Power interchange management system and power interchange management method

The power interchange management system enhances self-consumption and reduces emissions by integrating EV charging and private power generation management, optimizing the use of surplus solar power across logistics sites, thereby extending EV range and improving energy efficiency.

WO2024247447A1PCT designated stage expired Publication Date: 2024-12-05HITACHI LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/010561
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-26
Filing Date
2024-03-18
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Current power interchange systems fail to maximize self-consumption of surplus electricity generated by solar power in logistics companies, leading to inefficiencies and increased CO2 emissions due to mismatched demand and supply predictions, and limitations in EV truck charging.

Method used

A power interchange management system that integrates EV charging and private power generation management, predicting and aggregating surplus power to prioritize its use across linked bases, optimizing EV dispatch and charging plans to align with renewable energy generation and demand, thereby extending EV range and reducing emissions.

Benefits of technology

Increases self-consumption of surplus electricity, reduces CO2 emissions by optimizing EV charging and dispatch based on renewable energy generation, and extends EV vehicle range by strategically allocating vehicles and power usage across logistics sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024010561_05122024_PF_FP_ABST
    Figure JP2024010561_05122024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention increases private consumption of surplus power of a business operator. A power interchange management system (1) comprises: an EV vehicle allocation / charging planning system (42) that manages a charging device (43) of an electric vehicle and a private power generation device, and plans charging and vehicle allocation of the electric vehicle; an EV vehicle allocation / charging planning system (46) that manages the charging device (43) of the electric vehicle, and plans charging and vehicle allocation of the electric vehicle; and an interchange planning unit (21) that aggregates surplus power from the EV vehicle allocation / charging planning system (42), configures the aggregated surplus power as interchangeable power, and provides interchangeable power to the EV vehicle allocation / charging planning system (46) in accordance with a predetermined priority rank.
Need to check novelty before this filing date? Find Prior Art

Description

Power interchange management system and power interchange management method

[0001] The present invention relates to a power interchange management system and a power interchange management method.

[0002] In recent years, major logistics companies have been promoting the introduction of renewable energy (PV: solar power generation) by utilizing the large rooftops of their own warehouses. They are also considering the use of a self-consignment system that allows electricity to be shared between their own locations. At the same time, they are also promoting the use of electric (EV) trucks for the last mile, and are operating a mixture of internal combustion engine trucks and EV trucks.

[0003] Patent Literature 1 describes a power transmission control method executed by a terminal connected to a communication network. This method includes a process of individually predicting the amount of electricity that each consumer using a power interchange service will receive from the power grid, and a process of controlling the amount of electricity generated by each consumer's private power generation facility and transmitted to the power grid in accordance with the predicted amount of electricity.

[0004] Patent No. 7202928

[0005] When a certain base has a warehouse, there may be surplus electricity generated compared to the PV capacity that can be installed. Therefore, it is possible to transmit this surplus electricity to other bases of the same company through the power transmission and distribution network by self-consignment. This will reduce the amount of electricity purchased from the power company and reduce CO 2 This will reduce emissions. In addition, surplus electricity that cannot be self-consumed at one site can be used efficiently at other sites.

[0006] When using self-dispatch, the system of "same time and same volume of planned values" must be observed. "Same time and same volume of planned values" requires forecasting electricity demand and supply in 30-minute increments and reporting planned values. Furthermore, self-dispatch must not be for the purpose of selling electricity, and there must be a close relationship between the generator and the supplier.

[0007] Self-dispatch of solar power generation makes it possible to use renewable energy even in demand locations where it is difficult to secure rooftop or vacant lot space. However, with self-dispatch, electricity demand and generation must be forecast in 30-minute increments, and actual supply and demand must match the planned values ​​to avoid any discrepancies. Care must be taken, as penalties will be imposed if there is any discrepancy between the planned and actual values.

[0008] However, simply forwarding surplus electricity from one base to another base does not link with EV charging plans and does not maximize the use of surplus electricity. Furthermore, the current conversion of trucks to EVs (electric vehicles) can only be introduced in a limited manner due to charging restrictions imposed by contracted power. Therefore, the present invention aims to increase the amount of surplus electricity consumed by businesses.

