Vaporization system control method, semiconductor device manufacturing method, substrate processing apparatus, vaporization system, and program
The method of controlling vaporization system pressure after replenishing liquid raw materials in semiconductor manufacturing prevents poor vaporization, ensuring efficient semiconductor device production by maintaining optimal conditions within the vaporization system.
Patent Information
- Application Number
- PCT/JP2024/012791
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-19
- Filing Date
- 2024-03-28
- Publication Date
- 2024-10-24
AI Technical Summary
Poor vaporization of liquid raw materials occurs due to pressure fluctuations when replenished in vaporization containers, leading to inefficient semiconductor device manufacturing processes.
A method where the liquid raw material is supplied into the vaporization container, and after a predetermined time, pressure adjustment within the container is stopped, allowing vaporized gas to be maintained and supplied to a processing container, thereby preventing poor vaporization.
This method effectively suppresses poor vaporization of liquid raw materials, ensuring consistent and efficient semiconductor device manufacturing by maintaining optimal pressure conditions within the vaporization system.
Smart Images

Figure JP2024012791_24102024_PF_FP_ABST
Abstract
Description
Vaporization system control method, semiconductor device manufacturing method, substrate processing apparatus, vaporization system, and program
[0001] The present disclosure relates to a vaporization system control method, a semiconductor device manufacturing method, a substrate processing apparatus, a vaporization system, and a program.
[0002] Patent Document 1 discloses a vaporization system that generates vaporized gas by vaporizing a liquid source stored in a vaporization container, and a substrate processing apparatus that performs substrate processing using the generated vaporized gas.
[0003] WO2018 / 056346
[0004] When the liquid source stored in the vaporization container decreases, the vaporization container may be replenished with the liquid source. However, due to pressure fluctuations within the vaporization container that occur when the liquid source is injected into the vaporization container, vaporization failure of the liquid source may easily occur. The present disclosure provides a technology that can suppress vaporization failure of the liquid source that may occur due to the injection of the liquid source into the vaporization container.
[0005] According to the present disclosure, there is provided a technology that performs the following steps: (a) supplying a liquid source into a vaporization container; (b) adjusting the pressure in the vaporization container to reduce the pressure when (a) is completed or after a first predetermined time has elapsed from that point; (c) after (b), maintaining a state in which the pressure adjustment in the vaporization container is stopped while vaporizing the liquid source; and (d) after (c), supplying the vaporized gas generated by the evaporation of the liquid source in the vaporization container into a processing container in which a substrate is processed.
[0006] According to the present disclosure, it is possible to suppress the occurrence of poor vaporization of the liquid source that may occur due to the injection of the liquid source into the vaporization container.
[0007] 1 is a schematic configuration diagram of a vertical processing furnace of a substrate processing apparatus preferably used in one embodiment of the present disclosure, showing a processing furnace 202 portion in a vertical cross-sectional view. FIG. 2 is a schematic configuration diagram of a vertical processing furnace of a substrate processing apparatus preferably used in one embodiment of the present disclosure, showing a processing furnace 202 portion in a cross-sectional view along line L in FIG. 1. FIG. 3 is a configuration diagram showing a vaporization system provided in a substrate processing apparatus preferably used in one embodiment of the present disclosure. FIG. 4 is a schematic configuration diagram of a controller 121 of a substrate processing apparatus preferably used in one embodiment of the present disclosure, showing a control system of the controller 121 in a block diagram. FIG. 5 is a diagram showing a film formation sequence when performing a film formation process on a wafer in one embodiment of the present disclosure. FIG. 6 is a diagram showing the relationship between the passage of time and the pressure in a vaporization container in one embodiment of the present disclosure. FIG. 7 is a diagram showing the relationship between the passage of time and the pressure in a vaporization container in another embodiment of the present disclosure. FIG. 8 is a diagram showing the relationship between the passage of time and the pressure in a vaporization container in a comparative example of the present disclosure. FIG. 9 is a configuration diagram showing a vaporization system provided in a substrate processing apparatus preferably used in another embodiment of the present disclosure.
[0008] <One Aspect of the Present Disclosure> One aspect of the present disclosure will be described below, mainly with reference to Figures 1 to 6 and 8. Note that all drawings used in the following description are schematic, and the dimensional relationships between elements, the ratios of elements, etc. shown in the drawings do not necessarily match those in reality. Furthermore, the dimensional relationships between elements, the ratios of elements, etc. do not necessarily match between multiple drawings.
[0009] (1) Configuration of the Substrate Processing Apparatus As shown in Fig. 1, a substrate processing apparatus 10 equipped with a vaporization system (see Fig. 3) described below includes a processing furnace 202 for processing wafers 200 as substrates. The processing furnace 202 has a cylindrical heater 207 extending in the vertical direction of the apparatus, and the heater 207 is supported by a heater base (not shown) serving as a holding plate. The heater 207 heats the inside of a processing chamber 201 (described below) to a predetermined temperature.
[0010] Furthermore, a cylindrical processing tube 203 serving as a processing section is disposed inside the heater 207 and is concentric with the heater 207. A processing chamber 201 for processing a plurality of wafers 200 is formed inside the processing tube 203. Specifically, a plurality of wafers 200 (e.g., 25 to 200 sheets) are stacked vertically by a boat 217 serving as a substrate support, and the plurality of wafers 200 loaded by this boat 217 are disposed inside the processing chamber 201. A cylindrical heat insulating cylinder 218 is disposed below the boat 217.
[0011] A cylindrical manifold 209 is disposed below the processing tube 203 and is concentric with the processing tube 203. The upper end of the manifold 209 faces the lower end of the processing tube 203, and the manifold 209 supports the processing tube 203 via an O-ring 220 serving as a sealing member.
[0012] Furthermore, nozzles 410, 420 extending in the vertical direction are disposed in the processing chamber 201 between the wall surface of the processing tube 203 and the plurality of wafers 200 loaded on the boat 217. Furthermore, a plurality of supply holes 410a, 420a for supplying gas are formed in the nozzles 410, 420, respectively, in an area that faces the wafers 200 in the horizontal direction. As a result, gas ejected from the supply holes 410a, 420a flows toward the wafers 200.
[0013] Furthermore, the lower end portions of the nozzles 410 and 420 penetrate the side wall of the manifold 209, and the lower end portions of the nozzles 410 and 420 protrude outside the manifold 209. The lower end portions of the nozzles 410 and 420 are connected to gas supply pipes 310 and 320, respectively, as gas supply lines.
[0014] The gas supply pipes 310, 320 are respectively provided with mass flow controllers (MFCs) 312, 322 serving as flow rate controllers (flow rate control units) and valves 314, 324 serving as on-off valves, in order from the upstream side in the flow direction of gas flowing through the gas supply pipes 310, 320 (hereinafter referred to as the "gas flow direction"). Furthermore, ends of gas supply pipes 510, 520 serving as gas supply lines for supplying inert gas are connected to the gas supply pipes 310, 320 in portions downstream of the valves 314, 324 in the gas flow direction. The gas supply pipes 510, 520 are respectively provided with the MFCs 512, 522 and the valves 514, 524, in order from the upstream side in the flow direction of gas flowing through the gas supply pipes 510, 520.
