Method and device for monitoring the exploitation of a well or a borehole
The method addresses the unreliability of existing well monitoring solutions by using stability indicators and selection criteria for specific flow rates to determine the operating state of wells, ensuring accurate performance comparisons and reducing false positives, thus improving the reliability of well monitoring and maintenance planning.
Patent Information
- Application Number
- PCT/FR2024/050509
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-19
- Filing Date
- 2024-04-17
- Publication Date
- 2024-10-24
AI Technical Summary
Current well monitoring solutions, such as those described in patent EP3184731B1, are unreliable and lead to unnecessary maintenance operations due to interference between wells in a catchment field, as they fail to accurately determine the operational status of wells based on specific flow values measured with similar static water levels.
A method for monitoring well operation by determining specific flow rates using stability indicators for static and dynamic water levels, selecting flow rates under similar operating conditions, and calculating the operating state of the well, which includes criteria for static and pumping flow rates relative to reference levels, to ensure reliable performance comparisons and reduce false positives.
The proposed solution provides reliable well performance measurements and reduces unnecessary maintenance operations by ensuring stability indicators are below thresholds and flow rates are measured under comparable conditions, effectively detecting clogging and predicting future well performance.
Smart Images

Figure FR2024050509_24102024_PF_FP_ABST
Abstract
Description
Description Title: Method and device for monitoring the operation of a well or drilling Technical field
[0001] The present invention relates to the field of wells and boreholes. More particularly, the present invention relates to a method and device for monitoring the operation of a well or borehole, as well as a system for operating a well or borehole, and an associated computer program. The present invention finds a particularly advantageous, although in no way limiting, application for monitoring the operation of a well and planning maintenance operations thereon. Prior art
[0002] In the current state of the art, it is known to monitor the operation of a well from specific flow rate measurements. We recall that the specific flow rate corresponds to a pumping rate related to a drawdown, the latter being equal to the difference between the static water level and the dynamic water level in the well.
[0003] Patent EP3184731B1 illustrates such a well monitoring solution. This patent proposes to monitor a well by determining specific flow rate values and to plan a well maintenance operation based on these specific flow rate values. More specifically, to make reliable comparisons of well performance and plan a maintenance operation, this patent proposes to select the specific flow rate values measured with similar static water levels.
[0004] However, the reliability of the solution proposed in patent EP3184731B1 is not fully satisfactory, since the use of this solution leads to many false positives. In other words, when this solution is implemented, unnecessary maintenance operations are planned. In particular, selecting specific flow rate values measured with similar static water levels is not sufficient to make reliable comparisons of well performance.
[0005] Consider, for example, a catchment field grouping together several water collection devices in the same water table. The different wells in the catchment field influence each other and significant interference can occur between these wells. Also, for such a catchment field, the solution proposed in patent EP3184731B1 does not allow for reliable monitoring of the operation of a well and could lead to the planning of unnecessary maintenance operations.
[0006] Therefore, there is a need for a solution for reliably determining the operating status of a well or borehole. Disclosure of the invention
[0007] The present invention aims to remedy all or part of the drawbacks of the prior art, in particular those set out above.
[0008] According to one aspect of the invention, there is proposed a method for monitoring the operation of a well or a borehole comprising: - a determination of specific flow rates from water levels and flow rates measured during the operation of the well or borehole, the determination of each specific flow rate comprising: o obtaining a so-called static water level measured during a filling phase (during which the pump is stopped), a so-called dynamic water level measured during a pumping phase (during which the pump is running) following the filling phase, and a pumping flow rate measured during the pumping phase, so that: • an indicator of instability of the static water level is lower than a first threshold, this indicator being determined from a difference between the static water level and a water level measured at a previous time of the filling phase;and / or • an indicator of instability of the dynamic water level is less than a second threshold, this indicator being determined from a difference between the dynamic water level and a water level measured at a previous instant of the pumping phase; o a calculation of said specific flow rate from the static water level, the dynamic water level, and the pumping flow rate; - a selection of a plurality of specific flow rates from among the specific flow rates determined, each selected specific flow rate satisfying the criteria according to which: o a difference between: a reference static water level; and the static water level associated with said selected specific flow rate, is less than a given percentage of a reference water height; and o a difference between: a reference pumping flow rate; and the pumping flow rate associated with said selected specific flow rate, is less than a given percentage of the reference pumping flow rate;and - a determination of an operating state of the well or borehole from the specific flow rates selected.;
[0009] The present invention proposes to monitor the operation of a well by carrying out specific flow rate measurements and analyzing them.
[0010] On the one hand, the proposed solution allows for reliable well performance measurements. In fact, specific flow rates are calculated by ensuring that the static and dynamic water levels are stable. Specifically, it is verified that the static and dynamic water levels have instability indicators below thresholds. These indicators allow for verifying the stability of the water body during static and dynamic water level measurements. This ensures that the static and dynamic water levels are measured during established regimes (respectively filling and pumping), and not during transient regimes. In particular, for a well field, the use of instability indicators ensures that another well is not started during static and dynamic water level measurements.
[0011] On the other hand, the proposed solution allows for reliable comparisons of well or drilling performance measurements. In fact, to determine whether the well is functioning properly or not (e.g. the well is clogged), it is proposed to select specific flow rates measured under similar operating conditions. Two criteria are used to select the specific flow rates from which the operating status will be determined.
[0012] Similar to the solution of patent EP3184731B1, a first selection criterion implies that the selected specific flow rates are measured for similar static water levels (i.e. in a given range around a reference static level). It is important to note that the reference water height, used to define this first selection criterion, may in particular correspond to a reference aquifer power (i.e. a thickness of the saturated zone of the aquifer), or to the reference static water level.
