Method and device for determining dosage of temporary plugging agent for horizontal fracture in-fracture temporary plugging and diverting fracturing
By establishing a calculation model and using Fracpro-PT software for productivity simulation, the amount of temporary plugging agent in horizontal fractures is determined, which solves the problem of the lack of dosage calculation method in the existing technology and achieves accurate temporary plugging and diverting fracturing in horizontal fractures. The dosage is determined, which improves the controllability of construction and the fracturing effect.
Patent Information
- Application Number
- PCT/CN2024/083558
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-18
- Filing Date
- 2024-03-25
- Publication Date
- 2024-10-24
AI Technical Summary
The existing technology lacks a method for calculating the amount of temporary plugging agent for temporary plugging and fracturing in horizontal fractures, which results in a small pressure increase or pressure drop during temporary plugging during the construction process, affecting the fracturing effect and economic benefits.
Establish a calculation model, use Fracpro-PT software to carry out productivity prediction simulation under different fracture parameters, determine the optimal fracture radius and temporary plug thickness, calculate the temporary plugging agent volume, and determine temporary plugging based on reservoir characteristics and gamma value differences The dosage of the temporary plugging agent is combined with the numerical calculation module and the temporary plugging agent volume calculation module to achieve accurate determination of the temporary plugging agent dosage.
It achieves quantified and accurate determination of the amount and frequency of temporary plugging agent, improves the controllability and fracturing effect of temporary plugging and diverted fracturing in horizontal fractures, fills the technical gap, and improves the stimulation volume and production of single wells.
Smart Images

Figure CN2024083558_24102024_PF_FP_ABST
Abstract
Description
Method and device for determining dosage of temporary plugging agent for temporary plugging in horizontal fractures Technical Field
[0001] The present invention relates to the technical field of oil reservoir fracturing and production increase, and specifically to a method for determining the amount of a temporary plugging agent for temporary plugging and diverting fracturing in a horizontal fracture, a repeated fracturing method, a device for determining the amount of a temporary plugging agent for temporary plugging and diverting fracturing in a horizontal fracture, a computer device, and a computer-readable storage medium. Background Art
[0002] Currently, most of my country's oil fields have entered the mid-to-late-stage production phase, with the quality of the oil being degraded year by year. Most wells that were previously fractured have gradually lost their effectiveness due to long-term production and subsequent operations. Temporary plugging and diversion fracturing technology is needed to tap into the potential of remaining oil-rich areas. For example, after the initial renovation of the Changyuan old area of the Daqing Oilfield, the remaining oil was highly fragmented and ineffective circulation was exacerbated. Over 90% of the well layers had already been fractured, and the effectiveness of repeated fracturing has deteriorated year by year, hindering efficient development. Therefore, temporary plugging and diversion fracturing, as a new technology to tap the potential of remaining reserves, has broad application prospects and market demand.
[0003] To ensure the controllability of temporary plugging-directed fracturing technology during field implementation, the amount of temporary plugging agent added and the number of temporary plugging cycles must be clearly defined during fracturing. Existing methods for calculating temporary plugging agent dosage are mostly applicable to temporary plugging within vertical fractures. However, there is no specific method for calculating temporary plugging agent dosage and the number of temporary plugging cycles during temporary plugging within horizontal fractures. These calculations rely solely on the engineers' experience, often resulting in a small temporary plugging pressure increase or even a pressure drop, which in turn affects fracturing effectiveness and economic benefits.
[0004] Therefore, a method for calculating the dosage of temporary plugging agent for temporary plugging in horizontal fractures is urgently needed.
[0005] Summary of the Invention
[0006] The purpose of the embodiments of the present invention is to provide a method for determining the amount of temporary plugging agent for temporary plugging and diverting fracturing in horizontal seams, at least to solve the technical problem of the lack of a method for calculating the amount of temporary plugging agent for temporary plugging and diverting fracturing in horizontal seams in the prior art.
