Material sorting device
By abolishing the belt conveyor in the material sorting equipment, and using the feeding unit with arc-shaped edges and the detection and separation unit, the problems of vulnerability and insufficient density of existing equipment are solved, and the working efficiency and sorting accuracy are improved.
Patent Information
- Application Number
- PCT/CN2024/105205
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2024-06-05
- Filing Date
- 2024-07-12
- Publication Date
- 2024-12-05
AI Technical Summary
The existing material sorting equipment is vulnerable to belts, frequent maintenance, and limited release of material density, which limits the working efficiency of the equipment.
The belt conveyor is cancelled, and the feeding unit is used to release materials with arc edges, and the arc edges are used to increase the material transmission density, and separate them according to the material characteristics through the detection unit and the separation unit to achieve different movement trajectories of different materials.
It reduces equipment maintenance costs and frequency, improves material sorting efficiency, and reduces the footprint.
Smart Images

Figure CN2024105205_05122024_PF_FP_ABST
Abstract
Description
Material sorting equipment
[0001] This application is based on and enjoys the priority of Chinese patent applications 202410724563.9, 202321368959.1, and 202321432968.2, and all internal references of the above applications are incorporated herein. Technical Field
[0002] The embodiments of the present application relate to the field of material sorting. More specifically, the present application relates to a material sorting device. Background Art
[0003] Material sorting equipment is widely used in fields such as ore sorting, garbage classification, and agricultural product screening. It can sort materials according to their type or quality. Existing material sorting equipment mainly consists of a feeding unit, a detection unit, a separation unit, and a receiving unit. The feeding unit is used to transport materials and release them to other mechanisms. The detection unit is used to identify the type or quality of materials. The separation unit changes the track of passing materials according to the type or quality of the materials, so that materials of different types or qualities have different movement trajectories, ensuring that the receiving unit can receive materials from different movement trajectories and release or store them separately.
[0004] After long and diligent research, the applicant found that the existing material sorting equipment has a series of disadvantages due to the use of belt conveyors: First, the belt of the belt conveyor is a wearing part and requires regular maintenance or replacement, which reduces the working efficiency of the material sorting equipment; second, the belt conveyor is affected by its own structural design defects, resulting in limited density of material released each time, which limits the working efficiency of the material sorting equipment.
[0005] Summary of the Invention
[0006] In order to solve one or more of the technical problems mentioned above, the present application provides a material sorting device, which eliminates the belt conveyor and uses a feeding unit to realize the transmission and release of materials, which is conducive to improving the working efficiency of the material sorting equipment.
[0007] According to the present application, a material sorting device is provided, wherein the material sorting device comprises:
[0008] A feeding unit, the discharge end of which releases the material has a curved edge;
[0009] a detection unit for identifying characteristics of a material, comprising a transmitter for emitting radiation and a receiver for receiving the radiation, and an arc gap located between the transmitter and the receiver for the material to pass through, wherein the transmitter and the receiver respectively have a first arc surface and a second arc surface facing the arc gap;
[0010] A separation unit capable of performing or not performing separation operations on the material according to the characteristics of the material, so that materials with different characteristics have different movement trajectories and fall into different material areas of the receiving unit respectively, and the inner surface of the separation unit facing the material is arc-shaped; and
[0011] The receiving unit is used to receive different types of materials sorted by the separation unit.
[0012] The center lines of the arcuate edge of the feeding unit, the first and second arcuate surfaces of the detection unit, and the inner surface of the separation unit all coincide with a reference line, which is a selected straight line extending along the vertical direction in the material sorting equipment.
[0013] Preferably, projections of the arc-shaped edge of the feeding unit, the first arc surface and the second arc surface of the detection unit, and the bisectors of the inner surface of the separation unit on the horizontal plane coincide with each other.
[0014] Preferably, the transmitter has a transmission source located on the reference line;
[0015] The receiver has a plurality of receiving sources arranged in an arc shape and disposed along the second arc surface.
[0016] Preferably, the separation unit includes a plurality of execution components arranged in an arc shape along an inner surface thereof.
[0017] Preferably, the receiving unit further comprises at least one arc-shaped material separation baffle, and the material separation baffle is used to separate the drop channels of materials of different sorting types.
[0018] The material distribution baffle has:
[0019] base plate;
[0020] a first arc-shaped material distribution baffle, which is mounted on the bottom plate and is configured to be movable on the bottom plate assembly along its first radial direction;
[0021] a second arc-shaped material distribution baffle, the second arc-shaped material distribution baffle being mounted on the bottom plate and being configured to be movable on the bottom plate assembly along its second radial direction, the second radial direction intersecting the first radial direction;
[0022] The first arc-shaped material dividing baffle and the second arc-shaped material dividing baffle are overlapped, and the length of the overlap between the two can be adjusted as the first arc-shaped material dividing baffle and the second arc-shaped material dividing baffle move.
[0023] Preferably, the feeding unit further comprises a compensating liner, the size of which is expressed by the following formula:
[0024] Wherein, Rf: the arc of the discharge end of the vibration feeder after compensation,
[0025] R0: The arc of the initial discharge end of the vibrating feeder,
[0026] Kv: comprehensive experience coefficient of vibration feeder,
[0027] λ: single amplitude,
[0028] ω: vibration frequency,
[0029] δ: vibration direction angle,
[0030] β: The angle between the line connecting any point on the discharge end and the center of the equipment and the bisector.
[0031] In addition, another aspect of the present invention is a debugging method for material sorting equipment, characterized in that:
[0032] The material sorting equipment includes:
[0033] A feeding unit, the discharge end of which releases the material has a curved edge;
[0034] a detection unit for identifying characteristics of a material, comprising a transmitter for emitting radiation and a receiver for receiving the radiation, and an arc gap located between the transmitter and the receiver for the material to pass through, wherein the transmitter and the receiver respectively have a first arc surface and a second arc surface facing the arc gap;
[0035] A separation unit capable of performing or not performing separation operations on the material according to the characteristics of the material, so that materials with different characteristics have different movement trajectories and fall into different material areas of the receiving unit respectively, and the inner surface of the separation unit facing the material is arc-shaped; and
[0036] The receiving unit is used to receive different types of materials sorted by the separation unit.
[0037] The center lines of the arc-shaped edge of the feeding unit, the first arc surface and the second arc surface of the detection unit, and the inner surface of the separation unit are all coincident with a reference line, which is a selected straight line extending in the vertical direction in the material sorting device.
[0038] The debugging method of the material sorting equipment comprises the following steps:
[0039] An equipment assembling step is to arrange the feeding unit, the detection unit, the separation unit, and the receiving unit in such a manner that the center lines of the arc-shaped edge of the discharge end of the feeding unit, the first arc surface and the second arc surface of the detection unit, and the inner surface of the separation unit coincide with the reference line, and the projections of the respective bisectors on the horizontal plane coincide with each other;
[0040] an optical path verification step, placing at least one marker at a specified position on the material sorting equipment, and adjusting software parameters until the angle corresponding to the pixel channel where the at least one marker is located is consistent with the actual angle of the marker;
[0041] The blowing verification step is to repeat the equipment assembly step and the optical path verification step until the angle corresponding to the pixel channel where the at least one marker is located is consistent with the actual blowing angle.
[0042] The material sorting equipment provided above eliminates the need for a belt conveyor and utilizes a feeding unit to transfer and release materials. Since the feeding unit does not require a fragile belt, its repair and maintenance costs and frequency are lower, which helps improve the efficiency of the material sorting equipment. Furthermore, since the feeding unit utilizes a longer curved edge to release material, while a belt conveyor utilizes a shorter straight edge, the feeding unit releases material at a higher density each time, further improving the efficiency of the material sorting equipment. Furthermore, since the feeding unit is generally shorter than the belt conveyor at the same feeding frequency, this helps reduce the footprint of the material sorting equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] The above and other objects, features and advantages of the exemplary embodiments of the present application will become readily understood by reading the detailed description below with reference to the accompanying drawings. In the accompanying drawings, several embodiments of the present application are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:
[0044] FIG1 is a schematic structural diagram of a material sorting device according to an embodiment of the present application.
[0045] FIG2 is a top view of a material sorting device according to an embodiment of the present application;
[0046] FIG3 shows a feeding unit of a material sorting device according to an embodiment of the present application;
[0047] FIG4 shows a detection unit of a material sorting device according to an embodiment of the present application;
[0048] FIG5 shows a transmitter of a material sorting device according to an embodiment of the present application;
[0049] FIG6 shows a separation unit of a material sorting device according to an embodiment of the present application;
[0050] FIG7 shows a receiving unit of a material sorting device according to an embodiment of the present application.
[0051] FIG8 is a trajectory diagram of the movement of the existing arc-shaped material distribution baffle;
[0052] FIG9 is a diagram showing the movement trajectory of the adjustable arc-shaped material distribution baffle provided in an embodiment of the present application;
[0053] FIG10 is a schematic structural diagram (I) of an adjustable arc-shaped material distribution baffle provided in an embodiment of the present application;
[0054] FIG11 is a schematic structural diagram (II) of an adjustable arc-shaped material distribution baffle provided in an embodiment of the present application;
[0055] FIG12 is a schematic structural diagram of a first guide assembly of an adjustable arc-shaped material distribution baffle provided in an embodiment of the present application;
[0056] FIG13 is a schematic structural diagram of a second guide assembly of an adjustable arc-shaped material distribution baffle provided in an embodiment of the present application;
[0057] FIG14 is a schematic diagram of a partial structure of the material sorting equipment provided in an embodiment of the present application.
[0058] FIG15 shows a flow chart of a separation adjustment method according to an embodiment of the present invention;
[0059] FIG16 shows a flow chart of a separation adjustment method according to another embodiment of the present invention;
[0060] FIG17 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0061] FIG18 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0062] FIG19 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0063] FIG20 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0064] FIG21 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0065] FIG22 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0066] FIG23 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0067] FIG24 shows a flow chart of a separation adjustment method according to yet another embodiment of the present invention;
[0068] FIG25 shows a flowchart of a separation adjustment method according to yet another embodiment of the present invention.
[0069] 26A and 26B are diagrams for explaining curvature compensation of the first curved surface.
[0070] Explanation of the accompanying symbols: 1. Feeding unit; 11. Feeding part; 111. Discharging end; 111a. Arc edge; 12. Vibration source part; 2. Detection unit; 21. Transmitter; 211. Transmitter housing; 211a. First arc surface; 211b. Transmitting window; 2111. Upper cover; 2112. Lower box; 213. Rib plate; 214. Reinforcement beam; 212. Transmitting source; 22. Receiver; 221. Receiver housing; 221a. Second arc surface; 222. Receiving source; 23. Arc gap; 3. Separation unit; 31. Actuator; 31a. Jet hole; 32. Solenoid valve; 4. Receiving unit; 41. First channel; 42. Second channel; 43. Frame; 44. Material separation baffle; O. Center of circle.
[0071] Implementation Method
[0072] The following will be combined with the accompanying drawings in the embodiments of the present disclosure to clearly and completely describe the technical solutions in the embodiments of the present disclosure. Obviously, the embodiments described are part of the embodiments of the present disclosure, not all of them. Based on the embodiments of the present disclosure, all other embodiments obtained by those skilled in the art without making any creative efforts shall fall within the scope of protection of the present disclosure.