[0013] Furthermore, and unlike the solution of patent EP3184731B1, a second selection criterion implies that the specific flow rates selected are measured for similar pumping flow rates (i.e. in a given range around a reference pumping flow rate).
[0014] By selecting specific flow rates measured under similar operating conditions, the proposed solution ensures that comparisons of well performance are reliable. Thus, the present invention makes it possible to reliably determine the operating status of the well. This makes it possible to determine whether the well is functioning properly or not, or even whether its operation degrades over time. For example, the proposed solution can be used to determine whether the well is plugged or not.
[0015] Compared to existing solutions, and in particular that of patent EP3184731B1, the proposed solution makes it possible to improve the reliability of monitoring the operation of a well and to reduce the number of false positives, i.e. incorrect detections of a well malfunction. This improvement results in particular from the joint use of instability indicators for static and / or dynamic water levels, and the selection criteria for specific flow rates proposed.
[0016] According to one implementation method, the given percentage of the reference water height and / or the given percentage of the reference pumping flow rate are fixed according to the well or borehole.
[0017] In this implementation mode, it is proposed to adapt the selection criteria for specific flow rates according to the well. In other words, the given ranges around the reference static water level and the reference pumping rate, used to select specific flow rates considered comparable, are defined according to the well.
[0018] This implementation method thus makes it possible to adapt the proposed operational monitoring solution to different well configurations or topologies. This contributes to improving the reliability of operational monitoring.
[0019] For guidance, the given percentage of the reference water height may be 5%, 10% or 15%; and the given percentage of the reference pumping flow may be 5%, 10% or 15%.
[0020] According to an implementation method, for each specific flow rate determined: the static water level is measured after a filling time greater than or equal to 1 hour; and / or the dynamic water level is measured after a pumping time greater than or equal to 1 hour.
[0021] By setting the pumping duration to at least one hour, this implementation method ensures that the dynamic water level is measured during an established pumping regime, and not during a transient regime (e.g. the start of pumping). The same is true for the static water level. Therefore, this implementation method helps improve the reliability of the proposed solution for monitoring the operation of a well.
[0022] According to one implementation method, for each specific flow rate determined, the dynamic water level is measured after a given pumping duration (i.e. fixed, predetermined).
[0023] In this implementation, each dynamic level used to calculate a specific flow rate is measured after a fixed pumping time. Thus, the dynamic levels are measured after similar pumping times, which ensures that the specific flow rates are measured under similar operating conditions. This implementation method therefore allows for comparable well performance measurements and contributes to the reliability of the proposed solution.
[0024] According to one method of implementation, for each specific flow rate determined, an indicator of instability of the pumping flow rate is less than a third threshold, this indicator being determined from a difference between: an instantaneous pumping flow rate measured at the instant of measurement of the dynamic water level; and an instantaneous pumping flow rate measured at a previous instant of the pumping phase.
[0025] To perform a specific flow measurement of the well, it is proposed in this implementation mode to ensure not only that the static and dynamic water levels are stable, but also that the pumping rate is stable. This method of implementation makes it possible to obtain reliable performance measurements of the well.
[0026] According to one mode of implementation, the determination of the operating state of the well or drilling includes a detection of a clogging from the specific flow rates selected.
[0027] This implementation method allows for reliable detection of well clogging. As mentioned above, the proposed solution allows for reliable comparisons of well performance. Thus, compared to existing solutions, the proposed solution reduces the number of false positives, i.e. erroneous detections of clogging. The proposed solution is therefore particularly advantageous in that it avoids scheduling unnecessary maintenance operations.
[0028] According to one implementation method, a blockage is detected if a difference between: a specific reference flow rate; and one of the selected specific flow rates, is greater than a given percentage of the specific reference flow rate.
[0029] According to this implementation mode, a well clogging is detected if (and only if) the specific flow rate of the well drops significantly compared to the reference specific flow rate. It thus allows a well clogging to be reliably detected.
[0030] More specifically, the given percentage of the specific reference flow rate can be set according to the well or borehole, which allows the detection of clogging to be adapted to the configuration and topology of the well. The given percentage of the specific reference flow rate can in particular be equal to 15% or 30%.
[0031] According to one embodiment, the determination of the operating state of the well or drilling comprises a prediction (i.e. a determination) of specific flow rates for later times (i.e. later than the times of the selected specific flow rates) from the selected specific flow rates.
[0032] Here, it is proposed to predict future values of the specific flow rate of the well. Note that the prediction of specific flow rate values only uses selected specific flow rates, i.e. reliable and comparable well performance measurements. Therefore, the proposed solution allows to reliably evaluate the future evolution of the specific flow rate of the well. It can thus be used to determine a future operating state of the well.
[0033] The prediction of specific well flow rates is performed using a regression model. This can, for example, be a linear regression model. Alternatively, it could also be considered to use a non-linear regression model, or an artificial neural network to perform this prediction.
[0034] According to one method of implementation, the determination of the operating state of the well or drilling includes, if (and only if) a prediction quality indicator is greater than a fourth threshold: - a determination of a later time at which a difference between: a reference specific flow rate; and a predicted specific flow rate, is greater than a given percentage of the reference specific flow rate.
[0035] As mentioned previously, the given percentage of the specific reference flow rate can be set on a well or borehole basis, allowing adaptation to the well configuration and topology.
[0036] This implementation method allows determining when maintenance will be required. Predicted specific flow rates are used to determine whether a significant drop in the well's specific flow rate is expected. For example, this implementation method can be used to detect the formation of a well blockage and determine when maintenance will be required to correct it.
