Plugging structure and system for drainage holes in gas tunnel

By setting up a drainage hole sealing structure with a sealing layer, extraction pipe and hole sealing mechanism in the gas tunnel, the problem of necking and collapse caused by the softness of the coal seam after the extraction hole is formed is solved, and effective gas sealing is achieved. The stability of plugging and drainage is improved.

WO2024212507A1PCT designated stage expired Publication Date: 2024-10-17CHINA OVERSEAS CONSTR LTD +1

Patent Information

Application Number
PCT/CN2023/131534
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-13
Filing Date
2023-11-14
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

After the gas tunnel drainage hole is formed, the soft coal seam may cause necking, collapse and coal ash falling, making the drainage hole more likely to be blocked under negative pressure, affecting stability and drainage effects.

Method used

Design a drainage hole sealing structure, including a sealing layer, a drainage pipe and a hole sealing mechanism. The sealing layer is set on the surface of the gas tunnel to be drained. The drainage hole opening is connected to the formed area, and the drainage pipe is plugged in and connected. Extend, the sealing mechanism covers the outer circumference of the extraction pipe, expands and fills the sealing parts through the first and second sealing parts, and ensures the sealing effect through the exhaust and grouting pipes.

Benefits of technology

It effectively prevents gas from overflowing from the drainage holes, improves the stability and sealing effect of the drainage holes, solves the problem that the drainage holes are easily blocked under negative pressure, and improves the drainage efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023131534_17102024_PF_FP_ABST
    Figure CN2023131534_17102024_PF_FP_ABST
Patent Text Reader

Abstract

A plugging structure for drainage holes (20) in a gas tunnel. A sealing layer (100) is provided on a gas drainage pending surface of the gas tunnel, and openings of the drainage holes (20) are arranged in the sealing layer (100) and communicated with a formed area of the gas tunnel; then drainage pipes (200) are inserted into the drainage holes (20), and the pipe opening at one end of each drainage pipe (200) extends out of the drainage hole (20); then a hole sealing mechanism (300) is wrapped around the periphery of each drainage pipe (200), and then a plugging mechanism is plugged in each drainage hole (20). The plugging structure for the drainage holes (20) in the gas tunnel can plug the gas drainage holes (20), and after plugging, it can be effectively ensured that gas cannot escape from the drainage holes (20). Also provided is a plugging system for the drainage holes (20) in the gas tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Gas tunnel drainage hole sealing structure and system

[0001] This application claims priority to Chinese patent application No. 202310433742.2 filed on April 13, 2023, the entire contents of which are incorporated by reference into this application. Technical Field

[0002] The present application relates to the technical field of gas tunnel construction, and in particular to a drainage hole sealing structure and system for a gas tunnel. Background Art

[0003] Currently, there are various sealing technologies for gas extraction boreholes in China, primarily using cement mortar, high-molecular polyester, and two-belt-one-injection sealing technologies. The main issues with sealing extraction boreholes are improper selection of sealing technology, sealing materials, and sealing length, as well as poor grouting to seal the fissures between boreholes, resulting in poor sealing quality. Improper sequencing of drilling, the order of sealing grouting, and the irrational arrangement of sealing construction can disrupt the completed sealing process, leading to the formation of new fissure channels in and around the borehole seal. Furthermore, after free gas is extracted from the coal body, the coal body shrinks, forming splitting cracks. These factors lead to poor sealing of the extraction boreholes, significantly impacting extraction efficiency. Furthermore, after the extraction boreholes are formed, due to the relatively soft coal seam, the formed extraction boreholes may shrink, collapse, and cause coal ash to fall into the extraction boreholes. This makes the extraction boreholes more prone to collapse and blockage under negative pressure, resulting in poor extraction borehole stability and impacting extraction efficiency. Technical issues

[0004] The main purpose of this application is to provide a drainage hole sealing structure and system for a gas tunnel, which aims to solve the technical problem that after the drainage hole is formed in the related technology, due to the soft coal seam, the formed drainage hole may cause necking, collapse, and coal ash to fall into the drainage hole, causing the drainage hole to be more prone to collapse and blockage under negative pressure conditions, resulting in poor stability of the drainage hole and affecting the drainage effect. Technical Solutions

[0005] To achieve the above objectives, in a first aspect, the present application proposes a drainage hole blocking structure for a gas tunnel, wherein the drainage hole is arranged in a coal seam of the gas tunnel;

[0006] The drainage hole blocking structure includes:

[0007] a sealing layer, the sealing layer being provided on the gas extraction surface of the gas tunnel, the orifice of the extraction hole being arranged on the sealing layer and being in communication with the formed area of ​​the gas tunnel;

[0008] a drainage pipe, the drainage pipe being inserted into the drainage hole, and one end of the drainage pipe extending out of the drainage hole; and

[0009] A sealing mechanism is coated on the outer circumference of the drainage pipe and seals the drainage hole. The sealing mechanism includes a first sealing portion and a second sealing portion which are sequentially and spaced apart from the orifice of the drainage hole toward the inside of the drainage hole, and a cavity is formed between the first sealing portion and the second sealing portion. Both the first sealing portion and the second sealing portion can expand and fill the drainage hole to seal the drainage hole.

