Probe device, method for controlling probe device, inspection system, and method for controlling inspection system

The integration of a support, drive, and control section in the probe device addresses the lack of multifunctionality in semiconductor testing systems, enabling precise positioning and inspection of semiconductor devices, thereby enhancing the probe device's capabilities and reducing the measuring device's workload.

WO2024232271A1PCT designated stage expired Publication Date: 2024-11-14TOKYO ELECTRON LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/016069
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-08
Filing Date
2024-04-24
Publication Date
2024-11-14

AI Technical Summary

Technical Problem

Current semiconductor testing systems lack multifunctionality in their probe devices, which limits their ability to efficiently position and inspect semiconductor devices with varying characteristics and requirements.

Method used

The probe device is equipped with a support section, a drive section for precise movement and posture adjustment, and a control section that positions the test target and performs inspections based on measurement results, enabling multifunctional capabilities.

Benefits of technology

This configuration enhances the probe device's functionality, allowing for precise positioning and inspection of semiconductor devices, reducing the load on the measuring device and improving processing speed by performing data processing tasks within the probe device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024016069_14112024_PF_FP_ABST
    Figure JP2024016069_14112024_PF_FP_ABST
Patent Text Reader

Abstract

Provided is a probe device including: a support part for supporting an inspection object; a drive part for moving the support part and adjusting the orientation of the support part; and a control unit. The control unit executes: (a) processing for controlling the drive part so as to position the inspection object at a predetermined position; and (b) processing for inspecting the inspection object on the basis of a measurement result obtained by measuring characteristics of the inspection object.
Need to check novelty before this filing date? Find Prior Art

Description

Probe device, probe device control method, inspection system, and inspection system control method

[0001] The present disclosure relates to a probe apparatus, a control method for a probe apparatus, an inspection system, and a control method for an inspection system.

[0002] A semiconductor inspection system for inspecting semiconductors includes, for example, an inspection device (tester) that performs electrical inspection of the object to be measured, and a probe device (prober) that moves the object to a position where the tester inspects it (see, for example, Patent Document 1 and Patent Document 2).

[0003] JP 2008-004940 A JP 2007-538263 A

[0004] The present disclosure provides a technique for multi-functionalizing a probe device.

[0005] According to the present disclosure, there is provided a probe device including a support unit that supports an object to be inspected, a drive unit that moves the support unit and adjusts the attitude of the support unit, and a control unit, wherein the control unit executes (a) a process of controlling the drive unit so as to position the object to be inspected at a predetermined position, and (b) a process of inspecting the object to be inspected based on measurement results of characteristics of the object to be inspected.

[0006] The present disclosure provides a technique for multi-functionalizing a probe device.

[0007] FIG. 1 is a diagram illustrating an outline of an inspection system according to this embodiment. FIG. 2 is a diagram illustrating the overall configuration of the inspection system according to this embodiment. FIG. 3 is a diagram illustrating the hardware configuration of a control unit in a probe device included in the inspection system according to this embodiment. FIG. 4 is a diagram illustrating the hardware configuration of a measurement control unit in a measurement device included in the inspection system according to this embodiment. FIG. 5 is a flow diagram (part 1) illustrating the processing of the inspection system according to this embodiment. FIG. 6 is a flow diagram (part 2) illustrating the processing of the inspection system according to this embodiment. FIG. 7 is a flow diagram (part 3) illustrating the processing of the inspection system according to this embodiment. FIG. 8 is a diagram illustrating the availability of the calculation unit when the inspection system according to this embodiment is operated. FIG. 9 is a diagram illustrating the availability of the calculation unit when the inspection system of the reference example is operated. FIG. 10 is a diagram illustrating an outline of the inspection system of the reference example. FIG. 11 is a flow diagram (part 1) illustrating the processing of the inspection system of the reference example. FIG. 12 is a flow diagram (part 2) illustrating the processing of the inspection system of the reference example. FIG. 13 is a flow diagram (part 3) illustrating the processing of the inspection system of the reference example.

[0008] Hereinafter, embodiments will be described with reference to the accompanying drawings. Note that the present disclosure is not limited to these examples, but is defined by the claims, and is intended to include all modifications within the meaning and scope of the claims.

