Charging management system
The system predicts electric vehicle charging completion times by synchronizing clocks and calculating distances between devices, using predictive models to analyze vehicle and charger data, thereby improving navigation and reducing waiting times.
Patent Information
- Application Number
- PCT/JP2024/012522
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-29
- Filing Date
- 2024-03-27
- Publication Date
- 2024-10-03
AI Technical Summary
Current systems fail to accurately predict the completion time of charging for electric vehicles at charging facilities, leading to inefficiencies in user navigation and waiting times.
A system comprising multiple devices that synchronize clocks and calculate distances to predict the completion time of charging by analyzing the position and number of electric vehicles relative to available chargers, using machine-learned predictive models to estimate charging completion times based on vehicle and charger information.
Enables precise prediction of charging completion times, allowing users to optimize their routes and reduce waiting times by providing accurate information on charger availability and waiting times.
Smart Images

Figure JP2024012522_03102024_PF_FP_ABST
Abstract
Description
Charging Management System
[0001] The present invention relates to a system and method.
[0002] In recent years, with the spread of electric vehicles, chargers for charging electric vehicles have been installed. However, charging an electric vehicle takes longer than refueling at a gas station, and there may be waiting times before charging.
[0003] In response to this, for example, Patent Document 1 discloses a system aimed at guiding a vehicle to a charging facility with a short waiting time. In Patent Document 1, charging demand forecast information is created based on collected vehicle location and remaining battery capacity, as well as the locations of electric vehicle charging facilities and the number of chargers provided, and the charging demand forecast information is transmitted to a navigation device. Furthermore, when the in-vehicle navigation device receives the charging demand forecast information while providing guidance based on a route to a destination, the in-vehicle navigation device estimates road sections where congestion at charging facilities is predicted based on the charging demand forecast information and re-searches for a route to the destination that avoids those road sections.
[0004] JP 2011-027433 A
[0005] An object of the present invention is to provide a system and method that can predict the completion time or completion time when charging by a charger of a mobile object will be completed.
[0006] The present invention addresses the following problems: [1] A system comprising at least one computer device, the system comprising a location identification means for identifying the location of a mobile object, and a prediction means for predicting a completion time or time at which charging of the mobile object by a charger will be completed according to the identified location of the mobile object; [2] The system described in [1] above, comprising a number identification means for identifying the number of mobile objects within a predetermined range set in relation to the location of the charger, the prediction means predicting a completion time or time at which charging of the mobile objects within the predetermined range by the charger will be completed based on the identified number of mobile objects; [3] The system described in [1] or [2] above, in which the prediction means predicts a completion time or time at which charging of the mobile objects within the predetermined range by the charger will be completed based on a completion time at which charging will be completed for the mobile objects within the predetermined range by the charger; [4] The system described in any of [1] to [3] above, comprising a transmission means for transmitting the identified number of mobile objects and / or the predicted completion time or time to a first computer device; [5] The system described in any of [1] to [4] above, in which the number identification means identifies the number of mobile objects within a predetermined range set for each charger; [6] The system according to any one of [1] to [5], wherein the input means receives mobile body information about the mobile body, and the prediction means uses a machine-learned prediction model with the mobile body information about the mobile body as input data and the completion time of charging completion at the mobile body as output data to predict the completion time at the mobile body corresponding to the received input mobile body information; [7] The system according to any one of [1] to [6], wherein the system includes a plurality of first devices, the mobile body includes a second device, and the distance calculation means calculates the distance between each of the plurality of first devices and the second device based on information or signal propagation time between each of the plurality of first devices and the second device, and the location identification means identifies the location of the second device based on the calculated distance between each of the plurality of first devices and the second device; [8] The system according to [7], wherein the distance calculation means calculates the distance based on the time difference between the clock of one first device and the clock of the second device;[9] The system according to [7] or [8], comprising a time difference calculation means for calculating a time difference between a first device and a second device by performing communication between the first device and the second device, and a time correction means for correcting the time on the second device based on the calculated time difference;
[10] The system according to any one of [7] to [9], comprising a phase difference calculation means for calculating a phase difference between the clocks of the first device and the second device by performing communication between the first device and the second device, and a phase correction means for correcting the phase on the second device based on the calculated phase difference;
[11] A method executed in a system comprising at least one computer device, comprising a location identification step for identifying the location of a mobile body, and a prediction step for predicting a completion time or completion time at which charging by a charger of the mobile body will be completed according to the identified location of the mobile body;
[0007] According to the present invention, it is possible to provide a system and method capable of predicting the completion time or completion time when charging of a mobile object by a charger will be completed.
[0008] FIG. 1 is a block diagram showing a configuration of a system according to an embodiment of the present invention. FIG. 2 is a block diagram showing a configuration of a first device according to an embodiment of the present invention. FIG. 3 is a block diagram showing a configuration of a moving body according to an embodiment of the present invention. FIG. 4 is a block diagram showing a configuration of a server device according to an embodiment of the present invention. FIG. 5 is a diagram showing a flowchart of a position storage process according to an embodiment of the present invention. FIG. 6 is a diagram showing a flowchart of a distance calculation process according to an embodiment of the present invention. FIG. 7 is a diagram showing a flowchart of a position identification process according to an embodiment of the present invention. FIG. 8 is a diagram showing a flowchart of a prediction process according to an embodiment of the present invention. FIG. 9 is a schematic diagram of a prediction method according to an embodiment of the present invention. FIG. 10 is a diagram showing a flowchart of an output process according to an embodiment of the present invention.
[0009] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. The following description of the effects of the present invention is one aspect of the effects of the embodiments of the present invention and is not limited to those described herein. The order of the processes constituting the flowcharts described below is random as long as no contradictions or inconsistencies occur in the process content. Furthermore, it is also possible to omit some of the processes constituting the flowcharts or add new processes to the processes constituting the flowcharts as long as no contradictions or inconsistencies occur in the process content. Furthermore, the device that executes each process constituting the flowcharts can be changed to another device as long as this does not violate the spirit of the present invention. In this case, the process content can be changed so as not to cause contradictions or inconsistencies in the process content.
[0010] FIG. 1 is a block diagram showing the configuration of a system according to an embodiment of the present invention. As shown in the figure, the system 10 of the present invention includes at least one computer device. Specifically, the system 10 includes a plurality of first devices 1 (1a to 1z), a mobile object 3 including a second device 2, and a server device 4. As shown in the figure, the system 10 of the present invention may include a plurality of mobile objects 3 (3a to 3z). One mobile object 3 corresponds to one second device 2, and for example, the mobile object 3a includes the second device 2a. Preferably, the system 10 of the present invention includes three or more first devices 1. The system 10 of the present invention may also include a user terminal (not shown).
[0011] The first device 1 and the second device 2 can be directly connected for communication. The first device 1 and the second device 2 can be connected for communication with the server device 4 via a communication network 5. Furthermore, the mobile object 3 can be connected for communication with the server device 4 via the communication network 5.
[0012] [First Device] The first device 1 is a reference device for synchronizing the clocks of the second devices 2, and one first device 1 can function as the first device for multiple second devices 2. Because the first device 1 is a reference device for synchronizing the clocks of the second devices 2, it is preferable that the first device 1 has a clock with higher accuracy. Furthermore, even if a first device 1 functions as the second device 2, it can also function as the first device for other second devices. A pyramidal relationship may be formed by having multiple second devices 2 for one first device 1, and each of these multiple second devices 2 functioning as the first device for multiple other second devices.
