Fabricated steel structure pouring-free concrete building structure for civil engineering

Through the combined design of rotary clips and auxiliary reinforcements, the problem of low installation strength and construction efficiency of cast-free prefabricated steel structure cross beams is solved, and rapid and high-strength cross beam fixation is achieved, reducing the number of bolts and construction time, and reducing the Dust and noise pollution.

WO2024240204A1PCT designated stage expired Publication Date: 2024-11-28CHONGQING UNIV OF ARTS & SCI

Patent Information

Application Number
PCT/CN2024/094842
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-25
Filing Date
2024-05-23
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

The installation strength of crossbeams in existing cast-free prefabricated steel structure buildings is affected by the support of multiple screws or bolts, and the construction period is long, dust and noise problems are present, and the number of screws is too large to lead to complex installation.

Method used

The connecting joint between the two supporting columns and the beam is fixed by rotary clips to reduce the number of bolts, and the installation strength of the beam is increased through the supporting piles of the auxiliary reinforcement, simplifying the installation process.

Benefits of technology

The rapid installation and high-strength fixation of the cross beam are achieved, which shortens the installation time, reduces the number of bolts, and reduces dust and noise pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024094842_28112024_PF_FP_ABST
    Figure CN2024094842_28112024_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed in the present invention is a fabricated steel structure pouring-free concrete building structure for civil engineering, comprising: two supporting columns, wherein a cavity is formed in each supporting column, and the top ends of the opposite side walls of the two supporting columns are each provided with a placement opening; a cross beam, provided between the two supporting columns, wherein two ends of the cross beam are each fixed to one connecting joint, and the connecting joint extends into the cavity by means of the placement opening; rotating clamping members, rotatably connected to the cavities, wherein when the connecting joint is not located in the cavity, each rotating clamping member does not block the placement opening, when the connecting joint is located in the cavity, the rotating clamping member rotates and blocks the placement opening, and the rotating clamping member, the supporting column, and the connecting joint are connected by means of a connecting member; and an auxiliary reinforcing member, located below the cross beam and fixed on the two supporting columns, wherein a plurality of supporting piles are slidably connected to the auxiliary reinforcing member, and the movable end of each supporting pile is used for supporting the cross beam. The present invention can reduce the number of used bolts, shorten the mounting time of the cross beam, and guarantee the mounting strength of the cross beam.
Need to check novelty before this filing date? Find Prior Art

Description

An assembled steel structure for civil engineering without pouring concrete building structure Technical Field

[0001] The present invention belongs to the technical field of assembled steel structure buildings, and in particular relates to an assembled steel structure free of pouring concrete building structure for civil engineering. Background Art

[0002] Traditional cast-concrete prefabricated building structures involve mixing pre-made cement, sand, gravel, and water and pouring them into pre-assembled steel structures. However, this construction process creates dust and noise issues, and is also time-consuming and difficult to construct. Consequently, prefabricated steel structures that avoid the need for cast-concrete are increasingly being adopted in construction.

[0003] Most cast-free prefabricated steel structures are used for the installation of beams, which makes the beams easy to install and have high installation efficiency. However, the installation strength of the cast-free prefabricated beams needs to be guaranteed. In the existing technology, the installation of cast-free prefabricated beams mostly uses a circle of screws or bolts to fix them on the supporting columns. This setting results in a large number of screws or bolts that need to be installed. At the same time, multiple screws support the beam, and its supporting strength is still affected.

[0004] Summary of the Invention

[0005] In order to solve the above technical problems, the present invention proposes an assembled steel structure for civil engineering without pouring concrete, which can reduce the number of bolts used and shorten the installation time of the beams while ensuring the installation strength of the beams.

[0006] To achieve the above-mentioned purpose, the present invention provides a prefabricated steel structure for civil engineering without pouring concrete, comprising:

[0007] The two supporting columns are each provided with a cavity, and the top ends of the opposite side walls of the two supporting columns are provided with a placement opening;

[0008] A crossbeam is provided between the two supporting columns, with a connecting joint fixed to each end of the crossbeam, and the connecting joint extends into the cavity through the placement opening;

[0009] A rotating clamp is rotatably connected in the cavity. When the connecting joint is not located in the cavity, the rotating clamp does not block the placement opening. When the connecting joint is located in the cavity, the rotating clamp rotates and blocks the placement opening. The rotating clamp, the support column, and the connecting joint are fixed by a connecting member.