[0009] In addition, with regard to the description of the specification and drawings of each embodiment, components having substantially the same or corresponding functional configurations may be designated by the same or corresponding reference numerals to avoid redundant explanation. In addition, the scale of each part in the drawings may differ from the actual scale to facilitate understanding.

[0010] <Inspection System> An inspection system according to this embodiment will be described. The inspection system according to this embodiment includes a probe device and a measurement device that measures the characteristics of the inspection object. The probe device in the inspection system according to this embodiment includes a support unit that supports the inspection object, a drive unit that moves the support unit and adjusts the attitude of the support unit, and a control unit. The control unit in the inspection system according to this embodiment (a) executes processing to control the drive unit so as to position the inspection object at a predetermined position. Furthermore, the control unit in the inspection system according to this embodiment (b) executes processing to inspect the inspection object based on measurement results from the measurement device that measures the characteristics of the inspection object.

[0011] Fig. 1 is a diagram showing an outline of an inspection system 1, which is an example of an inspection system according to the present embodiment. Fig. 2 is a diagram showing the overall configuration of the inspection system 1, which is an example of an inspection system according to the present embodiment.

[0012] The inspection system 1 inspects, for example, devices formed on a semiconductor substrate. The inspection system 1 includes a probe apparatus 10 and a measurement apparatus 20.

[0013] The probe apparatus 10 transports a DUT (Device Under Test) to be tested so that it can be measured by the measuring apparatus 20. In other words, the probe apparatus 10 moves the DUT to a predetermined position, for example, a position where the measuring apparatus 20 can measure it. The probe apparatus 10 then adjusts the DUT to a predetermined posture, for example, a posture where the probe 14A can come into contact with the DUT so that the measuring apparatus 20 can measure it. As described above, the probe apparatus 10 aligns the DUT to be tested so that the measuring apparatus 20 can measure it.

[0014] The probe device 10 also controls the overall testing in the testing system 1. The probe device 10 controls the measuring device 20 to perform a predetermined test. Then, the probe device 10 performs testing of the DUT based on the results of measurements performed by the measuring device 20.

[0015] The measuring device 20 measures the electrical characteristics of the DUT under test.

[0016] [Probe Apparatus 10] The probe apparatus 10 transports the DUT to be tested. The probe apparatus 10 also aligns the DUT to be tested with the probes 14A of the probe card 14 so that the measuring apparatus 20 can perform measurements.

[0017] The probe device 10 includes a loader chamber 11 and a prober chamber 12. The probe device 10 transfers a wafer W, which is a DUT to be tested, from the loader chamber 11. The prober chamber 12 is adjacent to the loader chamber 11. In the prober chamber 12, the electrical characteristics of the wafer W transferred from the loader chamber 11 are tested.

[0018] The probe device 10 includes a display unit 18. The display unit 18 displays the results of the inspection and the like.

[0019] The probe device 10 includes a prober chamber 12 , a support unit 13 , a probe card 14 , an insert ring 15 , an alignment mechanism 16 , and a drive unit 19 .

[0020] The support unit 13 supports a wafer W, which is a DUT to be tested. The drive unit 19 moves the support unit 13 in three mutually orthogonal axial directions, i.e., the X-axis, the Y-axis, and the Z-axis, and rotates the support unit 13 around each of the X-axis, the Y-axis, and the Z-axis. For example, the X-axis and the Y-axis directions are horizontal directions, and the Z-axis direction is vertical. By the drive unit 19 moving and rotating the support unit 13, the probe device 10 aligns the wafer W, which is a DUT to be tested, with the multiple probes 14A on the probe card 14. In other words, the drive unit 19 moves the wafer W, which is a DUT to be tested, to a predetermined position and adjusts it so that it assumes a predetermined posture.

[0021] The probe card 14 includes a plurality of probes 14A that come into contact with electrodes formed on a wafer W, which is a DUT to be tested. The probe card 14 is electrically connected to the test head 21 via an insert ring 15. The probe card 14 is disposed above the support portion 13.

