UHPC-based wind turbine tower with ground anchor strands, and construction method therefor
By adopting a structural design combining UHPC and ground anchor in the wind power tower, the problems of wind power tower height, strength and stiffness are solved, and the wheel hub height is enhanced and the durability and economical structure are achieved.
Patent Information
- Application Number
- PCT/CN2023/114699
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-17
- Filing Date
- 2023-08-24
- Publication Date
- 2024-11-21
AI Technical Summary
Existing wind power towers are difficult to meet the requirements of height, strength and stiffness at the same time, especially in terms of height, due to material characteristics and stability, resulting in the failure of the wheel hub height to break through the bottleneck of 200 meters.
Using a UHPC-based ground anchor structure, the combination of multi-layer UHPC tower column segments and tower column transition sections is combined with prestressed ground anchors to ensure the stability and torsional stiffness of the tower under high pressures, and through Variable cross-section and frame structure reduce self-weight and material usage.
The height of the wind power tower has exceeded 200 meters, which improves the fatigue resistance and durability of the structure, reduces operation and maintenance costs, and provides an economical and feasible construction plan.
Smart Images

Figure CN2023114699_21112024_PF_FP_ABST
Abstract
Description
A UHPC-based wind turbine tower with ground anchor bundle and its construction method Technical Field
[0001] The present invention belongs to the technical field of wind power generation, and in particular relates to a wind power generation tower and a construction method thereof. Background Art
[0002] Currently, the capacity of a single wind turbine has reached over 10MW. With technological advancements, even larger turbines are being developed and manufactured. However, the weight of a large-capacity turbine on the tower increases significantly, requiring the tower to possess greater strength and rigidity. Furthermore, larger rotors also require taller towers. For onshore wind turbines located in low-wind-speed zones, increasing the hub height is crucial to fully utilize optimal wind conditions.
[0003] Conventional concrete or steel is usually used to build wind turbine towers in the existing technology. For conventional concrete tower columns, due to their heavy weight, when the tower height is too high, it becomes difficult to construct, or the hoisting weight soars, and the cost is unbearable. At this time, the height of the wind turbine tower is difficult to meet the requirements. For conventional steel tower columns, when the tower column is too high, it often meets the strength requirements but fails to meet the stiffness requirements. If the cross-sectional size is increased, the cost will also soar. In addition, steel towers have fatigue and durability problems, and the operation and maintenance costs are high. From the above, it can be seen that it is difficult for wind turbine towers in the existing technology to meet the requirements of height, strength and stiffness at the same time. Especially in terms of height, it is limited by material properties and stability. At present, the hub height of wind turbine towers has not been able to break through the bottleneck of 200 meters.
[0004] Summary of the Invention
[0005] The technical problem to be solved by this invention is how to utilize new UHPC materials to construct a new wind turbine tower structure that overcomes the shortcomings and defects mentioned in the above-mentioned background art. This invention provides a UHPC-based wind turbine tower with ground anchors and a construction method thereof, which offers advantages such as high tower height, good stability, fatigue resistance, and durability. To address the above-mentioned technical problems, the technical solutions proposed by this invention are as follows:
[0006] A UHPC-based wind turbine tower with ground anchor bundles comprises multiple layers of UHPC tower segments stacked one above the other, with upper and lower adjacent UHPC tower segments connected by tower transition sections. The UHPC tower segments comprise multiple UHPC tower units distributed around the vertical centerline of the wind turbine tower, and the tower transition sections comprise multiple UHPC transition sections and multiple transverse connecting members for connecting the UHPC transition sections into a whole. Upper and lower adjacent UHPC tower units are connected by the UHPC transition sections. The wind turbine tower further comprises multiple prestressed ground anchor bundles, which are arranged between the UHPC tower segments and / or the tower transition sections and the ground foundation. The above-mentioned ground anchor bundle is arranged between the UHPC tower segment and / or tower transition section and the ground foundation, which means that the ground anchor bundle is arranged between the UHPC tower segment and the ground foundation, and between the tower transition section and the ground foundation; or, the ground anchor bundle is arranged between the UHPC tower segment and the ground foundation, or between the tower transition section and the ground foundation.
[0007] In the above-mentioned wind turbine tower, preferably, the ground anchor bundle is arranged between the tower transition section and the ground foundation, the transverse connecting member includes a plurality of crossbeams, the adjacent UHPC transition sections are connected by crossbeams, and the ground anchor bundle is arranged between the crossbeams and the ground foundation. The crossbeams of the same transverse connecting member are located on the same plane. By setting the crossbeams, the stability of the UHPC tower segments with smaller size and variable pressure axis can be ensured, while providing large torsional stiffness for the overall tower structure under strong winds. Both ends of the ground anchor bundle can be tensioned and anchored to the crossbeams and the ground foundation respectively, which can ensure structural stability. In order to further improve the structural stability of the wind turbine tower, in addition to setting the crossbeams, horizontally arranged cross-links can be set between adjacent crossbeams, and ground anchor bundles can also be set between the cross-links and the ground foundation.
