Method for controlling multi-split air conditioner, apparatus, and multi-split air conditioner

By calculating the single-unit load and total load of the indoor unit, adjusting the external unit operating frequency and expansion valve opening of the multiple online air conditioning systems, the problem of inaccurate calculation of internal unit load in the existing technology is solved, and the control accuracy of the air conditioning system is improved. Adaptability.

WO2024227403A1PCT designated stage expired Publication Date: 2024-11-07QINGDAO HAIER AIR CONDITIONING ELECTRONICS CO LTD +3
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/088825
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-04
Filing Date
2024-04-19
Publication Date
2024-11-07

AI Technical Summary

Technical Problem

In the existing multi-online air conditioning systems, the internal unit load calculation is not accurate enough, resulting in the external unit control being not sensitive enough, making it difficult to quickly achieve the expected air conditioning effect.

Method used

By obtaining the temperature difference between the actual temperature and the set temperature of each indoor unit, the stand-alone load of the indoor unit is determined, and the total load of the indoor unit is calculated based on the stand-alone load, and the operating frequency and expansion valve opening of the outdoor unit are adjusted, so as to Achieve more precise external control.

Benefits of technology

It improves the control accuracy of the air conditioner external unit, ensures the rapid achievement of the expected air conditioner effect, and is adaptable in different application scenarios, with the advantages of energy saving and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024088825_07112024_PF_FP_ABST
    Figure CN2024088825_07112024_PF_FP_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of air conditioners. Disclosed are a method for controlling a multi-split air conditioner, an apparatus, and a multi-split air conditioner. The method comprises: determining a single-unit load of each indoor unit according to a temperature difference between an actual temperature and a set temperature; then further determining a total unit load of all the indoor units; and controlling the operation of an outdoor unit on the basis of the total unit load. The temperature difference of each indoor unit can accurately reflect the current state of the indoor unit, so that the single-unit load calculated on the basis of the temperature difference is more accurate. Compared with the mode of controlling an outdoor unit simply depending on a preset target pressure, the method provided by the embodiments of the present application can effectively improve the control accuracy for outdoor units.
Need to check novelty before this filing date? Find Prior Art

Description

Method and device for controlling multi-split air conditioner and multi-split air conditioner

[0001] This application is based on the Chinese patent application with application number 202310494312.1 and application date May 4, 2023, and claims the priority of the Chinese patent application. The entire content of the Chinese patent application is hereby introduced into this application as a reference. Technical Field

[0002] The present application relates to the technical field of air conditioning, for example, to a method and device for controlling a multi-split air conditioner and the multi-split air conditioner. Background Art

[0003] In a multi-split system, the method for controlling the capacity of the outdoor unit compressor is usually to set the cooling target low pressure PsTar (or the corresponding saturation temperature PsTempTar) and the heating target high pressure PdTar (or the corresponding saturation temperature PdTempTar), compare the difference between the target value and the actual value to determine the load of the indoor unit, and then adjust the compressor frequency to achieve the target pressure.

[0004] During the implementation of the embodiments of the present application, it was found that at least the following problems exist in the related art:

[0005] The indoor unit load calculated in related technologies is often not accurate enough, resulting in insufficient sensitivity in outdoor unit control, which is not conducive to quickly achieving the expected air-conditioning effect.

[0006] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of this application, and therefore may include information that does not constitute prior art known to ordinary technicians in this field.

[0007] Summary of the Invention

[0008] In order to provide a basic understanding of some aspects of the disclosed embodiments, a brief summary is given below. The summary is not an extensive review, nor is it intended to identify key / critical elements or delineate the scope of protection of these embodiments, but rather serves as a prelude to the detailed description that follows.

[0009] Embodiments of the present application provide a method and apparatus for controlling a multi-split air conditioner, and the multi-split air conditioner, so as to improve the control accuracy of the air conditioner outdoor unit.

[0010] In some embodiments, the method is applied to a multi-split air conditioner including an outdoor unit and multiple indoor units connected to the outdoor unit; the method includes: obtaining the temperature difference between the actual temperature of each indoor unit and the set temperature; determining the single-unit load of the indoor unit corresponding to each temperature difference; determining the total load of the indoor units of the multi-split air conditioner based on the single-unit load of the indoor units; and controlling the operation of the outdoor unit based on the total load of the indoor units.

[0011] Optionally, determining the indoor unit load corresponding to each temperature difference includes: determining the temperature difference range in which the temperature difference is located; determining a target corresponding relationship between the indoor unit load and the temperature difference based on the temperature difference range in which the temperature difference is located; and determining the indoor unit load corresponding to each temperature difference based on the target corresponding relationship.

[0012] Optionally, the target correspondence between the load of a single indoor unit and the temperature difference is determined based on the temperature difference range in which the temperature difference is located, including: when the temperature difference range in which the temperature difference is located is the first temperature difference range, determining the target correspondence as a quadratic curve relationship; when the temperature difference range in which the temperature difference is located is the second temperature difference range, determining the target correspondence as a linear relationship; when the temperature difference range in which the temperature difference is located is the third temperature difference range, determining the target correspondence as a constant value relationship; when the temperature difference range in which the temperature difference is located is the fourth temperature difference range, determining the target correspondence as a linear relationship; wherein the lower limit threshold of the first temperature difference range is greater than or equal to the upper limit threshold of the second temperature difference range, the lower limit threshold of the second temperature difference range is greater than or equal to the upper limit threshold of the third temperature difference range, and the lower limit threshold of the third temperature difference range is greater than or equal to the upper limit threshold of the fourth temperature difference range.