[0009] In order to solve the above-mentioned problems, the power interchange management system of the present invention is characterized by comprising: a first EV dispatch and charging planning system that manages electric vehicle charging devices and private power generation devices at a first location and plans charging and dispatch of the electric vehicles; a second EV dispatch and charging planning system that manages electric vehicle charging devices at a second location and plans charging and dispatch of the electric vehicles; and an interchange planning unit that aggregates surplus power from each of the first EV dispatch and charging planning systems to make it interchangeable power, and provides the interchangeable power to each of the second EV dispatch and charging planning systems in accordance with a predetermined priority order.

[0010] The power interchange management method of the present invention is characterized by comprising the steps of: a first EV dispatch and charging planning system that manages electric vehicle charging equipment and private power generation equipment at a first location planning the charging and dispatch of the electric vehicles; a second EV dispatch and charging planning system that manages electric vehicle charging equipment at a second location planning the charging and dispatch of the electric vehicles; an interchange planning unit aggregating surplus power from each of the first EV dispatch and charging planning systems to make it interchangeable power; and providing the interchangeable power to each of the second EV dispatch and charging planning systems in accordance with a predetermined priority order. Other means will be described in the description of the embodiment of the invention.

[0011] According to the present invention, it is possible to increase the amount of surplus power consumed by businesses themselves.

[0012] 1 is an overall configuration diagram of an electric power interchange management system according to an embodiment of the present invention. FIG. 1 is a configuration diagram of an EV dispatch and charging planning system. FIG. 2 is a configuration diagram of an EV dispatch and charging planning system. FIG. 3 is a diagram showing an example of a sequence diagram executed by an electric power interchange management system. FIG. 4 is a graph of the total power demand and charging amount at a base. FIG. 5 is a graph of solar power generation forecast data at a base. FIG. 6 is a graph of the final amount of purchased power and surplus power. FIG. 7 is a graph of the total power demand and charging amount at a base. FIG. 8 is a graph of surplus power. FIG. 9 is a graph of the result of subtracting surplus power from the total power demand and charging amount at a base. FIG. 10 is a table of the number of EV trucks owned at each base. FIG. 11 is a table of the total capacity of EV truck storage batteries at each base. FIG. 12 is a table of the average total delivery distance at each base. FIG. 13 is a table of the average ICE fuel efficiency at each base. FIG. 14 is a table of the average available capacity of contracted power at each base. FIG. 15 is a table of the renewable energy power ratio at each base. FIG. 16 is a table of the average total EV charging amount per day at each base.

[0013] Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 is an overall configuration diagram of a power interchange management system 1 according to this embodiment. The power interchange management system 1 includes an interchange planning server 2, an EV dispatch and charging planning system 42 provided at a base 4a or the like, and an EV dispatch and charging planning system 46 provided at bases 5a and 5b. The base 4a or the like is equipped with a solar power generation panel 41 as a private power generation device and a charging device 43 for EV vehicles 44, and is a first base where surplus power may be generated. The bases 5a and 5b are second bases equipped with a charging device 43 for EV vehicles 44 but not a private power generation device, and where surplus power is not generated. Note that although three bases are illustrated here, in reality, there are multiple first bases equipped with the solar power generation panel 41 and multiple second bases not equipped with the solar power generation panel 41.

[0014] The power interchange management system 1, when interchangeing surplus power generated at a base 4a or the like to other bases 5a, 5b, etc., creates an interchange plan linked to the EV vehicle dispatch plan, thereby increasing the amount of self-consumption of surplus power and reducing CO2 emissions due to the extension of the driving range of EV vehicles 44. 2 For example, by allocating EV vehicles 44 to routes with long delivery distances and engine vehicles 45 to routes with short delivery distances, CO 2 It is possible to reduce emissions. The engine vehicle 45 is also called an ICE (Internal Combustion Engine).

[0015] The interchange planning server 2 includes an interchange planning unit 21 that manages the amount of surplus power (total amount) of bases 4a and the like that have introduced renewable energy power generation devices such as solar power generation panels 41. The interchange planning unit 21 calculates and manages the amount of surplus power from the base 4a to be interchanged with bases 5a, 5b, etc. that do not generate surplus power. The interchange planning unit 21 sets priorities for the bases 5a, 5b, etc. that do not generate surplus power, and notifies the bases 5a, 5b, etc. of the amount of available surplus power in accordance with the priorities.

