Control line for mining belt conveyor

By converting the control voltage of the coal mine underground belt conveyor from 220V AC to 24V DC, and using the PLC centralized control system to protect the motor start and stop, the problem of frequent start and stop of the motor due to long-distance transmission is solved and a more stable motor is achieved. operation and higher equipment reliability.

WO2024221672A1PCT designated stage expired Publication Date: 2024-10-31ZHALAINUOER COAL IND CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/115251
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-25
Filing Date
2023-08-28
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

During the underground transportation of coal mines, due to the long transmission distance of the control voltage of the belt conveyor, voltage loss is prone to occur, causing the motor to start and stop frequently, which may cause damage to the motor.

Method used

Design a control circuit for a mining belt conveyor. By converting 220V AC power into 24V DC power, and using a PLC centralized control system to protect the start and stop of the motor, it extends the start time and avoids frequent starts and stops. The control circuit includes a rectification structure, a delayed power-on time relay and a programmable logic controller to ensure the stable operation of the motor.

Benefits of technology

It effectively avoids the loss of control voltage, improves the starting stability of the motor, extends the service life of the equipment, shortens the maintenance time, and improves the transportation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023115251_31102024_PF_FP_ABST
    Figure CN2023115251_31102024_PF_FP_ABST
Patent Text Reader

Abstract

A control line for a mining belt conveyor comprises an original conveyor control line, a rectification structure, a power-on delay time relay, a second intermediate relay, and a PLC centralized control system, wherein a first contact of the second intermediate relay is arranged in a first target line in the original conveyor control line, a second contact and a coil are arranged in a second target line in the original conveyor control line, and an intermediate relay in the second target line is used for receiving an input 220 V alternating-current voltage; an intermediate relay in the first target line is used for transmitting the 220 V alternating-current voltage to a rectifier, and sending a signal to the PLC centralized control system; the PLC centralized control system is used for controlling the rectifier to convert the 220 V alternating-current voltage into a 24 V direct-current voltage, and the rectification structure is used for receiving the 24 V direct-current voltage, so as to transmit, by means of the control line, the 24 V direct-current voltage to an electric motor of a belt conveyor; and the PLC centralized control system is further used for controlling the power-on delay time relay on the basis of a preset start-stop program, so as to prolong a starting time of the electric motor.
Need to check novelty before this filing date? Find Prior Art

Description

Control circuit of mining belt conveyor

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This disclosure claims priority to Chinese Patent Application No. 2023104579031 filed in China on April 25, 2023, the entire contents of which are incorporated herein by reference. Technical Field

[0003] The present disclosure relates to the technical field of coal mine equipment, and in particular to a control circuit of a mining belt conveyor. Background Art

[0004] At present, in the field of underground transportation in coal mines, belt conveyors (such as belt conveyors) are often used to transport items. Among them, the belt conveyor needs to transmit a control voltage to the motor through a control circuit so that the motor is powered on to drive the belt to run.

[0005] In related technologies, 220V AC power is typically transmitted to the motor via the belt conveyor's control circuit. However, for underground belt conveyors, the distance between the distribution room providing the control voltage and the belt conveyor itself is relatively long, typically up to 300 meters. Furthermore, due to the large operating range of the coal conveyor, the control voltage transmission distance is relatively long, leading to frequent voltage drops. This can cause the motor to stop working and require a power cycle. Frequent starting and stopping of the motor can also lead to burnout.

[0006] Therefore, how to avoid voltage loss in belt conveyors has become an urgent problem that needs to be solved.

[0007] Summary of the Invention

[0008] The embodiments of the present disclosure aim to solve one of the technical problems in the related art at least to a certain extent.

[0009] To this end, the first purpose of the embodiment of the present disclosure is to propose a control circuit for a mining belt conveyor, which converts the control voltage from 220V AC to 24V DC, thereby avoiding the phenomenon of voltage loss in the control voltage, and adds protection for the start and stop of the motor through the PLC centralized control system to avoid frequent start and stop of the motor.

[0010] A second objective of the embodiments of the present disclosure is to provide a starting system for a mining belt conveyor.