[0010] The secondary reinforcement is located below the crossbeam and fixed on the two supporting columns. A plurality of supporting piles are slidably connected to the secondary reinforcement, and the movable ends of the supporting piles are used to support the crossbeam.

[0011] Furthermore, a central tube is provided at the axial center position of the cavity, the bottom end of the central tube is fixedly connected to the inner wall of the bottom end of the supporting column, the rotating clamp is rotatably connected to the central tube, and the end of the connecting joint away from the beam is adapted to the outer wall of the central tube.

[0012] Furthermore, the connecting joint includes a connecting seat arranged at both ends of the beam, and the side wall of the connecting seat is provided with an accommodating cavity for accommodating the end of the beam. A plurality of first bolts are threadedly connected to the connecting seat, and the ends of the first bolts are fixedly connected to the end of the beam. A clamp is fixedly connected to the end of the connecting seat away from the end of the beam, and the clamp extends into the supporting column through the placement port, and the outer wall of the clamp is adapted to the inner wall of the placement port.

[0013] Furthermore, an arc-shaped frame plate is fixedly connected to one end of the clamping head away from the connecting seat, and an arc-shaped surface of the arc-shaped frame plate away from one end of the connecting seat is closely matched with the outer wall of the central tube.

[0014] Furthermore, the rotating clamp includes a rotating ring sleeved on the central tube, and limiting rings are respectively provided on the upper and lower sides of the rotating ring, and the limiting rings are sleeved and fixed on the central tube. The two limiting rings support and limit the rotating ring, and two sliding rods are fixedly connected to the outer wall of the rotating ring, and mounting plates are fixed on the two sliding rods. A sealing plate is fixedly connected to the end of the mounting plate away from the rotating ring, and the sealing plate is used to seal the placement port above the clamping head.

[0015] Furthermore, the connecting member includes a first L-shaped connecting frame, one end face of the first L-shaped connecting frame is fixed to the side wall of the mounting plate away from the blocking plate, and the other end face of the first L-shaped connecting frame is fixed to the top end of the clamping head;

[0016] One end face of a second L-shaped connecting frame is fixedly connected to the connecting seat, and the other end face of the second L-shaped connecting frame is in contact with the outer wall of the supporting column. A second bolt is passed through the other end face of the second L-shaped connecting frame, and the end of the second bolt passes through the supporting column and the mounting plate and is fixedly connected to the mounting plate.

[0017] Furthermore, two groups of rotating clamps are provided, and the two groups of rotating clamps are respectively located on the upper and lower sides of the clamping head. A connecting plate is provided on one side wall of the mounting plates on the two groups of rotating clamps, and the two mounting plates are fixedly connected through the connecting plate.

[0018] Furthermore, the reinforcement member includes a reinforcement frame arranged outside the two support columns, the two ends of the reinforcement frame are respectively fixedly connected to the outer walls of the two support columns, and a plurality of sliding sleeves are slidably mounted on the reinforcement frame, and the top of the sliding sleeves is fixedly connected to the support piles.

[0019] Furthermore, the support pile includes a fixing seat fixed to the top end of the sliding sleeve, the fixing seat is threadedly connected to a support seat, and the top end of the support seat is in contact with the bottom end of the beam.

[0020] Furthermore, the bottom end of the support column is fixedly connected to a support base, and the support base is fixed on the ground.

[0021] Compared with the prior art, the present invention has the following advantages and technical effects:

[0022] 1. The crossbeam and the supporting column are connected by a connecting joint, so that the crossbeam is easy to install on the supporting column. At the same time, a rotating clamp is provided in the supporting column. When the crossbeam is connected to the supporting column, the rotating clamp is rotated and the rotating clamp and the connecting joint are connected to achieve effective fixation of the crossbeam and the supporting column. At the same time, the installation time of the crossbeam is shortened.

[0023] 2. A secondary reinforcement is provided under the beam, and the beam is supported by the support piles on the secondary reinforcement to ensure the installation strength of the beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings, which constitute part of this application, are intended to provide a further understanding of this application. The exemplary embodiments and descriptions of this application are intended to explain this application and do not constitute an improper limitation on this application. In the accompanying drawings:

[0025] Figure 1 is a perspective view of the connection between the support column and the beam;

[0026] FIG2 is a perspective view of a state where the rotating clamp does not correspond to the placement opening;

[0027] FIG3 is a perspective view of the corresponding state of the rotating clamp and the placement port;

[0028] FIG4 is a cross-sectional view of FIG3;