[0007] To achieve the above objectives, the present invention provides, in a first aspect, a method for determining the amount of a temporary plugging agent for temporary plugging and diverting fracturing in a horizontal fracture. The method comprises: establishing a calculation model for the amount of a temporary plugging agent for temporary plugging and diverting fracturing in a horizontal fracture; conducting a production capacity prediction simulation under different fracture parameters, and determining an optimal fracture radius based on the simulation results, wherein the fracture parameters include the fracture radius and fracture conductivity; and determining the volume of the temporary plugging agent based on the optimal fracture radius, the temporary plug thickness, and the fracture height.
[0008] In an exemplary embodiment of the present invention, determining the volume of the temporary plugging agent based on the optimal fracture radius, the thickness of the temporary plugging slug, and the fracture height may include: determining the area of the temporary plugging slug based on the optimal fracture radius and the thickness of the temporary plugging slug; determining the fracture height based on a difference in reservoir gamma values; and determining the volume of the temporary plugging agent based on the fracture height and the area of the temporary plugging slug.
[0009] In an exemplary embodiment of the present invention, the calculation formula for the temporary slug area may be:
[0010] Where S is the temporary blockage area, m 2 ; r is the crack radius, m; h d is the thickness of the temporary plugging section, m; θ is the polar angle, degrees.
[0011] In an exemplary embodiment of the present invention, the determination method may further include: determining the total usage of a single layer of the temporary plugging agent based on the volume and density of the temporary plugging agent.
[0012] In an exemplary embodiment of the present invention, performing productivity prediction simulations under different fracture parameters and determining the optimal fracture radius based on the simulation results may include: determining multiple sets of fracture parameter schemes based on reservoir characteristics of the fractured layer section, and performing productivity prediction simulations under different fracture parameters; obtaining a fracture parameter-production relationship chart based on the simulation results; and determining the optimal fracture radius based on the production inflection point on the chart.
[0013] A second aspect of the present invention provides a repeated fracturing method, which includes: when designing fracturing, using the temporary plugging agent dosage determination method as described above to determine the total temporary plugging agent dosage for single-layer fracturing; designing a temporary plugging and diverting fracturing scheme within a horizontal fracture based on the total temporary plugging agent dosage; implementing temporary plugging and diverting fracturing within a horizontal fracture for a target well, and comparing the fracture extension pressure and pump-off pressure before and after each temporary plugging. If the fracture extension pressure and pump-off pressure after temporary plugging are both higher than the fracture extension pressure and pump-off pressure before temporary plugging, temporary plugging is implemented again; otherwise, temporary plugging is stopped.
[0014] A third aspect of the present invention provides a device for determining the amount of temporary plugging agent used for temporary plugging and diverting fracturing in horizontal fractures. The device may include a numerical calculation module, a fracture parameter determination module, and a temporary plugging agent volume calculation module. The numerical calculation module is used to simulate and calculate the production capacity under different fracture parameters based on Fracpro-PT software; the fracture parameter determination module is used to determine the optimal fracture radius based on the production capacity prediction simulation results under different fracture parameters; and the temporary plugging agent volume calculation module is used to determine the temporary plugging agent volume based on the optimal fracture radius, the temporary plug thickness, and the fracture height.
[0015] In another exemplary embodiment of the present invention, the determining device may further include a temporary plugging agent mass calculation module for determining the total usage of a single layer of the temporary plugging agent according to the volume and density of the temporary plugging agent.
[0016] A fourth aspect of the present invention provides a computer device, comprising a processor and a memory, wherein the memory stores at least one computer program, and the at least one computer program is loaded and executed by one or more of the above-mentioned processors to enable the computer to implement the temporary plugging agent dosage determination method as described above.
[0017] A fifth aspect of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores at least one program code, and the program code is loaded and executed by a processor to enable a computer to implement the temporary plugging agent dosage determination method as described above.