[0010] In one embodiment, the first sealing portion includes a first sealing layer and a first expansion layer, the first sealing layer fills the opening of the drainage hole, the first expansion layer expands and fills the drainage hole, and the first expansion layer abuts against one side of the first sealing layer located in the drainage hole.

[0011] In one embodiment, the second expansion section includes a second expansion layer and a second blocking layer arranged in sequence, the second expansion layer expands and fills the drainage hole, and the second expansion layer is arranged opposite to the first expansion layer with the cavity formed therebetween, and the second blocking layer fills the drainage hole.

[0012] In one embodiment, the drainage hole blocking structure further includes an exhaust pipe extending from the opening of the drainage hole through the first blocking portion and to the highest position in the cavity, wherein the exhaust pipe connects the cavity with the formed area of ​​the gas tunnel.

[0013] In one embodiment, the drainage hole sealing structure also includes a grouting pipe that passes through the first sealing portion from the orifice of the drainage hole and extends to the lowest position in the cavity. The grouting pipe connects the cavity with an external grouting device. The external grouting device injects cement slurry into the cavity through the grouting pipe, and the cement slurry can be filled from the lowest position to the highest position, and the gas in the cavity is discharged from the exhaust pipe.

[0014] In one embodiment, the cement slurry includes water and cement, wherein the mix ratio of water to cement is water:cement=1:1.

[0015] In one embodiment, an expansion agent is further added to the cement slurry, wherein the amount of the expansion agent is 2.5% of the amount of the cement.

[0016] In one embodiment, a polycarboxylate high-efficiency water reducer and a retarder are further added to the cement slurry, wherein the amount of the polycarboxylate high-efficiency water reducer is 1% of the amount of the cement, and the amount of the retarder is 1.8% of the amount of the cement.

[0017] In one embodiment, the sealing layer includes a sealing concrete layer and a reinforcement layer. The sealing concrete layer is arranged on the gas extraction surface, and the orifice of the extraction hole is arranged on the sealing concrete layer. The reinforcement layer is arranged on the outer surface of the sealing concrete layer.

[0018] Based on the same technical concept, in the second aspect, the present application proposes a drainage hole sealing system for a gas tunnel, comprising a drainage construction surface and at least two drainage hole sealing structures as described in the first aspect, wherein at least two of the drainage hole sealing structures are spaced apart and distributed on the drainage construction surface. Beneficial effects

[0019] The technical solution of the present application is to set the sealing layer on the gas to be extracted surface of the gas tunnel by setting a sealing layer, a drainage pipe and a sealing mechanism. The sealing layer is set on the gas to be extracted surface of the gas tunnel. The orifice of the drainage hole is arranged in the sealing layer and is connected with the formed area of ​​the gas tunnel. The drainage pipe is inserted into the drainage hole, and one end of the drainage pipe extends out of the drainage hole. The sealing mechanism is covered on the outer periphery of the drainage pipe, and the sealing mechanism is sealed in the drainage hole. The sealing mechanism includes a first sealing part and a second sealing part which are arranged in sequence and at intervals from the orifice of the drainage hole toward the hole of the drainage hole. The first sealing part and the second sealing part can both expand and fill the drainage hole. A cavity is formed between the first sealing part and the second sealing part. The technical solution of the present application is to set the sealing layer on the gas to be extracted surface of the gas tunnel, and the drainage hole is arranged in the sealing layer. The orifice of the hole is arranged in the sealing layer and connected to the formed area of ​​the gas tunnel. Then the extraction pipe is inserted into the extraction hole, and the pipe mouth of one end of the extraction pipe extends out of the extraction hole. Then the sealing mechanism is covered on the outer periphery of the extraction pipe, and the sealing mechanism is sealed in the extraction hole, so that the present application can seal the gas extraction hole during specific implementation, and after sealing, it can also effectively ensure that the gas will not overflow from the extraction hole, which solves the technical problem of the related technology that after the extraction hole is formed, due to the soft coal seam, the formed extraction hole may cause necking, collapse, and coal ash falls into the extraction hole, resulting in the extraction hole being more prone to collapse and blocking the channel under negative pressure, resulting in poor stability of the extraction hole and affecting the extraction effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying any creative work.

