Energy storage capacity test and control method and apparatus, and system and storage medium
By adopting the energy storage capacity testing method of bidirectional converter and switching unit in the uninterruptible power supply system, the problem of low discharge test efficiency of the battery pack is solved, efficient battery capacity testing is achieved, and cost is reduced.
Patent Information
- Application Number
- PCT/CN2023/095952
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-24
- Publication Date
- 2024-11-28
AI Technical Summary
In the existing uninterruptible power supply system, all battery packs need to be charged and discharged through UPS, making it difficult to effectively test the actual discharge capacity of each battery pack, and the discharge time is long and the labor and time cost is high.
The energy storage capacity test and control method of a power supply system is adopted, including a bidirectional converter unit, an energy storage unit and a switching unit. The switching unit is connected to the bidirectional converter unit and the DC end of the load to realize the discharge and charging of the energy storage capacity. Test, control discharge power and voltage to ensure test efficiency and accuracy.
Effectively test the actual discharge capacity of each battery, reduce time and labor costs, and achieve accurate testing of the battery capacity of the uninterruptible power system.
Smart Images

Figure CN2023095952_28112024_PF_FP_ABST
Abstract
Description
Energy storage capacity testing and control method, device, system and storage medium Technical Field
[0001] The present application relates to the technical field of battery capacity testing, and in particular to a method, device, system and storage medium for testing and controlling energy storage capacity. Background Art
[0002] An uninterruptible power supply (UPS) is a constant-voltage, constant-frequency uninterruptible power supply with an energy storage device and an inverter as its main component. It is primarily used to provide uninterrupted power to computers, computer network systems, or other power electronic equipment.
[0003] To increase the backup power capacity of an uninterruptible power supply (UPS) system, multiple battery packs can be used to power the system. However, existing UPS battery capacity tests require all battery packs to be charged and discharged through a UPS, making it difficult to effectively test the actual discharge capacity of each battery pack. Furthermore, because battery discharge power is determined by the load power, if the load power is too low, the discharge time is long, resulting in high time and labor costs.
[0004] Summary of the Invention
[0005] The present application provides a method, device, system and storage medium for testing and controlling energy storage capacity, which solves the problem that in the battery capacity test of the existing uninterruptible power supply system, all battery packs need to be charged and discharged through the UPS, making it difficult to effectively test the actual discharge capacity of each battery pack.
[0006] To solve the above technical problems, a technical solution adopted in this application is to provide a method for testing and controlling the energy storage capacity of a power supply system, comprising:
[0007] The power supply system includes a bidirectional converter unit, at least one first energy storage unit, and at least one first switching unit, wherein at least one first switching unit corresponds to at least one first energy storage unit, each first energy storage unit is connected to a DC terminal of the bidirectional converter unit and a DC terminal of a load via the corresponding first switching unit, each first energy storage unit can supply power to the DC terminal of the load via the first switching unit during non-energy storage capacity testing, and the AC terminal of the bidirectional converter unit is connected to an AC voltage terminal. The method includes:
[0008] When the current capacity of one of the first energy storage units meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides the voltage to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and obtains the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit;
[0009] When one of the first energy storage units is discharged, the AC voltage end charges the corresponding first energy storage unit via the bidirectional conversion unit and the first switching unit, completing the energy storage capacity test of the corresponding first energy storage unit, and performing energy storage capacity tests on the remaining first energy storage units.
[0010] According to one embodiment of the present application, when one of the first energy storage units is discharged, the AC voltage end charges the corresponding first energy storage unit via the bidirectional conversion unit and the first switching unit, and completing the energy storage capacity test of the corresponding first energy storage unit further includes:
[0011] Obtaining a charging voltage and a charging current of the first energy storage unit during a charging process to calculate a second energy storage capacity of the first energy storage unit;
[0012] A test energy storage capacity of the first energy storage unit is calculated according to the first energy storage capacity and the second energy storage capacity.
[0013] According to one embodiment of the present application, the power supply system further includes a UPS unit for providing uninterruptible power supply to the load, each of the first energy storage units is connected to the DC end of the UPS unit via the corresponding first switching unit, the input end of the UPS unit is connected to the mains unit, the output end of the UPS unit is connected to the load, and the AC voltage end includes the input end of the UPS unit or the output end of the UPS unit;
[0014] When the current capacity of one of the first energy storage units meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides the voltage to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and obtaining the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit further includes:
[0015] When the current capacity of one of the first energy storage units meets the discharge test requirements and the output of the mains unit is normal, the first energy storage unit provides a first DC voltage to the DC end of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage end via the AC end of the bidirectional converter unit, and obtains the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit. At the same time, the mains unit provides electrical energy to the load via the UPS unit.
[0016] According to one embodiment of the present application, when the current capacity of one of the first energy storage units meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides the voltage to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and obtaining the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit further includes:
[0017] When the current capacity of one of the first energy storage units meets the discharge test requirements and the output of the mains unit is abnormal, the first energy storage unit provides a first DC voltage to the DC end of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage end via the AC end of the bidirectional converter unit, and obtains the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit. At the same time, the remaining first energy storage units provide a second DC voltage to the DC end of the UPS unit to provide electrical energy to the load.
[0018] According to one embodiment of the present application, in the step of the first energy storage unit providing a first DC voltage to the DC terminal of the bidirectional conversion unit via the first switching unit, so that the bidirectional conversion unit converts the first DC voltage into a first AC voltage and provides the first AC voltage to the AC voltage terminal via the AC terminal of the bidirectional conversion unit, the step further includes:
[0019] Controlling the discharge power of the bidirectional converter unit to be no higher than a preset power threshold;
[0020] Controlling the DC end discharge voltage of the bidirectional converter unit to be no lower than the minimum discharge voltage of the first energy storage unit, and controlling the DC end discharge current of the bidirectional converter unit to be no higher than the maximum discharge current of the first energy storage unit;
[0021] The AC output voltage of the bidirectional converter unit is controlled to be connected to the output of the UPS unit to provide power to the load.
