By obtaining the construction parameters and soil resistivity of the pipeline in the blind zone of the crossing section, and using the polarization potential threshold table to evaluate the effectiveness of cathodic protection, the problem of the inability to accurately evaluate cathodic protection in the existing technology is solved, and scientific and accurate evaluation and optimization are achieved. , reducing the risk of external corrosion.

WO2024222047A1PCT designated stage expired Publication Date: 2024-10-31PETROCHINA CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/071188
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-24
Filing Date
2024-01-08
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

The existing technology cannot accurately evaluate the cathodic protection effect of pipelines in the blind zone of the crossing section, resulting in external corrosion failure, economic losses and safety hazards.

Method used

By obtaining the construction parameters and soil resistivity of the pipeline, using the pre-constructed polarization potential threshold table, the polarization potential thresholds at both ends are calculated to determine the effectiveness of cathodic protection, and provide a scientific method and device to evaluate the effectiveness of cathodic protection. sex.

Benefits of technology

It achieves a convenient, scientific and accurate assessment of the effectiveness of cathodic protection, improves the accuracy of judgment, optimizes cathodic protection in a timely manner, and reduces the risk of external corrosion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024071188_31102024_PF_FP_ABST
    Figure CN2024071188_31102024_PF_FP_ABST
Patent Text Reader

Abstract

A method and apparatus for determining the effectiveness of cathodic protection in a blind horizontal well. The method comprises: according to obtained construction parameters of a blind horizontal well to be evaluated, determining a soil resistivity corresponding to the blind horizontal well to be evaluated, and a corresponding two-end polarization potential; from a preconstructed blind horizontal well polarization potential threshold table, obtaining a first polarization potential threshold corresponding to the length and soil resistivity in the construction parameters; and according to the two-end polarization potential and first polarization potential threshold corresponding to the blind horizontal well to be evaluated, determining the effectiveness of the cathodic protection of the blind horizontal well to be evaluated. The method and apparatus allow for conveniently and effectively determining the cathodic protection of an entire blind horizontal well, further optimizing anti-corrosion measures outside of the well, and significantly improving the safety of blind horizontal wells.
Need to check novelty before this filing date? Find Prior Art

Description

Method and device for determining effectiveness of cathodic protection of pipelines in blind areas of crossing sections Technical Field

[0001] The present invention relates to the technical field of pipeline safety protection, and in particular to a method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section, a method for constructing a polarization potential threshold table for a pipeline in a blind area of ​​a crossing section, a device for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section, a device for constructing a polarization potential threshold table for a pipeline in a blind area of ​​a crossing section, a computer storage medium, a terminal device, and a computer program product. Background Art

[0002] Directional drilling, a trenchless construction technique, is typically used when oil and gas pipelines pass through areas such as rivers, ditches, highways, and railways. The section of pipeline traversed by directional drilling is also known as the "blind-spot pipeline." Because the blind-spot pipelines are buried deep underground and often located above inaccessible areas such as rivers, ditches, highways, and railways, testers are unable to reach directly above the pipelines in the traversing section to promptly evaluate the effectiveness of external corrosion control measures and optimize external corrosion prevention measures. This results in blind spots and significant hidden dangers in the management of external corrosion control in transmission pipelines. In actual production, external corrosion failures in blind-spot pipelines have repeatedly occurred, resulting in significant economic losses and severe impacts on production.

[0003] In actual production, two measures, external anti-corrosion layer and cathodic protection, are usually adopted to protect the blind area pipelines in the crossing section. Due to the directional drilling construction process and environmental characteristics, it is often impossible to guarantee the integrity of the external anti-corrosion layer of the blind area pipelines in the crossing section. Therefore, it is even more necessary to ensure the effectiveness of the pipeline cathodic protection. The existing technology determines whether the cathodic protection of the entire pipe section meets the standards by testing the cathodic protection potential at both ends of the crossing section pipeline on the surface. However, in practice, since the buried depth of the blind area pipelines in the crossing section ranges from a few meters to tens of meters, and the length of the crossing section may reach several thousand meters, the external corrosion environment on the surface at both ends of the crossing section pipeline is significantly different from the external corrosion environment at its deepest point, resulting in the polarization characteristics at both ends of the crossing section pipeline being significantly different from the polarization characteristics at the deepest point, and the cathodic protection effect will also be very different. Therefore, the cathodic protection potential at both ends of the crossing section pipeline cannot reflect the cathodic protection effect of the entire pipe section of the blind area pipeline in the crossing section. Therefore, there is an urgent need for a simple, convenient, scientific and effective method to determine the effectiveness of cathodic protection of pipelines in the blind area of ​​the crossing section. At the same time, there is an urgent need for a strategy to optimize the cathodic protection system to effectively control the risk of external corrosion and perforation of pipelines in the blind area of ​​the crossing section, improve the inherent safety level of pipelines in the blind area of ​​the crossing section, and help improve quality and efficiency.

[0004] Summary of the Invention

[0005] In the prior art, the cathodic protection potential measured at the surface at both ends of a pipeline crossing section cannot reflect the cathodic protection effectiveness of the entire pipeline section in the blind area of ​​the crossing section. To increase the scope of options, embodiments of the present invention provide a method and apparatus for determining the effectiveness of cathodic protection in the blind area of ​​a pipeline crossing section.

[0006] In a first aspect, an embodiment of the present invention provides a method for determining the effectiveness of cathodic protection of a pipeline crossing a blind area, comprising:

[0007] Obtaining construction parameters of the blind area pipeline of the to-be-evaluated crossing section, and determining the soil resistivity and the corresponding polarization potential at both ends of the blind area pipeline of the to-be-evaluated crossing section according to the construction parameters;

[0008] Obtaining a first polarization potential threshold corresponding to the length and the soil resistivity in the construction parameters from a pre-constructed polarization potential threshold table for blind-spot pipelines in a crossing section; the polarization potential threshold table for blind-spot pipelines in a crossing section includes the length of the blind-spot pipeline in the crossing section, the soil resistivity corresponding to the blind-spot pipeline in the crossing section, and the first polarization potential threshold; the polarization potential threshold table for blind-spot pipelines in the crossing section represents the correspondence between the length of the blind-spot pipeline in the crossing section, the soil resistivity, and the polarization potential threshold;

[0009] The effectiveness of cathodic protection of the blind area pipeline in the crossing section to be evaluated is determined based on the polarization potentials at both ends corresponding to the blind area pipeline in the crossing section to be evaluated and the first polarization potential threshold.