[0011] To achieve the above-mentioned purpose, the embodiment of the first aspect of the present disclosure provides a control circuit for a mining belt conveyor, the control circuit comprising: an original conveyor control circuit, a rectifier structure, a time delay power-on time relay, a second intermediate relay and a programmable logic controller (PLC) centralized control system, wherein:

[0012] The first contact of the second intermediate relay is arranged in the first target circuit in the original conveyor control circuit, and the first contact is used to connect the original conveyor control circuit with the PLC centralized control system;

[0013] The second contact and the coil of the second intermediate relay are arranged in the second target circuit in the original conveyor control circuit, and the second contact is connected to the coil of the second intermediate relay;

[0014] The contacts and coil of the delayed power-on time relay, and the third contact of the second intermediate relay are arranged in the third target circuit in the original conveyor control circuit, the second end of the third contact is connected to the first end of the contact of the delayed power-on time relay, and the second end of the contact of the delayed power-on time relay is connected to the coil of the delayed power-on time relay; the rectifier structure is connected to the original conveyor control circuit through a plurality of intermediate relays;

[0015] The intermediate relay in the second target line is used to receive the input 220V AC voltage and transmit it to the first target line; the intermediate relay in the first target line is used to transmit the 220V AC voltage to the rectifier and send a signal to the PLC centralized control system;

[0016] The PLC centralized control system is used to control the rectifier to convert the 220V AC voltage into a 24V DC voltage, and the rectifier structure is used to receive the 24V DC voltage and transmit the 24V DC voltage to the motor of the mining belt conveyor based on the control circuit;

[0017] The PLC centralized control system is also used to control the delayed power-on time relay based on a preset start-stop program to extend the starting time of the motor.

[0018] In one embodiment of the present disclosure, the rectifier structure includes: a first intermediate relay, a second intermediate relay, a third intermediate relay, a first button, and a second button, wherein the negative pole of the 24V DC voltage is connected to the contact of the third intermediate relay and the first end of the second button, and the second end of the contact of the third intermediate relay is connected to the first end of the first button; the second end of the first button is connected to the first end of the coil of the first intermediate relay, and the second end of the second button is connected to the first end of the coil of the second intermediate relay; the positive pole of the 24V DC voltage is respectively connected to the second end of the coil of the first intermediate relay and the second end of the coil of the second intermediate relay.

[0019] In one embodiment of the present disclosure, the first button and the second button are specifically used to control the turning on and off of the voltage conversion function and the delayed start motor function of the control circuit of the mining belt conveyor.

[0020] In one embodiment of the present disclosure, the rectification structure further includes: an indicator light, which is connected between the positive pole and the negative pole of the 24V DC voltage, and is used to display whether the 24V DC voltage is converted.

[0021] In one embodiment of the present disclosure, the PLC centralized control system is further used to: obtain the control voltage actually transmitted to the motor and the start-stop protection time of the motor, and detect whether the actual control voltage and the start-stop protection time are abnormal based on a preset detection program.

[0022] In one embodiment of the present disclosure, the PLC centralized control system is further used to: display the detection result of whether the actual control voltage and the start-stop protection time are abnormal on the display screen of the PLC centralized control system.

[0023] In one embodiment of the present disclosure, the PLC centralized control system is further used to: display an alarm message on the display screen based on the abnormality of the detection result, and send the alarm message to the mobile terminal of the staff based on wireless communication technology.

[0024] In one embodiment of the present disclosure, the PLC centralized control system is further used to: adjust the extended start time parameters in the start-stop program in combination with the real-time demand for delayed start of the motor and the detection results, so as to adjust the duration of the delayed power-on time relay blocking signal transmission.

[0025] In one embodiment of the present disclosure, the original conveyor control circuit further includes: a switch status indicator, which is used to display the opening and closing status of each contact of each intermediate relay, the working status of the delayed power-on time relay, and the working status of related components in the original conveyor control circuit.

[0026] To achieve the above-mentioned purpose, an embodiment of the second aspect of the present disclosure proposes a starting system for a mining belt conveyor, comprising: a control circuit for the mining belt conveyor as described in any embodiment of the first aspect above.

[0027] The technical solutions provided by the embodiments of the present disclosure bring at least the following beneficial effects: The embodiments of the present disclosure convert the control voltage from 220V AC to 24V DC, thereby avoiding the phenomenon of control voltage loss caused by long-distance transmission, and provide additional protection for the high-voltage startup and operation of the motor. The start and stop of the motor are incorporated into the PLC centralized control system, making the motor startup stable and avoiding frequent starting and stopping of the motor. Thus, the embodiments of the present disclosure solve the problem of voltage loss over long distances, avoid the motor from stopping secretly, make the control voltage more stable, improve the power safety of the motor control voltage, and protect the high-voltage operation and start and stop of the motor, which is conducive to extending the life of the motor, shortening the time of maintenance work, and improving the operating efficiency of the equipment.

