereo camera, a LiDAR (Light Detection and Ranging) device, and a laser scanner. These sensors are installed, for example, so that their detection direction faces forward of the cab 140 of the work machine 100. These sensors identify the three-dimensional position of an object in a coordinate system based on the position of each sensor. These sensors may be installed on either the left or right side of the work machine, or on both sides, so as to face to the side of the work machine.

[0035] The work machine 100 is also equipped with, for example, a short-range communication device for performing vehicle-to-vehicle communication with other nearby vehicles, a mobile communication device for connecting to a remote server, etc.

[0036] (Basic Operation of the Control Device) First, with reference to FIGS. 4 to 11 , the basic operation of the control device 61 according to an embodiment of the present disclosure will be described. In this embodiment, the swing operation of automatically raising the boom 131 from a state in which the bucket 133 is positioned outside the loading target due to excavation of the excavation target, swinging the bucket 133 to a direction facing the loading target, and moving the bucket 133 to a discharge point is referred to as a "loading swing." Furthermore, the swing operation of automatically lowering the boom 131 from a state in which the bucket 133 is positioned above the loading target due to loading, swinging the bucket 133 to a predetermined direction, and moving the bucket 133 to the excavation start point is referred to as a "return swing." The discharge point is a target point for the loading swing, and is set, for example, at the loading platform of a dump truck, a land improvement machine, a hopper, or the like. Dump trucks, land improvement machines, hoppers, and the like are examples of loading targets. However, the target point is not limited to these, and the destination of excavated soil or sand to be moved to another part of the ground can also be set as a discharge point. In the present disclosure, the unloading point is an example of a first target point (hereinafter also referred to as a loading swing target point TLP) corresponding to a target position for unloading a load stored in the bucket 133 or the like. The excavation start point is a target point for automatic return operation after unloading is completed, and is set, for example, as a point for starting excavation. In the present disclosure, the excavation start point is an example of a second target point (hereinafter also referred to as a return swing target point TRP) corresponding to a target position for loading a load for excavating an excavation target with the bucket 133 or the like. Note that in the present embodiment, the unloading point (loading swing target point TLP), the excavation start point (return swing target point TRP), and the interference avoidance point described below are collectively referred to as reference points. In the present embodiment, the part of the work machine 100 that corresponds to the reference point is the bucket pin 133P. The control device 61 uses the position and orientation of each reference point as target values ​​and controls the position of the bucket pin 133P. Furthermore, the cargo turning target point TLP and the return turning target point TRP are collectively referred to as the target points.

[0037] Figure 4 schematically shows a series of steps in manual excavation, loading swing, manual earth removal, and return swing. In the work machine 100 shown in Figure 4, for example, as shown in the upper left diagram, the operator manually excavates and loads earth and sand or other cargo into the bucket 133. When the operator then operates the automatic start switch 1432, loading swing is initiated as shown in the upper right diagram, and combined operation of the work implement 130 and the rotating unit 120 is automatically realized up to the loading swing target point TLP. Then, as shown in the lower right diagram, the operator manually removes earth and sand from the bucket 133. After earth removal is complete, the operator presses the automatic start switch 1432 to initiate return swing as shown in the lower left diagram, and combined operation of the work implement 130 and the rotating unit 120 is automatically realized up to the return swing target point TRP.

[0038] 2 and 3, one automatic start switch 1432 is used in common for loading swing and return swing, but two or more switches may be used. For example, two independent automatic start switches may be provided, with the automatic start switch for loading swing being the automatic start switch 1432 shown in FIG. 2 (hereinafter also referred to as the loading swing automatic start switch 1432) and the automatic start switch for return swing being the automatic start switch 1433 shown in FIG. 2 (hereinafter also referred to as the return swing automatic start switch 1433). The switches may be provided in such a way that the operator can set them as desired, for example.

[0039] Next, the interference avoidance point will be described with reference to Figure 5. Figure 5 schematically shows the positional relationship between the work machine 100 and a dump truck 200 onto which earth and sand or other cargo is to be loaded. The dump truck 200 is equipped with a cab 201, a loading platform 202, and a tailgate 203. Figure 5 shows an example of a loading swing operation. By operating the automatic start switch 1432, the work machine 100 moves the bucket 133 (133a) located at the automatic swing start point (SP) to the loading target point (TLP) via the interference avoidance point (EVP). The posture of the bucket 133 (133b) upon reaching the loading swing target point (TLP) is the hoarding posture (in this embodiment, this is the posture in which the load excavated from the excavation target is stored in the bucket 133, and is also referred to as the loading posture). Here, the operator sets the attitude of the bucket 133 to a dump attitude (in this embodiment, this is a load unloading attitude in which all of the load contained in the bucket 133 can be unloaded, also referred to as a load unloading attitude) (bucket 133 (133c)) and performs the soil unloading operation. Here, the interference avoidance point (EVP) is a point (position information) that represents the boundary of an area set to avoid collision with the bed 202 of the dump truck 200, etc. For example, the interference avoidance point (EVP) is a point that sets a position or a direction in which the rotating unit 120 faces to avoid collision with the bed 202 of the dump truck 200, etc. In this embodiment, only a swing operation is performed on the unloading point side of this boundary (load swing target point TLP). The interference avoidance point (EVP) can be set, for example, based on teaching in which the operator actually operates the work implement to set the direction in which the rotating unit 120 faces and the attitude of the work implement 130. At this time, as shown in FIG. 5 , for example, the interference avoidance point (EVP) is set with a certain margin in the vertical and horizontal directions from the interference avoidance point (teaching position) registered by the operator. The automatic swing start point (SP) is the position of the bucket pin 133P at the start of loading swing or return swing, and is the position when the operator operates the automatic start switch 1432. In the following, the automatic swing start point (SP) is also referred to as the start point. The automatic swing start point (SP) may be a specific position of the work implement 130 at the start of loading swing or return swing, and may be, for example, the left or right end of the bucket 133, the cutting edge, or the like.

