Automatic refeeding method

Through the automatic re-throw method, the intermittent movement of the re-throw umbrella and sensor monitoring are used to solve the problems of manual re-throw operation difficulties and safety hazards, improve production efficiency and reduce costs.

WO2024217088A1PCT designated stage expired Publication Date: 2024-10-24TIANJIN ZHONGHUAN SEMICON CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/072109
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-18
Filing Date
2024-01-12
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

Manual re-investment operation is difficult, there are potential safety hazards, and production efficiency is low. Re-investment in large-scale hot fields requires a lot of time, which can easily lead to personnel fatigue and abnormal accidents.

Method used

The automatic re-throwing method is adopted, and through the intermittent descent and upward movement of the re-throw parachute, combined with sensors to monitor the unloading status of the re-throw canister, automatic lowering, re-throwing and re-throwing of the canister are realized, saving human resources.

Benefits of technology

It improves production efficiency, avoids safety hazards, realizes automated operations, and reduces production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024072109_24102024_PF_FP_ABST
    Figure CN2024072109_24102024_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed in the present disclosure is an automatic refeeding method, which comprises the following steps: performing unloading on a refeeding cylinder; in a first stage of refeeding, after descending by a first height, a refeeding umbrella performing multiple intermittent descents by the first height, and the refeeding umbrella moving at a first time interval until the refeeding of crushed materials is completed; in a second stage of refeeding, after descending by a second height, the refeeding umbrella performing multiple intermittent descents by the second height, and the refeeding umbrella moving at a second time interval until the refeeding of large materials is completed; and removing the refeeding cylinder. By means of the method, automatic cylinder descending, automatic refeeding and automatic cylinder removal are implemented, thereby saving on labor resources, improving the production efficiency, and avoiding potential safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

A method of automatic reinvestment

[0001] This application claims priority to the Chinese patent application filed with the China Patent Office on April 18, 2023, with application number 202310411963.X and application name “A Method for Automatic Resubmission”, the entire contents of which are incorporated by reference into this application. Technical Field

[0002] The embodiments of the present application relate to, but are not limited to, the field of Czochralski single crystal silicon manufacturing technology, and specifically to an automatic re-investment method. Background Art

[0003] To reduce the production cost of Czochralski single crystal silicon, one approach is to use large-scale hot fields to increase the feed rate and perform multiple re-feeds to reduce costs. Large hot fields can require up to six to eight re-feeds, and manual re-feeding can be time-consuming due to wide variations in operator skills. This fatigue can lead to increased accidents, safety hazards, and low production efficiency. Application Contents

[0004] The embodiment of the present application provides an automatic reinvestment method, which aims to solve the problems of difficult manual reinvestment operations, potential safety hazards, and low production efficiency.

[0005] The technical solution adopted in the embodiment of the present application is: an automatic reinvestment method, comprising the following steps:

[0006] Re-throwing the barrel to unload the weight;

[0007] In the first stage of re-drop, after the re-drop parachute descends to a first height, it performs multiple intermittent descents at the first height, and the re-drop parachute moves at first time intervals until the re-drop of the debris is completed;

[0008] In the second stage of re-dropping, the re-dropping parachute descends to the second height and then performs multiple intermittent drops at the second height. The re-dropping parachute moves at second time intervals until the re-dropping of the bulk material is completed;

[0009] Move away from the re-throw tube.

[0010] In some embodiments, the intermittent descent includes a descending stage and an ascending stage, the descending height of the descending stage is greater than the ascending height of the ascending stage, and the difference between the descending height and the ascending height is the first height or the second height.

[0011] In some embodiments, the descending height and the ascending height increase in an arithmetic progression.

[0012] In some embodiments, the second height is greater than the first height.

[0013] In some embodiments, the second duration is greater than the first duration.

[0014] In some embodiments, a sensor is provided on the top of the re-throw cylinder for monitoring whether the re-throw cylinder is unloaded.

[0015] In some embodiments, the seed crystal is set on the top of the re-throw cylinder, the weight change value of the sensor is the weight of the re-throw cylinder, and when the height of the seed crystal is within the error range of the standard height, the re-throw cylinder is unloaded.

[0016] In some embodiments, the error range of the standard height is from -5 mm to +5 mm.