[0008] In the above-mentioned wind turbine tower, preferably, ground anchor bundles, arranged perpendicular to the ground foundation, are tensioned between the crossbeams of multiple tower column transition sections, including the topmost one, and the ground foundation, and the upper ends of the ground anchor bundles are anchored to the crossbeams at the end of the crossbeams closest to the UHPC transition section. More preferably, the ground anchor bundles are tensioned vertically, with the number of vertical ground anchor bundles tensioned between each tower column transition section and the ground foundation being twice that of the crossbeams, i.e., ground anchor bundles are tensioned at both ends of each crossbeam.
[0009] In the above-mentioned wind turbine tower, preferably, the ground foundation is a cavity-type foundation having an internal cavity, one end of the vertical ground anchor is anchored in the cavity of the cavity-type foundation, and the other end is anchored to the upper surface of the tower column transition section. The provision of the internal cavity facilitates anchor tie tensioning, inspection, and maintenance.
[0010] In the present invention, the ground anchor bundle can be made of conventional prestressed steel wire or steel strand, or carbon fiber prestressed bundle. The number of anchors in each layer of crossbeams is no less than eight bundles, which are symmetrically arranged along the vertical center line of the wind turbine tower. By tensioning the ground anchor bundle in the height direction of the tower, the UHPC tower column is kept in a relatively high compressive stress state for a long time (within the allowable range of the UHPC design strength), and its ultra-high compressive strength is fully utilized to avoid the large tensile stress in the UHPC tower column that causes tensile cracking. The connection between the UHPC tower column segments is more stable and firm, and the overall stability of the wind turbine tower under strong winds is guaranteed. It has self-reset capability and avoids the problem of structural fatigue damage caused by wind loads. Compared with the prior art of applying external or internal prestress in the concrete tower column, the present invention uses vertical ground anchor bundles, which not only can play the role of applying external prestress to the UHPC tower column segments, but also the vertical ground anchor bundles can make the tower structure have a self-reset function in strong winds, ensuring that it does not collapse.
[0011] In the above-mentioned wind turbine tower, preferably, the cross-section of the UHPC tower segment located above the wind turbine tower is smaller than the cross-section of the UHPC tower segment located below the wind turbine tower, and the cross-section of the tower transition section matches the cross-section of its adjacent UHPC tower segment. The cross-section of the UHPC tower segment refers to the plane enclosed by the center lines connecting adjacent UHPC tower units on the same plane, and the cross-section of the tower transition section refers to the plane enclosed by the center lines connecting adjacent UHPC transition sections on the same plane.
[0012] In the above-mentioned wind turbine tower, preferably, the UHPC tower column units are all arranged vertically, and the cross-sectional size of each individual UHPC tower column segment remains the same from bottom to top. The upper and lower ends of the UHPC transition section are also arranged vertically, and the cross-sectional size of the UHPC tower column segments arranged from bottom to top gradually decreases. The cross-sectional size of the overall structure formed by connecting multiple UHPC tower column segments through the tower column transition section gradually decreases from bottom to top.
[0013] In the above-mentioned wind turbine tower, preferably, the UHPC tower column units are all arranged to be tilted inward, and the cross-sectional size of each of the UHPC tower column segments decreases from bottom to top. The UHPC transition sections are also arranged to be tilted inward, and the cross-sectional size of the overall structure formed by connecting multiple UHPC tower column segments through the tower column transition sections decreases from bottom to top.
[0014] The UHPC tower segments of the present invention adopt a variable cross-section along their height. These segments are the primary pressure-bearing components, bearing the greatest pressure at the tower base. As the tower height increases, the pressure on these segments gradually decreases, and their cross-sections gradually decrease. This results in greater overall structural stability, lower weight, and lower construction costs. In a more preferred embodiment, the cross-section of each UHPC tower segment remains the same from bottom to top, with the cross-sections gradually decreasing in size as the tower is positioned upwards, making construction more convenient.
[0015] In the above-mentioned wind turbine tower, preferably, the UHPC tower units and the UHPC transition sections are prefabricated hollow box-section components, connected by a flange structure. The transverse connecting members are prefabricated UHPC hollow box-section components or steel truss structures. The UHPC tower units and UHPC transition sections can have a box-shaped, rectangular, or circular cross-section. The preferred box-shaped cross-section has a large bending and torsional moment of inertia, effectively resisting axial pressure and bending moments. Due to the high height of the wind turbine tower structure of the present invention, the UHPC tower units and UHPC transition sections are prefabricated segmented components, which can be connected by a flange structure, facilitating construction. The crossbeams are thin components. Since the crossbeams are secondary load-bearing components, hollow UHPC box beams or steel trusses with smaller cross-sectional dimensions can be used to reduce deadweight and facilitate connection. Holes for ground anchors are provided at appropriate locations on the crossbeams.