[0021] FIG1 is a schematic structural diagram of a gas extraction hole blocking structure for a gas tunnel according to an embodiment of the present application;

[0022] FIG2 is an enlarged structural diagram of part A in FIG1 ;

[0023] FIG3 is a schematic plan view of a blocking layer according to an example of the present application;

[0024] FIG4 is a schematic diagram of the side structure of the plugging layer of the present application example;

[0025] FIG5 is a schematic diagram of the arrangement of the extraction holes of the present application example;

[0026] FIG6 is a schematic diagram of the blocking principle of the polyurethane material of the present application example;

[0027] FIG7 is a schematic structural diagram of the drainage hole sealing system according to an example of the present application.

[0028] Description of the drawings:

[0029] 10 Coal seam 312 First expansion layer 100 Sealing layer 321 Second expansion layer 200 Pumping pipe 322 Second blocking layer 300 Sealing mechanism 330 Exhaust pipe 310 First blocking part 340 Grouting pipe 320 Second blocking part 110 Concrete sealing layer 311 First blocking layer 120 Reinforcement layer 20 Pumping hole 130 Sleeve valve pipe

[0030] The purpose, features and advantages of this application will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Modes for Carrying Out the Invention

[0031] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments of this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.

[0032] It should be noted that all directional indications in the embodiments of the present application (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the various mechanisms under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0033] In this application, unless otherwise specified or limited, the terms "connection" and "fixation" should be understood in a broad sense. For example, "fixation" can mean fixed connection, detachable connection, or integration; mechanical connection or electrical connection; direct connection or indirect connection through an intermediate medium; internal communication between two elements or interaction between two elements, unless otherwise specified. For those skilled in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0034] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of such features. In addition, the meaning of "and / or" appearing throughout the text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme in which A and B are satisfied at the same time. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement it. When the combination of technical solutions is mutually contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0035] The inventive concept of this application is further explained below with reference to some specific implementation methods.

[0036] The present application proposes a sealing structure and system for a gas extraction hole 20 in a gas tunnel.

[0037] As shown in FIG. 1 to FIG. 7 , an embodiment of the present application is provided of a structure and system for blocking a gas extraction hole 20 in a gas tunnel.

[0038] In this embodiment, referring to FIG. 1 to FIG. 7 , the drainage hole 20 of this type of gas tunnel has a blocking structure, and the drainage hole 20 is arranged in the coal seam 10 of the gas tunnel;

[0039] The sealing structure of the extraction hole 20 includes:

[0040] A sealing layer 100 is provided on the gas extraction surface of the gas tunnel. The extraction hole 20 has an opening arranged on the sealing layer 100 and communicates with the formed area of ​​the gas tunnel.

[0041] The exhaust pipe 200 is inserted into the exhaust hole 20, and one end of the exhaust pipe 200 extends out of the exhaust hole 20; and

[0042] The sealing mechanism 300 is wrapped around the outer periphery of the extraction and drainage pipe 200, and the sealing mechanism 300 is sealed in the extraction and drainage hole 20. The sealing mechanism includes a first sealing portion 310 and a second sealing portion 320 arranged in sequence and at intervals from the orifice of the extraction and drainage hole 20 toward the hole of the extraction and drainage hole 20, and a cavity is formed between the first sealing portion 310 and the second sealing portion 320. Both the first sealing portion 310 and the second sealing portion 320 can expand and fill the extraction and drainage hole 20 to seal the extraction and drainage hole 20.

[0043] It should be specifically and clearly stated that in this embodiment, the exemplary sealing layer 100 is preferably formed by spraying airtight concrete on the gas extraction surface. At the same time, considering that cracks and other channels exist in the geological body in the unexcavated area behind the gas extraction surface, which can easily lead to gas overflow, the geological body can be reinforced according to the geological conditions during specific implementation. When reinforcing the geological body, the geological body can be reinforced by, but is not limited to, grouting with a sleeve valve pipe 130 or fracturing grouting. In addition, after the spraying construction of the airtight concrete layer is completed, in order to improve the stability and safety of the sealing layer 100, it is necessary to construct a steel frame on the surface of the airtight concrete layer. During the construction of the steel frame, the ends of the steel frame need to be fixed to the corresponding positions at the intersection of the formed section of the gas tunnel and the gas extraction surface, thereby improving the stability of the entire steel frame and the sealing layer 100, avoiding the hidden dangers of gas leakage caused by protrusion of the coal seam 10 or the geological body during gas extraction or cutting of the coal seam 10.

