Battery swapping station charging power distribution method and system, medium, apparatus, and battery swapping station

By obtaining the power limit and total requested power in the battery swap station, determining the battery charging priority and actual allocated power, the problem of insufficient power distribution capacity is solved, intelligent management and efficient allocation of charging power are realized, and charging efficiency and users are improved. experience.

WO2024222410A1PCT designated stage expired Publication Date: 2024-10-31NIO CO LTD

Patent Information

Application Number
PCT/CN2024/085828
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-28
Filing Date
2024-04-03
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

When selecting a location for a battery swap station, the battery swap station may face the problem of insufficient power distribution at the station, resulting in a conflict between the power demand of electric vehicles and the power distribution capacity of the battery swap station, bringing a bad experience to users.

Method used

A charging power allocation method for battery swapping stations is adopted. By obtaining the power limit and the total requested power, comparing their sizes, and when the power limit is less than the total requested power, the charging priority and actual allocated power of the battery are determined based on the charging strategy, and then Distribute power to the battery compartment. Specific steps include obtaining the battery type and its quantity, state of charge, determining the first and second priorities, and allocating charging power according to the priority and actual allocated power until the power limit or all batteries are fully charged.

Benefits of technology

It realizes intelligent management of charging power in battery swap stations when power distribution capacity is limited, ensuring maximum utilization of limited power, improving charging efficiency and user experience, and avoiding tripping and device damage caused by excessive battery compartment equipment. Reduced operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024085828_31102024_PF_FP_ABST
    Figure CN2024085828_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of battery swapping, and in particular to a battery swapping station charging power distribution method and system, a medium, an apparatus, and a battery swapping station. The present application aims to solve the problem of how to achieve intelligent management of battery swapping station charging power under the condition that the power distribution capacity is limited. To achieve this objective, according to the battery swapping station charging power distribution method in the present application, when a power limit value is smaller than total request power of a battery compartment, the charging priority and the actual distribution power of the battery compartment are determined on the basis of a charging strategy, and then power distribution is performed on the battery compartment on the basis of the charging priority and the actual distribution power, so that under the condition that the power distribution capacity of the battery swapping station is limited, intelligent management of the battery swapping station charging power is achieved, flexible and efficient power distribution of the battery swapping station under limited power is achieved, and the limited power in the battery swapping station can be utilized to the maximum extent, thereby improving the charging efficiency of the battery swapping station.
Need to check novelty before this filing date? Find Prior Art

Description

Battery swap station charging power distribution method, system, medium, device and battery swap station

[0001] This application claims priority to Chinese patent application No. 202310493365.1 filed on April 28, 2023, entitled “Method, system, medium, device and battery swap station for charging power distribution at battery swap stations”. The entire contents of the above-mentioned Chinese patent application are incorporated into this application by reference. Technical Field

[0002] The present invention relates to the field of battery swapping technology, and in particular to a charging power distribution method, system, medium, device and battery swapping station. Background Art

[0003] As the electric vehicle industry continues to develop and mature, more and more consumers are choosing electric vehicles as their means of transportation. As the number of electric vehicles continues to rise, the demand for recharging electric vehicles is also increasing, and various recharging devices are emerging. Among them, battery swap stations are currently a key facility that enables rapid recharging.

[0004] When selecting a site for a battery swap station, the station may face the problem of insufficient power distribution, which will cause a contradiction between the charging demand of electric vehicles and the power distribution capacity of the battery swap station, and will bring a bad experience to users. Therefore, comprehensive power management of the battery swap station must be done well.

[0005] Accordingly, this field requires a new technical solution to solve the above problems.

[0006] Summary of the Invention

[0007] In order to solve at least one of the above problems in the prior art, that is, to solve the problem of how to achieve intelligent management of charging power in a battery swap station under limited power distribution capacity, the present application provides a charging power allocation method for a battery swap station, wherein the battery swap station includes n battery compartment groups (n≥1), and the battery compartments are used to charge batteries;

[0008] The battery swap station charging power distribution method includes:

[0009] Obtaining a power limit of the battery swap station and a total requested power of the battery swap station;

[0010] comparing the power limit value with the total requested power;

[0011] When the power limit is less than the total requested power, determining a charging priority and an actual allocated power of the battery based on a charging strategy;

[0012] Based on the charging priority and the actual allocated power, power is allocated to the battery compartment corresponding to the battery.

[0013] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the charging priority of the battery based on the charging strategy" further includes:

[0014] Obtaining the types and corresponding quantities of all the batteries in the battery swap station;

[0015] Determine the first priority based on the number of battery types;

[0016] Obtaining the state of charge of all the batteries in the battery swap station;

[0017] determining a second priority level of all the batteries of the same type according to the states of charge of all the batteries of the same type;

[0018] A charging priority of the battery is determined according to the first priority and the second priority.

[0019] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the charging priority of the battery according to the first priority and the second priority" further includes:

[0020] Determine, based on the battery type with the highest priority in the first priority level, the battery with the highest priority in the second priority level under the battery type; then, based on the battery type with the next highest priority level under the first priority level, determine the battery with the highest priority in the second priority level under the battery type; and in this manner, sequentially determine the batteries with the highest priority in all the second priority levels under the first priority level;

[0021] Then, based on the battery type with the highest priority in the first priority, determine the battery with the next priority in the second priority under that battery type; then, based on the battery type with the next priority in the first priority, determine the battery with the next priority in the second priority under that battery type, and so on, determine all the batteries in the battery swap station in sequence;

[0022] The charging priority of the batteries is determined according to the determination order of the batteries.

[0023] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the charging priority of the battery according to the above-mentioned determination order of the battery" further includes:

[0024] According to the determined order of the batteries, it is determined that the battery ranked first has a higher charging priority than the battery ranked last.

[0025] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the first priority according to the number of battery types" further includes:

[0026] Comparing the number of batteries of different battery types in the battery swap station;

[0027] sorting the battery types in descending order according to the number of batteries;

[0028] The first priority of the battery type is determined according to the sorting result.

[0029] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the first priority of the battery type according to the sorting result" further includes:

[0030] It is determined according to the sorting result that the battery type ranked first has a higher first priority than the battery type ranked later.

[0031] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the second priority of all batteries of the same type according to the state of charge of all batteries of the same type" further includes:

[0032] comparing the states of charge of all batteries of the same battery type;

[0033] Sorting all the batteries of the same battery type in descending order of state of charge;

[0034] The second priority levels of the batteries of the same battery type are determined according to the sorting result.

[0035] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the second priority of the batteries of the same battery type according to the sorting result" further includes:

[0036] According to the sorting result, it is determined that the battery ranked first has a higher second priority than the battery ranked last.

[0037] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the step of "determining the actual allocated power of the battery compartment based on the charging strategy" further includes:

[0038] Obtaining a first charging request power of the battery and a second charging request power of the battery compartment corresponding to the battery;

[0039] The smaller power between the first charging request power and the second charging request power is calculated as the actual allocated power of the battery compartment.