[0028] Additional aspects and advantages of the present disclosure will be given in part in the description below and in part will become apparent from the description below or will be learned through practice of the embodiments of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The above and / or additional aspects and advantages of the embodiments of the present disclosure will become apparent and readily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0030] FIG1 is a schematic structural diagram of a control circuit of a mining belt conveyor proposed in an embodiment of the present disclosure;

[0031] FIG2 is a schematic structural diagram of a rectification structure proposed in an embodiment of the present disclosure;

[0032] FIG3 is a schematic structural diagram of a starting system for a mining belt conveyor according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0033] The following describes in detail embodiments of the present disclosure, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present disclosure, and should not be construed as limiting the present disclosure.

[0034] It should be noted that a long-standing issue plaguing underground mining transportation systems is the unpredictable stalling of belt conveyor motors. This is due to the long transmission distances of control lines, often exceeding 300 meters. This long transmission distance can lead to voltage dropouts, unstable control voltage, and motor stalls. Frequent starting of high-voltage motors can burn out, affecting normal production time and placing pressure on maintenance.

[0035] To this end, the disclosed embodiments propose a control circuit for a mining belt conveyor. This circuit changes the control voltage from 220V AC to 24V DC and programs the motor start and stop functions into the centralized PLC. This ensures stable control of the control voltage, prevents voltage dropout, eliminates potential motor stalls, and ensures safe control voltage usage.

[0036] A control circuit of a mining belt conveyor proposed in an embodiment of the present disclosure will be described in detail below with reference to the accompanying drawings.

[0037] Figure 1 is a structural schematic diagram of a control circuit of a mining belt conveyor proposed in an embodiment of the present disclosure. As shown in Figure 1, the control circuit of the mining belt conveyor includes: an original conveyor control circuit 10, a rectifier structure 20, a delayed power-on time relay KT, a second intermediate relay KA2 and a programmable logic controller (PLC) centralized control system 30.

[0038] It should be noted that the rectifier structure 20 and the PLC centralized control system 30 are not shown in FIG1 . In FIG1 , except for the newly added and modified components such as the delayed power-on time relay KT and the second intermediate relay KA2, all other components are the original conveyor control circuit 10, wherein the newly added components are shown in the dotted box in FIG1 . That is, the original conveyor control circuit is an existing conveyor control circuit in the relevant technology. The control circuit can be a part of the electrical circuit of the belt conveyor starting cabinet. The various components and connection structures contained in the original conveyor control circuit 10 can be set with reference to the setting method in the relevant technology and combined with the specific situation of the currently used belt conveyor. For example, as shown in FIG1 , the original conveyor control circuit 10 includes a first control switch SA1, a second control switch 1KK, an air switch 1DK and a connecting piece LP1, etc. The remaining components contained in the original conveyor control circuit 10 and the functions of each component are not described here one by one.

[0039] It should also be noted that, as shown in Figure 1, the original conveyor control circuit includes multiple lines, such as lines 22 to 40 shown in the figure. Each line can be connected to multiple devices. In the embodiment of the present disclosure, some of these lines are selected as target lines for adding devices, so that the functions of the control circuit of the embodiment of the present disclosure can be achieved through the added and modified parts.

[0040] Among them, the first contact KA21 of the second intermediate relay KA2 is set in the first target line (ie line 29) in the original conveyor control line 10, and the first contact KA21 is used to connect the original conveyor control line 10 with the PLC centralized control system 30.

[0041] The second contact KA22 and the coil KA20 of the second intermediate relay are set in the second target line (ie line No. 35) in the original conveyor control line 10, and the second contact KA22 is connected to the coil KA20 of the second intermediate relay.

[0042] The contact KT1 and coil KT0 of the delayed power-on time relay KT, and the third contact KA23 of the second intermediate relay are arranged in the third target line (i.e., line 36) in the original conveyor control line 10, and the second end of the third contact KA23 is connected to the first end of the contact KT1 of the delayed power-on time relay, and the second end of the contact KT1 of the delayed power-on time relay is connected to the coil KT0 of the delayed power-on time relay.

[0043] The rectifier structure 20 is connected to the original conveyor control circuit 10 through multiple intermediate relays. That is, the rectifier structure 20 includes multiple additional intermediate relays, some of which can be set in the original conveyor control circuit 10 to realize the return of the converted DC voltage to the control circuit for transmission of the control voltage.