[0029] FIG5 is a perspective view of FIG3 with the support columns removed;

[0030] FIG6 is an exploded view of FIG5 ;

[0031] Among them, 1-support column, 2-cavity, 3-placement port, 4-crossbeam, 5-center tube, 6-connecting seat, 7-first bolt, 8-clamp, 9-arc-shaped frame, 10-rotating ring, 11-limiting ring, 12-slide rod, 13-mounting plate, 14-sealing plate, 15-first L-shaped connecting frame, 16-second L-shaped connecting frame, 17-second bolt, 18-connecting plate, 19-reinforcement frame, 20-slide sleeve, 21-fixed seat, 22-support seat, 23-support base, 24-third bolt; 25-fourth bolt, 26-top cover. DETAILED DESCRIPTION

[0032] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0033] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0034] 1-6, an assembled steel structure for civil engineering without pouring concrete comprises: two supporting columns 1, each of which has a cavity 2 formed therein, and a placement opening 3 formed at the top of the opposite side walls of the two supporting columns 1; a crossbeam 4, which is arranged between the two supporting columns 1, and a connecting joint is fixed at each end of the crossbeam 4, and the connecting joint extends into the cavity 2 through the placement opening 3; a rotating clamp, which is rotatably connected in the cavity 2, and when the connecting joint is not located in the cavity 2, the rotating clamp does not block the placement opening 3, and when the connecting joint is located in the cavity 2, the rotating clamp rotates and blocks the placement opening 3, and the rotating clamp, the supporting columns 1, and the connecting joint are fixed by the connecting member; a secondary reinforcement member is located below the crossbeam 4 and fixed on the two supporting columns 1, and a plurality of supporting piles are slidably connected to the secondary reinforcement member, and the movable ends of the supporting piles are used to support the crossbeam 4.

[0035] It is understandable that when installing the crossbeam 4, the rotating clamp does not correspond to the placement opening 3, so the placement opening 3 serves as a notch at the top of the support column 1, which is used to place the connecting joint, that is, determine the position of the two support columns 1, pre-install the connecting joints at both ends of the crossbeam 4, then hoist the crossbeam 4, make the connecting joint correspond to the placement opening 3 and lower it, so that the connecting joint is clamped with the support column 1 through the placement opening 3, so that the crossbeam 4 is supported, and then rotate the rotating clamp so that the rotating clamp corresponds to the connecting joint, move the position of the rotating clamp, and use the rotating clamp to seal the remaining area of ​​the placement opening 3 to prevent external water or dust from entering the cavity 2. At the same time, the rotating clamp, the support column 1, and the connecting joint are connected and fixed by the connecting piece, so that the support column 1 and the crossbeam 4 are connected to form an integral structure. After the above construction is completed, the secondary reinforcement is fixed on the two support columns 1. At the same time, the support piles are placed at different positions of the secondary reinforcement according to the actual support needs. The support piles are used to support different positions of the crossbeam 4.

[0036] During the above construction process, the crossbeam 4 is positioned and limited by the placement opening 3, so that the position of the crossbeam 4 is easy to determine. At the same time, under the action of the rotating clamp, the crossbeam 4 and the supporting column 1 can be quickly connected and effectively fixed to ensure the supporting strength of the crossbeam 4.

[0037] Further optimization scheme, referring to Figures 2, 3, 4, 5 and 6, a central tube 5 is provided at the axial position of the cavity 2, the bottom end of the central tube 5 is fixedly connected to the inner wall of the bottom end of the supporting column 1, the rotating clamp is rotatably connected to the central tube 5, and the end of the connecting joint away from the beam 4 is adapted to the outer wall of the central tube 5.

[0038] It can be understood that the cavity 2 inside the support column 1 makes its interior hollow. The support column 1 is a square steel pipe. The center pipe 5 is fixed inside the support column 1 and is located at the axis of the support column 1. The rotating clamp rotates around the center pipe 5. When the crossbeam 4 is not installed, the rotating clamp does not correspond to the side wall of the support column 1 with the placement opening 3, but corresponds to any side wall of the other three side walls. When the connecting joint enters the placement opening 3, the rotating clamp is manually rotated to correspond to the connecting joint, and the rotating clamp and the connecting joint are connected through the connecting structure.

[0039] 1 , a top cover 26 is fixed to the top of the support column 1. After the crossbeam 4 is installed, the top of the support column 1 is sealed by the top cover 26, thereby protecting the structure in the cavity 2.