[0016] The EV dispatch and charging planning system 42 predicts the amount of power generated by the solar power generation panels 41 at the first base and formulates a dispatch plan and an EV charging plan for EV vehicles 44 based on delivery route conditions, etc. In some cases, like base 4a, engine vehicles 45 and EV vehicles 44 are mixed. The EV dispatch and charging planning system 42 formulates a dispatch plan that determines which vehicles are assigned to which delivery routes. When formulating an EV charging plan, the EV dispatch and charging planning system 42 formulates a charging plan so that the base's power consumption does not exceed the contracted power (upper limit). This EV dispatch and charging planning system 42 functions as a first EV dispatch and charging planning system that manages electric vehicle charging devices and private power generation devices and plans the charging and dispatch of these electric vehicles. Note that the private power generation device installed at the base is not limited to a renewable energy power generation device such as the solar power generation panels 41 or a wind power generation device, and may be any type of power generation device.

[0017] The EV vehicle allocation and charging planning system 46 receives the amount of available surplus electricity from the interchange planning server 2 and formulates a vehicle allocation plan and an EV charging plan for EV vehicles 44 based on the delivery route conditions of the second base, etc. As in the case of bases 5a and 5b, there may be a mixture of engine vehicles 45 and EV vehicles 44. The EV vehicle allocation and charging planning system 46 formulates a vehicle allocation plan that determines which vehicles should be assigned to which delivery routes. When formulating an EV charging plan, the EV vehicle allocation and charging planning system 46 formulates a charging plan so that the amount of power consumption at the base does not exceed the contracted power (upper limit). The EV vehicle allocation and charging planning system 46 manages the electric vehicle charging equipment at the second base and functions as a second EV vehicle allocation and charging planning system that plans the charging and dispatch of these electric vehicles. The interchange planning unit 21 then aggregates surplus power from each EV dispatch and charging planning system 42 to generate interchangeable power, and provides the interchangeable power to each EV dispatch and charging planning system 46 according to a predetermined priority order.

[0018] 2A is a configuration diagram of the EV vehicle dispatch and charging planning system 42. The EV vehicle dispatch and charging planning system 42 includes a power generation prediction unit 421, a power demand prediction unit 422, a vehicle dispatch planning unit 423, an EV vehicle dispatch and charging planning unit 424, and a surplus power notification unit 425. The power generation prediction unit 421 predicts the power generated by the solar power generation panel 41. The power demand prediction unit 422 predicts the power demand, including the power required to charge EV vehicles 44 at this base.

[0019] The vehicle allocation plan creation unit 423 creates a vehicle allocation plan for allocating which EV vehicle 44 to which delivery route based on information regarding the time and location of delivery routes. The EV vehicle allocation / charging plan creation unit 424 creates a vehicle allocation plan and charging plan for the EV vehicle 44 so as to satisfy the delivery information. The surplus power notification unit 425 notifies the interchange plan unit 21 of the surplus power obtained by subtracting the power demand at this base from the power generated by the solar power generation panel 41.

[0020] 2B is a configuration diagram of the EV vehicle dispatch and charging planning system 46. The EV vehicle dispatch and charging planning system 46 includes a surplus power receiving unit 461, a power demand forecasting unit 462, a vehicle dispatch planning unit 463, and a surplus power notifying unit 465. The surplus power receiving unit 461 receives surplus power. The power demand forecasting unit 462 forecasts power demand, including charging power for EV vehicles 44 at this base.

[0021] The vehicle allocation plan creation unit 463 creates a vehicle allocation plan for allocating which EV vehicle 44 to which delivery route based on information regarding the time and location of delivery routes. The EV vehicle allocation / charging plan creation unit 464 creates a vehicle allocation plan and a charging plan for the EV vehicle 44 so as to satisfy the delivery information. The surplus power notification unit 465 notifies the interchange plan unit 21 of new surplus power obtained by subtracting the power demand from the surplus power provided by the interchange plan unit 21.