[0010] In one embodiment, determining the soil resistivity corresponding to the blind area pipeline of the to-be-evaluated crossing section includes:

[0011] Use the following formula to determine the distance between two adjacent probes during testing: a i =INT(h~H);

[0012] In the above formula, h represents the buried depth of the pipeline at both ends of the blind area of ​​the crossing section, H represents the maximum buried depth of the pipeline in the blind area of ​​the crossing section, and INT represents the integer function;

[0013] Use the following formula to obtain the soil resistivity corresponding to the blind area of ​​the crossing section: ρ = max h≤i≤H (2πa i R i );

[0014] In the above formula, h represents the buried depth of the pipeline at both ends of the blind area of ​​the crossing section, H represents the maximum buried depth of the pipeline in the blind area of ​​the crossing section, and a i Indicates the distance between two adjacent probes during testing, R i Indicates that the distance between two adjacent probes is a i The resistance value of the soil near the blind area pipeline in the crossing section.

[0015] In one embodiment, obtaining the first polarization potential threshold corresponding to the length and the soil resistivity in the construction parameters from the constructed polarization potential threshold table of the blind area pipeline crossing section further includes:

[0016] If the soil resistivity corresponding to the blind area pipeline of the crossing section to be evaluated is within the preset soil resistivity range, then, based on the length of the crossing section pipeline to be evaluated and the two end values ​​of the preset soil resistivity range, the second polarization potential threshold and the third polarization potential threshold corresponding to the length of the crossing section pipeline to be evaluated and the two end values, respectively, are matched in the polarization potential threshold table of the blind area pipeline of the crossing section;

[0017] The following formula is used to calculate the first polarization potential threshold corresponding to the blind zone pipeline of the crossing section to be evaluated: (ρ-ρ1) / (ρ2-ρ)=(E max -E1) / (E2-E max );

[0018] In the above formula, E max represents the first polarization potential threshold, ρ represents the soil resistivity corresponding to the blind area of ​​the crossing section, ρ1 and ρ2 represent the two end values ​​of the preset soil resistivity range, E1 represents the second polarization potential threshold, and E2 represents the third polarization potential threshold;

[0019] If the soil resistivity corresponding to the blind spot pipeline of the crossing section to be evaluated is not within the preset soil resistivity range, then according to the length of the crossing section pipeline to be evaluated and the soil resistivity, a first polarization potential threshold corresponding to the length of the crossing section pipeline to be evaluated and the soil resistivity is matched in the polarization potential threshold table of the blind spot pipeline of the crossing section.

[0020] In one embodiment, determining the effectiveness of cathodic protection of the blind zone pipeline in the crossing section to be evaluated based on the polarization potentials at both ends of the blind zone pipeline in the crossing section to be evaluated and the first polarization potential threshold includes:

[0021] Determine whether the polarization potentials at both ends of the blind zone pipeline of the evaluated crossing section are both less than the first polarization potential threshold; if so, determine that the cathodic protection of the pipeline of the evaluated crossing section is effective; otherwise, determine that the cathodic protection is invalid.

[0022] In a second aspect, an embodiment of the present invention provides a method for constructing a polarization potential threshold table for a pipeline crossing a blind zone, comprising:

[0023] Obtain construction parameters and soil environment parameters of the blind area pipeline crossing the section;

[0024] Calculate the soil resistivity corresponding to the blind area pipeline of the crossing section according to the construction parameters;

[0025] Based on the construction parameters and the soil environmental parameters, a numerical simulation method is used to construct a polarization potential threshold model at both ends of the pipeline; using the polarization potential threshold model at both ends of the pipeline, the polarization potential threshold corresponding to the blind area pipeline of the crossing section under different external anti-corrosion layer types and different soil resistivities is calculated;

[0026] A polarization potential threshold table for the blind area pipeline in the crossing section is constructed according to the length of the blind area pipeline construction parameters of the crossing section, the soil resistivity corresponding to the blind area pipeline in the crossing section, and the polarization potential threshold corresponding to the blind area pipeline in the crossing section.

[0027] In a third aspect, an embodiment of the present invention provides a device for determining the effectiveness of cathodic protection of a pipeline crossing a blind area, comprising:

[0028] The first determination module is used to obtain construction parameters of the blind area pipeline of the crossing section to be evaluated, and determine the soil resistivity and the corresponding polarization potential at both ends of the blind area pipeline of the crossing section to be evaluated based on the construction parameters;

[0029] An acquisition module is configured to obtain a first polarization potential threshold corresponding to the length in the construction parameters and the soil resistivity from a pre-constructed table of polarization potential thresholds for blind-spot pipelines in a crossing section; the table of polarization potential thresholds for blind-spot pipelines in a crossing section includes the length of the blind-spot pipeline in the crossing section, the soil resistivity corresponding to the blind-spot pipeline in the crossing section, and the first polarization potential threshold; the table of polarization potential thresholds for blind-spot pipelines in the crossing section represents the correspondence between the length of the blind-spot pipeline in the crossing section, the soil resistivity, and the polarization potential threshold;

[0030] The second determining module is used to determine the effectiveness of cathodic protection of the blind area pipeline in the crossing section to be evaluated based on the polarization potentials at both ends corresponding to the blind area pipeline in the crossing section to be evaluated and the first polarization potential threshold.

[0031] In a fourth aspect, an embodiment of the present invention provides a device for constructing a polarization potential threshold table for a pipeline crossing a blind zone, comprising:

[0032] An acquisition module is used to obtain the construction parameters and soil environment parameters of the blind area pipeline crossing the section;

[0033] A first calculation module is used to calculate the soil resistivity corresponding to the blind area pipeline of the crossing section according to the construction parameters;

[0034] The second calculation module is used to construct a polarization potential threshold model at both ends of the pipeline using a numerical simulation method based on the construction parameters and the soil environmental parameters; using the polarization potential threshold model at both ends of the pipeline, calculate the polarization potential threshold corresponding to the blind area pipeline of the crossing section under different external anti-corrosion layer types and different soil resistivities;

[0035] A construction module is used to construct a polarization potential threshold table for the blind area pipeline in the crossing section according to the length of the blind area pipeline construction parameters of the crossing section, the soil resistivity corresponding to the blind area pipeline in the crossing section, and the polarization potential threshold corresponding to the blind area pipeline in the crossing section.

[0036] In a fifth aspect, an embodiment of the present invention provides a computer storage medium, which stores computer-executable instructions. When the computer-executable instructions are executed by a processor, the method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section or the method for constructing a polarization potential threshold table for a pipeline in a blind area of ​​a crossing section is implemented.