[0037] It is important to note that the proposed solution determines whether a maintenance operation will be necessary only when the prediction quality indicator is above a threshold. This ensures that conclusions about the future operating state of the well are based on a regression model that accurately describes the evolution of the specific well flow rate over time.
[0038] In particular, the prediction quality indicator is determined from differences between specific determined flows (i.e. calculated from measurements) and specific predicted flows (i.e. calculated by the regression model). For example, when a linear regression is used, this indicator may correspond to the coefficient of determination, commonly noted R². Alternatively, it could also be the root-mean-square error.
[0039] According to one implementation mode, the prediction of specific flow rates is carried out (only) if the number of specific flow rates selected is greater than a fifth threshold.
[0040] This implementation mode ensures that the number of specific flow rate values selected is sufficient to reliably predict the future evolution of the specific flow rate of the well.
[0041] According to one implementation method, water levels and flow rates are measured with a sampling interval of less than or equal to 15 minutes.
[0042] By using a sampling interval of less than or equal to 15 minutes to measure the water level and pumping rate of the well, this implementation method allows for precise monitoring of well operation over time.
[0043] According to one method of implementation, a so-called reference value is a value measured or determined following commissioning of the well or drilling, or following a maintenance operation on the well or drilling.
[0044] By "reference value" we mean here: the reference static water level, the reference water height, the reference pumping rate, and / or the reference specific flow rate. For example, a reference value is measured or determined during a pumping test (e.g., a step test pumping) carried out following the last maintenance operation on the well.
[0045] This implementation method is particularly advantageous in that it allows for reliable comparisons of well performance. Indeed, the reference values used to compare well performance are those measured during commissioning or the last maintenance operation on the well. In other words, the proposed solution determines the operating state of the well (i.e. correct operation or malfunction) by referring to a well operation considered correct, or even optimal, by the operator at that given time (i.e. a reference state).
[0046] According to one aspect of the invention, a device is proposed for monitoring the operation of a well or a borehole, the device comprising means configured to implement a method in accordance with the invention.
[0047] The operating monitoring device may be configured to implement any of the modes of implementing a method according to the invention. In particular, for each step of a method according to the invention, the proposed device may be configured to implement said step, or comprise a module configured to implement said step.
[0048] According to another aspect of the invention, there is provided a system for operating a well or a borehole comprising: - at least one pump; - a water level sensor (i.e. a probe); - at least one volumetric meter or a flow meter; and - an operating monitoring device in accordance with the invention.
[0049] According to one aspect of the invention, there is provided a computer program comprising instructions for implementing the steps of a method according to the invention, when the computer program is executed by at least one processor or computer.
[0050] The computer program may consist of one or more subparts stored in the same memory or in separate memories. The program may use any programming language, and may be in the form of source code, object code, or intermediate code between source code and object code, such as in a partially compiled form, or in any other desirable form.
[0051] According to one aspect of the invention, there is provided a computer-readable information medium comprising a computer program according to the invention.
[0052] The information carrier may be any entity or device capable of storing the program. For example, the carrier may comprise a storage medium, such as a non-volatile memory or ROM, for example a CD-ROM or a microelectronic circuit ROM, or a magnetic recording medium, for example a floppy disk or a hard disk. Furthermore, the storage medium may be a transmissible medium such as an electrical or optical signal, which may be conveyed via an electrical or optical cable, by radio or by a telecommunications network or by a computer network or by other means. The program according to the invention may in particular be downloaded onto a computer network. Alternatively, the information carrier may be an integrated circuit in which the program is incorporated, the circuit being adapted to execute or to be used in the execution of the method in question.
[0053] The proposed operating monitoring device, operating system, computer program and information medium have the advantages described above in connection with the operating monitoring method. Brief description of the drawings
[0054] Other characteristics and advantages of the present invention will emerge from the description provided below, illustrating embodiments of the invention given by way of example and without any limiting character, with reference to the attached drawings:
[0055] Figure 1 represents the architecture of a well operating system according to one embodiment of the invention;
[0056] Figure 2 represents steps of a method for monitoring the operation of a well according to one embodiment of the invention;
[0057] Figure 3 represents steps of a method according to an embodiment of the invention for determining a specific flow rate of the well;
[0058] Figure 4 depicts well water levels over time used to determine a specific well flow rate;
[0059] Figure 5 shows steps of a method according to one embodiment of the invention for selecting specific flow rate values; and
[0060] Figure 6 represents steps of a method according to an embodiment of the invention for determining an operating state of a well. Description of the embodiments
[0061] Figure 1 represents the architecture of a well operating system according to one embodiment of the invention. In particular, Figure 1 is described below to introduce the present invention and to exemplify an application thereof.
[0062] The SYS system for operating a well comprises at least: a PMP pump; a set of SENS sensors; and an APP device for monitoring operations. In particular, the SYS system may be a SCADA (Supervisory Control And Data Acquisition) type system.
[0063] The PMP pump is configured to extract (i.e. capture) water from an aquifer. This is controlled by CMD control signals that trigger the PMP pump to start or stop. As illustrated in Figure 1, the CMD control signals can be issued by the APP device. However, it could be envisaged that the CMD control signals are issued by a separate device.
[0064] The SENS sensor set comprises at least: a WLS water level sensor (i.e. a level probe); and at least one FMS volumetric sensor or flow meter. The SENS sensor set is thus configured to provide water level values N1-NN and Q1-Q flow values N measured during well operation. These values are provided to the APP device.
[0065] In addition to the water level values N1-NN and flow rates Q1-QN, the APP device is configured to obtain the state changes (i.e., start or stop) of the PMP pump, so as to be able to identify the well pumping phases (i.e. pump running) and the well filling phases (i.e. pump stopped).