[0022] 3 is a diagram showing an example of a sequence diagram executed by the power interchange management system 1. The power interchange management system 1 periodically executes this processing sequence to create a plan. The execution interval of this processing sequence is, for example, once every few hours to once a day.

[0023] The power generation prediction unit 421 predicts future (one day to several days, hourly, etc.) solar power generation amount using machine learning functions based on information such as past power demand history, season, day of the week, time, and weather (step S10).

[0024] The power demand forecasting unit 422 forecasts the future (one day to several days, hourly, etc.) power demand of the base station using a machine learning function or the like based on information such as the past power demand history, season, day of the week, time, and weather (step S11). The forecasting function itself may be realized by a separate system and is not a required component of this patent.

[0025] The vehicle allocation plan creation unit 423 acquires information about delivery routes, including when and where to deliver the goods (step S12). The vehicle allocation plan creation unit 423 then creates a vehicle allocation plan that determines which electric vehicles 44 should be assigned to which delivery routes (step S13). As shown in FIG. 1, there are cases where engine vehicles 45 and electric vehicles 44 are mixed at a base. Even in this case, the vehicle allocation plan creation unit 423 creates a vehicle allocation plan that determines which vehicles should be assigned to which delivery routes.

[0026] Next, the EV vehicle allocation and charging plan formulation unit 424 formulates a vehicle allocation plan and a charging plan for the EV vehicles 44 so as to satisfy the delivery information. The EV vehicle allocation and charging plan formulation unit 424 further formulates a charging plan based on the constraints of equation (1).

[0027] The final amounts of purchased power and surplus power at the base 4a where surplus power is generated are shown in FIG. 4C and calculated using equation (2).

[0028] The surplus power notification unit 425 then notifies the interchange plan unit 21 of this amount of surplus power (step S14). The surplus power notification units 425 of the other bases also notify the interchange plan unit 21 of this amount of surplus power (step S15). The interchange plan unit 21 repeats the process of receiving the amount of surplus power a number of times, the number of times being the number of bases that have power generation facilities such as solar power generation and wind power generation and are capable of generating surplus power, and then calculates the total amount of surplus power (step S16).

[0029] The EV dispatch and charging planning system 42 determines whether the amount of purchased power is equal to the contracted power E n The EV truck charging plan is created so that the EV trucks do not exceed the contracted power E. n Plans are created by solving constraint satisfaction problems, which satisfy the constraint that the amount of work done must not exceed a certain amount, and optimization problems.

[0030] The power interchange planning unit 21 utilizes the total surplus power calculated in step S16 at bases 5a, 5b, etc. where no surplus power is generated. The power interchange planning unit 21 checks the priority of the interchange destinations (step S20) and notifies each base of the amount of surplus power in accordance with the priority (step S21).

[0031] The power demand forecasting unit 462 predicts future (one day to several days, hourly, etc.) base power demand using machine learning functions based on information such as past power demand history, season, day of the week, time, and weather (step S22).

[0032] The vehicle allocation plan creation unit 463 acquires information about the delivery route, including the time and location of delivery (step S23). Then, the vehicle allocation plan creation unit 463 creates a vehicle allocation plan that determines which electric vehicle 44 should be assigned to which delivery route.

[0033] Next, the EV vehicle allocation / charging plan formulation unit 464 formulates a vehicle allocation plan and a charging plan for the EV vehicles 44 so as to satisfy the delivery information (step S24). The EV vehicle allocation / charging plan formulation unit 464 further formulates a charging plan based on the constraints of equation (1). Then, the surplus power notification unit 465 notifies the interchange plan unit 21 of the remaining amount of surplus power (step S25).

[0034] The power interchange planning unit 21 repeats the process of providing the new surplus power, obtained by subtracting the excess demand of the EV dispatch and charging planning system 46 of a base with a certain priority, to the EV dispatch and charging planning system 46 of the base with the next highest priority. The power interchange planning unit 21 repeats this process until the creation of EV dispatch plans and EV charging plans is completed for all bases 5a, 5b, etc. where no surplus power is generated. If there is little or no surplus power, the bases where no surplus power is generated will create EV dispatch plans without power interchange.