[0040] In the preferred technical solution of the above-mentioned method for allocating charging power at a battery swap station, the step of “allocating power to the battery compartment corresponding to the battery based on the charging priority and the actual allocated power” further includes:

[0041] Based on the order of the charging priority from high to low, power is allocated to the battery compartments in sequence according to the actual allocated power until the total power consumption of the battery swap station is equal to the power limit and the power allocation is fully allocated, or the remaining power of the battery swap station is insufficient to charge the batteries, or all the batteries are charged, or all the batteries are fully charged.

[0042] In the preferred technical solution of the above-mentioned battery swap station charging power allocation method, the total requested power is determined based on the following method:

[0043] Calculating the total charging request power of all the battery compartments;

[0044] Calculating the power requirements of other power-consuming devices in the battery swap station;

[0045] The sum of the total charging request power and the power consumption is calculated as the total requested power.

[0046] In the preferred technical solution of the above-mentioned method for allocating charging power at a battery swap station, the method further includes:

[0047] Obtaining the real-time total power of the battery swap station;

[0048] Comparing the real-time total power with the power limit;

[0049] When the real-time total power is greater than the power limit, the total charging power of the battery swap station is controlled to be reduced to the power limit.

[0050] The present invention also provides a charging power distribution system for a battery swap station, wherein the battery swap station includes n battery compartment groups and n≥1, and the battery compartments are used to charge batteries;

[0051] The battery swap station charging power distribution system includes:

[0052] an acquisition module configured to acquire a power limit value of the battery swap station and a total requested power of the battery swap station;

[0053] a comparison module configured to compare the power limit value with the total requested power;

[0054] a determining module configured to determine a charging priority of the battery based on a charging strategy when the power limit is less than the total requested power;

[0055] A power distribution module is configured to distribute power to the battery compartments corresponding to the batteries based on the charging priority.

[0056] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the determination module is further configured to determine the charging priority of the battery based on the charging strategy in the following manner:

[0057] Obtaining the types and corresponding quantities of all the batteries in the battery swap station;

[0058] Determine the first priority based on the number of battery types;

[0059] Obtaining the state of charge of all the batteries in the battery swap station;

[0060] determining a second priority level of all the batteries of the same type according to the states of charge of all the batteries of the same type;

[0061] A charging priority of the battery is determined according to the first priority and the second priority.

[0062] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the determination module is further configured to determine the charging priority of the battery according to the first priority and the second priority in the following manner:

[0063] Determine, based on the battery type with the highest priority in the first priority level, the battery with the highest priority in the second priority level under the battery type; then, based on the battery type with the next highest priority level under the first priority level, determine the battery with the highest priority in the second priority level under the battery type; and in this manner, sequentially determine the batteries with the highest priority in all the second priority levels under the first priority level;

[0064] Then, based on the battery type with the highest priority in the first priority, determine the battery with the next priority in the second priority under that battery type; then, based on the battery type with the next priority in the first priority, determine the battery with the next priority in the second priority under that battery type, and so on, determine all the batteries in the battery swap station in sequence;

[0065] The charging priority of the batteries is determined according to the determination order of the batteries.

[0066] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the determination module is further configured to determine the charging priority of the battery according to the determination order of the battery in the following manner:

[0067] According to the determined order of the batteries, it is determined that the battery ranked first has a higher charging priority than the battery ranked last.

[0068] In the preferred technical solution of the above battery swap station charging power distribution system, the determination module is further configured to determine the first priority according to the number of battery types in the following manner:

[0069] Comparing the number of batteries of different battery types in the battery swap station;

[0070] sorting the battery types in descending order according to the number of batteries;

[0071] The first priority of the battery type is determined according to the sorting result.

[0072] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the determination module is further configured to determine the first priority of the battery type according to the sorting result in the following manner:

[0073] It is determined according to the sorting result that the battery type ranked first has a higher first priority than the battery type ranked later.

[0074] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the determination module is further configured to determine the second priority of all the batteries of the same type according to the state of charge of all the batteries of the same type in the following manner:

[0075] comparing the states of charge of all batteries of the same battery type;

[0076] Sorting all the batteries of the same battery type in descending order of state of charge;

[0077] The second priority levels of the batteries of the same battery type are determined according to the sorting result.

[0078] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the determination module is further configured to determine the second priority of the batteries of the same battery type according to the sorting result in the following manner:

[0079] According to the sorting result, it is determined that the battery ranked first has a higher second priority than the battery ranked last.

[0080] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the determination module is further configured to determine the actual distributed power of the battery compartment based on the charging strategy in the following manner:

[0081] Obtaining a first charging request power of the battery and a second charging request power of the battery compartment corresponding to the battery;

[0082] The smaller power between the first charging request power and the second charging request power is calculated as the actual allocated power of the battery compartment.

[0083] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the power distribution module is further configured to distribute power to the battery compartment corresponding to the battery based on the charging priority and the actual allocated power in the following manner:

[0084] Based on the order of the charging priority from high to low, power is allocated to the battery compartments in sequence according to the actual allocated power until the total power consumption of the battery swap station is equal to the power limit and the power allocation is fully allocated, or the remaining power of the battery swap station is insufficient to charge the batteries, or all the batteries are charged, or all the batteries are fully charged.

[0085] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the battery swap station charging power distribution system further includes:

[0086] A total requested power determination module is configured to determine the total requested power based on the following manner:

[0087] Calculating the total charging request power of all the battery compartments;

[0088] Calculating the power requirements of other power-consuming devices in the battery swap station;

[0089] The sum of the total charging request power and the power consumption is calculated as the total requested power.

[0090] In the preferred technical solution of the above-mentioned battery swap station charging power distribution system, the acquisition module is further configured to acquire the real-time total power of the battery swap station;

[0091] Comparing the real-time total power with the power limit;

[0092] When the real-time total power is greater than the power limit, the total charging power of the battery swap station is controlled to be reduced to the power limit.

[0093] The present invention also provides a computer-readable storage medium storing a plurality of program codes, wherein the program codes are suitable for being loaded and run by a processor to execute the battery swap station charging power distribution method described in any one of the above-mentioned preferred technical solutions.

[0094] The present invention also provides a control device, comprising:

[0095] processor;

[0096] A memory, wherein the memory is suitable for storing multiple program codes, and the program codes are suitable for being loaded and run by the processor to execute the battery swap station charging power distribution method described in any one of the above-mentioned preferred technical solutions.

[0097] The present invention also provides a battery swap station, in which the control device described in the above preferred technical solution is installed.

[0098] Those skilled in the art will understand that the battery swap station charging power allocation method of the present application determines the charging priority and actual allocated power of the battery compartment based on the charging strategy when the power limit is less than the total requested power of the battery compartment, and then allocates power to the battery compartment based on the charging priority and the actual allocated power. This enables the battery swap station to achieve intelligent management of the charging power of the battery swap station when the power distribution capacity is limited, and enables the battery swap station to achieve flexible and efficient power allocation under limited power, thereby maximizing the utilization of the limited power in the battery swap station and improving the charging efficiency of the battery swap station.