[0013] Optionally, determining the target corresponding relationship as a quadratic curve relationship includes: determining a quadratic function according to the square of the temperature difference, the temperature difference, and the indoor unit capacity matching number; and determining the quadratic function as the target corresponding relationship.

[0014] Optionally, determining the target correspondence function as a linear relationship includes: determining a linear function according to the temperature difference and the indoor unit capacity matching number; and determining the linear function as the target correspondence.

[0015] Optionally, determining the total load of the indoor units of the multi-split air conditioner based on the load of the individual indoor units includes: determining the weight value of the individual indoor unit load corresponding to each temperature difference; and determining the total load of the indoor units based on the individual indoor unit load and the weight value of the individual indoor unit load.

[0016] Optionally, controlling the outdoor unit operation based on the indoor unit total load includes: determining an indoor unit total load range in which the indoor unit total load is located; and adjusting the operating frequency of the outdoor unit according to the indoor unit total load range in which the indoor unit total load is located.

[0017] Optionally, the operating frequency of the outdoor unit is adjusted according to the indoor unit total load range of the indoor unit total load, including: when the indoor unit total load range of the indoor unit total load is within the first indoor unit total load range, increasing the operating frequency of the outdoor unit; when the indoor unit total load range of the indoor unit total load is within the second indoor unit total load range, maintaining the operating frequency of the outdoor unit; when the indoor unit total load range of the indoor unit total load is within the third indoor unit total load range, reducing the operating frequency of the outdoor unit; wherein the upper limit threshold of the first indoor unit total load is less than or equal to the lower limit threshold of the second indoor unit total load, and the upper limit threshold of the second indoor unit total load is less than or equal to the lower limit threshold of the third indoor unit total load.

[0018] Optionally, the upper limit threshold of the total load of the first indoor unit is equal to the lower limit threshold of the total load of the second indoor unit, and the upper limit threshold of the total load of the second indoor unit is equal to the lower limit threshold of the total load of the third indoor unit.

[0019] Optionally, controlling the operation of the outdoor unit based on the indoor unit total load further includes: when the indoor unit total load range of the indoor unit total load is within a second indoor unit total load range, adjusting the opening of the expansion valve corresponding to each indoor unit.

[0020] Optionally, adjusting the opening of the expansion valve corresponding to each indoor unit includes: determining the temperature difference range of each indoor unit; determining a target adjustment strategy corresponding to the temperature difference based on the temperature difference range of each indoor unit; and adjusting the expansion valve of the indoor unit according to the target adjustment strategy.

[0021] Optionally, determining a target adjustment strategy corresponding to the temperature difference includes: when the temperature difference is less than a first temperature difference threshold, determining the target adjustment strategy to reduce the opening degree; when the temperature difference is greater than or equal to the first temperature difference threshold and less than a second temperature difference threshold, determining the target adjustment strategy to be a maintenance strategy; when the temperature difference is greater than or equal to the second temperature difference threshold, determining the target adjustment strategy to be an automatic adjustment strategy; wherein the first temperature difference threshold is less than the second temperature difference threshold.

[0022] Optionally, the method further includes: when the temperature difference is less than a first temperature difference threshold, adjusting the speed of reducing the opening degree based on the temperature difference.

[0023] Optionally, the speed of reducing the opening is adjusted based on the temperature difference, including: if the temperature difference of the indoor unit is less than 3, reducing the opening at a first speed; or if the temperature difference of the indoor unit is between 3-0, reducing the opening at a second speed; wherein the first speed is less than the second speed.

[0024] In some embodiments, the device includes: a processor and a memory storing program instructions, wherein the processor is configured to execute the above-mentioned method for controlling a multi-split air conditioner when executing the program instructions.

[0025] In some embodiments, the multi-split air conditioner includes: an outdoor unit; a plurality of indoor units connected to the outdoor unit; and the above-mentioned device for controlling the multi-split air conditioner is installed in the outdoor unit or the indoor unit.

[0026] The method, device, and multi-split air conditioner for controlling a multi-split air conditioner provided in the embodiments of the present application can achieve the following technical effects:

[0027] The method provided in the embodiments of the present application determines the individual load of each indoor unit based on the temperature difference between the actual temperature and the set temperature, thereby determining the total load of all indoor units and controlling the operation of the outdoor unit based on the total load. The temperature difference of each indoor unit accurately reflects the current state of that indoor unit. Therefore, the individual load calculated based on the temperature difference is more accurate. Compared to methods that rely solely on pre-set target pressures to control outdoor units, the method of the embodiments of the present application can effectively improve the control accuracy of outdoor units.

[0028] The above general description and the following description are exemplary and explanatory only and are not intended to limit the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] One or more embodiments are exemplarily described by corresponding drawings. These exemplary descriptions and drawings do not limit the embodiments. Elements with the same reference numerals in the drawings are shown as similar elements. The drawings do not constitute a scale limitation. In addition,

[0030] FIG1 is a schematic diagram of a hardware environment for a method for controlling a multi-split air conditioner according to an embodiment of the present application;

[0031] FIG2 is a schematic diagram of a method for controlling a multi-split air conditioner according to an embodiment of the present application;

[0032] FIG3 is a schematic diagram of another method for controlling a multi-split air conditioner provided in an embodiment of the present application;

[0033] FIG4 is a schematic diagram of another method for controlling a multi-split air conditioner provided in an embodiment of the present application;

[0034] FIG5 is a schematic diagram of another method for controlling a multi-split air conditioner provided in an embodiment of the present application;