[0016] In the aforementioned wind turbine tower, preferably, a tower transition section is also provided at the top of the topmost UHPC tower segment. A steel turntable is mounted on the top of the topmost tower transition section via a flange structure. The tower is mounted on the steel turntable via a sleeve with a tapered plate. The top of the tower is greater than 200 meters from the ground foundation. The tower can be a hollow cylindrical UHPC structure or a steel structure, with the vertical centerline of the tower coinciding with the vertical centerline of the wind turbine tower. The tower can be mounted in any manner, such as by installing the steel turntable at the top of the topmost tower transition section and then attaching the tower to the steel turntable via a sleeve with a tapered plate. Finally, the wind turbine generator set and impeller are mounted at the top of the tower. In existing technologies, the hub height is generally too high, resulting in low wind turbine tower stability. However, in the present invention, through structural optimization, the wind turbine tower structure allows for a hub height greater than 200 meters (more preferably 200-300 meters).
[0017] As a general technical concept, the present invention also provides a construction method of a UHPC-based wind turbine tower with a ground anchor bundle as described above, comprising the following steps:
[0018] S1: Prefabricate the UHPC tower column unit and prefabricate or assemble the tower column transition section in a factory;
[0019] S2: Construct the ground foundation, hoist multiple UHPC tower column units in the first layer (the lowest layer) of the UHPC tower column segment to the ground foundation and install and fix them. Then, connect the tower column transition section of the first layer below with the UHPC tower column units below it through its UHPC transition section to form an integral whole on the UHPC tower column segment of the first layer below, and tension the ground anchor beam between the tower column transition section and the ground foundation.
[0020] S3: Multiple UHPC tower column units in the second-layer UHPC tower column segment are hoisted onto the tower column transition section of the first layer below, and are installed and fixed by connecting the UHPC transition section of the tower column transition section with the UHPC tower column units above it. The tower column transition section of the second layer below is then installed on the UHPC tower column segment of the second layer below by connecting its UHPC transition section with the UHPC tower column units below it to form an integral whole, and ground anchor beams are tensioned between the tower column transition section and the ground foundation;
[0021] S4: Repeat step S3 until the installation of the uppermost tower column transition section is completed, and then install the accessories and tower tube on the uppermost tower column transition section to complete the construction.
[0022] UHPC has excellent compressive strength and tensile strength. Under the same load conditions, the cross-sectional dimensions of the UHPC structure are much smaller than those of ordinary concrete structures, about 1 / 3 of the cross-sectional dimensions of ordinary concrete structures. Applying it to wind turbine towers can achieve a lighter tower structure and thus increase the height of the wind turbine tower. In the present invention, the UHPC tower column unit is the main load-bearing component, mainly for pressure bearing. Due to the excellent compressive performance of UHPC and the light weight of the tower column, the use of UHPC can increase the height of the wind turbine tower. At the same time, UHPC has good durability and is not easily corroded or damaged. The present invention uses UHPC as the main material to build a wind turbine tower, which can solve the problems of tower fatigue and durability and reduce the periodic maintenance needs of the wind turbine tower. Preferably, the UHPC tower column units are all components made of UHPC material, and the bending tensile strength of the UHPC material is above 20MPa and the compressive strength is above 120MPa.
[0023] The wind turbine tower of the present invention is a variable-width frame structure. The UHPC tower units are connected laterally through the tower transition section to ensure the stability of the tower. The ground anchor bundle applies axial preload to the tower to ensure that the tower does not have large tensile stress and prevent UHPC cracking. On the other hand, it provides the wind turbine tower with self-resetting ability under strong winds, ensuring the overall stability of the tower and preventing it from collapsing.
[0024] In the present invention, each UHPC tower segment generally contains no fewer than three UHPC tower units, symmetrically distributed along the vertical centerline of the wind turbine tower. The number of UHPC transition sections is the same as the number of UHPC tower units. The number of vertical anchor bundles anchored to each layer of crossbeams is no fewer than six, symmetrically arranged along the vertical centerline of the wind turbine tower. In a preferred embodiment, each UHPC tower segment contains four UHPC tower units, distributed in a rectangular pattern. The number of UHPC transition sections is the same as the number of UHPC tower units, also in a rectangular pattern. The number of vertical anchor bundles anchored to each layer of crossbeams is eight, symmetrically distributed along the vertical centerline of the wind turbine tower, and the shape enclosed by the anchor points is also rectangular.
[0025] Compared with the prior art, the advantages of the present invention are:
[0026] 1. The wind turbine tower structure of this invention utilizes ground anchor bundles. These anchor bundles place the UHPC tower columns in a state of high compressive stress, fully leveraging the advantages of UHPC's high compressive strength and improving its load-bearing performance. Compared to existing techniques that apply external or internal prestressing within concrete tower columns, the present invention utilizes ground anchor bundles, which not only apply external prestressing to the UHPC tower columns but also provide a self-resetting feature in strong winds, preventing collapse.
[0027] 2. The wind turbine tower of the present invention adopts UHPC with excellent mechanical properties and durability, matched with new materials, and adopts a frame-type tower column structure, which has greater strength, rigidity and wind resistance stability, good fatigue resistance and durability, low operation and maintenance costs, and good durability.
[0028] 3. The wind turbine tower of the present invention adopts UHPC and frame structure. At the same height, the preferred variable width frame structure can greatly reduce the deadweight and material consumption (for example, the UHPC tower structure with a hub height of 123m has a material consumption of 512m). 3 At the same height, the material consumption of the present invention can be as low as 335m 3 ), which enables the hub height of the wind turbine to exceed 200 meters and be even higher.