[0099] Furthermore, by obtaining the types and corresponding quantities of all batteries in the battery swap station, and determining the first priority based on the number of battery types, then obtaining the charge status of all batteries in the battery swap station, and determining the second priority of all batteries of the same type based on the charge status of all batteries of the same type, and finally determining the charging priority of the battery based on the first priority and the second priority, the batteries in the battery swap station can be flexibly allocated charging power according to the charging priority, thereby realizing orderly management of the batteries in the battery swap station.

[0100] Furthermore, the charging priority of the battery is determined by the first priority and the second priority, so that the batteries in the battery swap station can flexibly allocate charging power according to the charging priority, thereby improving the user's battery swap experience.

[0101] Furthermore, by determining that batteries ranked earlier have higher priority than batteries ranked later, the number of fully charged batteries of various types in the battery swap station can meet the charging needs of different cars, ensuring the user's battery swap experience.

[0102] Furthermore, by calculating the total charging request power of the battery compartment and the power request power of other electrical equipment in the battery swap station, the total request power is determined. In this way, the battery swap station can maximize the utilization of the limited power in the station while retaining other electrical equipment, thereby improving the charging efficiency of the station.

[0103] Furthermore, by calculating the smaller power between the first charging request power of the battery and the second charging request power of the battery compartment as the actual allocated power of the battery compartment, the battery swap station can charge as many batteries as possible under limited power, so that the limited power in the battery swap station can be maximized.

[0104] Furthermore, the real-time total power of the battery swap station is monitored in real time during power distribution, and the power distribution of the battery swap station is controlled based on the real-time total power and the power limit. The present application can also strictly distribute power within the power limit, avoiding over-limit operation from the source, and avoiding tripping, device damage, etc. caused by the total power exceeding the limit when equipment such as the battery compartment is abnormal, thereby reducing the operation and maintenance costs of the entire station. BRIEF DESCRIPTION OF THE DRAWINGS

[0105] The following describes the charging power distribution method of the battery swap station of the present application with reference to the accompanying drawings.

[0106] FIG1 is a flow chart of the method for distributing charging power in a battery swap station of the present application;

[0107] FIG2 is a system diagram of the battery swap station charging power distribution method of the present application;

[0108] FIG3 is a logic diagram of a possible implementation of the battery swap station charging power distribution method of the present application. DETAILED DESCRIPTION

[0109] The preferred embodiments of the present application are described below with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present application and are not intended to limit the scope of protection of the present application. For example, although this embodiment is introduced in conjunction with a battery swap station, this is not intended to limit the scope of protection of the present application. Without departing from the principles of the present application, those skilled in the art can apply the present application to other application scenarios, as long as the location can charge the battery. For example, a charging pile, etc.

[0110] First, the battery swap station of the present application is introduced with reference to Figure 2. Figure 2 is a system diagram of the charging power distribution method of the battery swap station of the present application.

[0111] As shown in Figure 2, the battery swap station of the present application includes a main control system, electrical equipment within the station, and n battery compartments, where n is a positive integer greater than or equal to 1. Each battery compartment includes a charging branch. When the battery is in the battery compartment, the charging branch is coupled with the battery and charges the battery. The main control system is arranged in the battery swap station, and each battery compartment is connected to the main control system so that the main control system sends power allocation instructions to the battery compartment to control the charging power of the battery compartment. Each charging branch includes a charging control board and an AC / DC module. The charging control board is respectively connected to the main control system, the AC / DC module, and the battery compartment, so that the charging control board can realize real-time information collection of the battery and the AC / DC module in the battery compartment, and control the branch to charge the battery; the charging control board of each branch interacts with the main control system, uploads branch-related information in real time, and accepts the control of the main control system.

[0112] It should be noted that the battery swap station also includes an electricity meter, which is connected to the control system to measure the overall power of the battery swap station and adjust the power of each charging device based on the overall power, so as to realize the real-time load power monitoring of the entire station, avoid tripping and device damage caused by excessive power operation of the station from the source of power supply, and reduce operation and maintenance costs.

[0113] Among them, electrical equipment within the station mainly refers to other electrical equipment except the battery compartment, including but not limited to battery replacement process equipment (such as battery replacement carts, battery transfer equipment, lifting mechanism, locking and unlocking mechanism, positioning mechanism, etc.), lighting equipment, communication equipment, etc.

[0114] Next, the present invention's method for allocating charging power to a battery swap station is described in conjunction with Figures 1 and 3. Figure 1 is a flow chart of the present invention's method for allocating charging power to a battery swap station, and Figure 3 is a logic diagram of a possible implementation of the present invention's method for allocating charging power to a battery swap station.

[0115] As shown in Figures 1 and 3, in order to solve the problem of how to achieve intelligent management of charging power at a battery swap station when the power distribution capacity is limited, the battery swap station charging power allocation method of the present application includes:

[0116] S101. Obtain the power limit of the battery swap station and the total requested power of the battery swap station. For example, the power limit can be a fixed value set manually, or it can be calculated or obtained in real time based on the information of the upstream power grid. The specific acquisition method is not limited in this application, as long as the power limit can be accurately obtained. The total requested power of the battery swap station includes not only the charging request power of all battery compartments that need to be charged, but also the power request power of other electrical equipment in the battery swap station.

[0117] S102: Compare the power limit and the total requested power. For example, after detecting the power limit and the total requested power, the power limit and the total requested power are compared to determine whether the total requested power exceeds the power limit by comparing whether the difference between the power limit and the total requested power is greater than 0 or whether the ratio between the power limit and the total requested power is greater than 1.

[0118] S103. When the power limit is less than the total requested power, the charging priority and actual allocated power of the battery compartment are determined based on the charging strategy. For example, when the power limit is greater than or equal to the total requested power, it is proved that the current power limit can meet the requested power of all battery compartments and electrical equipment in the station, and power allocation can be performed according to the requested power of the battery compartment. When the power limit is less than the total requested power, it is proved that the current power limit cannot meet the requested power of the battery compartment, and further power allocation is required to avoid power over-limit operation. At this time, the charging priority and actual allocated power of the battery compartment are determined based on the charging strategy.

[0119] S104: Allocate power to the battery compartment based on the charging priority and the actual allocated power. For example, after determining the charging priority and the actual allocated power, allocate power to the battery compartment based on the charging priority.

[0120] This application determines the charging priority and actual allocated power of the battery compartment based on the charging strategy when the power limit is less than the total requested power of the battery compartment, and then allocates power to the battery compartment based on the charging priority and the actual allocated power. This allows the battery swap station to achieve intelligent management of the charging power of the battery swap station when the distribution capacity is limited, and realizes flexible and efficient power allocation under limited power, so that the limited power in the battery swap station can be maximized, thereby improving the charging efficiency of the battery swap station.