[0073] FIG1 is a schematic structural diagram of a material sorting device according to an embodiment of the present application, and FIG2 is a top view of the material sorting device according to an embodiment of the present application. As shown in FIG1 and FIG2 , the material sorting device includes a feeding unit 1 having a discharge end 111, a detection unit 2 provided below the discharge end 111 of the feeding unit 1, a separation unit 3 provided below the detection unit 2, and a receiving unit 4 provided below the separation unit 3. As shown in FIG1 and FIG3 , the feeding unit 1 has a discharge end 111, and the discharge end 111 has an arc-shaped edge 111a, so that the feeding unit 1 can release the material downward through the arc-shaped edge 111a, and ensure that the material can pass through the detection unit 2, the separation unit 3 and the receiving unit 4 in sequence. Here, "arc" is not limited to a strict circular arc, but also includes an elliptical arc or other types of arcs.
[0074] The detection unit 2 is used to identify the type or quality of the material, and the separation unit 3 selectively sprays or strikes the passing material based on the type or quality, so that at least two types or qualities of material have independent movement trajectories. The receiving unit 4 is used to receive at least two types or qualities of material and release or store them separately. It will be readily understood that in order to maintain the relative positional relationship between each mechanism and the feeding unit 1, the material sorting equipment may further include a frame, on which the feeding unit 1 and each of the aforementioned mechanisms are mounted.
[0075] According to the present application, the material sorting equipment eliminates the belt conveyor and uses the feeding unit 1 to realize the transmission and release of materials. Since the feeding unit 1 does not require a fragile belt, the cost and frequency of its repair and maintenance are lower, which is conducive to improving the working efficiency of the material sorting equipment. At the same time, since the arc edge is longer than the straight edge, by making the feeding unit 1 use the longer arc edge 111a to release the material, the density of the material released by the feeding unit 1 each time is greater, which can easily further improve the working efficiency of the material sorting equipment. In addition, at the same feeding frequency, since the length of the feeding unit 1 is shorter than the length of the belt conveyor, it is conducive to reducing the floor space occupied by the material sorting equipment.
[0076] On the other hand, the feeding mechanism 1 of the present invention is a vibrating feeding mechanism. Therefore, unlike a conventional belt feeding mechanism, the vibrating feeding mechanism can ensure that the material separated from the arcuate edge 111a of the discharge end 111 has a uniform initial velocity in the radial direction, that is, in the direction perpendicular to the arcuate edge 111a at the separation point.
[0077] Next, the aforementioned feeding unit 1 will be described in detail with reference to Figures 1, 2, and 3. As shown in Figures 1 to 3, the feeding unit 1 includes a feeding portion 11 and a vibration source portion 12. The feeding portion 11 is generally constructed of a hard material (e.g., steel or aluminum alloy) and arranged horizontally or obliquely in a dustpan configuration. Its baffled end serves as a receiving end for receiving material, while its unbaffled end serves as a discharge end 111 for releasing material. This discharge end 111 includes an arcuate edge 111a for releasing material. The vibration source portion 12 is connected to the feeding portion 11 and is used to drive the feeding portion 11 to vibrate and uniformly release the received material during vibration. The vibration source portion 12 comprises a vibration motor or an electromagnetic vibrator. The vibration motor primarily consists of a motor and an eccentric block mounted on the motor's rotating shaft. Driven by the motor, the eccentric block generates vibrations, thereby driving the feeding portion 11 to vibrate. The electromagnetic vibrator mainly consists of an electromagnet, a reset spring and a moving block arranged between the two and connected to the reset spring. When the electromagnet is powered, the electromagnet generates a magnetic field and attracts the moving block to overcome the pressure of the spring to attract the electromagnet to one side of the electromagnet; when the power is cut off, the electromagnet's magnetic field disappears and the pressure of the spring resets the moving block; this process is repeated, and the moving block performs reciprocating motion (vibration) under the action of the electromagnet and the spring to cause the feeding part 11 to vibrate.
[0078] The aforementioned detection unit 2 can be a camera or a radiographic detection unit, depending on the material being used. For example, if the material being used is ore, the detection unit 2 can be a radiographic identification detection mechanism. The radiographic detection mechanism is described in detail below with reference to Figures 1, 4, and 5.
[0079] As shown in Figures 1, 4, and 5, the detection unit 2 is preferably a radiographic detection mechanism and includes a transmitter 21, a receiver 22, and an arcuate gap 23 formed between the transmitter 21 and the receiver 22. It will be appreciated that because the discharge end 111 of the feeding unit 1 of the present invention utilizes an arcuate edge 111a, materials separated from the discharge end 111 travel radially at their respective separation points. Accordingly, the detection unit 2 is also configured to detect materials separated from the arcuate discharge end 111. That is, the transmitter 21 and the receiver 22 are both substantially arcuate, with an arcuate gap, i.e., the arcuate gap 23, formed between them.
[0080] When material from the feeding unit 1 passes through the arc slit 23, the transmitter 21 emits radiation, causing it to penetrate the ore. The receiver 22 receives the radiation and outputs a signal based on the attenuation of the radiation, used to determine the type or quality of the material. In this example, the surface of the transmitter 21 facing the arc slit 23 is the first arc surface 211a, and the surface of the receiver 22 facing the arc slit 23 is the second arc surface 221a. The centerlines of both the first and second arc surfaces 211a and 221a coincide with a reference line, a selected straight line extending vertically through the center O of the arc edge 111a (see Figures 2 and 4). Furthermore, the centerline of the arc edge 111a of the discharge end 111 also coincides with the reference line.
[0081] Here, the reference line is a selected straight line on the material sorting device, which is an imaginary straight line. A mark can also be made on the material sorting device, and the straight line passing through the mark and extending in the vertical direction is the reference line of the material sorting device. For example, with the arc-shaped edge 111a of the discharge end 111 as a reference, the center position of the arc-shaped edge 111a is marked on the material sorting device. In addition, the "center line" of the arc refers to the straight line passing through the center of the arc and extending in the vertical direction. By making the center lines of the arc-shaped edge 111a of the discharge end 111, the first arc surface 211a of the transmitter 21, and the second arc surface 221a of the receiver 22 coincide with the reference line, the projections of these arc-shaped components on the horizontal plane can be arranged concentrically.
[0082] In this way, the relative distance (radial distance) between the first arc surface 211a and the second arc surface 221a is constant, ensuring that the time for each ray to travel from the transmitter 21 to the receiver 22 is the same, so that when each ray passes through different materials, the imaging time of each material is the same, thereby improving the material sorting accuracy and sorting effect.
[0083] As an example, the transmitter 21 includes a transmitter housing 211 having a first curved surface 211a and a transmitting source 212 mounted on the transmitter housing 211. The receiver 22 includes a receiver housing 221 having a second curved surface 221a and multiple receiving sources 222 mounted on the receiver housing 221 and evenly arranged along an inner surface parallel to the second curved surface 221a. A transmitting window 211b is provided on the first curved surface 211a, through which the transmitting source 212 can emit fan-shaped X-rays toward the receiver 22. A receiving window is provided on the second curved surface 221a, through which the multiple receiving sources 222 receive the X-rays and generate information for identifying the type or quality of the material based on the X-rays. Preferably, the transmitting source 212 primarily comprises an X-ray tube, and the receiving source 222 comprises a photoelectric conversion device.
[0084] In the present invention, the emitter 21 includes only one emission source 212, or includes multiple emission sources 212 integrated into one body. By placing one or more emission sources 212 on the reference line, X-rays from the emission source 212 can be uniformly radiated in all directions. This is also a unique technical effect of the curved discharge end 111 compared to traditional linear discharge ends.
[0085] In a preferred embodiment, to facilitate assembly of the emission source 212, the emitter housing 211 includes a lower case 2112 having an emission window 211b and a lead lining on its inner surface, and an upper cover 2111 that covers the lower case 2112 and is also covered with a lead lining on its inner surface. The upper cover 2111 and the lower case 2112 are preferably connected by bolts or a snap-on connection, facilitating maintenance and repair of the emission source 212 of the emitter 21. The emission window 211b is an elongated, strip-shaped hole extending circumferentially along the first curved surface 211a. Both the lower case 2112 and the upper cover 2111, as components of the emitter housing 211, are lined with radiation-shielding lead. However, the presence of the lead makes both thin and heavy, which can easily lead to a slight collapse in the middle of the strip-shaped hole, partially blocking the emitted radiation. To reduce the possibility of collapse in the central region of the strip-shaped aperture, a diffusely arranged rib 213 can be provided on the upper cover 2111. These ribs 213 can be used to improve the pressure distribution of the upper cover 2111 on the lower box 2112, reduce the load on the sidewall where the emission window 211b is located, reduce the degree of collapse in the central region of the strip-shaped aperture, and improve the radiation emission rate of the emitter 21. Furthermore, to further reduce the possibility of collapse in the central region of the strip-shaped aperture, the emitter housing 211 can further include a reinforcing beam 214 provided on the upper cover 2111 and extending through the rib 213. The reinforcing beam 214 is perpendicular to the axial bisector of the first curved surface 211a. Thus, the reinforcing beam 214 can further reduce the degree of collapse in the central region of the strip-shaped aperture and further improve the radiation emission rate of the emitter 21.
[0086] The separation unit 3 mentioned above can be selected as a blowing mechanism or a flap mechanism, etc. The specific selection needs to be determined according to the actual material. For example, when the actual material is a large-volume, heavy-weight material, it is recommended that the separation unit 3 be selected as a flap mechanism. On the contrary, if the actual material is a small-volume, light-weight material, it is recommended that the separation unit 3 be selected as a blowing mechanism. Next, the blowing mechanism is described in detail with reference to Figures 1 and 6. As shown in Figures 1 and 6, the separation unit 3 is selected as a blowing mechanism, which includes an actuator 31 and a valve assembly provided on the actuator 31. The actuator 31 is in the form of a fan-shaped cylinder and includes a plurality of jet holes 31a provided on its outer peripheral surface and spaced circumferentially. The valve assembly includes a plurality of solenoid valves 32 provided on the actuator 31, and the plurality of solenoid valves 32 are configured to independently control the start and stop of each jet hole 31a, that is, the start and stop of each jet hole 31a is controlled by a solenoid valve 32. When the material from the detection unit 2 passes through the outside of the execution component 31, the jet hole 31a at the corresponding position can selectively spray the material under the control of the solenoid valve 32. For example, when bulk materials containing iron ore and copper ore need to be sorted, the jet hole 31a can only spray the iron ore without blowing the copper ore under the control of the solenoid valve 32, thereby ensuring that the iron ore and copper ore can start to produce different movement trajectories here, so that the receiving unit 4 can separately receive the iron ore and copper ore and release or store the two separately.
[0087] In this embodiment, the centerline of the outer circumference of actuator 31 coincides with a reference line, which is a selected straight line extending vertically through the center O of arcuate edge 111a. This ensures that each material is approximately the same distance from separation unit 3 as it passes through. The new trajectory of materials of the same type or variety, after being ejected through different air jet holes 31a, lies approximately within the same curved surface. This ensures that receiving unit 4 can accurately receive materials of the same type or variety through corresponding channels, thereby maintaining or improving the sorting accuracy of the material sorting equipment.
[0088] The receiving unit 4 mentioned above can be selected as a separate storage mechanism or a separate conveying mechanism, etc. The specific selection needs to be determined according to actual needs. The separate storage structure mainly includes at least two chambers, and the at least two chambers are used to receive materials of different types or qualities from the separation unit 3. An example of a separate conveying mechanism has been shown in Figures 1 and 7. The receiving unit 4 includes a frame 43, a material separation baffle 44 provided on the frame 43, and a first channel 41 and a second channel 42 separated by the material separation baffle 44. The material separation baffle 44 divides the internal space of the frame 43 into two parts, which are the first channel 41 and the second channel 42. Among them, the first channel 41 is used to receive and release materials that have been blown or struck, such as the circular material shown in Figure 1; the second channel 42 is used to receive and release materials that have not been blown or struck, such as the diamond-shaped material shown in Figure 1. The center line of the outer peripheral surface of the material separation baffle 44 falls on the reference line, which is a selected straight line passing through the center O of the arc edge 111a and extending in the up and down directions.