[0035] 4A to 4C show an outline of EV dispatch and charging planning at a base where surplus power is generated. As shown in FIG. 4A, the final amount of purchased power or the amount of surplus power at the base 4a where surplus power is generated is calculated based on the power demand E d and the charge amount of the EV car E c From the sum of these, the solar power generation amount at the base is E p It is calculated by subtracting

[0036] In the EV vehicle dispatch and charging planning system 42, the amount of purchased power is the contracted power E nThe EV truck charging plan is created so that the EV trucks do not exceed the contracted power E. n Plans are created by solving constraint satisfaction problems and optimization problems that satisfy the constraint that the number of iterations must not exceed .

[0037] FIG. 4A is a graph showing the total power demand and charging amount of a base. The horizontal axis of the graph represents time. The vertical axis of the graph represents the power demand E of the base. d and charge amount E c This shows the sum of the above.

[0038] FIG. 4B is a graph of predicted solar power generation data for a site. The horizontal axis of the graph represents time. The vertical axis of the graph represents the amount of solar power generation E p The predicted values ​​are shown.

[0039] 4C is a graph of the final amount of purchased power or the amount of surplus power. The horizontal axis of the graph represents time. The vertical axis of the graph represents the final amount of purchased power or the amount of surplus power. Note that when the vertical axis of the graph is positive, it represents the amount of purchased power, and when the vertical axis of the graph is negative, it represents the amount of surplus power. The final amount of purchased power or the amount of surplus power is calculated using the above-mentioned formula (2).

[0040] 5A to 5C show an outline of EV dispatch and charging planning at a base where surplus power is not generated.

[0041] The final amount of purchased power or the amount of surplus power at the bases 5a and 5b where no surplus power is generated is expressed by equation (3).

[0042] In the EV vehicle dispatch and charging planning system 46, the amount of purchased power is the contracted power E n The EV truck charging plan is created so that the total amount of power purchased does not exceed the contracted amount. The EV vehicle dispatch and charging plan system 46 creates a plan by solving a constraint satisfaction problem or an optimization problem that satisfies the constraint that the delivery route is traveled and the purchased power does not exceed the contracted power.

[0043] FIG. 5A is a graph showing the total power demand and charging amount of a base. The horizontal axis of the graph represents time. The vertical axis of the graph represents the power demand E of the base. d and charge amount Ec This shows the sum of the above.

[0044] FIG. 5B is a graph of surplus power. The horizontal axis of the graph represents time. The vertical axis of the graph represents the amount of surplus power E 0 This shows:

[0045] 5C is a graph showing the result of subtracting surplus power from the total power demand and charging amount of the base. The horizontal axis of the graph represents time. The vertical axis of the graph represents the current surplus power amount E from the total power demand and charging amount of the base. 0 When the vertical axis of the graph is positive, it indicates the amount of purchased electricity, and when the vertical axis of the graph is negative, it indicates the new amount of surplus electricity E 1 Shows.

[0046] In step S20, the interchange planning unit 21 determines the priority of each base as an interchange destination based on the parameters of each base. Examples of parameters for determining the priority are shown in Figs. 6 to 12 below.

[0047] 6 is a table showing the number of electric trucks owned at each base. The interchange planning unit 21 determines the priority in descending order of the number of electric vehicles managed by the EV vehicle dispatch and charging planning system 46, based on the idea that the more electric trucks there are at a base, the more power they consume and the more power interchange is required.

[0048] 7 is a table showing the total battery capacity of electric vehicle trucks at each base station. The interchange planning unit 21 determines the priority of electric vehicle trucks managed by the EV vehicle dispatch and charging planning system 46 in descending order of total battery capacity based on the idea that the larger the total battery capacity of electric vehicle trucks at a base station, the more power they consume and the more power interchange is required.

[0049] 8 is a table of the average total delivery distance for each base. The average total delivery distance for a base refers to the average sum of the distances (delivery distances) traveled by each truck at that base to deliver packages. Based on the idea that the longer the average total delivery distance per day for a base, the more power consumed by EV trucks and the greater the need for power interchange, the interchange planning unit 21 determines the priority in descending order of the average total delivery distance managed by the EV dispatch and charging planning system 46.