[0022] The alignment mechanism 16 aligns the probes 14 A of the probe card 14 with the electrode pads of the wafer W, which is the DUT under test supported on the support portion 13 .

[0023] The alignment mechanism 16 includes an alignment bridge 16A, a CCD camera 16B, and a CCD camera 16C. The alignment bridge 16A moves horizontally between the rear surface of the prober chamber 12 and the probe center. The CCD camera 16B is provided on the alignment bridge 16A. The CCD camera 16C is provided on the side of the support portion 13.

[0024] The alignment mechanism 16 aligns the probe card 14 with the wafer W supported on the support part 13. The CCD camera 16B advances from the rear of the prober chamber to the probe center via the alignment bridge 16A. The CCD camera 16B is located between the probe card 14 and the support part 13. The CCD camera 16B detects the electrode pads of the wafer W from above while the support part 13 moves in the X-axis and Y-axis directions.

[0025] After the alignment bridge 16A retreats to the rear of the prober chamber 12, the CCD camera 16C sequentially detects the specified probes 14A from below the probe card 14 while the support portion 13 moves in the X-axis and Y-axis directions below the probe card 14.

[0026] The control unit 17 controls various components including the driving unit 19 and the alignment mechanism 16. The control unit 17 is, for example, a computer. The control unit 17 controls the driving unit 19 and the alignment mechanism 16 so as to align the wafer W supported by the support unit 13 with the plurality of probes 14A on the probe card 14. The control unit 17 then controls the driving unit 19 and the alignment mechanism 16 so as to electrically contact the plurality of probes 14A with electrodes formed on the wafer W.

[0027] The control unit 17 may adjust the temperature in the prober chamber 12, for example, so that the inspection system 1 performs a high-temperature inspection or a low-temperature inspection of the wafer W.

[0028] The following describes the hardware configuration of the control unit 17. Fig. 3 is a diagram illustrating the hardware configuration of the control unit 17 in the probe device 10 included in the inspection system 1, which is an example of the inspection system according to this embodiment.

[0029] The control unit 17 includes a calculation unit 17A, a main memory unit 17B, an external memory unit 17C, a clock unit 17D, an input unit 17E, a transmission / reception unit 17F, and an output unit 17G. The calculation unit 17A, the main memory unit 17B, the external memory unit 17C, the clock unit 17D, the input unit 17E, the transmission / reception unit 17F, and the output unit 17G are each connected to a bus 17H.

[0030] The display unit 18 is connected to the control unit 17. The display unit 18 displays, for example, various data such as the target temperature during inspection input from the input unit 17E, image data such as images captured by the CCD cameras 16B and 16C, and the like.

[0031] The calculation unit 17A is mainly composed of a processor such as a CPU (Central Processing Unit). The main storage unit 17B is composed of a volatile memory such as a RAM (Random Access Memory). The external storage unit 17C is composed of a storage medium such as a nonvolatile memory such as a ROM (Read Only Memory), a HDD (Hard Disk Drive), or an SSD (Solid State Drive).

[0032] The calculation unit 17A loads a program stored in the external storage unit 17C into the main storage unit 17B and executes it. The calculation unit 17A controls the drive unit 19 by executing the program. The calculation unit 17A also communicates with the measurement device 20 by executing the program. The external storage unit 17C also stores various processing results executed by the calculation unit 17A.

[0033] The timekeeping unit 17D measures time. The timekeeping unit 17D also displays the current time. The timekeeping unit 17D includes a crystal oscillator, a counter that counts clock pulses generated by the crystal oscillator, and a clock. The timekeeping unit 17D operates as a timer at any time in response to a command from the calculation unit 17A. The timekeeping unit 17D also supplies the current time to the calculation unit 17A.

[0034] For example, when the calculation unit 17A sets the counter of the timing unit 17D to a certain value and starts the timer, the timing unit 17D subtracts 1 from the counter every time it generates a clock pulse, and generates an interrupt signal to the calculation unit 17A when the counter value reaches 0. By the timing unit 17D generating an interrupt signal to the calculation unit 17A, the calculation unit 17A can measure a certain inspection time, etc.

