Data transmission method, base station, and storage medium
By receiving data requests and obtaining status information in the base station, determining the load migration node and controlling the user equipment to access the node, the data transmission instability caused by the base station overload is solved, and the data transmission stability between user equipment is improved .
Patent Information
- Application Number
- PCT/CN2023/135977
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-16
- Filing Date
- 2023-12-01
- Publication Date
- 2024-11-21
AI Technical Summary
In a wireless communication system, when the base station is running under an overload state, it will affect the stability of data transmission between user equipment.
By receiving data requests from the user equipment and obtaining status information of the base station, the load migration node is determined, and the user equipment is controlled to access the node to share the load of the base station, thereby realizing data transmission.
It effectively reduces the operating load of the base station and improves the stability of data transmission between user equipment.
Smart Images

Figure CN2023135977_21112024_PF_FP_ABST
Abstract
Description
Data transmission method, base station and storage medium
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This disclosure is based on Chinese patent application 202310554923.0, filed on May 16, 2023, entitled “Data Transmission Method, Base Station and Storage Medium”, and claims the priority of the patent application, and all the contents disclosed therein are incorporated into this disclosure by reference. Technical Field
[0003] The present disclosure relates to the field of communication technologies, and in particular to a data transmission method, a base station, and a storage medium. Background Art
[0004] In wireless communication systems, base stations can exchange information with terminal devices (such as user equipment) within their coverage area. With the further development of wireless communication technology, the content of information transmitted by user equipment through base stations has become increasingly rich, and the amount of data transmitted between base stations and user equipment has also increased. However, when the amount of data transmitted between a base station and a user equipment exceeds a preset value, it will place a heavy burden on the base station, causing the base station to operate in an overloaded state. If a user equipment transmits data through a base station operating in an overloaded state, the stability of data transmission between the user equipment may be affected.
[0005] Therefore, how to improve the stability of data transmission between user devices is a hot topic being studied by those skilled in the art.
[0006] Summary of the Invention
[0007] The main purpose of the embodiments of the present disclosure is to provide a data transmission method, a base station and a storage medium, which aim to solve the problem of unstable data transmission between user devices caused by overload operation of the base station, so as to improve the stability of data transmission between user devices.
[0008] In a first aspect, an embodiment of the present disclosure provides a data transmission method, applied to a base station, the method comprising:
[0009] receiving a data request from a first user equipment and obtaining status information of a base station;
[0010] Determine the load migration node based on data request and status information;
[0011] The first user equipment is controlled to access the load migration node, and in response to a data request, the second user equipment is controlled to perform data transmission with the first user equipment through the load migration node.
[0012] In a second aspect, an embodiment of the present disclosure further provides a base station, comprising: a processor, a memory, a computer program stored in the memory and executable by the processor, and a data bus for realizing connection and communication between the processor and the memory, wherein when the computer program is executed by the processor, the steps of the aforementioned data transmission method are implemented.
[0013] In a third aspect, an embodiment of the present disclosure further provides a storage medium for computer-readable storage, characterized in that the storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the steps of the aforementioned data transmission method.
[0014] An embodiment of the present disclosure provides a data transmission method, a base station, and a storage medium, wherein the data transmission method is applied to the base station. The method receives a data request from a first user device and obtains status information of the base station; determines a load migration node based on the data request and the status information; thereby controlling the first user device to access the load migration node, and controls the second user device to transmit data with the first user device through the load migration node in response to the data request. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.
[0016] FIG1 is a schematic diagram of an application scenario of a data transmission method provided by an embodiment of the present disclosure;
[0017] FIG2 is a flowchart of a data transmission method according to an embodiment of the present disclosure;
[0018] FIG3 is a schematic diagram of another application scenario of a data transmission method provided by an embodiment of the present disclosure;
[0019] FIG4 is a schematic diagram of a framework structure of a base station provided in an embodiment of the present disclosure. DETAILED DESCRIPTION
[0020] The following will clearly and completely describe the technical solutions in the embodiments of the present disclosure in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present disclosure, not all of them. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present disclosure without making any creative efforts shall fall within the scope of protection of the present disclosure.
