Communication method and related device
By dynamically adjusting the wireless resource configuration of the UE in the XR service scenario, the waste or insufficient problems of network elements when configuring resources for the UE are solved, and the rational allocation and effective utilization of resources are achieved.
Patent Information
- Application Number
- PCT/CN2023/130404
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-04
- Filing Date
- 2023-11-08
- Publication Date
- 2024-11-21
AI Technical Summary
In the extended reality (XR) business scenario, the wireless resources configured by the network element for the user equipment (UE) are wasted or insufficient, resulting in unreasonable resource allocation.
By transmitting notification information between the UE and the network element, the wireless resource configuration configured to the UE is dynamically adjusted, including notifying the network element to cancel or increase the number of wireless resources during the configuration cycle, ensuring the reasonable use of resources and avoiding resource waste.
It realizes the rationality of network elements to configure wireless resources for UEs in XR service scenarios, ensures effective utilization of resources, avoids resource waste, and meets data transmission needs.
Smart Images

Figure CN2023130404_21112024_PF_FP_ABST
Abstract
Description
Communication method and related equipment
[0001] This application claims priority to the Chinese patent application filed with the State Intellectual Property Office on April 4, 2023, with application number 202310396775.4 and invention name “Communication Methods and Related Equipment”, the entire contents of which are incorporated by reference into this application. Technical Field
[0002] The present application relates to the field of communication technology, and in particular to a communication method and related equipment. Background Art
[0003] Extended reality (XR) uses hardware devices combined with various technologies to create a virtual environment for human-computer interaction by integrating virtual content with real scenes. It integrates multiple technologies such as augmented reality (AR), virtual reality (VR), and mixed reality (MR). Because communication frames in XR service scenarios are periodic, network elements (such as base stations) can configure the radio resources used by the UE in each data transmission cycle based on semi-persistent scheduling (SPS) or other methods. This allows user equipment (UE) to communicate data with the network element based on the configured radio resources during each data transmission cycle, thereby supporting the UE to transmit communication frames in XR service scenarios to the network element.
[0004] However, based on the current resource configuration method, unreasonable resource allocation problems are prone to occur, such as waste of more radio resources allocated to UE by network elements, or insufficient radio resources allocated to UE.
[0005] Summary of the Invention
[0006] The present application provides a communication method and related equipment, the purpose of which is to improve the rationality of network elements configuring wireless resources for UEs.
[0007] In order to achieve the above objectives, this application provides the following technical solutions:
[0008] The first aspect of the present application provides a communication method, applied to a user equipment UE, comprising: determining relevant information of N configured authorized CGs within a data transmission cycle configured for the UE, the relevant information of the N CGs including time periods corresponding to the N CGs and wireless resources corresponding to the activated N CGs, where N is a positive integer; sending notification information based on the relevant information of the N CGs, the notification information being used to notify a network element that a target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the notification information being used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
[0009] Since the notification information sent by the UE to the network element based on the current configuration for the CG can reflect the UE's usage requirements for the current CG, this is conducive to the subsequent network elements to improve the rationality of CG configuration for the UE based on the notification information. For example, after the subsequent network element reasonably adjusts the number of CGs configured for the UE and the starting time, the UE can just send all the data required to be sent in the current data transmission cycle to the network element based on the configured CG, thereby meeting the UE's demand for wireless resources in the process of sending data. At the same time, it also avoids the situation where the wireless resources corresponding to some CGs are idle in the current data transmission cycle, thereby avoiding resource waste. In this way, when the network element can realize normal interaction with the UE in the communication frame of the XR service scenario, the rationality of the network element configuring wireless resources for the UE is improved.
[0010] In one possible implementation, the UE may receive a control message, which is used to adjust the N CGs in a data transmission cycle included in the target CG configuration to M CGs, where M is a positive integer different from N; based on the starting moments corresponding to the M CGs, data interaction is performed using the wireless resources corresponding to the M CGs. Since the UE can send all the data required to be sent in the current data transmission cycle to the network element within the time period corresponding to the M CGs, the demand for wireless resources in the process of the UE sending data is met. At the same time, it also avoids the situation where the wireless resources corresponding to some CGs are idle in the current data transmission cycle, thereby avoiding resource waste. In this way, when the network element can realize normal interaction with the UE in the communication frame of the XR service scenario (or the communication frame in other scenarios), the rationality of the network element configuring wireless resources for the UE is improved.
[0011] In one possible implementation, the notification information includes a bit field, and the value of the bit field is used to indicate that the target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the value of the bit field is used to instruct the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration. In this way, by defining the bit field in the notification information, the network element can be notified to cancel the use of some CGs or the UE requests to increase the CG.
[0012] In one possible implementation, the notification information is used to notify the network element that the target CG among the N CGs included in the target CG configuration within a data transmission cycle is not used by the UE. The notification information includes a cancellation operation and an identifier of the target CG. The cancellation operation is used to instruct the UE to cancel the use of the CG, and the identifier is used to indicate the target CG canceled by the UE. In this way, the UE can notify the network element to cancel the use of some of the configured CGs according to actual application needs, so that the network element can manage and schedule the wireless resources to reduce resource waste.
[0013] In a possible implementation, the notification information includes a bitmap, and the value of the bitmap is used to indicate the target CG that is canceled by the UE. By defining the bitmap in the notification information, the network element can be notified of which CGs are canceled by the UE.
[0014] In one possible implementation, the notification information includes a bitmap. When the value of the first portion of bits in the bitmap is a first value, the first portion of bits is used to indicate a cancellation operation, and the value of the second portion of bits in the bitmap is used to indicate a target CG that is canceled by the UE. In this way, by defining a bitmap in the notification information, the network element can be notified that the UE cancels the use of the CG and indicates which specific CGs are to be canceled.
[0015] In a possible implementation, when the value of the first part of the bits in the bitmap is the second value, the first part of the bits is used to indicate an add operation, the add operation is used to indicate the addition of CGs within a data transmission cycle included in the target CG configuration, and the value of the second part of the bits in the bitmap is used to indicate the number of added CGs. In this way, by defining a bitmap in the notification information, the network element can be notified that the UE requests to add a CG and indicates the specific number of CGs requested to be added.
[0016] In one possible implementation, the notification information includes a number M, where M is used to indicate the number of CGs within a data transmission cycle included in the target CG configuration, and M is a positive integer. In this way, the network element can determine whether the UE is notified to cancel the use of some CGs or to increase the number of CGs by comparing M with the number N of configured CGs.
[0017] In one possible implementation, the notification information includes a target field, which is used to identify the target CG configuration. Thus, by defining the target field in the notification information, it is possible to notify which CG configuration includes which CG number in the data transmission cycle to adjust.
[0018] In one possible implementation, the UE sends notification information based on the first CG, and the target CG configuration is the CG configuration where the first CG is located. In this way, the network element can determine the number of CGs within the data transmission period included in the CG configuration and adjust it according to the CG configuration to which the CG on which the UE relies to send the notification information belongs.
[0019] In one possible implementation, the notification information is used to notify the network element to increase the number of CGs within a data transmission period included in the target CG configuration, and the method further includes: receiving a downlink control message DCI message, the DCI message is used to configure a dynamic permission DG within the data transmission period, the amount of data supported by the DG for UE transmission matches the amount of data supported by the UE transmission supported by the number of CGs increased as indicated by the notification information; based on the start times corresponding to the N CGs and the start times of the DGs, data interaction is performed using the wireless resources corresponding to the N CGs and the wireless resources of the DGs. In this way, the network element can meet the UE's demand for wireless resources by dynamically allocating DGs, thereby improving the rationality and flexibility of network element resource scheduling.
[0020] In one possible implementation, the notification information is used to instruct the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations, and the multiple CG configurations include a target CG configuration. The number of CGs configured in a data transmission cycle included in different CG configurations may be the same or different, thereby achieving more flexible configuration of the number of CGs for the UE.
[0021] In one possible implementation, the notification information includes a bit field or a bit map, and the value of the bit field or the value of the bit map is used to instruct the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations. In this way, by defining the bit field or the bit map in the notification information, it is possible to notify the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations.
[0022] In one possible implementation, the first field in the bit field or bitmap is used to identify each of the multiple CG configurations, and the second field in the bit field or bitmap is used to indicate the number of CGs in a data transmission cycle included in each of the multiple CG configurations. In this way, the bit field or bitmap in the notification information can be used to indicate which CG configuration is to be processed and to indicate that the number of CGs in the data transmission cycle included in the CG configuration is to be adjusted.
[0023] In one possible implementation, the notification information includes an identifier of a target CG group, the target CG group is one of a plurality of CG groups, each of the plurality of CG groups includes a plurality of CG configurations, and the notification information is used to notify the network element to configure the number of CGs in a data transmission cycle respectively included in the plurality of CG configurations based on the target CG group. In this way, the identifier of the target CG group can be used to notify the network element based on which CG group to configure the number of CGs in a data transmission cycle respectively included in the plurality of CG configurations.
[0024] In one possible implementation, the notification information is used to notify the network element that a target CG among N CGs within a data transmission cycle included in the target CG configuration is not used by the UE; then, sending the notification information includes: sending the notification information at a target moment; wherein the target moment is any moment within the time period corresponding to the first CG among the N CGs; or, the target moment is any moment within the time period corresponding to the m CGs before the first CG in the target CG, and m is a positive integer greater than or equal to 1; or, the interval between the target moment and the starting moment of the first CG in the target CG is greater than a preset duration. In this way, communication information can be sent to the network element in advance before reaching the Nth CG, so that the network element can have enough time to schedule the wireless resources of the target CG, or have enough data to configure new wireless resources for the UE.
[0025] In one possible implementation, sending notification information includes: sending an uplink control message (UCI) including notification information; or sending a medium access control layer control element (MAC-CE) message including notification information; or sending a user equipment assistance message (UAI) including notification information. In this way, the UE can instruct the network element to adjust the UE's CG configuration accordingly through the UCI message, MAC-CE message, or UAI message.
[0026] The second aspect of the present application provides a communication method, which is applied to a user equipment UE, and includes: generating notification information, where the notification information is used to indicate that L CGs are configured for the UE within a data transmission cycle, where L is a positive integer; and sending the notification information.
[0027] Since the UE can send all the data required to be sent in the current data transmission cycle to the network element within the time period corresponding to L CGs, the UE's demand for wireless resources in the process of sending data is met. At the same time, it also avoids the situation where the wireless resources corresponding to some CGs are idle in the current data transmission cycle, thereby avoiding resource waste. In this way, when the network element can realize normal interaction with the UE in the communication frame of the XR service scenario (or the communication frame in other scenarios), the rationality of the network element configuring wireless resources for the UE is improved.
[0028] In one possible implementation, a first control message sent by a network element is received, where the first control message is used to configure the data transmission cycle and wireless resources of the UE; at least one second control message is received from the network element, where the second control message is used to activate wireless resources corresponding to L CGs configured for the UE within a data transmission cycle; and data is exchanged with the network element using the wireless resources corresponding to the L CGs within a time period corresponding to the L CGs. In this way, the UE can exchange data with the network element based on the requested L CGs, which can not only meet the UE's demand for wireless resources during data transmission, but also avoid the situation where the wireless resources corresponding to some CGs are idle during the current data transmission cycle.
[0029] In one possible implementation, the notification information is used to notify the network element to configure the number of CGs for the UE within a data transmission cycle respectively included in multiple CG configurations, where the multiple CG configurations include a target CG configuration. The number of CGs configured within a data transmission cycle included in different CG configurations may be the same or different, thereby enabling more flexible CG configuration for the UE.
[0030] In one possible implementation, the notification information includes an identifier of a target CG group, the target CG group is one of multiple CG groups, each of the multiple CG groups includes multiple CG configurations, and the multiple CG configurations include the target CG configuration; the notification information is used to notify the network element to configure the number of CGs in a data transmission cycle respectively included in the multiple CG configurations based on the target CG group. In this way, the identifier of the target CG group can be used to notify the network element based on which CG group to configure the number of CGs in a data transmission cycle respectively included in the multiple CG configurations.
[0031] In a possible implementation, sending the notification information includes: sending a user equipment assistance message UAI, where the UAI includes the notification information.
[0032] The third aspect of the present application provides a communication method, which receives notification information, where the notification information is used to notify the network element that a target CG among multiple CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the communication message is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration; manage the wireless resources of the target CG according to the notification information, or configure resources for the UE according to the notification information. Since the notification information sent by the UE to the network element based on the current configuration for the CG can reflect the UE's usage requirements for the current CG, this enables the network element to perform more reasonable resource management based on the notification information.
[0033] In a possible implementation, configuring resources for the UE according to the notification information includes: sending a control message, where the control message is used to adjust N CGs within a data transmission period included in the target CG configuration to M CGs, where N is a positive integer and M is a positive integer different from N. In this way, the network element can configure an appropriate number of CGs for the UE based on the notification information of the UE, thereby reducing the problem of resource waste while meeting the UE's demand for using radio resources.
[0034] In one possible implementation, configuring resources for the UE based on the notification information includes dynamically scheduling the radio resources of the target CG to other UEs. In this way, the network element can increase the number of UEs that the network element can serve by dynamically allocating radio resources that are temporarily unused by the UE to other UEs, while also avoiding waste of these radio resources.
[0035] In one possible implementation, a communication message is used to notify a network element to increase the number of CGs within a data transmission cycle included in the target CG configuration; then, resources are configured for the UE according to the notification information, including: sending a downlink control message DCI message, the DCI message is used to configure a dynamic authorization DG within the data transmission cycle, and the amount of data supported by the DG for UE transmission matches the amount of data supported by the UE transmission for the number of CGs increased as indicated by the notification information. In this way, the network element can meet the UE's demand for wireless resources by dynamically scheduling resources.