[0037] In a sixth aspect, an embodiment of the present invention provides a terminal device, comprising: a memory, a processor, and a computer program stored in the memory and runnable on the processor, wherein when the processor executes the program, the method for determining the effectiveness of cathodic protection of a pipeline crossing a blind area or the method for constructing a polarization potential threshold table for a pipeline crossing a blind area is implemented.

[0038] In the seventh aspect, an embodiment of the present invention provides a computer program product, characterized in that the computer program product includes a computer program, and when the computer program is executed by a processor, it implements the above-mentioned method for determining the effectiveness of cathodic protection of pipelines in blind areas of crossing sections or the above-mentioned method for constructing a polarization potential threshold table for pipelines in blind areas of crossing sections.

[0039] The beneficial effects of the above technical solutions provided by the embodiments of the present invention include at least:

[0040] The method for determining the effectiveness of cathodic protection of a blind-spot pipeline in a crossing section provided by an embodiment of the present invention obtains the construction parameters of the blind-spot pipeline in the crossing section to be evaluated, determines the soil resistivity and the corresponding polarization potential at both ends of the blind-spot pipeline in the crossing section to be evaluated based on the construction parameters of the blind-spot pipeline in the crossing section to be evaluated, matches the polarization potential threshold corresponding to the length of the blind-spot pipeline in the crossing section to be evaluated and the soil resistivity of the blind-spot pipeline in the crossing section to be evaluated from a pre-constructed polarization potential threshold table of the blind-spot pipeline in the crossing section to be evaluated, and evaluates the effectiveness of the blind-spot pipeline in the crossing section to be evaluated based on the polarization potential at both ends corresponding to the blind-spot pipeline in the crossing section to be evaluated and the obtained polarization potential threshold. This method can conveniently, scientifically, and accurately determine whether the cathodic protection of the blind-spot pipeline in the crossing section to be evaluated is effective, improves the accuracy of judging whether the effectiveness of the cathodic protection of the blind-spot pipeline in the crossing section meets the standard, helps to take timely measures to strengthen the cathodic protection of the blind-spot pipeline in the crossing section to be evaluated when the effectiveness does not meet the standard, and reduces the risk of external corrosion perforation of the blind-spot pipeline in the crossing section to be evaluated.

[0041] The method for constructing a polarization potential threshold table for a blind-spot pipeline in a crossing section provided in an embodiment of the present invention obtains construction parameters and soil environment parameters of the blind-spot pipeline in the crossing section, calculates the soil resistivity corresponding to the blind-spot pipeline in the crossing section based on the obtained construction parameters, constructs a polarization potential threshold model for both ends of the pipeline based on the construction parameters and soil environment parameters of the blind-spot pipeline in the crossing section, and uses the polarization potential threshold model at both ends of the pipeline to calculate the polarization potential threshold of the blind-spot pipeline in the crossing section. A polarization potential threshold table for the blind-spot pipeline in the crossing section is constructed based on the length of the blind-spot pipeline in the crossing section construction parameters, the soil resistivity corresponding to the blind-spot pipeline in the crossing section, and the polarization potential threshold of the blind-spot pipeline in the crossing section. The polarization potential threshold table for the blind-spot pipeline in the crossing section characterizes the correspondence between the length, soil resistivity, and polarization potential threshold of the blind-spot pipeline in the crossing section, and provides good data support for using the polarization potential threshold table for the blind-spot pipeline in the crossing section to evaluate the effectiveness of the blind-spot pipeline in the crossing section.

[0042] Other features and advantages of the present invention will be described in the following description, and in part will become apparent from the description, or will be understood by practicing the present invention. The purposes and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0043] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following detailed description, they are used to explain the embodiments of the present invention, but do not constitute a limitation of the embodiments of the present invention. In the accompanying drawings:

[0045] FIG1 is a flow chart of a method for determining effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section according to an embodiment of the present invention;

[0046] FIG2 is a flow chart of a method for constructing a polarization potential threshold table for a pipeline crossing a blind zone in an embodiment of the present invention;

[0047] 3 is a flow chart of a method for optimizing cathodic protection of pipelines crossing blind areas in an embodiment of the present invention;

[0048] FIG4 is a schematic structural diagram of an apparatus for determining effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section according to an embodiment of the present invention;

[0049] FIG5 is a schematic structural diagram of a device for constructing a polarization potential threshold table for a pipeline crossing a blind zone in an embodiment of the present invention. DETAILED DESCRIPTION

[0050] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0051] The inventors discovered during their work that, in the prior art, testing the cathodic protection potential at both ends of a crossing section pipeline cannot accurately reflect the cathodic protection effect of the entire section of the blind area pipeline in the crossing section. After further research and development, the inventors made the present invention. The embodiments of the present invention provide a method for determining the effectiveness of cathodic protection of a crossing section blind area pipeline, and a method and device for constructing a polarization potential threshold table for a crossing section blind area pipeline.

[0052] Example

[0053] The method for determining the effectiveness of cathodic protection of a pipeline crossing a blind area is described in detail below with reference to an embodiment.

[0054] An embodiment of the present invention provides a method for determining the effectiveness of cathodic protection of a pipeline crossing a blind area. The method includes the following steps, as shown in FIG1 :

[0055] Step S1: Obtain the construction parameters of the blind area pipeline in the crossing section to be evaluated, and determine the soil resistivity and the corresponding polarization potential at both ends of the blind area pipeline in the crossing section to be evaluated based on the construction parameters;

[0056] Step S2: Obtain a first polarization potential threshold corresponding to the length and soil resistivity in the construction parameters from a pre-constructed table of polarization potential thresholds for blind-spot pipelines in the crossing section. The table of polarization potential thresholds for blind-spot pipelines in the crossing section includes the length of the blind-spot pipeline in the crossing section, the soil resistivity corresponding to the blind-spot pipeline in the crossing section, and the first polarization potential threshold. The table of polarization potential thresholds for blind-spot pipelines in the crossing section represents the correspondence between the length of the blind-spot pipeline in the crossing section, the soil resistivity, and the polarization potential threshold.

[0057] Step S3: determining the effectiveness of cathodic protection of the blind zone pipeline in the crossing section to be evaluated based on the polarization potentials at both ends of the pipeline in the blind zone of the crossing section to be evaluated and the first polarization potential threshold.

[0058] In order to distinguish the polarization potential threshold corresponding to the blind zone pipeline of the to-be-evaluated crossing section from the polarization potential thresholds corresponding to the blind zone pipelines of other crossing sections, in the following description, the polarization potential threshold corresponding to the blind zone pipeline of the to-be-evaluated crossing section is referred to as the first polarization potential threshold.