[0015] A raw material gas serving as a process gas generated by vaporizing a liquid raw material in a storage tank 610 (described later) is supplied from the gas supply pipe 310 to the process chamber 201 via the MFC 312, the valve 314, and the nozzle 410. The gas supply pipe 310, the MFC 312, and the valve 314 constitute a raw material gas supply system or a raw material gas supply unit. (Similarly, hereinafter, the "supply system" may be referred to as the "supply unit.") The nozzle 410 may be considered to be included in the raw material gas supply system. Furthermore, the vaporization system 500 (described later) may be considered to be included in the raw material gas supply system. The raw material gas supply system may also be referred to as a raw material supply system or a vaporized gas supply system.
[0016] On the other hand, a reactive gas serving as a processing gas is supplied from the gas supply pipe 320 to the processing chamber 201 via an MFC 322 , a valve 324 , and a nozzle 420 .
[0017] When a reactive gas (reactant) is supplied from the gas supply pipe 320, a reactive gas supply system (reactant supply system) is mainly configured by the gas supply pipe 320, the MFC 322, and the valve 324. The nozzle 420 may be considered to be included in the reactive gas supply system. When a reactive gas is flowed from the nozzle 420, the nozzle 420 may be referred to as a reactive gas nozzle.
[0018] Furthermore, an inert gas is supplied from gas supply pipes 510 and 520 to the processing chamber 201 via MFCs 512 and 522 , valves 514 and 524 , and nozzles 410 and 420 .
[0019] An inert gas supply system is mainly composed of gas supply pipes 510 and 520, MFCs 512 and 522, and valves 514 and 525.
[0020] Meanwhile, one end of an exhaust pipe 231 serving as an exhaust flow path for exhausting the atmosphere of the processing chamber 201 is connected to a wall surface of the manifold 209. A pressure sensor 245 serving as a pressure detector (pressure detection unit) for detecting the pressure of the processing chamber 201 and an APC (Auto Pressure Controller) valve 243 serving as an exhaust valve (pressure adjustment unit) are attached to the exhaust pipe 231, and a vacuum pump 246 serving as a vacuum exhaust device is attached to the end of the exhaust pipe 231.
[0021] The APC valve 243 is a valve configured to be able to evacuate and stop the evacuation of the processing chamber 201 by opening and closing the valve while the vacuum pump 246 is operating, and further to be able to adjust the pressure of the processing chamber 201 by adjusting the valve opening based on pressure information detected by the pressure sensor 245 while the vacuum pump 246 is operating. An exhaust system is mainly configured by the exhaust pipe 231, the APC valve 243, and the pressure sensor 245. The vacuum pump 246 may be considered to be included in the exhaust system.
[0022] A seal cap 219 is provided below the manifold 209 as a furnace port cover that can airtightly close the lower end opening of the manifold 209. The seal cap 219 is configured to abut against the lower end of the manifold 209 from below in the vertical direction via an O-ring 220. On the opposite side of the process chamber 201 from the seal cap 219, a rotation mechanism 267 that rotates a boat 217 (described later) is installed. A rotation shaft 255 of the rotation mechanism 267 is connected to the boat 217. The rotation mechanism 267 is configured to rotate the boat 217, thereby rotating the wafers 200.
[0023] The seal cap 219 is configured to be raised and lowered vertically by a boat elevator 115 serving as an elevating mechanism installed vertically outside the process tube 203. The boat elevator 115 is configured to be able to load and unload the boat 217 into and out of the process chamber 201 by raising and lowering the seal cap 219. The boat elevator 115 is configured as a transfer device that transfers the boat 217, i.e., the wafers 200, into and out of the process chamber 201. In addition, a shutter 219s serving as a furnace port cover is provided below the manifold 209. The shutter 219s can airtightly close the lower end opening of the manifold 209 via an O-ring 220c while the seal cap 219 is being lowered by the boat elevator 115. The opening and closing operation of the shutter 219s is controlled by a shutter opening and closing mechanism 115s.
[0024] A temperature sensor 263 serving as a temperature detector is also provided in the processing chamber 201. The temperature distribution in the processing chamber 201 is set to a desired value by adjusting the power supply to the heater 207 based on the temperature information detected by the temperature sensor 263. The temperature sensor 263 is provided along the inner wall of the processing tube 203, similar to the nozzles 410 and 420.
[0025] [Vaporization System] Next, the vaporization system 500 will be described with reference to Fig. 3. The vaporization system 500 is a system that vaporizes a liquid source stored in a storage tank 610 to generate a vaporized gas as a source gas, and supplies the vaporized gas into the processing chamber 201 via a gas supply pipe 310. The vaporization system 500 includes a vaporizing unit 600, a replenishing unit 700, and a pressure adjusting unit 800, which will be described later. The vaporization system 500 can also be considered to include at least a part of a source gas supply system.
[0026] [Vaporization section 600] The vaporization section 600 includes a storage tank 610 as a vaporization container for storing a liquid raw material that will be vaporized into a raw material gas, a heater 630 as a heating section (heating device) for heating the storage tank 610 to vaporize the liquid raw material, and a pressure sensor 640 for detecting the pressure inside the storage tank 610.
[0027] Storage tank 610 is formed, for example, in the shape of a rectangular parallelepiped or a cylinder. The storage space formed inside storage tank 610 becomes a space sealed from the outside when valves 620 and 720 are closed. The lower end side of gas supply pipe 310 is connected to pass through the ceiling of storage tank 610 so as to communicate with the inside of the storage space.
[0028] When the valves 620 and 720 are closed, the liquid source material is vaporized in the storage tank 610, thereby filling the storage tank 610 with vaporized gas. The vaporized gas thus filled is pumped to the gas supply pipe 310 by the pressure inside the storage tank 610.
[0029] In the vaporization unit 600 of this embodiment, no other gases such as a carrier gas are supplied to the storage tank 610. Therefore, the pressure increase in the storage tank 610 is mainly caused by the generation of vaporized gas due to the vaporization of the liquid source and the supply (replenishment) of the liquid source into the storage tank 610, which will be described later.
[0030] [Replenishing Unit 700] Replenishing unit 700, which serves as a liquid source supply system, is an apparatus that replenishes storage tank 610 with liquid source pressure-fed from replenishing tank 760, and includes a liquid supply pipe 754 as a liquid source supply line through which the liquid source flows, and valve 720, which is an on-off valve. Replenishing unit 700 may also include replenishing tank 760 as a supply source of liquid source. Valve 720 is not limited to an open / close operation (full open / full closed operation), and may be configured such that the opening degree of valve 720 is controlled by control unit 121 to adjust the flow rate (or pressure-fed pressure) of the liquid source. Valve 720 is closed when liquid source is not being replenished.
[0031] Liquid supply pipe 754 penetrates the ceiling of storage tank 610, and one end is connected to communicate with the inside of storage tank 610. By opening valve 720, the liquid source in liquid supply pipe 754 is pressure-fed into storage tank 610. At this time, when valve 620 is closed, the liquid source is pressure-fed into storage tank 610, which is an enclosed space, and the pressure inside storage tank 610 may rise rapidly.