[0089] Next, the working principle of the material sorting equipment of the embodiment of the present application is described. During use, the feeding unit 1 is used to receive at least two types or qualities of materials, relies on vibration to transport the materials, and releases the materials at the arc-shaped edge 111a of the discharge end 111, so that the materials can pass through the detection unit 2, the separation unit 3, and the receiving unit 4 in sequence. As a result, the detection unit 2 can identify the type or quality of the passing materials, so that the separation unit 3 can selectively blow or strike the passing materials according to the type or quality of the materials, so that the at least two types or qualities of materials have independent movement trajectories, ensuring that the receiving unit 4 can receive at least two types or qualities of materials and release or store them separately, thereby completing the material sorting.
[0090] In the present invention, receiving unit 4 also includes at least one arc-shaped material separation baffle 44, which is used to separate the drop channels for materials of different sorting types. Specifically, to ensure that the different types of objects separated by separation unit 3 accurately fall into the corresponding material areas of receiving unit 4, a material separation baffle is required to separate the drop channels for materials of different sorting types in receiving unit 4. The provision of the material separation baffle can properly guide the flying materials and prevent them from splashing and bouncing into other material areas after landing.
[0091] However, the applicant discovered that using a circular arc-shaped plate corresponding to the curved edge 111a of the discharge end 111 made it difficult to accommodate the separation of materials with varying flight paths. Specifically, after the materials are separated by the separation unit 3, their flight distance is determined by the jet force of the separation unit 3. If the flight distance of the materials fluctuates, the positions of the various material zones of the receiving unit 4 must also be appropriately adjusted.
[0092] However, as can be seen from Figure 8, the integrated material distribution baffle can only move along the center line of the arc when moving forward and backward, and the material distribution baffle can no longer keep its center line coincident with the reference line. In other words, the arc-shaped material distribution baffle can no longer maintain concentricity with the arc edge 111a of the discharge end 111. Since the diameter corresponding to the arc shape remains unchanged, there will be a certain deviation between the position of the material distribution baffle after movement and the ideal material blocking position after movement. The deviation gradually increases from the center of the arc-shaped plate to the ends, affecting the accuracy of material distribution.
[0093] When the position of the arc-shaped material dividing baffle needs to be adjusted, the arc-shaped material dividing baffle is moved along the moving direction in the figure. The moving direction is the center line or the center radial direction of the arc-shaped material dividing baffle. The position of the arc-shaped material dividing baffle after movement is shown in the figure.
[0094] Since the diameter of the fixed arc-shaped material dividing baffle is fixed, the circle of the arc-shaped material dividing baffle after movement moves from the center a in the figure to the center b. At this time, the distance between the moved arc-shaped material dividing baffle and the arc-shaped material dividing baffle in the initial position in the circumferential direction gradually decreases from the center position. Therefore, compared with the ideal position in the figure, a deviation as shown in the figure will be formed, and the deviation gradually increases from the center to both sides, thereby affecting the subsequent material dividing accuracy.
[0095] In view of this, the present embodiment provides an adjustable arc-shaped material dividing baffle, which aims to solve the above technical problems by designing the arc-shaped material dividing baffle as a split structure and changing the moving trajectory of the arc-shaped material dividing baffle.
[0096] FIG9 is a diagram showing the movement trajectory of the adjustable arc-shaped material distribution baffle provided in an embodiment of the present application.
[0097] As shown in FIG9 , the adjustable arc-shaped material dividing baffle provided in this embodiment includes a bottom plate 44a (not shown in FIG9 , but given in the following drawings), a first arc-shaped material dividing baffle 44b and a second arc-shaped material dividing baffle 44c.
[0098] Among them, the first arc-shaped material dividing baffle 44b and the second arc-shaped material dividing baffle 44c of this embodiment are both installed on the base plate 44a, and the first arc-shaped material dividing baffle 44b of this embodiment is configured to be able to move on the base plate 44a assembly along its own first radial direction; the second arc-shaped material dividing baffle 44c of this embodiment is configured to be able to move on the base plate 44a assembly along its own second radial direction, and the second radial direction is at an angle to the first radial direction.
[0099] Furthermore, the first arc-shaped material dividing baffle 44b and the second arc-shaped material dividing baffle 44c of this embodiment are overlapped, and the length of the overlap between the two is constructed to be adjustable along with the movement of the first arc-shaped material dividing baffle 44b and the second arc-shaped material dividing baffle 44c.
[0100] As a result, when the first curved material distribution baffle 44b of this embodiment moves along the first radial direction shown in the figure, and the second curved material distribution baffle 44c of this embodiment moves along the second radial direction shown in the figure, the overlap length of the first and second curved baffles can be reduced, and the two can form an arc-shaped or plate-like structure with a larger diameter. Compared with the curved material distribution baffle in the initial position, the spacing between the two curved material distribution baffles along the circumference is essentially the same, which can compensate for the deviation in Figure 8 and make the curved material distribution baffles as a whole in an ideal state or as close to the ideal state as possible. Therefore, the accuracy of material distribution can be improved and the distribution effect can be ensured.
[0101] FIG10 is a schematic structural diagram (I) of an adjustable arc-shaped material distribution baffle provided in an embodiment of the present application, and FIG11 is a schematic structural diagram (II) of an adjustable arc-shaped material distribution baffle provided in an embodiment of the present application.
[0102] As shown in Figures 10 and 11 , in order to enable the first and second curved material distribution baffles 44b and 44c of this embodiment to move along the first and second radial directions, a first guide plate 44d and a second guide plate 44e are vertically mounted on the base plate 44a. The length of the first guide plate 44d of this embodiment extends along the first radial direction, while the length of the second guide plate 44e of this embodiment extends along the second radial direction. Furthermore, the base plate 44a of this embodiment can also be designed as a curved plate. Therefore, the first and second radial directions can also be considered as two radial directions of the base plate 44a.
[0103] Accordingly, to coordinate with the first guide plate 44d and the second guide plate 44e, the first curved material distribution baffle 44b of this embodiment is provided with a first mounting hole 44b1 that matches the first guide plate 44d, and the second curved material distribution baffle 44c is provided with a second mounting hole 44c1 that matches the second guide plate 44e. This allows the first curved material distribution baffle 44b of this embodiment to slide on the first guide plate 44d of this embodiment through the first mounting hole 44b1, and allows the second curved material distribution baffle 44c of this embodiment to slide on the second guide plate 44e of this embodiment through the second mounting hole 44c1.
[0104] As shown in Figures 10 and 12 , to achieve better guiding coordination between the first curved material distribution baffle 44b and the first guide plate 44d, and to allow the first curved material distribution baffle 44b to be fixed after movement, this embodiment provides a first guide hole 44d1 extending along the length of the first guide plate 44d. Accordingly, in this embodiment, a first guide assembly 44f is provided at the first mounting hole 44b1 of the first curved material distribution baffle 44b. The first guide assembly 44f is connected to the first guide hole 44d1 and is configured to be lockably fixed to the first guide plate 44d.
[0105] Similarly, in this embodiment, a second guide hole 44e1 is provided on the second guide plate 44e along its length direction, and a second guide component 44g is provided at the second mounting hole 44c1 of the second arc-shaped material distribution baffle 44c in this embodiment. The second guide component 44g is connected to the second guide hole 44e1 and is configured to be lockably fixed to the second guide plate 44e.
[0106] In some examples, the first guide assembly 44f of this embodiment includes a first lug 44f1, a second lug 44f2, a first bolt 44f3, and a first nut 44f4. The first and second lugs 44f1, 44f2 of this embodiment are connected to the first curved material distribution baffle 44b, and the first guide plate 44d is positioned between the first and second lugs 44f1, 44f2. The first bolt 44f3 of this embodiment is sequentially inserted through the first lug 44f1, the first guide hole 44d1, and the second lug 44f2, with the nut portion of the first bolt 44f3 abutting the first lug 44f1. The first nut 44f4 of this embodiment is connected to the first bolt 44f3 and abuts the second lug 44f2.
[0107] By tightening the first bolt 44f3 and the first nut 44f4 onto the first lug 44f1 and the second lug 44f2, the first lug 44f1 and the second lug 44f2 can be pressed against the first guide plate 44d of this embodiment, thereby completing the locking and fixing between the first curved material distribution baffle 44b and the first guide plate 44d. When the front-back position of the first curved material distribution baffle 44b needs to be adjusted, the first bolt 44f3 and the first nut 44f4 are released, allowing the first curved material distribution baffle 44b of this embodiment to move along the length direction of the first guide plate 44d.
[0108] Similarly, as shown in Figures 10 and 14 , the second guide assembly 44g of this embodiment includes a third lug 44g1, a fourth lug 44g2, a second bolt 44g3, and a second nut 44g4. The third and fourth lugs 44g1 and 44g2 of this embodiment are connected to the second curved material-distributing baffle 44c, and the second guide plate 44e is located between the third and fourth lugs 44g1 and 44g2. The second bolt 44g3 of this embodiment is sequentially inserted through the third lug 44g1, the second guide hole 44e1, and the fourth lug 44g2, with the nut portion of the second bolt 44g3 abutting the third lug 44g1. The second nut 44g4 of this embodiment is connected to the second bolt 44g3 and abuts the fourth lug 44g2.
[0109] The structure and working principle of the second guide component 44g of this embodiment are the same as those of the aforementioned first guide component 44f. It is also for the purpose of achieving better guidance and locking the second arc-shaped material distribution baffle 44c to the second guide plate 44e. Therefore, this embodiment does not provide too much description of the second guide component 44g.
[0110] Referring again to Figures 10 and 11 , the first curved material-distributing baffle 44b of this embodiment comprises an integrally connected first plate body 44b2 and a first overlapping portion 44b3, wherein the thickness of the first overlapping portion 44b3 is less than that of the first plate body 44b2. The second curved material-distributing baffle 44c of this embodiment comprises an integrally connected second plate body 44c2 and a second overlapping portion 44c3, wherein the thickness of the second overlapping portion 44c3 is less than that of the second plate body 44c2. Furthermore, the first overlapping portion 44b3 and the second overlapping portion 44c3 overlap and are able to move relative to each other.
[0111] Furthermore, the thickness formed by overlapping the first overlapping portion 44b3 and the second overlapping portion 44c3 of this embodiment can be designed to be less than or equal to the thickness of the first plate body 44b2 and the second plate body 44c2, so that the first arc-shaped material dividing baffle 44b and the second arc-shaped material dividing baffle 44c can form an arc-shaped plate body with stronger integrity.
[0112] In order to achieve stability in the connection between the first overlap portion 44b3 and the second overlap portion 44c3, and to achieve relative fixation of the two after the overlap length is adjusted, this embodiment provides a third guide hole 44b31 opened circumferentially in the length direction on the first overlap portion 44b3, and accordingly, the second overlap portion 44c3 of this embodiment provides a third connection hole 44c31.
[0113] Furthermore, in this embodiment, a third guide assembly 44h is mounted in the third guide hole 44b31. The third guide assembly 44h is connected to the third connecting hole 44c31 and is configured to lock the first overlapping portion 44b3 and the second overlapping portion 44c3. The number of third guide holes 44b31, third connecting hole 44c31, and third guide assembly 44h can all be two as shown in the figure.
[0114] In some examples, the third guide assembly 44h of this embodiment includes a third bolt 44h1 and a third nut 44h2. The third bolt 44h1 of this embodiment is inserted through the first overlapping portion 44b3 and the second overlapping portion 44c3, with the nut portion of the third bolt 44h1 abutting against the first overlapping portion 44b3. The third nut 44h2 is installed on the third bolt 44h1 and abuts against the second overlapping portion 44c3.