[0040] Further optimization scheme, referring to Figures 2, 3, 4, 5 and 6, the connecting joint includes a connecting seat 6 arranged at both ends of the beam 4, and the side wall of the connecting seat 6 is provided with a accommodating cavity for accommodating the end of the beam 4. A plurality of first bolts 7 are threadedly connected to the connecting seat 6, and the ends of the first bolts 7 are fixedly connected to the end of the beam 4. A clamp 8 is fixed on the end of the connecting seat 6 away from the end of the beam 4, and the clamp 8 extends into the supporting column 1 through the placement opening 3, and the outer wall of the clamp 8 is adapted to the inner wall of the placement opening 3.

[0041] It can be understood that before installing the beam 4 on the supporting column 1, the connecting seat 6 is installed on both ends of the beam 4 through the first bolt 7. The connecting seat 6 can increase the end cross-sectional area of ​​the beam 4 and improve its force-bearing effect. At the same time, the connecting seat 6 is located outside the supporting column 1 and is fixed to the surface of the supporting column 1. The clamp 8 is used to support the connecting seat 6. At the same time, the other end of the clamp 8 extends into the cavity 2 through the placement port 3, and the clamp 8 located in the cavity 2 is connected and fixed to the rotating clamp.

[0042] Further optimization scheme, referring to Figures 2, 3, 4, 5 and 6, the end of the clamp 8 away from the connecting seat 6 is fixedly connected with an arc-shaped frame plate 9, and the arc surface of the arc-shaped frame plate 9 away from the connecting seat 6 is in close contact with the outer wall of the central tube 5.

[0043] It can be understood that the presence of the arc-shaped frame plate 9 further limits the clamping head 8. Since the arc-shaped surface of the arc-shaped frame plate 9 fits closely with the outer wall of the central tube 5, after the clamping head 8 is installed, the clamping head 8 cannot be offset under the action of the arc-shaped frame plate 9 and the central tube 5.

[0044] Further optimization scheme, referring to Figures 2, 3, 4, 5 and 6, the rotating clamp includes a rotating ring 10 mounted on the central tube 5, and limit rings 11 are respectively provided on the upper and lower sides of the rotating ring 10. The limit rings 11 are mounted and fixed on the central tube 5, and the two limit rings 11 support and limit the rotating ring 10. Two sliding rods 12 are fixed to the outer wall of the rotating ring 10, and a mounting plate 13 is fixed on the two sliding rods 12. A sealing plate 14 is fixed to the end of the mounting plate 13 away from the rotating ring 10, and the sealing plate 14 is used to seal the placement port 3 above the clamping head 8.

[0045] The limiting ring 11 located at the bottom is used to support the rotating ring 10, and the limiting ring 11 located at the top is used to limit the rotating ring 10. By rotating the rotating ring 10, the two slide bars 12 and the mounting plate 13 and the sealing plate 14 on the slide bar 12 are driven to rotate in the cavity 2. When the clamping head 8 is installed, the clamping head 8 blocks the bottom of the placement opening 3, and the placement opening 3 above the clamping head 8 is in an open state. Therefore, after rotating the rotating ring 10, the sealing plate 14 corresponds to the placement opening 3, and the mounting plate 13 is moved toward the placement opening 3 on the slide bar 12 to achieve the sealing of the placement opening 3 by the sealing plate 14.

[0046] Specifically, the length of the blocking plate 14 is smaller than that of the mounting plate 13 , that is, after the blocking plate 14 blocks the placement opening 3 , the outer wall of the mounting plate 13 fits into the inner wall of the support column 1 .

[0047] Further optimizing the scheme, referring to Figures 2, 3, 4, 5 and 6, the connecting member includes a first L-shaped connecting frame 15, one end face of the first L-shaped connecting frame 15 is fixed to the side wall of the mounting plate 13 away from the blocking plate 14, and the other end face of the first L-shaped connecting frame 15 is fixed to the top of the clamp 8;

[0048] One end face of the second L-shaped connecting frame 16 is fixed to the connecting seat 6, and the other end face of the second L-shaped connecting frame 16 is in contact with the outer wall of the supporting column 1. A second bolt 17 is passed through the other end face of the second L-shaped connecting frame 16, and the end of the second bolt 17 passes through the supporting column 1 and the mounting plate 13 and is fixed to the mounting plate 13.