[0022] According to one embodiment of the present application, when the current capacity of one of the first energy storage units meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides the voltage to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and before obtaining the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit, the method further includes:
[0023] Obtaining a first current time and determining whether the first current time is an energy storage capacity test time;
[0024] If so, obtaining the current capacity of each of the first energy storage units and determining whether each of the current capacities reaches a preset capacity threshold;
[0025] If so, determining that the current capacity of the first energy storage unit meets the discharge test requirements;
[0026] If not, the AC voltage end charges each of the first energy storage units via the bidirectional conversion unit and the first switching unit until the current capacity of all the first energy storage units reaches the preset capacity threshold.
[0027] According to one embodiment of the present application, after obtaining the first current time and determining whether the first current time is the energy storage capacity test time, the method further includes:
[0028] If not, each of the first energy storage units supplies power to the DC end of the load via the first switching unit.
[0029] According to one embodiment of the present application, the power supply system further includes a second switching unit and a second energy storage unit connected to the second switching unit, the second switching unit being connected to the first switching unit and the DC end of the bidirectional converter unit, respectively; after obtaining the first current time and determining whether the first current time is the energy storage capacity test time, the system further includes:
[0030] If not, determining whether the first current time is a preset mains peak and valley time, wherein the preset mains peak and valley time includes a preset mains peak time and a preset mains valley time;
[0031] If so, during the preset mains peak time, the second energy storage unit provides a third DC voltage to the DC terminal of the bidirectional conversion unit via the second switching unit, so that the bidirectional conversion unit converts the third DC voltage into a third AC voltage and provides the voltage to the AC voltage terminal via the AC terminal of the bidirectional conversion unit; during the preset mains valley time, the AC voltage terminal charges the second energy storage unit via the bidirectional conversion unit and the second switching unit;
[0032] If not, the bidirectional converter unit operates in a reactive power compensation mode.
[0033] According to one embodiment of the present application, the power supply system further includes a third switching unit, the third switching unit being respectively connected to the AC end of the bidirectional converter unit, the output end of the UPS unit, and the input end of the UPS unit. After determining whether the first current time is a preset mains peak and valley time, the system further includes:
[0034] If so, during the preset mains peak time, the second energy storage unit provides a fourth DC voltage to the DC end of the bidirectional conversion unit via the second switching unit and the third switching unit, so that the bidirectional conversion unit converts the fourth DC voltage into a fourth AC voltage and provides it to the AC voltage end via the AC end of the bidirectional conversion unit; during the preset valley time, the AC voltage end charges the second energy storage unit via the third switching unit, the bidirectional conversion unit and the second switching unit.
[0035] To solve the above technical problems, another technical solution adopted in this application is: to provide an energy storage capacity testing and control device, including: a first controller and a bidirectional converter unit connected to the first controller, and the first controller executes the energy storage capacity testing and control method.
[0036] According to one embodiment of the present application, the energy storage capacity testing and control device further includes: a first switching unit connected to the bidirectional conversion unit and the first controller.
[0037] According to one embodiment of the present application, the energy storage capacity testing and control device also includes: at least one first switching unit connected to the bidirectional converter unit and the first controller, and at least one first energy storage unit connected to each of the first switching units, each of the first energy storage units being connected to the DC end of the bidirectional converter unit and the DC end of the load via the corresponding first switching unit, each of the first energy storage units being able to supply power to the DC end of the load via the first switching unit during non-energy storage capacity testing time, and the AC end of the bidirectional converter unit being connected to the AC voltage end.
[0038] According to one embodiment of the present application, the energy storage capacity testing and control device also includes a second switching unit connected to the first controller and a second energy storage unit connected to the second switching unit, and the second switching unit is respectively connected to the first switching unit and the DC end of the bidirectional conversion unit.
[0039] According to one embodiment of the present application, the energy storage capacity testing and control device further includes a third switching unit connected to the first controller, and the third switching unit is respectively connected to the AC end and the AC voltage end of the bidirectional conversion unit.
[0040] In order to solve the above technical problems, another technical solution adopted in this application is: to provide a power supply system, including: the above energy storage capacity testing and control device and a UPS unit for providing uninterruptible power supply to the load.
[0041] According to one embodiment of the present application, the UPS unit includes a second controller, a rectifier, an inverter and a charger and discharger, the AC end of the rectifier is connected to the mains unit, the DC end of the rectifier and the DC end of the inverter are connected to one end of the charger and discharger, the other end of the charger and discharger is connected to each first energy storage unit through a DC bus, the AC end of the inverter is connected to the load, the charger and discharger, the rectifier and the inverter are all connected to the second controller, and the second controller is connected to the first controller.
[0042] According to one embodiment of the present application, the UPS unit includes a static switch, one end of the static switch is connected to the input end of the UPS unit, and the other end of the static switch is connected to the output end of the UPS unit.
[0043] According to one embodiment of the present application, the UPS unit includes a second controller, a charger and discharger, an inverter, and a static switch. One end of the charger and discharger is connected to the DC side of the inverter, and the other end of the charger and discharger is connected to each of the first energy storage units through a DC bus. The AC side of the inverter is connected to the load, one end of the static switch is connected to the input end of the UPS unit, and the other end of the static switch is connected to the output end of the UPS unit. The charger and discharger, the inverter, and the static switch are all connected to the second controller, and the second controller is connected to the first controller.
[0044] In order to solve the above technical problems, another technical solution adopted in this application is: providing a computer storage medium on which a computer program is stored, and when the computer program is executed by a processor, the above energy storage capacity testing and control method is implemented.