[0036] The fourth aspect of the present application provides a communication method, receiving notification information, the notification information is used to notify the network element to configure L CGs for the UE within a data transmission period included in the target configuration authorization CG configuration, where L is a positive integer; sending a first control message, the first control message is used to configure the data transmission period of the UE; sending at least one second control message, at least one second control message is used to activate the L CGs within a data transmission period included in the target CG configuration; receiving data transmitted based on the starting times corresponding to the L CGs, respectively, using the wireless resources corresponding to the L CGs.
[0037] The communication method provided in the fourth aspect corresponds to the communication method provided in the second aspect, so the technical effects of the implementation of the fourth aspect can refer to the technical effects of the second aspect.
[0038] The fifth aspect of the present application provides a UE, which includes: a determination module for determining relevant information of N configured authorized CGs within a data transmission cycle configured for the UE, the relevant information of the N CGs including the starting time corresponding to the N CGs and the wireless resources corresponding to the N CGs, where N is a positive integer; a sending module for sending notification information based on the relevant information of the N CGs, the notification information being used to notify the network element that a target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the communication message is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
[0039] In one possible implementation, the UE also includes: a receiving module for receiving a control message, where the control message is used to adjust N CGs within a data transmission cycle included in the target CG configuration to M CGs, where M is a positive integer different from N; and a sending module for performing data interaction based on the starting times corresponding to the M CGs and using the wireless resources corresponding to the M CGs.
[0040] In one possible embodiment, the notification information includes a bit field, and the value of the bit field is used to indicate that the target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the value of the bit field is used to instruct the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
[0041] In one possible implementation, the notification information is used to notify the network element that the target CG among the N CGs included in the target CG configuration within a data transmission cycle is not used by the UE. The notification information includes a cancellation operation and an identifier of the target CG. The cancellation operation is used to instruct the UE to cancel the use of the CG, and the identifier is used to indicate the target CG that is canceled by the UE.
[0042] In a possible implementation, the notification information includes a bitmap, and the value of the bitmap is used to indicate the target CG that is canceled by the UE.
[0043] In one possible embodiment, the notification information includes a bitmap. When the value of the first part of the bits in the bitmap is the first value, the first part of the bits is used to indicate a cancellation operation, and the value of the second part of the bits in the bitmap is used to indicate the target CG canceled by the UE.
[0044] In a possible embodiment, when the value of the first part of the bits in the bitmap is the second value, the first part of the bits is used to indicate an increase operation, the increase operation is used to indicate the increase of the CG within a data transmission cycle included in the target CG configuration, and the value of the second part of the bits in the bitmap is used to indicate the number of increased CGs.
[0045] In a possible implementation, the notification information includes a number M, where M is used to indicate the number of CGs within a data transmission cycle included in the target CG configuration, and M is a positive integer.
[0046] In a possible implementation, the notification information includes a target field, where the target field is used to identify a target CG configuration.
[0047] In one possible implementation, the UE sends notification information based on the first CG, and the target CG configuration is the CG configuration where the first CG is located.
[0048] In one possible implementation, the notification information is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration; the UE also includes: a receiving module for receiving a downlink control message DCI message, the DCI message is used to configure a dynamic permission DG within the data transmission cycle, and the amount of data supported by the DG for UE transmission matches the amount of data supported by the number of CGs increased as indicated by the notification information; the sending module is also used to perform data interaction based on the starting times corresponding to the N CGs and the starting time of the DG, using the wireless resources corresponding to the N CGs and the wireless resources of the DG.
[0049] In a possible implementation, the notification information is used to notify the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations, and the multiple CG configurations include a target CG configuration.
[0050] In a possible implementation, the notification information includes a bit field or a bit map, and the value of the bit field or the value of the bit map is used to instruct the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations.
[0051] In one possible embodiment, the first field in the bit field or bit map is used to identify each CG configuration in multiple CG configurations, and the second field in the bit field or bit map is used to indicate the number of CGs in a data transmission cycle respectively included in the multiple CG configurations.
[0052] In one possible embodiment, the notification information includes the identifier of the target CG group, the target CG group is one of multiple CG groups, each of the multiple CG groups includes multiple CG configurations, and the notification information is used to notify the network element to configure the number of CGs in a data transmission cycle respectively included in the multiple CG configurations based on the target CG group.
[0053] In one possible implementation, the notification information is used to notify the network element that a target CG among N CGs within a data transmission cycle included in the target CG configuration is not used by the UE; then, the sending module is specifically used to send the notification information to the network element at the target time; wherein the target time is any time within the time period corresponding to the first CG among the N CGs; or, the target time is any time within the time period corresponding to the m CGs before the first CG in the target CG, and m is a positive integer greater than or equal to 1; or, the interval between the target time and the starting time of the first CG in the target CG is greater than the preset time.
[0054] In a possible implementation, the sending module is specifically used to: send an uplink control message UCI, where the UCI includes notification information; or send a medium access control layer control element MAC-CE message, where the MAC-CE message includes notification information; or send a user equipment assistance message UAI, where the UAI includes notification information.
[0055] The UE provided in the fifth aspect corresponds to the communication method provided in the first aspect. Therefore, the technical effects of the fifth aspect and any implementation method of the fifth aspect can refer to the technical effects of the first aspect and the corresponding implementation method of the first aspect.
[0056] The sixth aspect of the present application provides a UE, which includes: a generation module for generating notification information, wherein the notification information is used to notify the network element to configure L CGs for the UE within a data transmission cycle included in the target configuration authorization CG configuration, where L is a positive integer; and a sending module for sending the notification information.
[0057] In one possible embodiment, the UE also includes: a receiving module for receiving a first control message sent by a network element, the first control message being used to configure the data transmission period of the UE; receiving at least one second control message sent by the network element, the second control message being used to activate L CGs within a data transmission period included in the target CG configuration; and a sending module for performing data interaction based on the starting times corresponding to the L CGs and using the wireless resources corresponding to the L CGs.
[0058] In a possible implementation, the notification information is used to notify the network element to configure the number of CGs for the UE within a data transmission cycle respectively included in multiple CG configurations, and the multiple CG configurations include a target CG configuration.
[0059] In one possible implementation, the notification information includes an identifier of a target CG group, the target CG group is one of multiple CG groups, each of the multiple CG groups includes multiple CG configurations, and the multiple CG configurations include the target CG configuration; the notification information is used to notify the network element to configure the number of CGs in a data transmission cycle respectively included in the multiple CG configurations based on the target CG group.
[0060] In a possible implementation, the sending module is specifically configured to send a user equipment assistance message UAI to a network element, where the UAI includes notification information.
[0061] The UE provided in the sixth aspect corresponds to the communication method provided in the second aspect. Therefore, the technical effects of the sixth aspect and any implementation method of the sixth aspect can refer to the technical effects of the second aspect and the corresponding implementation methods of the second aspect.
[0062] The seventh aspect of the present application provides a network element, which includes: a receiving module for receiving notification information, where the notification information is used to notify the network element that a target CG among N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the notification information is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration; a resource management module for managing the wireless resources of the target CG according to the notification information, or configuring resources for the UE according to the notification information.
[0063] In a possible implementation, the resource management module is specifically used to send a control message to the UE, where the control message is used to adjust N CGs within a data transmission cycle included in the target CG configuration to M CGs, where N is a positive integer and M is a positive integer different from N.
[0064] In a possible implementation, the resource management module is specifically used to dynamically schedule the wireless resources of the target CG to other UEs.
[0065] In one possible implementation, the communication message is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration; then, the resource management module is specifically used to send a downlink control message DCI message to the UE, and the DCI message is used to configure a dynamic authorization DG within the data transmission cycle, and the amount of data supported by the DG for UE transmission matches the amount of data supported by the UE transmission for the increased number of CGs indicated by the notification information.
[0066] The network element provided in the seventh aspect corresponds to the communication method provided in the third aspect. Therefore, the technical effects of the seventh aspect and any implementation method of the seventh aspect can refer to the technical effects of the third aspect and the corresponding implementation method of the third aspect.
[0067] The eighth aspect of the present application provides a network element, which includes: a receiving module for receiving notification information, the notification information is used to notify the network element to configure L CGs for the UE within a data transmission period included in the target configuration authorization CG configuration, where L is a positive integer; a sending module for sending a first control message, the first control message is used to configure the data transmission period of the UE; and sending at least one second control message, the at least one second control message is used to activate the L CGs within a data transmission period included in the target CG configuration; the receiving module is also used to receive data transmitted based on the starting times corresponding to the L CGs and using the wireless resources corresponding to the L CGs, the starting times corresponding to the L CGs and the wireless resources corresponding to the L CGs are determined based on the first control message and at least one second control message.
[0068] The network element provided in the eighth aspect corresponds to the communication method provided in the fourth aspect, so the technical effects of the eighth aspect can refer to the technical effects of the fourth aspect.
[0069] A ninth aspect of the present application provides an electronic device comprising: a memory and at least one processor. The memory is used to store programs, and the at least one processor is used to run the programs, so that the electronic device implements any one of the communication methods provided in the first to fourth aspects of the present application.
[0070] The tenth aspect of the present application provides a computer storage medium for storing a computer program. When the computer program is executed, it is used to implement the communication method provided in any one of the first to fourth aspects of the present application.
[0071] The eleventh aspect of the present application provides a computer program product containing instructions, which, when executed on at least one computing device, enables the at least one computing device to implement the communication method provided in any one of the first to fourth aspects of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] FIG1 is a structural diagram of an exemplary communication system disclosed in an embodiment of the present application;
[0073] FIG2 is a schematic structural diagram of an electronic device disclosed in an embodiment of the present application;
[0074] FIG3 is a schematic diagram of a communication frame in an XR service scenario disclosed in an embodiment of the present application;
[0075] FIG4 is a flow chart of a communication method disclosed in an embodiment of the present application;
[0076] FIG5a is a schematic diagram of configuring time periods corresponding to four CGs within a data transmission cycle disclosed in an embodiment of the present application;
[0077] FIG5 b is a schematic diagram of notifying a network element to cancel the use of CG4 within the time period corresponding to CG1 according to an embodiment of the present application;
[0078] FIG5c is a schematic diagram of canceling a CG in a data transmission period included in a plurality of CG configurations disclosed in an embodiment of the present application;
[0079] FIG6 is a schematic diagram of configuring a CG for a UE based on different configuration strategies according to an embodiment of the present application;
[0080] FIG7 is a flow chart of another communication method disclosed in an embodiment of the present application;
[0081] FIG8 is a flow chart of another communication method disclosed in an embodiment of the present application;
[0082] FIG9 is a schematic structural diagram of a UE disclosed in an embodiment of the present application;
[0083] FIG10 is a schematic structural diagram of another UE disclosed in an embodiment of the present application;
[0084] FIG11 is a structural diagram of a network element disclosed in an embodiment of the present application;
[0085] FIG12 is a structural diagram of another network element disclosed in an embodiment of the present application. DETAILED DESCRIPTION
[0086] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. The terms used in the following embodiments are only for the purpose of describing specific embodiments and are not intended to be limiting of the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "said", "above", "the" and "this" are intended to also include expressions such as "one or more", unless there is a clear contrary indication in the context. It should also be understood that in the embodiments of the present application, "one or more" refers to one, two or more; "and / or" describes the association relationship of associated objects, indicating that three relationships may exist; for example, A and / or B can represent: the existence of A alone, the existence of A and B at the same time, and the existence of B alone, where A and B can be singular or plural. The character " / " generally indicates that the related objects before and after are in an "or" relationship.
[0087] References to "one embodiment" or "some embodiments" in this specification mean that a particular feature, structure, or characteristic described in conjunction with that embodiment is included in one or more embodiments of the present application. Thus, phrases such as "in one embodiment," "in some embodiments," "in other embodiments," and "in yet other embodiments" appearing in various places in this specification do not necessarily refer to the same embodiment, but rather mean "one or more but not all embodiments," unless otherwise specifically emphasized. The terms "including," "comprising," "having," and variations thereof mean "including but not limited to," unless otherwise specifically emphasized.
[0088] The "multiple" involved in the embodiments of the present application means greater than or equal to two. It should be noted that in the description of the embodiments of the present application, the words "first" and "second" are only used for the purpose of distinguishing the description and cannot be understood as indicating or implying relative importance or order.
[0089] The embodiments of the present application are applied to a communication system, which may be a fifth-generation (5G) communication system, or a hybrid architecture of LTE and 5G, or a 5G New Radio (5G NR) system, as well as new communication systems that will emerge in future communication developments.
[0090] An example of a communication system is shown in FIG1 , which includes a base station 1 and a UE 2 .
[0091] In the embodiments provided in the present application, base station 1 can be any device located on the network side and having wireless transceiver functions, including but not limited to: a base station (gNodeB or gNB) or a transmission receiving point (TRP) in new radio (NR). Base station 1 can be: a macro base station, a micro base station, a pico base station, a small station, a relay station, or a balloon station. Base station 1 can include one or more co-site or non-co-site transmission points (TRP). Base station 1 can also be a wireless controller, a centralized unit (CU), and / or a distributed unit (DU) in a cloud radio access network (CRAN) scenario. Base station 1 can communicate with UE2, or communicate with UE2 through a relay station. UE2 can communicate with multiple base stations of different technologies. For example, UE2 can communicate with a base station that supports an LTE network, or with a base station that supports a 5G network, or can establish dual connections with a base station that supports an LTE network and a base station that supports a 5G network.
[0092] In the embodiments provided in the present application, UE2 can be in various forms, for example, a mobile phone, a tablet computer, a computer with wireless transceiver function, a virtual reality (VR) terminal device, an augmented reality (AR) terminal device, a wireless terminal in industrial control, a vehicle-mounted terminal device, a wireless terminal in self-driving, a wireless terminal in remote medical, a wireless terminal in smart grid, a wireless terminal in transportation safety, a wireless terminal in smart city, a wireless terminal in smart home, a wearable terminal device, etc. UE can also sometimes be referred to as a terminal device, an access terminal device, a vehicle-mounted terminal, an industrial control terminal, a UE unit, a UE station, a mobile station, a mobile station, a remote station, a remote terminal device, a mobile device, a UE terminal device, a terminal device, a wireless communication device, a UE agent, or a UE device, etc. A terminal can also be a fixed terminal or a mobile terminal.
