Temporary plugging feasibility evaluation method and system, processor and storage medium

By calculating parameters such as wellhead pressure limit, pipeline friction and hole friction, combined with tortuosity friction, closure stress and hydrostatic column pressure, a temporary plugging feasibility evaluation chart is constructed to guide well selection and solve the problem of conglomerate tight oil reservoirs. The problem of uneven temporary plugging in the horizontal well section has improved the success rate of temporary plugging and development benefits.

WO2024216889A1PCT designated stage expired Publication Date: 2024-10-24PETROCHINA CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/125781
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-21
Filing Date
2023-10-20
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

In the horizontal well section of conglomerate tight oil reservoirs, the holes with temporary plugging and fracturing technology have uneven liquid and sand inflows, resulting in a low temporary plugging success rate and affecting the development effect.

Method used

By collecting geological and engineering parameters, we calculate the first parameter that reflects the feasibility of project implementation and the second parameter that reflects the geological difficulty, construct a temporary plugging feasibility evaluation chart, distinguish conventional areas and key research areas, evaluate the feasibility of temporary plugging technology, and guide selections Select the well.

Benefits of technology

It improves the effectiveness of the temporary plugging process, avoids inconspicuous effects or overpressure problems caused by insufficient or excessive temporary plugging agent dosage, and improves oilfield development benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023125781_24102024_PF_FP_ABST
    Figure CN2023125781_24102024_PF_FP_ABST
Patent Text Reader

Abstract

A temporary plugging feasibility evaluation method and system, a processor and a storage medium. The method comprises: collecting geological and engineering parameters of a target block (S110); calculating, according to the geological and engineering parameters, a first parameter reflecting the engineering implementation feasibility and a second parameter reflecting the geological difficulty, the first parameter being related to the wellhead pressure limit, pipeline friction and perforation friction of the target block, and the second parameter being related to the tortuous friction, closure pressure and hydrostatic column pressure of the target block (S120); and evaluating the temporary plugging feasibility of the target block according to the first parameter and the second parameter (S130). According to the method, the first parameter reflecting the engineering implementation feasibility and the second parameter reflecting the geological difficulty are calculated according to the geological and engineering parameters of the target block, the temporary plugging feasibility of the target block is evaluated by integrating the first parameter and the second parameter. Therefore, the implementation effectiveness of the temporary plugging process is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Temporary blocking feasibility evaluation method, system, processor and storage medium Technical Field

[0001] The present invention relates to the technical field of oil and gas well fracturing construction, and in particular to a temporary plugging feasibility evaluation method, system, processor and storage medium. Background Art

[0002] Currently, intra-segment multi-cluster and temporary plugging fracturing technologies have become important tools for increasing production and efficiency through volume fracturing in horizontal wells, and are widely used in unconventional oil and gas reservoirs both domestically and internationally. However, due to the wide variations in reservoir depth and geological conditions across various blocks, fluid and sand inflows within each cluster of holes within a horizontal well section in tight conglomerate reservoirs are extremely uneven. This leads to significant variations in hole diameters within each cluster and poor stimulation balance, resulting in a low temporary plugging success rate and a direct constraint on development effectiveness.

[0003] Summary of the Invention

[0004] The purpose of the embodiments of the present invention is to provide a temporary blocking feasibility evaluation method, system, processor and storage medium, which can solve or partially solve the problems existing in the prior art.

[0005] To achieve the above objectives, an embodiment of the present invention provides a temporary blocking feasibility evaluation method, which includes:

[0006] Collect geological and engineering parameters of the target block;

[0007] Calculating, based on the geological and engineering parameters, a first parameter reflecting the feasibility of the project implementation and a second parameter reflecting the geological difficulty, wherein the first parameter is related to the wellhead pressure limit, pipeline friction, and hole friction of the target block, and the second parameter is related to the tortuosity friction, closure stress, and hydrostatic column pressure of the target block;

[0008] The feasibility of temporary blocking of the target block is evaluated based on the first parameter and the second parameter.

[0009] Optionally, evaluating the feasibility of temporary blocking of the target block according to the first parameter and the second parameter includes:

[0010] Constructing a temporary blocking feasibility evaluation chart with coordinate axes of a first parameter and a second parameter, the chart including a conventional temporary blocking implementation area and a key temporary blocking implementation area;

[0011] evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block;

[0012] Among them, the dividing line between the conventional area and the key research area is composed of points where the first parameter and the second parameter are equal. The conventional area is the area between the coordinate axis of the first parameter and the dividing line between the conventional area and the key research area. The key research area is the area between the coordinate axis of the second parameter and the dividing line between the conventional area and the key research area.