[0045] The beneficial effects of the present application are: when the current capacity of a first energy storage unit meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC end of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage end, and obtains the discharge voltage and discharge current during the discharge test to calculate the first energy storage capacity of the first energy storage unit; when the discharge of a first energy storage unit is completed, the AC voltage end charges the corresponding first energy storage unit via the bidirectional converter unit and the first switching unit, completes the energy storage capacity test of the corresponding first energy storage unit, and performs energy storage capacity tests on the remaining first energy storage units, which can effectively test the actual discharge capacity of each battery group with low time and labor costs, and solves the problem that in the battery capacity test of the existing uninterruptible power supply system, all battery groups need to be charged and discharged by the UPS, making it difficult to effectively test the actual discharge capacity of each battery group. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] FIG1 is a schematic structural diagram of a power supply system according to an embodiment of the present application;
[0047] FIG2 is a schematic structural diagram of a power supply system applied to a DC load according to an embodiment of the present application;
[0048] FIG3 is a schematic structural diagram of a power supply system in a state where an embodiment of the present application is applied to an AC load;
[0049] FIG4 is a schematic structural diagram of a power supply system in another state in which an embodiment of the present application is applied to an AC load;
[0050] FIG5 is a flow chart of a method for testing and controlling energy storage capacity of a power supply system according to an embodiment of the present application;
[0051] FIG6 is a schematic diagram of a discharging state of a power supply system according to an embodiment of the present application;
[0052] FIG7 is a schematic diagram of another discharge state of the power supply system according to an embodiment of the present application;
[0053] FIG8 is a power variation diagram of a bidirectional converter unit during an energy storage capacity test of a power supply system according to an embodiment of the present application;
[0054] FIG9 is a schematic diagram of a charging state of a power supply system according to an embodiment of the present application;
[0055] FIG10 is a power variation diagram of a bidirectional converter unit during an energy storage capacity test of a power supply system according to an embodiment of the present application;
[0056] 11 is a flow chart of a method for testing and controlling energy storage capacity of a power supply system according to another embodiment of the present application;
[0057] FIG12 is a schematic diagram of a charging state of a power supply system according to an embodiment of the present application;
[0058] FIG13 is a schematic structural diagram of a power supply system according to another embodiment of the present application;
[0059] FIG14 is a flow chart of a method for testing and controlling energy storage capacity of a power supply system according to another embodiment of the present application;
[0060] FIG15 is a schematic structural diagram of a power supply system according to another embodiment of the present application;
[0061] FIG16 is a flow chart of a method for testing and controlling energy storage capacity of a power supply system according to another embodiment of the present application;
[0062] FIG17 is a schematic diagram of the charge and discharge state of the power supply system of FIG16;
[0063] FIG18 is a schematic structural diagram of an energy storage capacity testing and control device according to an embodiment of the present application;
[0064] FIG19 is a schematic structural diagram of an energy storage capacity testing and control device according to another embodiment of the present application;
[0065] FIG20 is a schematic structural diagram of an energy storage capacity testing and control device according to an embodiment of the present application;
[0066] FIG21 is a schematic structural diagram of an energy storage capacity testing and control device according to another embodiment of the present application;
[0067] FIG22 is a schematic structural diagram of an energy storage capacity testing and control device according to another embodiment of the present application;
[0068] FIG23 is a schematic structural diagram of a power supply system according to another embodiment of the present application;
[0069] FIG24 is a schematic structural diagram of a UPS unit according to an embodiment of the present application;
[0070] FIG25 is a schematic structural diagram of a UPS unit according to another embodiment of the present application;
[0071] FIG26 is a schematic structural diagram of a UPS unit according to another embodiment of the present application;
[0072] FIG27 is a schematic diagram of the structure of a computer storage medium according to an embodiment of the present application. DETAILED DESCRIPTION
[0073] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.
[0074] Figure 1 provides a schematic diagram of the structure of a power supply system according to an embodiment of the present application. The power supply system 100 includes a bidirectional converter unit 101, at least one first energy storage unit 102, and at least one first switching unit 103. At least one first switching unit 103 corresponds to at least one first energy storage unit 102. Each first energy storage unit 102 is connected to the DC terminal of the bidirectional converter unit 101 and the DC terminal 104 of the load via the corresponding first switching unit 103. Each first energy storage unit 102 can supply power to the DC terminal 104 of the load via the first switching unit 103 during non-energy storage capacity testing. The AC terminal of the bidirectional converter unit 101 is connected to the AC voltage terminal 105.
[0075] In a feasible implementation, the bidirectional conversion unit 101 is used to implement DC-AC bidirectional conversion and may be a bidirectional converter including a DC end and an AC end.
[0076] In a feasible implementation, the first energy storage unit 102 is used for backup energy storage of the bidirectional conversion unit 101 , and multiple energy storage units may be provided. The embodiment of the present application is described using three as an example. The first energy storage unit 102 may be an energy storage battery.
[0077] In one feasible embodiment, the first switching unit 103 is used to control the switching between the first energy storage unit 102 and the bidirectional converter unit 101 or the DC end 104 of the load. It can be a switching switch, for example, such as an ATS (Automatic Transfer Switch) or an STS (Static Transfer Switch). The rated current of the first switching unit 103 is configured to be no higher than the maximum discharge current of the first energy storage unit 102 to which it is connected.
[0078] In one achievable embodiment, the load is applied to a data center and can be a DC load or an AC load. When the load is a DC load, the DC terminal 104 of the load is the DC terminal of the DC load, and the AC voltage terminal 105 is the input terminal of an uninterruptible power supply connected to the DC load. When the load is an AC load, the DC terminal 104 of the load is the DC terminal of the uninterruptible power supply connected to the AC load, and the AC voltage terminal 105 is the input terminal or output terminal of the uninterruptible power supply connected to the AC load.