[0093] Exemplarily, FIG2 shows a schematic structural diagram of UE2.
[0094] UE2 may include a processor 110, an external memory interface 120, an internal memory 121, a universal serial bus (USB) interface 130, a charging management module 140, a power management module 141, a battery 142, an antenna 1, an antenna 2, a mobile communication module 150, a wireless communication module 160, an audio module 170, a speaker 170A, a receiver 170B, a microphone 170C, an earphone interface 170D, a sensor module 180, a button 190, a motor 191, an indicator 192, a camera 193, a display screen 194, and a subscriber identification module (SIM) card interface 195, etc.
[0095] It should be understood that the structure illustrated in the embodiments of the present invention does not constitute a specific limitation on UE2. In other embodiments of the present application, UE2 may include more or fewer components than illustrated, or may combine or separate certain components, or may have different component arrangements. The illustrated components may be implemented in hardware, software, or a combination of software and hardware.
[0096] The processor 110 may include one or more processing units. For example, the processor 110 may include an application processor (AP), a modem processor, a graphics processing unit (GPU), an image signal processor (ISP), a controller, a video codec, a digital signal processor (DSP), a baseband processor, and / or a neural-network processing unit (NPU). The different processing units may be independent devices or integrated into one or more processors.
[0097] The controller can generate operation control signals according to the instruction operation code and timing signal to complete the control of instruction fetching and execution.
[0098] The processor 110 may also include a memory for storing instructions and data.
[0099] In some embodiments, the processor 110 may include one or more interfaces. The interfaces may include an inter-integrated circuit (I2C) interface, an inter-integrated circuit sound (I2S) interface, a pulse code modulation (PCM) interface, a universal asynchronous receiver / transmitter (UART) interface, a mobile industry processor interface (MIPI), a general-purpose input / output (GPIO) interface, a subscriber identity module (SIM) interface, and / or a universal serial bus (USB) interface.
[0100] USB interface 130 is an interface that complies with USB standards and specifications, and may be a Mini USB interface, a Micro USB interface, a USB Type-C interface, or the like. USB interface 130 can be used to connect a charger to charge UE2 and to transfer data between UE2 and peripheral devices. It can also be used to connect headphones to play audio. This interface can also be used to connect other electronic devices, such as AR devices.
[0101] It is understood that the interface connection relationship between the modules illustrated in the embodiment of the present invention is only for illustrative purposes and does not constitute a structural limitation on UE 2. In other embodiments of the present application, UE 2 may also adopt different interface connection methods from the above embodiments, or a combination of multiple interface connection methods.
[0102] The charging management module 140 is configured to receive charging input from a charger. While charging the battery 142 , the charging management module 140 can also provide power to the UE 2 through the power management module 141 .
[0103] The power management module 141 is used to connect the battery 142, the charging management module 140, and the processor 110. The power management module 141 receives input from the battery 142 and / or the charging management module 140 and provides power to the processor 110, the internal memory 121, the display 194, the camera 193, and the wireless communication module 160. The power management module 141 can also be used to monitor parameters such as battery capacity, battery cycle count, and battery health status (leakage, impedance).
[0104] The wireless communication function of UE2 can be implemented through antenna 1, antenna 2, mobile communication module 150, wireless communication module 160, modem processor and baseband processor.
[0105] Antenna 1 and Antenna 2 are used to transmit and receive electromagnetic wave signals. Each antenna in UE 2 can be used to cover a single or multiple communication frequency bands. Different antennas can also be reused to improve antenna utilization. For example, antenna 1 can be reused as a diversity antenna for a wireless local area network. In other embodiments, the antennas can be used in conjunction with a tuning switch.
[0106] The mobile communication module 150 can provide solutions for wireless communications including 5G applied on UE2. The mobile communication module 150 may include at least one filter, a switch, a power amplifier, a low noise amplifier (LNA), etc. The mobile communication module 150 can receive electromagnetic waves from the antenna 1, and filter, amplify, and process the received electromagnetic waves, and transmit them to the modulation and demodulation processor for demodulation. The mobile communication module 150 can also amplify the signal modulated by the modulation and demodulation processor, and convert it into electromagnetic waves for radiation through the antenna 1. In some embodiments, at least some of the functional modules of the mobile communication module 150 can be set in the processor 110. In some embodiments, at least some of the functional modules of the mobile communication module 150 can be set in the same device as at least some of the modules of the processor 110.
[0107] The wireless communication module 160 can provide wireless communication solutions applied on UE2, including wireless local area networks (WLAN) (such as wireless fidelity (Wi-Fi) networks), Bluetooth (BT), global navigation satellite system (GNSS), frequency modulation (FM), near field communication (NFC), infrared technology (IR), etc. The wireless communication module 160 can be one or more devices integrating at least one communication processing module. The wireless communication module 160 receives electromagnetic waves via antenna 2, frequency modulates and filters the electromagnetic wave signals, and sends the processed signals to the processor 110. The wireless communication module 160 can also receive the signal to be sent from the processor 110, frequency modulate it, amplify it, and convert it into electromagnetic waves for radiation through antenna 2.
[0108] In some embodiments, antenna 1 of UE2 is coupled to mobile communication module 150, and antenna 2 is coupled to wireless communication module 160, so that UE2 can communicate with a network and other devices via wireless communication technologies. The wireless communication technologies may include global system for mobile communications (GSM), general packet radio service (GPRS), code division multiple access (CDMA), wideband code division multiple access (WCDMA), time-division code division multiple access (TD-SCDMA), long term evolution (LTE), BT, GNSS, WLAN, NFC, FM, and / or IR technology. The GNSS may include global positioning system (GPS), global navigation satellite system (GLONASS), Beidou navigation satellite system (BDS), quasi-zenith satellite system (QZSS) and / or satellite based augmentation system (SBAS).
[0109] UE2 implements display functions through a GPU, a display screen 194, and an application processor.
[0110] Display screen 194 is used to display images, videos, etc. Display screen 194 includes a display panel. The display panel can be a liquid crystal display (LCD), an organic light-emitting diode (OLED), an active-matrix organic light-emitting diode or an active-matrix organic light-emitting diode (AMOLED), a flexible light-emitting diode (FLED), a MiniLED, a MicroLED, a Micro-oLed, or a quantum dot light-emitting diode (QLED). In some embodiments, UE2 may include one or N display screens 194, where N is a positive integer greater than 1.
[0111] UE2 can realize the shooting function through an image signal processor (ISP), a camera 193, a video codec, a GPU, a display screen 194, and an application processor.
[0112] The ISP processes data fed back by camera 193. The ISP can also perform algorithmic optimizations on image noise, brightness, and skin tone. The ISP can also optimize parameters such as exposure and color temperature of the captured scene. In some embodiments, the ISP can be incorporated into camera 193.
[0113] The camera 193 is used to capture still images or videos. In some embodiments, the UE 2 may include one or more cameras 193 .
[0114] The external memory interface 120 can be used to connect an external memory card, such as a Micro SD card, to expand the storage capacity of UE 2. The external memory card communicates with the processor 110 via the external memory interface 120 to implement data storage functions. For example, files such as music and videos can be stored on the external memory card.
[0115] The internal memory 121 can be used to store computer executable program codes, which include instructions. The internal memory 121 may include a program storage area and a data storage area. The program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc. The data storage area may store data created during the use of UE2 (such as audio data, a phone book, etc.), etc. In addition, the internal memory 121 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, a universal flash storage (UFS), etc. The processor 110 executes various functional applications and data processing of UE2 by running instructions stored in the internal memory 121 and / or instructions stored in a memory provided in the processor.
[0116] UE2 can implement audio functions such as music playback and recording through the audio module 170, speaker 170A, receiver 170B, microphone 170C, headphone jack 170D, and application processor.
[0117] The audio module 170 is used to convert digital audio information into analog audio signal output, and is also used to convert analog audio input into digital audio signals. The audio module 170 can also be used to encode and decode audio signals. In some embodiments, the audio module 170 can be provided in the processor 110, or some functional modules of the audio module 170 can be provided in the processor 110.
[0118] Keys 190 include a power button, a volume button, etc. Keys 190 may be mechanical keys or touch keys. UE2 may receive key inputs and generate key signal inputs related to user settings and function control of UE2.
[0119] Motor 191 can generate vibration prompts. Motor 191 can be used for incoming call vibration prompts, and can also be used for touch vibration feedback. For example, touch operations acting on different applications (such as taking pictures, audio playback, etc.) can correspond to different vibration feedback effects. For touch operations acting on different areas of the display screen 194, motor 191 can also correspond to different vibration feedback effects. Different application scenarios (for example: time reminders, receiving messages, alarm clocks, games, etc.) can also correspond to different vibration feedback effects. The touch vibration feedback effect can also support customization.
[0120] The indicator 192 may be an indicator light, which may be used to indicate the charging status, power level changes, messages, missed calls, notifications, etc.
[0121] The SIM card interface 195 is used to connect a SIM card. The SIM card can be connected to and separated from the UE2 by inserting it into or removing it from the SIM card interface 195. The UE2 can support 1 or N SIM card interfaces, where N is a positive integer greater than 1. The SIM card interface 195 can support Nano SIM cards, Micro SIM cards, SIM cards, and the like. Multiple cards can be inserted into the same SIM card interface 195 at the same time. The types of the multiple cards can be the same or different. The SIM card interface 195 can also be compatible with different types of SIM cards. The SIM card interface 195 can also be compatible with external memory cards. The UE2 interacts with the network through the SIM card to implement functions such as calls and data communications. In some embodiments, the UE2 uses an eSIM, i.e., an embedded SIM card. The eSIM card can be embedded in the UE2 and cannot be separated from the UE2.
[0122] The above description is based on an example of a communication system including base station 1 and UE 2. In other possible implementations, base station 1 in the communication system may be replaced with other network elements, and this is not limited to this. For ease of understanding, the following description still uses the interaction between base station 1 and UE 2 as an example.
[0123] In XR service scenarios, the communication frames sent between base station 1 and UE 2 during data exchange are periodic. As shown in Figure 3, UE 2 can periodically send I frames (intra-coded frames, also known as key frames), P frames (predicted frames), and B frames (bidirectional frames) to base station 1.
[0124] Typically, base station 1 can first send a radio resource control (RRC) message to UE2, so that the RRC message can be used to configure the period for transmitting communication frames and the radio resources (such as frequency domain resources) required for sending data for UE2. At this time, the radio resources are not activated, and UE2 will not send data to base station 1. Then, base station 1 sends a downlink control information (DCI) message to UE2 to activate the radio resources configured for the UE, so that UE2 uses the activated radio resources to send data to base station 1 in each data transmission cycle, that is, it sends I frames to base station 1 in the first cycle, P frames to base station 1 in the second cycle, B frames to base station 1 in the third cycle, and I frames to base station 1 in the fourth cycle, and so on. This resource scheduling method is called semi-persistent scheduling (SPS).
[0125] However, the resources scheduled by SPS in each cycle are usually fixed, that is, UE2 uses fixed configured wireless resources (RRC signaling configuration, DCI activated wireless resources) to send data in the first cycle, the second cycle, and the third cycle. As shown in Figure 3, the amount of data of I frames, P frames, and B frames usually decreases in sequence. This makes UE2 complete all data transmission in a part of the time period within a data transmission cycle because the amount of data of P frames and B frames is small. Correspondingly, the activated wireless resources will be idle in the remaining time period of the data transmission cycle. At the same time, this part of the wireless resources has been configured to UE2 and is difficult to be used by other UEs. Therefore, the SPS scheduling method will cause a part of the wireless resources configured by base station 1 to be wasted for UE2, and will cause base station 1 to only be able to transmit communication frames in the XR service scenario with a smaller number of UEs in the same time period, thereby limiting the number of UEs that base station 1 can serve.
[0126] Furthermore, when the base station configures multiple configuration grants (CGs) for the UE in each data transmission cycle, the UE can use the activated wireless resources corresponding to each CG to send data to the network element in the time period corresponding to the CG. This resource configuration method can alleviate the problem of resource waste to a certain extent. However, in actual application scenarios, the UE often does not need to interact with the network element for data in the time period corresponding to some CGs, which makes the wireless resources corresponding to some CGs still idle, resulting in resource waste; or, the UE does not complete the transmission of all data with the network element in the time period corresponding to multiple CGs, resulting in the UE not being allocated enough wireless resources. Therefore, there are still unreasonable problems in the way the base station configures wireless resources for the UE.
[0127] An embodiment of the present application provides a communication method for solving the problem of improving the rationality of network elements configuring wireless resources for UEs when network elements such as base stations can implement communication frames in normal interactive XR service scenarios with UEs.
[0128] Referring to FIG4 , a communication method provided by an embodiment of the present application is shown. The data interaction between the network element and the UE includes the UE sending data to the base station (data uplink) and the base station sending data to the UE (data downlink). For ease of understanding, the communication method flow shown in FIG4 mainly describes the process of the UE sending data to the network element. The specific implementation process of the network element sending data to the UE can be understood by referring to the relevant description of the embodiment shown in FIG4 .
[0129] The communication method shown in FIG4 includes the following steps:
[0130] S401: The UE determines the relevant information of N CGs in a data transmission cycle included in the target CG configuration configured by the network element for the UE, wherein the relevant information of the N CGs includes the starting time corresponding to the N CGs and the wireless resources corresponding to the N CGs, and N is a positive integer.
[0131] In this embodiment, when periodic service data is exchanged between the network element and the UE (such as the communication frames in the XR service scenario shown in Figure 3), the network element can pre-configure the UE, specifically configuring the UE to have N CGs within a data transmission period included in the target CG configuration, and configuring the starting time and wireless resources (such as frequency domain resources) corresponding to the N CGs respectively.