[0032] The replenishing tank 760 is disposed outside the storage tank 610 and is connected to the other end of the liquid supply pipe 754. A pressure feed pipe 761 is connected to the top of the replenishing tank 760. A pressurized gas is sent from the pressure feed pipe 761 to the replenishing tank 760, and the liquid source stored in the replenishing tank 760 is pressure fed into the liquid supply pipe 754 by the pressure in the replenishing tank 760.
[0033] The pressure inside the refill tank 760 is greater than the pressure inside the storage tank 610. For example, the pressure inside the storage tank 610 is 100 Pa to 10,000 Pa, and the pressure from the refill tank 760 is 0.1 MPa to 10 MPa.
[0034] [Pressure Adjustment Unit 800] The pressure adjustment unit 800 includes an exhaust pipe 810 as an exhaust line connected at one end directly or indirectly to the storage tank 610, a valve 820 which is an on-off valve provided in the exhaust pipe 810, and an exhaust pump 830 as an exhaust device connected to the exhaust pipe 810 downstream of the valve 820. In this embodiment, the exhaust pipe 810 is connected to the gas supply pipe 310 downstream of the valve 620, and is connected so as to communicate with the inside of the storage tank 610 via the gas supply pipe 310. In this case, the valve 620 can also be considered to constitute the pressure adjustment unit 800.
[0035] As another embodiment, as shown in FIG. 9, the exhaust pipe 810 may be provided so as to be directly connected to the storage tank 610 without passing through the gas supply pipe 310 .
[0036] Alternatively, instead of providing the vacuum pump 830, the exhaust pipe 810 may be connected to the exhaust pipe 231 (downstream of the APC valve 245), and the vacuum pump 246 may be used to exhaust air from the exhaust pipe 810. Alternatively, instead of providing the vacuum pump 830, the exhaust pipe 810 may be connected to an exhaust line provided in a facility in which the substrate processing apparatus 10 is installed, and the exhaust pipe 810 may be used to exhaust air through the exhaust line.
[0037] Furthermore, the valve 820 is not limited to an open / close operation (full open / full closed operation), and may be configured so that the flow rate of exhaust (exhaust speed) can be adjusted by controlling the opening degree by the control unit 121. The valve 820 is closed when pressure adjustment inside the storage tank 610, which will be described later, is not performed.
[0038] Furthermore, in addition to the valve 820, the exhaust pipe 810 may further be provided with an MFC configured to adjust the flow rate of the exhaust gas in the exhaust pipe 810. The flow rate control by the MFC performed by the control unit 121 makes it possible to adjust the exhaust speed when adjusting the pressure in the storage tank 610.
[0039] Next, the control unit 121 provided in the substrate processing apparatus 10 will be described. As shown in Fig. 4, the control unit 121 is configured as a computer including a CPU (Central Processing Unit) 121a, a RAM (Random Access Memory) 121b, a storage device 121c, and an I / O port 121d. The RAM 121b, the storage device 121c, and the I / O port 121d are configured to be able to exchange data with the CPU 121a via an internal bus 121e. An input / output device 122 configured as, for example, a touch panel, is connected to the control unit 121.
[0040] The storage device 121c is configured with, for example, a flash memory, an HDD (Hard Disk Drive), etc. Various programs, such as a control program for controlling the operation of the substrate processing apparatus and a liquid source replenishment program (described later), and data for executing each program, are readably stored in the storage device 121c. The RAM 121b is configured as a memory area (work area) in which programs and data read by the CPU 121a are temporarily stored.
[0041] The I / O port 121d is connected to the MFCs 312, 322, 512, 522, valves 314, 324, 514, 524, 620, 720, 820, pressure sensors 245, 640, APC valve 243, vacuum pumps 246, 830, temperature sensor 263, heaters 207, 630, rotation mechanism 267, boat elevator 115, shutter opening / closing mechanism 115s, etc.
[0042] The CPU 121a is configured to read and execute a control program from the storage device 121c, and to read data from the storage device 121c in response to an input of an operation command from the input / output device 122, etc.
[0043] The CPU 121a is configured to control, in accordance with the contents of the read data, the flow rate adjustment of various gases by the MFCs 312, 322, 512, and 522, the opening and closing of the valves 314, 324, 514, 524, 620, 720, and 820, the opening and closing of the APC valve 243, the pressure adjustment by the APC valve 243 based on the pressure sensor 245, the opening and closing of the valves 620 and 820 based on the pressure sensor 640, the start and stop of the vacuum pumps 246 and 830, the temperature adjustment of the heater 207 based on the temperature sensor 263, the rotation and rotation speed adjustment of the boat 217 by the rotation mechanism 267, the raising and lowering of the boat 217 by the boat elevator 115, and the opening and closing of the shutter 219s by the shutter opening and closing mechanism 115s. Note that, in addition to the control unit 121, another control unit configured to be able to control the above-mentioned controlled elements constituting the vaporization system 500 may be provided.
[0044] The control unit 121 can be configured by installing a program stored in an external storage device (e.g., a magnetic disk such as a magnetic tape or a hard disk, an optical disk such as a CD or a DVD, or a semiconductor memory such as a USB memory or a memory card) 123 into a computer.
[0045] The storage device 121c and the external storage device 123 are configured as computer-readable recording media. Hereinafter, these will be collectively referred to simply as recording media. When the term recording media is used in this specification, it may include only the storage device 121c alone, only the external storage device 123 alone, or both. Note that the program (program product) may be provided to the computer using a communication means such as the Internet or a dedicated line, without using the external storage device 123.
[0046] (2) Substrate Processing Step Next, a substrate processing method will be described, in which a step of processing a substrate using the substrate processing apparatus 10 is performed as one step in the manufacturing process of a semiconductor device. Also, a control method for the vaporization system 500 will be described, in which a step of refilling the storage tank 610 with a liquid source is performed as one step in the substrate processing step. The operation of each component of the substrate processing apparatus 10 is controlled by the control unit 121.
[0047] First, an example of a sequence for forming a film on wafers 200 using the substrate processing apparatus 10 will be described with reference to FIG. 5 . In this embodiment, the processing chamber 201 containing a plurality of stacked wafers 200 is heated to a predetermined temperature. Then, a source gas supply process for supplying a source gas containing a predetermined element through the supply holes 410a of the nozzle 410 into the processing chamber 201 and a reactive gas supply process for supplying a reactive gas through the supply holes 420a of the nozzle 420 are performed a predetermined number of times (n times, where n is an integer equal to or greater than 1). In this manner, a film containing the predetermined element is formed on the wafers 200. The predetermined number of times (n times) here corresponds to one batch process in the film formation process and is set in advance.
[0048] [Loading and Loading] First, a plurality of wafers 200 are loaded onto the boat 217. The shutter 219s is moved by the shutter opening / closing mechanism 115s to open the lower end opening of the manifold 209. Then, as shown in Fig. 1, the boat 217 loaded with the plurality of wafers 200 is lifted by the boat elevator 115 and loaded into the processing chamber 201. In this state, the seal cap 219 seals the lower end of the manifold 209.