[0035] FIG6 is a schematic diagram of another method for controlling a multi-split air conditioner provided in an embodiment of the present application;

[0036] FIG7 is a schematic diagram of another method for controlling a multi-split air conditioner provided in an embodiment of the present application;

[0037] FIG8 is a schematic diagram of a device for controlling a multi-split air conditioner according to an embodiment of the present application;

[0038] FIG9 is a schematic diagram of a multi-split air conditioner provided in an embodiment of the present application. DETAILED DESCRIPTION

[0039] In order to be able to understand the features and technical contents of the embodiments of the present application in more detail, the implementation of the embodiments of the present application is described in detail below in conjunction with the accompanying drawings. The accompanying drawings are for reference only and are not used to limit the embodiments of the present application. In the following technical description, for the sake of convenience of explanation, a full understanding of the disclosed embodiments is provided through multiple details. However, one or more embodiments can still be implemented without these details. In other cases, to simplify the drawings, well-known structures and devices can be simplified for display.

[0040] In the description and claims of the embodiments of the present application and the accompanying drawings, the terms "first," "second," and the like are used to distinguish similar objects and are not necessarily used to describe a particular order or precedence. It should be understood that the terms used in this manner are interchangeable where appropriate for the purposes of describing the embodiments of the present application. In addition, the terms "including," "having," and any variations thereof are intended to cover non-exclusive inclusions.

[0041] Unless otherwise stated, the term "plurality" means two or more.

[0042] In the embodiments of the present application, the character " / " indicates that the preceding and following objects are in an "or" relationship. For example, A / B means: A or B.

[0043] The term "and / or" describes an association between objects, indicating that three relationships can exist. For example, A and / or B means: A or B, or A and B.

[0044] 1 , an embodiment of the present application provides a multi-split air conditioner, comprising an outdoor unit 10 and multiple indoor units 20. The outdoor unit 10 is communicatively connected to each indoor unit 20, and the outdoor unit 10 can obtain the operating status of each indoor unit 20 at any time.

[0045] In a multi-split system, the method for controlling the capacity of the outdoor unit compressor is usually to set the cooling target low pressure PsTar (or the corresponding saturation temperature PsTempTar) and the heating target high pressure PdTar (or the corresponding saturation temperature PdTempTar), compare the difference between the target value and the actual value, and adjust the compressor frequency to achieve the target pressure.

[0046] Calculating load capacity solely based on a pre-set target pressure doesn't consider the actual load requirements of each indoor unit. In actual operation, load requirements can change at any time due to factors such as installation location, unit capacity, and user-defined parameters. Therefore, outdoor unit capacity control isn't fully adaptive to every application scenario.

[0047] This embodiment of the application calculates the load of each indoor unit in a hierarchical manner and adjusts the refrigerant flow rate of the indoor unit's expansion valve. The outdoor unit's hierarchical control capability, based on actual pressure values, is adaptive to different application scenarios, rapidly improving air conditioning performance while also facilitating energy conservation and control stability in multi-split air conditioners.

[0048] In conjunction with FIG2 , a method for controlling a multi-split air conditioner is provided in an embodiment of the present application. The method can be applied to the multi-split air conditioner shown in FIG1 . As shown in FIG2 , the method includes:

[0049] S201: Obtain the temperature difference between the actual temperature and the set temperature of each indoor unit.

[0050] S202: Determine the load of each indoor unit corresponding to each temperature difference.

[0051] S203: Determine the total load of the indoor units of the multi-split air conditioner according to the load of each indoor unit.

[0052] S204: Controlling the operation of the outdoor unit based on the total load of the indoor units.

[0053] The method provided in the embodiments of the present application determines the individual load of each indoor unit based on the temperature difference between the actual temperature and the set temperature, thereby determining the total load of all indoor units and controlling the operation of the outdoor unit based on the total load. The temperature difference of each indoor unit accurately reflects the current state of that indoor unit. Therefore, the individual load calculated based on the temperature difference is more accurate. Compared to methods that rely solely on pre-set target pressures to control outdoor units, the method of the embodiments of the present application can effectively improve the control accuracy of outdoor units.

[0054] Optionally, the method for controlling a multi-split air conditioner can be executed in the multi-split air conditioner system or in a server communicating with the multi-split air conditioner system. In the embodiment of the present application, the solution is described with the processor in the multi-split air conditioner system as the execution subject.

[0055] The temperature difference is the difference between the indoor ambient temperature and the set temperature during cooling, and the temperature difference is the difference between the set temperature and the indoor ambient temperature during heating.

[0056] In conjunction with FIG3 , another method for controlling a multi-split air conditioner provided in an embodiment of the present application is provided. The method can be applied to the multi-split air conditioner shown in FIG1 . As shown in FIG3 , the method includes:

[0057] S301: Obtain the temperature difference between the actual temperature and the set temperature of each indoor unit.

[0058] S302: Determine the temperature difference range within which the temperature difference falls;

[0059] S303: Determine a target correspondence between the indoor unit load and the temperature difference based on the temperature difference range.

[0060] S304: Determine the single indoor unit load corresponding to each temperature difference based on the target correspondence.

[0061] S305: Determine the total load of the indoor units of the multi-split air conditioner according to the load of each indoor unit.

[0062] S306: Controlling the operation of the outdoor unit based on the total load of the indoor units.