[0017] In some embodiments, after the first stage of re-dosing is completed, the crucible performs a first stage of descent, and after the second stage of re-dosing is completed, the crucible performs a second stage of descent.

[0018] In some embodiments, the second stage of re-investment can be repeated multiple times. Beneficial effects

[0019] The automatic re-feeding method of the embodiment of the present application realizes automatic lowering of the barrel, automatic re-feeding and automatic removal of the barrel, which saves human resources, improves production efficiency and avoids safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] FIG1 is a schematic diagram of an automatic reinvestment method according to an embodiment of the present application.

[0021] Reference numerals:

[0022] 1. Lifting wire; 2. Heavy hammer; 3. Sensor; 4. Seed crystal; 5. Re-drop cylinder; 6. Re-drop umbrella; 7. Re-drop cylinder flange; 8. Single crystal furnace flange; 9. Crucible; 10. Guide tube; 11. Re-drop hook. Implementation Methods of the Application

[0023] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the embodiments described are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without making creative efforts are within the scope of protection of this application.

[0024] In the description of the embodiments of the present application, it should be understood that the orientation or positional relationship indicated by the terms "top", "bottom", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In the description of the present application, it should be noted that, unless otherwise clearly stipulated and limited, the terms "setting" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a communication between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood based on specific circumstances.

[0025] As shown in FIG1 , an automatic reinvestment method according to an embodiment of the present application includes the following steps:

[0026] Unload the re-throw cylinder 5.

[0027] The end of the hoisting wire 1 is provided with a sensor 3, which is connected to a re-casting hook 11. The re-casting hook 11 is a shell, in which a weight 2 is provided. The bottom of the weight 2 is connected to the seed crystal 4. The bottom of the shell is provided with a hook body for hoisting the top of the re-casting tube 5. The re-casting hook 11 is detachably connected to the wire and is only used during re-casting.

[0028] The lifting wire 1 places the re-throw tube 5 into the single crystal furnace through the re-throw hook 11. When the re-throw tube flange 7 is placed on the single crystal furnace flange 8, the weight on the sensor 3 changes significantly. The change value is the weight of the re-throw tube, and the re-throw tube 5 is unloaded.

[0029] During the unloading process, the bottom of the re-dumping tube 5 touches other components, such as the single crystal furnace flange 8, causing a significant change in the weight on the sensor 3, creating the illusion of pseudo-unloading. If re-dumping is performed at this time, the bottom of the re-dumping tube 5 is far from the liquid surface, and the impact force when the material block falls into the crucible 9 is too great, causing damage to the crucible 9. Therefore, it is necessary to ensure that the height of the seed crystal 4 is at the standard height during unloading. Since the seed crystal 4 and the top of the re-dumping tube 5 are simultaneously hooked on the weight 2, as long as the height of the seed crystal 4 is at the standard height during unloading, the re-dumping tube 5 is truly unloading.

[0030] When the furnace is shut down, the seed crystal 4 needs to be zero-calibrated. This is done by lowering the draft tube 10 to its zero position and then aligning the bottom of the seed crystal 4 with the bottom of the draft tube 10. During unloading, the standard height of the seed crystal 4 relative to the zero position is calculated by adding the distance from the flange of the re-injection tube 5 to the upper end face of the re-injection tube 5 and the distance from the bottom of the draft tube 10 to the flange of the re-injection tube 5.

[0031] When unloading, the height of the seed crystal 4 must be within the error range of the standard height, which is -5mm to +5mm.

[0032] In the first stage of re-drop, after the re-drop parachute 6 descends to the first height, it performs multiple intermittent descents at the first height, and the re-drop parachute 6 moves at first time intervals until the re-drop of the debris is completed.

[0033] After the re-drop tube 5 is placed on the single crystal furnace, the hook body at the bottom of the re-drop hook 11 is connected to the top of the connecting rod of the re-drop umbrella 6, driving the re-drop umbrella 6 to descend and start re-drop.

[0034] Usually, there is about 10% of crushed material at the lower end of the re-throw tube 5 to prevent silicon splashing, and the remaining 90% is large pieces of material. The first stage re-throw is used for the re-throw of crushed material.