[0029] 4. Because wind turbine towers primarily bear pressure, the present invention utilizes UHPC as its primary material. Under equivalent pressure conditions, UHPC compression components cost less than 40% of steel components, emit only 20% of the carbon footprint, and weigh only approximately 20% more. Compared to steel truss towers, the present invention's frame-type UHPC tower structure eliminates the truss or lattice stiffening required to maintain stability (which can account for over 50% of the main tower column steel). Consequently, the tower structure of the present invention can save over 60% in cost compared to steel towers, providing an economically viable core technology for tower heights exceeding 200 meters.
[0030] 5. The wind turbine tower of the present invention uses UHPC as the main material. Due to the light weight of UHPC components, UHPC tower columns can be prefabricated and hoisted in long sections, which greatly improves the construction progress and ensures quality. It does not require a large amount of on-site welding and high-altitude welding work, nor does it require a large number of cast-in-place concrete processes, and the construction period is shortened. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0032] FIG1 is a vertical view of the overall structure of a wind turbine tower according to Example 1. FIG.
[0033] FIG2 is a three-dimensional schematic diagram of the wind turbine tower of Example 1.
[0034] FIG3 is a three-dimensional schematic diagram of the UHPC tower column segment and tower column transition section of the first layer of Example 1.
[0035] FIG4 is a three-dimensional schematic diagram of the tower column transition section of Example 1.
[0036] FIG5 is a three-dimensional schematic diagram of the UHPC tower column unit and the UHPC transition section connected via a flange structure in Example 1.
[0037] FIG6 is a three-dimensional schematic diagram of the first and second layer UHPC tower column segments and tower column transition sections of Example 1.
[0038] FIG7 is a three-dimensional schematic diagram of the UHPC tower column segments and tower column transition sections of the first, second, and third layers of Example 1.
[0039] FIG8 is a three-dimensional schematic diagram of the UHPC tower column segments, tower column transition sections, and tower top of the first, second, third, and fourth layers of Example 1.
[0040] FIG9 is a three-dimensional schematic diagram of the first, second, third, fourth, and fifth-layer UHPC tower column segments, tower column transition sections, and tower top of Example 1.
[0041] FIG10 is a three-dimensional schematic diagram of the steel rotor segment and the sleeve with the conical plate of Example 1.
[0042] FIG11 is a schematic structural diagram of Example 1 when the crossbeam is a UHPC hollow box-section member.
[0043] FIG12 is a three-dimensional schematic diagram of the cross beam of the tower column transition section of Example 2 using a steel truss structure.
[0044] FIG13 is a schematic structural diagram of Example 2 when the crossbeam is a steel truss structure.
[0045] FIG14 is a vertical view of the wind turbine tower of Example 3.
[0046] Legend: 1. Ground foundation; 2. UHPC tower segment; 201. UHPC tower unit; 3. Tower transition section; 301. UHPC transition section; 302. Crossbeam; 4. Ground anchor bundle; 5. Ground anchor bundle reserved hole; 6. Flange structure; 7. Steel transition section; 8. Sleeve with tapered plate; 9. Tower; 10. Chord; 11. Web member; 12. Anchor plate. DETAILED DESCRIPTION
[0047] To facilitate understanding of the present invention, the present invention will be described in more comprehensive and detailed form below in conjunction with the accompanying drawings and preferred embodiments. However, the protection scope of the present invention is not limited to the following specific embodiments.
[0048] Unless otherwise defined, all technical terms used hereinafter have the same meanings as those generally understood by those skilled in the art. The technical terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the scope of protection of the present invention.
[0049] Unless otherwise specified, various raw materials, reagents, instruments and equipment used in the present invention can be purchased from the market or prepared by existing methods.
[0050] Example 1:
[0051] As shown in Figures 1 and 2, the UHPC-based wind turbine tower with ground anchor bundles of this embodiment includes multiple layers (five layers in this embodiment) of UHPC tower column segments 2 stacked up and down. Upper and lower adjacent UHPC tower column segments 2 are connected by tower column transition sections 3, and a tower column transition section 3 is provided on the topmost UHPC tower column segment 2. The UHPC tower column segment 2 includes multiple (four in this embodiment) UHPC tower column units 201 evenly distributed around the vertical centerline of the wind turbine tower (distributed in a rectangular shape). The tower column transition section 3 includes multiple UHPC transition sections 301 (four in this embodiment) and multiple transverse connecting members for connecting the UHPC transition sections 301 into a whole. Upper and lower adjacent UHPC tower column units 201 are connected by the UHPC transition sections 301. The wind turbine tower also includes multiple prestressed ground anchor bundles 4, which are provided between the tower column transition section 3 and the ground foundation 1.