[0059] There are many construction parameters for crossing blind zone pipelines. In the embodiment of the present invention, the obtained construction parameters include, for example, the length L of the crossing blind zone pipeline, the maximum burial depth H of the crossing blind zone pipeline, the burial depth h at both ends of the crossing blind zone pipeline, the cathodic protection type of the crossing blind zone pipeline, etc. It should be noted that the burial depth error at both ends of the crossing blind zone pipeline is generally less than the preset error threshold. For example, the preset error threshold is 5 meters. Therefore, it can be considered that the burial depth at both ends of the crossing blind zone pipeline is consistent; according to the actual calculation needs, other construction parameters of the crossing blind zone pipeline can also be obtained, such as the anti-corrosion layer type of the crossing blind zone pipeline, etc., which is not limited in the embodiment of the present invention.

[0060] In some optional embodiments, the Wenner four-electrode method can be used to test the soil resistivity corresponding to the blind area of ​​the crossing section. The above step S1, determining the soil resistivity corresponding to the blind area of ​​the crossing section to be evaluated, can be achieved by the following method:

[0061] (1) Use the following formula to determine the distance between two adjacent probes during testing: a i =INT(h~H); (1)

[0062] In the above formula, h represents the buried depth of the pipeline at both ends of the blind area of ​​the crossing section, H represents the maximum buried depth of the pipeline in the blind area of ​​the crossing section; INT is an integer function;

[0063] a i is the distance between two adjacent probes in the field test of Wenner four-electrode method. In the calculation, a i The value range of a is an integer between h and H. In actual calculation, it can be taken as follows: an integer between h and H (including h and H). If the maximum buried depth H of the blind area pipeline in the crossing section to be evaluated is large, a partial integer between h and H (including h and H) can also be taken as a i Assign a value. For example, if h is 2 meters and H is 15 meters, then the distance a between two adjacent probes is i They are 2m, 3m, 4m, 5m, 6m...15m respectively. For example, if h is 2 meters and H is 100 meters, then the distance a between two adjacent probes is i They are 2m, 3m, 4m, 10m, 20m, 30m...70m, 80m, 90m, 95m, 96m, 97m, 98m, 99m, 100m respectively.

[0064] (2) Use the following formula to obtain the soil resistivity corresponding to the blind area of ​​the pipeline crossing the section: ρ = max h≤i≤H (2πa i R i ); (2)

[0065] In the above formula, h represents the buried depth of the pipeline at both ends of the blind area of ​​the crossing section, H represents the maximum buried depth of the pipeline in the blind area of ​​the crossing section, and a i Indicates the distance between two adjacent probes during testing, R i Indicates that the distance between two adjacent probes is a i The resistance value of the soil near the blind area of ​​the pipeline in the time-travel section; max is the maximum value function.

[0066] In some optional embodiments, the above step S1, determining the polarization potentials at both ends of the pipeline corresponding to the blind zone of the section to be evaluated, can be implemented in the following manner:

[0067] (1) If the blind area pipeline of the crossing section to be evaluated adopts impressed current as the cathodic protection type, use a multimeter and a reference electrode to test the polarization potential at both ends of the blind area pipeline of the crossing section to be evaluated by the instantaneous power-off potential method;

[0068] Use a multimeter, connect the positive pole of the multimeter to the blind area pipeline of the crossing section to be evaluated, and connect the negative pole to the copper sulfate reference electrode (CSE). By instantaneously disconnecting the power supply of the impressed current cathodic protection system, respectively test the polarization potentials E1 and E2 at both ends of the blind area pipeline of the crossing section to be evaluated. The test results using the copper sulfate reference electrode are more stable than those using other reference electrodes. Of course, a high-purity zinc reference electrode, a silver chloride reference electrode, or a calomel reference electrode may also be used, and this embodiment of the present invention does not limit this.

[0069] (2) If the pipeline in the blind area of ​​the crossing section to be evaluated uses at least sacrificial anodes as the cathodic protection type, use a multimeter and polarization probe to test the polarization potential at both ends of the pipeline in the blind area of ​​the crossing section to be evaluated using the polarization probe method. The polarization probe consists of a copper sulfate reference electrode and a metal sheet connected to the pipeline in the blind area of ​​the crossing section to be evaluated.

[0070] The blind area pipeline of the crossing section to be evaluated shall at least use sacrificial anode as the cathodic protection type. There are two cases: the first is that the blind area pipeline of the crossing section to be evaluated adopts sacrificial anode as the cathodic protection type; the second is that the blind area pipeline of the crossing section to be evaluated adopts sacrificial anode combined with impressed current cathodic protection type. In these two cases, if the instantaneous power-off potential method is used, it is impossible to accurately test the cathodic protection polarization potential, so the polarization probe method is selected. The specific method is to connect the positive pole of the multimeter to the metal sheet of the polarization probe and the negative pole to the copper sulfate reference electrode of the polarization probe. By momentarily disconnecting the metal sheet from the blind area pipeline of the crossing section to be evaluated, the polarization potentials E1 and E2 at both ends of the blind area pipeline of the crossing section to be evaluated are tested respectively. It should be noted that when the polarization probe method is used for testing. The buried depth of the polarization probe is the same as the buried depth of the two ends of the blind area pipeline of the crossing section to be evaluated.

[0071] In some optional embodiments, in step S2, a first polarization potential threshold corresponding to the length and soil resistivity in the construction parameters is obtained from a pre-constructed table of polarization potential thresholds for blind-spot pipelines. If the soil resistivity corresponding to the blind-spot pipeline in the to-be-evaluated crossing section is not within a preset soil resistivity range, then, based on the length and soil resistivity of the to-be-evaluated crossing section, a first polarization potential threshold corresponding to the length and soil resistivity of the to-be-evaluated crossing section is matched from the table of polarization potential thresholds for blind-spot pipelines. For example, as shown in the following table of polarization potential thresholds for blind-spot pipelines, if the length L of the blind-spot pipeline in the to-be-evaluated crossing section is 300 m and the soil resistivity ρ of the blind-spot pipeline in the to-be-evaluated crossing section is 50 Ω·m, the polarization potential threshold for the blind-spot pipeline in the to-be-evaluated crossing section is matched to -1100 mV from the table of polarization potential thresholds for blind-spot pipelines.