[0121] The preferred implementation of the battery swap station charging power distribution method of the present application is introduced below.

[0122] The following describes two methods for determining the total requested power:

[0123] In one possible implementation, the total requested power is determined based on the following method:

[0124] Calculate the total charging request power of the batteries in all battery compartments;

[0125] Calculate the power requirements of other electrical equipment in the battery swap station;

[0126] The total requested power is calculated as the sum of the total charging request power and the electricity consumption power.

[0127] For example, let's assume the first requested charging power of the batteries in a battery compartment is P_req_i, where i represents the number of batteries, the total requested charging power is P_swap, and the other power-consuming devices are lighting devices, with the requested power of the lighting devices being P_au. If there are three batteries in all the battery compartments, the total requested charging power for the three battery compartments, P_chg_ac, equals P_req_1 + P_req_2 + P_req_3. Therefore, the total requested power, P_swap, equals P_req_1 + P_req_2 + P_req_3 + P_au.

[0128] In another alternative embodiment, the total requested power is determined based on the following method:

[0129] Calculate the total charging request power of all battery cells;

[0130] Calculate the power requirements of other electrical equipment in the battery swap station;

[0131] The total requested power is calculated as the sum of the total charging request power and the electricity consumption power.

[0132] For example, let's assume the second charging request power of a battery compartment is P_branch, the total requested power is P_swap, and the other power-consuming device is a lighting device, with the power consumption of the lighting device being P_au. If there are three battery compartments in the battery swap station, the total charging request power of the batteries in the compartments, P_chg_ac, equals 3P_branch. Therefore, the total requested power, P_swap, equals 3P_branch + P_au.

[0133] It should be noted that the total charging request power refers to the AC-side charging power P_chg_ac available at the battery swap station. Since charging in the battery swap station is controlled by DC-side power, the AC / DC module's AC / DC conversion efficiency is denoted as η. Therefore, the DC-side charging power of the battery swap station is P_chg_dc = η × P_chg_ac. The power mentioned in this application refers to the AC-side power.

[0134] In one embodiment, the step of “determining the actual allocated power of the battery compartment based on the charging strategy” specifically includes:

[0135] Obtaining a first charging request power of a battery and a second charging request power of a battery compartment corresponding to the battery;

[0136] The smaller power between the first charging request power and the second charging request power is calculated as the actual allocated power of the battery compartment.

[0137] For example, the first charging request power is P_req_i, where i represents the number of batteries, and the second charging request power is P_branch. Take the first charging request power P_req_1 of the battery in the first battery compartment, and the second charging request power of this battery compartment is P_branch. Compare the magnitudes of these two charging request powers. If P_req_1 > P_branch, then the smaller power of these two charging request powers is the second charging request power, and the actual allocated power of the battery compartment is P_branch. If P_req_1 < P_branch, then the smaller power of these two charging request powers is the first charging request power, and the actual allocated power of the battery compartment is P_req_1. When P_req_1 is equal to P_branch, either power is the actual allocated power of the battery compartment.

[0138] In one implementation, the charging power allocation method for the battery swapping station further includes:

[0139] Obtain the real-time total power of the battery swapping station;

[0140] Compare the real-time total power with the power limit;

[0141] When the real-time total power is greater than the power limit, control the total power of the battery swapping station to decrease to the power limit.

[0142] Specifically, on the premise that an electricity meter is set in the battery swapping station, obtain the real-time total power of the battery swapping station through the electricity meter. Then compare the real-time total power with the power limit. If the real-time total power is greater than the power limit, it proves that the total power of the current battery swapping station exceeds the power limit, which is likely to cause over-limit tripping and equipment failures. At this time, calculate the difference between the real-time total power and the power limit, and control the total power of the battery swapping station to decrease by this difference, so as to decrease to the power limit to avoid the above situation. Among them, the way to reduce the total power is to calculate the difference between the real-time total power and the power limit, and then determine the battery compartments with actual allocated power greater than this difference from the battery compartments, and no longer allocate power to these battery compartments, so that the real-time total power of the battery swapping station is less than the power limit. [[ID=??]] [[ID=??]]

[0143] Of course, when the measurement and control electricity meter is not set, the real-time total power in the station can also be calculated by obtaining the real-time power of all current battery compartments and other uses in the battery swapping station.

[0144] It should be noted that there seem to be some incorrect or incomplete tag references in the original text (such as the two "??" marked lines with tags that might be wrong). Please double-check the original text for accuracy if possible.It should be noted that when the battery swap station shares power capacity with the site where the battery swap station is located, the site where the battery swap station is located stipulates that the power available to the battery swap station is a constant value, that is, the available power of the battery swap station P_avlb is a fixed value. When the battery swap station shares power capacity with the site where the battery swap station is located, the total power is P_limit. The battery swap station is managed by the site where the battery swap station is located. Other loads at the site where the battery swap station is located change in real time. The power available to the battery swap station is the power available to other loads at the site after deducting the power P_load available to other loads at the site. This changes in real time, that is, the available power P_avlb of the battery swap station is a real-time changing value: P_avlb = P_limit - P_load. The battery swap station itself performs staggered charging management and controls the charging power according to the peak, flat and valley periods. That is, the available power P_avlb of the battery swap station is a changing value configured according to the time period, and this value needs to be updated at each peak-flat-valley switching moment.

[0145] In one embodiment, the step of “determining the charging priority of the battery compartment based on the charging strategy” specifically includes:

[0146] Get the types and corresponding quantities of all batteries in the battery swap station;

[0147] Determine the first priority based on the number of battery types;

[0148] Get the state of charge of all batteries under different battery types;

[0149] Determining a second priority level for all batteries of the same type based on the state of charge of all batteries of the same type;

[0150] The charging priority of the battery compartment corresponding to the battery is determined according to the first priority and the second priority.

[0151] The charging priority of the battery compartment corresponding to the battery is determined by the number of battery types and the state of charge of batteries of the same type, so that the charging power of the batteries in the battery swap station can be flexibly allocated according to the priority, so that the various types of batteries in the battery swap station can meet the user's power needs and realize orderly management of the batteries in the battery swap station.

[0152] Next, we will introduce the method of determining the first priority and the second priority:

[0153] Regarding the determination of the first priority, the step of “determining the first priority according to the number of battery types” specifically includes:

[0154] Compare the number of batteries of all battery types in the battery swap station;

[0155] Sort the battery types in order of most to least according to the number of batteries;

[0156] According to the sorting result, the first priority of the battery type is determined.

[0157] Specifically, the step of “determining the first priority of the battery type according to the sorting result” includes:

[0158] According to the sorting result, it is determined that the battery type ranked first has a higher first priority than the battery type ranked later.