[0049] [Pressure and Temperature Adjustment] Next, the processing chamber 201 is evacuated by the vacuum pump 246 to a desired pressure (vacuum level). At this time, the pressure in the processing chamber 201 is measured by the pressure sensor 245, and the APC valve 243 is feedback-controlled (pressure adjustment) based on the measured pressure information. The vacuum pump 246 is kept in a constantly operating state at least until the processing of the wafer 200 is completed.
[0050] The processing chamber 201 is heated to a desired temperature by the heater 207. The heating of the processing chamber 201 by the heater 207 continues at least until the processing of the wafers 200 is completed.
[0051] Furthermore, the boat 217 and the wafers 200 are rotated by the rotation mechanism 267. The rotation of the boat 217 and the wafers 200 by the rotation mechanism 267 continues at least until the processing of the wafers 200 is completed.
[0052] [Film Formation Process (Example of Substrate Processing)] [Source Gas Supply Process] Next, valves 314 and 620 are opened, and the source gas, which is the vaporized gas in the storage tank 610, is supplied into the processing chamber 201 via the gas supply pipe 310. As the source gas, one or more gases obtained by vaporizing a liquid source in the storage tank 610 can be used. Note that while the liquid source refill process described below is not being performed, the valve 820 of the pressure adjustment unit 800 is always closed.
[0053] Here, the storage tank 610 and the stored liquid source are heated by the heater 630, and the heated liquid source is vaporized to generate a source gas (vaporized gas). Immediately before the supply of the source gas to the processing chamber 201 is started, the valve 620 is closed, and the storage tank 610 is filled with the source gas. The pressure in the storage tank 610 decreases while the source gas is being supplied (i.e., while the valves 314 and 620 are open), and increases while the supply of the source gas is stopped (i.e., while the valves 314 and 620 are closed) due to the vaporization of the liquid source.
[0054] FIG. 6 shows the change in pressure in the storage tank 610 over time in this embodiment. For example, the change in pressure before time T0 shown in FIG. 6 shows that a decrease in pressure due to the supply of source gas and an increase in pressure due to the cessation of the supply of source gas occur a predetermined number of times (n times) during one batch process in the film formation process. By repeating the vaporization and supply of the liquid source one or more times in this manner, the liquid source in the storage tank 610 is consumed. In this embodiment, the liquid source is replenished into the storage tank 610 (a replenishment process) for each batch process. However, the liquid source replenishment process may be performed for each batch process.
[0055] The source gas supplied from the storage tank 610 has its flow rate adjusted by the MFC 312 and is supplied from the supply hole 410 a of the nozzle 410 to the processing chamber 201. At the same time, the valve 514 is opened to allow a carrier gas to flow into the gas supply pipe 510. The carrier gas has its flow rate adjusted by the MFC 512 and is supplied from the supply hole 410 a of the nozzle 410 together with the source gas into the processing chamber 201 and is exhausted from the exhaust pipe 231.
[0056] Furthermore, in order to prevent the source gas from entering the nozzle 420, the valve 524 is opened to allow the carrier gas to flow into the gas supply pipe 520. The carrier gas is supplied to the processing chamber 201 via the gas supply pipe 520 and the nozzle 420, and is exhausted from the exhaust pipe 231.
[0057] At this time, the APC valve 243 is adjusted to set the pressure in the processing chamber 201 to, for example, a pressure in the range of 1 to 1000 Pa. In this specification, for example, when a numerical range is stated as 1 to 1000 Pa, it means 1 Pa or more and 1000 Pa or less. In other words, the numerical range includes 1 Pa and 1000 Pa. The same applies to other numerical ranges stated in this specification.
[0058] The supply flow rate of the source gas controlled by the MFC 312 is, for example, within a range of 10 to 2000 sccm, preferably 50 to 1000 sccm, and more preferably 100 to 500 sccm. The time per cycle for supplying the source gas to the wafer 200 is, for example, within a range of 1 to 60 seconds. The heater 207 is controlled so that the temperature of the wafer 200 is, for example, within a range of 400 to 600°C.
[0059] When the source gas is supplied to the processing chamber 201 under the above-mentioned conditions, a layer containing the predetermined element contained in the source gas is formed on the top surface of the wafer 200 .
[0060] The inert gas may be, for example, nitrogen (N 2 Inert gases that can be used include rare gases such as argon (Ar) gas, helium (He) gas, neon (Ne) gas, and xenon (Xe) gas. One or more of these gases can be used as the inert gas. This also applies to the steps described below.
[0061] The source gas may be a gas containing a predetermined element such as a semiconductor element such as silicon (Si) or a metal element such as titanium (Ti), zirconium (Zr), hafnium (Hf), tantalum (Ta), aluminum (Al), molybdenum (Mo), or tungsten (W), and which is in a liquid state at room temperature and pressure (i.e., a liquid source).The source gas can be obtained by vaporizing these liquid source gases in the storage tank 610.
[0062] For example, monochlorosilane (SiH 3 Cl) gas, dichlorosilane (SiH 2 Cl 2 ) gas, trichlorosilane (SiHCl 3 ) gas, tetrachlorosilane (SiCl 4 ) gas, hexachlorodisilane (Si 2 Cl 6 ) gas, octachlorotrisilane (Si 3 Cl 8 ) gas, 1,2-bis(trichlorosilyl)ethane ((SiCl 3 )2 C 2 H 4 ) gas, bis(trichlorosilyl)methane ((SiCl 3 ) 2 CH 2 ) gas, 1,1,2,2-tetrachloro-1,2-dimethyldisilane ((CH 3 ) 2 Si 2 C l 4 ) gas, 1,2-dichloro-1,1,2,2-tetramethyldisilane ((CH 3 ) 4 Si 2 Cl 2 ) gas, 1-monochloro-1,1,2,2,2-pentamethyldisilane ((CH 3 ) 5 Si 2 Cl) gas, trifluorosilane (SiHF) gas, tetrafluorosilane (SiF 4 ) gas, tribromosilane (SiHBr 3 ) gas, tetrabromosilane (SiBr 4 Halosilane source gases such as trisilane (Si 3 H 8 ) gas, tetrasilane (Si 4 H 10 ) gas, pentasilane (Si 5 H 12 ) gas, hexasilane (Si 6 H 14 ) gas, other inorganic silane source gases such as tetrakisdimethylaminosilane (Si[N(CH 3 ) 2 ] 4 ) gas, trisdimethylaminosilane (Si[N(CH 3 ) 2 ] 3 H) gas, bis(diethylaminosilane) (Si[N(C 2 H 5 ) 2 ] 2 H 2 ), bis(tertiary butylaminosilane (SiH 2 [NH(C 4 H 9 )] 2various aminosilane source gases such as 1,4-disilabutane (Si 2 C 2 H 10 Other organic silane precursor gases such as SiO 2 ) gas, and liquid precursors can also be used.