[0052] Specifically, as shown in Figure 4 , in this embodiment, the transverse connecting members include multiple beams 302. Adjacent UHPC transition sections 301 are connected by the beams 302, and ground anchor bundles 4 are provided between the beams 302 and the ground foundation 1. In this embodiment, corresponding cross-connections (not shown) can also be provided between adjacent beams 302, and ground anchor bundles 4 can be provided between the cross-connections and the ground foundation 1 to further enhance structural stability.
[0053] In this embodiment, ground anchor bundles 4 arranged perpendicular to the ground foundation 1 are tensioned between the beams 302 of the five tower column transition sections 3, including the topmost one, and the ground foundation 1. The upper ends of the ground anchor bundles 4 are anchored to the beams 302 at the end of the beam 302 close to the UHPC transition section 301. The number of vertical ground anchor bundles 4 tensioned between each tower column transition section 3 and the ground foundation 1 is twice that of the beams 302, that is, 8, for a total of 40.
[0054] As shown in Figures 1 to 3, in this embodiment, the ground foundation 1 is a cavity-type foundation with an internal cavity. One end of the vertical ground anchor bundle 4 is anchored in the internal cavity of the cavity-type foundation, and the other end is anchored to the upper surface of the tower transition section 3.
[0055] As shown in Figures 1 and 2, in this embodiment, the cross-section of the UHPC tower segment 2 located above the wind turbine tower is smaller than the cross-section of the UHPC tower segment 2 located below the wind turbine tower, and the cross-section of the tower transition section 3 matches the cross-section of its adjacent UHPC tower segment 2. Specifically, the UHPC tower units 201 are all arranged vertically, and the cross-section of each individual UHPC tower segment 2 remains the same from bottom to top. The upper and lower ends of the UHPC transition section 301 are also arranged vertically. The cross-section of the UHPC tower segments 2 arranged from bottom to top gradually decreases, and the cross-section of the overall structure formed by connecting multiple UHPC tower segments 2 through the tower transition section 3 gradually decreases from bottom to top.
[0056] In this embodiment, the UHPC tower column unit 201 and the UHPC transition section 301 are prefabricated hollow box-section components, as shown in Figure 5 . The UHPC tower column unit 201 and the UHPC transition section 301 are connected by a flange structure 6 . As shown in Figures 11 , 12 , and 13 , the crossbeam 302 is a prefabricated UHPC hollow box-section component or a steel truss structure. When the crossbeam 302 is a UHPC hollow box-section component, it is provided with holes 5 reserved for ground anchors. When the crossbeam 302 is a steel truss structure, the structure of the tower column transition section 3 is shown in Figure 13 .
[0057] As shown in Figures 1, 2, and 10, in this embodiment, a tower transition section 3 is also provided on the top of the uppermost UHPC tower column segment 2. A steel transition section 7 is installed on the upper part of the uppermost tower column transition section 3 through a flange structure 6. A tower 9 is installed on the steel transition section 7 through a sleeve 8 with a tapered plate. The distance between the top of the tower 9 and the ground foundation 1 can be greater than 200m.
[0058] As shown in FIG3 to FIG10 , the construction method of the UHPC-based UHPC wind turbine tower with ground anchor bundles in this embodiment includes the following steps:
[0059] S1: Prefabricate the UHPC tower column unit 201 and prefabricate or assemble the tower column transition section 3 in a factory;
[0060] S2: Construct the ground foundation 1, hoist the multiple UHPC tower column units 201 of the UHPC tower column segment 2 of the first layer below onto the ground foundation 1 and install and fix them, then install the tower column transition section 3 of the first layer below onto the UHPC tower column segment 2 of the first layer below by connecting its UHPC transition section 301 with the UHPC tower column units 201 below it to form an integral whole, and tension the ground anchor beam 4 between the tower column transition section 3 and the ground foundation 1;
[0061] S3: Multiple UHPC tower column units 201 in the UHPC tower column segment 2 of the second lower layer are hoisted onto the tower column transition section 3 of the first lower layer, and are installed and fixed by connecting the UHPC transition section 301 of the tower column transition section 3 with the UHPC tower column units 201 above it. The tower column transition section 3 of the second lower layer is then installed on the UHPC tower column segment 2 of the second lower layer by connecting its UHPC transition section 301 with the UHPC tower column units 201 below it to form an integral whole, and a ground anchor bundle 4 is tensioned between the tower column transition section 3 and the ground foundation 1;
[0062] S4: Repeat step S3 until the installation of the uppermost tower column transition section 3 is completed, and then install the accessories and tower tube 9 on the uppermost tower column transition section 3 to complete the construction.
[0063] More specifically, the construction method of the UHPC-based UHPC wind turbine tower with ground anchor bundles in this embodiment includes the following steps:
[0064] S1: Construct the first-level segment of the wind turbine tower. UHPC tower column units 201 are prefabricated in the factory, and tower column transition sections 3 are prefabricated or assembled (Figure 4). As shown in Figure 3, a cavity foundation is cast with ordinary concrete at the selected wind turbine tower site. After the concrete in the cavity foundation reaches the designed strength, the UHPC tower column units 201 of the lower first-level UHPC tower column segment 2 are hoisted using a tower crane. Conventional flanges are used to secure the UHPC tower column units 201 to the cavity foundation. The lower first-level tower column transition section 3 is hoisted integrally to the top of the UHPC tower column segment 2, and the tower column transition section 3 and UHPC tower column segment 2 are connected via flange structure 6 (as shown in Figure 5). Finally, ground anchor bundles 4 are tensioned longitudinally from within the cavity foundation and anchored to the top surface of the crossbeam 302. The anchoring position is near the UHPC transition section 301. Eight ground anchor bundles 4 are symmetrically distributed along the vertical centerline of the wind turbine tower.