[0040] FIG. 6 shows an example of the swing angle and bucket pin height position during loading swing. The horizontal axis represents the swing angle, and the vertical axis represents the bucket pin height. In FIG. 6 , the swing angle of the automatic swing start point (SP) is shown as the start angle, the swing angle of the interference avoidance point (EVP) as the interference avoidance point angle, and the swing angle of the loading swing target point (TLP) as the target angle. The height of the automatic swing start point (SP) is shown as the start height, the height of the interference avoidance point (EVP) as the interference avoidance point height, and the height of the loading swing target point (TLP) as the target height. The interference area with the dump truck is also shown shaded. In the example shown in FIG. 6 , from the automatic swing start point (SP) to the interference avoidance point (EVP), the bucket pin height reaches the interference start point height before the swing angle reaches the interference avoidance point angle by performing combined control of the swing unit 120 and control of raising the boom 131 of the work implement 130. Furthermore, after reaching the interference avoidance point, the swing angle reaches the target angle through independent control of the swing unit 120. In this case, the combined operation of the swing operation of the swing unit 120 and the raising operation of the boom 131 of the work implement 130, or the independent operation of the swing unit 120, is controlled based on the interference avoidance point (EVP). In FIG. 6 , the start height of the automatic swing start point (SP) for loading swing is lower than the target height of the loading swing target point (TLP). However, for example, the start height of the automatic swing start point (SP) may be higher than at least one of the target height of the loading swing target point (TLP) and the height of the interference avoidance point (EVP). In this case, from the automatic swing start point (SP) to the loading swing target point (TLP) or the interference avoidance point (EVP), control of the swing unit 120 and control of lowering the boom 131 of the work implement 130 are executed in a combined manner.

[0041] 7 and 8 show examples of the swing angle and bucket pin height position during a return swing. FIG. 7 shows an example in which the height of the automatic swing start point (SP) is equal to the height of the interference avoidance point (EVP), while FIG. 8 shows an example in which the height of the automatic swing start point (SP) is lower than the height of the interference avoidance point (EVP). In the example shown in FIG. 7 , the bucket pin height is maintained at the start height until the interference avoidance point (EVP) is reached, and the swing unit 120 moves from the start angle to the interference avoidance point angle by independent control of the swing unit 120. After the interference avoidance point (EVP) is reached, the bucket pin reaches the target height and target angle by combined execution of swing control of the swing unit 120 and control to lower the boom 131 of the work implement 130. In this case, the independent operation of the revolving unit 120 or the combined operation of the revolving operation of the revolving unit 120 and the lowering operation of the boom 131 of the work implement 130 is controlled based on the interference avoidance point (EVP), which is a reference point. In the example shown in FIG. 8 , the work implement 130 is first independently controlled by raising the boom until the bucket pin height reaches the interference avoidance point height. After the interference avoidance point height is reached, the bucket pin height is maintained at the interference avoidance point height until the interference avoidance point (EVP) is reached, and the revolving unit 120 is independently controlled to move the revolving angle from the start angle to the interference avoidance point angle. After the interference avoidance point (EVP) is reached, the control of the revolving unit 120 and the lowering control of the boom 131 of the work implement 130 are performed in a combined manner, so that the bucket pin height reaches the target height and target angle. In this embodiment, during the return swing, the attitude of the work implement 130 is controlled to be the target attitude by the time the target angle and target height are reached. 7 and 8, the start height of the automatic rotation start point (SP) in the return swing is higher than the target height of the return swing target point (TRP), but, for example, at least one of the start height of the automatic rotation start point (SP) or the height of the interference avoidance point (EVP) may be lower than the target height of the return swing target point (TRP). In that case, control of the rotating unit 120 and control of raising the boom 131 of the work implement 130 are executed in a combined manner from the automatic rotation start point (SP) to the return swing target point (TRP) or the interference avoidance point (EVP).

[0042] FIG. 9 is a perspective view showing an example of operation during loading swing. A dump truck 200, which is a transport vehicle, is equipped with a covolane (scatter prevention device) 204 and a hinge 205 in addition to a gate 203. The covolane 204 and the hinge 205 are examples of obstructions. In the example shown in FIG. 9 , the trajectory of the bucket pin extends from the automatic swing start point (SP) to the interference avoidance point (EVP) by the movement of both the work implement 130 and the swing unit 120 (hereinafter referred to as combined movement), and continues from the interference avoidance point (EVP) to the loading swing target point (TLP) by the independent movement of the swing unit 120. That is, in this embodiment, the operation of the swing unit 120 and the work implement 130 is controlled based on an interference avoidance vertical plane (VS), which is a vertical plane including the swing axis 120C of the swing unit 120 and the interference avoidance point (EVP). An area bounded by the interference avoidance vertical plane (VS) is defined as the first area or the second area. The area from the excavation start point to the interference avoidance vertical plane (VS) is defined as the first area. The area from the interference avoidance vertical plane (VS) to the earth-discharging point is defined as the second area. In the first area, the work implement 130 and the rotating unit 120 perform combined operations. That is, based on the first area, control of the attitude of the work implement and control of the rotation of the rotating unit are executed in combination. In the second area, the rotating unit 120 operates independently, so control of the rotation of the rotating unit 120 is implemented. In this case, the area from the excavation start point to the interference avoidance vertical plane (VS) is defined as the first area, and the combined operation of the work implement 130 and the rotating unit 120 is executed as the trajectory of the bucket pin from the automatic rotation start point (SP) to the interference avoidance point (EVP) set at the reference point. After passing through the collision avoidance point (EVP), the second region is from the collision avoidance point (EVP) to the load turning target point (TLP), and the swing unit 120 performs an independent operation.