[0063] In addition, for example, tetrakis(dimethylamino)titanium (Ti[N(CH 3 ) 2 ] 4 ) gas and titanium tetrachloride (TiCl 4 ) gas, tetrakis(ethylmethylamino)hafnium (Hf[N(C 2 H 5 ) (C H 3 )] 4 ) gas and hafnium tetrachloride (HfCl 4 ) gas, tetrakis(ethylmethylamino)zirconium (Zr[N(C 2 H 5 ) (CH 3 )] 4 ) gas, and trimethylaluminum (Al(CH)) as an Al-containing raw material. 3 ) 3 ) gas, tetraethoxytantalum (Ta(OC) 2 H 5 ) 5 ), trisethylmethylamino tertiarybutylimino tantalum (Ta[NC(CH 3 ) 3 ][N(C 2 H 5 ) CH 3 ] 3 ), pentaethoxytantalum (Ta(OC 2 H 5 ) 5 ) A liquid source such as a gas can be used.
[0064] [Residual Gas Removal Process] After the layer containing the predetermined element is formed, the valves 314 and 620 are closed to stop the supply of the source gas. At this time, the APC valve 243 is left open, and the processing chamber 201 is evacuated by the vacuum pump 246 to remove any source gas remaining in the processing chamber 201 that has not reacted or that has contributed to the formation of the layer containing the predetermined element. With the valves 514 and 524 open, the supply of carrier gas to the processing chamber 201 is maintained. The carrier gas acts as a purge gas, and can enhance the effect of removing any source gas remaining in the processing chamber 201 that has not reacted or that has contributed to the formation of the layer containing the predetermined element from the processing chamber 201.
[0065] [Reactive Gas Supply Step] After removing the residual gas from the processing chamber 201, the valve 324 is opened to allow a reactive gas to flow into the gas supply pipe 320. As the reactive gas, for example, an oxygen-containing gas (oxidizing gas, oxidizing agent) is used as a reactive gas (reactant) that contains oxygen (O) and reacts with a predetermined element contained in the source gas. As the oxygen-containing gas, for example, oxygen (O 2 ) gas, ozone (O 3 ) gas, plasma-excited O 2 Gas (O 2 *), O 2 Gas and hydrogen (H 2 ) gas, water vapor (H 2 O gas), hydrogen peroxide (H 2 O 2 ) gas, nitrous oxide (N 2 O) gas, nitric oxide (NO) gas, nitrogen dioxide (NO 2 ) gas, carbon monoxide (CO) gas, carbon dioxide (CO 2 ) gas, etc. As the reactive gas, one or more of these gases can be used.
[0066] The reaction gas has a flow rate adjusted by the MFC 322, is supplied from the supply holes 420a of the nozzle 420 to the wafers 200 in the processing chamber 201, and is exhausted from the exhaust pipe 231. That is, the wafers 200 are exposed to the reaction gas.
[0067] At this time, a valve 524 is opened to allow a carrier gas to flow into the gas supply pipe 520. The flow rate of the carrier gas is adjusted by an MFC 522, and the carrier gas is supplied into the processing chamber 201 together with the reactive gas, and is then exhausted from the exhaust pipe 231. At this time, in order to prevent the reactive gas from entering the nozzle 410, a valve 514 is opened to allow the carrier gas to flow into the gas supply pipe 510. The carrier gas is supplied into the processing chamber 201 via the gas supply pipe 510 and the nozzle 410, and is then exhausted from the exhaust pipe 231.
[0068] At this time, the APC valve 243 is appropriately adjusted to set the pressure in the processing chamber 201 to, for example, a pressure in the range of 1 to 1000 Pa. The supply flow rate of the reaction gas controlled by the MFC 322 is set to, for example, a flow rate in the range of 5 to 40 slm, preferably 5 to 30 slm, and more preferably 10 to 20 slm. The time per cycle for supplying the reaction gas to the wafer 200 is set to, for example, a range of 1 to 60 seconds. Other processing conditions are the same as those in the source gas supply process described above.
[0069] When an oxygen-containing gas is supplied as a reactive gas to the processing chamber 201 under the above-described conditions, the reactive gas reacts with at least a part of the layer containing the predetermined element formed on the wafer 200 in the source gas supply step, oxidizing the layer containing the predetermined element and forming an oxide layer containing the predetermined element and O. In other words, the layer containing the predetermined element is modified into an oxide layer containing the predetermined element.
[0070] After the oxide layer is formed, the supply of the reaction gas is stopped by closing the valve 324. Then, by the same process procedure as in the residual gas removal process after the source gas supply process, the reaction gas and reaction by-products remaining in the process chamber 201 that have not reacted or that have contributed to the formation of the oxide layer are removed from the process chamber 201.
[0071] The cycle of sequentially performing the vaporization process, source gas supply process, residual gas removal process, reactive gas supply process, and residual gas removal process described above is performed a predetermined number of times (n times). In this way, by performing a plurality of processes a predetermined number of times in one batch process, an oxide film is formed by stacking oxide layers on the wafers 200.
[0072] In this specification, batch processing may refer to processing in which a cycle of sequentially performing a source gas supply step, a residual gas removal step, a reactive gas supply step, and a residual gas removal step is performed a predetermined number of times (n times) to form a film of a predetermined thickness on the wafers 200. Then, a film of a predetermined thickness is formed on the wafers 200 in one batch.
[0073] [Exhaust / Pressure Adjustment] After a film of a predetermined thickness is formed on the wafer 200 and the residual gas removal process is completed, the valves 514 and 524 are opened, and carrier gas is supplied to the processing chamber 201 from the gas supply pipes 310 and 320, respectively, and exhausted from the exhaust pipe 231. The carrier gas acts as a purge gas, and residual gases and by-products in the processing chamber 201 are removed from the processing chamber 201. Thereafter, the atmosphere in the processing chamber 201 is replaced with the carrier gas, and the pressure in the processing chamber 201 is returned to normal pressure (return to atmospheric pressure).
[0074] [Transportation / Removal] Thereafter, the seal cap 219 is lowered by the boat elevator 115, the lower end of the manifold 209 is opened, and the processed wafers 200 are transported out of the processing tube 203 from the lower end of the manifold 209 while being supported by the boat 217.
[0075] After the wafers 200 are unloaded, the shutter 219s is moved and the lower end opening of the manifold 209 is sealed by the shutter 219s. After being unloaded to the outside of the processing tube 203, the processed wafers 200 are taken out of the boat 217. In this embodiment, the wafers 200 are loaded into and unloaded from the processing tube 203 (processing chamber 201) for each batch.
[0076] As described above, after the wafer 200 on which a film of a predetermined thickness has been formed through each process (step) is removed, if a film is to be formed on another wafer 200, the "loading / carrying-in," "pressure / temperature adjustment," "film formation process," "exhaust / pressure adjustment," and "carry-out / removal" are performed again. In other words, batch processing is performed again on the wafer 200. Note that the batch processing in this specification can also be considered to be a series of processes from "loading / carrying-in" to "carry-out / removal."
[0077] The above-described film formation process allows an oxide film containing a predetermined element contained in the source gas to be formed on the wafer 200. For example, using the above-described source gas, oxide films such as a titanium oxide film (TiO film), a zirconium oxide film (ZrO film), a hafnium oxide film (HfO film), a tantalum oxide film (TaO film), an aluminum oxide film (AlO film), a molybdenum oxide film (MoO film), and a tungsten oxide film (WO film) can be formed. Furthermore, by using a nitrogen-containing gas (nitriding gas, nitriding agent) instead of an oxygen-containing gas as the reactive gas, nitride films such as a titanium nitride film (TiN film), a zirconium nitride film (ZrN film), a hafnium nitride film (HfN film), a tantalum nitride film (TaN film), an aluminum nitride film (AlN film), a molybdenum nitride film (MoN film), and a tungsten nitride film (WN film) can also be formed.