[0044] In some specific embodiments, the control circuit of a mining belt conveyor according to the disclosed embodiments includes intermediate relays and time-delayed power-on relays in some target circuits of the original conveyor control circuit and in the modified rectifier structure. An intermediate relay is a device used to transmit signals and simultaneously control multiple circuits and electrical actuators. The intermediate relay has a large number of contacts and includes multiple components, such as an iron core, a spring, a movable contact, a stationary contact, a coil, a terminal block, and a housing. The disclosed embodiments utilize intermediate relays to increase the number of contacts for easier connection and also implement multiple functions, such as switch control and voltage conversion.

[0045] The embodiment of the present disclosure provides multiple intermediate relays, including the above-mentioned second intermediate relay KA2. The models of the various intermediate relays and the target lines where the contacts and coils of the intermediate relays are located can be adjusted according to actual conditions without being limited to the defined lines in the above examples.

[0046] The intermediate relay in the second target line is used to receive the input 220V AC voltage and transmit it to the first target line; the intermediate relay in the first target line is used to transmit the 220V AC voltage to the rectifier and send a signal to the PLC centralized control system 30.

[0047] The PLC centralized control system 30 is used to control the rectifier to convert 220V AC voltage into 24V DC voltage. The rectifier structure is used to receive the 24V DC voltage and transmit the 24V DC voltage to the motor of the belt conveyor based on the control line.

[0048] The PLC centralized control system 30 is also used to control the delayed power-on time relay KT based on a preset start-stop program to extend the starting time of the motor.

[0049] In some specific embodiments, when transmitting control voltage in actual applications, the operating principle of the main circuit of the conveyor starting system to which the control circuit belongs remains unchanged. After receiving the 220V AC voltage transmitted from the distribution room in the control circuit, the air switch 1DK included in the original conveyor control circuit 10 outputs a starting point for the added and modified target lines 29, 35, and 36. This is then transmitted to line 31 via the KA2 intermediate relay added to line 35 (a 220V model is selected in this embodiment). Since line 31 is connected to line 29, the voltage is then transmitted to line 29 and enters the PLC centralized control system 30. After the PLC centralized control system 30 receives a signal requiring voltage conversion (which can be a signal sent by the intermediate relay in the first target line), it controls the rectifier to convert the 220V AC power into 24V DC power.

[0050] In some embodiments, the rectifier structure 20 receives the converted 24 V DC voltage. The components and connection methods of the rectifier structure 20 can be determined according to actual needs.

[0051] As one possible implementation, in one embodiment of the present disclosure, as shown in FIG2 , the modified rectifier structure 20 includes: a first intermediate relay KA1 , a second intermediate relay KA2 , a third intermediate relay KA3 , a first button SB1 , and a second button SB2 .

[0052] The negative pole of the 24V DC voltage is connected to the first end of the contact of the third intermediate relay KA3 and the first end of the second button SB2, and the second end of the contact of the third intermediate relay is connected to the first end of the first button SB1.

[0053] A second end of the first button SB1 is connected to a first end of the coil KA10 of the first intermediate relay KA1 , and a second end of the second button SB2 is connected to a first end of the coil KA20 of the second intermediate relay.

[0054] The positive pole of the 24V DC voltage is connected to the second end of the coil KA10 of the first intermediate relay and the second end of the coil KA20 of the second intermediate relay respectively.

[0055] As described above, the control voltage transmitted in the control circuit in the embodiment of the present disclosure is DC24V, while the voltage initially provided by the distribution room is AC220V. Therefore, the embodiment of the present disclosure can separate DC and AC, high voltage and low voltage by installing an intermediate relay, which facilitates subsequent maintenance and is conducive to the safe use of the control circuit.

[0056] In one embodiment of the present disclosure, the installation location and setting method of the added rectifier can be determined according to actual needs, such as being set in the distribution room close to the control line to facilitate connection with the rectifier structure 20 of the embodiment of the present disclosure.

[0057] In some embodiments, it is understood that the motor of a belt conveyor may frequently start and stop during actual operation due to various factors, including production factors and control deviations. To prevent frequent motor starts that could burn out, the control circuitry of the disclosed embodiment also incorporates a time-delayed power-on relay to protect the motor during high-voltage startup and operation.