[0018] Through the above technical solution, the beneficial effects of the present invention are as follows:
[0019] (1) The present invention provides a method for quantifying and accurately determining the amount of temporary plugging agent and the number of temporary plugging times, achieving optimal matching between the fracture system and the reservoir, and filling a current technical gap;
[0020] (2) The present invention is applicable to vertical wells that implement temporary plugging and diverting fracturing in horizontal seams, which can improve the controllability of temporary plugging and diverting fracturing in horizontal seams and the transformation volume of a single well, thereby improving the fracturing effect of a single well;
[0021] (3) The method for determining the dosage of the temporary plugging agent of the present invention is used in conjunction with the fine layered fracturing process to further improve the overall fracturing effect on the vertical and horizontal dimensions of the reservoir and increase the production of a single well.
[0022] Other features and advantages of the embodiments of the present invention will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following detailed description, they are used to explain the embodiments of the present invention, but do not constitute a limitation of the embodiments of the present invention. In the accompanying drawings:
[0024] FIG1 is a flow chart of a method for determining the dosage of a temporary plugging agent according to an embodiment of the present invention;
[0025] FIG2 is a schematic diagram of calculating the temporary slug area according to an embodiment of the present invention;
[0026] FIG3A is a diagram showing the effect of temporary plugging of crack openings on crack morphology according to an embodiment of the present invention;
[0027] FIG3B is a diagram showing the effect of temporary plugging on crack morphology provided by an embodiment of the present invention;
[0028] FIG3C is a diagram showing the effect of the temporary plugging end on the crack morphology provided by an embodiment of the present invention;
[0029] FIG4 is an optimization chart of crack radius and crack conductivity provided by an embodiment of the present invention;
[0030] FIG5 is a third-stage fracturing operation curve of Well A provided by an embodiment of the present invention;
[0031] FIG6 is a curve of the extension pressure and pump stop pressure before and after temporary plugging of the third section of Well A according to an embodiment of the present invention;
[0032] FIG7 is a schematic structural diagram of a device for determining the amount of temporary plugging agent provided in an embodiment of the present invention;
[0033] FIG8 is a schematic diagram of the structure of a computer device provided by an embodiment of the present invention.
[0034] Explanation of Reference Numerals 101 - numerical calculation module; 102 - fracture parameter determination module; 103 - temporary plugging agent volume calculation module; 201 - processor; 202 - memory. DETAILED DESCRIPTION
[0035] The following describes the specific implementation of the embodiment of the present invention in detail with reference to the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the embodiment of the present invention and is not used to limit the embodiment of the present invention.
[0036] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0037] In the present invention, unless otherwise specified, directional words such as "up, down, top, bottom" are usually used to describe the relative positions of components in the directions shown in the drawings or in the vertical, perpendicular or gravity directions.
[0038] Currently, refracturing reservoirs abroad are primarily marine sediments with thick, vertical fractures. Demand for refracturing multiple horizontal fractures in vertical wells is relatively low. Therefore, calculation methods for temporary plugging agent dosage are specifically tailored to the temporary plugging and diversion fracturing process within vertical fractures and are not applicable to temporary plugging and diversion fracturing within horizontal fractures. However, most domestic oilfields target water flooding refracturing for Type III reservoirs, which are shallow, multi-layered, thin, and characterized by horizontal fractures. For temporary plugging and diversion fracturing within horizontal fractures in oilfields, the dosage and number of temporary plugging agents are determined solely by engineers' experience, and no specific quantitative calculation methods have been reported.
[0039] To solve the above problems, the present invention breaks through the previous mode of thinking that the amount of temporary plugging agent to be added and the number of temporary plugging times during the temporary plugging and diversion fracturing construction in horizontal fractures are determined based on the experience of engineers. Based on the isotropy of the formation, a series of assumptions are creatively proposed, such as that the plane of the horizontal fracture after fracturing can be approximately regarded as a circle, the type of temporary plugging agent is single, and the ends of the fractures are temporarily plugged. Based on this series of assumptions, the Fracpro-PT fracturing simulation software is used to perform production capacity simulation and prediction, and the optimal fracture radius and empirical values of temporary plugging segment thickness are determined. The annular area of the temporary plugging segment is calculated by establishing polar coordinates, and then multiplied by the fracture height and the density of the temporary plugging agent. Finally, a method for calculating the amount of temporary plugging agent to be added for temporary plugging and diversion fracturing in horizontal fractures is derived.