[0013] The configuration of the first device 1 of the present invention will be described. Fig. 2 is a block diagram showing the configuration of the first device according to an embodiment of the present invention. The first device 1 includes a control unit 11, an RF chip 12, and an oscillator 13. The RF chip 12 includes a clock 12a and a phase detector 12b. In addition to the control unit 11, the RF chip 12, the oscillator 13, the clock 12a, and the phase detector 12b, the first device 1 may include other components as necessary.
[0014] The control unit 11 is not particularly limited, but may be, for example, a microcomputer (microcontroller). The control unit 11 executes programs based on programs and data. The RF chip 12 receives and transmits radio signals. The data received by the RF chip 12 is subjected to arithmetic processing by the control unit 11.
[0015] The oscillator 13 oscillates at a predetermined frequency and outputs a signal that provides operational timing for each component of the device. An atomic oscillator or a quartz oscillator can be used as the oscillator 13. The clock 12a uses the output signal from the oscillator 13 as a source of oscillation to clock and output the time. The control unit 11 controls the clock 12a to transmit the time to the second device 2 via the RF chip 12. The phase detector 12b detects the phase of the carrier wave that constitutes the information received from the second device 2, and detects the phase of the signal oscillated by the oscillator 13 in the first device 1.
[0016] The installation location of the first device 1 is not particularly limited, but it is preferable that the first device 1 be installed at a fixed location where the installation location can be identified. For example, the first device 1 may be installed on a transmission tower or the like for supporting an overhead power line. Furthermore, multiple first devices 1 are installed. In order to accurately identify the location of the second device 2, multiple first devices 1 may be placed at predetermined distances (for example, every 500 m). Note that installation location information of the first device 1 may be stored in the server device 4 or the like in association with identification information that can identify the first device 1.
[0017] [Second Device and Mobile Body] The second device 2 is provided in the mobile body 3 and is connected to the mobile body 3 via wired or wireless communication so that they can communicate with each other. In this system, the time of the second device 2 is synchronized based on the time clocked by the first device 1, and the phase of the signal generated by the oscillator in the second device 2 is synchronized based on the phase of the signal generated by the oscillator in the first device 1.
[0018] Furthermore, the second device 2 may function as the first device 1 with respect to another second device. The time of the other second device is synchronized based on the time clocked by the second device 2, and the phase of the signal generated by the oscillator in the other second device is synchronized based on the phase of the signal generated by the oscillator in the second device 2.
[0019] The phrase "the second device 2 is provided in the mobile body 3" includes both the second device 2 being incorporated inside the mobile body 3 and the second device 2 being attached to the outside of the mobile body 3. The phrase "the second device 2 is provided in the mobile body 3" also includes the case where the second device 2 and the mobile body 3 share the same control unit and are controlled by the control unit. The location information of the second device 2 may be stored in the server device 4 or the like in association with identification information that can identify the second device 2 or identification information that can identify the mobile body 3 that is provided with the second device 2.
[0020] The mobile object 3 of the present invention will be described. The mobile object 3 is equipped with a battery and operates on electricity. The concept of the mobile object 3 includes not only vehicles but also aircraft and ships. Specifically, the present invention can be applied to vehicles such as hybrid cars and electric cars, aircraft such as drones, helicopters, airships, gliders, and jet planes, and ships such as ferries and cargo ships, and other vehicles on which people can board. The mobile object 3 may be a conventional vehicle driven by a person, or may be an autonomous vehicle. As the mobile object 3, any known vehicle can be used, except that it is equipped with the second device 2.
[0021] The configurations of the second device 2 and the mobile object 3 will be described. Fig. 3 is a block diagram showing the configuration of the mobile object according to an embodiment of the present invention. The mobile object 3 includes the second device 2, a RAM 24, a storage unit 25, an input unit 26, and a display unit 27, all of which are connected via a bus. The mobile object 3 may also include a sensor that detects the remaining battery power of the mobile object. The second device 2 includes a control unit 21, an RF chip 22, and an oscillator 23, all of which are connected via a bus.
[0022] The control unit 21 is composed of a CPU and a ROM. The control unit 21 executes programs stored in the storage unit 25 and controls the second device 2 and the mobile object 3. The RAM 24 is a work area for the control unit 21. The storage unit 25 is a memory area for saving programs and data. The control unit 21 performs arithmetic processing based on the programs and data read from the RAM 24 and data input via the input unit 26.
[0023] The RF chip 22 is equipped with a clock 22a and a phase detector 22b. The second device 2 may include other components as necessary in addition to the control unit 21, RF chip 22, oscillator 23, clock 22a, and phase detector 22b. The RF chip 22 is capable of transmitting and receiving data to and from other computer devices. The RF chip 22 is also capable of receiving GPS signals. Data received by the RF chip 22 is loaded into RAM 24 and is subjected to arithmetic processing by the control unit 21.
[0024] The oscillator 23 oscillates at a predetermined frequency and outputs a signal that provides operational timing for each component of the device. A crystal oscillator, for example, can be used as the oscillator 23. The clock 22a uses the output signal from the oscillator 23 as a source of oscillation to clock and output the time. The control unit 21 controls the clock 22a to transmit the time to the first device 1 via the RF chip 22. The phase detector 22b detects the phase of the carrier wave that constitutes the information received from the first device 1, and detects the phase of the signal oscillated by the oscillator 23 of the second device 2.
[0025] The display unit 27 has a display screen. The control unit 21 outputs a video signal for displaying an image on the display screen according to the result of the arithmetic processing. Here, the display screen of the display unit 27 may be a touch panel equipped with a touch sensor. In this case, the touch panel functions as the input unit 26.
[0026] In the above, we have described a case where the second device 2 and the mobile body 3 share the same control unit 21 and are controlled by the control unit 21, but the second device 2 and the mobile body 3 may each have a different control unit.
[0027] In the embodiment of the present invention, the position information of the mobile object 3 is managed using latitude, longitude, and altitude, or coordinates in a coordinate system (for example, XYZ coordinates in a Cartesian coordinate system).
[0028] [Server Device] Next, the server device of the present invention will be described.
[0029] 4 is a block diagram showing the configuration of a server device according to an embodiment of the present invention. The server device 4 includes at least a control unit 41, a RAM 42, a storage unit 43, and a communication interface 44, which are connected to each other via an internal bus.
[0030] The control unit 41 is composed of a CPU and ROM, and executes programs stored in the storage unit 43 to control the server device 4. The control unit 41 also has an internal timer that measures time. The RAM 42 is the work area of the control unit 41. The storage unit 43 is a memory area for saving programs and data. The control unit 41 reads the programs and data from the RAM 42 and performs program execution processing based on information received from the first device 1, the second device 2, the mobile object 3, or the user terminal.
[0031] The server device 4 may communicate with the first device 1, the second device 2, the mobile object 3, or the user terminal via the smart meter.
[0032] [User Device] Next, the user terminal of the present invention will be described. The user terminal is operated by a user who uses a mobile device. The user terminal may be a stationary type installed at home or the like, or a portable type that the user carries with them when they move.
