Method and system for modifying a drilling plan, and a rock drilling RIG comprising such system

The method and system for modifying drilling plans in rock excavation address the issue of non-drillable holes by using digital surface profiling to adjust drilling parameters, improving efficiency and reducing manual adjustments, leading to more precise and efficient rock excavation.

WO2024248686A1PCT designated stage expired Publication Date: 2024-12-05EPIROC ROCK DRILLS AB

Patent Information

Application Number
PCT/SE2023/050536
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-31
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing drilling plans in rock excavation often fail to account for real-time surface conditions, leading to non-drillable holes and increased manual adjustments, which are time-consuming and prone to errors, resulting in surplus rock being broken and inefficient excavation processes.

Method used

A method and system that modify drilling plans by generating a surface profile using digital representation techniques, such as scanning or image analysis, to identify and adjust non-drillable holes, allowing for real-time changes in start position, direction angle, or length to ensure drillability, thereby reducing manual operations and improving excavation efficiency.

Benefits of technology

The system enables more efficient drilling rounds with reduced surplus rock breaking and minimizes manual interventions, maintaining the target cavity alignment and reducing the need for re-planning, thus enhancing the overall excavation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SE2023050536_05122024_PF_FP_ABST
    Figure SE2023050536_05122024_PF_FP_ABST
Patent Text Reader

Abstract

A method for modifying a drilling plan for drilling holes for excavating a cavity in rock is provided. The drilling plan is defining a plurality of holes to be drilled in a drilling surface of the rock by defining one or more of start position, direction angle, length or endpoint of each hole to be drilled. The method comprises generating a surface profile of the drilling surface, comparing the generated surface profile with the drilling plan, and, based on the comparison, identifying non-drillable holes, modifying the drilling plan for the identified non-drillable holes, and saving the modified drilling plan as a new drilling plan in the control unit.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] METHOD AND SYSTEM FOR MODIFYING A DRILLING PLAN, AND A ROCK DRILLING RIG COMPRISING SUCH SYSTEM

[0002] TECHNICAL FIELD

[0003] The present disclosure relates to rock excavation, and in particular to methods and systems for modifying a drilling plan during rock excavation. The disclosure also relates to a rock drilling rig, as well as a computer program and a computer-readable medium that implement methods herein.

[0004] BACKGROUND

[0005] Rock excavation, in particular underground rock excavation, may be carried out using various techniques, where excavation using drilling and blasting technology is a commonly used method. The excavation may consist in the creation of a rock cavity having a predefined shape and geographical location. This may be the case, for example, when creating tunnels or other kinds of underground cavities.

[0006] Excavation using drilling and blasting is, in general, carried out in a manner in which drilling is performed in rounds, where a round of holes is drilled to thereafter be loaded with explosives to blast the rock.

[0007] Following removal of rock being detached by the blasting, a new round of holes are drilled to blast a subsequent portion of the cavity to be created. This is repeated until excavation of the desired cavity has been completed. In order to achieve a rock excavation that results in a desired cavity being created, each round of holes are being drilled according to a drilling plan which often defines location, direction, length and possibly diameter, or any further property of the holes to be drilled. The object of the drilling plan is to create a cavity having a cross-sectional shape and geographical alignment that corresponds to the cavity the creation of which being the task at hand.

[0008] Cavities of this kind may be of various designs. For example, the cavity may be designed to have essentially the same cross-sectional appearance following an essentially straight line. However, as is oftentimes the case, properties of the cavity, e.g. in terms of cavity cross section and curvature, may vary along the length of the cavity. This may require utilization of different drilling plans for different sections of the cavity to be excavated.

[0009] With regard to tunnels, but also other kinds of cavities, these are often associated with highly precise requirements regarding conformance with the desired cavity cross section and geographic alignment and extension. Lining such as concrete lining may be utilised, where over-break of rock result in an increased consumption of lining and oftentimes also an increase in the requirement of rock reinforcement. Insufficient breaking, under-breaking, may require additional drilling and blasting to obtain the desired cavity. Hence, well designed drilling plans and subsequent drilling in accordance with the drilling plans is essential in order to achieve the desired result.