[0065] S2: Construct the second-layer segment of the wind turbine tower. As shown in Figure 6, the UHPC tower column unit 201 of the second-layer UHPC tower column segment 2 is hoisted using a tower crane. The second-layer UHPC tower column segment 2 (lower end) is connected to the first-layer tower column transition section 3 (upper end) using a flange structure 6. The second-layer tower column transition section 3 is then hoisted as a whole to the top of the second-layer UHPC tower column segment 2. The second-layer tower column transition section 3 (lower end) and the second-layer UHPC tower column segment 2 (upper end) are connected using a flange structure 6. Finally, the ground anchor bundles 4 are tensioned longitudinally from the interior of the cavity foundation and anchored to the top surface of the crossbeam 302. The anchoring position is close to the UHPC transition section 301. The eight ground anchor bundles 4 are symmetrically distributed along the vertical centerline of the wind turbine tower.
[0066] S3: Construction of the third-story segment of the wind turbine tower. As shown in Figure 7, the UHPC tower column unit 201 of the third-story UHPC tower column segment 2 is hoisted using a tower crane. The UHPC tower column segment 2 is connected to the tower column transition section 3 using a flange structure 6. The third-story tower column transition section 3 is then hoisted as a whole to the top of the third-story UHPC tower column segment 2, and the tower column transition section 3 and UHPC tower column segment 2 are connected using a flange structure 6. Finally, the ground anchor bundles 4 are tensioned longitudinally from the interior of the cavity foundation and anchored to the top surface of the crossbeam 302. The anchoring position is close to the UHPC transition section 301. Eight ground anchor bundles 4 are symmetrically distributed along the vertical centerline of the wind turbine tower.
[0067] S4: Construction of the fourth-story segment of the wind turbine tower. As shown in Figure 8, the UHPC tower column unit 201 of the fourth-story UHPC tower column segment 2 is hoisted using a tower crane. The UHPC tower column segment 2 is connected to the tower column transition section 3 using a flange structure 6. The fourth-story tower column transition section 3 is then hoisted as a whole to the top of the fourth-story UHPC tower column segment 2, and the tower column transition section 3 and UHPC tower column segment 2 are connected using a flange structure 6. Finally, the ground anchor bundles 4 are tensioned longitudinally from the interior of the cavity foundation and anchored to the top surface of the crossbeam 302. The anchoring position is close to the UHPC transition section 301. The eight ground anchor bundles 4 are symmetrically distributed along the vertical centerline of the wind turbine tower.
[0068] S5: Constructing the fifth-story segment of the wind turbine tower. As shown in Figure 9, the UHPC tower column unit 201 of the fifth-story UHPC tower column segment 2 is hoisted using a tower crane, and the UHPC tower column segment 2 and the tower column transition section 3 are connected as a whole using a flange structure 6. The fifth-story tower column transition section 3 is then hoisted as a whole to the top of the fifth-story UHPC tower column segment 2, and the tower column transition section 3 and the UHPC tower column segment 2 are connected using a flange structure 6. Finally, the ground anchor bundles 4 are tensioned longitudinally from the interior of the cavity foundation and anchored to the top surface of the crossbeam 302. The anchoring position is near the UHPC transition section 301. The eight ground anchor bundles 4 are symmetrically distributed along the vertical centerline of the wind turbine tower. In this embodiment, the fifth floor is the top floor of the wind turbine tower, and the top portion of the fifth-story tower column transition section 3 serves as the capping tower column.
[0069] S6: Install the tower 9, wind turbine, and impeller. As shown in Figures 1, 2, and 10, a steel transition section 7 is installed at the top of the tower transition section 3 and connected via flanges to form a single unit. The tower 9 is hoisted to the top of the uppermost steel transition section 7 using a tower crane. The tower 9 is secured using the steel transition section 7 and the sleeve 8 with a tapered plate. The wind turbine and impeller are then installed, completing the installation.
[0070] In this embodiment, both the UHPC tower segment 2 and the tower transition section 3 are factory-prefabricated with UHPC material, with a flexural tensile strength exceeding 20 MPa and a compressive strength exceeding 120 MPa. The height of the UHPC tower segment 2 is preferably 20-40 m, while the height of the tower transition section 3 is preferably 3-6 m. The UHPC tower unit 201 of the UHPC tower segment 2 and the UHPC transition section 301 of the tower transition section 3 are hollow box-section components. The UHPC tower unit 201 has a cross-sectional height and width a1 of 1-3 m, and a wall thickness b1 of 0.1-0.3 m. The cross-sectional dimensions of the UHPC transition section 301 are consistent with those of the adjacent UHPC tower unit 201. The top surface of the UHPC transition section 301 at the top of the tower has a cross-sectional length and width a2 of 0.5-1 m, and a wall thickness b2 of 0.1-0.2 m.