[0115] The first overlapping portion 44b3 and the second overlapping portion 44c3 can be locked and fixed by tightening the third bolt 44h1 and the third nut 44h2. When the overlapping length of the two needs to be adjusted, the third bolt 44h1 and the third nut 44h2 can be released. The structure is simple and the operation is convenient.
[0116] As shown in Figures 10 and 11 , in addition to being used to mount the first and second curved material separation baffles 44b and 44c, the base plate 44a of this embodiment is also used to connect the body of the ore sorting equipment. Therefore, in this embodiment, connecting mechanisms 44i are provided at opposite ends of the base plate 44a. These connecting mechanisms 44i are used to connect the body of the ore sorting equipment. In some examples, the connecting mechanisms 44i may include connecting ears and connecting bolts (not shown) connected to the connecting ears.
[0117] In combination with what is shown in FIG14 , based on the above-mentioned adjustable arc-shaped material dividing baffle, this embodiment also provides an ore sorting equipment, which includes a frame, a sorting device and an adjustable arc-shaped material dividing baffle as in the above-mentioned technical solution. Since the main improvement of the ore sorting equipment of this embodiment lies in the arc-shaped material dividing baffle, other structures of the ore sorting equipment are not described.
[0118] To sum up, according to the adjustable arc-shaped material dividing baffle and ore sorting equipment provided in this embodiment, the arc-shaped material dividing baffle is designed to be a split structure including a first arc-shaped material dividing baffle 44b and a second arc-shaped material dividing baffle 44c, and the first arc-shaped material dividing baffle 44b is designed to move back and forth along its own first radial direction, and the second arc-shaped material dividing baffle 44c is designed to move back and forth along its own second radial direction, rather than moving along the center line of the circular arc structure formed by the two, so that the diameter of the overall circular arc formed by the first arc-shaped material dividing baffle 44b and the second arc-shaped material dividing baffle 44c after movement can be adaptively adjusted to reduce the error after adjustment and improve the accuracy of material dividing.
[0119] The following describes the separation adjustment method provided in some embodiments of the present invention with reference to Figures 15 to 26.
[0120] The material sorting equipment includes a frame, a receiving unit, a detection unit and a separation unit. The discharge end of the receiving unit is provided with a first arc surface. The detection unit includes a ray source and a receiver. The side of the receiver facing the ray source is provided with a second arc surface. The separation unit includes multiple separation parts. The multiple separation parts are arranged at intervals along the third arc surface. The projections of the first arc surface, the second arc surface and the third arc surface on the horizontal plane are respectively the first arc line, the second arc line and the third arc line, and the curvatures of the first arc line, the second arc line and the third arc line are the same.
[0121] The frame serves as the basic supporting structure of the entire material sorting equipment. It provides a reference surface for installing and adjusting other components to ensure the stability and accuracy of the equipment.
[0122] Optionally, the receiving unit is a vibrating feeder. Optionally, the receiving unit includes a feeding section and a vibration source section. The feeding section is a horizontally or tilted dustpan structure. The vibration source section is connected to the feeding section and is configured to vibrate the feeding section so that the vibrating section can evenly release the received material during the vibration process.
[0123] Optionally, one end of the feeding section is a feed end, which receives material; the other end is a discharge end, which releases material. The discharge end has a drop arc. Because the receiving unit uses a longer drop arc to release material, feeding efficiency is improved. Optionally, the upper surface of the feeding section has a screen surface center. Typically, the screen surface center is the center of the drop arc.
[0124] Optionally, the vibration source includes a vibration motor or an electromagnetic vibrator. The vibration motor is mainly composed of a motor and an eccentric block arranged on the rotating shaft of the motor. The eccentric block can generate vibration under the drive of the motor to drive the feeding part to vibrate.
[0125] Optionally, the detection unit includes a transmitter, a receiver, and an arc gap formed between the transmitter and receiver. Both the transmitter and receiver are arc-shaped. The surface of the receiver facing the arc gap is a second arc surface. The relative distance between the transmitter and receiver is constant to ensure that each ray travels from the transmitter to the receiver in the same amount of time. The transmitter can emit radiation and cause it to penetrate the material, while the receiver can receive the radiation and output a signal based on the degree of radiation attenuation, used to determine the type or quality of the material.
[0126] Optionally, the separation unit includes a plurality of separation elements, each of which is spaced apart and arranged on the third curved surface, and each separation element operates independently. The separation unit is configured to separate different types of materials so that the different types of materials have different motion trajectories. It should be noted that the separation element may be formed by a valve block and an air jet hole.
[0127] The first curved surface design at the discharge end of the receiving unit facilitates uniform distribution of ore, ensuring stable flow during the sorting process and thus improving sorting efficiency. The detection unit, comprising a radiation source and receiver, detects the properties and location of the ore. The second curved surface design facilitates focusing and receiving radiation, improving detection accuracy. The separation unit, with multiple separators spaced along a third curved surface, separates the ore for sorting. This third curved surface ensures uniform and effective separation, improving sorting accuracy.
[0128] In one embodiment of the present invention, as shown in FIG15 , the steps of the separation adjustment method include:
[0129] S102, determining the installation reference surface of the frame.
[0130] S104: Determine at least one calibration reference object, where the calibration reference object extends along a plumb line, and a portion of the calibration reference object is located between the ray source and the receiver.
[0131] S106: Determine a first relative position of the calibration reference object relative to the first arc surface.
[0132] S108: Determine a second relative position of the calibration reference object relative to the second arc surface according to the detection unit.
[0133] S110 , controlling at least one separating member in the separating unit to separate according to the second relative position, and determining a third relative position of the separating member to separate relative to the third arc surface.
[0134] S112 , determining the offsets of the receiving unit, the receiver, and the separating unit relative to the installation reference plane according to the first relative position, the second relative position, and the third relative position.
[0135] S114, adjusting the positions of the receiving unit, the receiver, and the separation unit according to the offset until the symmetry center plane of the first arc surface, the symmetry center plane of the second arc surface, and the symmetry center plane of the third arc surface are coplanar.
[0136] By determining the installation reference surface of the frame, a unified reference standard is provided for the entire adjustment process, ensuring that the adjustment of all components is based on the same basis. By determining the calibration reference object, a fixed reference point can be provided for measuring and comparing the relative positions of each device to ensure the accuracy of the adjustment. On this basis, the first relative position of the calibration reference object relative to the first arc surface is determined, so that the actual position of the receiving unit can be understood, providing a basis for subsequent adjustments. And according to the detection unit, the second relative position of the calibration reference object relative to the second arc surface is determined, and the position of the calibration reference object relative to the detection unit is accurately measured to ensure the accuracy of the detection. By controlling at least one separation component in the separation unit to separate according to the second relative position, and determining the third relative position of the separation component to be separated relative to the third arc surface, the position and separation effect of the separation unit can be verified to ensure the correct position of the separation component.
[0137] Based on the first, second, and third relative positions, the offset of each device relative to the reference plane—that is, the offset of the receiving unit, receiver, and separation unit relative to the installation reference plane—can be calculated, providing data support for the final adjustment. Based on these offsets, the positions of the receiving unit, receiver, and separation unit are adjusted until the center planes of symmetry of the first, second, and third arcs are coplanar. This final adjustment ensures the coplanarity of the center planes of symmetry of all devices, improving ore sorting uniformity and detection accuracy, thereby enhancing sorting efficiency and precision.
[0138] It should be added that the installation reference plane of the frame is a set plane, and the ideal positions of the receiving unit, detection unit and separation unit during installation are all aligned through the installation reference plane, so it is easier to adjust the positions of the three.
[0139] Through this separation adjustment method, efficient and precise operation of material sorting equipment can be achieved, unnecessary energy consumption and equipment loss can be reduced, and the economic benefits of the entire sorting process can be improved.
[0140] As shown in FIG16 , the step of determining the offset of the receiving unit, the receiver, and the separation unit relative to the installation reference plane based on the first relative position, the second relative position, and the third relative position includes:
[0141] S1122 , when any two of the first relative position, the second relative position, and the third relative position correspond to the installation reference plane, determining a calibration theoretical position corresponding to the other one according to the installation reference plane.
[0142] S1124 , determining an offset according to the calibration theoretical position and the installation reference plane corresponding to another one of the first relative position, the second relative position, and the third relative position.
[0143] The first relative position (the relative position of the receiving unit and the calibration reference object), the second relative position (the relative position of the receiver of the detection unit and the calibration reference object) and the third relative position (the relative position of the separation unit and the calibration reference object) are obtained through actual measurements, and they reflect the positional relationship of each device under actual working conditions.
[0144] By determining the theoretical calibration position, given the first and second relative positions, an ideal theoretical calibration position can be assumed, based on the mounting reference plane. Ideally, if all devices are perfectly aligned, the projections of the calibration reference object on the first curved surface of the receiving unit and the second curved surface of the receiver should be identical. Similarly, if the second and third relative positions are known, a theoretical calibration position based on the mounting reference plane can also be assumed. This position represents the ideal position of the separation element of the separation unit.
[0145] Based on the known relative positions and the theoretical calibration positions, the actual offset of each device relative to the mounting reference surface can be calculated. For example, if the first relative position indicates that the position of the calibration reference object projected on the first curved surface of the receiving unit differs from the theoretical calibration position, then this difference is the offset of the receiving unit. Similarly, if the second relative position indicates that the position of the receiver differs from the theoretical calibration position, then this difference is the offset of the receiver. For the separation unit, if the third relative position indicates that the position of the separation component differs from the theoretical calibration position, then this difference is the offset of the separation unit.
[0146] Based on the calculated offsets, the receiving unit, receiver, and separation unit can be fine-tuned to reduce these offsets until their center planes of symmetry are coplanar. This typically involves using adjustment tools (such as jacks, screwdrivers, etc.) to move the units until their actual positions match the calibration theoretical positions.
[0147] This process ensures that all key components in the material sorting equipment (receiving units, receivers, and separation units) are precisely aligned, thereby improving the efficiency and accuracy of ore sorting. This approach helps reduce operational errors, improves equipment stability and reliability, and ultimately enhances the economic benefits of the entire sorting process.
[0148] In some embodiments, optionally, as shown in FIG17 , determining the offset according to another corresponding calibration theoretical position and the installation reference plane among the first relative position, the second relative position, and the third relative position specifically includes:
[0149] S11242: When the first relative position corresponds to the installation reference plane and the second relative position corresponds to the installation reference plane, determine the offset of the separation unit relative to the installation reference plane according to the calibration theoretical position corresponding to the third relative position.
[0150] S11244: When the first relative position corresponds to the installation reference plane and the third relative position corresponds to the installation reference plane, determine the offset of the receiver relative to the installation reference plane according to the calibration theoretical position corresponding to the second relative position.
[0151] S11246: When the second relative position corresponds to the installation reference plane and the third relative position corresponds to the installation reference plane, determine the offset of the receiving unit relative to the installation reference plane according to the calibration theoretical position corresponding to the first relative position.
[0152] The offset of each device is determined by comparing the actual measured relative position with the calibrated theoretical position based on the mounting reference surface.
[0153] Among them, when the first relative position corresponds to the installation reference plane and the second relative position corresponds to the installation reference plane, the offset of the separation unit is determined, assuming that the receiving unit and the receiver are already aligned with the installation reference plane, that is, their first relative position and second relative position correspond to the installation reference plane. Then, according to the third relative position (the relative position of the separation part of the separation unit and the calibration reference object), the calibration theoretical position of the separation unit is determined, and this position is based on the installation reference plane. Next, by comparing the third relative position with the calibration theoretical position, the offset of the separation unit relative to the installation reference plane is calculated. If the third relative position is inconsistent with the calibration theoretical position, then this difference is the offset of the separation unit.