[0035] After the parachute 6 descends to the first altitude, it then performs multiple intermittent descents, each of which includes a descent phase and an ascent phase. The descent altitude of the descent phase is greater than the ascent altitude of the ascent phase, and the difference between the descent altitude and the ascent altitude is the first altitude. The descent altitude and the ascent altitude increase in an arithmetic progression.

[0036] The weight of the re-throw can be calculated by the weight connected to the calculating sensor 3. When 10% of the crushed materials have been re-thrown, the re-throw of the first stage is completed. At this time, the crucible 9 descends in the first stage.

[0037] In the second stage of re-dropping, after the re-dropping parachute 6 descends to the second height, it performs multiple intermittent drops at the second height, and the re-dropping parachute 6 moves at second time intervals until the re-dropping of the bulk material is completed.

[0038] After the parachute 6 descends to the second altitude, it then performs multiple intermittent descents, each of which includes a descent phase and an ascent phase. The descent altitude of the descent phase is greater than the ascent altitude of the ascent phase, and the difference between the descent altitude and the ascent altitude is the second altitude. The descent altitude and the ascent altitude increase in an arithmetic progression.

[0039] The intermittent descent allows for the buffering of material blocks during the ascending phase, making it easier to discharge the blocks through the descent and ascent phases. The second height is greater than the first, and the second duration is greater than the first. The second stage re-throw can be repeated multiple times.

[0040] In some embodiments, after completing one second stage reinvestment, the second stage may be repeated for multiple reinvestments until the reinvestment is completed.

[0041] In some embodiments, after completing a second stage reinvestment, the second height can be increased and the reinvestment can be continued according to the rules of the second stage reinvestment until the reinvestment is completed.

[0042] After each re-addition in the second stage is completed, the crucible 9 is lowered once until the re-addition is completed and the crucible 9 no longer descends.

[0043] The height to which the crucible 9 descends is set according to the weight of the re-feed material. The greater the weight of the re-feed material, the greater the height to which the crucible 9 descends, and the less the weight of the re-feed material, the smaller the height to which the crucible 9 descends. The weight of the re-feed material can be monitored by the sensor 3.

[0044] Move away from the re-throw tube 5.

[0045] When the weight of sensor 3 changes by less than 5kg within 30S, it is determined that the re-drop is completed. The hoisting wire 1 drives the re-drop parachute 6 to move upward. When the re-drop parachute 6 reaches the bottom of the re-drop tube 5, if the re-drop parachute 6 continues to rise, the weight on the sensor 3 begins to increase rapidly. A limit value can be set. When the sensor 3 reaches the limit value, an alarm is immediately issued that the weight exceeds the limit and the operation is stopped. The limit value can be set according to the weight of the re-drop parachute. At this time, the re-drop tube 5 is hoisted onto the hoisting wire 1, and the re-drop tube 5 and the re-drop parachute 6 are lifted away.

[0046] Example: A method for automatic reinvestment, comprising the following steps:

[0047] (1) Re-throwing tube 5 unloads weight;

[0048] The lifting wire 1 passes through the re-throw hook 11 to place the re-throw tube 5 into the single crystal furnace. The weight on the sensor 3 changes significantly to 100 kg, and the height of the seed crystal 4 is 3002 mm. The standard height of the seed crystal 4 is 3 meters, and the error is + 2 mm. The height of the seed crystal 4 is within the error range, and the re-throw tube 5 is unloaded.

[0049] (2) In the first stage of re-drop, the re-drop parachute 6 moves every 5 seconds and moves according to the following rules:

[0050] Drop 1mm;

[0051] 2mm down, 1mm up;

[0052] 3mm down, 2mm up;

[0053] 4mm down, 3mm up;

[0054] 5mm down, 4mm up;

[0055] …

[0056] By analogy, when the crushed materials are re-added, the first stage has a total descent of 10 mm, and the crucible 9 has descended 20 mm.

[0057] (3) In the second stage, the parachute 6 moves once every 10 seconds.

[0058] 1) The first move is performed according to the following rules:

[0059] Drop 2mm;

[0060] 4mm down, 2mm up;

[0061] 6mm down, 4mm up;

[0062] 8mm down, 6mm up;

[0063] 10mm down, 8mm up;

[0064] The first second stage is completed, the parachute 6 is lowered by 10 mm, and the crucible 9 is lowered by 50 mm.