[0132] Among them, the data transmission cycle belongs to a CG configuration provided by the network element. In this embodiment, the network element can provide different CG configurations based on the different types of communication frames transmitted by the UE and the network element in different data transmission cycles. For example, for the I frame data, P frame data and B frame data exchanged between the network element and the UE, the network element can provide CG configuration 1, CG configuration 2 and CG configuration 3 respectively, and when the network element configures a CG within a data transmission cycle for the UE, it can indicate which CG configuration the data transmission cycle belongs to. Each CG configuration includes multiple configuration contents, including the data transmission cycle, the number of CGs included in a data transmission cycle, the wireless resources available for data transmission, etc. In actual application, each CG configuration may also include other configuration contents.
[0133] The starting time corresponding to each CG is the time when the UE starts to exchange data with the network element based on the radio resources of the CG. The time period for the UE to exchange data based on the radio resources of the CG is a period of time within the data transmission cycle. There is no overlap between the time periods corresponding to multiple different CGs within a data transmission cycle. In addition, there may be a corresponding time interval between the time periods corresponding to different CGs. For example, two time periods may be separated by one or more time slots (a time unit in the time domain structure), or by one or more symbols. The symbol may be, for example, an orthogonal frequency-division multiplexing (OFDM) symbol in a time slot. In addition, the interval between two time periods may be a fixed length, such as a fixed length corresponding to one time slot or four symbols, or may be a non-fixed length, such as the interval between the time periods corresponding to the first CG and the second CG is one time slot, and the interval between the time periods corresponding to the second CG and the third CG is two time slots.
[0134] In this way, within each data transmission cycle, the UE can use the configured wireless resources to send data to the network element within the time period corresponding to the N CGs.
[0135] For example, as shown in Figure 5a, the network element can use the first control message to instruct the UE to generate 4 CGs (i.e., N is 4) within a data transmission cycle included in the specified CG configuration (hereinafter referred to as the target CG configuration). Then, the UE can use the configured wireless resources to send data to the network element within the data transmission time periods corresponding to CG1 to CG4.
[0136] As an implementation example, the network element can configure the target CG configuration for the UE by sending RRC messages and DCI messages to the UE, so that the target CG configuration includes N CGs in a data transmission cycle.
[0137] In specific implementation, the network element can first send an RRC message to the UE to configure the period for the UE to send data to the network element (hereinafter referred to as the data transmission period). Then, the network element will send one or more DCI messages to the UE, so that the UE can activate the various CGs configured for the UE based on the one or more DCI messages. Among them, the information such as the number of CGs that the UE has in a data transmission period included in the target CG configuration, the starting time of each CG, the interval between different CGs, etc., can be carried in the RRC message, can also be carried in the DCI message, or can be calculated based on the RRC message and the DCI message.
[0138] For example, when the network element sends a DCI message to the UE, the UE can first calculate the starting time of the first CG based on the RRC message and the DCI message, and then calculate the data transmission time period corresponding to the first CG based on the starting time and the default duration of the time period, and determine the wireless resources of the CG (that is, the wireless resources used in the data transmission time period corresponding to the CG). Then, the UE calculates the starting time of the second CG based on the interval duration between the CGs corresponding to the first CG and the second CG, and determines the wireless resources of the second CG. Similarly, the starting time and wireless resources of each CG in a data transmission cycle included in the target CG configuration can be calculated in sequence. Among them, the specific implementation method of the UE calculating the starting time of the first CG based on the second control message has relevant applications in actual application scenarios and will not be explained in detail.
[0139] When the network element sends multiple DCI messages to the UE, each DCI message is used to determine the starting time of a CG. At this time, the UE can calculate the starting time of the first CG based on the RRC message and the first DCI message, and then calculate the end time corresponding to the first CG based on the starting time and the default duration of the time period (that is, determine the data transmission time period corresponding to the CG). Then, the UE calculates the starting time of the second CG based on the RRC message and the second received DCI message (or based on the DCI message containing the second CG identifier), and determines the wireless resources of the second CG. Similarly, the UE can calculate the starting time and wireless resources corresponding to each CG based on the RRC message and multiple DCI messages.
[0140] Similarly, when the network element needs to send data to the UE, it can follow a similar process as described above. The network element sends an RRC message and a medium access control layer control element (MAC-CE) to the UE to activate multiple downlink assignment configurations (CDAs) within a data transmission period included in the target SPS configuration in multiple SPS configurations. In addition, the UE determines the starting time and wireless resources of the multiple CDAs within a data transmission period included in the target SPS configuration based on the first control message and at least one second control message, and based on the starting time of the multiple CDAs, uses the wireless resources of the multiple CDAs to interact with the network element. Specifically, it can be to use the physical downlink shared channel (PDSCH) corresponding to the wireless resources to receive the downlink data sent by the network element. For ease of understanding, this embodiment takes the configuration CG as an example for illustrative explanation.
[0141] Because the N CGs configured by the network element for the UE within a data transmission cycle included in the target CG configuration may deviate from the actual needs of the UE, for example, the UE may complete all data transmission within the time periods corresponding to some CGs within a data transmission cycle; or, within a data transmission cycle, the UE may not complete all data transmission within the time periods corresponding to N CGs. Therefore, in this embodiment, the following steps may be further performed to notify the network element whether the current CG configuration for the UE matches the actual needs of the UE.
[0142] S402: The UE sends a notification message to the network element, where the notification message is used to notify the network element that the target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the communication message is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
[0143] In this embodiment, after determining the relevant information of the N CGs configured by the current network element, the UE can notify the network element that some CGs are not used by the UE (excess wireless resources) or notify the network element that the number of CGs is insufficient (insufficient wireless resources) based on its own business needs and the relevant information of the N CGs.
[0144] As a first possible implementation, within a data transmission cycle included in the target CG configuration, assuming that the UE is in the process of sending data to the network element using the wireless resources corresponding to N CGs (or before sending data), based on the current amount of data to be transmitted and the size of the configured wireless resources, it is determined that all data can be sent to the network element within M CGs (M is a positive integer less than N). This indicates that within the remaining (NM) CGs, the wireless resources corresponding to the (NM) CGs will be idle, resulting in a problem of resource waste. Therefore, the UE can generate a message including notification information and send the message to the network element. At this time, the notification information is used to notify the network element of the number of CGs that the UE does not use within a data transmission cycle or to notify the network element which CGs are not used.
[0145] Alternatively, the UE determines that data transmission requires a time period corresponding to M CGs (M is a positive integer greater than N) based on the current amount of data to be transmitted and the size of the configured wireless resources. This means that the UE cannot send all the data within N CGs, resulting in insufficient resources. Therefore, the UE can generate a message including notification information and send the message to the network element. At this time, the notification information is used to notify the network element to increase the number of CGs configured for the UE in one data transmission cycle.
[0146] Alternatively, the network element supports providing multiple configuration strategies for CG, and the multiple configuration strategies that the network element can support can be notified to the UE through RRC messages or other messages. In this way, after the network element configures multiple CGs for the UE in a data transmission cycle based on one of the configuration strategies, the UE can determine whether there is a problem of resource waste or insufficient resources based on the current amount of data to be transmitted and the size of the configured wireless resources, and generate a message including notification information, and send the message to the network element. At this time, the notification information is used to notify the network element to switch the configuration strategy for the CG from the current configuration strategy to the specified configuration strategy, that is, to notify the network element that some of the configured CGs are not used by the UE or to notify the network element to increase the number of CGs configured for the UE.
[0147] For example, assume that the network element supports providing three configuration strategies, and assume that the wireless resources used by these three configuration strategies are the same. Among them, configuration strategy 1 is to configure 2 CGs in one data transmission cycle, configuration strategy 2 is to configure 3 CGs in one data transmission cycle, and configuration strategy 3 is to configure 4 CGs in one data transmission cycle. If the network element initially uses configuration strategy 2 to configure the UE, then when the UE determines that configuration strategy 2 will cause a waste of resources, the notification information is used to notify the network element to switch the configuration strategy of the CG from configuration strategy 2 to configuration strategy 1, or, when the UE determines that configuration strategy 2 will cause a problem of insufficient resources, the notification information is used to notify the network element to switch the configuration strategy of the CG from configuration strategy 2 to configuration strategy 3.
[0148] For example, the message generated by the UE and including the notification information may be, for example, an uplink control message (UCI), a CG-UCI message, UE assistance information (UAI), or a MAC-CE message. In actual application, the message may also be other types of messages, which is not limited in this embodiment.
[0149] Taking the UCI message as an example, a new bit field can be defined in the UCI message. This can be defined based on the reserved field in the UCI message, and the bit field can include one or more bits. In this way, when generating the UCI message, the UE can use the values of one or more bits included in the bit field as notification information. Alternatively, a bitmap can be defined in the UCI message, and the value of the bitmap can be used as notification information. These implementations are described below.
[0150] In the first implementation, a new "Cancle CG Occasion Indicator" field is defined in the UCI message. This field may include one bit. When the value of this field is 1, it can be used to notify the network element that one (or more) of the N CGs configured in a data transmission cycle are not used by the UE. When the value of this field is 0, it indicates that the UE uses all of the N CGs.
[0151] Specifically, which CG(s) the UE cancels can be pre-defined, such as canceling the last CG of N CGs (or canceling the last two CGs) by default. Alternatively, the UE can select a configuration strategy with a smaller number of CG configurations from a plurality of configuration strategies pre-provided by the network element for the UE to configure the number of CGs that the UE has in a data transmission cycle, thereby canceling some of the CGs currently configured for the UE (the number of CGs corresponding to the selected configuration strategy is less than the number of CGs that have been configured).
[0152] Similarly, a new "increase CG occasion indicator" field can be newly defined in the UCI message, and when the value of this field is 1, it can be used to notify the network element to increase the number of CGs configured for the UE in a data transmission period, such as notifying the network element to add one (or more) CGs, etc.; when the value of this field is 0, it indicates that the configured N CGs can support the UE to send all data to the network element.
[0153] In the second implementation, a new "CG occasion indicator" field is defined in the UCI message, and the field may include 2 bits. Moreover, when the value of the field is "01", it can be used to notify the network element that one (or more) CGs among the N CGs configured in a data transmission period are not used by the UE. Among them, which CG (or CGs) the UE specifically cancels can be pre-defined. When the value of the field is "10", it can be used to notify the network element to increase the number of CGs configured for the UE in a data transmission period. When the value of the field is "00" or "11", it indicates that the UE uses N CGs to send all data to the network element.
[0154] In the third implementation, a bitmap for canceling CG is defined in the UCI message. Specifically, when generating the UCI message, the UE can use the value of the bitmap to indicate the cancellation operation and the identifier of the target CG to be canceled, thereby notifying the network element of one or more CGs canceled by the UE.
[0155] Example 1: Assuming that one or more consecutive CGs with a later timing are canceled by default, the network element can determine the first bit with a value of 0 based on the value of the bitmap in the UCI message, so that the network element can determine that the UE cancels the use of the CG corresponding to the bit and its subsequent CGs (that is, determines the target CG). At this time, the first bit with a value of 0 can be used as an identifier of the CG that the UE wants to cancel. For example, assuming that the network element configures 4 CGs for the UE under initial conditions, such as CG1 to CG4 as shown in Figure 5, when the UE cancels the use of CG3 and CG4 in Figure 5, the value of the bitmap field in the UCI message generated by the UE and sent to the network element can be "110", which is used to notify the network element that the third CG and subsequent CGs in the current data transmission cycle are canceled by the UE, that is, CG3 and CG4 are canceled by the UE.
[0156] Example 2: The bitmap in the UCI message includes multiple bits, and each bit in the multiple bits can respectively identify whether the UE cancels the use of each configured CG. For example, assuming that the network element configures 4 CGs for the UE under initial conditions, such as CG1 to CG4 as shown in Figure 5, then when the field of the bitmap in the UCI message sent by the UE to the network element is "1010", since the values of the second and fourth bits are 0, the value of the bitmap can notify the network element that the second and fourth CGs are canceled by the UE during the current data transmission cycle, that is, CG1 to CG4 are canceled by the UE.
[0157] Example 3: The bitmap in the UCI message is a 2-level bitmap, that is, the first part of the bits in the bitmap (the first-level bits) can be used to notify the network element that the UE cancels the use of some of the configured CGs (the value of the first part of the bits is the first value) or requests to increase the number of CGs (the value of the first part of the bits is the second value), and the second part of the bits in the bitmap (the second-level bits) can be used to indicate the number of CGs involved (such as indicating the number of CGs to be canceled or the number of CGs to be increased). For example, the bitmap in the UCI message may include 4 bits, of which the first and second bits can be used to indicate the operation on the CG. For example, when the values of the first two bits are "01", it indicates that the operation on the CG is specifically to cancel the CG; when the values of the first two bits are "10", it indicates that the operation on the CG is specifically to increase the number of CGs; when the values of the first two bits are "11", it indicates that the operation on the CG is specifically to switch the configuration of the number of CGs. In addition, when the UE cancels the use of some CGs, the third and fourth bits can be used to indicate the number of CGs canceled by the UE. For example, when the value of the last two bits is "00", it indicates that the number of CGs that the UE has canceled is 1; when the value of the last two bits is "01", it indicates that the number of CGs that the UE has canceled is 2; when the value of the last two bits is "10", it indicates that the number of CGs that the UE has canceled is 4; when the value of the last two bits is "11", it indicates that the number of CGs that the UE has canceled is 8. Among them, when some bits in the bitmap indicate a "cancel" operation, the remaining bits can also be used to identify the CGs that need to be canceled (for details, please refer to the relevant descriptions in Example 1 and Example 2). Similarly, when the UE requests to increase the number of CGs or switch the number of CGs, the third bit and the fourth bit can be used to indicate the number of CGs that the UE requests to increase, or to indicate the number of CGs after switching the configuration policy.