[0021] The flowcharts shown in the accompanying drawings are for illustrative purposes only and do not necessarily include all contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may be decomposed, combined, or partially merged, so the actual execution order may vary depending on the actual situation.
[0022] It should be understood that the terms used in this disclosure are only for the purpose of describing particular embodiments and are not intended to limit the disclosure. As used in this disclosure and the appended claims, the singular forms "a," "an," and "the" are intended to include the plural forms unless the context clearly indicates otherwise.
[0023] The following embodiments of the present disclosure are described in detail with reference to the accompanying drawings. In the absence of conflict, the following embodiments and features therein may be combined with each other.
[0024] Please refer to FIG1 , which is a schematic diagram of an application scenario of a data transmission method provided by an embodiment of the present disclosure.
[0025] As shown in Figure 1, a data transmission system 100 includes a first user device 10, a base station 20, a second user device 30, and a load migration node 40. The operating state of the base station 20 includes a normal operating state and an overloaded operating state. When the base station 20 is in the overloaded operating state, the data transmission stability between the terminal device connected to the base station 20 and the base station is poor.
[0026] Exemplarily, the signal coverage range of the base station 20 is A. Within the signal coverage range of the base station 20, a first user device 10 and a second user device 30 access the base station 20. When data transmission is required between the first user device 10 and the second user device 30, if the base station 20 is in normal operation, the first user device 10 and the second user device 30 establish a communication connection with the base station 20 to establish a first communication link between the first user device 10 and the base station 20, and a second communication link between the base station 20 and the second user device 30, so that the first user device 10 and the second user device 30 can use the base station 20 as a data transfer station to transmit data between each other.
[0027] For example, when the second user device 30 stores the target data required by the first user device 10, the first user device 10 sends a data request to the base station 20. The base station queries and obtains the device information of the second user device 30 storing the target data based on the data request sent by the first user device 10. The base station 20 responds to the data request to obtain the corresponding target data from the second user device 30, and sends the target data to the first user device 10, thereby realizing data transmission between the first user device 10 and the second user device 30.
[0028] If the base station 20 is in an overloaded state, the base station 20 performs a load transfer operation. During the load transfer operation, the base station 20 first determines the load migration node 40 to which the load transfer operation is to be performed, controls the first user equipment 10 to access the load migration node 40, and responds to the data request of the first user equipment 40 to control the second user equipment 30 to perform data transmission with the first user equipment 10 through the load migration node 40. For example, based on the data request of the first user equipment 40, the base station 20 controls the load migration node 40 to access the second user equipment 30, obtains the corresponding target data from the second user equipment 30, and sends the target data to the first user equipment 10, thereby realizing data transmission between the first user equipment 10 and the second user equipment 30.
[0029] Please refer to FIG. 2 , which shows a data transmission method provided by an embodiment of the present disclosure. The data transmission method is applied to a base station in the aforementioned data transmission system.
[0030] As shown in FIG2 , the data transmission method is applied to a base station 20 , and the data transmission method includes steps S101 to S103 .
[0031] Step S101: receiving a data request from a first user equipment, and obtaining status information of the base station.
[0032] Exemplarily, when a user wants to download target data through the first user device 10, he can control the first user device 10 to send a data request to the base station 20. The data request includes the identity information of the first user device and the target data to be downloaded by the first user device.
[0033] After receiving the data request from the first user equipment 10, the base station 20 obtains its own status information. The status information is used to represent the current operating status of the base station. The status information can be used to analyze whether the base station 20 is overloaded. After obtaining its own status information, the base station 20 can execute corresponding response strategies based on the status information. For example, if the base station 20 detects that it is in an overloaded operating state based on the status information, it can perform load migration operations to reduce its own operating load.
[0034] It is understood that user devices include but are not limited to mobile phones, tablets, notebooks, smart bracelets, smart watches, smart glasses, etc.
[0035] Step S102: Determine a load migration node according to the data request and the status information.