[0079] Further, referring to Figures 2-4, the power supply system 100 also includes a UPS unit 106 for providing uninterruptible power supply to the load 108. Each first energy storage unit 102 is connected to the DC end of the UPS unit 106 via the corresponding first switching unit 103. The input end of the UPS unit 106 is connected to the AC power unit 107, and the output end of the UPS unit 106 is connected to the load 108. The AC voltage end 105 includes the input end of the UPS unit 106 or the output end of the UPS unit 106.
[0080] In this embodiment, when the load 108 is a DC load, the DC end of the load 108 is the DC end of the DC load, and the AC voltage end 105 is the input end of the UPS unit 106, as shown in FIG2 ; when the load 108 is an AC load, the DC end 104 of the load is the DC end of the UPS unit 106, and the AC voltage end 105 is the input end (as shown in FIG3 ) or the output end (as shown in FIG4 ) of the UPS unit 106. Preferably, the load 108 of this embodiment is an AC load, and the AC voltage end 105 is the output end of the UPS unit 106, as shown in FIG4 . During the discharge test of this embodiment, if the input power supply of the UPS unit 106 fails, the first energy storage unit 102 under test can still discharge to supply power to the load 108, thereby reducing the backup time and reducing the risk, and better ensuring the power supply time of the load 108.
[0081] FIG5 is a flow chart of a method for testing and controlling the energy storage capacity of a power supply system according to an embodiment of the present application. It should be noted that the method of the present application is not limited to the flow sequence shown in FIG5 if substantially the same results are achieved. As shown in FIG5 , the method includes the following steps:
[0082] Step S501: When the current capacity of a first energy storage unit meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC end of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage end via the AC end of the bidirectional converter unit, and obtains the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit.
[0083] In step S501, the energy storage capacity test includes a discharge test and a charge test. The discharge test requirements are met based on the current time and the current capacity of each first energy storage unit. When the current time is the energy storage capacity test time and the current capacity of each first energy storage unit reaches the preset capacity threshold, the discharge test requirements are met and the discharge test can be performed; otherwise, the discharge test requirements are not met and the discharge test cannot be performed. During the discharge test, the first energy storage capacity is the product of the discharge voltage, the discharge current and the discharge time. In a feasible embodiment, the first energy storage capacity can be used as the test energy storage capacity of the first energy storage unit.
[0084] In an achievable embodiment, taking an AC load and the AC voltage terminal 105 as the output terminal of the UPS unit 106 as an example, as shown in FIG6 , when the current capacity of a first energy storage unit 102 meets the discharge test requirements and the output of the mains unit 107 is normal, the first energy storage unit 102 is connected to the DC terminal of the bidirectional converter unit 101 through the corresponding first switching unit 103 (NC), and is disconnected from the DC terminal of the UPS unit 106 (NO). The remaining first energy storage units 102 are disconnected from the DC terminal of the bidirectional converter unit 101 through the corresponding first switching unit 103 and are connected to the DC terminal of the UPS unit 106. The first energy storage unit 102 provides a first DC voltage to the DC terminal of the bidirectional converter unit 101 via the first switching unit 103, so that the bidirectional converter unit 101 converts the first DC voltage into a first AC voltage and provides it to the output terminal of the UPS unit 106 via the AC terminal of the bidirectional converter unit 101 to power the load 108. At the same time, the mains unit 107 provides power to the load 108 via the UPS unit 106. In this embodiment, the discharge of the first energy storage unit 102 and the discharge of the UPS unit 106 jointly supply power to the load 108, which is equivalent to the first energy storage unit 102 and the mains unit 107 jointly supplying power, reducing the usage capacity of the mains unit 107 (i.e., shaving the mains peak). Furthermore, the discharge test can be performed during the mains peak power time, which can optimize electricity costs.
[0085] In a feasible embodiment, taking the AC load and the AC voltage terminal 105 as the output terminal of the UPS unit 106 as an example, as shown in FIG7 , when the current capacity of a first energy storage unit 102 meets the discharge test requirements, when the output of the mains unit 106 is abnormal, the first energy storage unit 102 is connected to the DC end of the bidirectional converter unit 101 through the corresponding first switching unit 103 (NC), and is disconnected from the DC end of the UPS unit 106 (NO), and the remaining first energy storage units 102 are connected to the bidirectional converter unit 101 through the corresponding first switching unit 103 (NC). The DC end of the bidirectional converter unit 101 is disconnected and connected to the DC end of the UPS unit 106. The first energy storage unit 102 provides a first DC voltage to the DC end of the bidirectional converter unit 101 via the first switching unit 103, so that the bidirectional converter unit 101 converts the first DC voltage into a first AC voltage and provides it to the output end of the UPS unit 106 via the AC end of the bidirectional converter unit 101 to power the load 108. At the same time, the remaining first energy storage units 102 provide a second DC voltage to the DC end of the UPS unit 106 to provide electrical energy to the load 108. In this embodiment, the discharge of the first energy storage units 102 and the discharge of the UPS units 106 jointly power the load 108, which is equivalent to all the first energy storage units 102 supplying power to the load, thereby better ensuring the power supply time of the load 108.
[0086] During the discharge test, the discharge power of the bidirectional converter unit is no greater than (equal to or less than) a preset power threshold; the DC-terminal discharge voltage of the bidirectional converter unit is no less than (equal to or greater than) the minimum discharge voltage of the first energy storage unit, and the DC-terminal discharge current of the bidirectional converter unit is no greater than (equal to or less than) the maximum discharge current of the first energy storage unit; and the AC-terminal output voltage of the bidirectional converter unit is grid-connected to the output of the UPS unit to provide power to the load. In this embodiment, grid connection means that the AC voltage, phase, and frequency of the outputs of the bidirectional converter unit and the UPS unit are consistent. When the discharge voltage (i.e., the DC-terminal voltage of the bidirectional converter unit) or the state of charge (SOC) of the first energy storage unit during the discharge test drops to a set value, the bidirectional converter unit is controlled to stop discharging. The corresponding discharge power is calculated based on the discharge current and discharge voltage of the first energy storage unit, and the energy storage capacity of the first energy storage unit after discharge is recorded and compared with a preset value to determine whether the capacity state of the first energy storage unit meets normal usage requirements. The preset value can be stored in a memory.