[0159] For example, let's take the battery range as an example to illustrate the classification of batteries. If there are 10 batteries with a range of 300km, 20 batteries with a range of 200km, and 5 batteries with a range of 100km in the battery swap station, that is, there are three types of batteries in the battery swap station. The first battery type is a battery with a range of 300km, the second battery type is a battery with a range of 200km, and the third battery type is a battery with a range of 100km. The batteries are sorted in order of number from most to least, and the sorting results are the second battery type, the first battery type, and the third battery type. Since the battery type in the front has a higher first priority than the battery type in the back, the sorting order from high to low according to the first priority is the second battery type, the first battery type, and the third battery type.

[0160] Regarding the determination of the second priority, the step of “determining the second priority of all batteries of the same type according to the state of charge of all batteries of the same type” specifically includes:

[0161] Compare the state of charge of all batteries of the same battery type;

[0162] Sort all batteries of the same battery type in descending order of state of charge;

[0163] According to the sorting result, the second priority of the battery under the same battery type is determined.

[0164] Specifically, the step of “determining the second priority of batteries of the same battery type according to the sorting result” includes:

[0165] According to the sorting result, it is determined that the batteries ranked first have a higher second priority than the batteries ranked last.

[0166] For example, take 10 batteries with a range of 300 km as an example. The state of charge of the first battery is 100%, the state of charge of the second battery is 80%, the state of charge of the third battery is 30%, the state of charge of the fourth battery is 50%, the state of charge of the fifth battery is 25%, the state of charge of the sixth battery is 100%, the state of charge of the seventh battery is 50%, the state of charge of the eighth battery is 70%, the state of charge of the ninth battery is 30%, and the state of charge of the tenth battery is 40%. All batteries under the range are sorted in descending order of state of charge. The sorting result is: first battery (or sixth battery), sixth battery (or first battery), second battery, eighth battery, fourth battery (or seventh battery), seventh battery (or fourth battery), tenth battery, third battery (or ninth battery), ninth battery (or third battery), fifth battery. Since the batteries in the front order have a higher second priority than the batteries in the back order, the order of the second priority from high to low is the first battery (or sixth battery), sixth battery (or first battery), second battery, eighth battery, fourth battery (or seventh battery), seventh battery (or fourth battery), tenth battery, third battery (or ninth battery), ninth battery (or third battery), and fifth battery.

[0167] In one embodiment, the step of “determining the charging priority of the battery according to the first priority and the second priority” specifically includes:

[0168] According to the battery type with the highest priority in the first priority level, determine the battery with the highest priority in the second priority level under the battery type; then, according to the battery type with the next priority level under the first priority level, determine the battery with the highest priority in the second priority level under the battery type; and in this way, determine the batteries with the highest priority in all the second priority levels under the first priority level;

[0169] Then, based on the battery type with the highest priority in the first priority, determine the battery with the next priority in the second priority under that battery type; then, based on the battery type with the next priority in the first priority, determine the battery with the next priority in the second priority under that battery type, and so on. All batteries in the station are swapped in this order.

[0170] According to the above battery determination order, determine the battery

[0171] The charging priority of the corresponding battery compartment.

[0172] Specifically, the first priority can be represented by An to indicate the order of battery quantity under different cruising ranges, where n=1, 2, 3, ..., M1, n=1 indicates the highest priority, with the largest number of batteries, and n=M1 indicates the lowest priority, with the least number of batteries. The second priority can be represented by Bm to indicate the order of different SOCs under the same cruising range, where m=1, 2, 3, ..., M2, m=1 indicates the highest priority, with the largest state of charge of the battery, and m=M2 indicates the lowest priority, with the smallest state of charge of the battery. Based on the highest priority battery type A1 in the first priority An, determine the highest priority battery A1B1 in the second priority Bm under the battery type A1; then, based on the next priority battery type A2 in the first priority An, determine the highest priority battery A2B1 in the second priority Bm under the battery type A2, and so on, determine the highest priority batteries in all second priority levels Bm under the first priority An in turn;

[0173] Then, based on the highest priority battery type A1 in the first priority An, determine the battery A1B2 with the next priority B2 in the second priority Bm under battery type A1; then, based on the next priority battery type A2 in the first priority An, determine the next priority battery A2B2 in the second priority Bm under battery type A2. In this way, all batteries in the battery swap station are determined in sequence to form a battery charging priority queue:

[0174] A1B1, A2B1, A3B1, …,

[0175] A1B2, A2B2, A3B2, …,

[0176] A1B3, A2B3, A3B3, …,

[0177] …….

[0178] According to the order in which the batteries are determined, the charging priority of the battery compartments corresponding to the batteries is determined.

[0179] To further illustrate, let's use the data in Table 1 as an example. Based on the battery range, there are three types of batteries in the battery swap station: P70, P84, and P100, with a ratio of 6:1:3. Based on charging priority, the charging priority sequence defined by the battery compartment number is: Battery Compartment 1, Battery Compartment 7, Battery Compartment 2, Battery Compartment 8, Battery Compartment 6, Battery Compartment 10, Battery Compartment 4, Battery Compartment 3, Battery Compartment 5, and Battery Compartment 9. When allocating charging power, it is allocated in descending order of priority. A fully charged battery does not require charging, so the allocated power is 0. It should be noted that, since the batteries in battery compartment 1, battery compartment 8, and battery compartment 10 are all fully charged under the battery type of P70, the order of these three battery compartments can be set arbitrarily, such as the charging priority sequence can also be battery compartment 8, battery compartment 7, battery compartment 2, battery compartment 1, battery compartment 6, battery compartment 10, battery compartment 4, battery compartment 3, battery compartment 5, battery compartment 9, or the charging priority sequence can also be battery compartment 10, battery compartment 7, battery compartment 2, battery compartment 8, battery compartment 6, battery compartment 1, battery compartment 4, battery compartment 3, battery compartment 5, battery compartment 9.

[0180] Table 1

[0181]

[0182] A possible operation process of the battery swap station of the present application is briefly described below in conjunction with Figure 3. Figure 3 is a logic diagram of a possible implementation method of the battery swap station charging power distribution method of the present application.

[0183] As shown in Figure 3, in one possible operation process:

[0184] S201, obtain the real-time total power and power limit of the battery swap station, and then execute S202.

[0185] S202: Compare the real-time total power with the power limit. If the real-time total power is greater than the power limit, execute S203; otherwise, execute S204.

[0186] S203, calculating the difference between the real-time total power and the power limit, and controlling the total power of the battery swap station to be reduced to the power limit, and then returning to S201.

[0187] S204, calculate the sum of the second charging request power of all battery compartments and the power request power of other power-consuming equipment in the battery swap station to obtain the total requested power, and then execute S205.

[0188] S205: Compare the power limit value and the total requested power. If the power limit value is greater than or equal to the total requested power, execute S206; otherwise, execute S207.

[0189] S206 , distributing power to each battery compartment according to the second charging request power of the battery compartment.

[0190] S207, obtain the types and corresponding quantities of different batteries in the battery swap station, and then execute S208.

[0191] S208, compare the number of batteries of all battery types in the battery swap station, and then execute S209.

[0192] S209 , sort the battery types in descending order according to the number of batteries, and then execute S210 .