[0154] Assume that both the receiving unit and the separation unit are aligned with the mounting reference plane. That is, their first and third relative positions correspond to the mounting reference plane. The receiver's theoretical calibration position, relative to the mounting reference plane, is then determined based on the second relative position (the relative position of the receiver to the calibration reference object). This position is then compared with the theoretical calibration position to calculate the receiver's offset relative to the mounting reference plane. If the second relative position differs from the theoretical calibration position, the difference is the receiver's offset.
[0155] Assume that both the receiver and the separation unit are aligned with the mounting reference plane. That is, their second and third relative positions correspond to the mounting reference plane. Based on the first relative position (the relative position of the receiver unit to the calibration reference object), the theoretical calibration position of the receiver unit is determined, which is relative to the mounting reference plane. Next, the first relative position is compared with the theoretical calibration position to calculate the offset of the receiver unit relative to the mounting reference plane. If the first relative position differs from the theoretical calibration position, the difference is the offset of the receiver unit.
[0156] Through these steps, the offset of each device relative to the mounting reference plane can be accurately calculated and adjusted accordingly to ensure that the center planes of symmetry of all devices are coplanar, thereby improving the efficiency and accuracy of ore sorting. This method helps to reduce operating errors, improve equipment stability and reliability, and ultimately enhance the economic benefits of the entire sorting process.
[0157] In some embodiments, optionally, as shown in FIG18 , determining the offset of the separation unit relative to the installation reference plane according to the calibration theoretical position corresponding to the third relative position specifically includes:
[0158] S112422: Determine a calibration theoretical position corresponding to the third relative position. The calibration theoretical position includes a third distance between the calibration reference object and the center of the third arc, and a third angle between a line connecting the calibration reference object and the center of the third arc and the installation reference plane.
[0159] S112424: Determine an offset of the separation unit relative to the installation reference plane according to the third distance and the third angle.
[0160] To determine the offset of the separation unit relative to the mounting reference plane, first, an ideal calibration theoretical position is determined based on the third relative position (the relative position of the separation unit's separation components and the calibration reference object). This position is based on the mounting reference plane and reflects the ideal position of the separation unit.
[0161] Calibration of the theoretical position involves two key parameters: the third distance and the third angle. The third distance is the distance from the calibration reference object to the center of the third arc (the arc where the separation element of the separation unit is located). The third angle is the angle between the line connecting the calibration reference object and the center of the third arc and the installation reference surface.
[0162] Next, the difference between the measured third relative position and the calibrated theoretical position needs to be compared. This difference represents the offset of the separation unit relative to the mounting reference plane. Specifically, if the measured third distance value differs from the third distance in the calibrated theoretical position, the distance difference represents the offset of the separation unit perpendicular to the mounting reference plane. Similarly, if the measured third angle value differs from the third angle in the calibrated theoretical position, the angle difference represents the offset of the separation unit relative to the mounting reference plane.
[0163] Finally, the position of the separation unit is adjusted. Based on the calculated offsets, the separation unit can be fine-tuned to reduce these offsets until the actual position of the separation unit is consistent with the calibrated theoretical position. This usually involves using adjustment tools (such as jacks, screwdrivers, etc.) to move the separation parts until their actual position is consistent with the calibrated theoretical position.
[0164] This process ensures precise alignment of the separation units, improving the efficiency and accuracy of ore sorting. This approach helps reduce operational errors, improves equipment stability and reliability, and ultimately enhances the economic benefits of the entire sorting process.
[0165] As shown in FIG19 , the positions of the receiving unit, the receiver, and the separation unit are adjusted according to the offset, specifically including:
[0166] S1142, determine the offset angle of the separation unit relative to the installation reference plane based on the third angle; rotate the separation unit until the third angle is 0°; or screen all the separation parts in the separation unit based on the offset angle to determine multiple working separation parts, wherein the symmetry center plane corresponding to the arrangement positions of the multiple working separation parts coincides with the installation reference plane.
[0167] When adjusting the position of the separation unit to ensure that its center plane of symmetry coincides with the installation reference plane, first determine the separation unit's offset angle relative to the installation reference plane based on the previously calculated third angle (the angle between the line connecting the calibration reference object and the center of the third arc and the installation reference plane). This angle reflects the positional deviation of the separation unit on the horizontal plane.
[0168] If you choose to adjust the position of the separation unit directly, you will eliminate this offset angle by rotating the separation unit. Specifically, use an appropriate tool (such as a wrench or special adjustment tool) to rotate the separation unit until the third angle is reduced to 0°, which means that the symmetrical center plane of the separation unit completely coincides with the installation reference plane.
[0169] Another adjustment method is to select a portion of all the separation components as working separation components instead of directly adjusting the overall position of the separation unit, so that the symmetric center plane corresponding to the arrangement position of these working separation components coincides with the installation reference plane.
[0170] The specific operation is to select the separation parts that can compensate for the offset according to the offset angle as the working separation parts. The combination of these separation parts will form a new symmetrical center plane, which will coincide with the installation reference plane, thereby achieving the purpose of adjustment.
[0171] These steps ensure precise alignment of the separation unit, improving the efficiency and accuracy of ore sorting. This approach helps reduce operational errors, improves equipment stability and reliability, and ultimately enhances the economic benefits of the entire sorting process. Regardless of the chosen adjustment method, the goal is to ensure that the center plane of symmetry of the separation unit coincides with the mounting reference plane for optimal sorting results.
[0172] As shown in FIG20 , the step of determining the offset of the receiver relative to the installation reference plane according to the calibration theoretical position corresponding to the second relative position includes:
[0173] S112442, determine a calibration theoretical position corresponding to the second relative position, the calibration theoretical position including a second distance between the calibration reference object and the center of the second arc, and a second angle between a line connecting the calibration reference object and the center of the second arc and the installation reference plane.
[0174] S112444, determining an offset of the receiver relative to the installation reference plane according to the second distance and the second angle.
[0175] First, an ideal calibration theoretical position needs to be determined based on the second relative position (the relative position of the receiver and the calibration reference object). This position is based on the installation reference plane and reflects where the receiver should be located in an ideal situation.
[0176] Calibration of the theoretical position involves two key parameters: the second distance and the second angle. The second distance is the distance from the calibration reference object to the center of the second arc (the arc where the receiver is located). The second angle is the angle between the line connecting the calibration reference object and the center of the second arc and the mounting reference surface.
[0177] Next, the difference between the measured second relative position and the calibrated theoretical position needs to be compared. This difference represents the receiver's offset relative to the mounting reference plane. Specifically, if the measured second distance differs from the calibrated second distance, the distance difference represents the receiver's offset perpendicular to the mounting reference plane. Similarly, if the measured second angle differs from the calibrated second angle, the angle difference represents the receiver's offset relative to the mounting reference plane.
[0178] Based on the calculated offsets, the receivers can be fine-tuned to reduce these offsets until the actual position of the receivers is consistent with the calibration theoretical position. This usually involves using adjustment tools (such as jacks, screwdrivers, etc.) to move the receivers until their actual position is consistent with the calibration theoretical position.
[0179] This process ensures precise receiver alignment, improving the efficiency and accuracy of ore sorting. This approach helps reduce operating errors, improves equipment stability and reliability, and ultimately enhances the economic efficiency of the entire sorting process.
[0180] In some embodiments, optionally, the positions of the receiving unit, the receiver, and the separation unit are adjusted according to the offset, specifically including: determining the offset angle of the receiver relative to the installation reference plane according to the second angle; and rotating the receiver until the second angle is 0°.
[0181] When adjusting the receiver's position based on the offset to ensure its center plane of symmetry coincides with the mounting reference plane, first determine the receiver's offset angle relative to the mounting reference plane based on the previously calculated second angle (the angle between the line connecting the calibration reference object and the center point of the second arc and the mounting reference plane). This angle reflects the receiver's positional deviation from the horizontal plane.
[0182] Next, the receiver is rotated to eliminate this offset angle. Specifically, the receiver is rotated using an appropriate tool (such as a wrench or a special adjustment tool) until the second angle is reduced to 0°, which means that the center plane of symmetry of the receiver is completely aligned with the mounting reference plane.
[0183] These steps ensure precise alignment of the receiver, improving the efficiency and accuracy of ore sorting. This approach helps reduce operational errors, improves equipment stability and reliability, and ultimately enhances the economic efficiency of the entire sorting process. Rotating the receiver until the second angle reaches 0° is a critical step in ensuring alignment with the mounting reference surface, which is crucial for maintaining the accuracy of the detection unit and the precision of the sorting process.
[0184] In some embodiments, optionally, as shown in FIG21 , determining the offset of the receiving unit relative to the installation reference surface according to the calibration theoretical position corresponding to the first relative position includes:
[0185] S112462, determining a calibration theoretical position corresponding to the first relative position, the calibration theoretical position including a first distance between the calibration reference object and the center of the first arc, and a first angle between a line connecting the calibration reference object and the center of the first arc and the installation reference plane.
[0186] S112464: Determine an offset of the receiving unit relative to the installation reference plane according to the first distance and the first angle.
[0187] To determine the offset of the receiving unit relative to the mounting reference surface, first, an ideal calibration theoretical position must be determined based on the first relative position (the relative position of the receiving unit and the calibration reference object). This position is based on the mounting reference surface and reflects where the receiving unit should ideally be located.
[0188] Calibration of the theoretical position involves two key parameters: the first distance and the first angle. The first distance is the distance from the calibration reference object to the center of the first arc (the arc where the discharge end of the receiving unit is located). The first angle is the angle between the line connecting the calibration reference object and the center of the first arc and the installation reference surface.
[0189] Next, the difference between the measured first relative position and the calibrated theoretical position needs to be compared. This difference represents the offset of the receiving unit relative to the mounting reference surface. Specifically, if the measured first distance value differs from the first distance in the calibrated theoretical position, the distance difference represents the offset of the receiving unit perpendicular to the mounting reference surface. Similarly, if the measured first angle value differs from the first angle in the calibrated theoretical position, the angle difference represents the offset of the receiving unit relative to the mounting reference surface.
[0190] Based on the calculated offsets, the receiving units can be fine-tuned to reduce these offsets until the actual position of the receiving units is consistent with the calibrated theoretical position. This usually involves using adjustment tools (such as jacks, screwdrivers, etc.) to move the receiving units until their actual position is consistent with the calibrated theoretical position. Through this process, it is possible to ensure that the receiving units are precisely aligned, thereby improving the efficiency and accuracy of ore sorting. This approach helps to reduce operating errors, improve the stability and reliability of the equipment, and ultimately improve the economic benefits of the entire sorting process.
[0191] In some embodiments, optionally, the positions of the receiving unit, the receiver and the separation unit are adjusted according to the offset, specifically including: determining the offset angle of the receiving unit relative to the installation reference plane according to the first angle; and rotating the receiving unit until the first angle is 0°.
[0192] When adjusting the receiving unit's position based on the offset to ensure its center plane of symmetry coincides with the installation reference plane, first determine the receiving unit's offset angle relative to the installation reference plane based on the previously calculated first angle (the angle between the line connecting the calibration reference object and the center point of the first arc and the installation reference plane). This angle reflects the receiving unit's positional deviation on the horizontal plane.
[0193] Next, the receiving unit is rotated to eliminate the offset angle. Specifically, the receiving unit is rotated using an appropriate tool (such as a wrench or a special adjustment tool) until the first angle is reduced to 0°, which means that the symmetry center plane of the receiving unit completely coincides with the installation reference plane.