[0072] The polarization potential threshold value table of the blind zone pipeline in the crossing section is shown in Table 1 below:

[0073] Table 1

[0074] If ρ≤25Ω·m or ρ=50Ω·m or ρ≥100Ω·m, the first polarization potential threshold can be obtained by directly looking up the polarization potential threshold table of the blind zone pipeline in the crossing section;

[0075] If 25Ω·m<ρ<50Ω·m or 50Ω·m<ρ<100Ω·m, the corresponding first polarization potential threshold cannot be directly matched in the polarization potential threshold table of the blind zone pipeline in the crossing section. In this case, the first polarization potential threshold needs to be calculated using the interpolation method.

[0076] In some optional embodiments, the above step S2, obtaining the first polarization potential threshold corresponding to the length and soil resistivity in the construction parameters from the constructed polarization potential threshold table of the blind area pipeline crossing section, can also be implemented in the following manner:

[0077] If the soil resistivity corresponding to the blind area pipeline of the crossing section to be evaluated is within the preset soil resistivity range, then according to the length of the crossing section pipeline to be evaluated and the two end values ​​of the preset soil resistivity range, the second polarization potential threshold and the third polarization potential threshold corresponding to the length of the crossing section pipeline to be evaluated and the two end values ​​are matched in the polarization potential threshold table of the blind area pipeline of the crossing section;

[0078] The following formula is used to calculate the first polarization potential threshold corresponding to the blind zone pipeline of the crossing section to be evaluated: (ρ-ρ1) / (ρ2-ρ)=(E max -E1) / (E2-E max ); (3)

[0079] In the above formula (1), E max represents the first polarization potential threshold, ρ represents the soil resistivity corresponding to the blind area pipeline of the crossing section, ρ1 and ρ2 represent the two end values ​​of the preset soil resistivity range, E1 represents the second polarization potential threshold, and E2 represents the third polarization potential threshold.

[0080] For example, the length L of the blind area pipeline in the crossing section to be evaluated is 300m. The soil resistivity ρ of the blind area pipeline in the crossing section to be evaluated is 70Ω·m. From the polarization potential threshold table of the blind area pipeline in the crossing section, ρ1 is 50Ω·m, ρ2 is 100Ω·m, the second polarization potential threshold corresponding to ρ1 is -1100mV, and the third polarization potential threshold corresponding to ρ2 is -1170mV. Substitute ρ1, ρ2, E1 and E2 into formula (3): (70-50) / (100-70)=(E max -(-1100)) / (-1170-E max );

[0081] Solving for Emax we obtain -1128 mV.

[0082] In some optional embodiments, the above step S3, determining the effectiveness of cathodic protection of the pipeline in the blind area of ​​the crossing section to be evaluated based on the polarization potentials at both ends of the pipeline in the blind area of ​​the crossing section to be evaluated and the first polarization potential threshold, can be achieved in the following manner:

[0083] Determine whether the polarization potentials at both ends of the blind zone pipeline of the evaluated crossing section are both less than the first polarization potential threshold. If so, it is determined that the cathodic protection of the pipeline of the evaluated crossing section is effective; otherwise, it is invalid.

[0084] The following describes in detail a method for constructing a polarization potential threshold table for a pipeline crossing a blind zone in a section with reference to an embodiment.

[0085] An embodiment of the present invention provides a method for constructing a polarization potential threshold table for a pipeline crossing a blind zone. The method includes the following steps, as shown in FIG2 :

[0086] Step S21: Acquire construction parameters and soil environment parameters of the pipeline crossing the blind area;

[0087] Step S22: Calculate the soil resistivity corresponding to the blind area of ​​the pipeline crossing the section according to the construction parameters;

[0088] Step S23: Based on the construction parameters and soil environmental parameters, a numerical simulation method is used to construct a polarization potential threshold model for both ends of the pipeline; using the polarization potential threshold model for both ends of the pipeline, the polarization potential threshold corresponding to the blind area of ​​the crossing section is calculated under different outer anti-corrosion layer types and different soil resistivities;

[0089] Step S24: constructing a table of polarization potential thresholds for blind-spot pipelines in the crossing section according to the length of the blind-spot pipeline construction parameters, the soil resistivity corresponding to the blind-spot pipeline in the crossing section, and the polarization potential threshold corresponding to the blind-spot pipeline in the crossing section.

[0090] In some optional embodiments, the above step S23 can use numerical simulation software (BEASY) to construct a polarization potential threshold model at both ends of the pipeline. By applying different types of external anti-corrosion layers to the blind area pipeline of the crossing section and changing the soil boundary around the blind area pipeline of the crossing section, the polarization potential threshold corresponding to the blind area pipeline of the crossing section under different external anti-corrosion layer types and different soil resistivities is calculated.

[0091] In order to improve the accuracy of the polarization potential threshold corresponding to the blind zone pipeline in the crossing section, the calculated polarization potential threshold corresponding to the blind zone pipeline in the crossing section can also be corrected in combination with the relevant data of the blind zone pipeline in the crossing section obtained from the field test, so as to reduce the error of the polarization potential threshold corresponding to the blind zone pipeline in the crossing section.

[0092] With reference to the above-mentioned table of polarization potential thresholds for blind-zone pipelines in the crossing section, a constructed table of polarization potential thresholds for blind-zone pipelines in the crossing section is obtained.

[0093] Based on the method for determining the effectiveness of cathodic protection of pipelines in blind areas of crossing sections and the method for constructing a polarization potential threshold table for pipelines in blind areas of crossing sections provided by the embodiments of the present invention, optimization processing can be performed on pipelines in blind areas of crossing sections whose cathodic protection effectiveness does not meet the standards. For example, as shown in FIG3 , this can be achieved through the following steps:

[0094] Step S31: using the above method for determining the effectiveness of cathodic protection of pipelines in blind areas of the crossing section, determining whether the cathodic protection of pipelines in blind areas of the crossing section to be optimized is effective;

[0095] Step S32: If not, determining the cathodic protection type of the pipeline in the blind area of ​​the section to be optimized based on the construction parameters of the pipeline in the blind area of ​​the section to be optimized;

[0096] Step S33: Optimizing the cathodic protection of the pipeline in the blind area of ​​the optimized crossing section according to the cathodic protection type until the polarization potentials at both ends of the pipeline in the blind area of ​​the optimized crossing section reach a polarization potential threshold.