[0049] Among them, the first L-shaped connecting frame 15 is fixed to the mounting plate 13 by the third bolt 24, and it moves with the mounting plate 13. A screw hole matching the fourth bolt 25 is opened on the clamp 8. After the sealing plate 14 is placed in the placement port 3, the fourth bolt 25 is installed on the other end face of the first L-shaped connecting frame 15, and the first L-shaped connecting frame 15 and the clamp 8 are fixed by the fourth bolt 25.

[0050] The second L-shaped connecting frame 16 is fixed to the connecting seat 6 by the fifth bolt. After the first L-shaped connecting frame 15 is fixed, the second bolt 17 is passed through the supporting column 1, the second L-shaped connecting frame 16 and the mounting plate 13 to fix the three.

[0051] Further optimization scheme, referring to Figures 5 and 6, there are two groups of rotating clamps, which are respectively located on the upper and lower sides of the clamping head 8. A connecting plate 18 is provided on one side wall of the mounting plate 13 on the two groups of rotating clamps, and the two mounting plates 13 are fixedly connected by the connecting plate 18.

[0052] In order to further improve the connection strength between the beam 4 and the supporting column 1, the rotating clamps are set into two groups. At the same time, the two mounting plates 13 are connected by a connecting plate 18. This structural setting enables the two mounting plates 13 to be away from the opening at one end of the connecting plate 18, thereby realizing the normal rotation of the mounting plates 13. At the same time, a first L-shaped connecting frame 15 and a second L-shaped connecting frame 16 should be provided to match the other group of rotating clamps.

[0053] When two sets of rotating clamps are provided, an accommodating groove is provided on the inner wall of the supporting column 1 , and the accommodating groove is used to accommodate the blocking plate 14 located below.

[0054] Further optimization scheme, referring to Figure 1, the reinforcement includes a reinforcement frame 19 arranged outside the two supporting columns 1, the two ends of the reinforcement frame 19 are respectively fixed to the outer walls of the two supporting columns 1, and a number of sliding sleeves 20 are slidably sleeved on the reinforcement frame 19, and the top of the sliding sleeve 20 is fixed to the support pile.

[0055] The reinforcement frame 19 is fixed on the supporting column 1, and the sliding sleeve 20 can change its position on the reinforcement frame 19 to achieve the change of the position of the supporting pile.

[0056] As a further optimization, referring to Figure 1 , the support pile includes a fixing base 21 fixed to the top of the sliding sleeve 20. A support base 22 is threadedly connected to the fixing base 21, and the top of the support base 22 contacts the bottom of the beam 4. The height of the support base 22 can be changed by rotating the support base 22. The support base 22 is used to support the portion of the beam 4 that is easily bent, thereby improving the supporting strength of the beam 4.

[0057] According to a further optimized solution, a support base 23 is fixed to the bottom end of the support column 1 , and the support base 23 is fixed on the ground.

[0058] It can be understood that the bottom end of the support column 1 can be connected to the support base 23 by bolting or casting, and the support base 23 can be fixed on the ground by casting.

[0059] The above are merely preferred embodiments of the present application, but the scope of protection of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this application should be included in the scope of protection of the present application. Therefore, the scope of protection of the present application should be based on the scope of protection of the claims.

Claims

1. A prefabricated steel structure for civil engineering without pouring concrete, characterized by: include, The two support columns (1) are each provided with a cavity (2) therein, and the top ends of the opposite side walls of the two support columns (1) are provided with a placement opening (3); A crossbeam (4) is arranged between the two supporting columns (1), and a connecting joint is fixed to each end of the crossbeam (4), and the connecting joint extends into the cavity (2) through the placement opening (3); A rotating clamp is rotatably connected in the cavity (2); when the connecting joint is not located in the cavity (2), the rotating clamp does not block the placement opening (3); when the connecting joint is located in the cavity (2), the rotating clamp rotates and blocks the placement opening (3); the rotating clamp, the supporting column (1) and the connecting joint are fixed by a connecting piece; The secondary reinforcement member is located below the cross beam (4) and fixed on the two supporting columns (1); a plurality of supporting piles are slidably connected to the secondary reinforcement member; and the movable ends of the supporting piles are used to support the cross beam (4).

2. The prefabricated steel structure for civil engineering without pouring concrete according to claim 1, characterized in that: A central tube (5) is provided at the axial center of the cavity (2); the bottom end of the central tube (5) is fixedly connected to the inner wall of the bottom end of the supporting column (1); the rotating clamp is rotatably connected to the central tube (5); and the end of the connecting joint away from the cross beam (4) is adapted to the outer wall of the central tube (5).