[0194] These steps ensure precise alignment of the receiving unit, improving the efficiency and accuracy of ore sorting. This approach helps reduce operational errors, improves equipment stability and reliability, and ultimately enhances the economic efficiency of the entire sorting process. Rotating the receiving unit until the first angle reaches 0° is a critical step in ensuring alignment with the mounting reference surface, which is crucial for even ore distribution and accurate sorting.
[0195] As shown in FIG22 , determining the offsets of the receiving unit, the receiver, and the separation unit relative to the installation reference plane based on the first relative position, the second relative position, and the third relative position includes:
[0196] S2122: According to one of the first relative position, the second relative position, and the third relative position, determine a calibration theoretical position corresponding to the other two.
[0197] S2124: Determine an offset according to the other two corresponding calibration theoretical positions and the installation reference plane among the first relative position, the second relative position, and the third relative position.
[0198] The offset of each device is determined by comparing the actual measured relative position with the calibrated theoretical position based on the mounting reference surface. First, one of the first relative position, second relative position, and third relative position is selected (for example, the first relative position) and it is assumed that this position is aligned with the mounting reference surface. Based on this aligned relative position, the calibrated theoretical positions of the other two relative positions (the second relative position and the third relative position) are then determined. These calibrated theoretical positions are based on the mounting reference surface and reflect the positions where the receiver and separation unit should ideally be located. Next, the differences between the actual measured values of the second relative position and the third relative position and their respective calibrated theoretical positions are compared. These differences are the offsets of the receiver and separation unit relative to the mounting reference surface.
[0199] Specifically, if the actual measured value of the second relative position is inconsistent with the calibrated theoretical position, then the difference is the offset of the receiver. Similarly, if the actual measured value of the third relative position is inconsistent with the calibrated theoretical position, then the difference is the offset of the separation unit.
[0200] Based on the calculated offsets, the receiver and separation unit can be fine-tuned to reduce these offsets until their actual positions are consistent with the calibrated theoretical positions. This typically involves using adjustment tools (such as jacks, screwdrivers, etc.) to move the units until their actual positions are consistent with the calibrated theoretical positions.
[0201] This process ensures that the receiving unit, receiver, and separation unit are precisely aligned, thereby improving the efficiency and accuracy of ore sorting. This approach helps reduce operating errors, improves equipment stability and reliability, and ultimately improves the economic benefits of the entire sorting process.
[0202] In some embodiments, optionally, as shown in FIG23 , determining, based on one of the first relative position, the second relative position, and the third relative position, a calibration theoretical position corresponding to the other two may include:
[0203] S21222: Determine the symmetry center plane of the first arc as the installation reference plane of the frame.
[0204] S21224, determine the calibration theoretical position of the calibration reference object relative to the installation reference plane, the calibration theoretical position corresponding to the second relative position includes the distance between the calibration reference object and the center of the second arc, and the angle between the line connecting the calibration reference object and the center of the second arc and the installation reference plane, the calibration theoretical position corresponding to the third relative position includes the distance between the calibration reference object and the center of the third arc, and the angle between the line connecting the calibration reference object and the center of the third arc and the installation reference plane.
[0205] The theoretical calibration position of the calibration reference object relative to the receiver and separation unit is determined by determining the center plane of symmetry of the first arc as the mounting reference plane of the frame. First, assume that the center plane of symmetry of the first arc of the receiving unit is aligned with the mounting reference plane of the frame. This means that the center point of the first arc is on the mounting reference plane, and the center of curvature of the first arc is perpendicular to the mounting reference plane.
[0206] Next, the ideal position of the calibration reference object relative to the mounting reference surface is determined based on the first relative position (the relative position of the receiving unit and the calibration reference object). Since the center plane of symmetry of the first arc has already been used as the mounting reference surface, we can assume that the position of the calibration reference object on the receiving unit is aligned.
[0207] For the receiver, the theoretical calibration position of the calibration reference on the receiver unit is determined based on the aligned position of the calibration reference on the receiving unit. This position consists of two parameters: the distance of the calibration reference from the center of the second arc, and the angle between the line connecting the calibration reference and the center of the second arc and the mounting reference surface.
[0208] For the separation unit, the theoretical calibration position of the calibration reference object on the receiving unit is also determined based on the aligned position of the calibration reference object on the receiving unit. This position also includes two parameters: the distance of the calibration reference object from the center of the third arc, and the angle between the line connecting the calibration reference object and the center of the third arc and the mounting reference surface.
[0209] These steps determine the ideal, theoretically aligned positions for the receiver and separation units, based on the aligned receiver units and mounting datum plane. Next, these theoretically aligned positions are compared with the measured second and third relative positions to calculate the offsets of the receiver and separation units relative to the mounting datum plane. Adjustments are then made accordingly to ensure the center planes of symmetry for all units are coplanar, improving ore sorting efficiency and accuracy.
[0210] In some embodiments, optionally, as shown in FIG24 , determining, based on one of the first relative position, the second relative position, and the third relative position, a calibration theoretical position corresponding to the other two may include:
[0211] S21226, determining the symmetric center plane of the second arc as the installation reference plane of the frame;
[0212] S21228, determine the calibration theoretical position of the calibration reference object relative to the installation reference plane, the calibration theoretical position corresponding to the first relative position includes the distance between the calibration reference object and the center of the first arc, and the angle between the line connecting the calibration reference object and the center of the first arc and the installation reference plane, the calibration theoretical position corresponding to the third relative position includes the distance between the calibration reference object and the center of the third arc, and the angle between the line connecting the calibration reference object and the center of the third arc and the installation reference plane.
[0213] By determining the center plane of symmetry of the second arc as the installation reference plane of the bracket, and based on this, the theoretical calibration position of the calibration reference object relative to the receiving unit and the separation unit is determined. First, it is assumed that the center plane of symmetry of the second arc of the receiver is aligned with the installation reference plane of the bracket. This means that the center point of the second arc is on the installation reference plane, and the center of curvature of the second arc is perpendicular to the installation reference plane. Next, based on the second relative position (the relative position of the receiver and the calibration reference object), the ideal position of the calibration reference object relative to the installation reference plane is determined. Since the center plane of symmetry of the second arc has been used as the installation reference plane, we can assume that the position of the calibration reference object on the receiver is aligned.
[0214] For the receiving unit, the theoretical calibration position of the calibration reference object on the receiver is determined based on the aligned position of the calibration reference object on the receiver. This position consists of two parameters: the distance of the calibration reference object from the center of the first arc, and the angle between the line connecting the calibration reference object and the center of the first arc and the mounting reference surface.
[0215] For the separation unit, the theoretical calibration position of the calibration reference on the separation unit is also determined based on the aligned position of the calibration reference on the receiver. This position also includes two parameters: the distance of the calibration reference from the center of the third arc, and the angle between the line connecting the calibration reference and the center of the third arc and the mounting reference surface.
[0216] Through these steps, the ideal calibration theoretical positions for the receiving and separation units are determined, based on the aligned receiver and mounting reference surfaces. Next, these calibration theoretical positions are compared with the measured first and third relative positions to calculate the offset of the receiving and separation units relative to the mounting reference surface. Adjustments are then made accordingly to ensure the center planes of symmetry of all units are coplanar, thereby improving the efficiency and accuracy of ore sorting.
[0217] In some embodiments, optionally, as shown in FIG25 , determining, based on one of the first relative position, the second relative position, and the third relative position, a calibration theoretical position corresponding to the other two may include:
[0218] S21230, determining the symmetric center plane of the third arc as the installation reference plane of the frame;
[0219] S21232, determine the calibration theoretical position of the calibration reference object relative to the installation reference plane, the calibration theoretical position corresponding to the first relative position includes the distance between the calibration reference object and the center of the first arc, and the angle between the line connecting the calibration reference object and the center of the first arc and the installation reference plane, the calibration theoretical position corresponding to the second relative position includes the distance between the calibration reference object and the center of the second arc, and the angle between the line connecting the calibration reference object and the center of the second arc and the installation reference plane.
[0220] By determining the center plane of symmetry of the third arc as the installation reference plane of the frame, and based on this, determine the theoretical calibration position of the calibration reference object relative to the receiving unit and the receiver. First, assume that the center plane of symmetry of the third arc of the separation unit is aligned with the installation reference plane of the frame. This means that the center point of the third arc is on the installation reference plane, and the center of curvature of the third arc is perpendicular to the installation reference plane. Next, based on the third relative position (the relative position of the separation unit and the calibration reference object), determine the ideal position of the calibration reference object relative to the installation reference plane. Since the center plane of symmetry of the third arc has been used as the installation reference plane, we can assume that the position of the calibration reference object on the separation unit is aligned.
[0221] For the receiving unit, the theoretical calibration position of the calibration reference object on the receiving unit is determined based on the aligned position of the calibration reference object on the separation unit. This position includes two parameters: the distance of the calibration reference object from the center of the first arc, and the angle between the line connecting the calibration reference object and the center of the first arc and the mounting reference surface. For the receiver, the theoretical calibration position of the receiver is similarly determined based on the aligned position of the calibration reference object on the separation unit. This position also includes two parameters: the distance of the calibration reference object from the center of the second arc, and the angle between the line connecting the calibration reference object and the center of the second arc and the mounting reference surface.
[0222] Through these steps, the ideal calibration theoretical positions for the receiving unit and receiver are determined. These positions are based on the aligned separation unit and the mounting reference surface. Next, these calibration theoretical positions are compared with the actual measured first and second relative positions to calculate the offset of the receiving unit and receiver relative to the mounting reference surface. Adjustments are made accordingly to ensure that the center planes of symmetry of all devices are coplanar, thereby improving the efficiency and accuracy of ore sorting.
[0223] In some embodiments, optionally, as shown in FIG26 , adjusting the positions of the receiving unit, the receiver, and the separation unit according to the offset specifically includes:
[0224] S2142: If the first relative position is different from the corresponding calibration theoretical position, adjust the position of the receiving unit until the first relative position is the same as the corresponding calibration theoretical position;
[0225] S2144, if the second relative position is different from the corresponding calibration theoretical position, adjust the position of the receiver until the second relative position is the same as the corresponding calibration theoretical position;
[0226] S2146: When the third relative position is different from the corresponding calibration theoretical position, adjust the position of the separation unit until the third relative position is the same as the corresponding calibration theoretical position.
[0227] Adjust the positions of the receiving unit, receiver, and separation unit based on the difference between the actual measured relative position and the calibrated theoretical position. If the first relative position (the relative position of the receiving unit and the calibration reference object) differs from the corresponding calibrated theoretical position, the position of the receiving unit needs to be adjusted. This may involve moving the entire receiving unit assembly or adjusting its supporting structure. Use a measuring tool (such as a laser rangefinder, angle meter, etc.) to monitor the position of the receiving unit and make fine adjustments until the first relative position is the same as the calibrated theoretical position. This indicates that the receiving unit is aligned with the mounting reference surface.
[0228] If the second relative position (the position of the receiver relative to the calibration reference) differs from the corresponding theoretical calibration position, the receiver's position needs to be adjusted. This may involve adjusting the receiver's height, angle, or mounting position on the frame. Again, use a measuring tool to monitor the receiver's position and make any necessary adjustments until the second relative position matches the theoretical calibration position. This ensures that the receiver can accurately detect minerals passing through its detection zone.
[0229] If the third relative position (the relative position of the separation unit and the calibration reference) is different from the corresponding calibration theoretical position, the position of the separation unit needs to be adjusted. This may involve adjusting the angle, position of the separation element, or the overall structure of the separation unit. Use a measuring tool to monitor the position of the separation unit and make fine adjustments until the third relative position is the same as the calibration theoretical position. This ensures that the separation unit can separate the ore at the correct angle and position, thereby improving sorting efficiency.