[0158] In the fourth implementation, the communication information may specifically be the number M of CGs, where M is a positive integer greater than 1, indicating the number of CGs that the UE expects to activate within a data transmission cycle included in the target CG configuration. In this way, the subsequent network element may compare whether the number M of CGs included in the communication information is consistent with the number N of CGs configured for the UE. If they are not consistent, it indicates that the UE requests to cancel the use of some of the configured CGs or requests to increase CGs. Specifically, when M is greater than N, it indicates that the notification information is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration, and the number of CGs increased is (MN); when M is less than N, it indicates that the notification information is used to notify the network element that some of the N CGs within a data transmission cycle included in the target CG configuration are not used by the UE, and the number of unused CGs is (NM). If they are consistent, it indicates that the UE does not request to adjust the CG.
[0159] It is worth noting that the above-mentioned implementation examples of the UE sending notification information to the network element are only some exemplary explanations. In other embodiments, the UE may also send notification information to the network element based on other methods, such as sending notification information to the network element by combining the above-mentioned multiple implementation examples, or sending other types of messages (including notification information) such as MAC CE messages and UAI messages to the network element, and carrying notification information by adding some fields or redefining some fields in the message.
[0160] In this way, since the notification information sent by the UE to the network element based on the current CG configuration can reflect the UE's usage requirements for the target CG configuration, the network element can grasp the UE's usage requirements for the CG based on the notification information, which is beneficial for the subsequent network element to improve the rationality of CG configuration for the UE based on the notification information. For example, after the subsequent network element reasonably adjusts the number of CGs and the starting time configured for the UE, the UE can just send all the data required to be transmitted in the current data transmission cycle to the network element based on the configured CG, thereby meeting the UE's demand for wireless resources in the process of interacting with the network element. At the same time, it also avoids the situation where the wireless resources corresponding to some CGs are idle in the current data transmission cycle, thereby avoiding resource waste. In this way, when the network element can realize normal interaction with the UE in the communication frame of the XR service scenario, the rationality of the network element configuring wireless resources for the UE is improved.
[0161] The above mainly introduces the specific implementation of the UE sending notification information for the target CG configuration to notify the network element to adjust the number of CGs within the data transmission period included in the target CG configuration. In actual application, the network element can provide one or more CG configurations for the UE. When the network element provides multiple CG configurations, the UE can indicate to the network element which CG configuration the notification information is currently being sent.
[0162] In the first implementation example, the notification information sent by the network element to the UE may include a target field, and the target field may include one or more bits, so that the target field can be used to identify the target CG configuration among multiple CG configurations. For example, assume that the network element provides three CG configurations for the UE, namely CG configuration 1, CG configuration 2, and CG configuration 3. Then, the target field may include two 2 bits, and when the value of the target field is "00", it can indicate CG configuration 1; when the value of the target field is "01", it can indicate CG configuration 2; when the value of the target field is "10", it can indicate CG configuration 3.
[0163] In the second implementation example, the UE can use the CG used to send notification information to the network element to identify the target CG configuration. Specifically, when the UE needs to adjust the CG within the data transmission period included in the target CG configuration, the UE can send notification information to the network element based on the first CG within the data transmission period included in the target CG configuration. The first CG is one of the multiple CGs within the data transmission period. In this way, the network element can determine the CG configuration of the CG (the CG configuration is also the above-mentioned target CG configuration) based on the CG corresponding to the wireless resource used to receive the notification information, and then the network element can determine that the UE sends notification information for the CG within the data transmission period included in the CG configuration. Optionally, the network element can also send notification information to the network element based on other CGs within the data transmission period, such as the second CG, the third CG, etc.
[0164] The above two implementation methods are only used as some exemplary explanations. In actual application, the UE and the network element can also determine based on other methods which CG configuration the UE sends notification information for. This embodiment does not limit this.
[0165] It is worth noting that the UE sends notification information to the network element in order to inform the network element that some CGs have been deactivated by the UE so that the network element can manage the radio resources of these CGs, or to notify the network element to request the addition of CGs so that the network element can schedule more CGs or dynamic authorization (DG) for the network element. Therefore, the UE can send notification information to the network element before the start time of the deactivated CGs (CG excess) or before the end time of the last CG (CG shortage).
[0166] Specifically, the UE determines, based on the relevant information corresponding to the N CGs and the size of the wireless resources, that all data transmissions can be completed based on the first a CGs (a is less than N) in the current data transmission cycle. Then, the wireless resources of the remaining b CGs will be idle in the data transmission cycle (a+b=N). The UE can send notification information to the network element at a target time before the start time of the remaining b CGs. There is a time interval T between the target time and the start time of the (a+1)th CG. In this way, the network element can have enough time within the time interval T to dynamically schedule the wireless resources of the b CGs configured for the UE to other UEs for data transmission, thereby effectively improving the utilization of the wireless resources. The duration of the time interval T can be greater than the preset duration, such as being greater than the duration of the timing advance (TA).
[0167] The target moment can be, for example, any moment within the time period corresponding to the first CG, that is, in the process of the UE sending data to the network element based on the first CG, it can also send notification information to the network element. As shown in Figure 5b, the UE can send notification information to the network element within the time period corresponding to CG1 to notify the network element that CG4 is canceled by the UE. Alternatively, the target moment can be any moment within the time period corresponding to m CGs before the (a+1)th CG, that is, the network element is notified m times in advance of the time interval between CGs to cancel the use of the wireless resources corresponding to the remaining b CGs, where m is a positive integer greater than or equal to 1.
[0168] For another example, when the UE determines that it is difficult to transmit all data to the network element in the current data transmission cycle based on the relevant information corresponding to N CGs and the size of the wireless resources, it may send a notification message to the network element before reaching the start time of the last CG among the N CGs. The specific implementation method of the moment when the UE sends the notification message can refer to the description of the target moment for sending the notification message, which will not be repeated here. In this way, the network element can have enough time to send a control message to the UE to increase the number of CGs allocated to the UE within the time interval between the target moment and the end moment of the last CG. At this time, the UE has M CGs (M is greater than N) in one data transmission cycle. Alternatively, the network element can have enough time in the time interval to schedule DGs for the UE in the data transmission cycle, so that the UE can send data to the network element based on N CGs and dynamically scheduled DGs in one data transmission cycle. In this way, the UE can send data to the network element based on a larger number of CGs in the current data transmission cycle to meet the data transmission needs of the UE.
[0169] In a further possible implementation, after receiving the notification information sent by the UE, the network element can manage the wireless resources of the target CG that has been canceled by the UE according to the notification information, or configure resources for the UE according to the notification information. Specifically, the network element can dynamically schedule the wireless resources of the target CG that has been canceled by the UE according to the notification information, or can statically adjust the CG configuration of the UE, or can dynamically adjust the CG configuration. These are described in detail below.
[0170] When the network element dynamically schedules the radio resources of the target CG that is canceled by the UE, this embodiment may further include:
[0171] S403a: The network element does not detect the data sent by the UE on the wireless resources of the target CG that has been deactivated.
[0172] It can be understood that since the UE cancels the use of the target CG, the UE will not use the wireless resources corresponding to the target CG to send data to the network element. Therefore, after the network element determines the target CG based on the notification information, it may not search on the wireless resources of the target CG to determine whether the UE sends data.
[0173] S404a: The network element dynamically schedules the wireless resources of the unused target CG to other UEs.
[0174] In this way, the wireless resources of the target CG will not be idle, thereby avoiding the waste of the wireless resources of the target CG and improving the utilization of wireless resources. At this time, the CG configuration of the UE remains unchanged, that is, in the next data transmission cycle included in the target CG configuration, the UE still has N CGs to send data to the network element.
[0175] After executing step S403a, the network element may choose to continue executing step S404a, or may not execute step S404a, which is not limited here.
[0176] When the network element statically adjusts the CG configuration of the UE, this embodiment may further include:
[0177] S403b: The network element sends a control message to the UE, where the control message is used to adjust N CGs within a data transmission period included in the target CG configuration for the UE to M CGs, where M is a positive integer different from N.
[0178] In this embodiment, the network element can determine the adjustment strategy for the CG configuration based on the notification information sent by the UE, such as increasing the number of currently configured CGs or reducing the number of currently configured CGs, etc., and then generate a corresponding control message based on the adjustment strategy and send it to the UE.
[0179] Exemplarily, the control message sent by the network element may be, for example, a DCI message, which may carry the adjusted number M of CGs, so as to adjust the number of CGs in a data transmission cycle configured for the UE from N to M, where M is not equal to N. The specific implementation method of the network element sending the control message to the UE can be found in the aforementioned description of the relevant parts regarding the network element sending the DCI message to the UE, which will not be repeated here.
[0180] In this embodiment, the network element may send a control message to the UE within the data transmission period in which the notification information sent by the UE is received, so as to adjust the number of CGs within the data transmission period.
[0181] It should be noted that the above-mentioned implementation method of adjusting the number of CGs that the UE has in a data transmission cycle is only for illustrative purposes. In other embodiments, the network element may also use other methods to adjust the number of CGs.
[0182] S404b: Based on the starting time of the M CGs, the UE uses the wireless resources of the M CGs to transmit data to the network element.
[0183] It can be understood that after the number of CGs is adjusted from N configured in the initial state to M, the UE can use the wireless resources allocated to the M CGs to send data to the network element during the time period corresponding to the M CGs. Since the UE can just send all the data required to be sent in the current data transmission cycle to the network element during the time period corresponding to the M CGs, the demand for wireless resources in the process of UE sending data is met. At the same time, it also avoids the situation where the wireless resources corresponding to some CGs are idle during the current data transmission cycle, thereby avoiding resource waste. In this way, when the network element can realize normal interaction with the UE in the communication frame of the XR service scenario, the rationality of the network element configuring wireless resources for the UE is improved.
[0184] When the network element dynamically adjusts the CG configuration of the UE, this embodiment may further include:
[0185] S403c: The network element sends a DCI message to the UE, which is used to configure a DG for the UE during the current data transmission cycle. The amount of data transmitted by the DG supports the UE, which matches the amount of data transmitted by the UE supported by the increased number of CGs indicated in the notification information previously sent by the UE.
[0186] When the UE requests to increase the number of UEs during the current data transmission cycle, the network element can estimate the amount of data that the UE needs to send based on the number of CGs requested to be increased indicated by the notification information, and select idle wireless resources from the resource pool based on the amount of data.
[0187] Then, the network element can calculate the duration of time that the UE uses the wireless resource after the wireless resource is scheduled to the UE in the current data transmission period based on the size of the wireless resource and the amount of data that the UE needs to send, that is, the amount of data that the UE can transmit based on the dynamically adjusted wireless resource is greater than or equal to the amount of data that can be transmitted by the number of CGs requested by the UE. Thus, the network element can generate a DCI message based on the wireless resources required for dynamic scheduling, and the DCI message is used to configure a dynamic grant (DG) for the UE in the current data transmission period. The wireless resources in the DG are the wireless resources dynamically scheduled to the UE by the network element.
[0188] S404c: Based on the start times corresponding to the configured N CGs and the start time of the DG, the UE transmits data to the network element using the wireless resources corresponding to the N CGs and the wireless resources of the DG.
[0189] It can be understood that after the DG is dynamically configured for the UE, the UE can have sufficient radio resources to send all the data required to be sent in the current data transmission cycle to the network element based on the N CGs and the DG, thereby meeting the UE's demand for radio resources during the data transmission process. In this way, when the network element can realize normal communication frames in the XR service scenario with the UE, the rationality of the network element's configuration of radio resources for the UE is improved.
[0190] It is worth noting that after the network element configures DG for the UE, the UE still transmits data between N CGs and the network element during the next data transmission cycle included in the target CG configuration, that is, DG is only valid during the current data transmission cycle.
[0191] This embodiment mainly introduces static or dynamic adjustment of CG configuration within the current data transmission cycle, including the network element canceling part of the CG configured for the UE, increasing the number of CGs configured for the UE, or the network element configuring DG for the UE. In other embodiments, the network element may also adjust the number of configured CGs or increase DG for the UE within the next data transmission cycle. At this time, there is no limitation on the time when the UE sends notification information to the network element within the current data transmission cycle. For example, the UE may send notification information to the network element at the end time of the Nth CG, or send notification information to the network element at the start time of the 1st CG, etc.
[0192] Furthermore, the UE can send data to the network element in each data transmission period included in the target CG configuration based on the same number of CGs. Alternatively, the UE can also send data to the network element in multiple data transmission periods included in the target CG configuration based on the periodically changing number of CGs. For example, the network element can configure the number of CGs for the UE based on the cycle of {6 CGs, 4 CGs, 2 CGs}. Specifically, the network element can configure the UE to have 6 CGs in the first data transmission period included in the target CG configuration, 4 CGs in the second data transmission period included in the target CG configuration, 2 CGs in the third data transmission period included in the target CG configuration, 6 CGs in the fourth data transmission period included in the target CG configuration, and so on.
[0193] When the UE requests to adjust the number of CGs to 5 during the first data transmission cycle included in the target CG configuration, the CG configuration executed by the network element for the UE is {5 CGs, 4 CGs, 2 CGs}. Furthermore, if the UE notifies the network element to cancel the use of the last CG during the second data transmission cycle, the CG configuration executed by the network element for the UE can be changed to {5 CGs, 3 CGs, 2 CGs}.
[0194] The above process mainly introduces the specific implementation process of the UE sending notification information for a CG configuration (i.e., the target CG configuration). In actual application, the network element can provide multiple CG configurations for the UE. In addition, the UE can send a separate notification message for each CG configuration to inform the network element of the UE's CG usage within the data transmission period included in each CG configuration.
[0195] Alternatively, the UE may send one notification message for multiple CG configurations, and based on the one notification message, notify the network element of the UE's CG usage within the data transmission period included in each CG configuration.