[0066] The SYS system may also include a display device DISP as illustrated in Figure 1. The display device DISP may, for example, be used to display to a user specific rates Qs1-Qs M of the well determined by the APP device. It could also be used to signal to a user that a well maintenance operation is considered necessary or will be necessary.
[0067] The APP device monitors the well operation. The APP device is thus configured to automatically determine specific flow rates Qs1-Qs M of the well during its operation. To do this, it uses in particular the water levels N1-N N and the Q1-Q flow rates N measured, as well as changes in the state of the PMP pump.
[0068] The APP device is further configured to determine the operating status of the well (e.g. correct operation, operation in the process of degrading, or clogged well) from the specific flow rates Qs1-Qs M The operational monitoring carried out by the APP device is described in more detail below with reference to Figure 2.
[0069] The APP device comprises, according to the embodiment illustrated by FIG. 1: at least one processing unit or processor PROC; and at least one memory MEM.
[0070] More particularly, the APP device has the hardware architecture of a computer according to one embodiment. The memory MEM constitutes an information medium in accordance with the invention, readable by a computer and by the processor PROC, on which is recorded a computer program PROG in accordance with the invention. The program PROG comprises instructions for carrying out steps of a method in accordance with the invention, when the program PROG is executed by the processor PROC.
[0071] As illustrated in Figure 1, the APP device has a communication module COM configured to communicate with at least one of the following: the pump PMP; the set of sensors SENS; and the display device DISP. No limitation is attached to the nature of the communication interfaces between these devices, which may be wired or wireless, and may implement any protocol known to those skilled in the art.
[0072] The architecture of the SYS well operating system having been introduced, we describe below the operating monitoring carried out by the APP device with reference to the following figures.
[0073] Figure 2 represents steps of a method for monitoring the operation of a well according to one embodiment of the invention.
[0074] As illustrated in Figure 2, the proposed method comprises at least one of the steps S100 to S500 described below. These steps are implemented by the APP device.
[0075] Note that the proposed method may comprise a plurality of iterations of each of its steps. The steps of the method may be repeated at a given frequency, for example every day, every week, or every month.
[0076] At step S100, the APP device obtains the water levels N1-N N and the Q1-Q flow rates Nmeasured during well operation by the SENS sensor set. The APP device may in particular receive these values from the SENS sensor set. Alternatively, the APP device could obtain these values from a storage device.
[0077] Water levels N1-N N and the Q1-Q flow rates N measured are time-stamped. We hereinafter denote T1- T N the times of measurement of these values. In particular, the water levels N1-N N and the Q1-Q flow rates N are measured using a fixed sampling rate.
[0078] According to one embodiment, the sampling interval is less than or equal to 15 minutes. It may, for example, be equal to 5 minutes, 10 minutes or 15 minutes. This embodiment makes it possible to carry out precise monitoring of the operation of the well over time.
[0079] Q1-Q flow rates Ncan be obtained directly from a flow meter, but could also be calculated from information provided by a volumetric meter.
[0080] In step S200, the APP device determines specific rates Qs1-Qs M from the well from water levels N1-N N and Q1-Q flow rates N measured during well operation. The implementation of step S200 is described in more detail with reference to Figures 3 and 4.
[0081] Thus, the APP device has performance measurements of the well over time. These performance measurements are then used by the APP device to determine the operating status of the well.
[0082] In step S300, the APP device selects a plurality of specific rates Qs1-Qs P among the specific flow rates determined Qs1-Qs M .
[0083] In fact, the APP device selects in step S300 specific flow rates measured under similar operating conditions, which allows reliable comparisons of well performance measurements. The implementation of step S300 is described in more detail with reference to Figure 5.
[0084] In step S400, the APP device determines an FST operating state of the well using specific flow rates including only the selected specific flow rates Qs1-Qs P . It is important to note that the APP device does not use, during step S400, the specific rates not selected in step S300. The implementation of step S400 is described in more detail with reference to FIG. 6.
[0085] The APP device can determine, during this step, a current FST operating state of the well. For example, it can determine that the well is operating correctly or, on the contrary, that its operation is abnormal (e.g. the well is clogged), or that the operation of the well is degrading.
[0086] However, it may alternatively be a future FST operating state of the well. For example, based on the selected specific flow rates, the APP device can predict the evolution of the specific flow rate of the well. This makes it possible, in particular, to determine whether a maintenance operation will be necessary in the future and, if so, the date before which this maintenance operation must be carried out.
[0087] Of course, other operating parameters can be taken into account to determine the well's operating condition. We can cite, for example, water quality indicators, or pump performance indicators, or even indicators relating to the presence of bacteria in the water, etc.
[0088] In step S500, the APP device provides a SIG signal. The SIG signal may indicate the FST operating status of the well, and / or include the specific flow rate values Qs1-Qs M of the well. This GIS signal could also indicate that a maintenance operation is considered necessary and the date before which this operation must be carried out.
[0089] As illustrated in Figure 1, the SIG signal can be sent by the APP device to the DISP display device to be returned to a user (e.g. a person in charge of well operation control). Also, this SIG signal could be provided to a control device, or to a storage device.
[0090] As detailed below, the proposed solution enables reliable monitoring of well operation. By using specific flow rates measured under similar operating conditions, the proposed solution ensures that well performance comparisons are reliable and therefore that conclusions about the well's operating status are correct.
[0091] We describe below the implementation of steps S200, S300 and S400 with reference to the following figures.
[0092] Figure 3 and Figure 4 respectively represent steps of a method according to an embodiment of the invention and water levels of a well over time.
[0093] More specifically, these figures detail the implementation of step S200 previously introduced with reference to figure 2. We recall that in step S200 the APP device determines specific flow rates Qs1-Qs M from the well from water levels N1-N N and Q1-Q flow rates N .