[0063] In related technologies, the indoor unit load is usually calculated directly based on the temperature difference between the set temperature and the ambient temperature multiplied by the indoor unit capacity. However, this calculation is too simple and cannot truly meet the actual application environment. Through the above method provided in the embodiment of the present application, a target correspondence relationship that matches the actual temperature of each indoor unit can be determined based on the actual scenario. Then, on multiple indoor units in a multi-split air conditioner, different target correspondence relationships are applied to calculate the indoor unit load of each indoor unit. Compared with the existing technology that applies a fixed calculation method to all indoor units to determine the indoor unit load, the indoor unit load result obtained by this application is more accurate, effectively improving the accuracy of external unit control.

[0064] In conjunction with FIG4 , an embodiment of the present application provides a method for determining a target correspondence relationship between indoor units. As shown in FIG4 , the method includes:

[0065] S401: When the temperature difference range in which the temperature difference falls is a first temperature difference range, determining that the target corresponding relationship is a quadratic curve relationship;

[0066] S402: When the temperature difference range in which the temperature difference falls is a second temperature difference range, determining that the target corresponding relationship is a linear relationship;

[0067] S403: When the temperature difference range is within the third temperature difference range, determining that the target corresponding relationship is a fixed value relationship;

[0068] S404: When the temperature difference range is within the fourth temperature difference range, determining that the target corresponding relationship is a linear relationship;

[0069] Among them, the lower limit threshold of the first temperature difference range is greater than or equal to the upper limit threshold of the second temperature difference range, the lower limit threshold of the second temperature difference range is greater than or equal to the upper limit threshold of the third temperature difference range, and the lower limit threshold of the third temperature difference range is greater than or equal to the upper limit threshold of the fourth temperature difference range.

[0070] The relationship between load and temperature difference is not a simple linear one; different curves appear at different stages. When the temperature difference is small, the relationship is generally linear, but when the temperature difference is large, it becomes a quadratic curve. Calculating load in layers helps quickly improve the air conditioning effect when the temperature difference is large. The first to fourth temperature difference ranges follow a high-to-low relationship, meaning that when the temperature difference is large, it forms a quadratic curve, and when the temperature difference is small, it generally forms a linear curve. This conclusion was drawn after verification and analysis of a large amount of actual data. Therefore, the target correspondence determined based on this conclusion can more accurately calculate the load of a single unit, further improving the control accuracy of the outdoor unit.

[0071] Specifically, three thresholds can be defined to further divide the temperature ranges. For example, a first threshold, a second threshold, and a third threshold are set, and the size relationship of the three thresholds satisfies: first threshold>second threshold>third threshold. When the temperature difference is greater than the first threshold, it is determined that the temperature difference is in the first temperature difference range. When the temperature difference is less than or equal to the first threshold and greater than the second threshold, it is determined that the temperature difference is in the second temperature difference range. When the temperature difference is less than or equal to the second threshold and greater than the third threshold, it is determined that the temperature difference is in the third temperature difference range. When the temperature difference is less than or equal to the third threshold, it is determined that the temperature difference is in the fourth temperature difference range.

[0072] Optionally, the second threshold and the third threshold are set to satisfy the following relationship: second threshold>0>third threshold.

[0073] Preferably, the first threshold value may be set to 6°C, the second threshold value to 1°C, and the third threshold value to -1°C.

[0074] Optionally, the above-mentioned determination of the target corresponding relationship as a quadratic curve relationship includes: determining a quadratic function according to the square of the temperature difference, the temperature difference, and the indoor unit capacity matching number; and determining the quadratic function as the target corresponding relationship.

[0075] Specifically, the single unit load of each indoor unit can be calculated according to the following quadratic function: IULoad = (rate1*detT*detT+rate2*detT+rate3)*IUHP

[0076] Where IUHP is the indoor unit capacity matching number, rate1, rate2, and rate3 are calculation coefficients. Preferably, rate1 = 0.2, rate2 = 0.3, and rate3 = 0.2. Each calculation coefficient can be modified based on the results of laboratory tests, and this embodiment of the application is not limited to this.

[0077] Optionally, determining the target correspondence function as a linear relationship includes: determining a linear function according to the temperature difference and the indoor unit capacity matching number; and determining the linear function as the target correspondence.

[0078] Specifically, the load of each indoor unit can be calculated according to the following linear relationship: IULoad = (rate4*detT+rate5)*IUHP

[0079] Among them, IUHP is the indoor unit capacity matching number, rate4 and rate5 are calculation coefficients, and each calculation coefficient can be corrected according to the laboratory test operation results, which is not limited in the embodiment of the present application.

[0080] Optionally, the first-order linear relationship includes a first first-order linear relationship and a second first-order linear relationship, wherein calculation coefficients of the first first-order linear relationship and the second first-order linear relationship are different.

[0081] Optionally, when the temperature difference range in which the temperature difference is located is the second temperature difference range, the target corresponding relationship is determined to be the first linear relationship.

[0082] Optionally, when the temperature difference range in which the temperature difference is located is the fourth temperature difference range, the target corresponding relationship is determined to be a second linear relationship.

[0083] Specifically, the first linear relationship can be set as:

[0084] IULoad=(rate4*detT+rate5)*IUHP. Preferably, rate4=0.9 and rate5=1.0.

[0085] Assume the first linear relationship is:

[0086] IULoad=(rate6*detT+rate7)*IUHP. Preferably, rate6=0.8 and rate7=0.6.

[0087] Optionally, in the above step S403 , when the temperature difference range in which the temperature difference is located is the third temperature difference range, determining the target corresponding relationship as a fixed value relationship may specifically be: setting IULoad=0.