[0050] 9 is a table of the average fuel efficiency of ICEs at each base. The interchange planning unit 21 calculates the CO 2 Based on the idea that emissions are high and electric trucks will be required to drive, increasing power consumption, priority is determined in ascending order of average fuel efficiency of engine vehicles managed by the EV vehicle allocation and charging planning system 46.

[0051] 10 is a table showing the average available capacity of contracted power at each base. Based on the idea that the smaller the average available capacity of contracted power at a base, the higher the risk of exceeding the contracted power and the greater the need for power interchange, the interchange planning unit 21 determines the priority in ascending order of the average available capacity value relative to the contracted power managed by the EV dispatch and charging planning system 46.

[0052] 11 is a table of the renewable energy power ratio of each base. The interchange planning unit 21 calculates the CO 2 Based on the idea that the interchange of surplus renewable energy power is necessary to reduce emissions, the priority is determined in ascending order of the renewable energy power ratio value of the bases managed by the EV vehicle dispatch and charging planning system 46. Note that the renewable energy power ratio R r is calculated by the following formula (4).

[0053] The amount of purchased renewable energy electricity refers to the amount of renewable energy electricity purchased from a retail electricity supplier.

[0054] 12 is a table of the average value of the total EV charging amount per day at each base. The interchange planning unit 21 determines the priority in descending order of the average total EV charging amount, based on the idea that the higher the average total EV charging amount per day at a base, the greater the power consumption. In addition, the interchange planning unit 21 determines the priority of each EV dispatch / charging planning system 46 based on the CO2 of the power plan contracted at the second base managed by this EV dispatch / charging planning system 46. 2 The interchange planning unit 21 is not limited to the above parameters, and may determine the priority based on an evaluation value obtained by selecting and weighting any of the multiple parameters, and is not limited thereto.

[0055] (Modifications) The present invention is not limited to the above-described embodiments and includes various modifications. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and are not necessarily limited to those including all of the described configurations. It is possible to replace part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. Furthermore, it is also possible to add, delete, or replace part of the configuration of each embodiment with other configurations.

[0056] The above-described configurations, functions, processing units, processing means, etc. may be implemented in part or in whole by hardware such as an integrated circuit. The above-described configurations, functions, etc. may also be implemented by software, with a processor interpreting and executing a program that implements each function. Information such as the program, table, and file that implements each function can be stored in a recording device such as a memory, a hard disk, or an SSD (Solid State Drive), or on a recording medium such as a flash memory card or a DVD (Digital Versatile Disk).

[0057] In each embodiment, the control lines and information lines shown are those that are considered necessary for the explanation, and not all control lines and information lines in the product are necessarily shown. In reality, it can be considered that almost all components are interconnected.

[0058] DESCRIPTION OF SYMBOLS 1 Power interchange management system 2 Interchange planning server 21 Interchange planning unit 4a Base (first base) 5a, 5b Base (second base) 41 Solar power generation panel 42 EV vehicle dispatch and charging planning system (first EV vehicle dispatch and charging planning system) 421 Power generation prediction unit 422 Power demand prediction unit 423 Vehicle dispatch planning unit 424 EV vehicle dispatch and charging planning unit 425 Surplus power notification unit 43 Charging device 44 EV vehicle 45 Engine vehicle 46 EV vehicle dispatch and charging planning system (second EV vehicle dispatch and charging planning system) 461 Surplus power receiving unit 462 Power demand prediction unit 463 Vehicle dispatch planning unit 464 EV vehicle dispatch and charging planning unit 465 Surplus power notification unit

Claims

1. A power interchange management system comprising: a first EV dispatch and charging planning system that manages electric vehicle charging equipment and private power generation equipment at a first location and plans charging and dispatch of the electric vehicles; a second EV dispatch and charging planning system that manages electric vehicle charging equipment at a second location and plans charging and dispatch of the electric vehicles; and an interchange planning unit that aggregates surplus power from each of the first EV dispatch and charging planning systems to make it interchangeable power, and provides the interchangeable power to each of the second EV dispatch and charging planning systems in accordance with a predetermined priority order.

2. The power interchange management system described in claim 1, characterized in that the interchange planning unit repeats the process of providing new surplus power, remaining after subtracting the excess demand of a second location managed by a second EV dispatching and charging planning system of a certain priority, to a second location managed by a second EV dispatching and charging planning system of a next priority.