[0065] 2) In the second stage of the cycle, the parachute 6 is lowered by another 10 mm, and the crucible 9 is lowered by 20 mm.

[0066] 3) Parachute 6 is then moved according to the following rules:

[0067] Drop 3mm;

[0068] 6mm down, 3mm up;

[0069] 9mm down, 6mm up;

[0070] 12mm down, 9mm up;

[0071] The re-drop parachute 6 descends 12 mm, and the re-drop is completed, and the crucible 9 does not descend any more.

[0072] During the entire second stage, the parachute 6 descended a total of 32 mm, and the crucible 9 descended a total of 70 mm.

[0073] (4) Move out of the re-throw tube 5

[0074] If the weight of sensor 3 remains within 30 seconds, 20kg ± 3kg (17kg to 23kg), with a change of less than 5kg, the re-drop is considered complete. The re-drop hook 11 drives the re-drop parachute 6 upward. When the weight of sensor 3 rapidly increases to 25kg, an alarm is triggered indicating a weight-exceeded limit, halting the operation. At this point, the re-drop parachute 6 reaches the bottom of the re-drop tube 5 and stops rising. At this point, the re-drop tube 5 is hoisted onto the hoisting wire 1, and the re-drop tube 5 and re-drop parachute 6 are hoisted away.

[0075] The embodiment of the present application realizes automatic lowering of the barrel, automatic re-dropping and automatic removal of the barrel, which saves human resources, improves production efficiency and avoids safety hazards.

[0076] The above describes the embodiments of the present application in detail, and uses specific examples to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the technical solutions and core ideas of the present application; ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some of the technical features therein with equivalents; and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. An automatic reinvestment method, comprising the following steps: The re-throwing cylinder unloads the weight; In the first stage of re-dropping, after the re-dropping parachute descends to a first height, it performs multiple intermittent descents at the first height, and the re-dropping parachute moves at first time intervals until the re-dropping of the debris is completed; In the second stage, after the re-drop parachute descends to the second height, it performs multiple intermittent descents at the second height, and the re-drop parachute moves at second time intervals until the re-drop of the bulk material is completed; Move away from the re-throw tube.

2. The automatic reinvestment method according to claim 1, wherein: The intermittent descent includes a descent stage and an ascending stage, the descent height of the descent stage is greater than the ascending height of the ascending stage, and the difference between the descent height and the ascending height is the first height or the second height.

3. The automatic reinvestment method according to claim 2, wherein: The descending height and ascending height are increased in an arithmetic progression respectively.

4. The automatic reinvestment method according to claim 1, wherein: The second height is greater than the first height.

5. The automatic reinvestment method according to claim 1, wherein: The second duration is greater than the first duration.

6. An automatic reinvestment method according to any one of claims 1 to 5, wherein: A sensor is provided on the top of the re-throw cylinder for monitoring whether the re-throw cylinder is unloaded.

7. An automatic reinvestment method according to claim 6, wherein: The seed crystal is arranged on the top of the re-throw cylinder, the weight change value of the sensor is the weight of the re-throw cylinder, and when the height of the seed crystal is within the error range of the standard height, the re-throw cylinder is unloaded.

8. An automatic reinvestment method according to claim 7, wherein: The error range of the standard height is -5mm to +5mm.

9. An automatic reinvestment method according to any one of claims 1 to 5, wherein: After the first stage of re-investment is completed, the crucible performs the first stage of descent, and after the second stage of re-investment is completed, the crucible performs the second stage of descent.

10. An automatic reinvestment method according to any one of claims 1 to 5, wherein: The second stage reinvestment can be repeated multiple times.

Citation Information

Patent Citations

  • Continuous re-feeding production method of solar-grade Czochralski silicon

    CN102345157A

  • Re-feeding device and method for producing Czochralski crystal by using apparatus with re-feeding device

    CN103132137A

  • Single crystal furnace secondary charging system and charging method thereof

    CN105420806A

  • Silicon material feeding method

    CN113430639A

  • Czochralski single crystal re-feeding device and re-feeding method

    CN113622026A