[0088] Optionally, determining the total load of the indoor units of the multi-split air conditioner based on the load of the individual indoor units includes: determining the weight value of the individual indoor unit load corresponding to each temperature difference; and determining the total load of the indoor units based on the individual indoor unit load and the weight value of the individual indoor unit load.

[0089] As shown in FIG5 , a method for controlling a multi-split air conditioner according to an embodiment of the present application is provided. This method can be applied to the multi-split air conditioner shown in FIG1 . The method mainly describes how to control the operation of the outdoor unit according to the total load of the indoor units. As shown in FIG5 , the method includes:

[0090] S501: Obtain the temperature difference between the actual temperature and the set temperature of each indoor unit.

[0091] S502: Determine the load of each indoor unit corresponding to each temperature difference.

[0092] S503: Determine the total load of the indoor units of the multi-split air conditioner according to the load of each indoor unit.

[0093] S504: Determine the indoor unit total load range in which the indoor unit total load falls;

[0094] S505: Adjusting the operating frequency of the outdoor unit according to the indoor unit total load range in which the indoor unit total load falls.

[0095] The above method provided in this embodiment divides the total load of the indoor unit into multiple ranges, and each range corresponds to a different adjustment method. The upper and lower thresholds of the adjustment range and the corresponding adjustment method can be adjusted according to the actual application scenario to achieve precise control of the outdoor unit frequency.

[0096] As shown in FIG6 , a method for controlling a multi-split air conditioner is provided in an embodiment of the present application. The method can be applied to the multi-split air conditioner shown in FIG1 . As shown in FIG6 , the method includes:

[0097] S601: Obtain the temperature difference between the actual temperature and the set temperature of each indoor unit.

[0098] S602: Determine the load of each indoor unit corresponding to each temperature difference.

[0099] S603: Determine the total load of the indoor units of the multi-split air conditioner according to the load of each indoor unit.

[0100] S604: Obtaining the actual pressure value of each indoor unit;

[0101] S605: Adjust the frequency of the outdoor unit according to the relationship between the actual pressure value and the target pressure value of each indoor unit.

[0102] S606: Determine the indoor unit total load range within which the indoor unit total load falls;

[0103] S607: Adjust the operating frequency of the outdoor unit according to the indoor unit total load range in which the indoor unit total load falls.

[0104] Optionally, the actual pressure value of each indoor unit includes: when the multi-split air conditioner is in cooling mode, the actual pressure value is the actual suction pressure value of the compressor; or when the multi-split air conditioner is in heating mode, the actual pressure value is the actual exhalation pressure value of the compressor.

[0105] Optionally, when the multi-split air conditioner is in cooling mode, in step S605 in the above embodiment, adjusting the frequency of the outdoor unit according to the relationship between the actual pressure value and the target pressure value of each indoor unit includes:

[0106] When the actual pressure value of each indoor unit is greater than the first pressure threshold, adjusting the operating capacity of the outdoor unit according to the target pressure value;

[0107] Alternatively, when the actual pressure value of each indoor unit is less than the second pressure threshold, the operating capacity of the outdoor unit is adjusted to reduce the frequency according to the target pressure value.

[0108] Alternatively, when the actual pressure value of each indoor unit is greater than or equal to the second pressure threshold and less than or equal to the first pressure threshold, the operation of the outdoor unit is controlled according to the total load of the indoor units.

[0109] The first pressure threshold is the sum of the target pressure value and threshold 4, and the second pressure threshold is the difference between the target pressure and threshold 5.

[0110] Specifically, the above process can be expressed as follows: When the air conditioner is in cooling mode, if Actual Ps > Target Ps + Threshold 4, the outdoor unit's operating capacity is adjusted up according to Target Ps; if Actual Ps < Target Ps - Threshold 5, the outdoor unit's operating capacity is adjusted down according to Target Ps, where Target Ps is the target pressure value and Actual Ps is the actual pressure value. This allows the outdoor unit's operating capacity to be increased when the actual pressure value is high and reduced when the actual pressure value is low, further improving the outdoor unit's operating efficiency.

[0111] Preferably, threshold 4 can be set to 0.3 MPa, and threshold 5 can be set to 0.05 MPa.

[0112] Optionally, when the multi-split air conditioner is in heating mode, in step S605 in the above embodiment, adjusting the frequency of the outdoor unit according to the relationship between the actual pressure value and the target pressure value of each indoor unit includes:

[0113] When the actual pressure value of each indoor unit is less than a third pressure threshold, adjusting the operating capacity of the outdoor unit according to the target pressure value;

[0114] Alternatively, when the actual pressure value of each indoor unit is greater than the fourth pressure threshold, the operating capacity of the outdoor unit is adjusted to reduce the frequency according to the target pressure value.

[0115] Alternatively, when the actual pressure value of each indoor unit is greater than or equal to the third pressure threshold and less than or equal to the fourth pressure threshold, the operation of the outdoor unit is controlled according to the total load of the indoor units.

[0116] The third pressure threshold is the difference between the target pressure value and the threshold 8, and the fourth pressure threshold is the sum of the target pressure and the threshold 9.

[0117] Specifically, the above process can be expressed as follows: When the air conditioner is in cooling mode, if Actual Pd < Target Pd - Threshold 8, the outdoor unit's operating capacity is adjusted up according to Target Pd. If Actual Pd > Target Pd + Threshold 9, the outdoor unit's operating capacity is adjusted down according to Target Pd, where Actual Pd is the actual pressure value and Target Pd is the target pressure value. This allows the outdoor unit's operating capacity to be increased when the actual pressure is high and reduced when the actual pressure is low, further improving its operating efficiency.