[0040] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0041] Example 1
[0042] Referring to FIG1 , a first embodiment of the present invention provides a method for determining the amount of temporary plugging agent for diverting fracturing in a horizontal fracture, the method comprising the following steps:
[0043] Step S101: establishing a calculation model for the amount of temporary plugging agent for diverting fracturing in horizontal fractures based on assumptions.
[0044] For example, a calculation model for the dosage of temporary plugging agents for diverting fracturing within horizontal fractures can be established based on assumptions such as: the horizontal fracture plane after fracturing is circular, the temporary plugging position is at the fracture end, and the temporary plug plane is a circular ring. Furthermore, a single type of temporary plugging agent can be assumed.
[0045] It's important to note that if the post-compression horizontal fracture plane is assumed to be circular and the temporary plugging position is assumed to be at the fracture end, then the temporary plug plane can be considered a ring. In this case, the temporary plug area can be simply simplified to calculate the ring area. This assumption helps resolve the difficulty in calculating the temporary plug area. Furthermore, assuming a single type of temporary plugging agent, the temporary plugging agent volume can be directly determined based on the temporary plugging agent area. The temporary plugging agent mass can then be directly calculated based on the temporary plugging agent volume and density.
[0046] Step S102: Use Fracpro-PT software to perform productivity prediction simulations under different fracture parameters, and determine the optimal fracture radius based on the simulation results. Fracture parameters may include fracture radius and fracture conductivity.
[0047] Illustratively, the process of determining the optimal crack radius according to the simulation results includes but is not limited to the following sub-steps S1021 to S1023.
[0048] Sub-step S1021: Determine multiple sets of fracture parameter schemes based on reservoir characteristics of the fractured layer, and conduct productivity prediction simulations under different fracture parameters.
[0049] Sub-step S1022: obtaining a chart showing the relationship between fracture parameters and production according to the simulation results;
[0050] Sub-step S1023: Determine the optimal crack radius based on the yield inflection point on the chart.
[0051] It's important to note that the optimal fracture radius is the fracture radius most suitable for the target reservoir, achieving the highest oil production. Fracture conductivity also has a certain impact on oil production: higher fracture conductivity leads to greater oil production. Therefore, numerical simulations can be performed for different fracture conductivities to determine the optimal fracture conductivity, thereby ensuring high oil production while maintaining economical development costs.
[0052] Step S103: Determine the volume of the temporary plugging agent based on the optimal fracture radius, the thickness of the temporary plug and the fracture height.
[0053] Illustratively, the process of determining the volume of the temporary plugging agent includes but is not limited to the following sub-steps S1031 to S1033.
[0054] Sub-step S1031: determining the temporary plug area based on the optimal fracture radius and the temporary plug thickness.
[0055] For example, referring to FIG2 , the annular area of the temporary blocking slug can be obtained by establishing polar coordinates. The calculation formula for the temporary blocking slug area can be as follows:
[0056] Where S is the temporary plugging area, m 2 ; r is the crack radius, m; h d is the thickness of the temporary plugging section, m; θ is the polar angle, degrees.
[0057] The thickness of the temporary plug may be an empirical value, for example, the thickness of the temporary plug may be determined to be 0.3 m.
[0058] Sub-step S1032: determining the fracture height according to the difference in reservoir gamma values.
[0059] Sub-step S1033: Determine the volume of the temporary plugging agent based on the fracture height and the temporary plug area. For example, the calculation formula for the volume of the temporary plugging agent may be as follows:
[0060] Where, V is the volume of temporary plugging agent, kg; h f is the crack height, m; r is the crack radius, m; h d is the thickness of the temporary plugging section, m; θ is the polar angle, degrees.