[0044] In this embodiment, a sealing layer 100, a drainage pipe 200 and a sealing mechanism 300 are provided, the sealing layer 100 is provided on the gas to-be-extracted surface of the gas tunnel, the orifice of the drainage hole 20 is arranged on the sealing layer 100 and is connected to the formed area of ​​the gas tunnel, the drainage pipe 200 is inserted into the drainage hole 20, and one end of the drainage pipe 200 extends out of the drainage hole 20, the sealing mechanism 300 is covered on the outer periphery of the drainage pipe 200, and the sealing mechanism 300 is blocked in the drainage hole 20, the blocking mechanism includes a first blocking portion 310 and a second blocking portion 320 which are sequentially and spaced from the orifice of the drainage hole 20 toward the inside of the drainage hole 20, the first blocking portion 310 and the second blocking portion 320 can both expand and fill the drainage hole 20, and a cavity is formed between the first blocking portion 310 and the second blocking portion 320. A sealing layer 100 is set on the surface to be extracted, and the orifice of the extraction hole 20 is arranged in the sealing layer 100 and connected to the formed area of ​​the gas tunnel. Then the extraction pipe 200 is inserted into the extraction hole 20, and the pipe mouth of one end of the extraction pipe 200 extends out of the extraction hole 20. Then the sealing mechanism 300 is covered on the outer periphery of the extraction pipe 200, and the sealing mechanism is sealed in the extraction hole 20, so that the present application can seal the gas extraction hole 20 during specific implementation, and after sealing, it can also effectively ensure that the gas will not overflow from the extraction hole 20, which solves the technical problem of the related technology that after the extraction hole is formed, due to the soft coal seam 10, the formed extraction hole may cause necking, collapse, and coal ash falling into the extraction hole, resulting in the extraction hole being more prone to collapse and blocking the channel under negative pressure, resulting in poor stability of the extraction hole and affecting the extraction effect.

[0045] In some specific embodiments, the first blocking portion 310 includes a first blocking layer 311 and a first expansion layer 312. The first blocking layer 311 fills the opening of the drainage hole 20, and the first expansion layer 312 expands and fills the drainage hole 20, and the first expansion layer 312 abuts against one side of the first blocking layer 311 located in the drainage hole 20.

[0046] In this embodiment, by providing the first sealing layer 311 and the first expansion layer 312 on the first sealing portion 310 , the present application can seal the drainage hole 20 during implementation, thereby avoiding the risk of gas overflowing from the cracks in the drainage hole 20 .

[0047] It should be particularly and clearly stated that in this embodiment, the first sealing layer 311 is preferably made of bagged polyurethane, and the first expansion layer 312 is preferably made of an expansion waterstop. In specific implementation, the expansion waterstop is a waterstop that expands 40 times when exposed to water.

[0048] In some specific embodiments, the second expansion section includes a second expansion layer 321 and a second blocking layer 322 arranged in sequence. The second expansion layer 321 expands and fills the drainage hole 20. The second expansion layer 321 is arranged opposite to the first expansion layer 312 and a cavity is formed therebetween. The second blocking layer 322 fills the drainage hole 20.

[0049] In this embodiment, by providing a first sealing layer 311 and a second expansion layer 321 in the second sealing portion 320, the present application can seal the drainage hole 20 a second time during implementation, thereby further improving the sealing effect of the drainage hole 20 and further avoiding the risk of gas overflowing from the cracks in the drainage hole 20.

[0050] It should be particularly and clearly stated that in this embodiment, the second sealing layer 322 is preferably made of bagged polyurethane, and the second expansion layer 321 is preferably made of an expansion waterstop. In specific implementation, the expansion waterstop is a waterstop that expands 40 times when exposed to water.

[0051] In some specific embodiments, the sealing structure of the drainage hole 20 further includes an exhaust pipe 330 extending from the opening of the drainage hole 20 through the first sealing portion 310 and to the highest position in the cavity. The exhaust pipe 330 connects the cavity with the formed area of ​​the gas tunnel.

[0052] In this embodiment, by forming a highest position in the cavity, then setting an exhaust pipe 330, and allowing the exhaust pipe 330 to pass through the first blocking portion 310 and placing the pipe mouth at one end of the exhaust pipe 330 at the highest position, the present application can discharge the gas in the cavity during specific implementation.

[0053] In some specific embodiments, the sealing structure of the drainage hole 20 also includes a grouting pipe 340 that passes through the first sealing portion 310 from the orifice of the drainage hole 20 and extends to the lowest position in the cavity. The grouting pipe 340 connects the cavity with an external grouting device. The external grouting device injects cement slurry into the cavity through the grouting pipe 340, and the cement slurry can be filled from the lowest position to the highest position, and the gas in the cavity is discharged from the exhaust pipe 330.