[0118] Preferably, threshold 8 can be set to 0.35 MPa, and threshold 9 can be set to 0.1 MPa.

[0119] Optionally, the operating frequency of the outdoor unit is adjusted according to the indoor unit total load range of the indoor unit total load, including: when the indoor unit total load range of the indoor unit total load is within the first indoor unit total load range, increasing the operating frequency of the outdoor unit; when the indoor unit total load range of the indoor unit total load is within the second indoor unit total load range, maintaining the operating frequency of the outdoor unit; when the indoor unit total load range of the indoor unit total load is within the third indoor unit total load range, reducing the operating frequency of the outdoor unit; wherein, the upper limit threshold of the first indoor unit total load is less than or equal to the lower limit threshold of the second indoor unit total load, and the upper limit threshold of the second indoor unit total load is less than or equal to the lower limit threshold of the third indoor unit total load.

[0120] In this way, the total load range from the first indoor unit to the third indoor unit increases from small to large. This means that when the total indoor unit load is low, the outdoor unit capacity is insufficient and needs to be increased. When the indoor unit capacities are balanced, the current operating capacity is maintained to achieve energy savings. However, when the indoor unit load is high, the outdoor unit capacity is excessive and can be appropriately reduced, for example, by reducing the frequency within a specified timeframe. This hierarchical control and adjustment of outdoor units enables precise control of the outdoor units, improving control accuracy.

[0121] Optionally, the upper limit threshold of the total load of the first indoor unit is equal to the lower limit threshold of the total load of the second indoor unit, and the upper limit threshold of the total load of the second indoor unit is equal to the lower limit threshold of the total load of the third indoor unit.

[0122] 7 , a method for controlling a multi-split air conditioner is provided in an embodiment of the present application. The method can be applied to the multi-split air conditioner shown in FIG1 . As shown in FIG7 , the method includes:

[0123] S701: Obtain the temperature difference between the actual temperature and the set temperature of each indoor unit.

[0124] S702: Determine the load of each indoor unit corresponding to each temperature difference.

[0125] S703: Determine the total load of the indoor units of the multi-split air conditioner based on the load of each indoor unit.

[0126] S704: Determine the indoor unit total load range within which the indoor unit total load falls;

[0127] S705: Adjust the operating frequency of the outdoor unit according to the indoor unit total load range in which the indoor unit total load falls.

[0128] S706: When the indoor unit total load range of the indoor unit total load is within the second indoor unit total load range, adjust the opening of the expansion valve corresponding to each indoor unit.

[0129] In this way, the total indoor unit load falls within the second total indoor unit load range, indicating that the current total indoor unit load meets the demand, maintaining the outdoor unit operating capacity. At this time, the refrigerant is distributed among the indoor units by adjusting the opening of the expansion valves of each indoor unit to meet the load requirements of each indoor unit.

[0130] Optionally, adjusting the opening of the expansion valve corresponding to each indoor unit includes: determining the temperature difference range of each indoor unit; determining a target adjustment strategy corresponding to the temperature difference based on the temperature difference range of each indoor unit; and adjusting the expansion valve of the indoor unit according to the target adjustment strategy.

[0131] Alternatively, the target adjustment strategy corresponding to the temperature difference may be determined as follows:

[0132] (1) When the temperature difference is less than a first temperature difference threshold, determining the target adjustment strategy to reduce the opening degree;

[0133] (2) when the temperature difference is greater than or equal to the first temperature difference threshold and less than the second temperature difference threshold, determining the target adjustment strategy to be the maintenance strategy;

[0134] (3) When the temperature difference is greater than or equal to the second temperature difference threshold, the target adjustment strategy is determined to be the automatic adjustment strategy; wherein the first temperature difference threshold is less than the second temperature difference threshold.

[0135] In this embodiment, when the temperature difference is small, it means that the load demand of the indoor unit has been met. At this time, the opening can be reduced to ensure the effect of other indoor units, that is, to allow more refrigerant to flow to other indoor units. This achieves energy saving and improves control efficiency. If the temperature difference is in a balanced state, it means that the current load of the indoor unit is in a balanced state, and there is no need to change the opening value. If the temperature difference is too high, it means that the impact of the temperature difference on the load is small. At this time, it is necessary to automatically adjust the expansion valve based on other parameters of the air conditioner. Specifically, it can be based on the indoor unit coil temperature, superheat, etc. In this way, by controlling the opening in levels, precise control of the indoor unit expansion valve is achieved, which not only saves energy, but also prevents invalid control and improves control accuracy.

[0136] Specifically, the method for controlling the opening degree of the expansion valve of each indoor unit can be set as follows: (detT represents the temperature difference)

[0137] (1) detT ≥ threshold 2: automatic control, such as normal control based on the indoor unit coil temperature, superheat, etc.

[0138] (2) 0≤detT<Threshold 2: The expansion valve opening remains unchanged at the current value.

[0139] (3) Threshold 3 ≤ detT < 0: The load demand of this indoor unit has been met. To ensure the performance of other indoor units, the expansion valve opening of this indoor unit is reduced by a fixed value, such as 5 pls per minute.

[0140] (4) detT < threshold 3: The load demand of the indoor unit has been oversatisfied, and the expansion valve opening adjustment is accelerated.

[0141] Optionally, the method further includes: when the temperature difference is less than a first temperature difference threshold, adjusting the speed of reducing the opening degree based on the temperature difference.

[0142] Optionally, the speed of reducing the opening is adjusted based on the temperature difference, including: if the temperature difference of the indoor unit is less than a threshold value 3, reducing the opening according to a first speed; or, if the temperature difference of the indoor unit is between a threshold value 3 and 0, reducing the opening according to a second speed; wherein the first speed is less than the second speed.