[0094] Each specific flow rate Qs i is associated with a pumping cycle E i comprising: a filling phase (i.e. non-pumping) during which the PMP pump is stopped; immediately followed by a pumping phase during which the PMP pump is running. We also refer to a pumping cycle by the expression “filling-pumping sequence”.
[0095] Such a pumping cycle E iis illustrated in Figure 4. In this figure, the PMP pump is stopped at time T t and started at time T u . Thus, the PMP pump is stopped during the filling phase of time T t at time T u ; and the PMP pump is running during the pumping phase from time T u .
[0096] The APP device determines a specific flow rate Qs i associated with a pumping cycle E i if (and only if): the filling phase of this cycle E i is of a duration greater than a given duration (eg 1 hour); and if the pumping phase of this cycle E i is of a duration greater than a given duration (eg 1 hour). This ensures that static and dynamic water levels are measured during established regimes.
[0097] It is important to note that the frequency of pumping cycles (i.e., filling-pumping sequences) may vary depending on the well or borehole. For example, pumping cycles may occur at least once a day for a given well. In this case, the APP device determines a specific flow rate for the pumping cycle with the longest filling phase of the day and meeting the filling and pumping duration criteria stated above.
[0098] Alternatively, pumping cycles may occur less than once per day. In this case, the APP device determines a specific flow rate for any pumping cycle that meets the filling and pumping duration criteria set out above.
[0099] However, within the scope of the invention, other embodiments could also be envisaged. The APP device could determine a specific flow rate for each of the cycles of pumping (i.e. each of the filling-pumping sequences) occurring during well operation.
[0100] In step S200, and according to the embodiment of FIG. 3, the APP device implements steps S210 to S240 for each specific flow rate to be determined. We detail below the determination of a specific flow rate value Qs i associated with a pumping cycle E i .
[0101] In step S210, the APP device obtains a static water level N S i measured during the filling phase of cycle E i To do this, the APP device performs the S211 to S213.
[0102] In step S211, the APP device determines the static level N S i. More precisely, the static level N S i corresponds to the last level measured during the filling phase, i.e. the level before starting the PMP pump.
[0103] As mentioned above, the static level N S i is measured after a filling of duration R i greater than or equal to 1 hour. This allows that the static level is measured during an established filling regime. Furthermore, it should be mentioned that the longer the filling duration, the more established the filling regime will be.
[0104] In step S212, the APP device determines an instability indicator I S i of the static level N S i. This indicator I S i is determined from a difference between: the static water level N S i ; and the water level measured at the previous instant.
[0105] According to one embodiment, the indicator I S i is calculated using the following expression: ^N S i -N' S i ^ 6] where N i is the level s S [010S tactic, N' i is the level preceding the static level, and RT is the total rise of the filling phase. The total rise RT of the filling phase is equal to the difference between: the water level at the start of the filling phase; and the water level at the end of the filling phase. Note that the indicator I S i is greater than or equal to 0 since an absolute value is used to calculate it.
[0107] In step S213, the APP device checks that the instability indicator I S i of the static level N S i is less than a threshold λ S . In particular, the threshold λ S is set according to the well or drilling. It can for example be equal to 5% or 10%.
[0108] If the result of this check is positive (i.e. the measured static level is stable), the method continues at step S220. Otherwise, the calculation of the specific flow rate associated with cycle E istops; and step S200 continues to determine another specific flow rate Qs i+1 associated with a following pumping cycle E i+1 resuming at step S210.
[0109] In step S220, the APP device obtains a dynamic water level N D i measured during the pumping phase of cycle E i . To do this, the APP device implements steps S221 to S223.
[0110] In step S221, the APP device determines the dynamic level N D i. In particular, the dynamic level N D i corresponds to the water level measured after a given pumping duration P0(eg 1 hour, or hours). Thus, the dynamic level N D i is measured at time T v =T u +P0.
[0111] Measuring the dynamic level N Di after a given pumping duration P0 has two advantages. On the one hand, when this duration is greater than or equal to 1 hour, this ensures that the dynamic level is measured in a stable pumping regime. For some wells, it may be considered to use a pumping duration P0 greater than 1 hour, for example 2 hours, to ensure that the pumping regime is established.
[0112] On the other hand, this allows for comparable well performance measurements. Indeed, it is important that dynamic levels are measured after similar pumping times so that specific flow rates are comparable.
[0113] In step S222, the APP device determines an instability indicator I D i of the dynamic level N D i. This indicator I D i is determined from a difference between: the dynamic level N D i measured at time T v; and the water level measured at the previous instant T v-1 .
[0114] According to one embodiment, the indicator I D i is calculated using the following expression: ^ D D D N i -N' i ^ I i = , RT
[0115] with: N D i, the dynamic level; N' D i, the water level preceding the dynamic level; and RT, the total rise. Note that the indicator I D i is greater than or equal to 0 since an absolute value is used to calculate it.
[0116] In step S223, the APP device checks that the instability indicator I D i of the dynamic level N D i is less than a threshold λ D . In particular, the threshold λ D is set according to the well or drilling. It can for example be equal to 5% or 10%.
[0117] If the result of this check is positive (i.e. the measured dynamic level is stable), the method continues at step S230. Otherwise, the calculation of the specific flow rate associated with cycle E i stops; and step S200 continues to determine another specific flow rate Qs i+1 associated with a following pumping cycle E i+1 resuming at step S210.
[0118] In step S230, the APP device obtains a pumping flow rate Q i measured during the pumping phase of cycle E i . To do this, the APP device implements steps S221 to S223.