[0043] FIG. 10 is a perspective view illustrating an example of operation during a return swing. In the example illustrated in FIG. 10 , the height of the automatic swing start point (SP) is higher than the height of the interference avoidance point (EVP). Furthermore, the positions of the automatic swing start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, interference between the bucket 133 and the loading target is avoided based on a vertical plane (interference avoidance vertical plane (VS)) that includes the swing axis 120C of the swing unit 120 and the interference avoidance point (EVP). Note that in this embodiment, the interference avoidance vertical plane (VS) and the interference avoidance plane (HS), which will be described later, are collectively referred to as the interference avoidance plane. In this example, the trajectory of the bucket pin extends from the automatic swing start point (SP) until it passes through the interference avoidance vertical plane (VS) by the independent operation of the swing unit 120. After passing the interference avoidance vertical plane (VS), the combined operation of the work implement 130 and the revolving unit 120 continues to the return swing target point (TRP). That is, in the second region from the earth-discharging point to the interference avoidance vertical plane (VS), the revolving unit 120 performs an independent operation from the automatic swing start point (SP) to the interference avoidance vertical plane (VS). After passing the interference avoidance vertical plane (VS), the combined operation of the work implement 130 and the revolving unit 120 is performed in the first region from the interference avoidance vertical plane (VS) to the excavation start point. In this case, in the return swing control, if the height of the automatic swing start point (SP) is higher than the height of the interference avoidance point (EVP), only the revolving unit 120 swings to the interference avoidance vertical plane (VS), and does not pass through the interference avoidance point. That is, there is no need to return from the automatic swing start point (SP) to the interference avoidance point, so unnecessary operation of the work implement can be controlled. In this case, the interference avoidance vertical plane (VS) is passed through during the return turn, and the interference avoidance vertical plane (VS) passing point included in the interference avoidance vertical plane (VS) is at a different position from the interference avoidance point (EVP) passed through during the loading turn.

[0044] FIG. 11 is a perspective view showing an example of operation during a return swing. In the example shown in FIG. 11 , the height of the automatic swing start point (SP) is lower than the height of the interference avoidance point (EVP). Furthermore, the positions of the automatic swing start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, the work implement 130 is controlled based on a horizontal plane (interference avoidance plane (HS)) that includes the interference avoidance point (EVP) until the height of the bucket pin 133P reaches or exceeds the height of the interference avoidance plane (HS). Thereafter, similar to the example shown in FIG. 10 , interference between the bucket 133 and the loading target is avoided based on the interference avoidance vertical plane (VS). In this example, the trajectory of the bucket pin rises from the automatic swing start point (SP) until it reaches the interference avoidance plane (HS), then extends by the independent operation of the rotating unit 120 until it passes the interference avoidance vertical plane (VS), and after passing the interference avoidance vertical plane (VS), continues to the return swing target point (TRP) by the combined operation of the work implement 130 and the rotating unit 120. For example, in the return swing control, a combined operation of raising the boom 131 of the work implement 130 and a swing operation of the rotating unit 120 may be executed from the automatic swing start point (SP) to the interference avoidance vertical plane (VS). In this case, too, the trajectory does not pass through the interference avoidance point, so there is no need to return from the automatic swing start point (SP) to the interference avoidance vertical plane (VS), and unnecessary operation of the work implement can be controlled.

[0045] 3 , the control device 61 can be configured using a computer such as a microcontroller, and includes an automatic swing control unit 62, a memory unit 63, and an operation command switching unit 64 as a functional configuration formed by a combination of hardware such as a computer, computer peripheral devices and peripheral circuits, and software such as a program executed by the computer. The automatic swing control unit 62 also includes an information input / output unit 621, a reference point setting unit 622, a swing direction setting unit 623, a start instruction receiving unit 624, an operation command switching control unit 625, and an operation command signal generating unit 626. The memory unit 63 also stores information 631 indicating the target work implement attitude and vehicle body azimuth angle (earth removal target point, interference avoidance point, excavation start point), etc.

[0046] The automatic swing control unit 62 generates an operation command signal (automatic) and outputs it to the EPC valve 123-1 via the operation command switching unit 64, thereby driving the swing body 120 and the work machine 130.

[0047] The information input / output unit 621 inputs predetermined information output by the operation device 143, the attitude angle sensor 151, the GNSS sensor 152, the IMU 153, etc., and outputs predetermined display information to the display input device 143D.

[0048] The reference point setting unit 622 sets a loading swing target point TLP (earth unloading point), a return swing target point TRP (excavation start point), and an interference avoidance point (EVP). In this embodiment, these reference points can be set by the operator teaching, or by creating a three-dimensional map or the like as described in Patent Document 1 and setting the reference points based on the created three-dimensional map. The setting method can be, for example, freely selected by the operator. Here, an example in which the reference points are set by the operator teaching will be described. The reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the excavation start point. The operator operates the operation device 143 to move the bucket 133 to the excavation start point and inputs a completion of movement to the excavation start point into the display input device 143D. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the interference avoidance point. The operator operates the operation device 143 to move the bucket 133 to the interference avoidance point and inputs into the display input device 143D the completion of movement to the interference avoidance point. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the discharge point. The operator operates the operation device 143 to move the bucket 133 to the discharge point and inputs into the display input device 143D the completion of movement to the discharge point.

