The invention discloses a technology for optimizing MJS construction method
pile construction. The optimization technology comprises the steps that A, geology and environment investigation is conducted, wherein a construction scheme is formulated through
geological investigation; b, monitoring point setting: monitoring the change of a soil body in the construction process; c,
data analysis: determining key construction parameters based on theoretical analysis of the
monitoring data, comparing the real-time
monitoring data with a preset threshold value, and analyzing the stability of the soil body; d,
simulation and prediction: simulating a construction process and predicting a construction result; e, process adjustment: comparing a construction
simulation result with a monitoring result, and adjusting construction parameters of different construction stages; f,
quality control, wherein the construction quality of the MJS
pile is regularly checked and evaluated in the construction process; and G, completing evaluation: according to an
evaluation result, improving the value of the construction parameter. According to the technology for optimizing MJS construction method
pile construction, the soil body change caused by MJS construction method pile construction is monitored in real time, and based on the soil body change rule, the change in the soil body in the construction stage is analyzed so as to optimize the MJS construction method pile construction technology.