[0087] Step S502: After a first energy storage unit is discharged, the AC voltage end charges the corresponding first energy storage unit via the bidirectional conversion unit and the first switching unit, completing the energy storage capacity test of the corresponding first energy storage unit, and performing energy storage capacity tests on the remaining first energy storage units.
[0088] In step S502, it can be understood that a complete energy storage capacity test of a first energy storage unit includes two phases: a discharge test and a charge test. After the energy storage capacity test of a first energy storage unit is completed, the energy storage capacity test of the next first energy storage unit is performed, and the energy storage capacity test of all first energy storage units is completed. The power changes of the bidirectional converter units of the power supply system during the energy storage capacity test are shown in Figure 8. When the AC power measurement of the bidirectional converter unit is positive, the first energy storage unit is discharged. When the AC power measurement of the bidirectional converter unit is negative, the first energy storage unit is charged.
[0089] The charging test state of this embodiment is shown in Figure 9. Taking the AC load and the AC voltage terminal 105 as the output terminal of the UPS unit 106 as an example, the AC voltage terminal 105 charges the corresponding first energy storage unit 102 through the bidirectional conversion unit 101 and the first switching unit 103 until the capacity of the first energy storage unit 102 reaches the preset capacity threshold, and the remaining first energy storage units 102 are in a floating charge state.
[0090] In one feasible implementation, the charging voltage and charging current of the first energy storage unit 102 are obtained during the charging test to calculate the second energy storage capacity of the first energy storage unit 102 ; and the test energy storage capacity of the first energy storage unit 102 is calculated based on the first energy storage capacity and the second energy storage capacity.
[0091] In this embodiment, the second energy storage capacity is the product of the charging voltage, the charging current, and the charging time. In an achievable embodiment, the test energy storage capacity of the first energy storage unit 102 is the average of the first energy storage capacity and the second energy storage capacity of the same first energy storage unit 102.
[0092] Through the above method, the present application can effectively test the actual discharge capacity of each battery group in the scenario where multiple battery groups are used to supply power to the backup power supply, with low time and labor costs.
[0093] In a feasible implementation, the discharge test can be performed during the preset mains peak time, and the charging test can be performed during the preset mains valley time. The preset mains peak time refers to the period of high electricity prices, and the preset mains valley time refers to the period of low electricity prices, as shown in Figure 10, which can achieve the effect of optimizing electricity costs.
[0094] Based on the above embodiment, further referring to FIG. 11 , before step S501, the following steps are further included:
[0095] Step S1101: obtaining a first current time and determining whether the first current time is an energy storage capacity test time;
[0096] In this step, the energy storage capacity test time can be set by the user and adjusted according to actual conditions, for example, based on the peak and off-peak hours of the mains power supply or the energy storage test interval. If the first current time is the energy storage capacity test time, step S1103 is executed. If the first current time is not the energy storage capacity test time, that is, it is not the energy storage capacity test time, step S1102 is executed.
[0097] Step S1102: If not, each first energy storage unit supplies power to the DC terminal of the load via the first switching unit.
[0098] Step S1103: If yes, obtain the current capacity of each first energy storage unit and determine whether each current capacity reaches a preset capacity threshold.
[0099] In this step, the energy storage capacity test requires that each first energy storage unit be fully charged. This means that a first energy storage unit is fully charged when its current capacity reaches a preset capacity threshold. The preset capacity threshold can be set by the user and adjusted based on actual conditions. If each current capacity reaches the preset capacity threshold, step S1104 is executed. If the current capacity of at least one first energy storage unit does not reach the preset capacity threshold, step S1105 is executed.
[0100] Step S1104: If yes, determine whether the current capacity of the first energy storage unit meets the discharge test requirements.
[0101] In this step, as shown in Figure 12, when the current capacity of the first energy storage unit 102 meets the discharge test requirements, the current capacity of each first energy storage unit 102 reaches the preset capacity threshold, and the bidirectional converter unit 101 is in reactive power compensation mode, that is, the bidirectional converter unit 101 can be used to compensate for reactive power and can increase the output power factor to close to 1.
[0102] Step S1105: If not, the AC voltage end charges each first energy storage unit via the bidirectional conversion unit and the first switching unit until the current capacity of all first energy storage units reaches a preset capacity threshold.
[0103] Figure 13 provides a structural schematic diagram of a power supply system of another embodiment of the present application. The power supply system 100 also includes a second switching unit 109 and a second energy storage unit 110 connected to the second switching unit 109. The second switching unit 109 is respectively connected to the first switching unit 103 and the DC end of the bidirectional conversion unit 101.
[0104] In one feasible embodiment, the second switching unit 109 is used to implement switching between the bidirectional converter unit 101 and the first switching unit 103 and the second energy storage unit 110, and can be a switching switch, such as an ATS or STS, for example. The second energy storage unit 110 can be a long-duration battery. During non-energy storage capacity testing time, the connection between the second switching unit 109 and the second energy storage unit 110 is connected, and the connection between the second switching unit 109 and the first switching unit 103 is disconnected. The bidirectional converter unit 101 can be used to implement the mains peak and frequency regulation function, and the second energy storage unit 110 can be combined to implement the mains peak regulation function.
[0105] Please refer to FIG. 14 . After step S1101 , the following steps are further included:
[0106] Step S1106: If not, determining whether the first current time is a preset mains power peak or valley time;
[0107] In this embodiment, the preset mains peak and valley times include a preset mains peak time and a preset mains valley time. If yes, step S1107 is executed, and if no, step S1108 is executed.