[0230] These steps ensure precise alignment of the receiving unit, receiver, and separation unit, improving the efficiency and accuracy of ore sorting. This approach helps reduce operational errors, improves equipment stability and reliability, and ultimately enhances the economic efficiency of the entire sorting process. During the adjustment process, precise measurement and fine-tuning are key to ensuring that the center planes of symmetry of all units are coplanar for optimal sorting results.
[0231] In some embodiments, optionally, determining a first relative position of the calibration reference object relative to the first arc surface specifically includes: determining the center of the first arc; determining a first projection point of the calibration reference object on the horizontal plane; determining a first detection line from the first projection point to the center of the first arc; determining the length of the first detection line, and / or determining a first angle between the first detection line and the installation reference plane.
[0232] To determine the first relative position of the calibration reference object relative to the first curved surface of the receiving unit, first, it is necessary to find the center of the first arc (the arc on which the discharge end of the receiving unit is located). This typically involves measuring the radius of curvature of the arc and determining its geometric center. Next, it is necessary to determine the point where the calibration reference object is projected onto the horizontal plane. This can be achieved by projecting the calibration reference object vertically onto the horizontal plane, ensuring that the projected point is aligned with the calibration reference object.
[0233] Then, connect the first projection point and the center of the first arc to form a straight line, which is called the first detection line. This line represents the relative positional relationship between the calibration reference object and the receiving unit. Next, measure the length of the first detection line, which represents the straight-line distance between the calibration reference object and the center of the first arc. At the same time, it is also necessary to determine the angle between the first detection line and the installation reference surface. This angle reflects the degree of inclination of the calibration reference object relative to the installation reference surface.
[0234] Through these steps, the key parameters for the first relative position of the calibration reference object with respect to the first curved surface of the receiving unit are obtained: the length and first angle of the first detection line. These parameters are used in subsequent adjustments to ensure the coplanarity of the central planes of symmetry of the receiving unit, the receiver, and the separation unit, thereby improving the efficiency and accuracy of ore sorting. Accurately measuring and recording these parameters is crucial to ensuring accurate adjustments.
[0235] In some embodiments, optionally, the second relative position of the calibration reference object relative to the second curved surface is determined based on the detection unit, specifically including: controlling the ray source to emit rays toward the calibration reference object; determining the second angle between the calibration reference object and the installation reference surface based on the rays received by the receiver, and / or determining the distance between the calibration reference object and the ray source.
[0236] A detection unit is used to determine the second relative position of the calibration reference object relative to the second curved surface of the receiver. First, a radiation source in the detection unit is activated to emit radiation toward the calibration reference object. This radiation source can be an X-ray, laser, or other type of detection radiation, depending on the design of the detection unit. After passing through the calibration reference object, the radiation is received by the receiver. The receiver is typically capable of measuring the angle of incidence of the radiation, which can be used to determine a second angle between the calibration reference object and the mounting reference surface. This angle reflects the degree of inclination of the calibration reference object relative to the mounting reference surface.
[0237] In addition to the angle, the distance between the calibration reference and the radiation source can also be determined by measuring the travel time of the radiation or the intensity of the received radiation. This distance information is crucial for determining the exact position of the calibration reference in space.
[0238] Through these steps, key parameters for the second relative position of the calibration reference object relative to the second curved surface of the receiver can be determined: the second angle and / or the distance between the calibration reference object and the radiation source. These parameters will be used in subsequent adjustments to ensure that the receiver can accurately detect minerals passing through its detection area. Accurately measuring and recording these parameters is crucial to ensuring accurate adjustments.
[0239] In some embodiments, optionally, based on the rays received by the receiver, a second angle between the calibration reference object and the installation reference surface is determined, and / or the distance between the calibration reference object and the ray source is determined, specifically including: obtaining an image generated by the receiver based on the received rays; determining a first area in the image, the first area and other areas in the image other than the first area have different brightness and darkness; determining the second angle and / or the distance between the calibration reference object and the ray source based on the position occupied by the first area in the image.
[0240] The image generated by the radiation received by the receiver is used to determine the second angle of the calibration reference object relative to the mounting reference surface and / or the distance between the calibration reference object and the radiation source. After receiving the radiation, the receiver generates an image based on the intensity, angle, or other characteristics of the radiation. This image can be digital or analog, depending on the design of the receiver. In the generated image, it is necessary to identify the area associated with the calibration reference object, namely the first area. This area is typically different in brightness from other areas (non-first areas) because the calibration reference object blocks or affects the propagation of the radiation.
[0241] The position and size of the first region in the image can provide important information about the calibration reference object's position. For example, if the first region is offset in the image, this may indicate a second angle between the calibration reference object and the mounting surface. Similarly, the size of the first region (i.e., the projected size of the calibration reference object in the image) can be used to estimate the distance between the calibration reference object and the radiation source. Generally, the greater the distance, the smaller the projected region in the image.
[0242] By analyzing the primary area in the image, we can calculate the secondary angle and / or the distance between the calibration reference and the radiation source. This information is crucial for adjusting the receiver's position to ensure accurate detection of the ore. Accurate image analysis and measurement are key to ensuring accurate adjustments.
[0243] In some embodiments, optionally, determining a third relative position of the separating part to be separated relative to the third arc surface specifically includes: determining a third detection line between the separating part to be separated and the center of the third arc surface; determining the length of the third detection line, and / or determining a third angle between the third detection line and the installation reference plane.
[0244] Determine the third relative position of the separating part to be separated relative to the third arc surface of the separation unit. First, it is necessary to find the center of the third arc (the arc where the separating part of the separation unit is located). This usually involves measuring the radius of curvature of the arc and determining its geometric center. Then, connect the separating part to be separated and the center of the third arc surface to form a straight line, which is called the third detection line. This line represents the relative position relationship between the separating part and the separation unit.
[0245] Next, the length of the third detection line needs to be measured, which represents the straight-line distance between the separator and the center of the third arc. This length information is crucial for determining the exact position of the separator in space.
[0246] In addition to the length, the angle between the third detection line and the installation reference plane also needs to be determined. This angle reflects the degree of inclination of the separator relative to the installation reference plane. This angle information is crucial to ensure that the separator can separate the ore at the correct angle.
[0247] Through these steps, we can determine the key parameters for the third relative position of the separating element relative to the third curved surface: the length of the third detection line and the third angle. These parameters will be used in subsequent adjustments to ensure that the separating element separates the ore at the correct angle and position, thereby improving sorting efficiency. Accurately measuring and recording these parameters is crucial to ensuring accurate adjustments.
[0248] In some embodiments, optionally, determining at least one calibration reference object specifically includes: arranging a plumb line at the discharge end of the receiving unit, the plumb line passing through the detection unit.
[0249] Identifying at least one calibration reference is a critical step in ensuring precise alignment of your material sorting equipment. First, a calibration reference—in this case, a plumb line—needs to be placed at the outfeed end of the receiving unit. A plumb line is a vertically suspended line that naturally stays perpendicular to the horizontal plane due to gravity. When placing the plumb line, ensure it is located near the outfeed end of the receiving unit so that it can serve as a calibration reference to help determine the unit's position.
[0250] Next, you need to ensure that the plumb line passes through the detection unit's operating area. This means the plumb line needs to be positioned between the radiation source and the receiver so that the radiation can pass through the plumb line and be detected by the receiver. The location of the plumb line is crucial for determining the accurate position of the detection unit because it provides a fixed reference point from which to measure and compare the relative positions of the receiving unit, receiver, and separation unit.
[0251] Through these steps, a calibration reference (plumb line) is set up, which can accurately measure and adjust the various components in the material sorting equipment. The use of the plumb line ensures the consistency and accuracy of the measurement because it provides a fixed reference point that is not affected by the movement of the equipment. In the subsequent adjustment process, this calibration reference will be used to determine the offset of each component relative to the installation reference surface, and adjustments will be made accordingly to ensure that the symmetry center planes of all devices are coplanar, thereby improving the efficiency and accuracy of ore sorting.
[0252] Next, the shape compensation of the first curved surface in the present invention is explained with reference to Figure 26 (Figure 26A, Figure 26B). As mentioned above, the first curved surface is the curved surface where the discharge end of the receiving unit is located. When the discharge end of the receiving unit is straight, the ore falling from the discharge end basically flies along a consistent flight trajectory, and falls into the corresponding material area after being sorted by the blowing device. However, in the present invention, since the discharge end is a first curved surface, the flight trajectories of the ores falling from different positions of the discharge end are different from each other. For example, the ore falling from the center position of the discharge end will fly a farther distance than the ore falling from the edge position of the discharge end. Such a difference makes the collection of the ore a problem, and may cause the ore to not accurately fall into the corresponding material area.
[0253] In this regard, the present invention compensates the first arc surface of the discharge end by the following method.
[0254] The parameters of the vibrating feeder include:
[0255] Fixed parameters:
[0256] Kv: Comprehensive empirical coefficient of linear vibrating feeder, for example, 0.75-0.95;
[0257] λ: single amplitude, unit: mm;
[0258] δ: vibration direction angle;
[0259] α: screen surface inclination angle, determined according to on-site conditions;
[0260] O: Equipment center position;
[0261] R0: The arc of the initial discharge end of the vibrating feeder;
[0262] Hb: The height between the discharge end of the vibrating feeder and the nozzle;
[0263] g: acceleration due to gravity;
[0264] Ss: The distance between two adjacent spray holes of the spray valve plate.
[0265] Variable parameters:
[0266] ω: vibration frequency, which changes with current;
[0267] X: Any point on the arc of the vibrating feeder’s discharge end;
[0268] Vx: The initial velocity of any point X on the arc line of the vibrating feeder’s discharge end when it leaves the screen surface;
[0269] Vxr: The velocity component of Vx along the direction from the center of the device to point X;
[0270] Vxt: The velocity component of Vx along the tangent direction of the arc at the discharge end;
[0271] β: The angle between the line connecting any point X at the discharge end and the center O of the equipment relative to the center line;
[0272] tb: The time it takes to travel from the vibrating feeder screen surface to the corresponding nozzle height in the vertical direction;
[0273] txr: the time Vx takes to run along the center of the circle in the horizontal direction during tb;
[0274] txt: the time Vx runs along the tangent in the horizontal direction during tb time;
[0275] sxr: the distance Vx travels along the center of the circle in the horizontal direction during time tb;
[0276] sxt: the distance Vx travels along the tangent in the horizontal direction during time tb;
[0277] Rf: The arc of the discharge end of the vibrating feeder after compensation;
[0278] n: The number of holes that need to be moved to compensate for the impact of the initial velocity.
[0279] Among them, A0 is the original nozzle position, and A1 is the nozzle position after compensation.
[0280] The initial movement speed of the ore after leaving the discharge end is: V x =V=Kv×λ×ω×cos(δ)[1+tan(δ)×tan(α)]
[0281] Where V is the material movement velocity of the linear vibrating feeder, which is the same as the initial velocity of the ore leaving the screen surface at any point X on the arc line of the vibrating feeder discharge end.
[0282] Furthermore, the initial velocity of the ore at point X is divided into two initial velocities. One initial velocity is along the direction from the center of the equipment to point X, marked as Vxr; the other initial velocity is along the tangent direction of the arc at the discharge end at point X, marked as Vxt. Vxr and Vxt are as follows: V xr =V x ×cosβ=Kv×λ×ω×cos(δ)[1+tan(δ)×tan(α)]×cosβ V xt =V x ×sinβ=Kv×λ×ω×sin(δ)[1+tan(δ)×tan(α)]×sinβ
[0283] Because the falling material moves independently in the horizontal and vertical directions, the two are carried out simultaneously. Therefore, during the time tb when the falling material runs vertically from the discharge end of the screen surface to the corresponding nozzle, the time txr when Vx runs horizontally along the center of the circle and the time txt when Vx runs horizontally along the tangent are the same.