[0010] The drilling plan may be generated prior to excavation of the cavity commences. The drilling plan may comprise holes to be drilled subsequently to the generation of the drilling plan. As was mentioned above, the drilling plan being used in rock excavation using drilling and blasting technology is an important factor in order to achieve a cavity having a cross section and geographical extension that conforms to a high extent to the planned alignment of the cavity. Drilling plans define the location, position, of the holes to be drilled in a drilling surface of the rock to be excavated, and also the direction and length of the holes. The drilling plan may also determine the diameter of the hole to be drilled, where e.g. holes along a periphery of the contour, i.e. cavity profile, outline or cross section, to be drilled may be of a different diameter than holes more to the centre of the rock portion to be excavated. Contour is used in the following as a representation of cavity profile / outline / cross-section. The drilling plan is generated on the basis of the contour / profile of the cavity to be created, and a plurality of consecutive rounds of drilling and blasting are in general required to create the desired cavity, such as a tunnel.

[0011] Drilling plans are oftentimes generated beforehand, i.e. prior to excavation of the cavity commences, e.g. in a control / planning centre, to then be downloaded to the rock drilling rig for use in the excavation. Drilling plans may be generated in various manners as is known to the person skilled in the art. The generation of a drilling plan that is optimal from an excavation point of view, e.g. with regard to surplus rock being broken, may be difficult, in particular when excavation is in progress and the excavation has progressed to a position along the tunnel line that does not correspond to a position for which drilling is planned to be performed on the planning stage.

[0012] The initial drilling plan to be used is oftentimes determined prior to the excavation of a tunnel commences e.g. in a planning centre, where the holes are planned such that the subsequent blasting as close as possible corresponds to the desired cavity to be excavated. The generation of the drilling plan that is optimal from an excavation point of view, e.g. with regard to surplus rock being broken, may be difficult, in particular when excavation is in progress and the excavation has progressed to a position along the tunnel line that does not correspond to a position for which drilling is planned to be performed on the planning stage.

[0013] Rock excavation often results in surplus rock being broken, and this is also often necessitated by constructional constraints that hinders optimal positioning of a drilling rig / drilling machine used in the excavation, which thereby renders it difficult to drill holes that result in excavation without surplus rock being broken. Surplus cavity formed during tunnel excavation is oftentimes subject e.g. to subsequent concrete lining, where the surplus rock being broken also results in additional consumption of concrete e.g. in concrete lining operations and may also generate an increase in required rock reinforcement following blasting.

[0014] Drilling plans are in general designed to reduce the amount of surplus rock being broken, but it may not always be possible to drill completely according to the predetermined drilling plan. A drilling plan needs to define holes with drillability, i.e. the holes need to be drillable by the rock drilling rig. The drillability of the holes is determined by ensuring manoeuvrability of the feed beam in relation to surrounding rock to ensure that the surrounding rock does not hinder positioning of the feed beam required to drill the hole. The holes need also to be drillable with respect to other factors, i.e. the drilling surface in which the holes are to be drilled may be complicated and uneven, or may comprise surface parts with loose or cracked rock parts which may be troublesome when it comes to drill a planned hole. Further, the planned holes for the next round may not be fully compatible with the holes of the previous round. Thus, a drilling plan may in practice not be applicable to all holes in a planned drilling round resulting in time consuming re-planning of the holes of the round. Such re-planning often requires manual steps to be taken by the operator of the drilling rig. Although the drilling process is proceeding by taken such manual steps, it is time consuming and there is always a risk of misjudgment depending on the experience of the operator. The result of a round affects coming rounds, and also if other steps are to be taken for example when it comes to lining.

[0015] Thus, there is a need for improved drilling plans admitting better performance of the individual drill rounds as well as minimizing the need of manual operations.