[0049] The reference point setting unit 622 displays instructions to move to the reference point on the display input device 143D, and stores information such as the position and attitude of the work implement 130 and the swing angle of the swing unit 120, which are acquired based on the operator's input operation on the display input device 143D and the information input by the information input / output unit 621, in the storage unit 63 as information 631. The reference point setting unit 622 can change the setting of the reference point at any timing. That is, after setting the loading swing target point TLP (earth unloading point), return swing target point TRP (digging start point), and interference avoidance point (EVP) once before executing automatic swing, the reference point setting unit 622 can change the setting of the reference point at any timing, for example, during work. In this case, the reference point can be fine-tuned as needed. For example, the loading swing target point TLP (earth unloading point), return swing target point TRP (digging start point), etc. can be fine-tuned as needed.

[0050] The swing direction setting unit 623 sets the swing direction of the work machine 130 for moving to the target position. The swing direction setting unit 623 sets the swing direction in loading swing control (first swing control) and return swing control (second swing control) based on, for example, the positional relationship between the loading target and the work machine.

[0051] The swing direction setting unit 623 sets the swing direction, for example, to a direction in which the bucket 133 crosses the interference avoidance point (EVP) and reaches a loading swing target point TLP (first target point) corresponding to the unloading position (target position for unloading) or a return swing target point TRP (second target point) corresponding to the excavation start position (target position for loading). FIG. 12 shows an example of the operation of the swing direction setting unit 623 in this case. The process shown in FIG. 12 is started when the automatic start switch is operated. When the process shown in FIG. 12 is started, the swing direction setting unit 623 first acquires the target angle described with reference to FIG. 6 or FIG. 7 (step S101). Next, the swing direction setting unit 623 acquires the interference avoidance point angle (step S102). Next, the swing direction setting unit 623 determines whether the target angle will be reached by crossing the interference avoidance point angle when turning left (step S103). If a left turn would cross the interference avoidance point angle and reach the target angle (step S103: YES), the turning direction setting unit 623 sets the turning direction to a left turn (step S104) and ends the processing shown in FIG. 12 . If a left turn would not cross the interference avoidance point angle and reach the target angle (step S103: NO), the turning direction setting unit 623 sets the turning direction to a right turn (step S105) and ends the processing shown in FIG. 12 . FIG. 13 shows an example when a left turn is set. FIG. 14 shows an example when a right turn is set. In this case, a loading turn or a return turn is performed in the direction of the taught interference avoidance point, so it is possible to prevent the direction of the turn from becoming unclear when, for example, making a turn of nearly 180 degrees. In other words, a reference point can be set in the direction in which the turn is desired, and the turn can be made toward the reference point.

[0052] Furthermore, for example, when the target (loading target) for unloading (loading, soil removal, etc.) is a dump truck and the cab 201 of the dump truck 200 interferes with the bucket 133, the swing direction setting unit 623 sets the swing direction in a direction that will not cause interference with the cab 201 of the dump truck 200, based on the positional relationship between the swing center (swing axis 120C) and the dump truck 200. The direction that will not cause interference is a direction in which the bucket 133 and the cab 201 of the transport vehicle do not overlap when viewed from above the transport vehicle. For example, when the transport vehicle is viewed from above, the swing direction is set in a direction in which the bucket 133 does not pass above the cab 201. FIG. 15 shows an example of the operation of the swing direction setting unit 623 in this case. 15 is an example of operation that is based on the premise that the work machine 100 and the dump truck 200, which is the loading target of the work machine 100, are in a generally parallel state (the X direction (the fore-and-aft direction of the work machine 100) and vector b (the fore-and-aft direction of the dump truck 200), which will be described later, are generally parallel). In this case, "approximately parallel" means being within a predetermined angle range from parallel. The processing shown in FIG. 15 is started when the automatic start switch 1432 is operated. When the processing shown in FIG. 15 is started, the turning direction setting unit 623 acquires position information of the earth discharge target point P0 and the position coordinates of the four track contour points P1 to P4 shown in FIG. 16 or 17, based on the excavator coordinate system (step S201). The position coordinates of the four track contour points P1 to P4 can be acquired, for example, by vehicle-to-vehicle communication, or by using external sensors such as a LiDAR device, radar scanner, or camera provided on the work machine 100. Next, the swing direction setting unit 623 calculates a vector (vector a) connecting the origin (swing axis 120C) of the excavator coordinate system and the earth unloading point P0 (step S202). Next, the swing direction setting unit 623 calculates a vector (vector b) of the X-axis of the truck coordinate system (step S203). The truck coordinate system is a coordinate system based on the position and orientation of the dump truck 200. Furthermore, the direction in which vector b faces is the direction from the loading platform to the loading platform when the front of the driver's cab 201 of the dump truck 200 is the front and the loading platform side is the rear.Next, the turning direction setting unit 623 determines whether the angle formed by vector a and vector b in a plan view from above is greater than 0 degrees (step S204). If the angle formed by vector a and vector b is greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to the right (step S205) and ends the processing shown in FIG. 15. If the angle formed by vector a and vector b is not greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to the left (step S206) and ends the processing shown in FIG. 15. In the example shown in FIG. 16, the angle formed is greater than 0, so the turning direction is set to the right. In the example shown in FIG. 17, the angle formed is not greater than 0, so the turning direction is set to the left. In this case, the work machine 130 can approach from the rear side of the bed 202 of the dump truck 200, which is preferable compared to passing over the cab 201. Note that when the angle formed by vector a and vector b is close to 0 degrees within a predetermined range from a preset 0 degree (see FIG. 18 ), automatic turning may be performed in a direction that results in the minimum turning angle. Also, when the angle formed by vector a and vector b is opposite to −180 degrees or within a predetermined range from −180 degrees, that is, when the dump truck 200 is facing the work machine 100 (see FIGS. 19 and 20 ), the turning direction is not determined, automatic turning is not activated, and a display or sound is output on the display input device 143D for a predetermined period of time to the effect that the position or attitude of the bucket 133 is inappropriate, for example.