[0033] The user terminal has a configuration similar to that of the server device 4, and includes, for example, a control unit, RAM, a storage unit, a communication interface, an input unit, and a display unit, all of which are connected by an internal bus. The user terminal may also include the second device 2. The user terminal is preferably a computer device that includes an input unit, a display unit, and a control unit, such as a tablet terminal, a smartphone, or a desktop or notebook personal computer.
[0034] [Location Storage Processing] Next, the location storage processing according to the embodiment of the present invention will be described. The location storage processing is a processing for transmitting location information identified by the mobile object 3 and information about the mobile object 3 to the server device 4 and storing the information. Fig. 5 is a diagram showing a flowchart of the location storage processing according to the embodiment of the present invention.
[0035] The position storage process may be executed while the mobile object 3 is in operation. The position storage process may be executed at predetermined time intervals or whenever predetermined conditions are met. The frequency of execution of the position storage process may be set arbitrarily, but may be set to execute the position storage process once every five minutes, for example. Alternatively, the position storage process may be executed when the mobile object 3 is located within a predetermined range.
[0036] The predetermined range is set in relation to the location of the charger, and if the location of the charger changes, the predetermined range will change accordingly. For example, the predetermined range can be a range that includes the location of the charger, or a range that includes at least one point within a predetermined distance from the location of the charger (i.e., a range that includes at least one point near the charger). The predetermined distance can be set as appropriate, for example, to 50 cm, 1 m, or 2 m.
[0037] The predetermined range is preferably determined for each charger, and can be set appropriately depending on, for example, the positional relationship with other chargers, the conditions of the area where the chargers are located, etc. The predetermined range is preferably set to match the area where mobile objects line up when queuing for their turn to use a charger. More specifically, the predetermined range is preferably set along the road that the mobile objects use when charging with the charger. It is preferable that a portion of the side of the charger faces this road. The area and shape of the predetermined range may differ for each charger.
[0038] First, in the mobile body 3, a distance calculation process is executed to calculate the distance between each of the plurality of first devices 1 and the second device 2 based on the propagation time of information or signals between each of the plurality of first devices 1 and the second device 2 (step S1). Because the second device 2 is provided in the mobile body 3, the distance calculation process can also be said to be a process of calculating the distance between each of the plurality of first devices and the mobile body 3. Details of the distance calculation process will be described later.
[0039] Next, the mobile object 3 executes a location specification process to specify the location of the second device based on the distances between each of the plurality of first devices and the second device calculated in the distance calculation process (step S2). Since the second device 2 is provided in the mobile object 3, the location specification process can also be said to be a process to specify the location of the mobile object 3. Details of the location specification process will be described later.
[0040] Next, the specified location information and mobile object information about the mobile object are transmitted from the mobile object 3 to the server device 4 (step S3). The server device 4 receives the location information and mobile object information (step S4) and stores them in the storage unit 43 (step S5). The location storage process is completed by the above steps S1 to S5.
[0041] In step S5, the received location information and mobile object information are stored in the storage unit 43 in association with time information. The time information is the time when the location of the mobile object 3 was identified in step S1, the time when the information was transmitted in step S3, or the time when the information was received in step S4.
[0042] The mobile object information is information necessary to predict the time until charging is completed (completion time) for the mobile object. For example, the mobile object information includes the vehicle model of the mobile object, the battery type, the battery capacity, and the remaining battery charge. Specifically, the mobile object information includes the battery capacity and remaining charge, and may also include the type of mobile object or the battery. This is because the type of battery can be identified from the type of mobile object. The battery capacity, type of mobile object, and type of battery are stored in the storage unit 25 of the mobile object 3. Furthermore, the remaining battery charge at the time step S2 is executed is identified by a sensor.
[0043] In the above, we have described a configuration in which the location information of the moving body 3 is determined by the distance calculation process in step S1 and the location determination process in step S2, but it is also possible to omit the processes in steps S1 and S2 and determine the location information of the moving body 3 by receiving a GPS signal.
[0044] In the above, the configuration has been described in which the location information and mobile body information identified in step S3 are transmitted and stored in the server device 4 in step S5, but it is also possible to transmit either the location information or the mobile body information and store either the location information or the mobile body information in the server device 4.
[0045] For example, in step S3, when the mobile object 3 is not located within a predetermined range of the charger, the mobile object 3 may transmit only the location information, and when the mobile object 3 is located within the predetermined range of the charger, the mobile object 3 may transmit both the location information and the mobile object information. Also, since the location of the mobile object 3 does not move while the mobile object 3 is being charged, the mobile object 3 may transmit only the mobile object information. In this case, the processes of steps S1 and S2 can be omitted. In other words, the information that the mobile object 3 transmits to the server device 4 can be changed depending on predetermined conditions.
[0046] [Distance Calculation Process] Next, the distance calculation process according to the embodiment of the present invention will be described. Fig. 6 is a flowchart of the distance calculation process according to the embodiment of the present invention. Note that the following flowchart describes the process of calculating the distance between the first device 1 and the second device 2.
[0047] It is possible to set the system so that the position identification process and the prediction process, which will be described later, are executed within a predetermined time (for example, within a few seconds) after the distance calculation process is executed. In this case, the moving object 3 moves only slightly or does not move at all from the position identified in the distance calculation process, so that it is possible to reduce the discrepancy between the position identified in the distance calculation process and the real-time position of the moving moving object 3.
[0048] First, the first device 1 transmits information or a signal to the second device 2 (step S11). There are no particular restrictions on the information or signal transmitted from the first device 1 to the second device 2. The first device 1 clocks the time when the information or signal was transmitted in step S11 and measures the phase at the time of transmission (step S12). The clocked time and the measured phase are then stored in the memory of the control unit 11 (step S13).
[0049] Next, the second device 2 receives the information or signal from the first device 1 (step S14). The second device 2 clocks the time when the information or signal was received in step S14 and measures the phase at the time of reception (step S15). The clocked time and the measured phase are then stored in the memory or storage unit 25 within the control unit 21 (step S16).
[0050] Next, the second device 2 transmits information or a signal to the first device 1 (step S17). There are no particular restrictions on the information or signal transmitted from the second device 2 to the first device 1. The second device 2 clocks the time when the information or signal was transmitted in step S17 and measures the phase at the time of transmission (step S18). The clocked time and the measured phase are then stored in the memory or storage unit 25 within the control unit 21 (step S19).
[0051] The first device 1 receives the information or signal transmitted in step S17 (step S20). The first device 1 clocks the time when the information or signal was received in step S20 and measures the phase at the time of reception (step S21). The clocked time and the measured phase are then stored in the memory of the control unit 11 (step S22). After step S22 is completed, the process proceeds to step S23.
[0052] The first device 1 transmits to the second device 2 via the RF chip 12 (step S23) information stored in step S13 regarding the time when the signal was transmitted in step S11 and the phase at the time of transmission, and information stored in step S22 regarding the time when the signal was received in step S20 and the phase at the time of reception.
[0053] Then, the second device 2 receives information regarding the time and phase at the time of transmission when the first device 1 transmitted the information or signal in step S11, and information regarding the time and phase at the time of reception when the first device 1 received the information or signal in step S20 (step S24).