[0016] SUMMARY

[0017] According to a first aspect, a method for modifying a drilling plan for drilling holes for excavating a cavity in rock is provided. The drilling plan is defining a plurality of holes to be drilled in a drilling surface of the rock by defining one or more of start position, direction angle, length or endpoint of each hole to be drilled. The holes are to be drilled by a drilling rig comprising at least one feed beam carrying a drilling machine, and being arranged to communicate with at least one processor and at least one control unit with a drilling plan therein. The method comprises generating a surface profile of the drilling surface comparing the generated surface profile with the drilling plan, and, based on the comparison, identifying non-drillable holes, modifying the drilling plan for the identified non-drillable holes, and saving the modified drilling plan as a new drilling plan in the control unit.

[0018] In embodiments, steps 102, 103 and 104 may be repeated for the modified drilling plan, and, if non-drillable holes are still identified, the identified holes may be marked. In embodiments, the surface profile may be generated by use of one or more devices configured to generate a digital representation of the drilling surface.

[0019] In embodiments, the surface profile may be generated by scanning the drilling surface. The scanning may be performed by one or more scanners being moveable, and / or arranged at different positions and / or arranged at different angles in relation to the drilling surface. A scanner may for example be arranged on one moveable arm on any equipment used, or may be arranged for example on a drone, or may be arranged to be moved manually. By scanning the surface, moving the scanner and scanning again, a more accurate surface profile may be obtained. In embodiments, scanning may be performed by one or more LIDAR scanners. In embodiments, the surface profile may be generated by measuring the drilling surface. Measuring parameters of the drilling surface such as the distance to a drilling rig, the actual working area of the drilling surface may as well be registered. It is to be noted that any suitable measuring technology may be used for such purposes. As an example, any technology providing a representation of the surface profile as a 3D-point cloud may be used.

[0020] In embodiments, generating the surface profile may comprise receiving one or more images of the drilling surface and performing image analysis of the one or more images. Thereby, a three-dimensional image of the surface may be provided representing the surface profile. In embodiments, the image analysis may comprise detecting high contrast areas such as edges or contours in the images.

[0021] In embodiments, the generated surface profile may be presented as a 3D point cloud.

[0022] In embodiments, the drilling plan may be modified by moving the start position and the angle of a hole identified as non-drillable such that the end point of the hole is maintained.

[0023] In embodiments, comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the direction angle at the respective start position of the hole according to the drilling plan with the surface angle at the corresponding position of the generated surface profile, and, if the angles are not compatible, identify the hole as a non-drillable hole.

[0024] In embodiments, comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the start position of the hole according to the drilling plan with the end position of the holes according to the previous drilling round, and, if the positions are located close to each other, identify the hole as a non-drillable hole. It is to be noted that irrespective of any surface profile, the drilling plan may at any time be compared to the drilling log, or the quality log. Thereby, the actual end positions of the holes according to the previous drilling round can be compared to the start positions according to the drilling plan.

[0025] In embodiments, comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the start position of the hole according to the drilling plan with the corresponding position of the generated surface profile, and, if the surface profile indicate a cracked or loose surface at the corresponding position, identifying the hole as a non-drillable hole.

[0026] In embodiments, modifying the drilling plan may be performed by changing the start position for the identified non-drillable holes such that drillability is achieved.

[0027] In embodiments, modifying the drilling plan may be performed by changing the direction angle for the identified non-drillable holes such that drillability is achieved.

[0028] In embodiments, modifying the drilling plan may be performed by changing the length for the identified non-drillable holes such that drillability is achieved.

[0029] In embodiments, modifying the drilling plan is performed such that each respective end position for the identified non-drillable holes is maintained.

[0030] In embodiments, methods herein may further comprise selecting, for relocation, a plurality of holes in the drilling plan constituting a group of holes, and wherein modifying the drilling plan may comprise relocating simultaneously the start points of all holes belonging to the group of holes to new locations, and keeping a mutual position of the start points of the holes with respect to one another unchanged during the relocation such that the end plane and the relative end points pattern are substantially maintained for the end points.

[0031] According to another aspect, a computer program is provided. The computer program comprises instructions which, when the program is executed by a computer, cause the computer to carry out methods herein.