[0097] In some optional embodiments, the above step S33 can be implemented in the following manner:

[0098] (1) If the blind area pipeline of the optimized crossing section adopts at least impressed current as cathodic protection type, the cathodic protection of the blind area pipeline of the optimized crossing section shall be optimized by adjusting the output parameters of the constant potentiostat; if the blind area pipeline of the optimized crossing section adopts impressed current cathodic protection or impressed current combined with sacrificial anode cathodic protection, the output parameters of the constant potentiostat of the impressed current cathodic protection system may be gradually increased: the specific method is: if the constant potentiostat is running in constant potential mode, gradually adjust the control potential to be more negative, for example, change -1200 mV is adjusted to -1250mV, -1300mV, -1350mV, and -1400mV until the polarization potentials E1 and E2 at both ends of the blind area pipeline in the optimized crossing section reach the corresponding polarization potential thresholds. If the potentiostat operates in constant current mode, gradually increase the output current value, for example, adjust 1.0A to -1.1A, -1.2A, -1.3A, and -1.4A until the polarization potentials E1 and E2 at both ends of the blind area pipeline in the optimized crossing section reach the corresponding polarization potential thresholds.

[0099] (2) If the pipeline in the blind area of ​​the optimized crossing section adopts sacrificial anode as the cathodic protection type, the cathodic protection of the pipeline in the blind area of ​​the optimized crossing section is optimized by adjusting the number of sacrificial anodes.

[0100] If the cathodic protection type of the blind zone pipeline in the optimized crossing section adopts sacrificial anode, the number of sacrificial anodes in the two sections of the blind zone of the crossing section can be increased to optimize the cathodic protection effect until the polarization potentials E1 and E2 at both ends of the blind zone pipeline in the optimized crossing section reach the corresponding polarization potential thresholds.

[0101] Based on the same inventive concept, an embodiment of the present invention further provides a device for determining the effectiveness of cathodic protection of a pipeline crossing a blind area. The structure of the device is shown in FIG4 , and includes:

[0102] The first determination module 41 is used to obtain the construction parameters of the blind area pipeline of the crossing section to be evaluated, and determine the soil resistivity and the corresponding polarization potential of the two ends of the blind area pipeline of the crossing section to be evaluated based on the construction parameters;

[0103] An acquisition module 42 is configured to obtain a first polarization potential threshold corresponding to the length and soil resistivity in the construction parameters from a pre-constructed table of polarization potential thresholds for blind-spot pipelines in a crossing section. The table of polarization potential thresholds for blind-spot pipelines in a crossing section includes the length of the blind-spot pipeline in the crossing section, the soil resistivity corresponding to the blind-spot pipeline in the crossing section, and the first polarization potential threshold. The table of polarization potential thresholds for blind-spot pipelines in the crossing section indicates the corresponding relationship between the length of the blind-spot pipeline in the crossing section, the soil resistivity, and the polarization potential threshold.

[0104] The second determining module 43 is configured to determine the effectiveness of cathodic protection of the blind zone pipeline in the passage section to be evaluated based on the polarization potentials at both ends of the pipeline in the blind zone of the passage section to be evaluated and the first polarization potential threshold.

[0105] Regarding the device for determining the effectiveness of cathodic protection of a pipeline crossing a blind area in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method and will not be elaborated here.

[0106] Based on the same inventive concept, an embodiment of the present invention further provides a device for constructing a polarization potential threshold table for a pipeline crossing a blind zone. The structure of the device is shown in FIG5 , and includes:

[0107] An acquisition module 51 is used to obtain construction parameters and soil environment parameters of the pipeline crossing the blind area;

[0108] The first calculation module 52 is used to calculate the soil resistivity corresponding to the blind area of ​​the pipeline crossing the section according to the construction parameters;

[0109] The second calculation module 53 is used to construct a polarization potential threshold model at both ends of the pipeline using a numerical simulation method based on construction parameters and soil environmental parameters. The polarization potential threshold model at both ends of the pipeline is used to calculate the corresponding polarization potential threshold of the blind area pipeline crossing section under different external anti-corrosion coating types and different soil resistivities.

[0110] The construction module 54 is used to construct a polarization potential threshold table for the blind area pipeline in the crossing section according to the length of the blind area pipeline construction parameters, the soil resistivity corresponding to the blind area pipeline in the crossing section, and the polarization potential threshold corresponding to the blind area pipeline in the crossing section.

[0111] Regarding the device for constructing the polarization potential threshold value table for a blind zone pipeline crossing section in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method and will not be elaborated on here.

[0112] Based on the same inventive concept, an embodiment of the present invention further provides a computer storage medium, which stores computer-executable instructions. When the computer-executable instructions are executed by a processor, the method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section or the method for constructing the polarization potential threshold table of a pipeline in a blind area of ​​a crossing section is implemented.

[0113] Based on the same inventive concept, an embodiment of the present invention further provides a terminal device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the method for determining the effectiveness of cathodic protection for pipelines in blind areas of a crossing section or the method for constructing a polarization potential threshold table for pipelines in blind areas of a crossing section are implemented.

[0114] Based on the same inventive concept, an embodiment of the present invention further provides a computer program product, characterized in that the computer program product includes a computer program, which, when executed by a processor, implements the above-mentioned method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section or the above-mentioned method for constructing a polarization potential threshold table for a pipeline in a blind area of ​​a crossing section.

[0115] The present invention will be described with a specific embodiment:

[0116] 1. Query the construction data of the blind area pipeline in the crossing section and find that the length L of the blind area pipeline in the crossing section is 1000m, the maximum buried depth H of the blind area pipeline in the crossing section is 15m, and the buried depth h at both ends of the blind area pipeline in the crossing section is 2m. The entire pipeline adopts the impressed current cathodic protection type;

[0117] 2. Use the Wenner four-electrode method to test the soil resistivity ρ near the blind area of ​​the pipeline in the crossing section. Set the distance a between two adjacent probes in sequence. i They are 2m, 3m, 4m, 5m, 6m…….15m respectively, and the corresponding resistance values ​​Ri=1Ω, 0.9Ω, 0.86Ω, 0.86Ω, 0.84Ω, 0.83Ω, 0.83Ω, 0.82Ω, 0.81Ω, 0.80Ω, 0.79Ω, 0.77Ω, 0.76Ω, 0.75Ω respectively;

[0118] 3. Solve formula (2) and get: ρ = max 2≤i≤15 (2πa i R i )=70Ω·m;

[0119] 4. Since the blind area pipeline in the crossing section adopts the type of impressed current cathodic protection, it is determined to use the instantaneous power-off potential method to test the polarization potential at both ends of the blind area pipeline in the crossing section;

[0120] 5. The polarization potentials E1 and E2 of the pipeline in the blind area of ​​the crossing section were measured by the instantaneous power-off potential method using a copper sulfate reference electrode (CSE) to be -1150mV and -956mV respectively;

[0121] 6. According to the length of the blind area pipeline in the crossing section L (1000m) and the soil resistivity ρ (70Ω·m) near the blind area pipeline in the crossing section, by querying the polarization potential threshold table of the blind area pipeline in the crossing section and combining formula (3), we can obtain: (70-50) / (100-70)=(E max -(-1100)) / (-1170-E max )

[0122] 7. Calculate and obtain Emax = -1128mV.