[0071] In this embodiment, the crossbeams 302 are thin components. Their length is the clear distance between adjacent UHPC transition sections 301, and their cross-sectional width is half their length. The cross-sectional length a3 of the first-layer crossbeams 302 is 2.5-3 meters, the cross-sectional length a4 of the second and third-layer crossbeams 302 is 2-2.5 meters, and the cross-sectional length a5 of the fourth and fifth-layer crossbeams 302 is 1.5-2 meters. As shown in Figure 11, the crossbeams 302 are box-section UHPC beams, prefabricated in the factory using UHPC materials. Each crossbeam 302 is provided with pre-requisite holes 5 for ground anchor bundles, the dimensions of which match the dimensions of the selected ground anchor bundles 4. The wall thickness b3 of the crossbeams 302 is 0.1-0.3 meters.
[0072] In this embodiment, the length and width a6 of the ground foundation 1 are both 10-30m and are cast with ordinary concrete. The ground foundation 1 has a hollow structure, which facilitates construction workers to enter the cavity to perform prestressing and anchoring operations on the vertical anchor bundles 4.
[0073] In this embodiment, the number and arrangement of the UHPC tower column units 201 can be adjusted as needed by adjusting the tower column transition section 3 accordingly. The number and installation positions of the ground anchor bundles 4 can also be adjusted as needed. For example, in this embodiment, the placement of the ground anchor bundles 4 can be adjusted by adding a corbel at the top of the UHPC tower column unit 201, extending inward toward the tower, and tensioning vertical ground anchor bundles 4 between the corbel and the ground foundation 1. Alternatively, additional ground anchor bundles 4, positioned between the corbel and the ground foundation 1, can be added to the existing ground anchor bundles 4.
[0074] Example 2:
[0075] The overall components of the wind turbine tower in this embodiment are essentially the same as those in Example 1. The difference, as shown in Figure 12, is that in this embodiment, the UHPC tower unit 201 of the UHPC tower segment 2 and the UHPC transition section 301 of the tower transition section 3 are hollow circular cross-section components. The cross-sectional outer diameter d1 of the UHPC tower unit 201 is 1-2 m, and the wall thickness t1 is 0.1-0.3 m. The cross-sectional dimensions of the UHPC transition section 301 are consistent with those of the adjacent UHPC tower unit 201. The cross-sectional outer diameter d2 of the top surface of the UHPC transition section 301 at the top of the tower is 0.5-1 m, and the wall thickness t2 is 0.1-0.2 m.
[0076] The overall components of the wind turbine tower in this embodiment differ from those in Example 1 in that, as shown in Figure 13, the crossbeam 302 in this embodiment utilizes a steel truss structure (made of steel, such as Q345), consisting of chord members 10 and web members 11. The steel trusses are double-row structures connected by steel cross-ties. One end of the ground anchor bundle 4 is anchored to an anchor plate 12, which has a pre-reserved hole 5 for the ground anchor bundle.
[0077] Other structures of this embodiment can also be adaptively adjusted, such as adjusting the number and anchoring positions of the ground anchor bundles 4, the number of layers of the UHPC tower column segments 2, etc.
[0078] Example 3:
[0079] The overall components of the wind turbine tower in this embodiment are basically the same as those in Example 1. The difference is that, as shown in Figure 14, in this embodiment, the UHPC tower column units 201 are all tilted inward, and the cross-sectional size of each UHPC tower column segment 2 decreases linearly from bottom to top. The UHPC transition sections 301 are also tilted inward, and the cross-sectional size of the overall structure formed by connecting multiple UHPC tower column segments 2 through the tower column transition sections 3 decreases linearly from bottom to top.
[0080] Other structures of this embodiment can also be adaptively adjusted, such as adjusting the number and anchoring positions of the ground anchor bundles 4, the number of layers of the UHPC tower column segments 2, etc.
Claims
1. A UHPC-based wind power tower with ground anchor bundle, characterized in that: The invention comprises a plurality of UHPC tower column segments (2) stacked in an upper and lower manner, wherein the upper and lower adjacent UHPC tower column segments (2) are connected via a tower column transition section (3); the UHPC tower column segment (2) comprises a plurality of UHPC tower column units (201) distributed around the vertical center line of the wind power tower, the tower column transition section (3) comprises a plurality of UHPC transition sections (301) and a plurality of transverse connection members for connecting the UHPC transition sections (301) into a whole, and the upper and lower adjacent UHPC tower column units (201) are connected via the UHPC transition section (301); the wind power tower further comprises a plurality of prestressed ground anchor bundles (4), wherein the ground anchor bundles (4) are arranged between the UHPC tower column segment (2) and / or the tower column transition section (3) and a ground foundation (1).
2. The wind power tower according to claim 1, characterized in that: The ground anchor bundle (4) is arranged between the tower column transition section (3) and the ground foundation (1); the transverse connecting member comprises a plurality of cross beams (302); adjacent UHPC transition sections (301) are connected via the cross beams (302); and the ground anchor bundle (4) is arranged between the cross beams (302) and the ground foundation (1).