[0054] Next, the control unit 21 of the second device 2 calculates the phase shift between the phase of the signal generated by the oscillator 13 of the first device 1 and the phase of the signal generated by the oscillator 23 of the second device 2 (step S25). The phase shift can be calculated based on the phase difference between the phase of the carrier wave constituting the information or signal transmitted from the first device 1 to the second device 2 and the phase of the signal oscillated by the oscillator 23 of the second device 2 when the second device 2 receives the information or signal, and the phase difference between the phase of the carrier wave constituting the information or signal transmitted from the second device 2 to the first device 1 and the phase of the signal oscillated by the oscillator 13 of the first device 1 when the first device 1 receives the information or signal.
[0055] The phase of the carrier wave constituting the information or signal transmitted from the first device 1 to the second device 2 is the phase of the information or signal transmitted in step S11. Information regarding this phase is transmitted from the first device 1 to the second device 2 in step S23. The phase of the signal oscillated by the oscillator 23 of the second device 2 when the second device 2 receives the information or signal is the phase of the information or signal received in step S14. The information regarding this phase is measured by the second device 2 in step S15 and stored in step S16. The phase of the carrier wave constituting the information or signal transmitted from the second device 2 to the first device 1 is, for example, the phase of the information or signal transmitted in step S17. The information regarding this phase is stored by the second device 2 in step S19. The phase of the signal oscillated by the oscillator 13 of the first device 1 when the first device 1 receives the information or signal is, for example, the phase of the information or signal received in step S20. The information about the phase is measured in step S21 and transmitted from the first device 1 to the second device 2 in step S23.
[0056] Here, the phase of the carrier wave constituting the information or signal transmitted from the first device 1 to the second device 2 is a concept that includes not only the phase of the carrier wave constituting the information or signal transmitted from the first device 1 to the second device 2, but also the phase of the carrier wave constituting the signal obtained by mixing down this information or signal. Similarly, the phase of the carrier wave constituting the information or signal transmitted from the second device 2 to the first device 1 is a concept that includes not only the phase of the carrier wave constituting the information or signal transmitted from the second device 2 to the first device 1, but also the phase of the carrier wave constituting the signal obtained by mixing down this information or signal.
[0057] The phase difference between the phase of the carrier wave constituting the information or signal transmitted from the first device 1 to the second device 2 and the phase of the signal oscillated by the oscillator 23 of the second device 2 when the information or signal is received by the second device 2 is defined as ΔΦ S and the phase difference between the phase of the carrier wave constituting the information or signal transmitted from the second device 2 to the first device 1 and the phase of the signal oscillated by the oscillator 13 of the first device 1 when the information or signal is received by the first device 1 is defined as ΔΦ M Then, the phase difference ΔΦ S and phase difference ΔΦ M From the arithmetic mean of these, the phase difference ΔΦ caused by the signal propagating between the first device 1 and the second device 2 is P That is, it is possible to calculate ΔΦ using the formula (1): P = 1 / 2 × (ΔΦ S +ΔΦ M ) and the phase difference ΔΦ P can be calculated.
[0058] The phase difference between the first device 1 and the second device 2 is ΔΦ C Then, the equation (2): ΔΦ M =ΔΦ P + (-ΔΦ C ) holds, so the phase shift ΔΦ C is the phase difference ΔΦ P from the phase difference ΔΦ M That is, it can be calculated by subtracting ΔΦ C = 1 / 2 × (ΔΦ S -ΔΦ M ) causes a phase shift ΔΦC In step S25, the phase shift between the first device 1 and the second device 2 is calculated using equation (3).
[0059] Here, the phase shift ΔΦ C was calculated using equation (3), but the phase shift ΔΦ C However, it may be further subtracted by 2π or 4π, i.e., 2nπ. n can be 0 or a positive integer. Therefore, the propagation time T P Based on the time difference between the first device 1 and the second device 2, it is possible to determine whether n is 0, 1, or 2 (i.e., the phase difference ΔΦ obtained from equation (3)). C It is also possible to determine whether the value obtained by further subtracting 2nπ from the phase shift is the original phase shift, or whether the value without the subtraction is the original phase shift.
[0060] The signal transmitted from the first device 1 to the second device 2 and the signal transmitted from the second device 2 to the first device 1 may start with an output of any value other than 0 at the start of transmission. In such a case, the phase and transmission time at the start of transmission are measured, and the phase shift ΔΦ C It is necessary to correct ΔΦ by always keeping the phase constant at the start of transmission and transmitting at a predetermined time, and then measuring the phase at the start of transmission and the transmission time. C This makes it possible to omit processing such as correcting the
[0061] In the second device 2, the calculated phase shift ΔΦ C Based on this, the phase of the signal generated by the oscillator 23 of the second device 2 is corrected so as to be synchronized with the signal generated by the oscillator 13 of the first device 1 (step S26). The phase correction in step S26 is controlled and executed by the control unit 21. The phase shift of the oscillator 23 of the second device 2 occurs due to the influence of the environment surrounding the second device 2. By periodically performing synchronization processing in this manner, the clock 22a of the second device 2 can be made to keep time with high accuracy.
[0062] Next, the first device 1 calculates the time difference between the first device 1 and the second device 2 based on the time when the information or signal was transmitted from the first device 1 to the second device 2, the time when the information or signal was transmitted from the second device 2 to the first device 1, the time when the information or signal was transmitted from the first device 1 and received and clocked by the second device 2, and the time when the information or signal was transmitted from the second device 2 and received and clocked by the first device 1 (step S27).
[0063] The time when information or a signal is transmitted from the first device 1 to the second device 2 is the time when the information is transmitted in step S11. Information about this time is transmitted from the first device 1 to the second device 2 in step S23. The time when information or a signal is transmitted from the second device 2 to the first device 1 is the time when the information or signal is transmitted in step S17. The information about this time is stored by the second device 2 in step S19. Next, the time when the information or signal is transmitted from the first device 1 and received and clocked by the second device 2 is the time when the information is received in step S14. The information about this time is clocked by the second device 2 in step S15 and stored in step S16. The time when the information or signal is transmitted from the second device 2 and received and clocked by the first device 1 is the time when the information or signal is received in step S20. The information about this time is clocked in step S21 and transmitted from the first device 1 to the second device 2 in step S23.
[0064] The time when the information or signal is transmitted from the first device 1 to the second device 2 is T M and the time when the second device 2 transmits information or a signal to the first device 1 is defined as T S The time when the second device 2 receives the information or signal transmitted from the first device 1 is defined as T MS Furthermore, the time when the information or signal is transmitted from the second device 2 and received by the first device 1 is defined as T SM Then, the time difference between the first device 1 and the second device 2 is expressed by the following equation (4): T L = 1 / 2 × ((T SM -T S )-(T MS -T MIn step S27, the time difference between the first device 1 and the second device 2 is calculated using equation (4). Based on the calculated time difference, the second device 2 corrects the time on the second device 2 so that it is synchronized with the time on the first device 1 (step S28).