[0119] In step S231, the APP device determines the pumping flow rate Q i . It can be an instantaneous flow rate measured at time T v (i.e. the instant of measurement of the dynamic level). Alternatively, the pumping flow rate Q i can be an average flow rate measured since the start of the pumping phase (i.e. from time Tu at time T v ).
[0120] In step S232, the APP device determines an instability indicator I Q i of the pumping flow rate Q i . This indicator I Q i is determined from a difference between: an instantaneous flow rate measured at time T v dynamic level measurement N D i ; and the instantaneous flow rate measured at the previous instant T v-1 .
[0121] According to one embodiment, the indicator I Q i is calculated using the following expression: ^Q i -Q' i ^
[0122] with: Q i , the instantaneous flow rate measured at ; and Q' i , the instantaneous flow rate at the previous instant T v-1 . Note that the indicator I Q i is greater than or equal to 0 since an absolute value is used to calculate it.
[0123] In step S233, the APP device checks that the instability indicator I Q i of the pumping flow rate Q i is less than a threshold λ Q . In particular, the threshold λ Q is set according to the well or drilling. It can for example be equal to 5% or 10%.
[0124] If the result of this check is positive (i.e. the measured pumping flow rate is stable), the method continues at step S240. Otherwise, the calculation of the specific flow rate associated with cycle E i stops; and step S200 continues to determine another specific flow rate Qs i+1 associated with a following pumping cycle E i+1 resuming at step S210.
[0125] In step S240, the APP device calculates the specific flow rate Qs i from static level N S i, of the dynamic level N D i, and the pumping flow rate Q i . The specific flow rate Qs iis calculated using the following expression: Q i
[0126] The proposed solution allows for the specific flow rate of the well during its operation, ensuring that the measured static levels, dynamic levels and pumping rates are stable. More specifically, the use of instability indicators makes it possible to verify the stability of the water body during measurements of static and dynamic water levels and the stability of pumping rates. Thus, the proposed solution makes it possible to obtain reliable well performance measurements.
[0127] We describe with reference to the following figures the use of these performance measures to determine the operating condition of the well.
[0128] Figure 5 represents steps of a method according to an embodiment of the invention. This figure details the implementation of step S300 previously introduced with reference to the Figure 2. We recall that step S300 relates to the selection of a plurality of specific flow rates Qs1-Qs P among the specific flow rates determined Qs1-Qs M .
[0129] In fact, it is proposed to select only specific flow rates measured under similar operating conditions, which will then allow reliably determining whether the well is functioning properly or not.
[0130] More precisely, the proposed solution is based on two selection criteria CRT_NS and CRT_Q. The first criterion CRT_NS ensures that the selected specific flow rates are measured for similar static water levels (i.e., within a given range around a reference static level). And, the second criterion CRT_Q ensures that the selected specific flow rates are measured for similar pumping rates (i.e., within a given range around a reference flow rate). For a specific flow rate to be selected, it must satisfy both of these criteria.
[0131] In step S300, the APP device implements steps S310 and S320 for each specific flow rate Qs j among the specific flow rates determined Qs1-Qs M . The APP device thus checks whether the specific flow rate Qs j meets the selection criteria CRT_NS and CRT_Q. If so, the specific flow rate Qs j is selected; otherwise, it is excluded.
[0132] Note that steps S310 and S320 can be implemented by the APP device in parallel, or consecutively.
[0133] In step S310, the APP device determines the difference between: a reference static water level N S 0 ; and the static water level N S j used to determine the specific flow rate Qs j . It then checks that the difference |N S j - N S 0| is less than a given percentage of a reference water height. This reference water height can correspond to an aquifer power (i.e. a thickness of the saturated zone of the aquifer). Alternatively, the reference water height could correspond to the reference static water level N S 0.
[0134] In particular, the given percentage of the reference water height is set according to the well. It can, for example, be equal to 5%, 10%, or 15%. This allows the CRT_NS selection criterion to be adapted according to the configuration or topology of the well.
[0135] As mentioned above, the reference water height corresponds, according to one embodiment, to a reference aquifer power. This embodiment is particularly advantageous in that it allows the selection criterion CRT_NS to be defined independently of the altitude of the well. In other words, the given range around the static reference level, used to select the specific flow rates, is defined independently of the altitude of the well.
[0136] Consider, for example, a well whose static reference level is 1500 m above mean sea level and whose base (i.e. the wall) is located at 1400 m above mean sea level. For this well, the aquifer capacity (i.e. the thickness of the saturated zone of the aquifer) is therefore 100 m. With a given percentage of 10% of the reference height, the given range of selection is 10% x 100 m = 10 m, if the aquifer capacity is used as the reference height. On the other hand, the range of selection is 10% x 1500 m = 150 m, if the static reference level is used as the reference height. Thus, by using the aquifer capacity as the reference height, rather than the static reference level, this embodiment ensures that the specific flow rates selected for this well actually have similar static levels.
[0137] In step S320, the APP device determines a difference between: a reference pumping flow rate Q0; and the pumping flow rate Q i used to calculate the specific flow rate Qs j . The APP device checks that the difference |Q j -Q0| is less than a given percentage of the reference pumping flow rate Q0.
[0138] Similarly, the given percentage of the reference flow rate Q0 is fixed according to the well. It can be equal to 5%, 10% or 15%. This allows the CRT_Q selection criterion to be adapted according to the configuration or topology of the well.
[0139] The proposed solution described here allows for the selection of specific flow rates measured under similar operating conditions and thus the selection of comparable well performance measurements.
[0140] Furthermore, it is important to mention that the static reference level ^ ^ ^, the reference water height, and the reference pumping flow rate Q0 are measured during a pumping test carried out following the commissioning of the well, or following the last maintenance operation. Also, and as detailed below, the proposed solution uses a specific reference flow rate Qs0 measured during this pumping test.