[0013] Optionally, evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point determined by the first parameter and the second parameter of the target block in the map includes:

[0014] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the conventional area of ​​the temporary plugging feasibility evaluation chart, it is theoretically feasible to implement the temporary plugging process in the target block;

[0015] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the key area of ​​the temporary plugging feasibility evaluation chart, it is theoretically not feasible to implement the temporary plugging process for the target block.

[0016] Optionally, the conventional area for temporary blocking implementation includes a feasible area for temporary blocking implementation and a potential area for temporary blocking implementation;

[0017] Among them, the boundary line between the feasible area and the potential area is a straight line obtained by translating the boundary line between the conventional area and the key research area in the direction of the coordinate axis of the first parameter by the size of the safe sand addition window; the feasible area is the area between the coordinate axis of the first parameter and the boundary line between the feasible area and the potential area, and the potential area is the area between the boundary line between the feasible area and the potential area and the boundary line between the conventional area and the key research area.

[0018] Optionally, evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point determined by the first parameter and the second parameter of the target block in the map includes:

[0019] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the feasible area of ​​the temporary plugging feasibility evaluation chart, it is feasible to implement the temporary plugging process in the target block;

[0020] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the potential area of ​​the temporary plugging feasibility evaluation chart, the temporary plugging feasibility of the target block is evaluated according to the early construction characteristics of the target block.

[0021] Optionally, the calculating of a first parameter reflecting the feasibility of project implementation based on geological and engineering parameters includes:

[0022] Calculate the wellhead pressure limit, pipeline friction and hole friction of the target block based on geological and engineering parameters;

[0023] The first parameter reflecting the feasibility of project implementation is obtained using the following formula: P1 = p J -p F -p M ,

[0024] Among them, P1 is the first parameter reflecting the feasibility of project implementation, p J is the wellhead pressure limit, p F is the pipeline friction, p M It is caused by friction in the holes.

[0025] Optionally, the geological and engineering parameters include wellhead pressure level, depth measurement, construction displacement, number of holes, hole diameter and liquid density;

[0026] Determining the wellhead pressure limit according to the wellhead pressure level;

[0027] The pipeline friction resistance is calculated using the following formula:

[0028] Where p F is the pipeline friction resistance, d is the inner diameter of the pipe, f is the friction coefficient, v is the flow velocity of the fluid in the pipe, L is the pipe length, p f is the fluid density;

[0029] The hole friction is calculated using the following formula:

[0030] Where p M is the hole friction, C d is the hole discharge coefficient, d F is the hole diameter, N p The number of holes.

[0031] Optionally, the calculating of a second parameter reflecting geological difficulty based on geological and engineering parameters includes:

[0032] Calculate the tortuosity friction, closure stress and hydrostatic column pressure of the target block based on geological and engineering parameters;

[0033] The second parameter reflecting the geological difficulty is obtained using the following formula: P2 = p tort +p c -p H ,

[0034] Among them, P2 is the second parameter reflecting the geological difficulty, p tort For tortuous friction, p c is the closing stress, p H is the hydrostatic pressure.

[0035] Optionally, the geological and engineering parameters include: gravel content and size, minimum horizontal principal stress of the reservoir, reservoir burial depth and construction fluid density;

[0036] Determining the tortuous friction according to the gravel content and size;

[0037] The reservoir closure stress is calculated using the following formula: c =σ Hmin

[0038] Where p c is the reservoir closure stress, σ Hmin is the minimum horizontal principal stress of the reservoir;

[0039] The hydrostatic column pressure is calculated using the following formula: p H =9.8×10 -3 ρ a H

[0040] Where p H is the hydrostatic column pressure, H is the reservoir depth, ρ a is the density of the construction liquid.

[0041] Accordingly, an embodiment of the present invention further provides a temporary blocking feasibility evaluation system, the temporary blocking feasibility evaluation system comprising: a data acquisition module and a temporary blocking feasibility evaluation module;

[0042] The data acquisition module is used to collect geological and engineering parameters of the target block;

[0043] The temporary plugging feasibility evaluation module is used to calculate a first parameter reflecting the feasibility of project implementation and a second parameter reflecting the geological difficulty based on the geological and engineering parameters; and to evaluate the temporary plugging feasibility of the target block based on the first parameter and the second parameter, wherein the first parameter is related to the wellhead pressure limit, pipeline friction resistance and hole friction resistance of the target block, and the second parameter is related to the tortuosity friction resistance, closure stress and hydrostatic column pressure of the target block.