[0035] The clock of the timekeeping unit 17D counts clock pulses from a reference time, and the calculation unit 17A can know the time elapsed from the reference time, that is, the current time, by reading the count value from the timekeeping unit 17D.

[0036] The transmitting / receiving unit 17F transmits and receives signals to and from the measuring device 20. For example, the calculation unit 17A receives (acquires) inspection results of the wafer W from the measuring device 20 via the transmitting / receiving unit 17F. The calculation unit 17A transmits control signals to the measuring device 20 via the transmitting / receiving unit 17F. The calculation unit 17A also receives control signals from the measuring device 20 via the transmitting / receiving unit 17F. The calculation unit 17A also receives inspection results of the wafer W from the measuring device 20 via the transmitting / receiving unit 17F.

[0037] The output unit 17G communicates with the drive unit 19. The control unit 17 controls the drive unit 19 via the output unit 17G. The control unit 17 may also control the support unit 13.

[0038] [Measuring Apparatus 20] The measuring apparatus 20 measures electrical characteristics of a semiconductor device formed on a wafer W, which is a DUT to be tested. The measuring apparatus 20 is a so-called semiconductor tester.

[0039] The measuring device 20 includes a test head 21. The test head 21 is electrically connected to the probe card 14 via the insert ring 15. The test head 21 measures the electrical characteristics of a semiconductor device formed on a wafer W, which is a DUT under test, via probes 14A included in the probe card 14.

[0040] The measuring device 20 also includes a measurement control unit 22 that controls the measuring device 20 .

[0041] A description will be given of the hardware configuration of the measurement control unit 22. Fig. 4 is a diagram illustrating the hardware configuration of the measurement control unit 22 in the measuring device 20 provided in the inspection system 1, which is an example of the inspection system according to this embodiment.

[0042] The measurement control unit 22 includes a calculation unit 22A, a main memory unit 22B, an external memory unit 22C, a clock unit 22D, a transmission / reception unit 22F, and an output unit 22G. The calculation unit 22A, the main memory unit 22B, the external memory unit 22C, the clock unit 22D, the transmission / reception unit 22F, and the output unit 22G are each connected to a bus 22H.

[0043] The calculation unit 22A is mainly composed of a processor such as a CPU, the main storage unit 22B is mainly composed of a volatile memory such as a RAM, and the external storage unit 22C is mainly composed of a nonvolatile memory such as a ROM, a HDD, an SSD, or the like.

[0044] The calculation unit 22A loads a program stored in the external storage unit 22C into the main storage unit 22B and executes it. The calculation unit 22A controls the test head 21 by executing the program. The calculation unit 22A also communicates with the probe device 10 by executing the program. The external storage unit 22C also stores various processing results executed by the calculation unit 22A.

[0045] The timekeeping unit 22D measures time. The timekeeping unit 22D also displays the current time. Since the timekeeping unit 22D has the same configuration as the timekeeping unit 17D, the detailed description of the timekeeping unit 22D is omitted here and the description of the timekeeping unit 22D is referred to in the description of the timekeeping unit 17D.

[0046] The transmitting / receiving unit 22F transmits and receives signals to and from the control unit 17. For example, the calculation unit 22A transmits the inspection results of the wafer W to the control unit 17 via the transmitting / receiving unit 22F. The calculation unit 22A receives a control signal from the control unit 17 via the transmitting / receiving unit 22F. The calculation unit 22A also transmits a control signal to the control unit 17 via the transmitting / receiving unit 22F.

[0047] The output section 22G communicates with the test head 21. The measurement control section 22 controls the test head 21 via the output section 22G.

[0048] The measuring device 20 is not limited to a large-scale measuring device such as a semiconductor tester, but may be a measuring device that measures electrical characteristics such as a current measuring device, a voltage measuring device, or a frequency measuring device.