[0061] Furthermore, in this embodiment, the method for determining the amount of temporary plugging agent in a horizontal seam may further include step S104: determining the total amount of a single layer of temporary plugging agent based on the volume and density of the temporary plugging agent. For example, the calculation formula for the total amount of a single layer of temporary plugging agent may be as follows:
[0062] Where, m is the mass of temporary plugging agent, kg; h f is the crack height, m; r is the crack radius, m; h d is the thickness of the temporary plugging section, m; ρ is the density of the temporary plugging agent, kg / m 3 ; θ is the polar angle, degrees.
[0063] The implementation environment of the embodiments of the present application includes at least one terminal and a server, and the method is executed on the terminal or server, respectively. The terminal and server can be connected in a communication manner to enable the exchange of information. The terminal and server obtain parameter data to perform calculations and determine the dosage of the temporary plugging agent.
[0064] Among them, the terminal can be any electronic product that can interact with the user through one or more methods such as keyboard, touchpad, touch screen, voice interaction, etc., such as PC (Personal Computer), PPC (Pocket Personal Computer), tablet computer, etc.
[0065] A server can be a single server or a server cluster consisting of multiple servers. It can also be a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN (Content Delivery Network), as well as big data and artificial intelligence platforms.
[0066] In order to more clearly introduce the method for determining the dosage of temporary plugging agent provided in this embodiment, a vertical well in the Changyuan old area of Daqing Oilfield is taken as an example to further explain in detail how to determine the dosage of temporary plugging agent in the target well during temporary plugging and diversion fracturing in horizontal fractures.
[0067] Well A is a vertical well with repeated fracturing in the old area of Changyuan, Daqing. The method for determining the dosage of temporary plugging agent for temporary plugging in the horizontal fractures of Well A includes the following steps:
[0068] The first step is to study a series of hypothetical conditions for temporary plugging and diverting fracturing in horizontal fractures, and establish a calculation model for the amount of temporary plugging agent for temporary plugging and diverting fracturing in horizontal fractures.
[0069] The specific assumptions are as follows: the stratum in the fractured section of Well A is isotropic, the horizontal fracture plane after fracturing can be approximately regarded as a circle, and the solid is a cylinder; the type of temporary plugging agent is single; the temporary plugging position is at the end of the fracture, and the plane of the temporary plugging section can be approximately regarded as a ring.
[0070] Figures 3A to 3C illustrate the effects of different temporary plugging locations on fracture morphology. As shown in Figures 3A to 3C, the effects of different temporary plugging locations on fracture morphology using software can be seen. Simulation results for temporary plugging in horizontal fractures show that temporary plugging near the wellbore may cause adjacent reservoirs to open; temporary plugging in the middle of the fracture may cause adjacent reservoirs to open; and temporary plugging at the end of the fracture has little effect on adjacent reservoirs, achieving the goal of layer-by-layer stimulation. In other words, the simulation results indicate that the temporary plug plane can be approximately viewed as a ring, and that the temporary plugging location at the end of the fracture minimizes the impact on adjacent layers, facilitating layer-by-layer stimulation.
[0071] The second step is to develop a fracture radius and conductivity plan based on the reservoir characteristics of the fractured layer. Use software to simulate different fracture parameters. Based on the simulation results, create a fracture parameter-production relationship chart. Based on the production inflection point on the chart, determine the optimal fracture radius (r) and fracture conductivity.
[0072] Based on the reservoir permeability of 500mD in the fractured layer of Well A, a fracturing model was established to obtain the production capacity prediction results under different schemes. Based on the production capacity prediction results of different schemes, a chart showing the relationship between fracture parameters and production was produced (as shown in Figure 4). The optimal fracture radius was designed to be 50m and the optimal fracture conductivity was designed to be 25um. 2 .cm.
[0073] Step 3: Use software to optimize the fracture radius (r) and temporary plug thickness (h d ) empirical value, the annular area of the temporary plug (S) is calculated by establishing polar coordinates, and then multiplied by the fracture height (h f ) and density of temporary plugging agent (ρ), and finally determine the total amount of temporary plugging agent for temporary plugging and diverting fracturing in horizontal fractures (m).