[0044] Optionally, evaluating the feasibility of temporary blocking of the target block according to the first parameter and the second parameter includes:

[0045] Constructing a temporary blocking feasibility evaluation chart with coordinate axes of a first parameter and a second parameter, the chart including a conventional temporary blocking implementation area and a key temporary blocking implementation area;

[0046] evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block;

[0047] Among them, the dividing line between the conventional area and the key research area is composed of points where the first parameter and the second parameter are equal. The conventional area is the area between the coordinate axis of the first parameter and the dividing line between the conventional area and the key research area. The key research area is the area between the coordinate axis of the second parameter and the dividing line between the conventional area and the key research area.

[0048] Optionally, evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point determined by the first parameter and the second parameter of the target block in the map includes:

[0049] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the conventional area of ​​the temporary plugging feasibility evaluation chart, it is theoretically feasible to implement the temporary plugging process in the target block;

[0050] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the key area of ​​the temporary plugging feasibility evaluation chart, it is theoretically not feasible to implement the temporary plugging process for the target block.

[0051] Correspondingly, an embodiment of the present invention further provides a machine-readable storage medium, on which instructions are stored, and the instructions are used to enable a machine to execute the temporary blocking feasibility evaluation method.

[0052] Correspondingly, an embodiment of the present invention further provides a processor for running a program, wherein the program is used to execute the temporary blocking feasibility evaluation method when being run.

[0053] In an embodiment of the present invention, a first parameter reflecting the feasibility of engineering implementation and a second parameter reflecting the geological difficulty are calculated based on the geological and engineering parameters of the target block. The feasibility of temporary plugging in the target block is evaluated by combining the first and second parameters, thereby guiding the selection of areas and wells for the temporary plugging process and improving the effectiveness of the implementation of the temporary plugging process.

[0054] Other features and advantages of the embodiments of the present invention will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following detailed description, they are used to explain the embodiments of the present invention, but do not constitute a limitation of the embodiments of the present invention. In the accompanying drawings:

[0056] FIG1 is a flow chart of a temporary blocking feasibility evaluation method provided by an embodiment of the present invention;

[0057] FIG2 is a schematic diagram of a temporary plugging feasibility evaluation chart provided by an embodiment of the present invention;

[0058] FIG3 is a schematic diagram of a temporary plugging feasibility evaluation chart provided by another embodiment of the present invention;

[0059] FIG4 is a structural block diagram of a temporary blocking feasibility evaluation system provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0060] The following describes the specific implementation of the embodiment of the present invention in detail with reference to the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the embodiment of the present invention and is not used to limit the embodiment of the present invention.

[0061] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application.

[0062] In the description of the embodiments of this application, the technical terms "first," "second," etc. are used only to distinguish different objects and should not be understood to indicate or imply relative importance or to implicitly indicate the quantity, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, the meaning of "plurality" is more than two, unless otherwise specifically defined.

[0063] The term "essentially consisting of..." to describe a combination should include the identified elements, ingredients, parts or steps and other elements, ingredients, parts or steps that do not substantially affect the basic novel features of the combination. The use of the terms "comprising" or "including" to describe the combination of elements, ingredients, parts or steps herein also contemplates embodiments that are essentially composed of these elements, ingredients, parts or steps. By using the term "may", it is intended to illustrate that any of the described attributes that "may" include are optional. Multiple elements, ingredients, parts or steps can be provided by a single integrated element, ingredient, part or step. Alternatively, a single integrated element, ingredient, part or step can be divided into separate multiple elements, ingredients, parts or steps. The disclosure "one" or "an" used to describe an element, ingredient, part or step is not intended to exclude other elements, ingredients, parts or steps.

[0064] FIG1 is a flow chart of a temporary blocking feasibility evaluation method provided by an embodiment of the present invention.