[0193] S210 , determining, based on the sorting result, that the battery type ranked first has a higher first priority than the battery type ranked later, and then executing S211 .

[0194] S211, obtain the charge status of all batteries, and then execute S212.

[0195] S212 , comparing the states of charge of all batteries of the same battery type, and then executing S213 .

[0196] S213 , sorting all batteries of the same battery type in descending order of state of charge, and then executing S214 .

[0197] S214 , determining, based on the sorting result, that the battery in the first order has a higher second priority than the battery in the last order, and then executing S215 .

[0198] S215, based on the battery type with the highest priority in the first priority level, determine the battery with the highest priority in the second priority level under that battery type; then, based on the battery type with the next highest priority level under the first priority level, determine the battery with the highest priority in the second priority level under that battery type; and so on, determine the batteries with the highest priority in all the second priority levels under the first priority level in sequence;

[0199] Then, based on the battery type with the highest priority in the first priority, determine the battery with the next priority in the second priority under that battery type; then, based on the battery type with the next priority in the first priority, determine the battery with the next priority in the second priority under that battery type, and so on. All batteries in the battery swap station are determined in this way.

[0200] According to the above determination order of the batteries, it is determined that the battery ranked first has a higher charging priority than the battery ranked last, and then S216 is executed.

[0201] S216 , obtaining a first charging request power of the battery, and then executing S217 .

[0202] S217: Compare the first charging request power of the battery and the second charging request power of the battery compartment corresponding to the battery. If the first charging request power is greater than the second charging request power, execute S218; otherwise, execute S219.

[0203] S218: Take the second charging request power as the actual allocated power of the battery compartment, and then execute S220.

[0204] S219: Take the first charging request power as the actual allocated power of the battery compartment, and then execute S220.

[0205] S220, allocate power to the battery compartments in descending order of charging priority until all power allocations are completed or the remaining power is insufficient to charge the batteries or all batteries are charged or all batteries are fully charged.

[0206] Next, the battery swap station charging power distribution system of the present application is introduced.

[0207] The battery swap station charging power distribution system of the present application includes an acquisition module, a comparison module, a determination module and a power distribution module. The acquisition module is configured to obtain the power limit of the battery swap station and the total requested power of the battery swap station; the comparison module is configured to compare the power limit and the total requested power; the determination module is configured to determine the charging priority of the battery based on the charging strategy when the power limit is less than the total requested power; the power distribution module is configured to distribute power to the battery compartment corresponding to the battery based on the charging priority. In one embodiment, the description of the specific implementation functions can be found in steps S101 to S105.

[0208] In one embodiment, the determination module is further configured to determine the charging priority of the batteries based on the charging strategy in the following manner: obtaining the types and corresponding quantities of all batteries in the battery swap station; determining a first priority based on the number of battery types; obtaining the state of charge of all batteries in the battery swap station; determining a second priority for all batteries of the same type based on the state of charge of all batteries of the same type; and determining the charging priority of the batteries based on the first and second priorities. For a description of the specific implementation functions, please refer to the above method steps.

[0209] In one embodiment, the determination module is further configured to determine the charging priority of the battery according to the first priority and the second priority in the following manner: according to the battery type with the highest priority in the first priority, determine the battery with the highest priority in the second priority under the battery type; then, according to the battery type with the next priority in the first priority, determine the battery with the highest priority in the second priority under the battery type, thereby determining the highest priority batteries in all second priority levels under the first priority; then, according to the battery type with the highest priority in the first priority, determine the battery with the next priority in the second priority under the battery type; then, according to the battery type with the next priority in the first priority, determine the battery with the next priority in the second priority under the battery type, thereby determining all batteries in the battery swap station in sequence; and determine the charging priority of the battery according to the order in which the above batteries are determined. The description of the specific implementation functions can be found in the above method steps.

[0210] In one embodiment, the determination module is further configured to determine the charging priority of the batteries according to the determined order of the batteries by determining, based on the determined order of the batteries, that batteries ranked earlier have a higher charging priority than batteries ranked later. For a description of the specific implementation functions, please refer to the above method steps.

[0211] In one embodiment, the determination module is further configured to determine the first priority based on the number of battery types by: comparing the number of batteries of different battery types within the battery swap station; sorting the battery types in descending order of number; and determining the first priority of the battery types based on the sorting results. For a description of the specific implementation functions, please refer to the above method steps.

[0212] In one embodiment, the determination module is further configured to determine a first priority of the battery type based on the sorting result by determining, based on the sorting result, that the battery type ranked earlier has a higher first priority than the battery type ranked later. For a description of the specific implementation functions, please refer to the above method steps.

[0213] In one embodiment, the determination module is further configured to determine the second priority of all batteries of the same type based on the state of charge of all batteries of the same type by: comparing the state of charge of all batteries of the same type; sorting all batteries of the same type in descending order of state of charge; and determining the second priority of the batteries of the same type based on the sorting results. For a description of the specific implementation functions, please refer to the above method steps.

[0214] In one embodiment, the determination module is further configured to determine the second priority of batteries of the same battery type based on the sorting results by determining, based on the sorting results, that batteries ranked earlier have a higher second priority than batteries ranked later. For a description of the specific implementation functions, please refer to the above method steps.

[0215] In one embodiment, the determination module is further configured to determine the actual allocated power of the battery compartment based on the charging policy by: obtaining a first requested charging power of a battery and a second requested charging power of the battery compartment corresponding to the battery; and calculating the smaller of the first requested charging power and the second requested charging power as the actual allocated power of the battery compartment. For a description of the specific implementation functions, please refer to the above method steps.

[0216] In one embodiment, the power allocation module is further configured to allocate power to the battery compartments corresponding to the batteries based on the charging priority and the actual allocated power in the following manner: based on the order of charging priority from high to low, the power allocation to the battery compartments is allocated in sequence according to the actual allocated power until the total power consumption of the battery swap station equals the power limit and the power allocation is fully allocated, or the remaining power of the battery swap station is insufficient to charge the batteries, or all batteries are charged, or all batteries are fully charged. The description of the specific implementation function can be found in the above method steps.

[0217] In one embodiment, the battery swap station charging power distribution system further includes a total requested power determination module configured to determine the total requested power based on the following: calculating the total requested charging power for all battery compartments; calculating the power consumption requested by other power-consuming devices within the battery swap station; and calculating the total requested power as the sum of the total requested charging power and the power consumption. For a description of the specific implementation functions, please refer to the above method steps.

[0218] In one embodiment, the acquisition module is further configured to acquire the real-time total power of the battery swap station; compare the real-time total power with the power limit; and, when the real-time total power is greater than the power limit, control the total charging power of the battery swap station to be reduced to the power limit. For a description of the specific implementation functions, please refer to the above method steps.

[0219] It should be noted that it should be understood that the division of the various modules of the above system is for illustration only. In actual applications, the above functional modules can be completed by different functional units as needed, that is, the functional modules in this embodiment can be further decomposed or combined. For example, the functional modules in the above embodiment can be combined into one functional module, or further divided into multiple sub-modules to complete all or part of the functions described above. The names of the functional modules involved in this embodiment are only for distinction and are not considered to be improper limitations of this application.