[0036] Exemplarily, after receiving the data request, the base station 20 determines whether load migration is required based on its own status information. When load migration is required, the base station 20 screens load migration nodes that meet preset requirements based on the data request, so that the load of the base station 20 can be shared by the load migration nodes. For example, the status information includes at least one of the communication quality between the terminal equipment accessing the base station and the base station, the data packet loss rate, and the number of terminal equipment accessing the base station. The base station 20 can analyze the current operating status of the base station itself as a normal operating state or an overloaded operating state based on the status information, wherein the operating state includes a normal operating state and an overloaded operating state. When the base station 20 is in an overloaded operating state, the base station 20 determines a load migration node 40 that meets the preset requirements based on the data request, and performs a load migration operation, so that the load migration node 40 takes on part of the work of the base station, thereby reducing the burden on the base station 20.
[0037] Alternatively, base station 20 periodically or randomly performs load migration node screening. For example, base station 20 records the number of data requests received. When the number of data requests reaches a preset number, base station 20 screens load migration nodes that meet preset requirements based on the data requests and status information, so that the load of base station 20 can be shared by the load migration nodes. For another example, each time base station 20 receives a data request, it screens load migration nodes that meet preset requirements based on the data requests and status information, and performs load migration operations, so that load migration nodes 40 can take over part of the base station's work, thereby reducing the burden on base station 20.
[0038] In one embodiment, determining the load migration node according to the data request and the status information includes:
[0039] Determining whether a load migration operation needs to be performed based on the status information;
[0040] When a load operation needs to be performed, a load migration node is determined according to the data request and a preset node selection strategy.
[0041] Exemplarily, the status information includes operating status information of the base station. After receiving the data request sent by the first user equipment 10, the base station 20 determines whether the current operating status of the base station 20 is an overloaded operating state based on its own status information. When the base station 20 is in an overloaded operating state, it may affect the data transmission stability and reliability of the user equipment that transmits data through the base station 20. That is, when the base station determines that the current operating state is an overloaded operating state based on its own status information, it determines that the base station needs to perform a load migration operation. Conversely, when the base station determines that the current operating state is a non-overloaded operating state (normal operating state) based on its own status information, it determines that the base station does not need to perform a load migration operation.
[0042] When a load operation needs to be performed, a load migration node is determined according to the data request and a preset node selection strategy, so that a load migration operation is performed through the load migration node to transfer part of the load of the base station 20, thereby reducing the burden on the base station itself.
[0043] In some implementations, the status information includes communication quality, and determining whether to perform a load migration operation based on the status information includes:
[0044] determining whether the communication quality satisfies a first condition, and when the communication quality satisfies the first condition, determining that the base station does not need to perform a load migration operation;
[0045] When the communication quality does not meet the first condition, it is determined that the base station needs to perform a load migration operation.
[0046] For example, the communication quality between a terminal device connected to base station 20 and base station 20, or the communication quality between terminal devices connected to base station 20 and other terminal devices, can reflect whether the current operating state of base station 20 is overloaded. That is, by determining whether the communication quality meets a preset first condition, it can be analyzed whether the operating state of base station 20 is overloaded, that is, it can be determined whether the base station needs to perform a load migration operation. For example, when the communication quality meets the first condition, it is determined that base station 20 does not need to perform a load migration operation; when the communication quality does not meet the first condition, it is determined that base station 20 needs to perform a load migration operation.
[0047] Exemplarily, the communication quality includes a data transmission rate, and the judgment of whether the communication quality meets the first condition includes: judging whether the data transmission rate is greater than a preset transmission rate value; when the data transmission rate is greater than the preset transmission rate value, judging that the communication quality meets the first condition; when the data transmission rate is less than or equal to the preset transmission rate value, judging that the communication quality does not meet the first condition.
[0048] Exemplarily, the communication quality includes a data packet loss rate, and the judging whether the communication quality satisfies the first condition includes: judging whether the data packet loss rate is less than a preset packet loss rate value; when the data packet loss rate is less than the preset packet loss rate value, judging that the communication quality satisfies the first condition; when the data packet loss rate is greater than or equal to the preset packet loss rate value, judging that the communication quality does not satisfy the first condition.