[0074] According to the fracture radius of Well A of 50m and the empirical value of the temporary plugging slug thickness of 0.3m, the annular area of the temporary plugging slug is calculated by establishing polar coordinates to be 94m 2 .
[0075] Currently, there are two main types of temporary plugging agents for fractures: fiber and powder. Fiber temporary plugging agents are introduced into fractures together with proppant. After the fiber is degraded, the temporary plugging section of the fracture still effectively supports the fracture. Powder temporary plugging agents are introduced into fractures alone to form a temporary plug. After the powder is degraded, the fracture end loses effective support, reducing the length of the supported fracture. Fiber temporary plugging agents are preferred, and the density of the temporary plugging agent is determined to be 1.25×10 3 kg / m3 .
[0076] According to the difference in gamma values of the reservoir in the fractured layer of Well A, the fracture height is determined to be 0.01m, and the volume of the temporary plugging agent is calculated to be 0.94m 3 The final calculated total consumption of a single layer of temporary plugging agent is 1175 kg.
[0077] Example 2
[0078] A second embodiment of the present invention provides a repeated fracturing method for a vertical well reservoir, the repeated fracturing method comprising the following steps:
[0079] Step S201: During fracturing design, the method for determining the amount of temporary plugging agent in the first embodiment is used to determine the total amount of temporary plugging agent for single-layer fracturing.
[0080] Step S202: Design a temporary plugging and diversion fracturing plan for the horizontal fractures based on the total temporary plugging agent dosage for the fractured layer. For example, the number of temporary pluggings can be preliminarily designed based on the sand body development. The preliminarily designed single temporary plugging agent dosage is then determined based on the total temporary plugging agent dosage and the preliminarily designed number of temporary pluggings.
[0081] Step S203: Perform temporary plugging and diverting fracturing in the horizontal fractures of the target well, and optimize the temporary plugging times by comparing the changes in fracture extension pressure and pump-off pressure before and after temporary plugging.
[0082] Specifically, after each temporary plugging, the fracture extension pressure and pump-off pressure before and after temporary plugging are compared. If the fracture extension pressure after temporary plugging is higher than the fracture extension pressure before temporary plugging, and the pump-off pressure after temporary plugging is higher than the pump-off pressure before temporary plugging, it is considered that the fracture has changed its orientation and extended to a new reservoir part, and temporary plugging can be implemented again. If the fracture extension pressure after temporary plugging is less than or equal to the fracture extension pressure before temporary plugging, or the pump-off pressure after temporary plugging is less than or equal to the pump-off pressure before temporary plugging, it is considered that the fracture is still extending along the old fracture and no new fracture is generated, and temporary plugging should be stopped.
[0083] By analyzing the relative size of the crack extension pressure and the pump stop pressure after each diverting fracturing operation, the crack extension status can be analyzed and evaluated in real time, the actual number of temporary plugging times in the horizontal seam during the diverting fracturing operation can be determined, and finally the single-layer single-time dosage of the temporary plugging agent for temporary plugging in the horizontal seam can be determined.
[0084] To more clearly describe the repeated fracturing method provided in this embodiment, a vertical well in the Changyuan old area of Daqing Oilfield is taken as an example to further explain in detail how to use the determined temporary plugging agent dosage to implement temporary plugging and diverting fracturing, and optimize the number of temporary plugging times.
[0085] Well A is a vertical well with repeated fracturing in the old area of Changyuan, Daqing. The repeated fracturing method of Well A includes the following steps:
[0086] The first step is to use the above-mentioned method to determine the dosage of temporary plugging agent to calculate the total dosage of a single layer of temporary plugging agent to be 1175 kg.
[0087] The second step is to design a temporary plugging and diversion fracturing plan for the horizontal fractures based on the total amount of temporary plugging agent used for the fractured interval. For example, the initial design of the temporary plugging times can be three based on the sand body development.