[0053] The swing direction setting unit 623 may be set manually based on, for example, an input operation by an operator via the display input device 143D. Furthermore, the swing direction setting unit 623 may set the swing direction in a direction that results in a minimum swing angle, for example, in the case of an earth dumping operation onto a hopper or ground work machine where there are no interfering objects. For example, if the bucket 133 and the driver's cab 201 of the haulage vehicle do not overlap when viewed from above, the swing direction may be set in a direction that results in a minimum swing angle to the target orientation. Furthermore, the setting method may be freely selected by the operator, for example, by touching the input screen.

[0054] When the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 receives, when the automatic start switch 1432 (predetermined operation unit) is operated, the start instruction receiving unit 624 receives the operation as an instruction to start loading swing control (first swing control for moving the implement to a first target point corresponding to the target position for unloading) or an instruction to start return swing control (second swing control for moving the implement to a second target point corresponding to the target position for excavation). With this configuration, a swing start can be instructed using a single operation switch.

[0055] Furthermore, when the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 receives an operation of the automatic start switch 1432 as an instruction to start return swing control (second swing control) when, for example, the bucket 133 is above the bed 202 or vessel 206 of the dump truck 200 (when the work tool is within a predetermined range from the first target point) as shown in FIG. 22 . Alternatively, when the bucket 133 is not above the bed 202 or vessel 206 of the dump truck 200 (when the work tool is not within a predetermined range from the first target point), the start instruction receiving unit 624 receives an instruction to start loading swing control (first swing control). Note that positions P5 and P6 in FIG. 22 are the positions of the ends of the cab 201. FIG. 21 shows an example of the operation of the start instruction receiving unit 624 in this case. The processing shown in FIG. 21 is started when the automatic start switch 1432 is operated. When the processing shown in Fig. 21 starts, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S301). Next, the start instruction receiving unit 624 acquires position information of the bucket 133 (step S302). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the rotating body 120 faces. Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S303). If the bucket 133 is above the vessel 206 (step S303: YES), the start instruction receiving unit 624 sets the swing mode (type of swing control) to return swing (step S304), and ends the processing shown in Fig. 21. If the bucket 133 is not above the vessel 206 (step S303: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S305), and ends the processing shown in FIG.

[0056] Furthermore, in the case where the automatic start switch 1432 is a single operation switch, when the automatic start switch 1432 is operated, for example, when the bucket 133 is in the dump position (the implement is in a predetermined unloading position) as shown in FIG. 24 , the start instruction receiving unit 624 receives this as an instruction to start return swing control (second swing control). Alternatively, when the automatic start switch 1432 is operated, when the bucket 133 is in the hoisting position (the implement is in a predetermined loading position) as shown in FIG. 26 , the start instruction receiving unit 624 receives this as an instruction to start loading swing control (first swing control). In this case, the swing mode can be set by the work machine 100 alone. An example of operation in this case is shown in FIGS. 23 and 25. The dump position is the position in which the load in the bucket 133 is being discharged. The dump posture is a posture (dashed line DL in FIG. 24 ) in which the cutting edge 133T of the bucket 133 faces in a direction away from the work machine 100 rather than in a posture in which the cutting edge 133T of the bucket 133 points in the vertical direction, as shown, for example, in FIG. 24 . The hoarding posture is a posture in which a load is loaded into the bucket 133. The hoarding posture is a posture in which the cutting edge 133T of the bucket 133 faces in a direction approaching the work machine 100 rather than in a posture in which the cutting edge 133T of the bucket 133 points in the vertical direction, as shown, for example, by dashed line DL in FIG. 26 . It is preferable that the approaching direction be such that the cutting edge 133T faces upward more than perpendicular to the vertical direction, as shown by dashed line DL in FIG. 24 . The posture of the bucket 133 may be corrected by the pitch angle of the work machine 100.

[0057] The process shown in FIG. 23 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 23 is started, the start instruction receiving unit 624 acquires attitude information of the bucket 133 (step S401). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the dump attitude (step S402). If the bucket 133 is in the dump attitude (step S402: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S403) and ends the process shown in FIG. 23. If the bucket 133 is not in the dump attitude (step S402: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S404) and ends the process shown in FIG. 23. In addition, the attitude information of the bucket 133 identified by the start instruction receiving unit 624 may be corrected by taking into account vehicle body inclination information, such as the pitch angle and roll angle of the vehicle body (traveling body 110), measured based on the vehicle body's IMU.

[0058] The process shown in Fig. 25 is started when the automatic start switch 1432 is operated. When the process shown in Fig. 25 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S501). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the hoisting posture (step S502). If the bucket 133 is in the hoisting posture (step S502: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S503) and ends the process shown in Fig. 25. If the bucket 133 is not in the hoisting posture (step S502: NO), the start instruction receiving unit 624 sets the swing mode to return swing (step S504) and ends the process shown in Fig. 25.