[0196] Specifically, the notification information sent by the UE to the network element may include the identifier of the CG configuration and the notification content corresponding to each CG configuration of the UE. The notification content can reflect the CG usage of the UE within the data transmission period included in the CG configuration. For example, the notification content can reflect that the UE cancels the use of some CGs or requests to increase the number of CGs in the data transmission period included in each CG configuration. For its specific implementation method, please refer to the aforementioned description of the adjustment of the number of CGs in the data transmission period included in the target CG configuration, which will not be repeated here. For example, the UE can send notification information including {{CG configuration id: notification content},…,{CG configuration id: notification content}} to the network element.
[0197] For example, assuming that the network element provides three CG configurations for the UE, namely CG configuration 1, CG configuration 2, and CG configuration 3 as shown in Figure 5c, the notification information sent by the UE to the network element may include {{CG configuration 1: notification content 1}, {CG configuration 2: notification content 2}, {CG configuration 3: notification content 3}}. In this way, the network element can determine, based on the notification content 1 in the notification information, that the UE cancels the use of CG4 during the data transmission period included in CG configuration 1, thereby managing the wireless resources during the data transmission period included in CG configuration 1 (such as reclaiming the wireless resources of CG4); based on the notification content 2, determine that the UE cancels the use of CG4 during the data transmission period included in CG configuration 2, thereby managing the wireless resources during the data transmission period included in CG configuration 2; based on the notification content 3 in the notification information, determine that the UE cancels the use of CG4 during the data transmission period included in CG configuration 3, thereby managing the wireless resources during the data transmission period included in CG configuration 3.
[0198] Exemplarily, the notification information sent by the UE may include a bit field or a bit map, and the value of the bit field or the value of the bit map may be used to indicate the number of CGs in a data transmission cycle respectively included in each CG configuration. The value in the bit field or the bit map may indicate the above-mentioned {{CG configuration id: notification content},…,{CG configuration id: notification content}}.
[0199] In a specific implementation, the bit field or bitmap includes at least a first field (including multiple bits) and a second field (including multiple bits), wherein the first field is used to identify each CG configuration among multiple CG configurations, and the second field is used to indicate the number of CGs in a data transmission cycle respectively included in the multiple CG configurations (i.e., the above-mentioned notification content). For example, the first field may include multiple bits for respectively identifying each CG configuration, and the second field may include multiple bits for respectively knowing each notification content.
[0200] In the XR service scenario, the network element can provide different CG configurations for the UE based on different types of communication frames (including I frames, P frames, and B frames) within the data transmission period for transmitting different types of communication frames. For example, the network element can have CG configuration 1, CG configuration 2, and CG configuration 3, wherein the number of CGs configured for the UE in CG configuration 1 is 4 (the largest number), and the transmission performance of the wireless resources corresponding to the CG is the highest; the number of CGs configured for the UE in CG configuration 3 is 2 (the least number), and the transmission performance of the wireless resources corresponding to the CG is the lowest. As shown in Figure 6, when I frames are exchanged between the network element and the UE, the network element can configure the UE based on CG configuration 1; when P frames are exchanged between the network element and the UE, the network element can configure the UE based on CG configuration 2; when B frames are exchanged between the network element and the UE, the network element can configure the UE based on CG configuration 3. At this time, during the first data transmission cycle, the UE uses the wireless resources with the highest transmission performance to transmit I frame data to the network element within the time period corresponding to 4 CGs; during the second data transmission cycle, the UE uses the wireless resources with medium transmission performance to transmit P frame data to the network element within the time period corresponding to 3 CGs; during the third data transmission cycle, the UE uses the wireless resources with the lowest transmission performance to transmit B frame data to the network element within the time period corresponding to 2 CGs; during the fourth data transmission cycle, the UE uses the wireless resources with the highest transmission performance to transmit I frame data to the network element within the time period corresponding to 4 CGs, and so on. In this way, the UE can use different wireless resources (such as frequency domain resources) to send different types of communication frames in different numbers of CGs, thereby improving the flexibility and rationality of the network element in configuring wireless resources for the UE, which is conducive to further improving the utilization rate of network element resources, such as wireless resources in different frequency domains can be fully utilized.
[0201] Accordingly, if the UE sends a notification message to the network element during the data transmission period of transmitting an I frame to the network element, in order to notify the network element that some of the configured CGs are canceled by the UE, or to notify the network element to increase the number of CGs configured for the UE, then the network element can adjust the number of CGs during the data transmission period of transmitting the I frame from the UE to the network element by sending a control message to the UE, such as adjusting the number of CGs from N to M, and will not adjust the number of CGs during the data transmission period of transmitting other types of communication frames from the UE. At this time, the number of CGs during the data transmission period of transmitting the P frame from the UE to the network element and the number of CGs during the data transmission period of transmitting the B frame from the UE to the network element do not change. Still taking the configuration shown in Figure 6 as an example, assuming that the network element adjusts the number of CGs in the data transmission period in which the UE transmits I frames to the network element from 4 to 3 based on the notification information sent by the UE, then the UE uses the wireless resources with the highest data transmission performance to send data to the network element in the time periods corresponding to the three CGs in the first data transmission period and the fourth data transmission period (and the subsequent 3n+1th data transmission period). The number of CGs in the data transmission period in which the UE transmits P frames to the network element (such as the second data transmission period) remains at 3, and the number of CGs in the data transmission period in which the UE transmits B frames to the network element (such as the third data transmission period) remains at 2.
[0202] In one possible implementation, when the UE sends different types of communication frames to the network element based on different CG configurations, the network element can also batch adjust the UE's CG configuration based on the CG group. The CG group includes multiple CG configurations. The CGs included in a data transmission cycle in different CG configurations may be the same, or may differ in quantity or wireless resources.
[0203] Referring to Figure 7, a flow chart of another communication method provided by the present application is shown. In the communication method shown in Figure 7, the UE can periodically send I frames, P frames, and B frames to the network element in sequence, and the network element can provide multiple CG groups to configure the number of CGs (and wireless resources) corresponding to the UE when sending I frames, P frames, and B frames. As shown in Figure 7, the method may specifically include:
[0204] S701: The network element sends an RRC message to the UE, which includes multiple CG groups. Each CG group is used to configure the number of CGs in the data transmission period included in each CG configuration where the UE sends I frame, P frame, and B frame data. The RRC message is used to configure the data transmission period of the UE.
[0205] The CG group defines the identifier of the CG configuration and the number of CGs, and its format can be {{CG configuration id, CG number}, {CG configuration id, CG number}, ..., {CG configuration id, CG number}}. The CG configuration id is used to identify the CG configuration corresponding to the different types of communication frames sent by the UE, and the CG number represents the number of CGs that the UE has in one data transmission cycle. The number of CGs configured by the network element for the UE when sending different types of communication frames can be the same or different; the wireless resources used can be the same or different.
[0206] For example, assume that the network element can support 2 CG groups. Among them, CG group 1 is specifically {{CG configuration 1,6}, {CG configuration 2,4}, {CG configuration 3,2}}, which indicates that the UE has 6 CGs in the data transmission period included in CG configuration 1 for sending I frame data, 4 CGs in the data transmission period included in CG configuration 2 for sending P frame data, and 2 CGs in the data transmission period included in CG configuration 3 for sending B frame data. Among them, CG group 2 is specifically {{CG configuration 1,4}, {CG configuration 2,2}, {CG configuration 3,1}}, which indicates that the UE has 4 CGs in the data transmission period included in CG configuration 1 for sending I frame data, 2 CGs in the data transmission period included in CG configuration 2 for sending P frame data, and 1 CG in the data transmission period included in CG configuration 3 for sending B frame data.
[0207] S702: The network element sends a DCI message to the UE. The DCI message includes the identifier of the CG group. The DCI message is used to activate one or more CGs within the data transmission period included in each CG configuration in the CG group.
[0208] When the UE receives the RRC message and the DCI message, it can determine the CG group based on the identifier of the CG group carried in the DCI message, and according to the number of CGs in a data transmission cycle included in each CG configuration defined in the CU group, activate the corresponding number of CGs in the data transmission cycle in which the UE sends different types of communication frames (including determining the starting time and wireless resources of each CG, etc.). Among them, the specific implementation method of the network element activating the CGs that the UE has in a data transmission cycle can be found in the aforementioned related descriptions and will not be repeated here.
[0209] Among them, when transmitting different types of communication frames, the UE can use wireless resources with the same transmission performance or wireless resources with different transmission performance. Therefore, the network element can set different CG configurations (CG configuration 1, CG configuration 2 and CG configuration 3) for different types of communication frames (I frames, P frames and B frames) to be transmitted by the UE, and activate several CGs within the data transmission period included in each CG configuration by issuing multiple different DCIs.
[0210] S703: The UE determines the starting time and wireless resources of each CG within the data transmission period included in each CG configuration based on the RRC message and the DCI message.
[0211] S704: The UE sends a UCI message to the network element, which includes notification information. The notification information is used to notify the network element that there is a target CG in the multiple CGs within the data transmission period included in each CG configuration that is not used by the UE, or the notification information is used to notify the network element to increase the number of CGs within the data transmission period included in each CG configuration.
[0212] In this embodiment, the UE can judge whether there is a problem of resource waste or resource shortage in the data transmission period included in each CG configuration of the UE according to the number of CGs in the data transmission period included in each CG configuration of the UE configured by the current network element and the transmission performance of the wireless resources. Based on the judgment result, it is determined whether the number of currently configured CGs needs to be increased in the data transmission period included in each CG configuration, or whether some of the configured CGs need to be cancelled by the UE, etc., and further send corresponding notification information to the network element.
[0213] In a possible implementation, the UE may first execute the process of sending I frame, P frame and B frame data once in the first data transmission cycle to the third data transmission cycle respectively, and thereby determine whether to request the network element to switch the CG group based on the execution status of the UE in these three data transmission cycles.
[0214] Specifically, assuming that the network element configures the number of CGs of the UE in each data transmission cycle based on CG group 1 under initial conditions, and if the UE has the problem of some CG radio resources being idle in these three data transmission cycles, the UE can send notification information before the end of the third data transmission cycle. The notification information is used to notify the network element to perform CG configuration on the UE based on CG group 2. In this way, after the network element configures the UE with CG based on CG group 2, the UE sends I frame data to the network element based on the radio resources of 4 CGs in the fourth data transmission cycle (that is, the second data transmission cycle for sending I frame data); the UE sends P frame data to the network element based on the radio resources of 2 CGs in the fifth data transmission cycle (that is, the second data transmission cycle for sending P frame data); and the UE sends B frame data to the network element based on the radio resources of 1 CG in the sixth data transmission cycle (that is, the second data transmission cycle for sending B frame data).
[0215] As an example, when the configuration made by the network element for the UE based on the currently selected CG group does not match the actual usage requirements of the UE, the UE can generate and send a notification message including the identifier of the target CG group (such as the identifier of CG group 2 mentioned above). The target CG group is one of the multiple CG groups that the network element can support (and is not consistent with the CG group currently selected by the network element). In this way, the subsequent network element can configure the UE accordingly based on the multiple CG configurations included in the target CG group based on the identifier.
[0216] As another example, the notification information sent by the UE to the network element may include a bit field or a bit map, so that the network element can configure the one or more CGs that the UE has in the data transmission periods respectively included in multiple CG configurations according to the values of the multiple bits included in the bit field or the bit map. Among them, the way in which the network element configures the UE to have several CGs in the data transmission period included in a CG configuration based on the bit field or the bit map can be found in the description of the relevant parts mentioned above and will not be repeated here, so that the network element can configure one or more CGs in the data transmission period included in each CG configuration one by one according to the bit field or the bit map in a similar manner.
[0217] In actual application, the network element can provide more CG groups based on finer-grained configuration. For example, the network element can also provide CG group 3: {{CG configuration 1,4}, {CG configuration 2,4}, {CG configuration 3,2}}, etc., so as to achieve fine-grained adjustment of the UE's CG configuration.
[0218] It can be understood that the above is explained using the example of resource waste in the UE during the data transmission period. When the UE has insufficient wireless resources in the th data transmission period to the 3rd data transmission period, the notification information sent by the UE to the network element is used to notify the network element to increase the number of CGs configured for the UE in the data transmission period included in each CG configuration. For example, the network element can also provide CG group 4: {{CG configuration 1,8}, {CG configuration 2,6}, {CG configuration 3,4}}, etc. Then, when the network element performs CG configuration on the UE based on CG group 1 and there is a problem of insufficient wireless resources, the notification information sent by the UE to the network element is used to notify the network element to perform CG configuration on the UE based on CG group 4.
[0219] S705: The network element sends a new DCI message to the UE based on the notification information. The new DCI message includes the identifier of the target CG group and is used to activate each CG within the data transmission period included in each CG configuration included in the target CG group.
[0220] In this way, the network element can reconfigure the UE to use several CGs within the data transmission period included in each CG configuration based on the target CG group.
[0221] S706: During the data transmission period included in each CG configuration, the UE transmits data to the network element based on the starting time of several CGs in the data transmission period and using the wireless resources of the several CGs.
[0222] In this way, the UE can interact with the network element based on the re-determined CG in each data transmission period, thereby improving the rationality of the network element's allocation of wireless resources.
[0223] It is worth noting that the communication method shown in FIG7 is only an exemplary description. In actual application, the above-mentioned multiple implementation examples can also be combined to achieve refined control of the CG configuration of the UE by the network element. For example, in other possible embodiments, if the network element provides two configurations of {6 CGs, 4 CGs, 2 CGs} and {4 CGs, 2 CGs, 1 CG}, the network element can configure the UE based on the strategy of {{6 CGs, 4 CGs, 2 CGs}, {4 CGs, 2 CGs, 1 CG}}. At this time, the UE has 6 CGs in the first data transmission cycle, 4 CGs in the second data transmission cycle, 2 CGs in the third data transmission cycle, 4 CGs in the fourth data transmission cycle, 2 CGs in the fifth data transmission cycle, 1 CG in the sixth data transmission cycle, 6 CGs in the seventh data transmission cycle, and so on.