[0065] Next, the distance between the first device 1 and the second device 2 is calculated (step S29). In step S29, the distance between the first device 1 and the second device 2 can be calculated by calculating the propagation time of the information or signal between the first device 1 and the second device 2 based on the substantial difference between the time when the first device 1 transmits the information or signal and the time when the second device 2 receives the information or signal, and multiplying the propagation time by the propagation speed of the information or signal (e.g., the speed of light). The difference between the time when the information or signal is transmitted by the first device 1 and the time when the information or signal is received by the second device 2 can be calculated, for example, based on the time when the information or signal is transmitted from the first device 1 to the second device 2 in step S11 (the time when the information or signal is transmitted from the first device 1 to the second device 2 in step S23) and the time when the information or signal is received from the first device 1 at the second device 2 in step S14, which is the time stored in the memory or storage unit 25 in step S16, and the time difference calculated in step S27.
[0066] In step S29, the distance between the first device 1 and the second device 2 can be calculated by calculating the propagation time of the information or signal between the first device 1 and the second device 2 based on the substantial difference between the time when the second device 2 transmits the information or signal and the time when the first device 1 receives the information or signal. The propagation time is then multiplied by the propagation speed of the information or signal (e.g., the speed of light) to calculate the distance between the first device 1 and the second device 2. The difference between the time when the second device 2 transmits the information or signal and the time when the first device 1 receives the information or signal can be calculated based on, for example, the time when the second device 2 transmits the information or signal to the first device 1 in step S17, which is stored in the memory or storage unit 25 in step S19, the time when the first device 1 receives the information or signal in step S20 (transmitted from the first device 1 to the second device 2 in step S23), and the time difference calculated in step S27.
[0067] The distance between the first device 1 and the second device 2 calculated in step S29 is stored in the memory or storage unit 25 in the control unit 21 of the second device 2 in association with, for example, time information regarding the calculated time and identification information that can identify the first device 1 (or location information of the first device 1) (step S30). Execution of step S30 ends the distance calculation process.
[0068] By executing the processes of steps S11 to S30, it is possible not only to correct the time difference and phase difference between the first device 1 and the second device 2, but also to calculate the distance between the first device 1 and the second device 2. Note that although the time difference between the first device 1 and the second device 2 is corrected in step S28, it is not necessary to correct the time difference; the distance between the first device 1 and the second device 2 can also be calculated based on the time difference calculated in step S27 without correcting the time difference. In other words, the distance can be calculated based on the time difference between the clock of the first device 1 and the clock of the second device 1.
[0069] In addition, in step S26, the phase shift between the first device 1 and the second device 2 is corrected, but it is not necessary to correct the phase shift, and the distance between the first device 1 and the second device 2 can also be calculated without correcting the phase shift. In other words, the distance can be calculated based on the phase shift between the clock of the first device 1 and the clock of the second device 2.
[0070] In addition, by executing the processing from steps S11 to S30, the time difference and phase difference between the first device 1 and the second device 2 are corrected and the distance between the first device 1 and the second device 2 is calculated, but it is also possible to execute the processing for correcting the time difference between the first device 1 and the second device 2, the processing for correcting the phase difference between the first device 1 and the second device 2, and the processing for calculating the distance between the first device 1 and the second device 2 separately.
[0071] The above-described process of calculating the distance between the first device 1 and the second device 2 can calculate the distance between one second device 2 and each of multiple first devices 1. When specifying the position of the second device 2, as described below, the distance between the first device 1 and the second device 2 is specified for as many first devices 1 as necessary to specify the position. However, even when calculating the distance between one second device 2 and each of multiple first devices 1, the time offset correction process and the phase offset correction process can be performed only with one first device 1, and the time offset correction process and the phase offset correction process can be omitted when communicating with other first devices 1.
[0072] Here, the second device 2 calculates the distance between the first device 1 and the second device 2, but the first device 1 may calculate the distance between the first device 1 and the second device 2 by processing similar to step S29 instead of the second device 2. When the distance is calculated by the first device 1, the distance between the first device 1 and the second device 2 is stored in the memory of the control unit 11 in association with time information regarding the calculated time, etc., and identification information that can identify the second device 2.
[0073] Alternatively, the server device 4, instead of the second device 2, may calculate the distance between the first device 1 and the second device 2 by processing similar to step S29. When the server device 4 calculates the distance, the information necessary for the calculation is received from the first device 1 and / or the second device 2. When the server device 4 calculates the distance, the distance between the first device 1 and the second device 2 is stored in the storage unit 43 of the server device 4 in association with time information regarding the calculated time, etc., identification information that can identify the first device 1 (or location information of the first device 1), and identification information that can identify the second device 2.
[0074] Here, the distance between the first device 1 and the second device 2 is calculated, but if there are multiple second devices 2, it is also possible to calculate the distance between one second device 2 and a different second device 2. In this case, the propagation time for the information or signal to propagate between the first second device 2 and the different second device 2 is calculated based on the substantial difference between the time when the information or signal is transmitted by the first second device 2 and the time when the information or signal is received by the different second device 2, and the distance between the first second device 2 and the different second device 2 can be calculated by multiplying the propagation time by the propagation speed of the information or signal (e.g., the speed of light).
[0075] Furthermore, although the above describes a method for calculating the distance between one first device 1 and one second device 2, in this system, for each of a plurality of first devices 1, it is possible to calculate the distance between the second device 2 and a first device 1 different from the one first device 1, in the same way as the calculation of the distance between the one first device 1 and one second device 2 described above.
[0076] In this embodiment, the distance calculation process is executed at predetermined time intervals or whenever predetermined conditions are met, but it is not necessary to execute all steps of the distance calculation process every time; for example, steps related to phase correction in steps S25 to S26 and time correction in steps S27 to S28 can be omitted.
[0077] [Position Identification Processing] Next, the position identification processing according to the embodiment of the present invention will be described.
[0078] In order to identify the position of the second device 2, the distance calculation process must first calculate the distance between one second device 2 and each of the multiple first devices 1. For example, if one second device 2 and multiple first devices 1 are located at the same height, that is, if these devices exist on the same XY plane, the position of the second device 2 (e.g., the XY coordinates of the second device 2) can be identified based on the distances between the one second device 2 and the three first devices 1 and the positions of the three first devices 1. Therefore, if one second device 2 and multiple first devices 1 are located at the same height, the number of data points for the distances between the first device 1 and the second device 2 required to identify the position is three.
[0079] Furthermore, for example, if one second device 2 and at least one of the multiple first devices 1 have different heights and are not on the same plane, the position of the second device 2 (for example, the XYZ coordinates or latitude, longitude, and altitude of the second device 2) can be identified based on the respective distances between the one second device 2 and four first devices 1 and the respective positions of the four first devices 1. Therefore, if one second device 2 and at least one of the multiple first devices 1 have different heights and are not on the same plane, the number of data points for the distance between the first device 1 and the second device 2 required to identify the position is four.
[0080] In other words, it is preferable that the system 10 of the present invention includes at least four first devices 1. This is because, when the first devices 1 are fixed to a transmission tower, the first devices 1 and the second devices 2 are not at the same height. In this case, it is preferable that the four first devices 1 are not on the same plane in the system 10. For example, it is preferable that the installation height of at least one first device 1 is different from the installation heights of the other three first devices 1. In this way, it is possible to identify the three-dimensional position of the second device 2 regardless of its location.
[0081] 7 is a flowchart showing a location specification process according to an embodiment of the present invention. Note that the following flowchart explains the process of specifying a location by the second device 2.