[0088] The third step is to implement temporary plugging and diverting fracturing in the horizontal fracture of Well A, and optimize the number of temporary plugging times by comparing the changes in fracture extension pressure and pump stop pressure before and after temporary plugging.
[0089] As shown in Figures 5 and 6, Well A implemented temporary plugging within the horizontal fractures and then diverted fracturing. After three temporary plugging attempts, both the fracture extension pressure and pump-off pressure were higher than before, indicating extension to a new sand body. The optimized number of temporary plugging attempts was three, and the per-fracturing injection volume was 392 kg. Initially, the daily oil production increased by 7.4 tons, demonstrating excellent stimulation results.
[0090] Example 3
[0091] The third embodiment of the present invention further provides a device for determining the amount of temporary plugging agent for temporary plugging and diverting fracturing in horizontal fractures. Referring to FIG7 , the device for determining the amount of temporary plugging agent may include a numerical calculation module 101 , a fracture parameter determination module 102 , and a temporary plugging agent volume calculation module 103 .
[0092] The numerical calculation module 101 is used to simulate and calculate the production capacity under different fracture parameters according to the Fracpro-PT software.
[0093] The fracture parameter determination module 102 is connected to the numerical calculation module 101 and is used to determine the optimal fracture radius according to the productivity prediction simulation results under different fracture parameters.
[0094] The temporary plugging agent volume calculation module 103 is connected to the fracture parameter determination module 102 and is used to determine the temporary plugging agent volume according to the optimal fracture radius, the temporary plug thickness and the fracture height.
[0095] Furthermore, in this embodiment, the temporary plugging agent dosage determination device may further include a temporary plugging agent mass calculation module, which is connected to the temporary plugging agent volume calculation module and is used to determine the total dosage of a single layer of temporary plugging agent based on the temporary plugging agent volume and temporary plugging agent density.
[0096] The device provided in FIG. 7 is merely an example of the division of the functional modules described above when implementing its functions. In actual applications, the functions described above can be assigned to different functional modules as needed, that is, the internal structure of the device can be divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiments are based on the same concept. The specific implementation process is detailed in the method embodiment and will not be repeated here.
[0097] Example 4
[0098] The fourth embodiment of the present invention further provides a computer device, see Figure 8, which includes a processor 201 and a memory 202. The memory stores at least one computer program, which is loaded and executed by one or more of the above-mentioned processors to enable the computer to implement the temporary plugging agent dosage determination method as described above.
[0099] Of course, the computer device may also have components such as a wired or wireless network interface, a keyboard, and an input / output interface for input and output. The computer device may also include other components for realizing various functions of the device, which will not be described in detail here.
[0100] Example 5
[0101] A fifth embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores at least one program code, which is loaded and executed by a processor to enable a computer to implement the temporary plugging agent dosage determination method as described above.
[0102] Optionally, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, and an optical data storage device. Those skilled in the art will appreciate that all or part of the steps in the above-mentioned embodiment method can be accomplished by instructing the relevant hardware through a program, and the program is stored in a storage medium, including several instructions for enabling a single-chip microcomputer, a chip, or a processor to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disc.
[0103] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered by the scope of protection of the claims of the present invention.
Claims
1. A method for determining the amount of temporary plugging agent for temporary plugging in horizontal seams during diversion fracturing, characterized in that: The determination method comprises: Establish a calculation model for the amount of temporary plugging agent used in temporary plugging and diverting fracturing in horizontal fractures; Conducting capacity prediction simulation under different fracture parameters, and determining the optimal fracture radius according to the simulation results, wherein the fracture parameters include fracture radius and fracture conductivity; The volume of temporary plugging agent is determined based on the optimal fracture radius, temporary plugging thickness and fracture height.