[0049] <Operation of the inspection system according to this embodiment> The operation of the inspection system according to this embodiment will be described. By describing the operation of the inspection system according to this embodiment, the procedure executed by the control unit of the probe device provided in the inspection system will be described. Furthermore, by describing the operation of the inspection system according to this embodiment, the procedures included in the respective control methods of the inspection system and the probe device will be described. Here, the explanation will be given using inspection system 1, which is an example of the inspection system according to this embodiment. Each of Figs. 5 to 7 is a flow chart explaining the processing of inspection system 1, which is an example of the inspection system according to this embodiment.

[0050] [Step S10] When the test system 1 starts processing, the control unit 17 controls the driving unit 19 to connect the probe 14A to the DUT under test.

[0051] [Steps S20 to S23] Next, the control unit 17 initializes the test status (step S20). Specifically, the control unit 17 sets the test status to a value indicating "defective." Then, the control unit 17 determines the target pins to be subjected to the contact test (step S21). The control unit 17 also determines the current value for the contact test (step S22). Furthermore, the control unit 17 determines the voltage for judgment in the contact test (step S23).

[0052] The control unit 17 transfers the determined target pin, current value, and voltage to the measurement control unit 22 .

[0053] [Steps S30 to S32] Next, the measurement control unit 22 controls the test head 21 to apply a voltage of 0 volts to the power supply pin (step S30). The measurement control unit 22 also controls the test head 21 to apply a current to the pin determined in step S21 (step S31). The measurement control unit 22 then controls the test head 21 to measure the voltage at the pin to which the current is applied.

[0054] The measurement control unit 22 transfers the measurement results to the control unit 17 .

[0055] [Step S40] Next, the control unit 17 stores the results of the measurement performed in step S32 in the measurement data memory.

[0056] [Steps S50 to S51] Next, the measurement control unit 22 controls the test head 21 to initialize the target pins (step S50). The measurement control unit 22 also controls the test head 21 to initialize the power supply pins (step S51).

[0057] [Step S60] Next, the control unit 17 determines whether the measured voltage is within a specified range (step S60). If the measured voltage is within the specified range (YES in step S60), the control unit 17 proceeds to step S70. If the measured voltage is not within the specified range (NO in step S60), the control unit 17 proceeds to step S130. Note that by the control unit 17 proceeding to step S130, the DUT under test is determined to be a "defective product."

[0058] [Steps S70 to S75] If the measured voltage is within the specified range (YES in step S60), the control unit 17 determines the voltage for the operational test (step S70). The control unit 17 also determines other test conditions (step S71). The control unit 17 also determines the input pin for the operational test (step S72). The control unit 17 also determines the signal measurement input signal for the operational test (step S73). The control unit 17 also determines the measurement pin for the operational test (step S74). The control unit 17 also determines the judgment value for the operational test (step S75).

[0059] The control unit 17 transfers the determined target pin, input signal, judgment value, voltage, etc. to the measurement control unit 22 .

[0060] [Steps S80 to S82] Next, the measurement control unit 22 controls the test head 21 to apply a voltage for the operational test to the power supply pin (step S80). The measurement control unit 22 also controls the test head 21 to apply a signal for the operational test to the input pin (step S81). Furthermore, the measurement control unit 22 controls the test head 21 to measure a signal from the output pin for the operational test (step S82).

[0061] The measurement control unit 22 transfers the measurement results to the control unit 17 .

[0062] [Step S90] Next, the control unit 17 stores the results of the measurement performed in step S82 in the measurement data memory.

[0063] [Steps S100 to S102] Next, the measurement control unit 22 controls the test head 21 to initialize the output pins to their initial states (step S100). The measurement control unit 22 also controls the test head 21 to initialize the input pins to their initial states (step S101). Furthermore, the measurement control unit 22 controls the test head 21 to initialize the power supply pins to their initial states (step S102).

[0064] [Step S110] Next, the control unit 17 determines whether the measured voltage is within a specified range (step S110). If the measured voltage is within the specified range (YES in step S110), the control unit 17 proceeds to step S120. If the measured voltage is not within the specified range (NO in step S110), the control unit 17 proceeds to step S130. Note that by the control unit 17 proceeding to step S130, the DUT under test is determined to be a "defective product."

[0065] [Step S120] If the measured voltage is within the specified range (YES in step S110), the control unit 17 changes the test status. Specifically, the control unit 17 changes the test status to a value indicating "good." Note that by performing the process of step S120, the control unit 17 determines that the DUT under test is "good."