[0123] 8. Comparing E1, E2 and Emax, we found that E1 = -1150mV < Emax = -1128mV, while E2 = -956mV > Emax = -1128mV. This indicates that some sections of the blind area pipeline in this crossing section are not effectively protected and the cathodic protection system needs to be optimized.

[0124] 9. Since the blind area pipeline in this crossing section adopts impressed current cathodic protection, and the current operating mode of the impressed current cathodic protection system is the constant potential instrument mode, the control potential is set to -1250mV, then the control potential is gradually set to -1300mV, -1350mV, -1400mV and -1450mV, and the polarization potential E1 and E2 at both ends of the blind area pipeline in the crossing section are tested in sequence using the instantaneous power-off potential method. It is found that when the control potential is set to -1450mV, E1 and E2 are -1190mV and -1130mV respectively, both less than Emax = -1128mV. The cathodic protection potential of the entire blind area pipeline in the crossing section meets the standard, and is effectively protected, completing the optimization of the cathodic protection effect.

[0125] Unless otherwise specifically stated, terms such as process, calculate, compute, determine, display, and the like may refer to the actions and / or processes of one or more processing or computing systems, or similar devices, that manipulate and convert data represented as physical (e.g., electronic) quantities within registers or memories of a processing system into other data similarly represented as physical quantities within the memories, registers, or other such information storage, transmission, or display devices of the processing system. Information and signals may be represented using any of a variety of different techniques and methods. For example, data, instructions, commands, information, signals, bits, symbols, and chips referred to throughout the above description may be represented by voltages, currents, electromagnetic waves, magnetic fields or particles, light fields or particles, or any combination thereof.

[0126] It should be understood that the specific order or hierarchy of steps in the disclosed processes is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process can be rearranged without departing from the scope of the present disclosure. The accompanying method claims present elements of the various steps in an exemplary order and are not intended to be limited to the specific order or hierarchy described.

[0127] In the foregoing detailed description, various features are grouped together in a single embodiment to simplify the disclosure. This method of disclosure should not be interpreted as reflecting an intention that embodiments of the claimed subject matter require more features than are expressly recited in each claim. On the contrary, as reflected in the appended claims, the invention comprises less than all the features of any individual disclosed embodiment. The appended claims are therefore hereby expressly incorporated into the detailed description, with each claim standing on its own as a separate preferred embodiment of the invention.

[0128] Those skilled in the art will also appreciate that the various illustrative logic blocks, modules, circuits, and algorithmic steps described in conjunction with the embodiments herein may be implemented as electronic hardware, computer software, or a combination thereof. In order to clearly illustrate the interchangeability between hardware and software, the various illustrative components, blocks, modules, circuits, and steps described above are generally described around their functions. Whether such functions are implemented as hardware or software depends on the specific application and the design constraints imposed on the entire system. A skilled person may implement the described functions in an adaptable manner for each specific application, but such implementation decisions should not be interpreted as departing from the scope of protection of this disclosure.

[0129] The steps of the methods or algorithms described in conjunction with the embodiments herein may be directly embodied as hardware, software modules executed by a processor, or a combination thereof. The software module may be located in a RAM memory, flash memory, ROM memory, EPROM memory, EEPROM memory, register, hard disk, removable disk, CD-ROM, or any other form of storage medium well known in the art. An exemplary storage medium is connected to the processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium may also be an integral part of the processor. The processor and storage medium may be located in an ASIC. The ASIC may be located in a user terminal. Of course, the processor and storage medium may also be present in a user terminal as discrete components.

[0130] For software implementation, the techniques described herein can be implemented using modules (e.g., procedures, functions, etc.) that perform the functions described herein. These software codes can be stored in a memory unit and executed by a processor. The memory unit can be implemented within the processor or external to the processor. In the latter case, it is communicatively coupled to the processor via various means, which are well known in the art.

[0131] The foregoing description includes examples of one or more embodiments. Of course, it is not possible to describe all possible combinations of components or methods for the purposes of describing the above embodiments, but one of ordinary skill in the art will recognize that the various embodiments may be further combined and arranged. Therefore, the embodiments described herein are intended to encompass all such changes, modifications and variations that fall within the scope of the appended claims. Furthermore, to the extent the term "comprising" is used in the specification or claims, the term is intended to be encompassed in a manner similar to the term "including," as explained in terms of "including," used as a transitional word in the claims. Furthermore, any use of the term "or" in the specification of the claims is intended to mean a "non-exclusive or."

Claims

1. A method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section, characterized in that: include: Acquire the construction parameters of the blind area pipeline of the crossing section to be evaluated, and determine the soil resistivity and the corresponding polarization potential at both ends of the blind area pipeline of the crossing section to be evaluated according to the construction parameters; Obtaining a first polarization potential threshold value corresponding to the length in the construction parameters and the soil resistivity from a pre-constructed polarization potential threshold value table of blind-spot pipelines in the crossing section; the polarization potential threshold value table of blind-spot pipelines in the crossing section includes the length of the blind-spot pipelines in the crossing section, the soil resistivity corresponding to the blind-spot pipelines in the crossing section, and the first polarization potential threshold value; the polarization potential threshold value table of blind-spot pipelines in the crossing section represents the corresponding relationship between the length of the blind-spot pipelines in the crossing section, the soil resistivity, and the polarization potential threshold value; The effectiveness of the cathodic protection of the blind zone pipeline in the crossing section to be evaluated is determined according to the polarization potentials at both ends corresponding to the blind zone pipeline in the crossing section to be evaluated and the first polarization potential threshold.

2. The method according to claim 1, characterized in that Determine the soil resistivity corresponding to the blind area pipeline of the crossing section to be evaluated, including: Use the following formula to determine the distance between two adjacent probes during testing: a i =INT(h~H); In the above formula, h represents the buried depth of both ends of the blind area pipeline in the crossing section, H represents the maximum buried depth of the blind area pipeline in the crossing section, and INT represents the integer function; The soil resistivity corresponding to the blind area pipeline of the crossing section is obtained by using the following formula: p=max h≤i≤H (2πa i R i ); In the above formula, h represents the buried depth of both ends of the blind area pipeline in the crossing section, H represents the maximum buried depth of the blind area pipeline in the crossing section, and a i Indicates the distance between two adjacent probes during testing, R i Indicates that the distance between two adjacent probes is a i The resistance value of the soil near the blind area pipeline of the crossing section.