[0141] The proposed solution thus selects specific flow rates measured under operating conditions similar to those of the reference specific flow rate (similar static levels, similar pumping rates, and similar pumping durations). Therefore, to determine the operating state of the well, the proposed solution only uses well performance measurements comparable to the well's performance at the time of its commissioning or its last maintenance operation.
[0142] We detail, with reference to the following figure, the determination of the operating state of the well from the selected specific flow rates.
[0143] Figure 6 represents steps of a method according to an embodiment of the invention. This figure details the implementation of step S400 of determining the FST operating state of the well, previously introduced with reference to Figure 2.
[0144] According to the embodiment of FIG. 6, step S400 comprises at least one of steps S410 to S430 described below.
[0145] In step S410, the APP device determines whether the well is plugged from specific flow rates including only the selected specific flow rates Qs1-Qs P . More specifically, the APP device detects a clogging of the well if a difference between: the specific reference flow rate Qs0; and one of the selected specific flow rates Qs1-Qs P, is greater than a given percentage of the reference specific flow rate Qs0.
[0146] The given percentage of the specific reference flow rate is set according to the well, which allows the detection of clogging to be adapted to the configuration and topology of the well. This given percentage can notably be equal to 15% or 30%.
[0147] The proposed solution thus detects a well clogging if (and only if) a significant drop in the specific flow rate is measured. This drop in specific flow rate is defined in relation to the reference specific flow rate, a measure of the well's performance at the time of its commissioning or the last maintenance operation. The drop in specific flow rate is thus measured in relation to an operation considered correct by the operator.
[0148] It is worth noting that the proposed solution reliably detects well clogging. The reliability of the proposed solution results from the fact that it uses only specific flow rates measured under similar operating conditions to detect clogging.
[0149] Compared to existing solutions, the proposed solution reduces the number of false positives, i.e. erroneous detections of clogging. The proposed solution is therefore particularly advantageous in that it makes it possible to avoid planning unnecessary maintenance operations.
[0150] In step S420, the APP device predicts (i.e. determines) specific flow rates Qs M+1 -Qs M+K for later (i.e. future) instants from specific flow rates including only the selected specific flow rates Qs1-Qs P .
[0151] According to one embodiment, the prediction step S420 is performed only if the number of selected specific flow rates Qs1-Qs P is greater than one-fifth threshold. This ensures that the number of specific flow values selected is sufficient to reliably predict the future evolution of the specific flow.
[0152] Prediction of specific well flow rates can be achieved using a linear regression model. Alternatively, consideration could be given to using a non-linear regression model, or an artificial neural network to perform this prediction.
[0153] To make this prediction, the proposed solution uses only selected specific flow rates, thus reliable and comparable well performance measurements. As a result, the proposed solution allows for a reliable assessment of the future evolution of the specific flow rate of the well. It can thus be used to determine a future operating state of the well, as described below.
[0154] In step S430, the APP device determines, from the predicted specific flow rates Qs M+1 -Qs M+K , a date on which a well maintenance operation is considered necessary. For this purpose, and according to the embodiment of FIG. 6, step S430 comprises steps S431 to S433.
[0155] In step S431, the APP device determines an indicator I p prediction quality. This indicator is calculated from differences between specific flow rates determined Qs1-Qs M; and predicted specific flow rates (i.e. calculated by the regression model).
[0156] Indicator I p thus characterizes the accuracy of the regression model. In other words, it characterizes the ability of the regression model to describe and predict the specific flow rate of the well.
[0157] When linear regression is used to make the prediction, the indicator I P can correspond to the coefficient of determination R², or to the root-mean-square error.
[0158] No limitation is attached to the type of prediction quality indicator used. Within the framework of the invention, it may be envisaged to use any type of prediction quality indicator.
[0159] In step S432, the APP device verifies that the flag I p prediction quality is greater than a fourth threshold λ P. If the result of this check is positive, the method continues at step S433; otherwise, step S430 is interrupted.
[0160] The APP device thus verifies that the regression model used for prediction is capable of accurately describing the evolution of the specific flow rate of the well over time.
[0161] In step S433, the device determines a later time T N+k to which a difference between: the reference specific flow rate Qs0; and the specific flow rate Qs N+k predicted for time T N+K , is greater than a given percentage of the reference specific flow rate Qs0.
[0162] Advantageously, the proposed solution makes it possible to determine the date on which a maintenance operation will be necessary. Indeed, the predicted values of the specific flow rate are used here to determine whether a significant drop in the specific flow rate of the well is expected. The proposed solution can thus be used to detect the formation of a well blockage and determine the date on which a maintenance operation will be necessary to remedy it.
[0163] Obviously, if no specific flow rate drop is observed, the APP device can indicate that no maintenance operation is considered necessary.
[0164] Compared to existing solutions, the proposed solution determines whether maintenance will be necessary only when the prediction quality indicator is above a threshold. This ensures that conclusions about the future operating state of the well are based on a regression model that accurately describes the evolution of the specific well flow rate over time.
[0165] Additional variants: It should be noted that the order in which the steps of a method according to the invention are carried out, in particular with reference to the attached drawings, constitutes only an example of embodiment without any limiting character, variants being possible. In particular, a method according to the invention may comprise one or more iterations of the steps described above, in particular with reference to the attached drawings. Furthermore, the reference signs do not limit the scope of the protection, their sole function being to facilitate the understanding of the claims.
[0166] A person skilled in the art will understand that the embodiments and variants described above constitute only non-limiting examples of implementation of the invention. In particular, a person skilled in the art may envisage any adaptation or combination of the embodiments and variants described above in order to meet a very specific need.