[0049] Exemplarily, the communication quality includes a data transmission rate and a data packet loss rate, and the judgment of whether the communication quality meets the first condition includes: judging whether the data transmission rate is greater than a preset transmission rate value, and judging whether the data packet loss rate is less than a preset packet loss rate value; when the data transmission rate is greater than the preset transmission rate value, and the data packet loss rate is less than the preset packet loss rate value, judging that the communication quality meets the first condition; otherwise, judging that the communication quality does not meet the first condition.
[0050] In some implementations, the status information includes the number of terminal devices connected to the base station, and determining whether to perform a load migration operation based on the status information includes:
[0051] Determining whether the number of terminal devices connected to the base station exceeds a preset number;
[0052] When the number of terminal devices accessing the base station exceeds a preset number, it is determined that the base station needs to perform a load migration operation.
[0053] Exemplarily, the terminal devices accessing the base station 20 include but are not limited to user devices. In order to ensure the communication quality of the terminal devices through the base station 20, the number of terminal devices accessed by the base station 20 needs to be within a preset number range. Therefore, when the number of terminal devices accessing the base station 20 exceeds the preset number, it indicates that the base station 20 is overloaded and a load migration operation needs to be performed to reduce the load of the base station.
[0054] In some implementations, determining a load migration node based on the data request and a preset node selection strategy includes:
[0055] determining a storage location of target data to be transmitted according to the data request;
[0056] When it is determined according to the storage location that the target data is stored in the second user equipment within the signal coverage of the base station, the target terminal equipment is screened out from the terminal equipment connected to the base station, and the target terminal equipment is used as a load migration node.
[0057] As shown in Figure 1, for example, base station 20 can obtain first data information stored in terminal devices within its own signal coverage, as well as second data information stored in terminal devices within the signal coverage of adjacent base stations with which it is in communication. Base station 20 determines the storage location of the target data from the first data information and the second data information. When it is determined based on the storage location that the target data is stored in a second user device 30 within the signal coverage of base station 20, the target terminal device is selected from the terminal devices connected to base station 20 and used as a load migration node.
[0058] In some implementations, screening out a target terminal device from terminal devices connected to the base station includes:
[0059] Obtaining device information of each terminal device accessing the base station, the device information including device performance information, storage space information, and distance information from the first user equipment;
[0060] Target terminal devices are screened from the terminal devices connected to the base station according to the device information.
[0061] Exemplarily, the device information of a terminal device can be used to evaluate whether the terminal device has the evaluation information to serve as a load migration node. Evaluation scores for different types of device information are preset. For example, the stronger the device performance, the higher the score of the device performance item. Similarly, the larger the storage space, the higher the score of the storage space item. The closer the distance between the terminal device and the first user device, the higher the score of the item. After obtaining the device information of each terminal device accessing the base station, the comprehensive score of each terminal device is calculated based on the evaluation of the device information of each terminal device, and the terminal device with the highest comprehensive score is used as the target terminal device.
[0062] In some implementations, determining a load migration node based on the data request and a preset node selection strategy includes:
[0063] determining a storage location of target data to be transmitted according to the data request;
[0064] When it is determined according to the storage location that the target data is stored in the second user equipment outside the signal coverage range of the base station, a target communication satellite is determined according to the first user equipment and the second user equipment, and the target communication satellite is used as the load migration node, wherein the first user equipment and the second user equipment are both within the satellite signal coverage range of the target communication satellite.
[0065] Exemplarily, the target communication satellite may be one or more, for example, the target communication satellite includes a first target communication satellite and a second target communication satellite, the first user equipment and the second target communication satellite are both within the satellite signal coverage of the first target communication satellite, and the second user equipment is within the satellite signal coverage of the second communication satellite.
[0066] Please refer to Figure 3. By way of example, the base station 20 includes a first base station 20a and a second base station 20b, wherein the first user equipment 10 is within the signal coverage range A of the first base station 20a, the second user equipment 30 is within the signal coverage range B of the second base station 20b, and the first base station 20a, the second base station 20b, the first user equipment 10 and the second user equipment 30 are all within the satellite signal coverage range C of the target communication satellite.