[0078] [Liquid Source Replenishing Process] After the source gas supplying process for one batch of processing is completed, the storage tank 610 is replenished with the liquid source (replenishing process). The replenishing process is performed after the source gas supplying process for one batch of processing is completed and the valves 314 and 620 are closed, and after the source gas supplying process for the next batch of processing starts and before the valves 314 and 620 are opened. The replenishing process may be performed simultaneously with other processes in one batch of processing, or may be performed simultaneously with other processes. In this embodiment, the replenishing process is performed for each batch, but as described above, the replenishing process may be performed once for each of several batches.
[0079] In this embodiment, in both the film forming process and the refilling process, a state in which heating control is performed by the heater 630 is maintained so that at least one of the storage tank 610 and the stored liquid source reaches a predetermined temperature.
[0080] (Step A: Liquid Source Supply Step) After the source gas supply process is completed, valve 720 is opened while valve 620 is closed, and the liquid source in liquid supply pipe 754 is pressure-fed into storage tank 610. By opening valve 720 for a predetermined time and then closing it, a predetermined amount of liquid source is supplied (replenished) into storage tank 610. At this time, as described above, when valve 620 is closed and the liquid source is pressure-fed into storage tank 610, which is an enclosed space, the pressure in storage tank 610 may rise suddenly. As an example, FIG. 6 shows that the pressure in storage tank 610 rises to pressure Pf when the supply of liquid source is started at time T0 and stopped at time T1.
[0081] Here, the pressure inside the storage tank 610 at time T1 becomes high, making it more likely that incomplete vaporization of the liquid source will occur. In particular, if the pressure rises to a value exceeding the saturated vapor pressure of the liquid source (specifically, the saturated vapor pressure at the temperature of the liquid source at that time; the same applies hereinafter), the possibility of incomplete vaporization of the liquid source increases, and there is also a possibility that part of the vaporized gas inside the storage tank 610 will liquefy. If tiny droplets generated by incomplete vaporization flow into the processing chamber 201 together with the source gas during the source gas supply process, they may adhere to the surface of the wafer 200, causing a decrease in product quality.
[0082] Therefore, in this embodiment, the pressure inside the storage tank 610 is adjusted in step B.
[0083] (Step B: First Pressure Adjustment Step) After step A is completed, valves 620 and 820 are opened with valve 314 closed to exhaust the atmosphere in storage tank 610 via exhaust pipe 810, thereby adjusting the pressure so as to reduce the pressure inside storage tank 610. Vacuum pump 830 is kept operating at least while this step is being performed.
[0084] In this embodiment, as shown in the example of FIG. 6 , pressure adjustment is started at or immediately after step A is completed (i.e., time T1), and pressure adjustment is performed for a predetermined time (first pressure adjustment time). That is, pressure adjustment is performed from time T1 to time T2. Through pressure adjustment, the pressure in the storage tank 610 is reduced to a first predetermined pressure, Pt. At time T2, the valves 620 and 820 are closed, thereby completing this step (i.e., pressure adjustment).
[0085] In this step, the possibility of insufficient vaporization of the liquid source can be reduced by reducing the pressure in the storage tank 610. In particular, it is preferable that the pressure Pt after reduction is less than the saturated vapor pressure of the liquid source. By reducing the pressure in the storage tank 610 to a level less than the saturated vapor pressure, the possibility of insufficient vaporization of the liquid source can be significantly reduced.
[0086] The pressure adjustment in this step is not limited to being terminated after being performed for a predetermined time as described above, but may be terminated based on the timing when the pressure in the storage tank 610 detected by the pressure sensor 640 becomes equal to or lower than a predetermined pressure (for example, when the predetermined pressure is reached). In this case, too, the predetermined pressure is preferably set to a pressure lower than the saturated vapor pressure of the liquid source.
[0087] The timing for starting this step is not limited to the time when step A is completed or immediately thereafter, as in the example shown in Fig. 6, but may be the time when a predetermined time has elapsed (time T1-2) from the time when step A is completed (time T1-1), as in the example shown in Fig. 7. By adjusting the pressure after a certain time interval has elapsed since the completion of step A in this way, it is possible to prevent minute droplets, etc. that may have been generated in the storage tank 610, from adhering to the inside of the gas supply pipe 310 during the pressure adjustment, thereby preventing corrosion, etc. from occurring.
[0088] The predetermined time (i.e., the time from time T1-1 to time T1-2) is preferably shorter than the time (i.e., the time from time T2 to time T3) required for the pressure stabilization step (step C) described below. If the predetermined time is longer than the time required for the pressure stabilization step, the period from time T1-1 to time T1-2, during which vaporization failure is likely to occur, becomes longer, and the effect of this step of suppressing vaporization failure may not be fully achieved.
[0089] (Step C: Pressure Stabilization Step) After step B is completed, the valve 620 is closed to seal the inside of the storage tank 610. The liquid source is heated and vaporized in the sealed storage tank 610, thereby increasing (recovering) the pressure inside the storage tank 610.
[0090] By ensuring that this step lasts for a sufficient period of time, the temperature of the liquid source in the storage tank 610 can be stabilized, and the pressure in the storage tank 610 can be increased to a pressure Ps close to the saturated vapor pressure of the liquid source at the stable temperature.
[0091] This step is ended based on the timing at which the execution of the next batch process is started, for example, at a timing prior to the timing at which the raw material gas supply step in the next batch process is started by the time required to execute steps D and E, which will be described later.
[0092] More specifically, for example, this step is terminated at a timing that is the aforementioned amount of time before the start time of the raw material gas supply process in the next batch processing that has been set in advance, or the start time of the raw material gas supply process in the next batch processing that has been instructed by the control unit 121 from the user.
[0093] This step may also be continued at least until the rate of change of the pressure value in the storage tank 610 (i.e., the slope of the change in the pressure value over time) becomes equal to or less than a predetermined value.
[0094] This step may be continued for at least a predetermined time (i.e., a third predetermined time), which is set to a time required for the rate of change of the pressure value to become sufficiently small, as determined, for example, by a prior experiment.
[0095] This step may be continued until the pressure value in the storage tank 610 rises to a predetermined pressure (i.e., a second predetermined pressure). The predetermined pressure is set to a pressure determined, for example, by a prior experiment, such that the rate of change of the pressure value is sufficiently small.
[0096] (Step D: Second Pressure Adjustment Step) After completing step C, as a pre-step for the source gas supply step in the next batch processing, the atmosphere in the storage tank 610 is discharged through the exhaust pipe 810 with the valve 314 closed, and pressure adjustment is performed to reduce the pressure inside the storage tank 610, similar to step B. The vacuum pump 830 is kept in operation at least while this step is being performed.
[0097] In this embodiment, as shown in the example of FIG. 6 , pressure adjustment is started at or immediately after step C is completed (i.e., time T3), and pressure adjustment is performed for a predetermined time (second pressure adjustment time). That is, pressure adjustment is performed from time T3 to time T4. Through pressure adjustment, the pressure in the storage tank 610 is reduced to pressure Pu. This step ends by closing the valves 620 and 820 at time T4.