[0143] Preferably, the above threshold 2>0>threshold 3.

[0144] In the above embodiment, when the temperature difference is small, the demand is basically met and only the opening degree needs to be reduced. However, when the temperature difference continues to decrease, it indicates that the load on the indoor unit has been excessively satisfied and the opening degree needs to be reduced more quickly. Specifically, the first rate can be a fixed rate reduction, for example, a set rate reduction of 5 pls per minute. The second rate can be a linear rate reduction, for example, a rate reduction of downVal = (rate8 * detT + rate9) * PerMAXPLS over a specified time (e.g., 20 seconds), with downVal <= PerMAXPLS. PerMAXPLS is the maximum opening degree of the indoor unit expansion valve at each adjustment, such as 20 pls.

[0145] As shown in Figure 8, an embodiment of the present application provides a device 800 for controlling a multi-split air conditioner, including a processor 100 and a memory 101. Optionally, the device may also include a communication interface 102 and a bus 103. The processor 100, the communication interface 102, and the memory 101 can communicate with each other through the bus 103. The communication interface 102 can be used for information transmission. The processor 100 can call the logic instructions in the memory 101 to execute the method for controlling a multi-split air conditioner described in any of the above embodiments.

[0146] In addition, the logic instructions in the memory 101 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product.

[0147] Memory 101, as a computer-readable storage medium, can be used to store software programs and computer-executable programs, such as program instructions / modules corresponding to the methods in the embodiments of the present application. Processor 100 executes the program instructions / modules stored in memory 101 to execute functional applications and data processing, thereby implementing the method for controlling a multi-split air conditioner in the above-described embodiment.

[0148] The memory 101 may include a program storage area and a data storage area. The program storage area may store an operating system and at least one application required for a function; the data storage area may store data generated based on the use of the terminal device. Furthermore, the memory 101 may include high-speed random access memory and non-volatile memory.

[0149] As shown in FIG9 , a multi-split air conditioner 900 provided for an embodiment of the present application includes: an outdoor unit 901; a plurality of indoor units 902 connected to the outdoor unit; and a device 800 for controlling the multi-split air conditioner as shown in FIG8 , which is installed in the outdoor unit 901 or the indoor unit 902. The installation relationship described here is not limited to placement inside the multi-split air conditioner, but also includes installation connections with other components of the multi-split air conditioner, including but not limited to physical connections, electrical connections, or signal transmission connections. It can be understood by those skilled in the art that the device 800 for controlling the multi-split air conditioner can be adapted to a feasible multi-split air conditioner, thereby realizing other feasible embodiments.

[0150] An embodiment of the present application provides a computer-readable storage medium storing computer-executable instructions, wherein the computer-executable instructions are configured to execute the method for controlling a multi-split air conditioner according to the above embodiment.

[0151] An embodiment of the present application provides a computer program product, which includes a computer program stored on a computer-readable storage medium. The computer program includes program instructions. When the program instructions are executed by a computer, the computer executes the method for controlling a multi-split air conditioner according to the above embodiment.

[0152] An embodiment of the present disclosure provides a computer program, which, when executed by a computer, enables the computer to implement the above-mentioned method for controlling a multi-split air conditioner.

[0153] The aforementioned computer-readable storage medium may be a transient computer-readable storage medium or a non-transitory computer-readable storage medium.

[0154] The technical solution of the embodiment of the present application can be embodied in the form of a software product, which is stored in a storage medium and includes one or more instructions for causing a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the method described in the embodiment of the present application. The aforementioned storage medium can be a non-transient storage medium, including: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program code, or a transient storage medium.

[0155] The above description and the accompanying drawings fully illustrate the embodiments of the present application so that those skilled in the art can practice them. Other embodiments may include structural, logical, electrical, process and other changes. The embodiments represent only possible variations. Unless explicitly required, separate components and functions are optional, and the order of operations may vary. Parts and features of some embodiments may be included in or replace parts and features of other embodiments. Moreover, the words used in this application are only used to describe the embodiments and are not used to limit the claims. As used in the description of the embodiments and claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to also include plural forms. Similarly, the term "and / or" as used in this application refers to any and all possible combinations of one or more associated listings. In addition, when used in this application, the term "comprise" and its variations "comprises" and / or comprising refer to the presence of stated features, wholes, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or groups thereof. In the absence of further restrictions, an element defined by the sentence "comprising a..." does not exclude the presence of other identical elements in the process, method or device comprising the element. In this article, each embodiment may focus on the differences from other embodiments, and the same and similar parts between the various embodiments can be referenced to each other. For the methods, products, etc. disclosed in the embodiments, if they correspond to the method part disclosed in the embodiments, then the relevant parts can be found in the description of the method part.

[0156] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented with electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software may depend on the specific application and design constraints of the technical solution. The technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the embodiments of the present application. The technicians will clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0157] In the embodiments disclosed herein, the disclosed methods and products (including but not limited to devices, equipment, etc.) can be implemented in other ways. For example, the device embodiments described above are merely illustrative. For example, the division of the units can be merely a logical functional division. In actual implementation, there may be other division methods, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the coupling or direct coupling or communication connection between each other shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms. The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the units may be selected according to actual needs to implement this embodiment. In addition, the functional units in the embodiments of the present application may be integrated into a processing unit, or each unit may exist physically alone, or two or more units may be integrated into one unit.