[0059] Furthermore, in the case where the automatic start switch 1432 is a single operation switch, when the switch is operated, for example, as shown in FIG. 22 , the start instruction receiving unit 624 does not accept the switch operation if the bucket 133 is not in the dump position (the work implement is not in the predetermined unloading position) even if the bucket 133 is above the bed 202 or vessel 206 of the dump truck 200 (even if the work implement is within a predetermined range from the first target point). Alternatively, when the switch is operated, the start instruction receiving unit 624 may not accept the switch operation if the bucket 133 is not above the bed 202 or vessel 206 of the dump truck 200 (even if the work implement is not within a predetermined range from the first target point) or if the bucket 133 is not in the hoarding position (the work implement is not in the predetermined loading position). An example of the operation in this case is shown in FIG. 27 .

[0060] The processing shown in Fig. 27 is started when the automatic start switch 1432 is operated. When the processing shown in Fig. 27 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S601) and also acquires position and attitude information of the bucket 133 (step S602). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the revolving unit 120 faces. The start instruction receiving unit 624 can acquire information representing the positional relationship between the vessel 206 and the bucket 133 based on the position information of the work machine 100, the position information of the vessel 206 acquired in step S601, and the position and attitude information of the bucket 133 acquired in step S602. Note that the position and attitude information of the bucket 133 can be calculated based on, for example, azimuth angle information of the revolving unit 120 and attitude information of the work implement 130 (boom, arm, bucket). Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S603). If the bucket 133 is above the vessel 206 (step S603: YES), the start instruction receiving unit 624 determines whether the bucket 133 is in a dump position (step S604). If the bucket 133 is in a dump position (step S604: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S607) and ends the processing shown in FIG. 27. If the bucket 133 is not in a dump position (step S604: NO), the start instruction receiving unit 624 does not activate automatic swing (step S605), and outputs a display or sound to the display input device 143D for, for example, a predetermined time, indicating that the position or posture of the bucket 133 is inappropriate (step S606), and ends the processing shown in FIG. 27. Note that step S601 may be omitted.

[0061] If the bucket 133 is not above the vessel 206 (step S603: NO), the start instruction receiving unit 624 determines whether the bucket 133 is in the hoisting position (step S608). If the bucket 133 is in the hoisting position (step S608: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S609) and ends the processing shown in FIG. 27. If the bucket 133 is not in the hoisting position (step S608: NO), the start instruction receiving unit 624 does not activate automatic swing (step S610), and outputs a display or sound to the display input device 143D for, for example, a predetermined time, indicating that the position or posture of the bucket 133 is inappropriate (step S611), and ends the processing shown in FIG. 27. This configuration makes it possible to prevent automatic swing control from being executed when the position or posture of the bucket 133 is inappropriate.

[0062] Furthermore, when the automatic start switch 1432 is a two-operation switch (for example, when the loading swing automatic start switch 1432 and the return swing automatic start switch 1433 are provided), the start instruction receiving unit 624 may be configured to receive operation of the loading swing automatic start switch 1432 or the return swing automatic start switch 1433 (first operation unit or second operation unit) as an instruction to start loading swing control (first swing control) or return swing control (second swing control) only when at least one of the position and attitude of the bucket 133 satisfies a predetermined condition (only when at least one of the position and attitude of the implement satisfies a predetermined condition). In this case, if the operator mistakenly operates the loading swing automatic start switch 1432 or the return swing automatic start switch 1433, for example, it is possible to prevent the automatic swing control from starting.

[0063] For example, when the return swing automatic start switch 1433 (second operation unit) is operated, the start instruction receiving unit 624 receives the operation as an instruction to start return swing control (second swing control) only when the bucket 133 is above the vessel 206 (only when the implement is within a predetermined range from the first target point). Alternatively, when the loading swing automatic start switch 1432 (first operation unit) is operated, the start instruction receiving unit 624 can receive the operation as an instruction to start loading swing control (first swing control) only when the bucket 133 is not above the vessel 206 (only when the implement is not within a predetermined range from the first target point). An example of operation in this case is shown in FIG.

[0064] The process shown in Figure 28 is started when the loading swing automatic start switch 1432 is operated. When the process shown in Figure 28 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S701) and acquires position information of the bucket 133 (step S702). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the swing bed 120 is facing. Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S703). If the bucket 133 is above the vessel 206 (step S703: YES), the start instruction receiving unit 624 does not activate automatic swing (step S704) and outputs a display or sound to the display input device 143D for, for example, a predetermined time, indicating that the position or attitude of the bucket 133 is inappropriate (step S705), and then ends the process shown in Figure 28. If the bucket 133 is not above the vessel 206 (step S703: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S706) and ends the processing shown in Fig. 28. Note that step S701 may not be included.

[0065] Furthermore, the start instruction receiving unit 624 may be configured to, for example, accept the switch operation as an instruction to start loading swing control (first swing control) when the loading swing automatic start switch 1432 (first operating unit) is pressed down only when the bucket 133 is in the hoarding position (the working implement is in a predetermined loading position), or to accept the switch operation as an instruction to start return swing control (second swing control) when the return swing automatic start switch 1433 (second operating unit) is pressed down only when the bucket 133 is in the dump position (the working implement is in a predetermined unloading position). An example of operation in this case is shown in FIG.

[0066] The process shown in FIG. 29 is started when the loading swing automatic start switch 1432 is operated. When the process shown in FIG. 29 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S801). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the dump posture (step S802). If the bucket 133 is in the dump posture (step S802: YES), the start instruction receiving unit 624 does not activate automatic swing (step S803), and outputs a display or sound on the display input device 143D to the effect that the posture of the bucket 133 is inappropriate for, for example, a predetermined period of time (step S804), and ends the process shown in FIG. 29. If the bucket 133 is not in the dump posture (step S802: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S805), and ends the process shown in FIG. 29.

[0067] The manner in which the above-described plurality of start instruction receiving sections 624 operate may be selected arbitrarily by the operator, for example.