[0065] As shown in FIG1 , the temporary plugging feasibility evaluation method includes:

[0066] S110: Collect geological and engineering parameters of the target block;

[0067] S120: Calculating a first parameter reflecting the feasibility of project implementation and a second parameter reflecting the geological difficulty based on the geological and engineering parameters, wherein the first parameter is related to the wellhead pressure limit, pipeline friction, and hole friction of the target block, and the second parameter is related to the tortuosity friction, closure stress, and hydrostatic column pressure of the target block;

[0068] The geological and engineering parameters include but are not limited to wellhead pressure level, depth measurement, construction displacement, number of holes, hole diameter and liquid density, gravel content and size, minimum horizontal principal stress of the reservoir, reservoir burial depth and construction liquid density.

[0069] The first parameter reflecting the feasibility of project implementation refers to the maximum net pressure value that the project can provide, calculated from an engineering perspective, taking into account the surface wellhead pressure limit, pipeline friction resistance in the target block, and hole friction resistance; the second parameter reflecting the geological difficulty refers to the minimum net pressure value required by the geological requirements, calculated from a geological perspective, taking into account the tortuosity friction resistance, closure stress, and hydrostatic column pressure in the target block.

[0070] In step S120, the wellhead pressure limit, pipeline friction resistance and borehole friction resistance of the target block can be calculated according to geological and engineering parameters, and the first parameter can be calculated by comprehensively considering the wellhead pressure limit, pipeline friction resistance and borehole friction resistance of the target block.

[0071] For example, the wellhead pressure limit may be determined according to the wellhead pressure level in the geological and engineering parameters;

[0072] Determine the pipeline friction resistance based on the depth measurement and construction displacement: When R e <2100 is laminar flow, When R e >2100 is turbulent flow, f=0.079R e -0.25 , Where p F is the pipeline friction, MPa; d is the inner diameter of the pipe, cm; f is the friction coefficient, dimensionless; R e is the Reynolds number, dimensionless; Q is the pump displacement, m 3 / min; v is the flow velocity of the fluid in the column, cm / s; L is the length of the tube, m; p f is the fluid density, g / cm 3 .

[0073] The hole friction resistance is determined based on the construction displacement, number of holes, hole diameter and liquid density: Where p M is the hole friction, MPa, C d is the hole discharge coefficient, C d=0.6~0.9,d F is the hole diameter, cm, N p is the number of holes, holes.

[0074] The first parameter reflecting the feasibility of project implementation is obtained using the following formula: P1 = p J -p F -p M , where P1 is the first parameter reflecting the feasibility of project implementation, p J is the wellhead pressure limit, p F is the pipeline friction, p M It is caused by friction in the holes.

[0075] Furthermore, in step S120, the tortuosity friction, closure stress and hydrostatic column pressure of the target block may be calculated based on geological and engineering parameters, and the second parameter may be calculated by comprehensively considering the tortuosity friction, closure stress and hydrostatic column pressure of the target block.

[0076] For example, the tortuosity friction resistance can be determined based on the gravel content and size in the geological and engineering parameters; a comprehensive fuzzy evaluation method is used for calculation, that is, based on a large number of simulation tests, the reservoir gravel content and size are classified into more gravel, large particle size (20 MPa), less gravel, large particle size (15 MPa), more gravel, small particle size (10 MPa), less gravel, small particle size (5 MPa), and sandstone (0 MPa);

[0077] The reservoir closure stress can be determined based on the minimum horizontal principal stress of the reservoir: c =σ Hmin , where p c is the reservoir closure stress, σ Hmin is the minimum horizontal principal stress of the reservoir;

[0078] The hydrostatic column pressure can be calculated based on the reservoir depth and the density of the construction liquid: H =9.8×10 -3 ρ a H, where p H is the hydrostatic column pressure, H is the reservoir depth, ρ a is the density of the construction liquid;

[0079] The second parameter reflecting the geological difficulty is obtained using the following formula: P2 = p tort +p c -p H , where P2 is the second parameter reflecting the geological difficulty, p tort For tortuous friction, p c is the closing stress, p H is the hydrostatic pressure.

[0080] S130: Evaluate the feasibility of temporary blocking of the target block according to the first parameter and the second parameter.

[0081] In step S130, the first parameter and the second parameter may be compared. When the first parameter is greater than the second parameter, it is feasible to implement the temporary plugging process on the target block. When the first parameter is not greater than the second parameter, it is not feasible to implement the temporary plugging process on the target block.

[0082] In a preferred embodiment, a temporary blocking feasibility evaluation chart can be constructed with the coordinate axes being the first parameter and the second parameter respectively, the chart including a conventional area for temporary blocking implementation and a key area for temporary blocking implementation; the temporary blocking feasibility of the target block is evaluated according to the area in the chart of the temporary blocking feasibility evaluation point determined by the first parameter and the second parameter of the target block.