[0067] After the terminal device accesses the base station (such as the first base station 20a), the base station (such as the first base station 20a) can send a data query request to the terminal device accessing the base station, so that the terminal device responds to the data query request and sends its own stored data to the base station, so that the base station (such as the first base station 20a) can obtain the first data information stored in the terminal device within its own signal coverage range, and the second data information stored in the terminal device within the signal coverage range of the adjacent base station (such as the second base station 20b) to which it is communicated.
[0068] The base station (e.g., the first base station 20a) determines the storage location where the target data is stored from the first data information and the second data information. When it is determined based on the storage location that the target data is stored in the second user device 30 outside the signal coverage range of the base station (e.g., the target data is stored in the second base station 20b outside the signal coverage range of the first base station 20a), the base station determines the target communication satellite based on the first user device 10 and the second user device 30, and uses the target communication satellite as the load migration node 40, so that the first user device 10 and the second user device 30 can transmit data through the target communication satellite as a data transfer point, wherein the first user device 10 and the second user device 30 are both within the satellite signal coverage range of the target communication satellite.
[0069] Step S103: Control the first user equipment to access the load migration node, and control the second user equipment to perform data transmission with the first user equipment through the load migration node in response to the data request.
[0070] Exemplarily, after determining the load migration node, the base station 20 performs a load migration operation. During the load migration operation, the base station 20 sends a first instruction to the first user device 10 to control the first user device 10 to access the load migration node 40. After the first device 10 accesses the load migration node, the base station 20 responds to the data request and sends a data request to the second user device 30, so that the second user device 20 transmits the target data required by the first user device 10 to the load migration node 40, and transmits it to the first user device 10 through the load migration node 40, thereby realizing data transmission between the first user device 10 and the second user device 30.
[0071] In the above-mentioned embodiment of the present disclosure, during the process of data transmission through the base station, the first user equipment determines the load migration node based on the data request and status information, controls the first user equipment to access the load migration node, and controls the first user equipment to respond to the data request and transmit data with the second user equipment through the load migration node, that is, the load migration operation is performed using the load migration node to share part of the data transmission pressure of the base station, thereby effectively reducing the operating load of the base station, and further improving the stability of the user equipment in transmitting data through the base station.
[0072] Referring to FIG. 4 , in some embodiments, the base station 20 includes a processor 201 and a memory 202 . The processor 201 and the memory 202 are connected via a bus 203 , such as an I 2 C (Inter-integrated Circuit) bus.
[0073] Specifically, the processor 201 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor, or the processor may be any conventional processor, etc.
[0074] The memory 202 may be a Flash chip, a read-only memory (ROM) disk, an optical disk, a USB flash drive, or a mobile hard disk.
[0075] The processor 201 is configured to run a computer program stored in the memory 202 and implement the following steps when executing the computer program:
[0076] receiving a data request from a first user equipment and obtaining status information of the base station;
[0077] determining a load migration node according to the data request and the status information;
[0078] The first user equipment is controlled to access the load migration node, and in response to the data request, the second user equipment is controlled to perform data transmission with the first user equipment through the load migration node.
[0079] In some implementations, determining a load migration node according to the data request and the status information includes:
[0080] Determining whether a load migration operation needs to be performed based on the status information;
[0081] When a load operation needs to be performed, a load migration node is determined according to the data request and a preset node selection strategy.
[0082] In some implementations, the status information includes communication quality, and determining whether to perform a load migration operation based on the status information includes:
[0083] determining whether the communication quality satisfies a first condition, and when the communication quality satisfies the first condition, determining that the base station does not need to perform a load migration operation;
[0084] When the communication quality does not meet the first condition, it is determined that the base station needs to perform a load migration operation.
[0085] In some implementations, the communication quality includes a data transmission rate, and determining whether the communication quality satisfies a first condition includes:
[0086] Determining whether the data transmission rate is greater than a preset transmission rate value;
[0087] When the data transmission rate is greater than the preset transmission rate value, determining that the communication quality meets the first condition;
[0088] When the data transmission rate is less than or equal to the preset transmission rate value, it is determined that the communication quality does not meet the first condition.