[0068] The operation command switching control unit 625 controls the operation command switching unit 64 to output from the operation command switching unit 64 either an operation command signal (manual) generated in response to an operation of the operator on the operation device 143 or an operation command signal (automatic) generated by the operation command signal generating unit 626. For example, when the operation command signal generating unit 626 generates and outputs an operation command signal (automatic), the operation command switching control unit 625 selects the operation command signal (automatic) and causes the operation command switching unit 64 to output it.

[0069] The operation command signal generation unit 626 is one example configuration of a control unit according to the present disclosure. The operation command signal generation unit 626 (control unit) generates and outputs an operation command signal for performing loading swing control or return swing control in response to a predetermined instruction (for example, pressing the automatic start switch 1432). The operation command signal generation unit 626 controls the movement of the bucket 133 in the loading swing control and return swing control based on a reference point. The operation command signal generation unit 626 controls the movement of the bucket 133 in the loading swing control and return swing control based on, for example, an interference avoidance point.

[0070] In addition, the operation command signal generating unit 626 executes loading swing control when the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control, and executes forward return swing control when the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start return swing control.

[0071] Furthermore, the operation command signal generating unit 626 executes loading swing control based on the loading swing target point TLP and the interference avoidance point EVP, and executes return swing control based on the return swing target point TRP and the interference avoidance vertical plane VS (interference avoidance plane) that includes the interference avoidance point EVP. For example, when the start instruction receiving unit 624 receives operation of the automatic start switch 1432 as an instruction to start return swing control, the interference avoidance point EVP is calculated based on the position of the bucket 133. That is, in the case of return swing control, the interference avoidance point EVP calculated based on the position of the bucket passes through the interference avoidance vertical plane VS and is a passing point that is included in the interference avoidance vertical plane VS. In other words, the interference avoidance point EVP in the case of return swing control and the interference avoidance point EVP in the case of loading swing control are at different positions.

[0072] Furthermore, when the interference avoidance plane is an interference avoidance vertical plane VS that includes the rotation axis 120C passing through the rotation center and the interference avoidance point EVP, the operation command signal generating unit 626 sets the height of the bucket pin 133P of the bucket 133 (the specified height of the implement) to be equal to or higher than the height of the interference avoidance point EVP from the start of the return rotation control until the bucket passes through the interference avoidance vertical plane VS.

[0073] In addition, the operation command signal generating unit 626 executes a combination of control of the attitude of the work implement 130 and control of the rotation of the rotating body 120 in one of the first and second areas bounded by the interference avoidance surface, and executes only control of the rotation of the rotating body 120 in the other area.

[0074] Furthermore, the operation command signal generation unit 626 executes loading swing control when the start instruction receiving unit 624 receives operation of the loading swing automatic start switch 1432 as an instruction to start loading swing control, and executes return swing control when the start instruction receiving unit 624 receives operation of the return swing automatic start switch 1433 as an instruction to start return swing control. In this embodiment, the operation command signal generation unit 626 executes control to move the bucket 133, which is a working tool, to a target position. The reference point setting unit 622 sets a reference point. The operation command signal generation unit 626 then executes control based on the reference point. The operation command signal generation unit 626 also executes control based on a first region and a second region defined by a vertical plane including the reference point and the rotation axis passing through the rotation center. The operation command signal generation unit 626 also executes a combination of control of the attitude of the work implement 130 and control of the rotation of the rotating unit 120 in the first region, and executes control of the rotation of the rotating unit 120 in the second region. The operation command signal generating unit 626 also executes a first swing control to move the bucket 133 to a discharge point corresponding to the target position for unloading, or a second swing control to move the bucket 133 to an excavation start point corresponding to the target position for loading. Here, the first region is the region from the excavation start point to a vertical plane, and the second region is the region from the discharge point to the vertical plane. The operation command signal generating unit 626 also executes the second swing control based on the discharge point and the vertical plane. In addition, in the second swing control, when the bucket 133 passes through an interference avoidance plane including a reference point for avoiding interference, the operation command signal generating unit 626 controls the bucket 133 so that a predetermined height on the interference avoidance plane is equal to or greater than the height of the reference point. The operation command signal generating unit 626 also executes the first swing control based on the excavation start point and the reference point. The reference point is set to avoid interference between the work implement 130 and the loading target.

[0075] FIG. 30 shows an example of the operation of the operation command signal generation unit 626. The operation shown in FIG. 30 is started when the automatic start switch 1432 is operated and the swing direction and swing mode are set. When the processing shown in FIG. 30 is started, the operation command signal generation unit 626 determines whether the swing mode is set to loading swing (step S901). If the swing mode is set to loading swing (step S901: YES), the operation command signal generation unit 626 performs combined swing control and work implement control in the set swing direction up to the interference avoidance point (step S902), and after passing the interference avoidance point, performs swing control alone up to the loading swing target point (step S903), and ends the processing shown in FIG. 30.

[0076] If the swing mode is not set to loading swing (step S901: NO), the operation command signal generator 626 determines whether the start height is equal to or greater than the interference avoidance point height (step S904). If the start height is not equal to or greater than the interference avoidance point height (step S904: NO), the operation command signal generator 626 independently executes work implement control up to the interference avoidance point height (step S907). After step 907, or if the start height is equal to or greater than the interference avoidance point height (step S904: YES), the operation command signal generator 626 independently executes swing control in the set swing direction up to the interference avoidance vertical plane (VS) (step S905). After passing the interference avoidance point, the operation command signal generator 626 executes swing control and work implement control in combination up to the return swing target point (return swing target attitude) (step S906), and ends the processing shown in FIG. 30 .