[0054] In this embodiment, by forming a lowest position in the cavity, allowing the grouting pipe 340 to pass through the first sealing portion 310 and placing the pipe mouth at one end of the grouting pipe 340 at the lowest position, and then injecting sealing slurry into the cavity through the grouting pipe 340, the present application can cooperate with the exhaust pipe 330 set at the highest position to discharge the gas in the cavity during specific implementation, and can also enable the injected sealing slurry to be filled from the lowest position to the highest position, further improving the sealing effect of the exhaust hole 20.

[0055] It should be particularly and clearly stated that in this embodiment, the grouting slurry can be, but is not limited to, a cement slurry with a cement:water ratio of 1:1. Other slurries that can achieve grouting and sealing functions, such as epoxy resin, can also be used.

[0056] In some specific embodiments, the cement slurry includes water and cement, wherein the mix ratio of water to cement is water:cement=1:1.

[0057] In this embodiment, during implementation, the mix ratio of water to cement can be adjusted accordingly.

[0058] In this embodiment, the cement slurry is set to water: cement with a mixing ratio of 1:1, so that the filling effect of the cavity can be ensured during the specific implementation of this application.

[0059] In some specific embodiments, an expansion agent is further added to the cement slurry, wherein the amount of the expansion agent is 2.5% of the amount of cement.

[0060] In this embodiment, during specific implementation, the actual dosage can be adjusted according to experiments in actual use.

[0061] In some specific embodiments, polycarboxylic acid high-efficiency water-reducing agent and retarder are further added to the cement slurry, wherein the amount of polycarboxylic acid high-efficiency water-reducing agent is 1% of the amount of cement, and the amount of retarder is 1.8% of the amount of cement.

[0062] In this embodiment, the parameters of the high-efficiency water-reducing agent and the retarding agent are adjusted in actual construction according to the results of trial mixing tests.

[0063] In some specific embodiments, the sealing layer 100 includes a sealing concrete layer 110 and a reinforcement layer 120. The sealing concrete layer 110 is arranged on the surface where gas is to be extracted, and the orifice of the extraction hole 20 is arranged on the sealing concrete layer 110. The reinforcement layer 120 is arranged on the outer surface of the sealing concrete layer 110.

[0064] It should be specifically and clearly stated that in this embodiment, the sealing concrete layer 110 is preferably made of airtight concrete spraying. At the same time, considering that cracks and other channels exist in the geological body in the unexcavated area behind the gas extraction surface, which can easily lead to gas overflow, the geological body can be reinforced according to the geological conditions during specific implementation. When reinforcing the geological body, the geological body can be reinforced by, but is not limited to, grouting with a sleeve valve pipe 130 or fracturing grouting. In addition, after the spraying construction of the airtight concrete layer is completed, in order to improve the stability and safety of the sealing layer 100, it is necessary to construct a steel frame on the surface of the airtight concrete layer. During the construction of the steel frame, the ends of the steel frame need to be fixed to the corresponding positions at the intersection of the formed section of the gas tunnel and the gas extraction surface, thereby improving the stability of the entire steel frame and the sealing layer 100, avoiding the hidden dangers of coal seam 10 protrusion or geological body protrusion causing gas leakage during gas extraction or cutting of the coal seam 10.

[0065] Based on the same technical concept, in the second aspect, the present application proposes a drainage hole 20 sealing system for a gas tunnel, comprising a drainage construction surface and at least two drainage hole 20 sealing structures of the first aspect, wherein at least two drainage hole 20 sealing structures are spaced apart and distributed on the drainage construction surface.

[0066] In some specific embodiments, the present application may also be implemented as follows:

[0067] After drilling and cleaning the hole with a large diameter drill, the extraction pipe is arranged along the entire length, and a drill hole is arranged on the hole wall at the front end of the extraction pipe to improve the integrity of the extraction hole and solve the problem of poor gas negative pressure distribution and poor flow caused by borehole necking, hole blockage, and obstruction; the sealing length is adjusted in the rock mass within a 10m distance range of the 10 normal line of the coal seam, and the sealing materials and processes at both ends are improved. Micro-expansive cement-based composite grouting materials are used to grout and plug the extraction hole to improve the sealing quality of the extraction hole 20, improve the high-quality sealing of the front and rear sections of the sealing section, and high-pressure grouting can be used The new expansive composite material not only improves the sealing effect, but also consolidates and seals the rock mass cracks, surrounding rock and coal seam 10 fissures, consolidating the broken rock mass into a whole stone body wrapped in cement-based slurry, which is leak-proof. At the same time, C25 airtight concrete is used to seal the face to improve the integrity and stability of the rock mass, and the shotcrete is reinforced with an I-beam to improve the stability of the rock mass and prevent collapse, which will cause gas leakage in the extraction hole. It also prevents and eliminates safety hazards caused by gas outbursts. When grouting the sealing section, the slurry can be sprayed to block the gap between the concrete and the face. By using different blocking materials, sealing lengths, and blocking processes, the above measures can reduce the negative pressure loss during extraction, prevent the air in the tunnel from entering the rock mass cracks through the face, reduce the extraction negative pressure, and improve the extraction effect.