[0220] Those skilled in the art will appreciate that all or part of the processes in the method of the above embodiment of the present invention can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by a processor, it can implement the steps of each of the above method embodiments. The computer program includes computer program code, which can be in source code form, object code form, executable file or some intermediate form. The computer-readable storage medium can include: any entity or device, medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory, random access memory, electric carrier signal, telecommunication signal and software distribution medium that can carry computer program code. It should be noted that the content contained in the computer-readable storage medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable storage media do not include electric carrier signals and telecommunication signals.

[0221] The various component embodiments of the present invention can be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. It will be appreciated by those skilled in the art that a microprocessor or digital signal processor (DSP) can be used in practice to implement some or all of the functions of some or all of the components in the server or client according to an embodiment of the present invention. The present invention can also be implemented as a device or apparatus program (e.g., a PC program and a PC program product) for executing a part or all of the methods described herein. Such a program implementing the present invention can be stored on a PC readable medium, or can have the form of one or more signals. Such a signal can be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.

[0222] The present application also provides a computer-readable storage medium. In a computer-readable storage medium embodiment according to the present application, the computer-readable storage medium can be configured to store a program for executing the battery swap station charging power distribution method of the above-mentioned method embodiment, and the program can be loaded and run by the processor to implement the above-mentioned battery swap station charging power distribution method. For ease of explanation, only the parts related to the embodiment of the present invention are shown. For specific technical details not disclosed, please refer to the method part of the embodiment of the present invention. The computer-readable storage medium can be a storage device formed by various electronic devices. Optionally, the computer-readable storage medium in the embodiment of the present invention is a non-temporary computer-readable storage medium.

[0223] The present application also provides a control device. In one embodiment of a control device according to the present application, the control device includes a processor and a memory. The memory can be configured to store a program for executing the battery swap station charging power distribution method of the above-mentioned method embodiment, and the processor can be configured to execute the program in the memory, which includes but is not limited to the program for executing the battery swap station charging power distribution method of the above-mentioned method embodiment. For ease of explanation, only the parts related to the embodiment of the present invention are shown. For specific technical details not disclosed, please refer to the method part of the embodiment of the present invention. The control device can be a device formed by various electronic devices.

[0224] The present application also provides a battery swap station, in which the above-mentioned control device is provided.

[0225] Those skilled in the art will appreciate that although some embodiments described herein include certain features included in other embodiments but not other features, combinations of features from different embodiments are intended to be within the scope of this application and to form different embodiments. For example, in the claims of this application, any of the claimed embodiments may be used in any combination.

[0226] It should be noted that although the detailed steps of the method of the present application are described in detail above, without departing from the basic principles of the present application, technical personnel in this field can combine, split and change the order of the above steps. The modified technical solution does not change the basic concept of the present application and therefore falls within the scope of protection of the present application.

[0227] Thus far, the technical solutions of the present application have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is readily understood by those skilled in the art that the scope of protection of the present application is obviously not limited to these specific embodiments. Without departing from the principles of the present application, those skilled in the art may make equivalent changes or substitutions to the relevant technical features, and the technical solutions after such changes or substitutions will fall within the scope of protection of the present application.

Claims

1. A charging power distribution method for a battery swap station, characterized in that: The battery swap station includes n battery compartment groups and n≥1, and the battery compartments are used to charge batteries; The battery swap station charging power distribution method comprises: Obtaining a power limit value of the battery swap station and a total requested power of the battery swap station; comparing the power limit value and the total requested power; When the power limit is less than the total requested power, determining the charging priority and actual allocated power of the battery based on a charging strategy; Based on the charging priority and the actual allocated power, power is allocated to the battery compartment corresponding to the battery.

2. The charging power distribution method of a battery swap station according to claim 1, characterized in that: The step of "determining the charging priority of the battery based on the charging strategy" further includes: Obtaining the types and corresponding quantities of all the batteries in the battery swap station; Determine the first priority based on the number of battery types; Obtaining the charge status of all the batteries in the battery swap station; Determining a second priority of all the batteries of the same type according to the charge states of all the batteries of the same type; A charging priority of the battery is determined according to the first priority and the second priority.

3. The charging power distribution method of a battery swap station according to claim 2, characterized in that: The step of "determining the charging priority of the battery according to the first priority and the second priority" further includes: According to the battery type with the highest priority in the first priority level, determine the battery with the highest priority in the second priority level under the battery type; then, according to the battery type with the next priority level in the first priority level, determine the battery with the highest priority in the second priority level under the battery type, and thereby determine the batteries with the highest priority in all the second priority levels under the first priority level in sequence; Then, according to the battery type with the highest priority in the first priority, determine the battery with the next priority in the second priority under the battery type; then, according to the battery type with the next priority in the first priority, determine the battery with the next priority in the second priority under the battery type, so as to determine all the batteries in the battery swap station in sequence; According to the determination order of the batteries described above, the charging priority of the batteries is determined.

4. The charging power distribution method of the battery swap station according to claim 3, characterized in that: The step of "determining the charging priority of the battery according to the determination order of the battery" further includes: According to the determined order of the batteries, it is determined that the battery in the front order has a higher charging priority than the battery in the back order.

5. The charging power distribution method of a battery swap station according to claim 2, characterized in that: The step of "determining a first priority according to the number of battery types" further includes: Comparing the number of batteries of different battery types in the battery swap station; Sorting the battery types in order of greatest to least according to the number of batteries; The first priority of the battery type is determined according to the sorting result.

6. The charging power distribution method of a battery swap station according to claim 5, characterized in that: The step of "determining the first priority of the battery type according to the sorting result" further includes: It is determined according to the sorting result that the battery type sorted first has a higher first priority than the battery type sorted later.

7. The charging power distribution method of a battery swap station according to claim 2, characterized in that: The step of "determining the second priority of all the batteries of the same type according to the charge state of all the batteries of the same type" further includes: comparing the states of charge of all said batteries of the same said battery type; Sorting all the batteries of the same battery type according to the state of charge from high to low; The second priority of the batteries of the same battery type is determined according to the sorting result.

8. The charging power distribution method of a battery swap station according to claim 7, characterized in that: The step of "determining the second priority of the batteries under the same battery type according to the sorting result" further includes: It is determined according to the sorting result that the battery in the front order has a higher second priority than the battery in the back order.

9. The charging power distribution method of a battery swap station according to claim 1, characterized in that: The step of "determining the actual allocated power of the battery compartment based on the charging strategy" further includes: Acquire a first charging request power of the battery and a second charging request power of the battery compartment corresponding to the battery; The smaller power between the first charging request power and the second charging request power is calculated as the actual allocated power of the battery compartment.