[0077] (Actions and Effects) According to this embodiment, in return swing control, interference can be avoided based on an interference avoidance point set to avoid interference between the loading target and the bucket 133, and unnecessary operation of the work machine can be suppressed based on an interference avoidance plane that includes the interference avoidance point. Therefore, according to this embodiment, usability can be improved in automatic swing control.

[0078] Although the embodiments of the present invention have been described above with reference to the drawings, the specific configuration is not limited to the above-described embodiments and includes design modifications within the scope of the present invention. For example, a remote control system may be used in which the operating device 143 and part of the configuration of the control device 61 are installed in a remote location, and an operator at the remote location controls the work machine 130 and the revolving body 120 via wireless communication while viewing a monitor screen. Furthermore, part or all of the programs executed by the computer in the above-described embodiments may be distributed via a computer-readable recording medium or a communication line.

[0079] [Additional Notes] The control device 61 described in the embodiment can be understood as follows.

[0080] (1) A control device according to a first aspect of the present disclosure is a control device for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a work tool and is attached to the rotating body, and includes an operation command signal generation unit that executes control to move the work tool to a target position, and a reference point setting unit that sets a reference point, and the operation command signal generation unit executes the control based on the reference point.

[0081] (2) A control device according to a second aspect of the present disclosure is the control device of (1), wherein the operation command signal generating unit executes the control based on a first region and a second region bounded by a rotation axis passing through the rotation center and a vertical plane including the reference point.

[0082] (3) A control device according to a third aspect of the present disclosure is a control device of (1) or (2), which in the first region executes a combination of control of the attitude of the work implement and control of the rotation of the rotating body, and in the second region executes control of the rotation of the rotating body.

[0083] (4) A control device according to a fourth aspect of the present disclosure is a control device according to any one of (1) to (3), which executes a first rotation control to move the implement to a discharge point corresponding to the target position for unloading, or a second rotation control to move the implement to a start point of excavation corresponding to the target position for loading.

[0084] (5) A control device according to a fifth aspect of the present disclosure is a control device of (4) that refers to (3) or (2), wherein the first region is the region from the excavation start point to the vertical plane, and the second region is the region from the earth removal point to the vertical plane.

[0085] (6) A control device according to a sixth aspect of the present disclosure is the control device of (4), wherein the operation command signal generation unit executes the second turning control based on the discharge point and the vertical plane.

[0086] (7) A control device according to a seventh aspect of the present disclosure is the control device of (6), which is the control device of (4) or (6), wherein the operation command signal generating unit controls, in the second rotation control, when the work implement passes through an interference avoidance plane including the reference point for avoiding interference, so that the predetermined height of the work implement on the interference avoidance plane is equal to or greater than the height of the reference point.

[0087] The control device, control method, and work machine disclosed herein can prevent interference between the loading target and the bucket, and can also suppress unnecessary operation of the work machine.

[0088] REFERENCE SIGNS LIST 100 Work machine 110 Traveling body 120 Swing body 130 Work machine 133 Bucket 140 Operator's cab 143D Display input device 60 Control system 61 Control device 622 Reference point setting unit 623 Swing direction setting unit 624 Start instruction receiving unit 626 Operation command signal generating unit (control unit)

Claims

1. A control device for a work machine having a rotating body that rotates around a rotation center, and a work implement having a working tool and attached to the rotating body, the control device comprising: an operation command signal generating unit that executes control to move the working tool to a target position; and a reference point setting unit that sets a reference point, wherein the operation command signal generating unit executes the control based on the reference point.

2. The control device according to claim 1, wherein the operation command signal generating unit executes the control based on a first area and a second area defined by a vertical plane including a rotation axis passing through the rotation center and the reference point.

3. The control device according to claim 2, wherein the operation command signal generating unit executes, as the control, a combination of control of the attitude of the work machine and control of the rotation of the rotating body in the first region, and executes control of the rotation of the rotating body in the second region.

4. The control device according to claim 2, wherein the operation command signal generating unit executes, as the control, a first rotation control for moving the work implement to a discharge point corresponding to the target position for unloading, or a second rotation control for moving the work implement to an excavation start point corresponding to the target position for loading.

5. The control device according to claim 4, wherein the first area is an area from the excavation start point to the vertical plane, and the second area is an area from the earth removal point to the vertical plane.

6. The control device according to claim 4, wherein the operation command signal generating unit executes the second turning control based on the earth unloading point and the vertical plane.

7. The control device as described in claim 6, wherein the operation command signal generating unit controls, in the second rotation control, when the work implement passes through an interference avoidance plane including the reference point for avoiding interference, so that a predetermined height of the work implement on the interference avoidance plane is equal to or higher than the height of the reference point.

8. The control device according to claim 4, wherein the operation command signal generating unit executes the first turning control based on the excavation start point and the reference point.

9. The control device according to claim 2 or 4, wherein the reference point is set to avoid interference between the work machine and an object to be loaded.

10. A control method for a work machine having a rotating body that rotates around a rotation center and a work implement having a working tool and attached to the rotating body, the control method including the steps of: setting a reference point; and executing control to move the working tool to a target position based on the reference point.

11. A work machine comprising: a rotating body that rotates around a rotation center; a work machine having a work implement attached to the rotating body; and a control device that controls the rotating body and the work implement, wherein the control device comprises: an operation command signal generating unit that executes control to move the work implement to a target position; and a reference point setting unit that sets a reference point, and the operation command signal generating unit executes the control based on the reference point.

Citation Information

Patent Citations

  • Control device and control method for loading machine

    JP2020041352A

  • Shovel and device for controlling shovel

    WO2020101005A1