3. The wind power tower according to claim 2, characterized in that: A ground anchor bundle (4) arranged perpendicular to the ground foundation (1) is tensioned between the cross beams (302) of the plurality of tower column transition sections (3), including the uppermost layer, and the ground foundation (1); and the anchoring position of the upper end of the ground anchor bundle (4) when anchored to the cross beam (302) is located at one end of the cross beam (302) close to the UHPC transition section (301).
4. The wind power tower according to claim 1, characterized in that: The ground foundation (1) is a cavity-type foundation provided with an internal cavity, one end of the vertical ground anchor bundle (4) is anchored in the internal cavity of the cavity-type foundation, and the other end is anchored to the upper surface of the tower column transition section (3).
5. The wind power tower according to any one of claims 1 to 4, characterized in that: The cross-section of the UHPC tower segment (2) located above the wind turbine tower is smaller than the cross-section of the UHPC tower segment (2) located below the wind turbine tower, and the cross-section size of the tower transition segment (3) matches the cross-section size of the adjacent UHPC tower segment (2).
6. The wind power tower according to claim 5, characterized in that: The UHPC tower column units (201) are all arranged vertically, and the cross-sectional size of each individual UHPC tower column segment (2) remains the same from bottom to top. The upper and lower ends of the UHPC transition section (301) are also arranged vertically, and the cross-sectional size of the UHPC tower column segments (2) arranged from bottom to top gradually decreases. The cross-sectional size of the overall structure formed by connecting a plurality of UHPC tower column segments (2) via the tower column transition section (3) gradually decreases from bottom to top.
7. The wind power tower according to claim 5, characterized in that: The UHPC tower column units (201) are all arranged to be tilted inwards, and the cross-sectional size of each of the UHPC tower column segments (2) decreases from bottom to top. The UHPC transition sections (301) are also arranged to be tilted inwards, and the cross-sectional size of the overall structure formed by connecting a plurality of the UHPC tower column segments (2) via the tower column transition sections (3) decreases from bottom to top.
8. The wind power tower according to any one of claims 1 to 4, characterized in that: The UHPC tower column unit (201) and the UHPC transition section (301) are prefabricated hollow box section components, the UHPC tower column unit (201) and the UHPC transition section (301) are connected via a flange structure (6), and the transverse connecting member is a prefabricated UHPC hollow box section component or a steel truss structure.
9. The wind power tower according to any one of claims 1 to 4, characterized in that: A tower transition section (3) is also provided at the top of the uppermost UHPC tower column segment (2), a steel transition section (7) is installed on the upper part of the uppermost tower column transition section (3) via a flange structure (6), a tower barrel (9) is installed on the steel transition section (7) via a sleeve (8) with a conical plate, and the distance between the top of the tower barrel (9) and the ground foundation (1) is greater than 200m.
10. A construction method of a UHPC wind power tower with a ground anchor bundle based on UHPC according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: prefabricate the UHPC tower column unit (201) and prefabricate or assemble the tower column transition section (3) in a factory; S2: constructing a ground foundation (1), hoisting a plurality of UHPC tower column units (201) in the first-layer UHPC tower column segment (2) to the ground foundation (1) and installing and fixing them, then connecting the first-layer tower column transition section (3) to the UHPC tower column units (201) below it through its UHPC transition section (301) to form a whole on the UHPC tower column segment (2) of the first layer below, and tensioning a ground anchor bundle (4) between the tower column transition section (3) and the ground foundation (1); S3: A plurality of UHPC tower column units (201) in the UHPC tower column segment (2) of the second layer below are hoisted onto the tower column transition section (3) of the first layer below, and are installed and fixed by connecting the UHPC transition section (301) of the tower column transition section (3) with the UHPC tower column unit (201) above it, and then the tower column transition section (3) of the second layer below is connected to the UHPC tower column unit (201) below it by connecting its UHPC transition section (301) to form a whole on the UHPC tower column segment (2) of the second layer below, and a ground anchor bundle (4) is tensioned between the tower column transition section (3) and the ground foundation (1); S4: Repeat step S3 until the installation of the uppermost tower column transition section (3) is completed, and then install the accessories and the tower tube (9) on the uppermost tower column transition section (3) to complete the construction.
Citation Information
Patent Citations
Tower drum of wind turbine generator system
CN102828917A
Fabricated prestressed concrete tower structure prefabricated in sections by pre-tensioning method
CN109930892A
Lattice prestressed concrete wind power tower
CN111173684A
Hybrid tower of wind driven generator
CN216741831U
UHPC (Ultra High Performance Concrete)-based wind power tower with ground anchor beam
CN219638978U
Cited By
Fabricated prestressed concrete frame tube tower wind power tower
CN119467224A
Three-column support-conical shell-box arch switching section suitable for wind power tower
CN119616779A
Wind turbine generator conversion device with paired rib plates
CN121363513A
Wind turbine generator concrete ring piece and design method thereof
CN121701012A