[0083] Furthermore, when the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the conventional area of ​​the temporary plugging feasibility evaluation chart, it is theoretically feasible to implement the temporary plugging process for the target block; when the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the key area of ​​the temporary plugging feasibility evaluation chart, it is theoretically not feasible to implement the temporary plugging process for the target block.

[0084] As shown in Figure 2, the boundary line between the conventional area and the key research area is composed of points where the first parameter and the second parameter are equal (solid line in Figure 2). The conventional area is the area between the coordinate axis of the first parameter and the boundary line between the conventional area and the key research area (area 1 and area 2 in Figure 2). The key research area is the area between the coordinate axis of the second parameter and the boundary line between the conventional area and the key research area (area 3 in Figure 2).

[0085] In a more preferred embodiment, the conventional temporary blocking implementation area may further include a feasible temporary blocking implementation area and a potential temporary blocking implementation area;

[0086] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the feasible area of ​​the temporary plugging feasibility evaluation chart, it is feasible to implement the temporary plugging process in the target block; when the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the potential area of ​​the temporary plugging feasibility evaluation chart, the temporary plugging feasibility of the target block is evaluated according to the early construction characteristics of the target block.

[0087] Among them, the boundary line between the feasible area and the potential area is a straight line obtained by translating the boundary line between the conventional area and the key research area in the direction of the coordinate axis of the first parameter by the size of the safe sand addition window (dashed line in Figure 2); the feasible area is the area between the coordinate axis of the first parameter and the boundary line between the feasible area and the potential area (area 1 in Figure 2), and the potential area is the area between the boundary line between the feasible area and the potential area and the boundary line between the conventional area and the key research area (area 2 in Figure 2).

[0088] The safe sand adding window refers to the requirement that the current construction pressure must be less than the construction pressure limit to ensure safe sand adding during the construction process. The difference between the two is called the safe sand adding window.

[0089] In an embodiment of the present invention, a first parameter reflecting the feasibility of engineering implementation and a second parameter reflecting the geological difficulty are calculated based on the geological and engineering parameters of the target block. The feasibility of temporary plugging in the target block is evaluated by combining the first and second parameters, thereby guiding the selection of areas and wells for the temporary plugging process and improving the effectiveness of the implementation of the temporary plugging process.

[0090] The reservoir of this embodiment is located in the 131 well block of the Mabei Oilfield in the Mahu Depression in the Central Depression of the Junggar Basin. The reservoir is a Mahu tight conglomerate oil reservoir.

[0091] First, the geological and engineering parameters of the target area were collected. Specifically, the vertical depth of the area was 3100m, the target layer had a small gravel content and particle size, cementation strength and tensile strength, a wellhead pressure limit of 84MPa, and a construction liquid density of 1.02g / cm 3 、Construction displacement 8m 3 / min, aperture 10mm, single segment 6 clusters, single cluster 8 holes, etc.

[0092] Furthermore, the tortuosity friction, closure stress, and hydrostatic column pressure of the target block were calculated based on geological and engineering parameters. Specifically, based on the minimum horizontal principal stress, the closure stress of the area was calculated to be 56 MPa; based on the gravel content and size, the tortuosity friction was calculated to be 5 MPa; based on the vertical depth of the formation of 3100 m and the construction liquid density of 1.02 g / cm 3 Determine the hydrostatic column pressure to be 31 MPa;

[0093] Furthermore, based on the geological and engineering parameters, the wellhead pressure limit, pipeline friction and hole friction of the target block are calculated; specifically, the maximum reservoir pressure increase of 74MPa is determined based on the construction pressure limit of 84MPa and the safe sand addition window of 10MPa; based on the measured depth of 4600m and the construction displacement of 8m 3 / min to determine the pipeline friction resistance of 24.1MPa; based on the construction displacement of 8m 3 / min, 48 holes, 10 mm pore diameter, and liquid density of 1.02 g / cm 3 Determine the hole friction resistance to be 5.2MPa;

[0094] Furthermore, the first parameter reflecting the feasibility of project implementation is obtained using the following formula: P1=p J -p F -p M , where P1 is the first parameter reflecting the feasibility of project implementation, p Jis the wellhead pressure limit, p F is the pipeline friction, p M is the hole friction resistance. Specifically, the first parameter is 54.7 MPa.