[0058] In some specific embodiments, as described above, the disclosed embodiments incorporate motor start and stop functions into a PLC centralized control system. The PLC centralized control system 30 can control the delayed energizing time relay KT based on pre-programmed start and stop routines. When the engine is restarted after stopping, the delayed energizing time relay on the third target line (Line 36) blocks signal transmission if the preset time has elapsed, extending the startup time and protecting the high-voltage motor.

[0059] Among them, when the delayed power-on time relay KT is just energized, the delayed contact does not operate. After the predetermined delay time, the delayed normally closed contact is disconnected and the delayed normally open contact is closed, thereby extending the control voltage to start the motor after the preset delay time.

[0060] In one embodiment of the present disclosure, the first button SB1 and the second button SB2 in the above-mentioned rectifier structure are specifically used to control the voltage conversion function and the delayed start motor function of the control circuit of the mining belt conveyor. In some specific embodiments, by disconnecting the first button SB1 or the second button SB2, the path of the rectifier structure 20 can be disconnected to turn off the voltage conversion function. Since the delayed power-on time relay KT is connected to the third contact KA23 of the second intermediate relay, and the second button SB2 is also connected to the coil of the second intermediate relay, the delayed power-on time relay KT can be disconnected or adjusted by correspondingly controlling the operation of the second button SB2. In actual application, the first button SB1 or the second button SB2 can be controlled by the PLC centralized control system 30 to adjust the function implemented by the control circuit, or the PLC centralized control system 30 can directly adjust each intermediate relay and the delayed power-on time relay.

[0061] In one embodiment of the present disclosure, as shown in FIG2 , the rectifier structure 20 further includes an indicator light 21 connected between the positive and negative electrodes of the 24V DC voltage. The indicator light is used to indicate whether the 24V DC voltage has been converted. In some specific embodiments, the indicator light 21 can be provided separately in a circuit of the rectifier structure 20. When the rectifier structure 20 is transmitting the 24V DC voltage normally, the indicator light 21 can be illuminated, so that the status of the indicator light 21 can more quickly determine whether the 24V DC voltage conversion has been completed normally.

[0062] In one embodiment of the present disclosure, the PLC centralized control system 30 is further used to: obtain the control voltage actually transmitted to the motor and the start-stop protection time of the motor, and detect whether the actual control voltage and start-stop protection time are abnormal based on a preset detection program.

[0063] Specifically, in this embodiment, the PLC centralized control system 30 has an automatic detection function. During actual operation, it can obtain feedback results of the control voltage actually transmitted to the motor and the start-stop protection time of the motor's actual delayed start after the current control operation, and input the real-time control voltage and start-stop protection time values ​​into a pre-written detection program for calculation to detect whether the actual operating values ​​reach the expected values, and judge whether the control voltage is stable and whether the protection time setting of the motor start-stop is reasonable in combination with the operating status of the belt conveyor.

[0064] In this embodiment, the PLC centralized control system 30 is further configured to display on the centralized control system's display screen whether the actual control voltage and start / stop protection time are abnormal. If the detection result is abnormal, an alarm message is displayed on the display screen and transmitted to a staff member's mobile terminal via wireless communication technology.

[0065] In some specific embodiments, the PLC centralized control system 30 displays the above-mentioned automatic detection results in real time on the display screen of the centralized control system of the ground workstation, so that the staff can promptly know whether the current control voltage in the control circuit is stable, whether the motor start-stop protection is normal, and the duration of the start-stop protection. When it is determined that the control voltage is unstable and the motor start-stop protection time does not meet the requirements, a text alarm message can be displayed on the display screen of the ground centralized control system, such as "The current control voltage fluctuates", and a voice broadcast can be performed. In addition, based on wireless communication technologies such as 5G communication, the alarm information can be transmitted to the communication base station at various locations underground through downhole optical fiber transmission, and the base station will then send the alarm information to the pre-connected mobile terminal of the staff, such as an explosion-proof mobile phone, so that the staff both above and below the well can promptly know the abnormal situation and promptly eliminate the fault on the well or below the well according to the cause of the abnormality.

[0066] In some embodiments, the PLC centralized control system 30 is further configured to adjust the extended start time parameter in the start / stop program based on the real-time demand for delayed motor start and the test results, thereby adjusting the duration for which the delayed power-on time relay blocks signal transmission. In some specific embodiments, when the previously set delayed motor start time does not meet the current operating conditions of the belt conveyor, the PLC centralized control system 30 can adjust the delayed protection time by increasing or decreasing the extended start time parameter in the start / stop program to adjust the duration for which the delayed power-on time relay blocks signal transmission to meet the current demand for motor start / stop protection.