[0082] In the position identification process, the position of the second device 2 is identified (step S41) based on the distance between each of the multiple first devices 1 and the second device 2 and the positions of these first devices 1. The positions of the first devices 1 may be stored in advance in any of the first device 1, the second device 2, the mobile object 3, or the server device 4 that executes the position identification process. The calculation process for identifying the position of the second device 2 is not particularly limited.
[0083] The identified position of the second device 2 is stored in the memory in the control unit 21 of the second device 2 or in the storage unit 25 of the mobile object 3 in association with time information on the calculated time (time information on the time when the distance was calculated or time information on the time when the position was identified), the identification information of the first device 1 (or the position information of the first device 1), and the identification information of the second device 2 (step S42). Steps S41 and S42 complete the position identification process.
[0084] Note that the distances between each of the multiple first devices 1 and the second device, which are used to identify the position of the second device 2 in step S41, are preferably calculated at the same or similar times (for example, calculated when the propagation times of information or signals between each of the multiple first devices and the second device are measured at the same or similar times). Here, the "similar times" are not particularly limited, but are preferably within a predetermined range from time 1. By using the distances between each of the multiple first devices 1 and the second device calculated at the same or similar times, a more accurate position at that time can be identified.
[0085] Here, the distance between each of the multiple first devices 1 and the second device 2 is calculated, and the position of the second device 2 is determined based on the calculated distance. However, if there are multiple second devices 2, the distance between one second device 2 and each of the multiple different second devices 2 can be calculated, and the position of the one second device 2 can be determined based on the calculated distance.
[0086] Here, the location of the second device 2 is determined by the second device 2. However, instead of the second device 2, the first device 1 or the server device 4 may determine the location of the second device 2 by processing similar to step S41. When the location determination processing is executed by the first device 1 or the server device 4, information regarding the distance between each of the multiple first devices 1 and the second device 2 (the distance calculated in step S29) is transmitted to the first device 1 or the server device 4 in association with time information regarding the calculated time, identification information of the first device 1 (or location information of the first device 1), and identification information of the second device 2, and used. When the location of the second device 2 is determined by the first device 1 or the server device 4, the determined location of the second device 2 is stored in the memory of the control unit 11 or the storage unit 43 of the server device 4 in association with time information regarding the calculated time, identification information of the first device 1 (or location information of the first device 1), and identification information of the second device 2.
[0087] [Prediction Process] Next, the prediction process according to the embodiment of the present invention will be described. The prediction process is a process for predicting the completion time or completion time at which charging of the mobile body by the charger is completed, depending on the identified position of the mobile body. Fig. 8 is a diagram showing a flowchart of the prediction process according to the embodiment of the present invention.
[0088] 9 is a schematic diagram of a prediction method according to an embodiment of the present invention. In FIG. 9, chargers 51 (51a to 51d) are present in a predetermined location 50. A region 52 (52a to 52d) within a predetermined range is defined for each charger 51. Map information of the predetermined location 50 is stored in the server device 4. Location information of the charger 51 is stored in the server device 4 in association with identification information (charger ID) that can identify the charger 51 and the location information of the region 52.
[0089] The position, range, and / or shape of the area 52 are not particularly limited. For example, the area 52 may be a different area for each charger. When multiple chargers are located nearby, the areas may overlap, be the same area, or may not overlap. Specifically, the area 52 is preferably set as an area where the mobile object 3 may wait to be charged by the charger 51. The area 52 may also be set according to the capabilities of the charger, such as the charging capacity. The area 52 may be a predetermined distance from the charger (for example, within a radius of 3 m).
[0090] Furthermore, latitude, longitude, and altitude or an XYZ coordinate system is stored in server device 4 as location information of charger 51 and location information of area 52. Furthermore, first devices 1a to 1d are provided in predetermined location 50 to identify the location of second device 2. Latitude, longitude, and altitude or an XYZ coordinate system is stored in server device 4 as location information of first devices 1a to 1d.
[0091] The following flowchart describes a case where the completion time or time at which charging of a mobile object at a charger 51a is completed is predicted. First, the server device 4 identifies mobile objects located within an area 52a that is within a predetermined range of the charger 51a (step S51). In FIG. 9, mobile objects 3a and 3b located within the area 52a are identified. In step S51, the server device 4 may also add up the number of identified mobile objects to identify the number of mobile objects within the predetermined range for each charger.
[0092] Step S51 can identify a moving object located within the predetermined area 52 by referring to the position information of the moving object 3 stored in step S5 of the position storage process. Note that once the position storage process is executed, the prediction process may be executed within a predetermined time (for example, within a few seconds). Alternatively, the position storage process may be executed within a predetermined time before the prediction process is executed. This can reduce the error between the moving object identified as being located within the predetermined area 52 at the time step S51 is executed and the actual position of the moving object.
[0093] When the mobile object is identified in step S51, the completion time or completion time at which charging of the mobile object is completed by the charger is identified (step S52).
[0094] The processing of step S52 will be described. In step S52, based on the identified number of mobile objects, the completion time or time at which charging of the mobile objects within a predetermined range by the charger is completed is predicted. Specifically, by storing a completion time of 30 minutes for each mobile object in advance in the server device 4, the server device 4 can identify the completion time at the charger by multiplying the number of identified mobile objects by the completion time per mobile object. For example, in FIG. 9, two mobile objects are identified in area 52a, so the completion time is 60 minutes. Furthermore, the server device 4 can calculate the charging completion time by adding the completion time to the time when the processing of step S52 is executed.
[0095] Furthermore, in step S52, the completion time or time at which charging of mobile objects within a predetermined range by the charger is completed can be predicted based on the completion time for charging specified for each mobile object. For example, mobile object information is stored in step S5. The server device 4 can identify the completion time for each mobile object by referring to the mobile object information. Furthermore, the completion time for each mobile object may be identified by referring to charger information related to the charger stored in the server device 4. The charger information includes, for example, the chargeable capacity per hour.
[0096] Specifically, if the server device 4 stores the output per hour of the charger 51a as 40 kW, the battery capacity of the mobile object 3a is 20 kWh, and the remaining battery charge is 50%, the completion time for the mobile object 3a will be 15 minutes. The server device 4 calculates the completion time for each of all the mobile objects 3 located within the area 52 and adds up the completion times for each of the mobile objects 3, thereby determining the completion time for the charger.
[0097] Alternatively, the server device 4 may store the completion time associated with each vehicle model and battery type, and the server device 4 may refer to the mobile object information stored in step S5 to determine the completion time for each mobile object.
[0098] When the completion time or completion time is specified in step S52, the server device 4 stores predicted information regarding the specified number of vehicles and / or the completion time or completion time in association with the charger ID (step S53). The predicted information includes the specified number of vehicles, the completion time, and / or the completion time. The predicted information may also include the completion time and / or the completion time for each mobile object located within a predetermined range.
[0099] The prediction information is transmitted from the server device 4 to the mobile object 3 (step S54) and received by the mobile object 3 (step S55). The prediction information is output by the mobile object 3 (step S56). The prediction process is completed by the above steps S51 to S56.