[0066] [Steps S130 to S131] Next, the control unit 17 creates a data log on the RAM (step S130), and stores the data log in a non-volatile memory, for example, the external storage unit 17C (step S131).

[0067] [Step S140] The control unit 17 controls the driving unit 19 to separate the probe 14A from the DUT under test.

[0068] [Step S150] Next, the control unit 17 determines whether to continue the process (step S150). If the process is to be continued (YES in step S150), the control unit 17 returns to step S10 and repeats the process. If the process is not to be continued (NO in step S150), the control unit 17 ends the process.

[0069] <Inspection System of Reference Example> An inspection system of a reference example will be described. Here, an inspection system 1z of the reference example will be used for the description. Fig. 10 is a diagram showing an outline of the inspection system 1z of the reference example.

[0070] The inspection system 1z of the reference example includes a probe device 10z and a measurement device 20z. The probe device 10z includes a control unit 17z instead of the control unit 17 in the probe device 10. The measurement device 20z includes a measurement control unit 22z and a data processing control unit 23z instead of the measurement control unit 22 in the probe device 10. Note that the measurement control unit 22z and the data processing control unit 23z are described separately for the purpose of explanation, but in reality, they are executed by the same calculation unit, for example, the calculation unit 22A.

[0071] 11 to 13 are diagrams for explaining the processing of the inspection system 1z of the reference example.

[0072] The data processing control unit 23z executes part of the processing that was previously performed by the control unit 17. Specifically, steps S20 to S23, step S40, step S60, steps S70 to S75, step S90, step S110, step S120, and steps S130 to S131 that are executed by the control unit 17 are executed by the data processing control unit 23z.

[0073] The control unit 17z executes part of the processing that was previously performed by the control unit 17. Specifically, step S10, step S140, and step S150 that were previously performed by the control unit 17 are now executed by the control unit 17z.

[0074] The measurement control unit 22z executes the same processing as the measurement control unit 22. However, the measurement control unit 22z is controlled by the data processing control unit 23z, not the control unit 17. Furthermore, the measurement control unit 22z outputs the measurement results to the data processing control unit 23z, not the control unit 17.

[0075] Typical semiconductor device testing is performed using a measuring device that applies electrical signals to the semiconductor and performs the test itself, and a probe device that transports the semiconductor device and connects it to test terminals (probes). The measuring device handles electrical signals, while the probe device performs positioning. Therefore, the roles of the measuring device and the probe device are different, and the respective suppliers of the measuring device and the probe device are often different.

[0076] In addition, testing of semiconductor devices involves alternating between positioning of the DUT under test by a probe device and testing of the DUT under test by a measurement device. While testing is being performed by the measurement device, the probe device is in an idle state.

[0077] The processing performed by the measurement device includes measurement control processing, which controls the hardware that generates and measures test signals, and data processing, which judges and processes data. Therefore, in the inspection system according to this embodiment, the measurement control processing is closely related to the measurement device, and is therefore executed by a calculation unit included in the measurement device. And, in the inspection system according to this embodiment, data processing is executed by a calculation unit included in the probe device, which is in an idle state.

[0078] Specifically, steps S30 to S32, steps S50 to S51, steps S80 to S82, and steps S100 to S102 executed by the measurement control unit 22 and the measurement control unit 22z, respectively, are examples of the above-mentioned measurement control processing.

[0079] Steps S20 to S23, step S40, step S60, step S70 to S75, step S90, step S110, step S120, and step S130 to S131 executed by the control unit 17 and the data processing control unit 23z, respectively, are an example of the above-mentioned data processing. In other words, the above-mentioned data processing is an example of processing for inspecting the inspection object based on the measurement results of the characteristics of the inspection object. In the inspection system according to this embodiment, the data processing is executed by a calculation unit provided in the probe device that is in an idling state during inspection by the measurement device.

[0080] Steps S10 and S140 executed by the control unit 17 and the control unit 17z are an example of a process of controlling the driving unit 19 so as to position the inspection object at a predetermined position.