[0032] According to yet another aspect, a system for modifying a drilling plan for excavating a cavity in rock is provided. The drilling plan is determining a plurality of holes to be drilled in a drilling surface of the rock by defining any of start position, direction angle or length of each hole to be drilled. The holes are arranged to be drilled by a drilling rig comprising at least one feed beam carrying a drilling machine. The system comprises at least one control unit with a drilling plan therein, and a processor. The control unit and the processor are arranged to communicate with the drilling rig. The processor is configured to provide a surface profile of the drilling surface, compare the provided surface profile with the current drilling plan, and, based on the comparing, identify non-drillable holes, and modify the drilling plan for the identified non-drillable holes such that drillability is achieved, and saving the modified drilling plan as a new drilling plan in the control unit.

[0033] Systems herein may further comprise one or more devices configured to generate a digital representation of the drilling surface, and the processor may further be configured to provide the surface profile by obtaining the generated digital representation.

[0034] In systems herein, the one or more devices configured to generate a digital representation may be one or more cameras providing images of the drilling surface. The processor may further be configured to provide the surface profile by obtaining a three-dimensional image based on the images. In systems herein, the one or more cameras may be arranged at different positions, or arranged with different angles in relation to the drilling surface.

[0035] According to yet another aspect, a rock drilling rig is provided. The rock drilling rig comprises at least one drilling unit which comprises a feed beam arranged in a drilling boom, and a rock drill machine movable by means of a feed device with respect to the feed beam. The rock drilling rig further comprises a system in according to embodiments herein.

[0036] BRIEF DESCRIPTION OF DRAWINGS

[0037] Fig. 1 shows a flowchart showing an exemplified method disclosed herein.

[0038] Fig. 2 shows an example of a rock drilling rig that may be used together with systems disclosed herein.

[0039] Fig. 3 is a block diagram showing an example of a system according to embodiments herein. Fig. 4 and 5 show different examples where one or more cameras and / or scanners are used for providing a digital representation of a drill face.

[0040] DETAILED DESCRIPTION

[0041] The present disclosure will now be described more in detail with reference to the accompanying drawings.

[0042] According to embodiments herein, a method for modifying a drilling plan for drilling holes for excavating a cavity in rock is provided. The method will be described in more detail later with reference to Fig. 1 .

[0043] Prior to drilling of a rock drilling surface commences, a drilling pattern, or drilling plan, is generated. The drilling plan defines holes to be drilled prior to blasting a drilling surface. The drilling plan is, if needed, modified to comply with the drilling surface to be drilled. The drilling plan is defining a plurality of holes to be drilled in a drilling surface of the rock by defining one or more of start position, direction angle, length or endpoint of each hole to be drilled. The drilling plan may also contain other useful information, such as the location rock bolts or bootlegs that is to be avoided when drilling. The initial drilling plan may be generated according to any of the various known technologies for generating a drilling plan. In general when generating a drilling plan, holes to be drilled close to the periphery of the drilling surface are subject to limitations regarding possible hole direction.

[0044] The provided method for modifying a drilling plan takes a plurality of factors into account thereby providing for a more efficient drilling process reducing the time needed for each drilling round, minimizing the need of manual acts, and reducing the amount of surplus rock being broken during the excavation. Thereby, the provided method is reducing the amount of surplus rock being broken during the excavation, and is minimizing the need of manual modifications and operations during the drilling process.

[0045] Fig. 1 illustrates a schematic flowchart for an exemplified method for modifying a drilling plan. An initial drilling plan may be supplied or generated e.g. by an operator of a drilling rig 201 , by any suitable input to the control system, or by any other remote or local suitable means. The method comprises a step 101 of generating a surface profile of the drilling surface 202. In a next step 102, comparing the generated surface profile with the drilling plan is performed. Based on the comparison, non-drillable holes are identified in step 103. In step 104, modifying of the drilling plan for the identified non-drillable holes is performed.

[0046] With “non-drillable holes” is herein meant planned drillholes that are not suitable to be drilled in view of the surface profile of the drilling surface 202. Non-drillable holes may comprise planned drillholes that would not be suitable to be drilled in an automated mode but would be suitable to be drilled by human intervention.