3. The prefabricated steel structure for civil engineering without pouring concrete according to claim 2, characterized in that: The connecting joint comprises a connecting seat (6) arranged at both ends of the cross beam (4), the side wall of the connecting seat (6) is provided with a receiving cavity for receiving the end of the cross beam (4), a plurality of first bolts (7) are threadedly connected to the connecting seat (6), the ends of the first bolts (7) are fixedly connected to the end of the cross beam (4), a clamp (8) is fixedly connected to the end of the connecting seat (6) away from the end of the cross beam (4), the clamp (8) extends into the supporting column (1) through the placement opening (3), and the outer wall of the clamp (8) is adapted to the inner wall of the placement opening (3).

4. The assembled steel structure for civil engineering without pouring concrete building structure according to claim 3 is characterized by: An arc-shaped frame plate (9) is fixedly connected to one end of the clamping head (8) away from the connecting seat (6), and the arc-shaped surface of the arc-shaped frame plate (9) away from the end of the connecting seat (6) fits closely with the outer wall of the central tube (5).

5. The prefabricated steel structure for civil engineering without pouring concrete according to claim 3, characterized in that: The rotating clamp comprises a rotating ring (10) sleeved on the central tube (5), and limit rings (11) are respectively arranged on the upper and lower sides of the rotating ring (10), and the limit rings (11) are sleeved and fixed on the central tube (5), and the two limit rings (11) support and limit the rotating ring (10), and the outer wall of the rotating ring (10) is fixedly connected with two sliding rods (12), and the two sliding rods (12) are fixedly provided with a mounting plate (13), and the mounting plate (13) is fixedly connected to one end of the mounting plate (13) away from the rotating ring (10), and the blocking plate (14) is used to block the placement opening (3) above the clamping head (8).

6. The assembled steel structure for civil engineering without pouring concrete building structure according to claim 5, characterized in that: The connecting member comprises a first L-shaped connecting frame (15), one end face of the first L-shaped connecting frame (15) is fixed to a side wall of the mounting plate (13) away from the blocking plate (14), and the other end face of the first L-shaped connecting frame (15) is fixed to the top end of the clamping head (8); One end face of a second L-shaped connecting frame (16) is fixedly connected to the connecting seat (6), and the other end face of the second L-shaped connecting frame (16) is in contact with the outer wall of the supporting column (1). A second bolt (17) is passed through the other end face of the second L-shaped connecting frame (16), and the end of the second bolt (17) passes through the supporting column (1) and the mounting plate (13) and is fixedly connected to the mounting plate (13).

7. The assembled steel structure without pouring concrete building structure for civil engineering according to claim 5, characterized in that: The rotating clamps are provided in two groups, and the two groups of rotating clamps are respectively located on the upper and lower sides of the clamp head (8); a connecting plate (18) is provided on one side wall of the mounting plates (13) on the two groups of rotating clamps, and the two mounting plates (13) are fixedly connected via the connecting plate (18).

8. The prefabricated steel structure for civil engineering without pouring concrete according to claim 1, characterized in that: The reinforcement member comprises a reinforcement frame (19) arranged outside the two supporting columns (1), the two ends of the reinforcement frame (19) are respectively fixedly connected to the outer walls of the two supporting columns (1), a plurality of sliding sleeves (20) are slidably sleeved on the reinforcement frame (19), and the top ends of the sliding sleeves (20) are fixedly connected to the supporting piles.

9. The assembled steel structure without pouring concrete building structure for civil engineering according to claim 8, characterized in that: The support pile comprises a fixing seat (21) fixed to the top end of the sliding sleeve (20), a supporting seat (22) being threadedly connected to the fixing seat (21), and a top end of the supporting seat (22) is in contact with a bottom end of the crossbeam (4).

10. The assembled steel structure without pouring concrete building structure for civil engineering according to claim 1, characterized in that: The bottom end of the support column (1) is fixedly connected to a support base (23), and the support base (23) is fixed on the ground.

Citation Information

Patent Citations

  • Frame structure building

    CN112064786A

  • Fabricated building frame

    CN115450316A

  • Fabricated steel structure pouring-free concrete building structure for civil engineering

    CN116446525A

  • Assembly type steel structure pouring-free concrete building structure for civil engineering

    CN210529958U

  • Concrete-pouring-free fabricated steel structure building structure

    CN211548047U

Cited By

  • Support-free mounting structure for industrial factory building and construction method of support-free mounting structure

    CN120739236A