[0068] This application is made in response to the 7.4MPa gas pressure and ultra-high gas concentration (21.99m3 / ton of coal) of a certain tunnel. First, a φ6mm steel mesh is laid on the face with a spacing of 25cm*25cm. The sprayed concrete is reinforced with horizontal and vertical I14 I-beams outside the steel bars (to prevent the sprayed concrete from cracking due to high gas pressure or grouting pressure). The tunnel face is sealed with 20cm thick C25 airtight sprayed concrete. After the sprayed concrete is completed, the extraction holes are drilled from the arch foot to the arch top, from left to right, at the upper step face according to the opening coordinates, deflection angle and length requirements of the designed extraction holes. After each extraction hole is completed, a full-length extraction pipe is installed. When 10m of the extraction pipe is left, the extraction holes within 10m of the face are sealed.

[0069] The drainage hole is sealed for 10m, with each end capped 1m long and the middle section 8m long. The front end capping section is completely wrapped with 40x water-swelling waterstop strips within 10cm of the φ20 drainage pipe. The remaining 90cm of the pipe is wrapped with bagged polyurethane material and tied securely with fine wire. The rear end, within a 1m long section, consists of three pipes: the main pipe is a φ20 plastic drainage pipe 200, a φ20mm galvanized steel pipe, and a φ10mm soft rubber hose. A layer of 40x water-swelling waterstop strips is wrapped within 10cm of the three pipes, and the remaining 90cm of the pipe is wrapped with bagged polyurethane material and tied securely with wire. The middle 8m section remains untreated. After the processed drainage pipes are sequentially installed into the φ76 drainage borehole, the gaps between the root canals at the ends are filled with polyurethane. The exposed portion of the 20 galvanized steel pipe, outside the face of the shotcrete, is installed with a standard tap for grouting. Grouting with expansive cement-based materials leverages the polyurethane foaming effect. The waterstop rapidly expands upon contact with water, filling the outer cavity. Furthermore, the waterstop is pressure-resistant. A micro-expandable modified sulphoaluminate cement-based grouting material is used for infiltration grouting within the hole, surrounding rock mass, and cracks within the coal seam. Grouting is performed from bottom to top, hole by hole, with each grouting pipe maintaining a pressure of 1.5 MPa for 10 minutes. Grouting is concentrated every three days in the installed extraction holes.

[0070] S201: A certain tunnel was excavated to 10m from the normal line of the coal seam. After the outburst prediction of coal seam 10 was completed, it was determined that coal seam 10 was an outburst coal seam 10 (C8 coal seam 10 gas pressure 7.4MPa, coal seam 10 gas content 21.99), and outburst prevention treatment was required. A φ6 steel mesh was hung on the face, and vertical and horizontal I14 steel bars were installed on the outside for reinforcement. Two 3m long mortar anchor rods were constructed at the intersection with the initial support and at some nodes for fixation. After completion, a 20cm thick C25 airtight sprayed concrete was used to completely seal the face.

[0071] Airtight shotcrete is made by adding an airtight agent to the shotcrete at a rate of 2% per cubic meter of cement. The airtight agent is in dry powder form and can be added and stirred evenly when mixing the shotcrete.

[0072] S202. After the closure is completed, the drilling of the gas drainage hole 20 is started according to the designed opening coordinates, angle of the deflection hole and length of the drainage hole.

[0073] S203 is drilled using two 4000 hydraulic drills with a 76mm diameter drill bit. These drills are positioned on either side of the tunnel face. Drilling is performed alternately to facilitate the installation of the 200mm drainage pipe. (Each drill rig drills 20 holes per day.) After each drainage pipe is completed and cleaned, the full-length 200mm drainage pipe is installed.

[0074] S204. The extraction pipe uses a φ20 hard plastic pipe with a φ4mm plum blossom-shaped drill hole at the front end of the pipe. The drill hole spacing is 30cm, with 2 holes in each ring, which are set opposite each other. The second ring of holes is staggered. No drilling is required in the remaining last 12m. The last 10m of the extraction pipe is installed at 200.