[0100] The mobile object to which the prediction information is sent in step S54 may be a mobile object that is within a predetermined range of the charger, as identified in step S52. Furthermore, the completion time and / or completion time displayed for each mobile object may be different. For example, for mobile object 3a currently being charged, the completion time and / or completion time of mobile object 3a may be displayed, and for mobile object 3b currently on standby, the completion time and / or completion time of charging by mobile object 3a and mobile object 3b, i.e., the charger 51, may be displayed.
[0101] When outputting the prediction information in step S56, text, images, and / or video may be displayed on the display screen of the moving object 3, or sound may be output.
[0102] Furthermore, in step S54, the prediction information may be transmitted to a user terminal of a user driving another vehicle or to a car navigation terminal installed in another vehicle. The prediction information may be transmitted directly from the server device 4 as in step S54, or may be made viewable via a browser such as the Web as in the output processing described below. Note that in the prediction processing, steps S54 to S56 may be omitted.
[0103] The system of the present invention can accurately identify the location of a mobile object by the processes of steps S1 and S2. Therefore, since the predetermined range for each charger can be set in detail, for example, the server device 4 can identify the completion time or completion time based on a mobile object that is currently charging or is waiting to be charged, without determining that the mobile object 3c that has finished charging is located within the area 52a.
[0104] The prediction process may be constantly executed at predetermined intervals (e.g., every five minutes). Alternatively, the execution frequency may be varied depending on the time period. For example, the prediction process may be executed every minute from 8:00 AM to 8:00 PM when traffic volume is heavy, and every 10 minutes from 8:00 PM to 8:00 AM the next day when traffic volume is light.
[0105] The frequency of execution of the prediction process may also be changed depending on the number of installed chargers. For example, the prediction process may be executed every minute in an area where there are many installed chargers per unit area, and every 10 minutes in an area where there are many installed chargers.
[0106] Here, in another embodiment of the present invention, in step S52, the completion time for a mobile body corresponding to the mobile body information received as input can be predicted using a machine-learned prediction model that uses mobile body information regarding the mobile body as input data and the completion time for charging to be completed for the mobile body as output data.
[0107] A prediction model according to another embodiment of the present invention will be described. Mobile object information and a completion time for charging of the mobile object are received by a server device 4 or another computer device. A prediction model trained by machine learning is stored in the storage unit of the server device 4 or another computer device, with the mobile object information about the mobile object as input data and the completion time for charging of the mobile object as output data. The machine learning algorithm is not particularly limited, and known algorithms can be used, such as deep learning using linear regression, multiple regression analysis, support vector machines, decision trees, random forests, multilayer neural networks, etc.
[0108] A multilayer neural network has an input layer, an output layer, and multiple intermediate layers. Weights are assigned to the edges connecting nodes in each layer. Weights corresponding to each input to the node are assigned to the edges, and the input to the node is multiplied by the weight corresponding to each input, and the value obtained by multiplying these weights is added to a bias. The value obtained by the addition is subjected to nonlinear transformation using an activation function to calculate an activation value. The calculated activation value becomes the input value passed to the node in the next layer. The number of intermediate layers can be designed as appropriate. The weights are optimized using the above training data.
[0109] The input data of the mobile object information includes, for example, the battery capacity and remaining battery charge, and may also include the vehicle model or the battery type, since the battery type can be identified from the vehicle model. Meanwhile, the output data includes time information regarding the time required for charging to be completed under these conditions of the mobile object.
[0110] As a result, when mobile object information about a mobile object is received, the mobile object information about the mobile object is used as input data, and a machine-learned prediction model is used with the completion time of charging at the mobile object as output data to predict the completion time for the mobile object corresponding to the received mobile object information, thereby making it possible to identify the completion time for the mobile object. Note that the mobile object information and charger information about the charger may also be used as input data. The charger information includes, for example, the chargeable capacity per hour.
[0111] Although the above describes a configuration in which a predetermined range (area) is set for each charger, a configuration in which a predetermined range (area) is set for each charging facility that has one or more chargers may also be used. For example, in FIG. 9, one area may be set for a charging facility that has chargers 51a to 51c.
[0112] [Output Processing] Next, the output processing according to the embodiment of the present invention will be described. The output processing is a process of outputting prediction information, which is the completion time or completion time predicted in the prediction processing. In the prediction processing, the prediction information is output regardless of whether or not there is an output request from the user. However, the output processing can also be said to be a process of outputting prediction information in response to an output request from the user. Figure 10 is a diagram showing a flowchart of the output processing according to the embodiment of the present invention.
[0113] First, the input unit 26 of the mobile object 3 receives an output request for outputting prediction information (step S61). For example, the user presses a predetermined button displayed on the display screen of the mobile object 3 to input the operation in step S61. At this time, the user may select a specific charger corresponding to the prediction information to be output. Alternatively, the user may select a predetermined range, and the mobile object 3 may output prediction information corresponding to one or more chargers within the selected predetermined range, or may output prediction information for one or more chargers within a predetermined range identified from the location information of the mobile object 3. When identifying a charger from the location information of the mobile object 3, the user may input the predetermined range in step S61. In this case, before the processing in step S62, the location information of the mobile object 3 on which the output processing is to be executed is identified by the processing in steps S1 and S2. The identified location information of the mobile object 3 is transmitted to the server device 4 in step S62.
[0114] Next, the output request is transmitted from the moving object 3 to the server device 4 (step S62) and received by the server device 4 (step S63). The server device 4 identifies the prediction information corresponding to the charger included in the output request from the prediction information stored in step S53 (step S64). Note that the identified prediction information is preferably the most recently stored prediction information.
[0115] When the server device 4 identifies the prediction information, the server device 4 transmits the prediction information to the mobile object 3 (step S65), and the mobile object 3 receives the prediction information (step S66). The mobile object 3 outputs the prediction information (step S67). The processes in steps S65 to S67 are the same as those in steps S54 to S56, and therefore detailed explanations will be omitted. The output process is completed by the processes in steps S61 to S67.
[0116] In step S67, the display screen of the mobile object 3 may display the location information and predicted information of the charger superimposed on a map. When predicted information for one or more chargers is displayed, the display mode may vary depending on the specified number of chargers, the completion time at the charger, or the completion time. For example, if the completion time is longer than a predetermined time (e.g., 40 minutes or more) or the completion time is later than the predetermined time (e.g., 40 minutes or more after the time the display screen is displayed), the area of the charger may be colored red. If the completion time is shorter than the predetermined time (e.g., 10 minutes or less) or the completion time is earlier than the predetermined time (e.g., within 10 minutes after the time the display screen is displayed), the area of the charger may be colored green. This allows the user to know in advance the waiting time at the charger and select an available charger to charge the mobile object 3.
[0117] Although the above describes a configuration in which the output process is executed by the mobile object 3 and the server device 4, the output process may also be executed by the user terminal and the server device 4. In this case, the user terminal may be equipped with a second device. For example, the user may operate the user terminal to access a predetermined website (i.e., access the server device 4 via a browser). Then, the processes of steps S61 to S67 may be executed.
[0118] In the above, steps S4 to S5, S51 to S54, and S63 to 65 are executed by server device 4, but they may also be executed by first device 1. Furthermore, the processing of server device 4 may be executed by mobile object 3 or a user terminal. In this case, the processing of steps S3 to S4, S54 to S55, S62 to 63, and S65 to 66 can be omitted. When processing is executed by first device 1, mobile object 3, or user terminal instead of server device 4, various information necessary for executing processing (e.g., mobile object location information, mobile object information, charger information, area information, prediction information, etc.) is stored in first device 1, mobile object 3, or user terminal.