2. The method for determining the amount of temporary plugging agent for temporary plugging in horizontal seams according to claim 1 is characterized in that: The method of determining the volume of the temporary plugging agent based on the optimal fracture radius, the thickness of the temporary plugging slug and the fracture height includes: Determine the temporary plugging area based on the optimal fracture radius and the temporary plugging thickness; Determine the fracture height based on the difference in reservoir gamma values; The volume of temporary plugging agent is determined based on the fracture height and the temporary plugging area.
3. The method for determining the amount of temporary plugging agent for temporary plugging in horizontal seams according to claim 2, characterized in that: The calculation formula of the temporary plugging slug area is: Where S is the temporary plugging area, m 2 ; r is the crack radius, m; h d is the thickness of the temporary plugging section, m; θ is the polar angle, degree.
4. The method for determining the amount of temporary plugging agent for temporary plugging in horizontal seams according to claim 2, characterized in that: The determination method further comprises: Based on the volume and density of the temporary plugging agent, the total amount of temporary plugging agent per single layer is determined.
5. The method for determining the amount of temporary plugging agent for temporary plugging in horizontal seams according to claim 1 or 2, characterized in that: The method of carrying out the capacity prediction simulation under different fracture parameters and determining the optimal fracture radius according to the simulation results includes: According to the reservoir characteristics of the fracturing layer, multiple groups of fracture parameter schemes are determined, and production capacity prediction simulations under different fracture parameters are carried out; Obtain a chart showing the relationship between fracture parameters and production based on simulation results; Determine the optimal fracture radius based on the production inflection point on the chart.
6. A repeated fracturing method, characterized in that: The repeated fracturing method comprises: During fracturing design, the method for determining the amount of temporary plugging agent described in any one of claims 1 to 5 is used to determine the total amount of temporary plugging agent for single-layer fracturing; Design the temporary plugging and diverting fracturing scheme in horizontal seams according to the total amount of temporary plugging agent; For the target well, temporary plugging and steering fracturing are carried out in the horizontal fractures. After each temporary plugging, the fracture extension pressure and pump stop pressure before and after the temporary plugging are compared. If the fracture extension pressure and pump stop pressure after the temporary plugging are higher than those before the temporary plugging, temporary plugging is carried out again, otherwise, the temporary plugging is stopped.
7. A device for determining the amount of temporary plugging agent for temporary plugging in horizontal seams during diversion fracturing, characterized in that: The determination device includes a numerical calculation module, a crack parameter determination module and a temporary plugging agent volume calculation module; The numerical calculation module is used to simulate and calculate the production capacity under different fracture parameters; The fracture parameter determination module is used to determine the optimal fracture radius according to the capacity prediction simulation results under different fracture parameters; The temporary plugging agent volume calculation module is used to determine the volume of the temporary plugging agent according to the optimal fracture radius, the thickness of the temporary plugging section and the fracture height.
8. The device for determining the amount of temporary plugging agent for temporary plugging in a horizontal seam according to claim 7, characterized in that: The determining device also includes a temporary plugging agent mass calculation module, which is used to determine the total usage of a single layer of the temporary plugging agent according to the volume and density of the temporary plugging agent.
9. A computer device, characterized in that: The computer device includes a processor and a memory, wherein at least one computer program is stored in the memory, and the at least one computer program is loaded and executed by one or more of the processors to enable the computer to implement the method for determining the amount of temporary plugging agent according to any one of claims 1 to 5.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one program code, and the program code is loaded and executed by a processor so that the computer implements the method for determining the amount of temporary plugging agent according to any one of claims 1 to 5.
Citation Information
Patent Citations
Method for optimizing multi-section fractured horizontal well network crack parameter
CN106321051A
Ball-throwing temporary plugging layered fracturing method for heterogeneous reservoir
CN107605449A
Method and device for determining fracture parameters of one-layer multi-horizontal fracture in shallow low-permeability oil reservoir
CN109236287A
Method and device for predicting unsteady-state productivity of closed-boundary fractured horizontal well
CN111400853A
Method for determining use amount of in-crack temporary blockage steering fracturing phase change temporary plugging agent
CN111502593A