[0095] Furthermore, the second parameter reflecting the geological difficulty is obtained using the following formula: P2 = p tort +p c -p H , where P2 is the second parameter reflecting the geological difficulty, p tort For tortuous friction, p c is the closing stress, p H is the hydrostatic column pressure. Specifically, the second parameter is 40.7 MPa.

[0096] Finally, as shown in Figure 3, the first and second parameters corresponding to this area were projected onto the temporary plugging feasibility evaluation chart (the triangle marks Block Ma 131, the circle marks Block Aihu 2, the semicircle marks Block Ma 18, and the rectangle marks Block Jinlong 2). Block Ma 131 was found to be a feasible area, indicating that temporary plugging is feasible in this area. Similarly, evaluations were conducted on other temporary plugging test blocks in 2022, and the results were consistent with actual construction results, verifying the accuracy and operability of the chart.

[0097] The technical solution of the embodiment of the present invention is economical and can accurately predict the feasibility of temporary plugging in various areas of Mahu, providing clear quantitative guidance for on-site area and well selection. On the one hand, it can avoid the temporary plugging effect being not obvious due to the small amount of temporary plugging agent used; on the other hand, it can avoid the excessive amount of temporary plugging agent used, resulting in temporary plugging overpressure or even "blocking" the blasthole, which in turn leads to excessive construction fluid volume and other negative effects, and can improve the development efficiency of the oil field.

[0098] Furthermore, the chart of the embodiment of the present invention can guide the selection of areas and wells for the rapid temporary plugging process, and the chart is drawn based on a large amount of theoretical research, numerical simulation research and field application, and has been verified to be practical and reliable.

[0099] Correspondingly, as shown in FIG4 , an embodiment of the present invention further provides a temporary blocking feasibility evaluation system, the temporary blocking feasibility evaluation system comprising: a data acquisition module and a temporary blocking feasibility evaluation module;

[0100] The data acquisition module is used to collect geological and engineering parameters of the target block;

[0101] The temporary plugging feasibility evaluation module is used to calculate a first parameter reflecting the feasibility of engineering implementation and a second parameter reflecting the geological difficulty based on the geological and engineering parameters; and

[0102] The feasibility of temporary blocking of the target block is evaluated based on the first parameter and the second parameter.

[0103] Optionally, evaluating the feasibility of temporary blocking of the target block according to the first parameter and the second parameter includes:

[0104] Constructing a temporary blocking feasibility evaluation chart with coordinate axes of a first parameter and a second parameter, the chart including a conventional temporary blocking implementation area and a key temporary blocking implementation area;

[0105] evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block;

[0106] Among them, the dividing line between the conventional area and the key research area is composed of points where the first parameter and the second parameter are equal. The conventional area is the area between the coordinate axis of the first parameter and the dividing line between the conventional area and the key research area. The key research area is the area between the coordinate axis of the second parameter and the dividing line between the conventional area and the key research area.

[0107] Optionally, evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point determined by the first parameter and the second parameter of the target block in the map includes:

[0108] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the conventional area of ​​the temporary plugging feasibility evaluation chart, it is theoretically feasible to implement the temporary plugging process in the target block;

[0109] When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the key area of ​​the temporary plugging feasibility evaluation chart, it is theoretically not feasible to implement the temporary plugging process for the target block.

[0110] Correspondingly, an embodiment of the present invention further provides a machine-readable storage medium, on which instructions are stored, and the instructions are used to enable a machine to execute the temporary blocking feasibility evaluation method.

[0111] Correspondingly, an embodiment of the present invention further provides a processor for running a program, wherein the program is used to execute the temporary blocking feasibility evaluation method when being run.

[0112] Those skilled in the art will appreciate that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to magnetic disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0113] The present application is described with reference to the flow chart and / or block diagram of the method, device (system), and computer program product according to the embodiment of the present application. It should be understood that each flow process and / or box in the flow chart and / or block diagram and the combination of the flow process and / or box in the flow chart and / or block diagram can be realized by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processing machine or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device produce a device for realizing the function specified in one flow chart flow or multiple flows and / or one box or multiple boxes of the block diagram.

[0114] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a product including an instruction device that implements the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0115] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0116] In a typical configuration, a computing device includes one or more processors (CPUs), input / output interfaces, network interfaces, and memory.