3. The power interchange management system described in claim 1, characterized in that the second EV dispatch and charging planning system is provided with a surplus power notification unit that notifies the interchange planning unit of new surplus power obtained by subtracting power demand from the surplus power provided by the interchange planning unit.

4. The power interchange management system described in claim 1, characterized in that the first EV dispatch and charging planning system comprises: a power generation prediction unit that predicts the generated power of the private power generation device; a power demand prediction unit that predicts power demand including charging power for the electric vehicle; and a surplus power notification unit that notifies the interchange planning unit of the surplus power obtained by subtracting the power demand from the generated power.

5. The power interchange management system according to claim 3, characterized in that the interchange planning unit determines the priority of each of the second EV dispatching and charging planning systems based on the number of electric vehicles at the second base managed by the second EV dispatching and charging planning system.

6. The power interchange management system according to claim 3, characterized in that the interchange planning unit determines the priority of each of the second EV dispatch and charging planning systems based on the total battery capacity of the electric vehicles at the second base managed by the second EV dispatch and charging planning system.

7. The power interchange management system described in claim 3, characterized in that the interchange planning unit determines the priority of each of the second EV dispatching and charging planning systems based on the average total delivery distance of the second bases managed by the second EV dispatching and charging planning system.

8. The power interchange management system described in claim 3, characterized in that the interchange planning unit determines the priority of each of the second EV dispatch and charging planning systems based on the average fuel efficiency of engine vehicles at the second base managed by the second EV dispatch and charging planning system.

9. The power interchange management system according to claim 3, characterized in that the interchange planning unit determines the priority of each of the second EV dispatch and charging planning systems based on the average available capacity relative to the contracted power of the second bases managed by the second EV dispatch and charging planning system.

10. The power interchange management system described in claim 3, characterized in that the interchange planning unit determines the priority of each of the second EV dispatching and charging planning systems based on the renewable energy power ratio of the second base managed by the second EV dispatching and charging planning system.

11. The power interchange management system described in claim 3, characterized in that the interchange planning unit determines the priority of each of the second EV dispatch and charging planning systems based on the average value of the total EV charging amount at the second locations managed by the second EV dispatch and charging planning system.

12. The interchange planning unit determines the priority of each of the second EV dispatching and charging planning systems based on the CO of the power plan contracted at the second base managed by the second EV dispatching and charging planning system. 2 The power interchange management system according to claim 3, characterized in that the power interchange management system is determined based on a basic unit.

13. The interchange planning unit determines the priority of each of the second EV dispatching and charging planning systems based on the number of electric vehicles at the second base managed by the second EV dispatching and charging planning system, the total storage battery capacity of electric vehicles at the second base managed by the second EV dispatching and charging planning system, the average total delivery distance at the second base managed by the second EV dispatching and charging planning system, the average fuel efficiency of engine vehicles managed by the second EV dispatching and charging planning system, the average available capacity relative to the contracted power at the second base managed by the second EV dispatching and charging planning system, the renewable energy power ratio at the second base managed by the second EV dispatching and charging planning system, the average total EV charging amount at the second base managed by the second EV dispatching and charging planning system, the CO2 of the power plan contracted at the second base managed by the second EV dispatching and charging planning system, 2 The power interchange management system according to claim 3, characterized in that the power interchange management system is determined by selecting and weighting a plurality of the basic units.

14. A power interchange management method comprising: a step of a first EV dispatch and charging planning system managing electric vehicle charging equipment and private power generation equipment at a first base planning the charging and dispatch of the electric vehicles; a step of a second EV dispatch and charging planning system managing electric vehicle charging equipment at a second base planning the charging and dispatch of the electric vehicles; a step of an interchange planning unit aggregating surplus power from each of the first EV dispatch and charging planning systems to make it interchangeable power; and a step of providing the interchangeable power to each of the second EV dispatch and charging planning systems in accordance with a predetermined priority order.

Citation Information

Patent Citations

  • Power transmission control method, power transmission management system and program

    JP7202928B2

  • Energy system

    JP2018078702A

  • Power supply system

    JP2019165561A

  • Community Based Energy Management System

    US20140129042A1