[0108] Step S1107: If yes, then during a preset mains peak time, the second energy storage unit provides a third DC voltage to the DC terminal of the bidirectional converter unit via the second switching unit, so that the bidirectional converter unit converts the third DC voltage into a third AC voltage and provides the voltage to the AC voltage terminal via the AC terminal of the bidirectional converter unit; during a preset mains off-peak time, the AC voltage terminal charges the second energy storage unit via the bidirectional converter unit and the second switching unit;
[0109] In this embodiment, the second energy storage unit is discharged during the preset mains peak hours, and is charged during the preset mains valley hours, thereby optimizing electricity costs.
[0110] Step S1108: If not, the bidirectional converter unit operates in reactive power compensation mode.
[0111] In this embodiment, during non-energy storage capacity test time, the connection between the second switching unit and the second energy storage unit is connected, and the connection between the second switching unit and the first switching switch is disconnected. The bidirectional converter unit operates in reactive compensation mode during non-preset mains peak and valley times, uses the second energy storage unit to discharge during preset mains peak times, and charges the second energy storage unit during preset mains valley times, thereby optimizing electricity costs.
[0112] Figure 15 provides a structural schematic diagram of the power supply system of another embodiment of the present application. The power supply system 100 also includes a third switching unit 111, which is respectively connected to the AC end of the bidirectional conversion unit 101, the output end of the UPS unit 106, and the input end of the UPS unit 106.
[0113] In a feasible embodiment, the third switching unit 111 is used to implement switching between the AC end of the bidirectional converter unit 101 and the output end of the UPS unit 106 or the input end of the UPS unit 106, and can be a switching switch, such as an ATS or STS.
[0114] Based on the above embodiment, further referring to FIG. 16 , after step S1106, the following steps are further included:
[0115] Step S1109: If yes, then during the preset mains peak time, the second energy storage unit provides a fourth DC voltage to the DC end of the bidirectional converter unit via the second switching unit and the third switching unit, so that the bidirectional converter unit converts the fourth DC voltage into a fourth AC voltage and provides it to the AC voltage end via the AC end of the bidirectional converter unit; during the preset mains valley time, the AC voltage end charges the second energy storage unit via the third switching unit, the bidirectional converter unit and the second switching unit. As shown in FIG17 , the second energy storage unit 110 is connected to the bidirectional converter unit 101 through the second switching unit 109, and the bidirectional converter unit 101 is connected to the output end of the UPS unit 106 through the third switching unit 111.
[0116] This embodiment can use the second energy storage unit to perform peak shaving and valley filling (discharge during preset mains peak time and discharge during preset mains valley time) to reduce electricity costs. In one application scenario. Since the load power output by the UPS unit is relatively low, the peak and valley time cannot be fully utilized. For example, the long-delay battery capacity is configured to be 1000kWh, and the output load of the UPS unit is only 100kW. The long-delay battery can be discharged for more than 6 hours, which exceeds the peak power period (usually 2 to 4 hours in a row); therefore, by connecting the third switching unit and the input AC bus of the UPS unit, if the input AC bus of the UPS unit is also equipped with other loads, the second energy storage unit can supply power to the UPS unit and other loads at the same time, which can make greater use of the mains peak power period to discharge and reduce electricity costs.
[0117] Please refer to Figure 18. An embodiment of the present application also provides an energy storage capacity testing and control device. The device 200 includes a first controller 201 and a bidirectional converter unit 101 connected to the first controller 201. The first controller 201 executes the above-mentioned energy storage capacity testing and control method.
[0118] Furthermore, referring to FIG. 19 , the device 200 further includes: a first switching unit 103 connected to the bidirectional conversion unit 101 and the first controller 201 .
[0119] Further, referring to Figure 20, the device 200 also includes: at least one first switching unit 103 connected to the bidirectional conversion unit 101 and the first controller 201, and at least one first energy storage unit 102 connected to each first switching unit 103. Each first energy storage unit 102 is connected to the DC end of the bidirectional conversion unit 101 and the DC end 104 of the load via the corresponding first switching unit 103. Each first energy storage unit 102 can supply power to the DC end 104 of the load via the first switching unit 103 during non-energy storage capacity testing time, and the AC end of the bidirectional conversion unit 101 is connected to the AC voltage end 105.
[0120] Further, referring to Figure 21, the device 200 also includes: a second switching unit 109 connected to the first controller 201 and a second energy storage unit 110 connected to the second switching unit 109, and the second switching unit 109 is respectively connected to the first switching unit 103 and the DC end of the bidirectional conversion unit 101.
[0121] Furthermore, referring to FIG. 22 , the device 200 further includes a third switching unit 111 connected to the first controller 201 , and the third switching unit 111 is connected to the AC end and the AC voltage end 105 of the bidirectional converter unit 101 , respectively.
[0122] Please refer to Figure 23. An embodiment of the present application also provides a power supply system. The power supply system 300 includes: the above-mentioned energy storage capacity testing and control device 200 and a UPS unit 106 for providing uninterruptible power supply to the load.
[0123] Further, referring to FIG24 , the UPS unit 106 includes a second controller 1061, a rectifier 1062, an inverter 1063, and a charger / discharger 1064. In one embodiment, in conjunction with FIG20 , the AC end of the rectifier 1062 is connected to the mains unit 107, the DC end of the rectifier 1062 and the DC end of the inverter 1063 are connected to one end of the charger / discharger 1064, the other end of the charger / discharger 1064 is connected to each first energy storage unit 102 via a DC bus, the AC end of the inverter 1063 is connected to the load 108, the charger / discharger 1064, the rectifier 1062, and the inverter 1063 are all connected to the second controller 1061, and the second controller 1061 is connected to the first controller 201.