[0067] In one embodiment of the present disclosure, the original conveyor control circuit 10 further includes: a switch status indicator CKD. The switch status indicator is used to display the opening and closing status of each contact of each intermediate relay, the working status of the delayed power-on time relay, and the working status of the relevant components in the original conveyor control circuit. In some specific embodiments, the embodiment of the present disclosure can also set a switch status indicator loop in the original conveyor control circuit 10. The switch status indicator can receive the working status of each relevant component detected and transmitted in the loop, such as the status of the normally closed contact and the normally open contact of the current delayed power-on time relay, so as to determine whether the delayed power-on time relay is performing the startup protection work. For another example, the working status of the first control switch SA1 and the second control switch 1KK mentioned above in the original conveyor control circuit 10 can also be displayed to facilitate clear and intuitive control of the status of each component in the circuit.

[0068] As an example, a switch status indicator may be composed of a plurality of indicator lights, each indicator light corresponding to a state of a related device. After a mapping relationship is pre-written, the corresponding status indicator light is controlled to light up according to the current working state of the related device.

[0069] Therefore, the embodiment of the present disclosure controls the relay to perform voltage conversion and delayed start-up functions through the PLC centralized control system. Compared with manually controlling the relay, frequent replacement of the relay can be avoided, thus saving costs.

[0070] In summary, the control circuit of the mining belt conveyor of the disclosed embodiment changes the control voltage from 220V AC to 24V DC, which can avoid the phenomenon of voltage loss in the control voltage caused by long-distance transmission, and adds protection for the high-voltage startup and operation of the motor. The start and stop of the motor are incorporated into the PLC centralized control system, making the motor startup stable and avoiding frequent start and stop of the motor. As a result, the control circuit solves the problem of voltage loss over long distances, avoids the motor from stopping secretly, makes the control voltage more stable, improves the power safety of the motor control voltage, and protects the high-voltage operation and start and stop of the motor, which is conducive to extending the life of the motor, shortening the time of maintenance work, and improving the operating efficiency of the equipment.

[0071] To implement the above embodiment, the present disclosure also provides a starting system for a mining belt conveyor. FIG3 is a schematic structural diagram of a starting system for a mining belt conveyor provided by the present disclosure.

[0072] As shown in Figure 3, the starting system 100 of the mining belt conveyor can include the control circuit 200 of the mining belt conveyor described in the above-mentioned embodiment. Specifically, in the disclosed embodiment, the control circuit of the belt conveyor is part of the starting system and can be provided within the main circuit of the starting system of the mining belt conveyor. The starting system 100 of the mining belt conveyor can be an integrated system for controlling the startup and operation of the mining belt conveyor, such as a starting cabinet. The other components of the starting cabinet and the overall electrical control principles can be referred to as conveyor starting cabinets in related art and will not be further described here.

[0073] Therefore, the starting system 100 of the embodiment of the present disclosure can stabilize the starting of the motor of the belt conveyor and control the voltage by applying the control circuit 200 carried therein, thereby improving the overall operating efficiency of the starting system 100.

[0074] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and features of different embodiments or examples, unless they are mutually inconsistent.

[0075] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the embodiments of the present disclosure, the meaning of "plurality" is at least two, for example, two, three, etc., unless otherwise clearly and specifically defined.

[0076] In the embodiments of the present disclosure, unless otherwise expressly specified or limited, the terms "installed," "connected," "connected," "fixed," and the like should be understood in a broad sense. For example, they may refer to fixed connections, detachable connections, or integration; mechanical connections or electrical connections; direct connections or indirect connections through an intermediate medium; and internal connections between two elements or interactions between two elements, unless otherwise expressly limited. Those skilled in the art can understand the specific meanings of the above terms in the embodiments of the present disclosure based on specific circumstances.

[0077] In the embodiments of the present disclosure, unless otherwise expressly specified or limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Furthermore, a first feature being "above," "above," and "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is at a higher level than the second feature. A first feature being "below," "below," and "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is at a lower level than the second feature.

[0078] Although the embodiments of the present disclosure have been shown and described above, it will be understood that the above embodiments are illustrative and are not to be construed as limitations on the embodiments of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.