[0089] In some implementations, the communication quality includes a data packet loss rate, and determining whether the communication quality satisfies the first condition includes:
[0090] Determining whether the data packet loss rate is less than a preset packet loss rate value;
[0091] When the data packet loss rate is less than the preset packet loss rate value, determining that the communication quality meets the first condition;
[0092] When the data packet loss rate is greater than or equal to the preset packet loss rate value, it is determined that the communication quality does not meet the first condition.
[0093] In some implementations, the status information includes the number of terminal devices connected to the base station, and determining whether to perform a load migration operation based on the status information includes:
[0094] Determining whether the number of terminal devices connected to the base station exceeds a preset number;
[0095] When the number of terminal devices accessing the base station exceeds a preset number, it is determined that the base station needs to perform a load migration operation.
[0096] In some implementations, determining a load migration node based on the data request and a preset node selection strategy includes:
[0097] determining a storage location of target data to be transmitted according to the data request;
[0098] When it is determined according to the storage location that the target data is stored in the second user equipment within the signal coverage of the base station, the target terminal equipment is screened out from the terminal equipment connected to the base station, and the target terminal equipment is used as a load migration node.
[0099] In some implementations, screening out a target terminal device from terminal devices connected to the base station includes:
[0100] Obtaining device information of each terminal device accessing the base station, the device information including device performance information, storage space information, and distance information from the first user equipment;
[0101] Target terminal devices are screened from the terminal devices connected to the base station according to the device information.
[0102] In some implementations, determining a load migration node based on the data request and a preset node selection strategy includes:
[0103] determining a storage location of target data to be transmitted according to the data request;
[0104] When it is determined according to the storage location that the target data is stored in the second user equipment outside the signal coverage range of the base station, a target communication satellite is determined according to the first user equipment and the second user equipment, and the target communication satellite is used as the load migration node, wherein the first user equipment and the second user equipment are both within the satellite signal coverage range of the target communication satellite.
[0105] In some embodiments, the target communication satellite includes a first target communication satellite and a second target communication satellite, the first user equipment and the second target communication satellite are both within the satellite signal coverage of the first target communication satellite, and the second user equipment is within the satellite signal coverage of the second communication satellite.
[0106] It should be noted that those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the base station described above can refer to the corresponding process in the aforementioned corresponding data transmission method embodiment, and will not be repeated here.
[0107] The embodiments of the present disclosure also provide a storage medium for computer-readable storage, wherein the storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the steps of the data transmission method of any embodiment provided in the specification of the embodiments of the present disclosure.
[0108] The storage medium may be an internal storage unit of the base station 20, such as a hard disk or memory of the base station 20. The storage medium may also be an external storage device of the base station 20, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc., equipped on the base station 20.
[0109] It will be appreciated by those skilled in the art that all or some of the steps, systems, and functional modules / units in the methods disclosed above may be implemented as software, firmware, hardware, and appropriate combinations thereof. In a hardware embodiment, the division between the functional modules / units mentioned in the above description does not necessarily correspond to the division of physical components; for example, a physical component may have multiple functions, or a function or step may be performed by several physical components in cooperation. Some or all physical components may be implemented as software executed by a processor, such as a central processing unit, a digital signal processor, or a microprocessor, or implemented as hardware, or implemented as an integrated circuit, such as an application-specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or non-transitory medium) and a communication medium (or temporary medium). As is well known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable, and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other medium that can be used to store the desired information and can be accessed by a computer. In addition, it is well known to those skilled in the art that communication media generally embodies computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.
[0110] It should be understood that the term "and / or" used in this disclosure and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, including these combinations. It should be noted that, in this article, the terms "include", "comprise" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system that includes a series of elements includes not only those elements, but also includes other elements that are not explicitly listed, or also includes elements that are inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "including a..." does not exclude the presence of other identical elements in the process, method, article or system that includes the element.
[0111] The serial numbers of the embodiments of the present disclosure are for description only and do not represent the advantages or disadvantages of the embodiments. The above description is only a specific embodiment of the present disclosure, but the scope of protection of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present disclosure, and these modifications or replacements should be included in the scope of protection of the present disclosure. Therefore, the scope of protection of the present disclosure should be based on the scope of protection of the claims.