10. The charging power distribution method of a battery swap station according to claim 9, characterized in that: The step of “based on the charging priority and the actual allocated power, allocating power to the battery compartment corresponding to the battery” further includes: Based on the order of the charging priority from high to low, power is allocated to the battery compartments in sequence according to the actual allocated power until the total power consumption of the battery swap station is equal to the power limit and the power allocation is fully allocated, or the remaining power of the battery swap station is insufficient to charge the batteries, or all the batteries are charged, or all the batteries are fully charged.

11. The charging power distribution method of a battery swap station according to claim 1, characterized in that: The total requested power is determined based on the following method: Calculating the total charging request power of all the battery compartments; Calculating the power demand of other power-consuming equipment in the battery swap station; The sum of the total charging request power and the power consumption is calculated as the total request power.

12. The charging power distribution method of a battery swap station according to claim 1, characterized in that: The battery swap station charging power distribution method further includes: Obtaining the real-time total power of the battery swap station; Comparing the real-time total power with the power limit; When the real-time total power is greater than the power limit, the total charging power of the battery swap station is controlled to be reduced to the power limit.

13. A charging power distribution system for a battery swap station, characterized in that: The battery swap station includes n battery compartment groups and n≥1, and the battery compartments are used to charge batteries; The battery swap station charging power distribution system comprises: an acquisition module, configured to acquire a power limit value of the battery swap station and a total requested power of the battery swap station; A comparison module, configured to compare the power limit value with the total requested power; a determination module configured to determine a charging priority of the battery based on a charging strategy when the power limit is less than the total requested power; A power allocation module is configured to allocate power to the battery compartment corresponding to the battery based on the charging priority.

14. The charging power distribution system of the battery swap station according to claim 13, characterized in that: The determination module is further configured to determine the charging priority of the battery based on the charging strategy in the following manner: Obtaining the types and corresponding quantities of all the batteries in the battery swap station; Determine the first priority based on the number of battery types; Obtaining the charge status of all the batteries in the battery swap station; Determining a second priority of all the batteries of the same type according to the charge states of all the batteries of the same type; A charging priority of the battery is determined according to the first priority and the second priority.

15. The battery swap station charging power distribution system according to claim 14, characterized in that: The determination module is further configured to determine the charging priority of the battery according to the first priority and the second priority in the following manner: According to the battery type with the highest priority in the first priority level, determine the battery with the highest priority in the second priority level under the battery type; then, according to the battery type with the next priority level in the first priority level, determine the battery with the highest priority in the second priority level under the battery type, and thereby determine the batteries with the highest priority in all the second priority levels under the first priority level in sequence; Then, according to the battery type with the highest priority in the first priority, determine the battery with the next priority in the second priority under the battery type; then, according to the battery type with the next priority in the first priority, determine the battery with the next priority in the second priority under the battery type, so as to determine all the batteries in the battery swap station in sequence; According to the determination order of the batteries described above, the charging priority of the batteries is determined.

16. The battery swap station charging power distribution system according to claim 15, characterized in that: The determination module is further configured to determine the charging priority of the battery according to the determination order of the battery in the following manner: According to the determined order of the batteries, it is determined that the battery in the front order has a higher charging priority than the battery in the back order.

17. The charging power distribution system of the battery swap station according to claim 14, characterized in that: The determination module is further configured to determine the first priority according to the number of battery types in the following manner: Comparing the number of batteries of different battery types in the battery swap station; Sorting the battery types in order of greatest to least according to the number of batteries; The first priority of the battery type is determined according to the sorting result.

18. The charging power distribution system of the battery swap station according to claim 17, characterized in that: The determination module is further configured to determine the first priority of the battery type according to the sorting result in the following manner: It is determined according to the sorting result that the battery type sorted first has a higher first priority than the battery type sorted later.

19. The battery swap station charging power distribution system according to claim 14, characterized in that: The determination module is further configured to determine the second priority of all the batteries of the same type according to the charge states of all the batteries of the same type in the following manner: comparing the states of charge of all said batteries of the same said battery type; Sorting all the batteries of the same battery type according to the state of charge from high to low; The second priority of the batteries of the same battery type is determined according to the sorting result.

20. The battery swap station charging power distribution system according to claim 19, characterized in that: The determination module is further configured to determine the second priority of the batteries of the same battery type according to the sorting result in the following manner: It is determined according to the sorting result that the battery in the front order has a higher second priority than the battery in the back order.

21. The battery swap station charging power distribution system according to claim 13, characterized in that: The determination module is further configured to determine the actual allocated power of the battery compartment based on the charging strategy in the following manner: Acquire a first charging request power of the battery and a second charging request power of the battery compartment corresponding to the battery; The smaller power between the first charging request power and the second charging request power is calculated as the actual allocated power of the battery compartment.

22. The battery swap station charging power distribution system according to claim 21, characterized in that: The power allocation module is further configured to allocate power to the battery compartment corresponding to the battery based on the charging priority and the actual allocated power in the following manner: Based on the order of the charging priority from high to low, power is allocated to the battery compartments in sequence according to the actual allocated power until the total power consumption of the battery swap station is equal to the power limit and the power allocation is fully allocated, or the remaining power of the battery swap station is insufficient to charge the batteries, or all the batteries are charged, or all the batteries are fully charged.

23. The battery swap station charging power distribution system according to claim 13, characterized in that: The battery swap station charging power distribution system also includes: A total requested power determination module is configured to determine the total requested power determination module based on the following manner: Calculating the total charging request power of all the battery compartments; Calculating the power demand of other power-consuming equipment in the battery swap station; The sum of the total charging request power and the power consumption is calculated as the total request power.

24. The battery swap station charging power distribution system according to claim 13, characterized in that: The acquisition module is further configured to acquire the real-time total power of the battery swap station; Comparing the real-time total power with the power limit; When the real-time total power is greater than the power limit, the total charging power of the battery swap station is controlled to be reduced to the power limit.

25. A computer-readable storage medium storing a plurality of program codes, characterized in that: The program code is suitable for being loaded and run by a processor to execute the battery swap station charging power allocation method according to any one of claims 1-12.

26. A control device, characterized in that: include: processor; A memory, wherein the memory is suitable for storing a plurality of program codes, wherein the program codes are suitable for being loaded and run by the processor to execute the battery swap station charging power distribution method according to any one of claims 1 to 12.

27. A battery swap station, characterized in that: The control device according to claim 26 is provided in the battery swap station.

Citation Information

Patent Citations

  • Charging power distribution method, charging power distribution device and battery replacing cabinet

    CN112677804A

  • Power control method, system, medium and device of charging and battery replacement station and charging and battery replacement station

    CN114056179A

  • Battery replacement bin charging method, battery replacement bin charging control system and storage medium

    CN116001599A

  • Charging power distribution method, system, medium and device for battery swap station and battery swap station

    CN116373670A

  • Comparison system, comparison method, program, and computer-readable storage medium

    US20240051427A1

Cited By

  • Intelligent charging scheduling and dynamic power management method and system for battery of battery swap station

    CN122600366A