Claims
Claims 1. Method for monitoring the operation of a well or drilling comprising: - a determination (S200) of specific flow rates (Qs 1 -Qs M ) from water levels (N 1 -N N ) and flow rates (Q 1 -Q N ) measured during the operation of the well or drilling, the determination of each specific flow rate (Qs i ) comprising: o obtaining (S210, S220, S230) a so-called static water level (^ ^ ^ ) measured during a filling phase, of a so-called dynamic water level (^ ^ ^ ) measured during a pumping phase following the filling phase, and a pumping flow rate (Q i ) measured during the pumping phase, so that: • an instability indicator (^ ^ ^ ) of the static water level (^ ^ ^ ) is less than a first threshold (λ S ), this indicator (^ ^ ^) being determined from a difference between the static water level (^ ^ ^ ) and a water level measured at a previous instant (T u-1 ) of the filling phase; and / or • an instability indicator (^ ^ ^ ) of the dynamic water level (^ ^ ^ ) is less than a second threshold (λ D ), this indicator (^ ^ ^ ) being determined from a difference between the dynamic water level (^ ^ ^ ) and a water level measured at a previous instant (T v-1 ) of the pumping phase; o a calculation (S240) of said specific flow rate (Qs i ) from the static water level (^ ^ ^ ), of the dynamic water level (^ ^ ^ ), and the pumping flow rate (Q i ); - a selection (S300) of a plurality of specific flow rates (Qs 1 -Qs P ) among the specific flow rates determined (Qs 1 -QsM ), each specific flow rate selected (Qs j ) satisfying the criteria (CRT_NS, CRT_Qs) according to which: o a difference between: a static reference water level (^ ^ ^ ) ; and the static water level (^ ^ ^ ) associated with said selected specific flow rate (Qs j ), is less than a given percentage of a reference water height; and o a difference between: a reference pumping flow rate (Q 0 ); and the pumping flow rate (Q i ) associated with said selected specific flow rate (Qs i ), is less than a given percentage of the reference pumping flow rate (Q 0 ); and - a determination (S400) of an operating state (FST) of the well or drilling from the selected specific flow rates (Qs 1 -Qs P).
2. Method according to claim 1, in which the given percentage of the reference water height and / or the given percentage of the reference pumping flow rate (Q 0 ) are fixed according to the well or drilling.
3. Method according to claim 1 or 2, in which for each determined specific flow rate (Qs i ): the static water level (N S i) is measured after a filling time (R i ) greater than or equal to 1 hour; and / or the dynamic water level (N D i) is measured after a pumping time (P 0 ) greater than or equal to 1 hour.
4. Method according to any one of claims 1 to 3, in which for each specific flow rate determined (Qs i ), the dynamic water level (^ ^ ^ ) is measured after a given pumping duration (P 0 ).
5. Method according to any one of claims 1 to 4, in which for each specific flow rate determined (Qs i), an instability indicator (^ ^ ^ ) of the pumping flow rate (Q i ) is less than a third threshold (λ Q ), this indicator (^ ^ ^ ) being from a difference between: a measured instantaneous pumping flow rate dynamic water level measurement (^ ^ ^ ); and an instantaneous pumping flow rate measured at a previous instant (T v-1 ) of the pumping phase.
6. Method according to any one of claims 1 to 5, in which the determination (S400) of the operating state (FST) of the well or borehole comprises a detection (S410) of a clogging from the selected specific flow rates (Qs 1 -Qs P 7. The method of claim 6, wherein a clogging is detected (S410) if a difference between: a reference specific flow rate (Qs 0 ); and one of the selected specific flow rates (Qs 1 - QsP ), is greater than a given percentage of the reference specific flow rate (Qs) 0 ), this given percentage being fixed according to the well or drilling.
8. Method according to any one of claims 1 to 7, in which the determination (S400) of the operating state (FST) of the well or drilling comprises a prediction (S420) of specific flow rates (Qs M+1 -Qs M+K ) for later times from the selected specific flow rates (Qs 1 -Qs P ).
9. The method of claim 8, wherein the determination (S400) of the operating state (FST) of the well or drilling comprises, if a prediction quality indicator (I p ) is greater than a fourth threshold (λ P ): - a determination (S433) of a later instant (T N+k ) to which a difference between: a specific reference flow rate (Qs 0 ); and a predicted specific flow rate (Qs N+k), is greater than a given percentage of the reference specific flow rate (Qs 0 ).
10. Method according to claim 8 or 9, wherein the prediction (S420) of specific flow rates (Qs M+1 -Qs M+K ) is performed if the number of selected specific flow rates (Qs 1 -Qs P ) is greater than a fifth threshold.
11. A method according to any one of claims 1 to 10, wherein the water levels (N 1 -N N ) and the flow rates (Q 1 -Q N ) are measured with a sampling step less than or equal to 15 minutes.
12. Method according to any one of claims 1 to 11, in which a said reference value (^ ^ ^ , Q 0 , S 0) is a value measured or determined following commissioning of the well or drilling, or following a maintenance operation of the well or drilling.
13. Device (APP) for monitoring the operation of a well or drilling, the device (APP) comprising means (PROC, MEM, COM) configured to implement a method according to any one of claims 1 to 12.
14. System (SYS) for operating a well or drilling comprising: - at least one pump (PMP); - a water level sensor (WLS); - at least one volumetric meter or flow meter (FMS); and - an operation monitoring device (APP) according to claim 13.
15. Computer program (PROG) comprising instructions for implementing the steps of a method according to any one of claims 1 to 12, when said computer program (PROG) is executed by at least one processor (PROC). 16.Computer-readable information medium (MEM) comprising a computer program (PROG) according to claim 15.