[0098] Here, the time taken to perform step B is longer than the time taken to perform step D. Since the pressure Pf inside the storage tank 610 at the time step B is started is higher than the pressure Ps at the time step D is started, the pressure inside the storage tank 610 can be reliably reduced to the desired pressure by lengthening the time for depressurization in step B. For example, each step is performed such that the time Tb for performing step B and the time Td for performing step D satisfy the relationship 1<Tb / Td≦20.
[0099] Furthermore, by adjusting the opening of valve 820, the exhaust speed of storage tank 610 in step B may be made slower than the exhaust speed of storage tank 610 in step D. By adjusting the exhaust speed in this manner, it becomes easier to control the pressure in storage tank 610 in step B so that it does not drop excessively.
[0100] In steps B and D, the opening of the valve 820 may be adjusted to make the pumping speed of the storage tank 610 in step B slower than the pumping speed of the storage tank 610 in step D. Adjusting the pumping speed in this manner can prevent the pressure in the storage tank 610 from excessively decreasing in step B, which would result in the liquid source being rapidly vaporized, discharged, and consumed. The pumping speed may be adjusted by an MFC further provided in the exhaust pipe 810.
[0101] (Step E: Pressure Increase Step) After step D is completed, similarly to step C, the inside of the storage tank 610 is sealed by closing the valve 620. By heating and vaporizing the liquid source in the sealed storage tank 610, the pressure in the storage tank 610 is increased (recovered) to a pressure at which the amount of source gas required in the source gas supply step can be supplied.
[0102] After this step, the valves 314 and 620 are opened to start the raw material gas supply step in the next batch process.
[0103] (3) Comparison with Comparative Example Here, as a comparative example of this embodiment, a case where step B and step D are not performed will be described. Fig. 8 shows an example of the change in pressure in the storage tank 610 over time in the comparative example.
[0104] In the comparative example, after the pressure in the storage tank 610 rises to pressure Pf' in step A, the valve 620 remains closed from time T1' to time T3' without adjusting the pressure. During this time, the pressure in the storage tank 610 decreases toward the saturated vapor pressure of the liquid source and stabilizes at pressure Ps'. However, in the comparative example, while the pressure decreases, the pressure exceeds the saturated vapor pressure, and a state in which vaporization failure is likely to occur continues. Therefore, when the source gas supply step in the next batch process is started after T3', there is a high possibility that mist of the liquid source generated by vaporization failure will be supplied into the processing chamber 201 along with the source gas.
[0105] On the other hand, in an embodiment of the present disclosure, as shown in Fig. 6, in step B, the pressure in the storage tank 610 is reduced to a pressure below the saturated vapor pressure of the liquid source. As a result, in step C, the pressure changes in a direction increasing toward the saturated vapor pressure and stabilizes. In this way, in an embodiment of the present disclosure, by increasing the pressure and bringing it closer to saturation, it is possible to stabilize the pressure while maintaining a state in which poor vaporization of the liquid source is unlikely to occur.
[0106] Furthermore, in an embodiment of the present disclosure, in step D, as a preliminary step to the raw material gas supply step in the next batch processing, the pressure in the storage tank 610 is reduced, thereby further reducing the possibility that the vaporized gas supplied into the processing chamber 201 in the raw material gas supply step will contain mist or the like that may be generated due to poor vaporization of the liquid raw material.
[0107] Other Aspects of the Present Disclosure The above describes specific aspects of the present disclosure. However, the present disclosure is not limited to the above aspects and can be modified in various ways without departing from the spirit and scope of the present disclosure.
[0108] In the above embodiment, the pressure in the storage tank 610 increases in step A of the liquid source replenishing process, and then the pressure is adjusted in step B. However, the present disclosure is not limited to this. For example, at least one of the pressure and the supply flow rate of the liquid source supplied in step A may be adjusted to a value such that the pressure in the storage tank 610 at the end of step A is equal to or less than the saturated vapor pressure of the liquid source, which is a predetermined pressure.
[0109] Specifically, the opening of valve 720 in step A may be adjusted so that at least one of the pumping pressure and the supply flow rate becomes the above-mentioned value. Also, a liquid MFC may be further provided in liquid supply pipe 754, and at least one of the pumping pressure and the supply flow rate may be adjusted by controlling this liquid MFC.
[0110] In addition, at least one of the pressure and supply flow rate of the liquid source may be set to the above-mentioned value or less by providing an orifice portion (throttling portion) in the liquid supply pipe 754 or by providing a nozzle having a throttle portion at the tip of the liquid supply pipe 754.
[0111] In this way, by adjusting the pressure inside the storage tank 610 at the end of step A to a value that is equal to or less than the saturated vapor pressure of the liquid source, it is possible to suppress the occurrence of poor vaporization caused by high pressure inside the storage tank 610, as in the above-described embodiment.
[0112] It is preferable that the recipes used for each process are individually prepared according to the process content and recorded and stored in the storage device 121c via an electric communication line or the external storage device 123. Then, when starting each process, it is preferable that the CPU 121a appropriately selects an appropriate recipe according to the process content from among the multiple recipes recorded and stored in the storage device 121c. This makes it possible to reproducibly form films with various film types, composition ratios, film qualities, and film thicknesses using a single substrate processing apparatus. It also reduces the burden on the operator, avoids operational errors, and enables each process to be started quickly.
[0113] The above-mentioned recipes do not necessarily have to be newly created, but may be prepared by modifying an existing recipe already installed in the substrate processing apparatus. When modifying a recipe, the modified recipe may be installed in the substrate processing apparatus via an electric communication line or a recording medium on which the modified recipe is recorded. Alternatively, an existing recipe already installed in the substrate processing apparatus may be directly modified by operating the input / output device 122 provided in the existing substrate processing apparatus.
[0114] In the above-described embodiment, an example of forming a film using a batch-type substrate processing apparatus that processes multiple substrates at a time has been described. The present disclosure is not limited to the above-described embodiment and can be suitably applied, for example, to a case where a film is formed using a single-wafer substrate processing apparatus that processes one or several substrates at a time. Furthermore, in the above-described embodiment, an example of forming a film using a substrate processing apparatus having a hot-wall processing furnace has been described. The present disclosure is not limited to the above-described embodiment and can be suitably applied to a case where a film is formed using a substrate processing apparatus having a cold-wall processing furnace.
[0115] When using these substrate processing apparatuses, each process can be performed using the same processing procedures and conditions as in the above-described embodiments and modifications, and the same effects as in the above-described embodiments and modifications can be obtained.
[0116] The above-described embodiments and modifications may be used in combination as appropriate. The processing procedures and processing conditions in such a case may be the same as those of the above-described embodiments and modifications, for example.
[0117] 10 Substrate processing apparatus 121 Control unit 200 Wafer 201 Processing chamber 610 Storage tank
Claims
1. A method for controlling a vaporization system comprising the steps of: (a) supplying a liquid source into a vaporization container; (b) adjusting the pressure in the vaporization container to reduce the pressure when (a) is completed or after a first predetermined time has elapsed since that point; (c) after (b), maintaining a state in which the pressure adjustment in the vaporization container is stopped while vaporizing the liquid source; and (d) after (c), supplying vaporized gas generated by evaporation of the liquid source in the vaporization container into a processing container in which a substrate is processed.