[0124] Further, referring to FIG. 25 , the UPS unit 106 includes a static switch 1065 , one end of the static switch 1065 is connected to the input end of the UPS unit 106 , and the other end of the static switch 1065 is connected to the output end of the UPS unit 106 .
[0125] Further, referring to FIG26 , the UPS unit 106 includes a second controller 1061, a charger / discharger 1064, an inverter 1063, and a static switch 1065. In one embodiment, in conjunction with FIG20 , one end of the charger / discharger 1064 is connected to the DC side of the inverter 1063, the other end of the charger / discharger 1064 is connected to each first energy storage unit 102 via a DC bus, the AC side of the inverter 1063 is connected to the load 108, one end of the static switch 1065 is connected to the input end of the UPS unit 106, and the other end of the static switch 1065 is connected to the output end of the UPS unit 106. The charger / discharger 1064, the inverter 1063, and the static switch 1065 are all connected to the second controller 1061, and the second controller 1061 is connected to the first controller 201.
[0126] Refer to Figure 27, which is a schematic diagram of the structure of the computer storage medium of an embodiment of the present application. The computer storage medium of the embodiment of the present application stores a program file 271 that can implement all the above methods, wherein the program file 271 can be stored in the above-mentioned computer storage medium in the form of a software product, including a number of instructions for causing a computer device (which can be a personal computer, server, or network device, etc.) or a processor to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned computer storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or terminal devices such as a computer, a server, a mobile phone, and a tablet.
[0127] In the several embodiments provided in this application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are merely schematic. For example, the division of units is only a logical function division. In actual implementation, there may be other division methods, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interface, device or unit, which can be electrical, mechanical or other forms.
[0128] In addition, the functional units in the various embodiments of the present application may be integrated into a single processing unit, or each unit may exist physically separately, or two or more units may be integrated into a single unit. The aforementioned integrated units may be implemented in the form of hardware or software functional units.
[0129] The above is only an implementation method of the present application and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the description and drawings of this application, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for testing and controlling energy storage capacity of a power supply system, characterized in that: The power supply system includes a bidirectional converter unit, at least one first energy storage unit and at least one first switching unit, at least one first switching unit corresponds to at least one first energy storage unit, each first energy storage unit is respectively connected to a DC end of the bidirectional converter unit and a DC end of a load via the corresponding first switching unit, each first energy storage unit can supply power to the DC end of the load via the first switching unit during a non-energy storage capacity test time, and the AC end of the bidirectional converter unit is connected to an AC voltage end, and the method includes: When the current capacity of one of the first energy storage units meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and obtains the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit; When one of the first energy storage units is discharged, the AC voltage end charges the corresponding first energy storage unit via the bidirectional conversion unit and the first switching unit, completes the energy storage capacity test of the corresponding first energy storage unit, and performs energy storage capacity tests on the remaining first energy storage units.
2. The energy storage capacity testing and control method according to claim 1, characterized in that: When the discharge of one of the first energy storage units is completed, the AC voltage end charges the corresponding first energy storage unit via the bidirectional conversion unit and the first switching unit, and completing the energy storage capacity test of the corresponding first energy storage unit further includes: Acquiring a charging voltage and a charging current of the first energy storage unit during a charging process to calculate a second energy storage capacity of the first energy storage unit; A test energy storage capacity of the first energy storage unit is calculated according to the first energy storage capacity and the second energy storage capacity.
3. The energy storage capacity testing and control method according to claim 1, characterized in that: The power supply system also includes a UPS unit for providing uninterrupted power supply to the load, each of the first energy storage units is connected to the DC end of the UPS unit via the corresponding first switching unit, the input end of the UPS unit is connected to the mains unit, the output end of the UPS unit is connected to the load, and the AC voltage end includes the input end of the UPS unit or the output end of the UPS unit; When the current capacity of one of the first energy storage units meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and obtaining the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit also includes: When the current capacity of one of the first energy storage units meets the discharge test requirements and the output of the AC power unit is normal, the first energy storage unit provides a first DC voltage to the DC end of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage end via the AC end of the bidirectional converter unit, and obtains the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit. At the same time, the AC power unit provides electrical energy to the load via the UPS unit.
4. The energy storage capacity testing and control method according to claim 3 is characterized in that: When the current capacity of one of the first energy storage units meets the discharge test requirements, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and obtaining the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit also includes: When the current capacity of one of the first energy storage units meets the discharge test requirements and the output of the AC power unit is abnormal, the first energy storage unit provides a first DC voltage to the DC end of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage end via the AC end of the bidirectional converter unit, and obtains the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit. At the same time, the remaining first energy storage units provide a second DC voltage to the DC end of the UPS unit to provide electrical energy to the load.
5. The energy storage capacity testing and control method according to claim 4, characterized in that: In the step of the first energy storage unit providing a first DC voltage to the DC terminal of the bidirectional conversion unit via the first switching unit, so that the bidirectional conversion unit converts the first DC voltage into a first AC voltage and provides the first AC voltage to the AC voltage terminal via the AC terminal of the bidirectional conversion unit, the step further includes: Controlling the discharge power of the bidirectional converter unit to be no higher than a preset power threshold; Controlling the discharge voltage at the DC end of the bidirectional converter unit to be not lower than the minimum discharge voltage of the first energy storage unit, and the discharge current at the DC end of the bidirectional converter unit to be not higher than the maximum discharge current of the first energy storage unit; The AC output voltage of the bidirectional converter unit is controlled to be connected to the output end of the UPS unit to provide electrical energy to the load.