[0075] S205. At both ends of the remaining 10m of the drainage pipe 200, use AB glue to bond the rubber waterstop strip that has expanded 40 times to the drainage pipe 200 at the front end. The bonding length is 10cm. Wrap the bagged polyurethane continuously for 90cm and tie it firmly with fine wire. Close to the palm side, tie together a 5m long 25mm diameter galvanized steel pipe and a 3m long 10mm soft rubber tube. Tie them firmly again with waterstop and bagged polyurethane according to the signature. After using polyurethane to fill the gaps between the 32 pipes, install the drainage pipe 200 in place.

[0076] The sealing principle of polyurethane material - black material (polyol polyether) and white material (polyisocyanate) are prepared in a certain proportion and tied to the gas extraction pipe. During the reaction and expansion of the polyurethane material, when the expansion radius is greater than the borehole radius (that is, R>r), on the one hand, the radial expansion effect generated by the material itself causes the polyurethane material to be squeezed into the cracks around the borehole; on the other hand, the radial extrusion effect generated causes the cracks within a certain range around the borehole to close. Finally, the polyurethane reaction ends (at this time, the expansion radius R'>R), and the cracks within the local range of the borehole are sealed.

[0077] S206. After the hole pipe is buried, use anchoring agent to block the air between the hole pipe spray concrete, leaving a gap of about 1 cm, and then use cotton yarn and cement mortar or AB glue to seal the hole. After the hole part solidifies, use φ20 ordinary faucet to weld it to the galvanized steel pipe for subsequent grouting.

[0078] S207. Install the remaining pumping and drainage pipes 200 in sequence. After every three days, perform grouting reinforcement on the installed pumping and drainage pipes.

[0079] S208. Grouting: Grouting is carried out in the order from the arch foot to the arch top, and grouting is carried out in a symmetrical order from the center of the section to both sides. The main material of the grouting material is sulphoaluminate ultrafine cement.

[0080] The cement water-cement ratio is 1:1, 2.5% of the cement mass of the expansion agent, 1% of the polycarboxylic acid high-efficiency water reducer, and 1.8% of the retarder are added.

[0081] The initial grouting pressure is 0.5MPa. During grouting, clear water and thin slurry are first discharged from the exhaust pipe 330, and then viscous cement is discharged. Use wire to tie the exhaust pipe 330 firmly, and continue grouting until the final pressure reaches 1.5MPa. After the pressure stabilizes, continue for 10 minutes. After each grouting is completed, turn off the faucet and grout one pipe.

[0082] S209. After completing the sealing and grouting reinforcement of the 200 extraction and drainage pipes, continue to extract and drain the gas as required until the inspection meets the standards.

[0083] The technical solution of the present application is to set a sealing layer 100, a drainage pipe 200 and a sealing mechanism 300, and set the sealing layer 100 on the gas to be extracted surface of the gas tunnel, the orifice of the drainage hole 20 is arranged in the sealing layer 100 and is connected to the formed area of ​​the gas tunnel, the drainage pipe 200 is inserted into the drainage hole 20, and one end of the drainage pipe 200 extends out of the drainage hole 20, the sealing mechanism 300 is covered on the outer periphery of the drainage pipe 200, and the sealing mechanism 300 is blocked in the drainage hole 20, and the blocking mechanism includes a first blocking part 310 and a second blocking part 320 arranged in sequence and at intervals from the orifice of the drainage hole 20 toward the hole of the drainage hole 20, the first blocking part 310 and the second blocking part 320 can both expand and fill the drainage hole 20, and a cavity is formed between the first blocking part 310 and the second blocking part 320. A sealing layer 100 is set on the surface to be extracted, and the orifice of the extraction hole 20 is arranged in the sealing layer 100 and connected to the formed area of ​​the gas tunnel. Then the extraction pipe 200 is inserted into the extraction hole 20, and the pipe mouth of one end of the extraction pipe 200 extends out of the extraction hole 20. Then the sealing mechanism 300 is covered on the outer periphery of the extraction pipe 200, and the sealing mechanism is sealed in the extraction hole 20, so that the present application can seal the gas extraction hole 20 during specific implementation, and after sealing, it can also effectively ensure that the gas will not overflow from the extraction hole 20, which solves the technical problem of the related technology that after the extraction hole is formed, due to the soft coal seam 10, the formed extraction hole may cause necking, collapse, and coal ash falling into the extraction hole, resulting in the extraction hole being more prone to collapse and blocking the channel under negative pressure, resulting in poor stability of the extraction hole and affecting the extraction effect.

[0084] The above description is merely an optional embodiment of the present application and does not limit the patent scope of the present application. Any equivalent structural transformation made by using the contents of the present application specification and drawings under the application concept of the present application, or directly / indirectly applied in other related technical fields, is included in the patent protection scope of the present application.