[0081] <Operation of the inspection system according to this embodiment> The results when the inspection system according to this embodiment is operated will be described. Fig. 8 is a diagram illustrating the results when the inspection system 1, which is an example of the inspection system according to this embodiment, is operated. Fig. 9 is a diagram illustrating the results when the inspection system 1z of the reference example is operated.

[0082] In the inspection system 1, which is an example of an inspection system according to this embodiment, the control unit 17 in the probe device 10 operates at a predetermined availability rate even while the inspection is being performed. On the other hand, in the inspection system 1z, the availability rate of the control unit 17z in the probe device 10z becomes almost zero during the inspection. Therefore, the inspection system according to this embodiment can improve the availability rate of the processor in the control unit provided in the probe device.

[0083] As described above, according to the inspection system of this embodiment, by performing inspection processing of the inspection object in the probe device, the probe device can inspect the inspection object, thereby realizing multi-functionality of the probe device. Also, according to the inspection system of this embodiment, by performing data processing in the probe device, the availability rate of the calculation unit in the probe device can be improved. Furthermore, according to the inspection system of this embodiment, by performing processing that was previously performed by a measurement device in the probe device, the load on the calculation unit in the measurement device can be reduced and processing in the inspection system can be accelerated.

[0084] The inspection system according to the present embodiment disclosed herein should be considered to be illustrative in all respects and not restrictive. The above-described embodiment can be modified and improved in various ways without departing from the spirit and scope of the appended claims. The features described in the above-described embodiments can be configured in other ways as long as they are not inconsistent, and can be combined as long as they are not inconsistent.

[0085] This application claims priority from basic patent application No. 2023-076645, filed with the Japan Patent Office on May 8, 2023, the entire contents of which are incorporated herein by reference.

[0086] REFERENCE SIGNS LIST 1 Inspection system 10 Probe device 13 Support unit 17 Control unit 19 Drive unit 20 Measurement device 22 Measurement control unit

Claims

1. A probe device comprising: a support section that supports an object to be inspected; a drive section that moves the support section and adjusts the attitude of the support section; and a control section, wherein the control section executes: (a) a process of controlling the drive section so as to position the object to be inspected at a predetermined position; and (b) a process of inspecting the object to be inspected based on measurement results of characteristics of the object to be inspected.

2. The probe apparatus according to claim 1, wherein the process (b) includes a process of acquiring the measurement results from a measurement device that measures a characteristic of the inspection target.

3. The probe apparatus according to claim 2, wherein the control unit controls the measurement in the measurement device.

4. A control method for a probe device comprising: a support section that supports an object to be inspected; a drive section that moves the support section and adjusts the attitude of the support section; and a control section, the control section including: a procedure in which the control section controls the drive section so as to position the object to be inspected at a predetermined position; and a procedure in which the control section inspects the object to be inspected based on a measurement result of a characteristic of the object to be inspected.

5. An inspection system comprising: a probe device; and a measuring device that measures characteristics of an object to be inspected, wherein the probe device comprises: a support section that supports the object to be inspected; a drive section that moves the support section and adjusts the attitude of the support section; and a control section, wherein the control section performs the following processes: (a) a process of controlling the drive section so as to position the object to be inspected at a predetermined position; and (b) a process of inspecting the object to be inspected based on measurement results from the measuring device.

6. The inspection system according to claim 5, wherein the process (b) includes a process of acquiring the measurement result from the measurement device.

7. The inspection system according to claim 6, wherein the control unit controls the measurement in the measurement device.

8. A control method for an inspection system comprising: a probe device; and a measuring device that measures characteristics of an object to be inspected, wherein the probe device comprises a support section that supports the object to be inspected; a drive section that moves the support section and adjusts the attitude of the support section; and a control section, the control method including a procedure for the control section to control the drive section so as to position the object to be inspected at a predetermined position; and a procedure for inspecting the object to be inspected based on measurement results from the measuring device.

Citation Information

Patent Citations

  • Wafer inspecting apparatus, wafer inspecting method and computer program

    WO2007034863A1

  • Substrate inspection device

    WO2018003269A1