[0224] The embodiments shown in Figures 4 and 7 above mainly describe the process of the UE requesting the network element to adjust the CG configuration. In other possible embodiments, the UE may also directly request the network element for a corresponding number of CGs (and corresponding wireless resources) according to the UE's needs after establishing a connection with the network element. The following, in conjunction with Figure 8, details the process of the UE instructing the network element to allocate a corresponding number of CGs to it and sending data to the network element.
[0225] Referring to Figure 8, a flow chart of another communication method provided by an embodiment of the present application is shown. As shown in Figure 8, the method may specifically include:
[0226] S801: After establishing a connection with a network element, the UE sends a notification message to the network element. The notification message is used to notify the network element to configure L CGs for the UE within a data transmission period included in the target CG configuration, where L is a positive integer.
[0227] Among them, the network element can provide one or more CG configurations, and the UE can notify the network element to configure a certain number of CGs within the data transmission period included in one CG configuration, or to configure a certain number of CGs within the data transmission period included in each CG configuration in multiple CG configurations. For ease of understanding, this embodiment is illustrated by taking the example of the UE notifying the network element to configure the CG within the data transmission period included in the target CG configuration in multiple CG configurations.
[0228] In this embodiment, the UE can request corresponding CG configuration from the network element based on the data transmission requirements between it and the network element, so that the UE can complete complete data transmission between it and the network element within a certain time period based on the wireless resources (such as frequency domain resources) corresponding to the CG configuration.
[0229] Exemplarily, the UE may generate a UAI message including the notification information and send the UAI message to the network element. The UAI message may define a "CG-AssistantceConfig" parameter, and the value of the "CG-AssistantceConfig" parameter may be used as the notification information.
[0230] For example, when the value of the "CG-AssistantceConfig" parameter is 4, that is, the value of L is 4, it is used to indicate that the network element configures 4 CGs for the UE within a data transmission cycle included in the target CG configuration. At this time, the UE can use the corresponding wireless resources to send data to the network element within the time period corresponding to the 4 CGs in each data transmission cycle.
[0231] For another example, when the value of the "CG-AssistantceConfig" parameter is {6, 4, 2}, it indicates that the value of L in the first data transmission cycle included in the target CG configuration is 6, the value of L in the second data transmission cycle is 4, and the value of L in the third data transmission cycle is 2. Then, in the first data transmission cycle (and the subsequent fourth data transmission cycle, etc.) included in the target CG configuration, the UE can use the corresponding wireless resources in the time period corresponding to the six CGs to send data to the network element; in the second data transmission cycle (and the subsequent fifth data transmission cycle, etc.) included in the target CG configuration, the UE can use the corresponding wireless resources in the time period corresponding to the four CGs to send data to the network element; in the third data transmission cycle (and the subsequent sixth data transmission cycle, etc.) included in the target CG configuration, the UE can use the corresponding wireless resources in the time period corresponding to the two CGs to send data to the network element.
[0232] For another example, the value of the "CG-AssistantceConfig" parameter can be used as an identifier of the target CG group to notify the network element to configure the UE accordingly based on the target CG. Specifically, the network element can provide 2 CG groups. Among them, CG group 1 is specifically {{CG configuration 1,6}, {CG configuration 2,4}, {CG configuration 3,2}}, indicating that the UE has 6 CGs in the data transmission period included in CG configuration 1 (for transmitting I frame data), 4 CGs in the data transmission period included in CG configuration 2 (for transmitting P frame data), and 2 CGs in the data transmission period included in CG configuration 3 (for transmitting B frame data). CG group 2 is specifically {{CG configuration 1,4}, {CG configuration 2,2}, {CG configuration 3,1}}. Assuming that the value of the "CG-AssistantceConfig" parameter is 2, the UE can use the value of the "CG-AssistantceConfig" parameter to notify the network element to configure the UE accordingly based on CG group 2 (that is, the above-mentioned target CG group). The target CG configuration in this embodiment is one of the multiple CG configurations included in the target CG group.
[0233] S802: The network element sends a first control message to the UE according to the notification information. The first control message is used to configure a data transmission period of the UE.
[0234] Exemplarily, the first control message may be, for example, an RRC message.
[0235] The RRC message may carry a parameter for indicating a data transmission period, so that the UE can determine the duration of the data transmission period according to the parameter in the RRC message.
[0236] S803: The network element sends at least one second control message to the UE, where the at least one second control message is used to activate L CGs within a data transmission cycle included in the target CG configuration.
[0237] Specifically, the network element can send a second control message to the UE, and based on the second control message, enable the UE to activate L CGs within a data transmission cycle included in the target CG configuration, that is, to activate the wireless resources of the L CGs. For example, the UE can first calculate the starting time of the first CG within a data transmission cycle included in the target CG configuration based on a second control message, and then determine the time period corresponding to the first CG based on the starting time and the duration indicated in the second control message. Then, the UE calculates the starting time of the second CG based on the time interval between different CGs, and so on, until the starting time of the Lth CG is determined. In addition, the UE can determine the wireless resources corresponding to each CG based on the frequency domain resource information carried in the second control message, and the wireless resources corresponding to different CGs are consistent.
[0238] Alternatively, the network element may send multiple second control messages to the UE, and based on the multiple second control messages, enable the UE to activate L CGs within a data transmission period included in the target CG configuration. For example, the UE can calculate the starting time of the time period corresponding to the first CG within the data transmission period based on the first second control message received, and determine the wireless resources of the first CG based on the frequency domain resource information carried in the second control message. Similarly, the UE can calculate the starting time of the second CG based on the second second control message received, and so on, until the starting time of the Lth CG is calculated based on the Lth second control message.
[0239] S804: The UE determines the starting time and wireless resources of L CGs within a data transmission period included in the target CG configuration based on the first control message and at least one second control message.
[0240] S805: Based on the starting times corresponding to the L CGs, the UE uses the wireless resources corresponding to the L CGs to exchange data with the network element.
[0241] Since the various CGs allocated to the UE by the network element have been activated, that is, the wireless resources in each CG have been activated, the UE can use the activated wireless resources to transmit data to the network element within the corresponding time period. Specifically, the UE can use the wireless resources of the first CG to send data to the network element from the start time of the first CG, and end the data sending at the end time of the first CG. Then, when the start time of the second CG is reached, the UE uses the wireless resources of the second CG to start sending data to the network element until the end time of the second CG is reached. Similarly, the UE uses the wireless resources of the L CGs to send data to the network element within the time periods corresponding to the L CGs.
[0242] It is worth noting that in the embodiment shown in FIG8 , the example is taken as follows: the UE sends notification information corresponding to the target CG configuration to the network element. When the network element provides multiple CG configurations, the UE can send notification information separately for each CG configuration, or the notification information sent can be used to notify the network element to configure a certain number of CGs within the data transmission period included in each CG configuration. For example, the UE can send notification information including {{CG configuration id, CG number},…,{CG configuration id, CG number}} to the network element, so that the network element can configure the UE to have a corresponding number of CGs within the data transmission period included in each CG configuration according to the number of CGs corresponding to each CG configuration. For example, assuming that the network element supports providing three CG configurations for the UE, namely CG configuration 1, CG configuration 2 and CG configuration 3, the UE can send a notification message including {{CG configuration 1, Num1}, {CG configuration 2, Num2}, {CG configuration 3, Num3}} to the network element. Then, the network element can configure the number of CGs of the UE in the data transmission period included in CG configuration 1 as Num1, the number of CGs of the UE in the data transmission period included in CG configuration 2 as Num2, and the number of CGs of the UE in the data transmission period included in CG configuration 3 as Num3 according to the notification message. Among them, the specific implementation process of the network element configuring the number of CGs in the data transmission period included in each CG configuration can be found in the above description of the configuration of CGs in the data transmission period included in the target CG configuration, which will not be repeated here.
[0243] In the embodiments shown in Figures 4 to 8 above, the process of the UE notifying the network element of the CG usage within a data transmission period included in one or more CG configurations is mainly described for exemplary illustration. In other possible embodiments, the network element may notify the UE of relevant information of multiple CDAs within a data transmission period included in one or more SPS configurations.
[0244] In specific implementation, the network element can be used to determine the relevant information of N CDAs within a data transmission cycle included in the target SPS configuration configured for the UE, where the relevant information of the N CDAs includes the starting times corresponding to the N CDAs and the wireless resources corresponding to the N CDAs, where N is a positive integer; then, the network element can send notification information to the UE based on the relevant information of the N CDAs, and the notification information is used to notify the UE that the target CDA among the N CDAs within a data transmission cycle included in the target SPS configuration is not scheduled for use by the UE.
[0245] Among them, the UE may not detect the data sent by the network element on the wireless resources of the target CDA.
[0246] Optionally, the network element may dynamically schedule the radio resources of the target CDA to other UEs for use.
[0247] For example, when the network element sends notification information to the UE, it may specifically send a MAC-CE message or a DCI message including the notification information to the UE. In actual application, the message may also be other types of messages, which is not limited in this embodiment.
[0248] The above embodiment, in combination with FIG. 3 to FIG. 8 , introduces a communication method between a network element and a UE. Below, the structures of the network element and the UE are exemplarily introduced.
[0249] 9 , which shows a schematic structural diagram of a user equipment UE 900 , wherein the UE 900 includes:
[0250] A determination module 901 is configured to determine relevant information of N configuration authorization CGs configured for a data transmission period of the UE, where the relevant information of the N CGs includes the start times corresponding to the N CGs and the radio resources corresponding to the N CGs, where N is a positive integer;
[0251] Sending module 902 is used to send notification information to the network element based on the relevant information of N CGs, where the notification information is used to notify the network element that the target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the communication message is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
[0252] In a possible implementation manner, the UE 900 further includes:
[0253] A receiving module 903 is configured to receive a control message sent by a network element, where the control message is used to adjust N CGs in a data transmission cycle included in the target CG configuration to M CGs, where M is a positive integer different from N;
[0254] The sending module 902 is also used to perform data interaction based on the starting times corresponding to the M CGs and using the wireless resources corresponding to the M CGs.
[0255] In one possible embodiment, the notification information includes a bit field, and the value of the bit field is used to indicate that the target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the value of the bit field is used to instruct the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
[0256] In one possible implementation, the notification information is used to notify the network element that the target CG among the N CGs included in the target CG configuration within a data transmission cycle is not used by the UE. The notification information includes a cancellation operation and an identifier of the target CG. The cancellation operation is used to instruct the UE to cancel the use of the CG, and the identifier is used to indicate the target CG that is canceled by the UE.
[0257] In a possible implementation, the notification information includes a bitmap, and the value of the bitmap is used to indicate the target CG that is canceled by the UE.
[0258] In one possible embodiment, the notification information includes a bitmap. When the value of the first part of the bits in the bitmap is the first value, the first part of the bits is used to indicate a cancellation operation, and the value of the second part of the bits in the bitmap is used to indicate the target CG canceled by the UE.
[0259] In a possible embodiment, when the value of the first part of the bits in the bitmap is the second value, the first part of the bits is used to indicate an increase operation, the increase operation is used to indicate the increase of the CG within a data transmission cycle included in the target CG configuration, and the value of the second part of the bits in the bitmap is used to indicate the number of increased CGs.
[0260] In a possible implementation, the notification information includes a number M, where M is used to indicate the number of CGs within a data transmission cycle included in the target CG configuration, and M is a positive integer.
[0261] In a possible implementation, the notification information includes a target field, where the target field is used to identify a target CG configuration.
[0262] In one possible implementation, the UE sends notification information based on the first CG, and the target CG configuration is the CG configuration where the first CG is located.
[0263] In a possible implementation, the notification information is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration;
[0264] The UE900 also includes:
[0265] The receiving module 903 is configured to receive a downlink control message DCI message sent by a network element, where the DCI message is used to configure a dynamic permission DG within a data transmission period, where the amount of data transmitted by the UE supported by the DG matches the amount of data transmitted by the UE supported by the number of CGs increased as indicated by the notification information;
[0266] The sending module 902 is also used to interact with the network element based on the starting times corresponding to the N CGs and the starting times of the DG, using the wireless resources corresponding to the N CGs and the wireless resources of the DG.
[0267] In a possible implementation, the notification information is used to notify the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations, and the multiple CG configurations include a target CG configuration.
[0268] In a possible implementation, the notification information includes a bit field or a bit map, and the value of the bit field or the value of the bit map is used to instruct the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations.
[0269] In one possible embodiment, the first field in the bit field or bit map is used to identify each CG configuration in multiple CG configurations, and the second field in the bit field or bit map is used to indicate the number of CGs in a data transmission cycle respectively included in the multiple CG configurations.
[0270] In one possible embodiment, the notification information includes the identifier of the target CG group, the target CG group is one of multiple CG groups, each of the multiple CG groups includes multiple CG configurations, and the notification information is used to notify the network element to configure the number of CGs in a data transmission cycle respectively included in the multiple CG configurations based on the target CG group.
[0271] In a possible implementation manner, the notification information is used to notify the network element that a target CG among N CGs within a data transmission period included in the target CG configuration is not used by the UE;
[0272] Then, the sending module 902 is specifically configured to send notification information to the network element at the target time;
[0273] Among them, the target moment is any moment in the time period corresponding to the first CG among N CGs; or, the target moment is any moment in the time period corresponding to the m CGs before the first CG among the target CGs, and m is a positive integer greater than or equal to 1; or, the interval between the target moment and the starting moment of the first CG among the target CGs is greater than the preset duration.
[0274] In a possible implementation, the sending module 902 is specifically configured to:
[0275] Sending an uplink control message UCI to the network element, where the UCI includes notification information;
[0276] Alternatively, a medium access control layer control element MAC-CE message is sent to the network element, where the MAC-CE message includes notification information;
[0277] Alternatively, a user equipment assistance message UAI is sent to the network element, where the UAI includes notification information.
[0278] 10 , which shows a schematic structural diagram of a user equipment UE 1000 , wherein the UE 1000 includes:
[0279] A generating module 1001 is configured to generate notification information, where the notification information is used to notify a network element to configure L CGs for the UE within a data transmission period included in a target configuration authorization CG configuration, where L is a positive integer;
[0280] The sending module 1002 is used to send the notification information.