[0047] The current drilling plan may for example be compared with the surface profile by overlaying the drilling plan with a digital representation of the surface profile. Any suitable digital representation of the surface profile may be used, i.e. measuring the surface, or scanning the surface, or using photos and image processing. Some examples of how to generate a digital representation of the surface will be described later. Different difficulties with the planned holes may be identified by the comparing step, i.e. the face of the rock may be to complicated to enable drilling with for example sharp edges, or the rock surface may be cracked or loose, or there may be problems related to the holes of an earlier drilling round. Modifying the drilling plan for the identified non-drillable holes may be performed in different ways which will be exemplified later. The present method enables a drilling round to be performed autonomously or from a remote location even when the circumstances are difficult for drilling for example due to a rough rock surface. A modified drilling plan where one or more difficult holes are identified and adjusted may be provided automatically in a fast and efficient way. Thereby, the drilling process is enabled to be continued without the need of manual adjustments of the drilling plan, or manual operation of the drill rig.

[0048] The steps comparing the generated surface profile with the drilling plan, and, based on the comparison, identifying non-drillable holes and modifying the drilling plan for the identified non-drillable holes, may optionally be repeated for the modified drilling plan. If non-drillable holes are still identified, marking of the identified holes as still non-drillable may be performed. Such more complicated holes, if any, may be taken care of in other ways such as manually later. It is to be noted that these repeated steps may be repeated a plurality of times, if needed. The number of repetitions may be set manually, or automatically.

[0049] Comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the direction angle at the respective start position of the hole according to the drilling plan with the surface angle at the corresponding position of the generated surface profile, and, if the angles are not compatible, identify the hole as a non-drillable hole. Further, comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the start position of the hole according to the drilling plan with the end position of the holes according to the previous drilling plan, and, if the positions are located close to each other, identify the hole as a non-drillable hole. Still further, comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the start position of the hole according to the drilling plan with the corresponding position of the generated surface profile, and, if the surface profile indicates a cracked or loose surface at the corresponding position, identifying the hole as a non-drillable hole.

[0050] The modified drilling plan is saved as a new drilling plan in the control unit 214 in step 105.

[0051] The drilling plan may be modified in a number of different ways. For example, the drilling plan may be modified by moving the start position and the angle of a hole identified as non-drillable such that the end point of the hole is maintained. By remaining the initially planned end point of the holes, the target plane for the drilling round can be maintained resulting in a more even new drilling surface after the present round. Modifying the drilling plan may be performed by changing the start position for the identified non-drillable holes such that drillability is achieved, and / or by changing the direction angle for the identified non-drillable holes such that drillability is achieved. Alternatively, or in combination, modifying the drilling plan may be performed by changing the length for the identified non-drillable holes such that drillability is achieved. For example, modifying the drilling plan may be performed such that each respective end position for the identified non-drillable holes is maintained. Thereby, the end plan of the drilling round can still be intact. The surface profile may be provided in different ways, for example by generation by scanning the drilling surface 202. The scanning may be performed by one or more scanners being arranged at different positions and / or at different angles in relation to the drilling surface 202. If a single scanner is used, the scanner may be arranged to be moved into different locations or angles in relation to the surface to be scanned. Thereby, a more accurate surface profile can be obtained still only using a single scanner. If multiple scanners are used, they can be located at different positions and / or angles in relation to the surface to be scanned. The scanning may for example be performed by one or more LIDAR scanners. The surface profile may alternatively be generated by measuring the drilling surface 202. Any suitable measurement method may be used providing a surface profile. The generated surface profile may be presented as a 3D point cloud.

[0052] When generating the surface profile irrespective of what method that is used, more complex surface areas may be identified and marked. For such areas, the drilling plan may be modified in a certain manner, for example manually by an operator. It is to be noted that any modifications of the drilling plan, either performed automatically of manually, may be saved and can be used later. Thereby a machine learning function is provided and future drilling surfaces with similar difficulties or challenges may be modified in accordance with such saved modifications. Thereby, a more suitable modified drilling plan may be provided by the system whereby time can be saved.