Claims

1. A control circuit for a mining belt conveyor, characterized in that: include: The original conveyor control circuit, rectifier structure, delayed power-on time relay, second intermediate relay and programmable logic controller PLC centralized control system, among which, The first contact of the second intermediate relay is arranged in the first target circuit in the original conveyor control circuit, and the first contact is used to connect the original conveyor control circuit with the PLC centralized control system; The second contact and the coil of the second intermediate relay are arranged in the second target circuit in the original conveyor control circuit, and the second contact is connected to the coil of the second intermediate relay; The contact and coil of the time delay power-on time relay and the third contact of the second intermediate relay are arranged in the third target line in the original conveyor control line, the second end of the third contact is connected to the first end of the contact of the time delay power-on time relay, and the second end of the contact of the time delay power-on time relay is connected to the coil of the time delay power-on time relay; the rectifier structure is connected to the original conveyor control line through a plurality of intermediate relays; The intermediate relay in the second target line is used to receive the input 220V AC voltage and transmit it to the first target line; the intermediate relay in the first target line is used to transmit the 220V AC voltage to the rectifier and send a signal to the PLC centralized control system; The PLC centralized control system is used to control the rectifier to convert the 220V AC voltage into a 24V DC voltage, and the rectifier structure is used to receive the 24V DC voltage, so as to transmit the 24V DC voltage to the motor of the mining belt conveyor based on the control circuit; The PLC centralized control system is also used to control the delayed power-on time relay based on a preset start-stop program to extend the starting time of the motor.

2. The control circuit of the mining belt conveyor according to claim 1, characterized in that: The rectification structure comprises: a first intermediate relay, a second intermediate relay, a third intermediate relay, a first button and a second button, wherein: The negative electrode of the 24V DC voltage is connected to the contact of the third intermediate relay and the first end of the second button, and the second end of the contact of the third intermediate relay is connected to the first end of the first button; The second end of the first button is connected to the first end of the coil of the first intermediate relay, and the second end of the second button is connected to the first end of the coil of the second intermediate relay; The positive electrode of the 24V DC voltage is connected to the second end of the coil of the first intermediate relay and the second end of the coil of the second intermediate relay respectively.

3. The control circuit of the mining belt conveyor according to claim 2, characterized in that: The first button and the second button are specifically used for: Control the opening and closing of the voltage conversion function and the delayed start motor function of the control circuit of the mining belt conveyor.

4. The control circuit of the mining belt conveyor according to claim 2 or 3, characterized in that: Also includes: An indicator light, wherein the indicator light is connected between the positive pole and the negative pole of the 24V DC voltage, and the indicator light is used to display whether the 24V DC voltage is converted.

5. The control circuit of the mining belt conveyor according to any one of claims 1 to 4, characterized in that: The PLC centralized control system is also used for: The control voltage actually transmitted to the motor and the start / stop protection time of the motor are obtained, and whether the actual control voltage and the start / stop protection time are abnormal is detected based on a preset detection program.

6. The control circuit of the mining belt conveyor according to claim 5, characterized in that: The PLC centralized control system is also used for: The detection results of whether the actual control voltage and the start-stop protection time are abnormal are displayed on the display screen of the PLC centralized control system.

7. The control circuit of the mining belt conveyor according to claim 6, characterized in that: The PLC centralized control system is also used for: Based on the detection result being abnormal, an alarm message is displayed on the display screen, and the alarm message is sent to a mobile terminal of a staff member based on wireless communication technology.

8. The control circuit of the mining belt conveyor according to claim 6 or 7, characterized in that: The PLC centralized control system is also used for: In combination with the real-time demand for delayed starting of the motor and the detection result, the extended starting time parameter in the start-stop program is adjusted to adjust the duration of the delayed power-on time relay blocking signal transmission.

9. The control circuit of the mining belt conveyor according to any one of claims 1 to 8, characterized in that: The original conveyor control circuit also includes: a switch status indicator, The switch status indicator is used to display the opening and closing status of each contact of each intermediate relay, the working status of the delayed power-on time relay, and the working status of related components in the original conveyor control circuit.

10. A starting system for a mining belt conveyor, characterized in that: The invention comprises a control circuit of a mining belt conveyor according to any one of claims 1 to 9.

Citation Information

Patent Citations

  • Ship motor start and stop control circuit

    CN107947643A

  • Movable disc iron remover controlling device

    CN203091081U

  • Novel seawater desalination water pump control loop