[0281] In a possible implementation manner, the UE 1000 further includes:
[0282] The receiving module 1003 is configured to receive a first control message sent by a network element, where the first control message is used to configure a data transmission period of the UE; and receive at least one second control message sent by the network element, where the second control message is used to activate L CGs within a data transmission period included in the target CG configuration.
[0283] The sending module 1001 is also used to perform data interaction based on the starting times corresponding to the L CGs and using the wireless resources corresponding to the L CGs.
[0284] In a possible implementation, the notification information is used to notify the network element to configure the number of CGs for the UE within a data transmission cycle respectively included in multiple CG configurations, and the multiple CG configurations include a target CG configuration.
[0285] In a possible implementation, the notification information includes an identifier of a target CG group, the target CG group is one of the multiple CG groups, each CG group in the multiple CG groups includes multiple CG configurations, and the multiple CG configurations include the target CG configuration;
[0286] The notification information is used to notify the network element to configure the number of CGs in a data transmission cycle included in each of the multiple CG configurations based on the target CG group.
[0287] In a possible implementation, the sending module 1001 is specifically configured to send a user equipment assistance message UAI to a network element, where the UAI includes notification information.
[0288] 11 shows a schematic diagram of the structure of a network element 1100, which includes:
[0289] The receiving module 1101 is configured to receive notification information, where the notification information is used to notify the network element that a target CG among N CGs included in a target CG configuration within a data transmission period is not used by the UE, or the notification information is used to notify the network element to increase the number of CGs included in the target CG configuration within a data transmission period;
[0290] The resource management module 1102 is used to manage the wireless resources of the target CG according to the notification information, or to configure resources for the UE according to the notification information.
[0291] In a possible implementation, the resource management module 1102 is specifically used to send a control message to the UE, where the control message is used to adjust N CGs within a data transmission cycle included in the target CG configuration to M CGs, where N is a positive integer and M is a positive integer different from N.
[0292] In a possible implementation, the resource management module 1102 is specifically used to dynamically schedule the wireless resources of the target CG to other UEs.
[0293] In a possible implementation, the communication message is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration;
[0294] Then, the resource management module 1102 is specifically used to send a downlink control message DCI message to the UE. The DCI message is used to configure the dynamic authorization DG during the data transmission period. The amount of data supported by the DG for UE transmission matches the amount of data supported by the UE transmission supported by the increased number of CGs indicated by the notification information.
[0295] 12 shows a schematic structural diagram of a network element 1200, which includes:
[0296] The receiving module 1201 is configured to receive notification information, where the notification information is used to notify the network element to configure L CGs for the UE within a data transmission period included in the target configuration authorization CG configuration, where L is a positive integer;
[0297] A sending module 1202 is configured to send a first control message to a UE, where the first control message is used to configure a data transmission period of the UE; and send at least one second control message, where the at least one second control message is used to activate L CGs within a data transmission period included in a target CG configuration;
[0298] The receiving module 1201 is also used to receive data transmitted based on the starting times corresponding to the L CGs and using the wireless resources corresponding to the L CGs.
[0299] In addition, an embodiment of the present application also provides a computer-readable storage medium, which stores instructions. When the computer-readable storage medium is run on one or more computing devices, the one or more computing devices execute the communication method described in the above embodiment.
[0300] In addition, embodiments of the present application further provide a computer program product. When the computer program product is executed by one or more computing devices, the one or more computing devices perform any of the aforementioned communication methods. The computer program product may be a software installation package. When any of the aforementioned communication methods is required, the computer program product may be downloaded and executed on a computer.
[0301] It should also be noted that the device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separate, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed across multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the present embodiment. In addition, in the drawings of the device embodiments provided in this application, the connection relationship between the modules indicates that there is a communication connection between them, which can be specifically implemented as one or more communication buses or signal lines.
[0302] Through the description of the above embodiments, those skilled in the art can clearly understand that the present application can be implemented by means of software plus necessary general hardware, and of course can also be implemented by special hardware including application-specific integrated circuits, special CPUs, special memories, special components, etc. In general, all functions performed by computer programs can be easily implemented with corresponding hardware, and the specific hardware structures used to implement the same function can also be diverse, such as analog circuits, digital circuits or special circuits, etc. However, for the present application, software program implementation is a better implementation method in most cases. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a readable storage medium, such as a computer's floppy disk, USB flash drive, mobile hard disk, ROM, RAM, magnetic disk or optical disk, etc., and includes a number of instructions to enable a computer device (which can be a personal computer, training equipment, or network equipment, etc.) to execute the methods described in each embodiment of the present application.
[0303] In the above embodiments, all or part of the embodiments may be implemented by software, hardware, firmware, or any combination thereof. When implemented by software, all or part of the embodiments may be implemented in the form of a computer program product.
[0304] The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from a website, a computer, a training device or a data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website, a computer, a training device or a data center. The computer-readable storage medium can be any available medium that a computer can store or a data storage device such as a training device, a data center, etc. that includes one or more available media integrations. The available medium can be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive (SSD)).
Claims
1. A communication method, It is characterized in that The method is applied to a user equipment UE, and the method includes: Determine the relevant information of N CGs within a data transmission cycle included in the target configuration authorization CG configuration configured for the UE, where the relevant information of the N CGs includes the start time corresponding to the N CGs and the radio resources corresponding to the N CGs, respectively, where N is a positive integer; According to the relevant information of the N CGs, notification information is sent, wherein the notification information is used to notify the network element that a target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the notification information is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
2. The method according to claim 1, It is characterized in that The method further comprises: receiving a control message, wherein the control message is used to adjust N CGs in a data transmission cycle included in the target CG configuration to M CGs, where M is a positive integer different from N; Based on the starting moments respectively corresponding to the M CGs, data interaction is performed using the wireless resources respectively corresponding to the M CGs.
3. The method according to claim 1 or 2, It is characterized in that The notification information includes a bit field, and the value of the bit field is used to indicate that the target CG among the N CGs within a data transmission cycle included in the target CG configuration is not used by the UE, or the value of the bit field is used to instruct the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration.
4. The method according to claim 1, It is characterized in that The notification information is used to notify the network element that the target CG among the N CGs included in a data transmission cycle configured by the target CG is not used by the UE. The notification information includes a cancellation operation and an identifier of the target CG. The cancellation operation is used to instruct the UE to cancel the use of the CG, and the identifier is used to indicate the target CG that is canceled by the UE.
5. The method according to claim 4, It is characterized in that The notification information includes a bitmap, and the value of the bitmap is used to indicate the target CG that is canceled by the UE.
6. The method according to claim 4, It is characterized in that The notification information includes a bitmap. When the value of the first part of the bits in the bitmap is a first value, the first part of the bits is used to indicate the cancellation operation, and the value of the second part of the bits in the bitmap is used to indicate the target CG that is canceled by the UE.
7. The method according to claim 6, It is characterized in that When the value of the first part of the bits in the bitmap is a second value, the first part of the bits is used to indicate an increase operation, and the increase operation is used to indicate the increase of the CG within a data transmission cycle included in the target CG configuration, and the value of the second part of the bits in the bitmap is used to indicate the number of increased CGs.
8. The method according to claim 1, It is characterized in that The notification information includes a number M, where M is used to indicate the number of CGs within a data transmission cycle included in the target CG configuration, and M is a positive integer.
9. The method according to any one of claims 1 to 8, It is characterized in that The notification information includes a target field, and the target field is used to identify the target CG configuration.
10. The method according to any one of claims 1 to 8, It is characterized in that The UE sends notification information based on the first CG, and the target CG configuration is the CG configuration where the first CG is located.
11. The method according to claim 1, It is characterized in that The notification information is used to notify the network element to increase the number of CGs in a data transmission cycle included in the target CG configuration, and the method further includes: Receiving a downlink control message DCI message, wherein the DCI message is used to configure a dynamic permission DG within the data transmission period, and the amount of data transmitted by the UE supported by the DG matches the amount of data transmitted by the UE supported by the number of CGs increased as indicated by the notification information; Based on the starting times corresponding to the N CGs and the starting times of the DG, data interaction is performed using the wireless resources corresponding to the N CGs and the wireless resources of the DG.
12. The method according to any one of claims 1 to 11, It is characterized in that The notification information is used to notify the network element to adjust the number of CGs in a data transmission cycle respectively included in multiple CG configurations, and the multiple CG configurations include the target CG configuration.
13. The method according to claim 12, It is characterized in that The notification information includes a bit field or a bit map, and the value of the bit field or the value of the bit map is used to instruct the network element to adjust the number of CGs in a data transmission cycle respectively included in the multiple CG configurations.
14. The method according to claim 13, It is characterized in that The first field in the bit field or bit map is used to identify each CG configuration among the multiple CG configurations, and the second field in the bit field or bit map is used to indicate the number of CGs in a data transmission cycle respectively included in the multiple CG configurations.
15. The method according to claim 12, It is characterized in that The notification information includes an identifier of a target CG group, the target CG group is one CG group among multiple CG groups, each CG group among the multiple CG groups includes the multiple CG configurations, and the notification information is used to notify the network element to configure the number of CGs within a data transmission cycle respectively included in the multiple CG configurations based on the target CG group.
16. The method according to any one of claims 1 to 15, It is characterized in that The notification information is used to notify the network element that a target CG among N CGs in a data transmission cycle included in the target CG configuration is not used by the UE; Then, the sending notification information includes: Sending the notification information at a target time; Among them, the target moment is any moment within the time period corresponding to the first CG among the N CGs; or, the target moment is any moment within the time period corresponding to the m CGs before the first CG among the target CGs, and m is a positive integer greater than or equal to 1; or, the interval between the target moment and the starting moment of the first CG among the target CGs is greater than the preset duration.
17. The method according to any one of claims 1 to 16, It is characterized in that The sending notification information includes: Sending an uplink control message UCI, where the UCI includes the notification information; Alternatively, sending a medium access control layer control element MAC-CE message, where the MAC-CE message includes the notification information; Alternatively, a user equipment assistance message UAI is sent, where the UAI includes the notification information.
18. A communication method, It is characterized in that The method is applied to a user equipment UE, and the method includes: Generate notification information, where the notification information is used to notify the network element to configure L CGs for the UE within a data transmission cycle included in the target configuration authorization CG configuration, where L is a positive integer; The notification information is sent.
19. The method according to claim 18, It is characterized in that The method further comprises: receiving a first control message, where the first control message is used to configure a data transmission period of the UE; receiving at least one second control message, where the second control message is used to activate the L CGs within a data transmission cycle included in the target CG configuration; Based on the starting times respectively corresponding to the L CGs, data interaction is performed using the wireless resources respectively corresponding to the L CGs.
20. The method according to claim 18 or 19, It is characterized in that The notification information is used to notify the network element to configure the number of CGs for the UE within a data transmission cycle respectively included in multiple CG configurations, and the multiple CG configurations include the target CG configuration.
21. The method according to claim 18 or 19, It is characterized in that The notification information includes an identifier of a target CG group, the target CG group is one of multiple CG groups, each CG group in the multiple CG groups includes multiple CG configurations, and the multiple CG configurations include the target CG configuration; The notification information is used to notify the network element to configure the number of CGs within a data transmission cycle respectively included in the multiple CG configurations based on the target CG group.
22. The method according to any one of claims 18 to 21, It is characterized in that The sending notification information includes: A user equipment assistance message UAI is sent, where the UAI includes the notification information.
23. A communication method, It is characterized in that The method is applied to a network element, and the method comprises: Receiving notification information, where the notification information is used to notify the network element that a target CG among multiple CGs in a data transmission cycle included in the target CG configuration is not used by a user equipment UE, or the communication message is used to notify the network element to increase the number of CGs in a data transmission cycle included in the target CG configuration; Manage the wireless resources of the target CG according to the notification information, or configure resources for the UE according to the notification information.
24. The communication method according to claim 23, It is characterized in that The configuring resources for the UE according to the notification information includes: Send a control message, wherein the control message is used to adjust N CGs in a data transmission cycle included in the target CG configuration to M CGs, where N is a positive integer and M is a positive integer different from N.
25. The method according to claim 23, It is characterized in that The configuring resources for the UE according to the notification information includes: Dynamically schedule the wireless resources of the target CG to other UEs.
26. The method according to claim 23, It is characterized in that The communication message is used to notify the network element to increase the number of CGs within a data transmission cycle included in the target CG configuration; Then, configuring resources for the UE according to the notification information includes: A downlink control message DCI message is sent, wherein the DCI message is used to configure a dynamic authorization DG within the data transmission period, and the amount of data transmitted by the UE supported by the DG matches the amount of data transmitted by the UE supported by the increased number of CGs indicated by the notification information.
27. A communication method, It is characterized in that The method is applied to a network element, and the method comprises: Receiving notification information, where the notification information is used to notify the network element to configure L CGs for the user equipment UE within a data transmission period included in the target configuration authorization CG configuration, where L is a positive integer; Sending a first control message, where the first control message is used to configure a data transmission period of the UE; Sending at least one second control message, where the at least one second control message is used to activate the L CGs within a data transmission cycle included in the target CG configuration; Receive data based on the starting times corresponding to the L CGs and transmitted using the wireless resources corresponding to the L CGs, wherein the starting times corresponding to the L CGs and the wireless resources corresponding to the L CGs are determined based on the first control message and the at least one second control message.
28. An electronic device, It is characterized in that include: memory and at least one processor; The memory is used to store programs; The at least one processor is used to run the program so that the electronic device implements the communication method described in any one of claims 1-17, the communication method described in any one of claims 18-22, the communication method described in any one of claims 23-26, or the communication method described in claim 27.
29. A computer storage medium for storing a computer program, which, when executed, is used to implement the communication method described in any one of claims 1 to 17, the communication method described in any one of claims 18 to 22, the communication method described in any one of claims 23 to 26, or the communication method described in claim 27.