[0053] Generating the surface profile may comprise receiving images of the drilling surface 202, and performing image analysis of the images. Thereby a three-dimensional image of the surface is provided representing the surface profile. The image analysis may comprise detecting high contrast areas such as edges or contours in the images.

[0054] Comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the start position of the hole according to the drilling plan with the end position of the holes according to the previous drilling plan, and, if the positions are located close to each other, identify the hole as a non- drillable hole. It is to be noted that irrespective of any surface profile, the drilling plan may at any time be compared to the drilling log, or the quality log. This may for example be done initially before starting up for a new round, or as a double check once a modified drilling plan is present. Thereby, the actual end positions of the holes according to the previous drilling round can be compared to the start positions according to the drilling plan.

[0055] Comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the direction angle at the respective start position of the hole according to the drilling plan with the surface angle at the corresponding position of the generated surface profile, and, if the angles are not compatible, identify the hole as a non-drillable hole. Comparing the generated surface profile with the drilling plan may comprise comparing, for each respective hole, the start position of the hole according to the drilling plan with the corresponding position of the generated surface profile, and, if the surface profile indicate a cracked or loose surface at the corresponding position, identifying the hole as a non-drillable hole.

[0056] Modifying the drilling plan may for example be performed by changing the start position for the identified non-drillable holes, or by changing the direction angle for the identified non-drillable holes such that drillability is achieved, or by changing the length for the identified non-drillable holes such that drillability is achieved.

[0057] Methods herein may further comprise selecting, for relocation, a plurality of holes in the drilling plan constituting a group of holes, relocating simultaneously the start points of all holes belonging to the group of holes to the new location indicated by the drilling unit, and keeping a mutual position of the start points of the holes with respect to one another unchanged during the relocation such that the hole pattern and the target plane of the round is maintained.

[0058] The holes are to be drilled by a drilling rig 201 comprising at least one feed beam carrying a drilling machine, and being arranged to communicate with at least one processor and at least one control unit 214 with a drilling plan therein.

[0059] Fig. 2 illustrates an exemplary rock drilling rig. According to embodiments disclosed herein the rock drilling rig comprises at least one drilling unit which comprises a feed beam arranged in a drilling boom and a rock drill machine movable by means of a feed device with respect to the feed beam The rock drilling rig further comprises a system according to any of the embodiments disclosed herein. The start positions of the holes to be drilled on the rock face are schematically illustrated by "x" markings, where these positions are determined by the drilling plan. The exemplary movable rock drilling rig 201 may be utilised e.g. in tunnel excavation. The rock drilling rig 201 is an underground drilling rig and is shown in position for drilling a round of holes in a drilling surface 202 during tunnel excavation, e.g. along a tunnel line TL.

[0060] As can be seen in fig. 2, the rock drilling rig 201 according to the disclosed example is provided with three booms 203-205, each of which is carrying a drilling machine 206-208 via feed beams 209-211 . Accordingly, the disclosed rock drilling rig 201 may drill up to three holes at a time. The drilling process may be controlled remote or by an operator from a cabin 215.

[0061] The drilling rig 201 is further arranged to communicate with a control system. The control system may be located remote or local. The control system may comprise at least one control unit 214, which controls various of the functions of the drilling rig 201 , e.g. by suitable control of various actuators / motors / pumps etc. Drilling rigs of the disclosed kind may comprise more than one control unit, where each control unit, respectively, can be arranged to be responsible for different functions of the drilling rig. The drilling rig 201 is arranged to be repositioned as excavation progresses and comprises, according to the present example, wheels 216, 217 for allowing drilling rig movability.

[0062] Crawler drives or other suitable means may alternatively be used to allow manoeuvring of the drilling rig 201 . Fig. 2 hence discloses a drilling rig that following a previous blast and clearing of broken rock has been moved forward in the excavating direction, i.e. along the tunnel line TL, towards the drilling surface 202 resulting from the previous blast and the drilling rig 201 has been positioned for drilling the subsequent round for blasting of the next section of the tunnel / cavity to be excavated.