6. The energy storage capacity testing and control method according to claim 4, characterized in that: When the current capacity of one of the first energy storage units meets the discharge test requirement, the first energy storage unit provides a first DC voltage to the DC terminal of the bidirectional converter unit via the first switching unit, so that the bidirectional converter unit converts the first DC voltage into a first AC voltage and provides it to the AC voltage terminal via the AC terminal of the bidirectional converter unit, and before obtaining the discharge voltage and discharge current of the first energy storage unit during the discharge test to calculate the first energy storage capacity of the first energy storage unit, the method further includes: Obtaining a first current time and determining whether the first current time is an energy storage capacity test time; If so, obtaining the current capacity of each of the first energy storage units and determining whether each of the current capacities reaches a preset capacity threshold; If yes, it is determined that the current capacity of the first energy storage unit meets the discharge test requirements; If not, the AC voltage end charges each of the first energy storage units via the bidirectional conversion unit and the first switching unit until the current capacity of all the first energy storage units reaches the preset capacity threshold.
7. The energy storage capacity testing and control method according to claim 6, characterized in that: After obtaining the first current time and determining whether the first current time is the energy storage capacity test time, the method further includes: If not, each of the first energy storage units supplies power to the DC end of the load via the first switching unit.
8. The energy storage capacity testing and control method according to claim 7, characterized in that: The power supply system further includes a second switching unit and a second energy storage unit connected to the second switching unit, wherein the second switching unit is respectively connected to the first switching unit and the DC end of the bidirectional converter unit; after obtaining the first current time and determining whether the first current time is the energy storage capacity test time, the system further includes: If not, determining whether the first current time is a preset mains peak and valley time, wherein the preset mains peak and valley time includes a preset mains peak time and a preset mains valley time; If yes, then at the preset mains peak time, the second energy storage unit provides a third DC voltage to the DC terminal of the bidirectional converter unit via the second switching unit, so that the bidirectional converter unit converts the first The three DC voltages are converted into a third AC voltage and provided to the AC voltage terminal via the AC terminal of the bidirectional conversion unit; during the preset mains off-peak time, the AC voltage terminal charges the second energy storage unit via the bidirectional conversion unit and the second switching unit; If not, the bidirectional converter unit operates in reactive power compensation mode.
9. The energy storage capacity testing and control method according to claim 8, characterized in that: The power supply system further includes a third switching unit, the third switching unit is respectively connected to the AC end of the bidirectional conversion unit, the output end of the UPS unit, and the input end of the UPS unit, and after determining whether the first current time is a preset city power peak and valley time, it also includes: If so, during the preset mains peak time, the second energy storage unit provides a fourth DC voltage to the DC end of the bidirectional conversion unit via the second switching unit and the third switching unit, so that the bidirectional conversion unit converts the fourth DC voltage into a fourth AC voltage and provides it to the AC voltage end via the AC end of the bidirectional conversion unit; during the preset mains valley time, the AC voltage end charges the second energy storage unit via the third switching unit, the bidirectional conversion unit and the second switching unit.
10. An energy storage capacity testing and control device, characterized in that: include: A first controller and a bidirectional converter unit connected to the first controller, wherein the first controller executes the energy storage capacity test and control method according to any one of claims 1 to 9.
11. The energy storage capacity testing and control device according to claim 10, characterized in that: Also includes: A first switching unit connected to the bidirectional conversion unit and the first controller.
12. The energy storage capacity testing and control device according to claim 11, characterized in that: Also includes: At least one first switching unit connected to the bidirectional converter unit and the first controller, and at least one first energy storage unit connected to each of the first switching units, each of the first energy storage units is respectively connected to the DC end of the bidirectional converter unit and the DC end of the load via the corresponding first switching unit, each of the first energy storage units can supply power to the DC end of the load via the first switching unit during non-energy storage capacity testing time, and the AC end of the bidirectional converter unit is connected to the AC voltage end.
13. The energy storage capacity testing and control device according to claim 12, characterized in that: It also includes a second switching unit connected to the first controller and a second energy storage unit connected to the second switching unit, and the second switching unit is connected to the first switching unit and the DC end of the bidirectional conversion unit respectively.
14. The energy storage capacity testing and control device according to claim 13, characterized in that: It also includes a third switching unit connected to the first controller, and the third switching unit is respectively connected to the AC end of the bidirectional conversion unit and the AC voltage end.
15. A power supply system, characterized in that: include: An energy storage capacity testing and control device as described in any one of claims 10-14, and a UPS unit for providing uninterruptible power supply to a load.
16. The power supply system according to claim 15, characterized in that: The UPS unit includes a second controller, a rectifier, an inverter and a charger and discharger. The AC end of the rectifier is connected to the mains unit, the DC end of the rectifier and the DC end of the inverter are connected to one end of the charger and discharger, the other end of the charger and discharger is connected to each first energy storage unit through a DC bus, the AC end of the inverter is connected to the load, the charger and discharger, the rectifier and the inverter are all connected to the second controller, and the second controller is connected to the first controller.
17. The power supply system according to claim 16, characterized in that: The UPS unit comprises a static switch, one end of the static switch is connected to the input end of the UPS unit, and the other end of the static switch is connected to the output end of the UPS unit.
18. The power supply system according to claim 15, characterized in that: The UPS unit includes a second controller, a charger and discharger, an inverter and a static switch. One end of the charger and discharger is connected to the DC side of the inverter, and the other end of the charger and discharger is connected to each of the first energy storage units through a DC bus. The AC side of the inverter is connected to the load. One end of the static switch is connected to the input end of the UPS unit, and the other end of the static switch is connected to the output end of the UPS unit. The charger and discharger, the inverter and the static switch are all connected to the second controller, and the second controller is connected to the first controller.
19. A computer storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the energy storage capacity testing and control method according to any one of claims 1 to 9 is implemented.
Citation Information
Patent Citations
System and method for controlling bidirectional direct current power supply of transformer substation
CN109449944A
Energy storage component testing system
CN109521369A
UPS energy storage battery test method and terminal device
CN109765492A
Finished battery pack charging and discharging test system based on Internet of Things
CN217901980U
Electric mobility apparatus
KR1020210115889A
Cited By
Energy storage test system
CN122386158A