[0284] Therefore, during the time it takes for the material to move from the screen surface at the discharge end to the corresponding nozzle, the horizontal movement distance of the material along the center of the equipment is sxr, sxr = Vxr × txr = Vxr × tb = Vx × cosβ × tb.
[0285] Multiplying all fixed parameters together as a fixed constant C, the above formula becomes: xr =C×ω×cos(β).
[0286] Similarly, the horizontal movement distance of the blank along the tangent is Sxt, S xt =C×ω×sin(β).
[0287] To account for the influence of the initial velocity of the material, the arc of the discharge end is optimized in the direction from the center of the equipment to the drop point, that is, the radial direction, that is, the distance the material moves is reduced based on the original arc of the discharge end. The new arc of the discharge end is Rf, which is achieved by matching the new lining plate of the discharge end of the vibrating feeder. f =R0-S xr =R0-C×ω×cos(β).
[0288] Adjust the injection hole position in the tangential direction of the discharge end, i.e., the circumferential direction. The closer to the center, the smaller the adjustment amount, and the closer to the sides, the larger the adjustment amount. The number of holes that need to be moved for compensation is n. n = S xt / S s =C×ω×sin(β) / S s .
[0289] In a specific embodiment, a method for installing and inspecting the optical path of a free-fall sorting machine is provided, including a blowing system, an arc detector, and a feeding device. Because the free-fall sorting machine employs an arc detector, the arc detector's optical path and blowing system are relatively complex. This often leads to discrepancies between the software-calculated angles on either side of the detector and the object's true angle (referenced to the center of the device). This is influenced by numerous factors, such as the blowing system's installation position, the arc detector's installation position, the feeder's installation position, and the software's blowing coordinate calculation parameters. This embodiment provides guidance for the installation and inspection of the core components of the arc detector's optical path.
[0290] For the injection system, measure the length of the front arc and the rear arc of the injection valve plate, take the median value, and connect the two points to find the center line; use the feeding frame as a reference to find the symmetrical center line of the equipment; assemble the injection so that the injection center coincides with the center of the equipment circle; control the injection height to be consistent with the bottom of the frame, and check it with a spirit level; check the distance between the front end point of the injection center and the front of the frame. After the position is determined, fix the screw holes on both sides.
[0291] For the arc detector, measure the length of the front arc and the rear arc of the bottom plate of the valve plate in the arc detector, take the median value, and connect the two points to find the center line; use the feeding frame as a reference to find the symmetrical center line of the equipment; assemble the arc detector so that the center of the arc detector coincides with the center of the equipment circle; adjust the height of the arc detector so that it is flush with the optical path collimation slit, and check it with a spirit level; drop multiple vertical lines from both sides of the arc line of the arc detector valve plate, check the shortest distance from the vertical line to the injection, and ensure that all spacings are equal; open the recognition software, open the ray, collect images, and observe whether the detector data is symmetrical and smooth, and fix the screws if it is suitable.
[0292] For the feeding device, measure whether the distance between the center of the screen surface and the blanking arc surface is consistent; measure the distance of the blanking arc surface and take the median value; use a spirit level to keep the center of the blanking arc surface and the center of the screen surface consistent with the center plane of the equipment through a laser level; check whether the distance between the blanking plane and the bottom of the frame is consistent, and correct it with a spirit level; hang down multiple vertical lines from the blanking arc surface to check the distance and height between the feeder and the nozzle, and keep them consistent; confirm the position distance and fix the bolts.
[0293] When debugging the optical path, the software is primarily used to compare the angles calculated with the actual measured angles. Specifically, three lead wires are hung on the left, center, and right sides of the blanking surface. The recognition software is then activated, the ray function is enabled, and an image is captured. The software output angles are then queried based on the pixel channels at the three locations (with the center of the device as the center). The actual distances of the three locations relative to the device frame are then measured. The actual angles of the three locations are then calculated from the mechanical drawings, with the center of the device as the center. The software-calculated and actual measured angles must remain consistent. If there is a discrepancy between the software-calculated and actual measurements, re-measurement of the software-calculated parameters is necessary to ensure they are consistent with the actual values.
[0294] When debugging the spraying, find the three nozzle positions on the left, middle and right during the spraying, and calculate the actual angle from the drawing; draw a lead line from the three positions to the blanking location; open the software and ray and start collecting images; query the angle output by the software according to the pixel channels of the three positions; measure the actual distance between the three positions of the above-mentioned blanking device and the equipment frame; calculate the actual angle of the three positions from the mechanical drawing, and compare it with the actual spraying angle calculated from the drawing; if the actual spraying angle does not match the actual blanking angle, readjust the spraying position.
[0295] In one embodiment of the present invention, the electronic device includes a processor, a memory, and a program or instruction stored in the memory and executable on the processor. When the program or instruction is executed by the processor, the steps of the separation and adjustment method in any of the above embodiments are implemented.
[0296] In the above description of this application, unless otherwise expressly specified or limited, terms such as "fixed," "mounted," "connected," or "connected" should be understood in a broad sense. For example, with respect to the term "connected," it can mean a fixed connection, a detachable connection, or an integral connection; it can mean a mechanical connection or an electrical connection; it can mean a direct connection or an indirect connection through an intermediate medium; it can mean internal communication between two elements or an interaction between two elements. Therefore, unless otherwise expressly specified in this application, those skilled in the art can understand the specific meanings of the above terms in this application based on the specific circumstances.
[0297] Based on the above description of the present application, those skilled in the art may also understand that the terms used below, such as "upper", "lower" and other terms indicating orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings of the present application. They are only for the purpose of facilitating the explanation of the scheme of the present application and simplifying the description, rather than explicitly or implicitly indicating that the devices or elements involved must have the specific orientation, be constructed and operated in a specific orientation. Therefore, the above-mentioned orientation or positional relationship terms cannot be understood or interpreted as limitations on the scheme of the present application.
[0298] In addition, the terms "first" or "second" used in this application to refer to numbers or ordinal numbers are used for descriptive purposes only and should not be understood as explicitly or implicitly indicating relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of this application, the meaning of "plurality" is at least two, such as two, three or more, etc., unless otherwise clearly and specifically defined.
[0299] Although multiple embodiments of the present application have been shown and described herein, it will be apparent to those skilled in the art that such embodiments are provided by way of example only. Those skilled in the art can conceive of many changes, modifications, and alternatives without departing from the thought and spirit of the present application. It should be understood that in the process of practicing the present application, various alternatives to the embodiments of the present application described herein can be adopted. The accompanying claims are intended to define the scope of protection of the present application and therefore cover equivalents or alternatives within the scope of these claims.
Claims
1. A material sorting device, characterized in that: include: A feeding unit, the discharge end of which releases the material has an arc-shaped edge; A detection unit, used for identifying the characteristics of the material, comprising a transmitter for emitting radiation and a receiver for receiving the radiation, and an arc gap between the transmitter and the receiver for the material to pass through, wherein the transmitter and the receiver respectively have a first arc surface and a second arc surface facing the arc gap; A separation unit, which can perform a separation operation on the material or not perform a separation operation on the material according to the characteristics of the material, so that materials with different characteristics have different movement trajectories and fall into different material areas of the receiving unit respectively, and the inner side surface of the separation unit facing the material is arc-shaped; and The receiving unit is used to receive different types of materials sorted by the separation unit. The center lines of the arc edge of the feeding unit, the first arc surface and the second arc surface of the detection unit, and the inner surface of the separation unit coincide with a reference line, which is a selected straight line extending along a vertical direction in the material sorting device.
2. The material sorting equipment according to claim 1, characterized in that: The projections of the arc-shaped edge of the feeding unit, the first arc surface and the second arc surface of the detection unit, and the bisectors of the inner surface of the separation unit on the horizontal plane coincide with each other.
3. The material sorting equipment according to claim 2, characterized in that: The transmitter has a transmission source located on the reference line; The receiver has a plurality of receiving sources arranged in an arc shape and disposed along the second arc surface.
4. The material sorting equipment according to claim 3, characterized in that: The separation unit is provided with a plurality of execution components arranged in an arc shape along the inner surface thereof.
5. The material sorting equipment according to any one of claims 1 to 4, characterized in that: The receiving unit is also provided with at least one arc-shaped material dividing baffle, and the material dividing baffle is used to separate the falling channels of materials of different sorting types. The material distribution baffle has: Base plate; A first arc-shaped material distribution baffle, which is mounted on the bottom plate and is configured to be movable on the bottom plate assembly along its first radial direction; a second arc-shaped material distribution baffle, which is mounted on the bottom plate and is configured to be movable on the bottom plate assembly along its second radial direction, the second radial direction intersecting the first radial direction; The first arc-shaped material dividing baffle plate and the second arc-shaped material dividing baffle plate are overlapped, and the length of the overlap between the two can be adjusted along with the movement of the first arc-shaped material dividing baffle plate and the second arc-shaped material dividing baffle plate.
6. The material sorting equipment according to any one of claims 1 to 4, characterized in that: The feeding unit is also provided with a compensating liner, and the size of the compensating liner is expressed by the following formula: Wherein, Rf: the arc of the discharge end of the vibrating feeder after compensation, R0: initial discharge end arc of the vibrating feeder, Kv: Comprehensive empirical coefficient of vibrating feeder, λ: single amplitude, ω: vibration frequency, δ: vibration direction angle, β: The angle between the line connecting any point on the discharge end and the center of the equipment and the bisector.
7. A debugging method for material sorting equipment, characterized in that: The material sorting equipment comprises: A feeding unit, the discharge end of which releases the material has an arc-shaped edge; A detection unit, used for identifying the characteristics of the material, comprising a transmitter for emitting radiation and a receiver for receiving the radiation, and an arc gap between the transmitter and the receiver for the material to pass through, wherein the transmitter and the receiver respectively have a first arc surface and a second arc surface facing the arc gap; A separation unit, which can perform a separation operation on the material or not perform a separation operation on the material according to the characteristics of the material, so that materials with different characteristics have different movement trajectories and fall into different material areas of the receiving unit respectively, and the inner side surface of the separation unit facing the material is arc-shaped; and The receiving unit is used to receive different types of materials sorted by the separation unit. The center lines of the arc edge of the feeding unit, the first arc surface and the second arc surface of the detection unit, and the inner surface of the separation unit coincide with the reference line, which is a selected straight line extending along the vertical direction in the material sorting device. The debugging method of the material sorting equipment comprises the following steps: Equipment assembly step, configuring the feeding unit, the detection unit, the separation unit, and the receiving unit in such a manner that the center lines of the arc edge of the discharge end of the feeding unit, the first arc surface and the second arc surface of the detection unit, and the inner surface of the separation unit coincide with the reference line, and the projections of the respective bisectors on the horizontal plane coincide with each other; an optical path verification step, setting at least one marker at a specified position of the material sorting device, and adjusting software parameters until the angle corresponding to the pixel channel where the at least one marker is located is consistent with the actual angle of the marker; The blowing verification step is to repeat the equipment assembly step and the optical path verification step until the angle corresponding to the pixel channel where the at least one marker is located is consistent with the actual blowing angle.
Citation Information
Patent Citations
Ray receiving device
CN115541630A
Fan-shaped mineral aggregate sorting machine, annular mineral aggregate sorting machine system and combination method
CN115608646A
Sector-shaped and annular blowing device and valve block mounting method
CN115608660A
Laser scanning sorting machine
CN202427649U
Material sorting equipment
CN216262089U