Claims
1. A data transmission method, applied to a base station, the method comprising: receiving a data request from a first user equipment and acquiring status information of the base station; Determine a load migration node according to the data request and the status information; The first user equipment is controlled to access the load migration node, and in response to the data request, the second user equipment is controlled to perform data transmission with the first user equipment through the load migration node.
2. The data transmission method according to claim 1, wherein: The determining the load migration node according to the data request and the state information includes: Determining whether a load migration operation needs to be performed according to the status information; When a load operation needs to be performed, a load migration node is determined according to the data request and a preset node selection strategy.
3. The data transmission method according to claim 2, wherein: The state information includes communication quality, and judging whether to perform a load migration operation according to the state information includes: Determining whether the communication quality satisfies a first condition, and when the communication quality satisfies the first condition, determining that the base station does not need to perform a load migration operation; When the communication quality does not meet the first condition, it is determined that the base station needs to perform a load migration operation.
4. The data transmission method according to claim 3, wherein: The communication quality includes a data transmission rate, and the determining whether the communication quality satisfies a first condition includes: Determining whether the data transmission rate is greater than a preset transmission rate value; When the data transmission rate is greater than the preset transmission rate value, determining that the communication quality meets the first condition; When the data transmission rate is less than or equal to the preset transmission rate value, it is determined that the communication quality does not meet the first condition.
5. The data transmission method according to claim 3, wherein: The communication quality includes a data packet loss rate, and the determining whether the communication quality satisfies a first condition includes: Determining whether the data packet loss rate is less than a preset packet loss rate value; When the data packet loss rate is less than the preset packet loss rate value, judging that the communication quality meets the first condition; When the data packet loss rate is greater than or equal to the preset packet loss rate value, it is determined that the communication quality does not meet the first condition.
6. The data transmission method according to claim 2, wherein: The state information includes the number of terminal devices connected to the base station, and judging whether to perform a load migration operation according to the state information includes: Determining whether the number of terminal devices connected to the base station exceeds a preset number; When the number of terminal devices connected to the base station exceeds a preset number, it is determined that the base station needs to perform a load migration operation.
7. The data transmission method according to claim 2, wherein: The determining of the load migration node according to the data request and a preset node selection strategy includes: Determine the storage location of the target data to be transmitted according to the data request; When it is determined according to the storage location that the target data is stored in the second user equipment within the signal coverage of the base station, a target terminal device is screened out from the terminal devices connected to the base station, and the target terminal device is used as a load migration node.
8. The data transmission method according to claim 7, wherein: The step of screening out a target terminal device from the terminal devices connected to the base station includes: Acquire device information of each terminal device accessing the base station, the device information including device performance information, storage space information, and distance information from the first user equipment; The target terminal device is screened from the terminal devices connected to the base station according to the device information.
9. The data transmission method according to claim 2, wherein: The determining of the load migration node according to the data request and a preset node selection strategy includes: Determine the storage location of the target data to be transmitted according to the data request; When it is determined according to the storage location that the target data is stored in the second user equipment outside the signal coverage of the base station, a target communication satellite is determined according to the first user equipment and the second user equipment, and the target communication satellite is used as the load migration node, wherein the first user equipment and the second user equipment are both within the satellite signal coverage of the target communication satellite.
10. The data transmission method according to claim 9, wherein: The target communication satellites include a first target communication satellite and a second target communication satellite. The first user equipment and the second target communication satellite are both within the satellite signal coverage of the first target communication satellite, and the second user equipment is within the satellite signal coverage of the second communication satellite.
11. A base station, comprising: A processor, a memory, a computer program stored in the memory and executable by the processor, and a data bus for realizing connection and communication between the processor and the memory, wherein when the computer program is executed by the processor, the steps of the data transmission method according to any one of claims 1 to 10 are realized.
12. A storage medium for computer-readable storage, wherein the storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the steps of the data transmission method according to any one of claims 1 to 10.
Citation Information
Patent Citations
Load sharing method, base station, user device, load sharing node and system
CN102946618A
Base station load balancing method and base station load balancing device
CN103415041A
Automatic maintenance and tuning method for 5G small base station equipment
CN113891377A
Migration method and apparatus
US20150257070A1
Cited By
Data processing method for magic box to respond to inquiry instruction of base station