3. The method according to claim 1, characterized in that The step of obtaining the first polarization potential threshold corresponding to the length in the construction parameter and the soil resistivity from the constructed polarization potential threshold table of the blind area pipeline in the crossing section also includes: If the soil resistivity corresponding to the blind zone pipeline of the crossing section to be evaluated is within the preset soil resistivity range, then according to the length of the crossing section pipeline to be evaluated and the two end values ​​of the preset soil resistivity range, in the polarization potential threshold table of the blind zone pipeline of the crossing section, the second polarization potential threshold and the third polarization potential threshold corresponding to the length of the crossing section pipeline to be evaluated and the two end values ​​are matched; The following formula is used to calculate the first polarization potential threshold corresponding to the blind zone pipeline of the crossing section to be evaluated: (p-p1) / (p2-p)=(E max -E1) / (E2-E max ); In the above formula, E max represents the first polarization potential threshold, ρ represents the soil resistivity corresponding to the blind area pipeline of the crossing section, ρ1 and ρ2 represent the two end values ​​of the preset soil resistivity range, E1 represents the second polarization potential threshold, and E2 represents the third polarization potential threshold; If the soil resistivity corresponding to the blind spot pipeline of the crossing section to be evaluated is not within the preset soil resistivity range, then according to the length of the crossing section pipeline to be evaluated and the soil resistivity, in the polarization potential threshold table of the blind spot pipeline of the crossing section, a first polarization potential threshold corresponding to the length of the crossing section pipeline to be evaluated and the soil resistivity is matched.

4. The method according to claim 1, characterized in that Determining the effectiveness of cathodic protection of the blind zone pipeline of the crossing section to be evaluated according to the polarization potentials at both ends of the blind zone pipeline of the crossing section to be evaluated and the first polarization potential threshold value, including: It is determined whether the polarization potentials at both ends of the blind zone pipeline of the crossing section to be evaluated are both less than the first polarization potential threshold. If so, it is determined that the cathodic protection of the crossing section pipeline to be evaluated is effective; if not, it is invalid.

5. A method for constructing a polarization potential threshold table for a pipeline crossing a blind area, characterized in that: include: Obtain construction parameters and soil environment parameters of the blind area pipeline crossing the section; Calculate the soil resistivity corresponding to the blind area pipeline of the crossing section according to the construction parameters; According to the construction parameters and the soil environment parameters, a numerical simulation method is used to construct a polarization potential threshold model at both ends of the pipeline; using the polarization potential threshold model at both ends of the pipeline, the polarization potential threshold corresponding to the blind area pipeline of the crossing section under different types of external anti-corrosion layers and different soil resistivities is calculated; According to the length of the blind area pipeline construction parameters of the crossing section, the soil resistivity corresponding to the blind area pipeline of the crossing section, and the polarization potential threshold corresponding to the blind area pipeline of the crossing section, a polarization potential threshold table of the blind area pipeline of the crossing section is constructed.

6. A device for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section, characterized in that: include: The first determination module is used to obtain the construction parameters of the blind area pipeline of the crossing section to be evaluated, and determine the soil resistivity and the corresponding polarization potential at both ends of the blind area pipeline of the crossing section to be evaluated according to the construction parameters; An acquisition module is used to acquire a first polarization potential threshold value corresponding to the length in the construction parameters and the soil resistivity from a pre-constructed polarization potential threshold value table of a blind zone pipeline in a crossing section; the polarization potential threshold value table of a blind zone pipeline in a crossing section includes the length of the blind zone pipeline in the crossing section, the soil resistivity corresponding to the blind zone pipeline in the crossing section, and the first polarization potential threshold value; the polarization potential threshold value table of a blind zone pipeline in the crossing section represents the corresponding relationship between the length of the blind zone pipeline in the crossing section, the soil resistivity, and the polarization potential threshold value; The second determination module is used to determine the polarization potentials at both ends of the blind zone pipeline of the to-be-evaluated crossing section and The first polarization potential threshold determines the effectiveness of the cathodic protection of the blind area pipeline in the crossing section to be evaluated.

7. A device for constructing a polarization potential threshold table for a pipeline crossing a blind area, characterized in that: include: An acquisition module is used to obtain the construction parameters and soil environment parameters of the blind area pipeline crossing the section; A first calculation module is used to calculate the soil resistivity corresponding to the blind area pipeline of the crossing section according to the construction parameters; The second calculation module is used to construct a polarization potential threshold model at both ends of the pipeline by a numerical simulation method according to the construction parameters and the soil environmental parameters; and calculate the polarization potential threshold corresponding to the blind area pipeline of the crossing section under different types of external anti-corrosion layers and different soil resistivities by using the polarization potential threshold model at both ends of the pipeline. A construction module is used to construct a polarization potential threshold table for the blind area pipeline of the crossing section according to the length of the blind area pipeline construction parameters of the crossing section, the soil resistivity corresponding to the blind area pipeline of the crossing section, and the polarization potential threshold corresponding to the blind area pipeline of the crossing section.

8. A computer storage medium, characterized in that: The computer storage medium stores computer executable instructions, which, when executed by a processor, implement the method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section as described in any one of claims 1 to 4 or the method for constructing a polarization potential threshold table for a pipeline in a blind area of ​​a crossing section as described in claim 5.

9. A terminal device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section as described in any one of claims 1 to 4 or the method for constructing a polarization potential threshold table for a pipeline in a blind area of ​​a crossing section as described in claim 5 is implemented.

10. A computer program product, characterized in that The computer program product includes a computer program, which, when executed by a processor, implements the method for determining the effectiveness of cathodic protection of a pipeline in a blind area of ​​a crossing section as described in any one of claims 1 to 4 or the method for constructing a polarization potential threshold table for a pipeline in a blind area of ​​a crossing section as described in claim 5.

Citation Information

Patent Citations

  • Detection method for cathode protection of directionally drilled and crossed pipeline

    CN104674228A

  • Method and device for calculating direct-current interference on buried metal pipeline

    CN107657072A

  • Method and device for evaluating insulating property of anti-corrosion layers of passing-through section pipelines

    CN109813764A

  • Buried pipeline anticorrosive coating quality evaluation method based on cathode protection data

    CN110210125A

  • Numerical simulation evaluation method for deep penetration section of in-use steel pipeline

    CN114429024A