[0117] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0118] Computer-readable media includes permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. The information can be computer-readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disc read-only memory (CD-ROM), digital versatile disc (DVD) or other optical storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer-readable media does not include transitory computer-readable media (transitory media), such as modulated data signals and carrier waves.

[0119] It should also be noted that the terms "comprises," "includes," or any other variations thereof are intended to encompass non-exclusive inclusion, such that a process, method, commodity, or apparatus that includes a series of elements includes not only those elements but also other elements not explicitly listed, or includes elements inherent to such process, method, commodity, or apparatus. In the absence of further limitations, an element defined by the phrase "comprises a ..." does not exclude the presence of other identical elements in the process, method, commodity, or apparatus that includes the element.

[0120] The above are merely embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present application should all be included within the scope of the claims of the present application.

Claims

1. A temporary plugging feasibility evaluation method, characterized in that: The temporary plugging feasibility evaluation method includes: Collect geological and engineering parameters of the target area; According to the geological and engineering parameters, a first parameter reflecting the feasibility of engineering implementation and a second parameter reflecting the geological difficulty are calculated, wherein the first parameter is related to the wellhead pressure limit, pipeline friction resistance and hole friction resistance of the target block, and the second parameter is related to the tortuosity friction resistance, closing stress and hydrostatic column pressure of the target block; The feasibility of temporary blocking of the target block is evaluated according to the first parameter and the second parameter.

2. The temporary plugging feasibility evaluation method according to claim 1 is characterized in that: Evaluating the feasibility of temporary blocking of the target block according to the first parameter and the second parameter includes: Constructing a temporary blocking feasibility evaluation chart whose coordinate axes are the first parameter and the second parameter respectively, the chart comprising a temporary blocking implementation conventional area and a temporary blocking implementation breakthrough area; Evaluate the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block; Among them, the dividing line between the conventional area and the key research area is composed of points where the first parameter and the second parameter are equal, the conventional area is the area between the coordinate axis of the first parameter and the dividing line between the conventional area and the key research area, and the key research area is the area between the coordinate axis of the second parameter and the dividing line between the conventional area and the key research area.

3. The temporary plugging feasibility evaluation method according to claim 2 is characterized in that: Evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block includes: When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the conventional area of ​​the temporary plugging feasibility evaluation chart, it is theoretically feasible to implement the temporary plugging process for the target block; When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the key area of ​​the temporary plugging feasibility evaluation chart, it is theoretically not feasible to implement the temporary plugging process for the target block.

4. The temporary plugging feasibility evaluation method according to claim 2 or 3, characterized in that: The conventional area for temporary blocking implementation includes a feasible area for temporary blocking implementation and a potential area for temporary blocking implementation; Among them, the boundary line between the feasible area and the potential area is a straight line obtained by translating the boundary line between the conventional area and the key research area in the direction of the coordinate axis of the first parameter by the size of the safe sand addition window; the feasible area is the area between the coordinate axis of the first parameter and the boundary line between the feasible area and the potential area, and the potential area is the area between the boundary line between the feasible area and the potential area and the boundary line between the conventional area and the key research area.

5. The temporary plugging feasibility evaluation method according to claim 4 is characterized in that: Evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block includes: When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the feasible area of ​​the temporary plugging feasibility evaluation chart, it is feasible to implement the temporary plugging process for the target block; When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the potential area of ​​the temporary plugging feasibility evaluation chart, the temporary plugging feasibility of the target block is evaluated according to the early construction characteristics of the target block.

6. The temporary plugging feasibility evaluation method according to claim 1, characterized in that: The calculation of the first parameter reflecting the feasibility of the project implementation according to the geological and engineering parameters includes: Calculate the wellhead pressure limit, pipeline friction and hole friction of the target block according to geological and engineering parameters; The first parameter reflecting the feasibility of project implementation is obtained using the following formula: P1=p J -p F -p M , Among them, P1 is the first parameter reflecting the feasibility of project implementation, p J is the wellhead pressure limit, p F is the pipeline friction, p M It is caused by friction of the hole.

7. The temporary plugging feasibility evaluation method according to claim 6, characterized in that: The geological and engineering parameters include wellhead pressure level, depth measurement, construction displacement, number of holes, hole diameter and liquid density; Determining the wellhead pressure limit according to the wellhead pressure level; The pipeline friction resistance is calculated using the following formula: In the formula, p F is the pipeline friction resistance, d is the inner diameter of the pipe, f is the friction coefficient, v is the flow velocity of the fluid in the pipe, L is the pipe length, and p f is the fluid density; The hole friction is calculated using the following formula: In the formula, p M is the friction resistance of the hole, C d is the hole flow coefficient, d F is the hole diameter, N p The number of holes.