Claims

1. A gas tunnel drainage hole plugging structure, in, The drainage hole is arranged in the coal seam of the gas tunnel; The drainage hole blocking structure comprises: A sealing layer, wherein the sealing layer is arranged on the gas to-be-extracted surface of the gas tunnel, and the orifice of the extraction hole is arranged on the sealing layer and communicated with the formed area of ​​the gas tunnel; a pumping pipe, wherein the pumping pipe is inserted into the pumping hole, and one end of the pumping pipe extends out of the pumping hole; and A sealing mechanism, which is coated on the outer circumference of the drainage pipe and seals the drainage hole. The sealing mechanism includes a first sealing portion and a second sealing portion which are arranged in sequence and at intervals from the orifice of the drainage hole toward the inside of the drainage hole, and a cavity is formed between the first sealing portion and the second sealing portion. Both the first sealing portion and the second sealing portion can expand and fill the drainage hole to seal the drainage hole.

2. The gas tunnel drainage hole blocking structure according to claim 1, in, The first blocking portion includes a first blocking layer and a first expansion layer. The first blocking layer fills the opening of the drainage hole. The first expansion layer expands and fills the drainage hole. The first expansion layer abuts against one side of the first blocking layer located in the drainage hole.

3. The gas tunnel drainage hole blocking structure according to claim 2, in, The second expansion section includes a second expansion layer and a second blocking layer arranged in sequence, the second expansion layer expands and fills the drainage hole, and the second expansion layer is arranged opposite to the first expansion layer with the cavity formed therebetween, and the second blocking layer fills the drainage hole.

4. The gas tunnel drainage hole blocking structure according to claim 1, in, The drainage hole blocking structure further includes an exhaust pipe extending from the opening of the drainage hole through the first blocking portion and to the highest position in the cavity, wherein the exhaust pipe connects the cavity with the formed area of ​​the gas tunnel.

5. The gas tunnel drainage hole blocking structure according to claim 4, in, The drainage hole sealing structure also includes a grouting pipe that passes through the first sealing portion from the opening of the drainage hole and extends to the lowest position in the cavity. The grouting pipe connects the cavity with an external grouting device. The external grouting device injects cement slurry into the cavity through the grouting pipe, and the cement slurry can be filled from the lowest position to the highest position, and the gas in the cavity is discharged from the exhaust pipe.

6. The gas tunnel drainage hole plugging structure according to claim 5, in, The cement slurry comprises water and cement, wherein the mix ratio of water to cement is water:cement=1:

1.

7. The gas tunnel drainage hole blocking structure according to claim 6, in, An expansion agent is also added to the cement slurry, wherein the amount of the expansion agent is 2.5% of the amount of the cement.

8. The gas tunnel drainage hole blocking structure according to claim 6, in, The cement slurry is further added with a polycarboxylic acid high-efficiency water-reducing agent and a retarder, wherein the amount of the polycarboxylic acid high-efficiency water-reducing agent is 1% of the amount of the cement, and the amount of the retarder is 1.8% of the amount of the cement.

9. The drainage hole blocking structure of a gas tunnel according to any one of claims 1 to 8, in, The sealing layer includes a sealing concrete layer and a reinforcement layer. The sealing concrete layer is arranged on the gas extraction surface, and the orifice of the extraction hole is arranged on the sealing concrete layer. The reinforcement layer is arranged on the outer surface of the sealing concrete layer.

10. A gas tunnel drainage hole plugging system, in, It comprises a drainage construction surface and at least two drainage hole plugging structures as described in any one of claims 1 to 9, and at least two drainage hole plugging structures are distributed at intervals on the drainage construction surface.

Citation Information

Patent Citations

  • Gas pumping sleeve-penetrating occluder and use method thereof

    CN103452522A

  • Three-section capsule sealing device for gas extraction drilling and sealing method thereof

    CN107780873A

  • Magnetic sealing device and method for near-horizontal gas extraction drill hole of coal seam

    CN110080712A

  • Sealing device for high-gas soft coal seam drilling and sealing method thereof

    CN110761734A

  • Device and method for protecting holes of full-length screen pipe in soft coal seam and sealing holes under pressure

    CN112228013A

Cited By

  • Coal seam gas extraction equipment and extraction method

    CN119062244A

  • Underground gas extraction pipeline

    CN119353032A

  • Flexible wall-attached hole sealing device, hole wall crack plugging method and hole sealing method

    CN119641282A

  • High-flow high-pressure water plugging device and construction method

    CN120701275A

  • Gas control reserved pipe plugging control system

    CN120990679A