[0119] [Billing Amount Calculation Process] Next, the billing amount calculation process according to the embodiment of the present invention will be described. The billing amount calculation process is a process for calculating a billing amount for the user of the mobile object 3 based on the amount of charge by the charger. The billing amount may include, for example, not only the amount calculated based on the amount of charge but also the usage fee for the system 10.
[0120] Each time charging is performed by the charger, the amount of power used to charge the mobile object 3 or the change in the remaining battery power of the mobile object 3 before and after charging (i.e., the charge amount) is associated with user identification information that can identify the user and transmitted from a computer device provided in the mobile object 3 or the charger to the server device 4. The server device 4 stores the amount of power or the change in association with the user identification information. In the billing amount calculation process, the server device 4 first tallies the amount of power or the change in power for a predetermined period for each user identification information. The predetermined period for which the amount of power or the change is tallied is not particularly limited, but can be, for example, one month, the same period as the period for which the user is billed for electricity usage.
[0121] Next, the server device 4 calculates the billing amount according to the aggregated amount of power consumption or the amount of change. The server device 4 has a fee table in which fees are stored in association with the amount of power consumption or the amount of change. By referring to the fee table, the server device 4 can identify the billing amount corresponding to the aggregated amount of power consumption or the amount of change. This allows the server device 4 to calculate the billing amount according to the amount of power consumption or the amount of change. The fee table may be stored in association with the user and the user's system usage fee, or with the type of charger and the fee. In other words, the server device 4 can calculate the billing amount according to the system usage fee or the type of charger.
[0122] When the server device 4 calculates the billing amount, the calculated billing amount is associated with the user identification information and stored in the storage unit 43 of the server device 4. The stored billing amount is transmitted to the mobile object 3 or the user terminal associated with the user in response to a transmission request from the mobile object 3 or the user terminal.
[0123] In the billing calculation process described above, the billing amount to the user is calculated based on the amount of electricity used for charging or the amount actually charged, but the server device 4 may also add a fee for the amount of electricity used for purposes other than charging to the billing amount. The amount of electricity used for purposes other than charging can be identified, for example, by a smart meter.
[0124] According to the present invention, it is possible to predict the completion time or time at which charging of mobile objects within a predetermined range related to the location of a charger will be completed by the charger. This allows users to check the waiting time at the charger in advance. According to the present invention, the completion time or time at which charging of mobile objects within a predetermined range will be completed by the charger is predicted based on the identified number of mobile objects, so it is possible to predict the completion time or time more accurately based on the mobile objects actually charging and waiting near the charger.
[0125] Furthermore, according to the present invention, the completion time or time at which charging by the charger of a mobile body within a specified range will be completed is predicted based on the completion time at which charging is completed that is specified for each mobile body, so that a more accurate completion time or time can be predicted based on the actual state of the mobile body that is charging and waiting near the charger.
[0126] Furthermore, according to the present invention, the identified number of vehicles and / or the predicted completion time or time is transmitted to the first computer device, allowing the user to know the degree of congestion at the charger. Furthermore, according to the present invention, the number of mobile objects within a predetermined range set in relation to the location of the charger is identified, allowing a more accurate completion time or time to be predicted based on the mobile objects actually charging and waiting near the charger, depending on the capacity of the charger.
[0127] According to the present invention, the position of a second device is identified based on the distance between each of a plurality of first devices and the second device, so the position of a moving object can be identified. Furthermore, according to the present invention, the distance is calculated based on the time difference between the clock of one first device and the clock of the second device, so the position of the moving object can be identified without including errors due to time differences.
[0128] According to the present invention, the time in the second device is corrected based on the calculated time offset, so the position of the moving object can be identified with high accuracy based on the synchronized time. Also, according to the present invention, the phase in the second device is corrected based on the calculated phase offset, so the position of the moving object can be identified with high accuracy based on the time with the phase synchronized.
[0129] REFERENCE SIGNS LIST 1 First device, 2 Second device, 3 Mobile object, 4 Server device, 5 Communication network, 10 System, 11 Control unit, 12 RF chip, 12a Clock, 12b Phase detector, 13 Oscillator, 21 Control unit, 22 RF chip, 22a Clock, 22b Phase detector, 23 Oscillator, 24 RAM, 25 Storage unit, 26 Input unit, 27 Display unit, 41 Control unit, 42 RAM, 43 Storage unit, 44 Communication interface, 50 Predetermined location, 51 Charger, 52 Area
Claims
1. A system comprising at least one computer device, comprising: a location determination means for determining the location of a mobile body; and a prediction means for predicting a completion time or completion time at which charging of the mobile body by a charger will be completed according to the determined location of the mobile body.
2. The system according to claim 1, further comprising: a number determination means for determining the number of mobile objects within a predetermined range set in relation to the location of the charger; and a prediction means for predicting the completion time or time at which charging of the mobile objects within the predetermined range by the charger will be completed based on the determined number of mobile objects.
3. A system as described in claim 1 or 2, wherein the prediction means predicts the completion time or time at which charging by the charger of a mobile body within a specified range will be completed based on the completion time at which charging is completed specified for each mobile body.
4. The system according to claim 1 or 2, further comprising: a transmitting means for transmitting the determined number of vehicles and / or the predicted completion time or completion time to the first computer device.
5. The system according to claim 1 or 2, wherein the unit number determination means determines the number of mobile objects within a predetermined range determined for each charger.
6. A system as described in claim 1 or 2, comprising: an input means for accepting mobile body information relating to a mobile body; and a prediction means for predicting a completion time for a mobile body corresponding to the accepted input mobile body information using a machine-learned prediction model that uses the mobile body information relating to the mobile body as input data and the completion time for charging to be completed for the mobile body as output data.
7. A system as described in claim 1 or 2, comprising: a plurality of first devices; a mobile body comprising a second device; a distance calculation means for calculating a distance between each of the plurality of first devices and the second device based on a propagation time of information or a signal between each of the plurality of first devices and the second device; and a position determination means for determining a position of the second device based on the calculated distance between each of the plurality of first devices and the second device.
8. The system according to claim 7, wherein the distance calculation means calculates the distance based on the difference in time between a clock of the first device and a clock of the second device.
9. The system according to claim 7, comprising: a time difference calculation means for calculating a time difference between a first device and a second device by communicating between the first device and the second device; and a time correction means for correcting the time on the second device based on the calculated time difference.
10. The system according to claim 7, comprising: a phase shift calculation means for calculating a phase shift between the clocks of one first device and the second device by communicating between the one first device and the second device; and a phase correction means for correcting the phase in the second device based on the calculated phase shift.
11. A method executed in a system having at least one computer device, comprising: a location determination step of determining a location of a mobile body; and a prediction step of predicting a completion time or completion time at which charging of the mobile body by a charger will be completed according to the determined location of the mobile body.
Citation Information
Patent Citations
Navigation system
JP2011027433A
Vehicle speed detection system, speed detection device, and on-vehicle unit
JP2009052962A
Server, charging stand guiding system, charging stand guiding method, and program
JP2020021152A
Charging management system
WO2014027690A1