8. The temporary plugging feasibility evaluation method according to claim 1, characterized in that: The calculation of the second parameter reflecting the geological difficulty according to the geological and engineering parameters includes: Calculate the tortuosity friction, closure stress and hydrostatic column pressure of the target block according to geological and engineering parameters; The second parameter reflecting the geological difficulty is obtained using the following formula: P2=p tort +p c -p H , Among them, P2 is the second parameter reflecting the geological difficulty, p tort is the tortuosity friction, p c is the closing stress, p H is the hydrostatic column pressure.

9. The temporary plugging feasibility evaluation method according to claim 8, characterized in that: The geological and engineering parameters include: gravel content and size, minimum horizontal principal stress of the reservoir, reservoir burial depth and construction liquid density; Determining the tortuous friction according to the gravel content and size; The reservoir closure stress is calculated using the following formula: p c =s Hmin In the formula, p c is the reservoir closure stress, σ Hmin is the minimum horizontal principal stress of the reservoir; The hydrostatic column pressure is calculated using the following formula: p H =9.8×10 -3 r a H In the formula, p H is the static liquid column pressure, H is the reservoir depth, ρ a is the density of the construction liquid.

10. A temporary blocking feasibility evaluation system, characterized in that: The temporary blocking feasibility evaluation system comprises: a data acquisition module and a temporary blocking feasibility evaluation module; The data acquisition module is used to collect geological and engineering parameters of the target block; The temporary plugging feasibility evaluation module is used to calculate a first parameter reflecting the feasibility of engineering implementation and a second parameter reflecting the geological difficulty according to the geological and engineering parameters; and to evaluate the temporary plugging feasibility of the target block according to the first parameter and the second parameter, wherein the first parameter is related to the wellhead pressure limit, pipeline friction resistance and hole friction resistance of the target block, and the second parameter is related to the tortuosity friction resistance, closing stress Related to the hydrostatic column pressure.

11. The temporary plugging feasibility evaluation system according to claim 10, characterized in that: Evaluating the feasibility of temporary blocking of the target block according to the first parameter and the second parameter includes: Constructing a temporary blocking feasibility evaluation chart whose coordinate axes are the first parameter and the second parameter respectively, the chart comprising a temporary blocking implementation conventional area and a temporary blocking implementation breakthrough area; Evaluate the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block; Among them, the dividing line between the conventional area and the key research area is composed of points where the first parameter and the second parameter are equal, the conventional area is the area between the coordinate axis of the first parameter and the dividing line between the conventional area and the key research area, and the key research area is the area between the coordinate axis of the second parameter and the dividing line between the conventional area and the key research area.

12. The temporary plugging feasibility evaluation system according to claim 11, characterized in that: Evaluating the feasibility of temporary blocking of the target block according to the area of ​​the temporary blocking feasibility evaluation point in the map determined by the first parameter and the second parameter of the target block includes: When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the conventional area of ​​the temporary plugging feasibility evaluation chart, it is theoretically feasible to implement the temporary plugging process for the target block; When the temporary plugging feasibility evaluation point determined by the first parameter and the second parameter of the target block is located in the key area of ​​the temporary plugging feasibility evaluation chart, it is theoretically not feasible to implement the temporary plugging process for the target block.

13. A machine-readable storage medium having instructions stored thereon, the instructions being used to enable a machine to execute the temporary blocking feasibility evaluation method as described in any one of claims 1 to 9.

14. A processor, characterized in that: Used to run a program, wherein the program, when run, is used to execute the temporary blocking feasibility evaluation method described in any one of claims 1-9.

Citation Information

Patent Citations

  • Optimal design method for promoting uniform expansion of horizontal well fracturing cracks by using temporary plugging agent

    CN110210144A

  • Digital-model-based in-crack temporary plugging fracturing crack complexity identification method

    CN110781617A

  • Method for determining real-time steering fracturing parameters based on composite temporary plugging system

    CN110905472A

  • Internal diversion fracturing temporary plugging agent dosage design method based on shale geology-engineering parameters

    CN113935093A

  • Method for optimizing particle size of diversion fracturing temporary plugging ball of deep shale gas horizontal well seam

    CN113971378A