[0158] The flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the systems, methods and computer program products according to the embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of the code, and the part of the module, program segment or code contains one or more executable instructions for realizing the specified logical function. In some alternative implementations, the functions marked in the box can also occur in an order different from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, which can depend on the functions involved. In the description corresponding to the flowcharts and block diagrams in the accompanying drawings, the operations or steps corresponding to different boxes can also occur in an order different from that disclosed in the description, and sometimes there is no specific order between different operations or steps. For example, two consecutive operations or steps can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, which can depend on the functions involved. Each block in the block diagrams and / or flowcharts, and combinations of blocks in the block diagrams and / or flowcharts, may be implemented by a dedicated hardware-based system that performs the specified function or action, or may be implemented by a combination of dedicated hardware and computer instructions.

Claims

1. A method for controlling a multi-split air conditioner, characterized in that: The multi-split air conditioner includes an outdoor unit and a plurality of indoor units connected to the outdoor unit; the method includes: Obtain the temperature difference between the actual temperature and the set temperature of each indoor unit; Determine the single load of the indoor unit corresponding to each temperature difference; Determine the total load of the indoor units of the multi-split air conditioner based on the load of the individual indoor units; Control the outdoor unit operation based on the total indoor unit load.

2. The method according to claim 1, characterized in that Determine the indoor unit load corresponding to each temperature difference, including: Determine the temperature difference range within which the temperature difference lies; According to the temperature difference range in which the temperature difference is located, determine the target corresponding relationship between the indoor unit load and the temperature difference; Based on the target corresponding relationship, the single load of the indoor unit corresponding to each temperature difference is determined.

3. The method according to claim 2, characterized in that According to the temperature difference range of the temperature difference, determine the target corresponding relationship between the indoor unit load and the temperature difference, including: When the temperature difference range in which the temperature difference is located is the first temperature difference range, determining that the target corresponding relationship is a quadratic curve relationship; When the temperature difference range in which the temperature difference is located is the second temperature difference range, determining that the target corresponding relationship is a linear relationship; When the temperature difference range in which the temperature difference is located is the third temperature difference range, determining the target corresponding relationship to be a fixed value relationship; When the temperature difference is in a fourth temperature difference range, determining that the target corresponding relationship is a linear relationship; Among them, the lower limit threshold of the first temperature difference range is greater than or equal to the upper limit threshold of the second temperature difference range, the lower limit threshold of the second temperature difference range is greater than or equal to the upper limit threshold of the third temperature difference range, and the lower limit threshold of the third temperature difference range is greater than or equal to the upper limit threshold of the fourth temperature difference range.

4. The method according to claim 3, characterized in that Determine that the target correspondence relationship is a quadratic curve relationship, including: Determine a quadratic function based on the square of the temperature difference, the temperature difference, and the indoor unit capacity; The quadratic function is determined as the target correspondence.

5. The method according to any one of claims 1 to 4, characterized in that: Control outdoor unit operation based on total indoor unit load, including: Determine the indoor unit total load range within which the indoor unit total load falls; The operation frequency of the outdoor unit is adjusted according to the total load range of the indoor unit where the total load of the indoor unit is located.

6. The method according to claim 5, characterized in that According to the indoor unit total load range where the indoor unit total load is located, the operation frequency of the outdoor unit is adjusted, including: When the indoor unit total load range where the indoor unit total load is located is the first indoor unit total load range, increasing the operation frequency of the outdoor unit; When the indoor unit total load range where the indoor unit total load is located is the second indoor unit total load range, maintaining the operation frequency of the outdoor unit; When the indoor unit total load range of the indoor unit total load is the third indoor unit total load range, the operation frequency of the outdoor unit is reduced; wherein the upper limit threshold of the first indoor unit total load is less than or equal to the lower limit threshold of the second indoor unit total load, and the upper limit threshold of the second indoor unit total load is less than or equal to the lower limit threshold of the third indoor unit total load.

7. The method according to claim 6, characterized in that The upper limit threshold of the total load of the first indoor unit is equal to the lower limit threshold of the total load of the second indoor unit, and the upper limit threshold of the total load of the second indoor unit is equal to the lower limit threshold of the total load of the third indoor unit.

8. The method according to claim 6, characterized in that Controlling outdoor unit operation based on total indoor unit load also includes: When the indoor unit total load range where the indoor unit total load is located is the second indoor unit total load range, the opening degree of the expansion valve corresponding to each indoor unit is adjusted.

9. A device for controlling a multi-split air conditioner, comprising a processor and a memory storing program instructions, characterized in that: The processor is configured to execute the method for controlling a multi-split air conditioner as described in any one of claims 1 to 8 when executing the program instructions.

10. A multi-split air conditioner, characterized in that: include: Outdoor unit; Multiple indoor units connected to the outdoor unit; The device for controlling a multi-split air conditioner as claimed in claim 9 is installed in an outdoor unit or an indoor unit.

11. A computer program, when executed by a computer, enables the computer to implement the method for controlling a multi-split air conditioner according to any one of claims 1 to 8.

12. A computer program product, comprising computer instructions stored on a computer-readable storage medium, and when the program instructions are executed by a computer, the computer is enabled to implement the method for controlling a multi-split air conditioner as claimed in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Compressor frequency control method for multi-connected variable-frequency air conditioner and air conditioner

    CN113483447A

  • Air conditioner

    JP1986272547A

  • Operation control device for air-conditioning apparatus

    JP1990169948A

  • Multi-chamber type air conditioning system

    JP1994257828A

  • Multi-room type air conditioning system

    JP1999166761A