2. A method for controlling an evaporation system as described in claim 1, further comprising the step of: (e) adjusting the pressure between (c) and (d) to reduce the pressure inside the evaporation container.
3. A method for controlling an evaporation system as described in claim 2, wherein the time for which pressure adjustment is performed in (b) is longer than the time for which pressure adjustment is performed in (e).
4. A method for controlling a vaporization system as described in claim 2, wherein the exhaust speed in the vaporization container in (b) is smaller than the exhaust speed in the vaporization container in (e).
5. A method for controlling an evaporation system described in any one of claims 2 to 4, further comprising a step of maintaining a state in which pressure adjustment within the evaporation container is stopped between (f) (e) and (d).
6. A method for controlling a vaporization system as described in claim 1, further comprising the step of not supplying the vaporization gas into the processing vessel during the period from when (a) is started to when (d) is started.
7. A method for controlling a vaporization system as described in claim 1, wherein in (b), pressure adjustment is performed until the pressure in the vaporization container becomes less than the saturated vapor pressure of the liquid raw material in the vaporization container.
8. The method of claim 1, wherein in (b), the pressure adjustment is performed until a second predetermined time has elapsed.
9. The method of claim 1, wherein in (b), pressure adjustment is performed until the pressure in the vaporization vessel is reduced to a first predetermined pressure.
10. A method for manufacturing a semiconductor device comprising the steps of: (a) supplying a liquid source into a vaporization container; (b) adjusting the pressure in the vaporization container to reduce the pressure when (a) is completed or after a first predetermined time has elapsed from that point; (c) after (b), maintaining a state in which the pressure adjustment in the vaporization container is stopped while vaporizing the liquid source; and (d) after (c), supplying vaporized gas generated by evaporation of the liquid source in the vaporization container into a processing container in which a substrate is processed.
11. A method for manufacturing a semiconductor device as described in claim 10, further comprising the steps of: (e) before (d), a step of loading the substrate into the processing vessel; and (f) after (d), a step of unloading the substrate from the processing vessel, wherein (a), (b) and (c) are carried out at least once each time (e) and (f) are carried out.
12. The method for manufacturing a semiconductor device according to claim 10, further comprising the steps of: (e) before (d), loading the substrate into the processing chamber; and (f) after (d), unloading the substrate from the processing chamber, wherein (a), (b) and (c) are carried out at least once each time (e) and (f) are carried out multiple times.
13. A substrate processing apparatus comprising: a vaporization container that vaporizes a liquid raw material therein; a liquid raw material supply system that supplies the liquid raw material into the vaporization container; a vaporization gas supply system that supplies vaporized gas generated by evaporation of the liquid raw material in the vaporization container into a processing container in which a substrate is processed; a pressure adjustment unit that adjusts the pressure in the vaporization container; a heating unit that heats the liquid raw material in the vaporization container; and a control unit configured to be capable of controlling the liquid raw material supply system, the vaporization gas supply system, the pressure adjustment unit, and the heating unit to perform the following steps: (a) a process of supplying the liquid raw material into the vaporization container; (b) a process of adjusting the pressure so as to reduce the pressure in the vaporization container when (a) is completed or after a first predetermined time has elapsed since that point; (c) after (b), a process of maintaining a state in which the pressure adjustment in the vaporization container is stopped while vaporizing the liquid raw material; and (d) a process of supplying the vaporized gas into the processing container after (c).
14. The substrate processing apparatus described in claim 13, wherein the pressure adjustment unit is composed of an exhaust pipe having one end connected directly or indirectly to the evaporation container and the other end connected to an exhaust device, and a first opening / closing valve provided on the exhaust pipe, and the control unit reduces the pressure inside the evaporation container by controlling at least one of the opening / closing or the opening degree of the first opening / closing valve in (b).
15. A substrate processing apparatus as described in claim 14, wherein the pressure adjustment unit further comprises a flow rate controller provided in the exhaust pipe, and the control unit adjusts the flow rate in the exhaust pipe by controlling the flow rate controller in (b).
16. The substrate processing apparatus of claim 13, wherein the liquid raw material supply system is composed of a liquid raw material supply pipe having one end connected to the vaporization container and the other end connected to a supply source of the liquid raw material, and a second on-off valve provided on the liquid raw material supply pipe, and the control unit supplies the liquid raw material into the vaporization container by controlling at least one of the opening and closing or the opening degree of the second on-off valve in (a).
17. The substrate processing apparatus of claim 13, wherein the vaporization gas supply system is composed of a vaporization gas supply pipe having one end connected directly or indirectly to the inside of the vaporization container and the other end connected to the inside of the processing container, and a third opening / closing valve provided on the vaporization gas supply pipe, and the control unit is configured to supply the vaporization gas from the vaporization container into the processing container by controlling at least one of the opening / closing or the opening degree of the third opening / closing valve.
18. The substrate processing apparatus according to claim 13, wherein the liquid source supply system includes a liquid source supply pipe having one end connected to the vaporization container and the other end connected to a supply source of the liquid source, and an orifice portion is provided in the liquid source supply pipe or at least either at a tip of the one end side of the liquid source supply pipe.
19. A vaporization system comprising: a vaporization container that vaporizes a liquid raw material therein; a liquid raw material supply system that supplies the liquid raw material into the vaporization container; a vaporization gas supply system that supplies vaporized gas generated by evaporation of the liquid raw material in the vaporization container into a processing container in which a substrate is processed; a pressure adjustment unit that adjusts the pressure in the vaporization container; a heating unit that heats the liquid raw material in the vaporization container; and a control unit configured to be capable of controlling the liquid raw material supply system, the vaporization gas supply system, the pressure adjustment unit, and the heating unit to perform the following steps: (a) a process of supplying the liquid raw material into the vaporization container; (b) a process of adjusting the pressure so as to reduce the pressure inside the vaporization container when (a) is completed or after a first predetermined time has elapsed since that point; (c) after (b), a process of maintaining a state in which the pressure adjustment in the vaporization container is stopped while vaporizing the liquid raw material; and (d) a process of supplying the vaporized gas into the processing container after (c).
20. A program for causing a substrate processing apparatus to execute, by a computer, the following steps: (a) supplying a liquid source into a vaporization container; (b) adjusting the pressure inside the vaporization container to reduce the pressure when (a) is completed or after a first predetermined time has elapsed from that point; (c) after (b), maintaining a state in which the pressure adjustment inside the vaporization container is stopped while vaporizing the liquid source; and (d) after (c), supplying vaporized gas generated by evaporation of the liquid source in the vaporization container into a processing container in which a substrate is processed.
Citation Information
Patent Citations
Substrate processing apparatus
JP2004111787A
Substrate processing apparatus
JP2009016799A
Substrate treating apparatus
JP2010040845A
Substrate processing apparatus and method of manufacturing semiconductor device
JP2013222768A
Substrate treatment device, liquid feedstock replenishing system, semiconductor device production method, and program
WO2018056346A1