[0063] In order to correctly excavate rock according to the predetermined tunnel alignment, the exact position of the rock drilling rig 201 in the prevailing coordinate system must be determined. This can be accomplished in various ways and, for example, by aligning one of the feed beams, e.g. feed beam 211 to a laser beam of a theodolite (not shown), where the position of the theodolite in turn has been established using fixed points.

[0064] The drilling rig in 201 general comprises a local rig coordinate system, and through the use of the drilling rig coordinate system the position of the drilling rig can be determined using the location of the feed beam in the drilling rig coordinate system and the location of the feed beam as determined in the coordinate system of the tunnel.

[0065] In addition to the feed beam being aligned with a laser beam of a theodolite, the position of the feed beam along the laser beam must also be determined. This can be performed e.g. by straight-forward measurement or in any other way. For example, the length of the tunnel that so far has been excavated from the beginning of the excavation, i.e. the drilled and blasted length of the tunnel, may e.g. be marked on the tunnel wall to facilitate positioning of the drilling rig.

[0066] Any other suitable method of positioning the drilling rig in the coordinate system of the tunnel to be drilled may be utilized.

[0067] It is not possible to drill precisely along a contour outline but drilling will have to be performed slightly outwards in relation to the desired direction to make room for drilling machine / feed beam when drilling the next round of holes following blasting of the current round.

[0068] Fig. 3 is a block diagram showing an example of a system 300 according to embodiments herein. The system 300 for modifying a drilling plan for excavating a cavity in rock will now be described. The drilling plan is determining a plurality of holes to be drilled in a drilling surface 202 of the rock by defining any of start position, direction angle or length of each hole to be drilled. The holes are arranged to be drilled by a drilling rig 201 comprising at least one feed beam carrying a drilling machine. The system comprises at least one control unit 214 with a drilling plan therein, and a processor 302. The control unit 214 and the processor 302 are arranged to communicate with the drilling rig 201 . The processor 302 is configured to provide a surface profile of the drilling surface 202, compare the provided surface profile with the current drilling plan, and, based on the comparing, identify non- drillable holes. Further, the drilling plan for the identified non-drillable holes is modified such that drillability is achieved. The modified drilling plan is saved as a new drilling plan in the control unit 214.

[0069] The surface profile may be generated by use of one or more devices configured to generate a digital representation of the drilling surface 202. In Fig. 4, one example of a system 300 is presented. The system 300 comprises a device 303 for generating a digital presentation of the rock face in the form of a single camera, or a single scanner. The single camera or scanner may be directed at different angles. By changing the angle, or the position of the single camera or scanner, a more accurate digital representation of the rock surface to be drilled can be provided.

[0070] As another example shown in Fig. 5, the system 300 may comprise two devices 303, such as two cameras, or scanners, providing a digital representation of the drilling surface 202, and the processor 302 may further be configured to provide the surface profile by obtaining a three-dimensional image based on the images. The one or more cameras, or scanners, may be arranged at different positions or at different angles in relation to the drilling surface 202. Thereby, a more accurate digital representation of the rock surface may be provided. It is however to be noted that any suitable number of cameras or scanners, or a combination thereof may be used. Further, it is to be noted that the generation of a digital representation of the drilling surface 202 may be provided in any other suitably way. In the figures, cameras and / or scanners are used only as examples. Any suitable measuring technique may for example be used.

[0071] According to another aspect, a computer program is provided. The computer program comprises instructions which, when the program is executed by a computer, cause the computer to carry out the methods disclosed herein.

[0072] In further embodiments herein, a rock drilling 201 rig is provided. The rock drilling rig comprises at least one drilling unit which comprises a feed beam arranged in a drilling boom and a rock drill machine movable by means of a feed device with respect to the feed beam The rock drilling rig further comprises a system according to any of the embodiments disclosed herein.

[0073] The foregoing disclosure is not intended to limit the present invention to the precise forms or particular fields of use disclosed. It is contemplated that various alternate embodiments and / or modifications to the present invention, whether explicitly described or implied herein, are possible in light of the disclosure. Accordingly, the scope of the invention is defined only by the claims.

Claims

CLAIMS1 . A method for modifying a drilling plan for drilling holes for excavating a cavity in rock, the drilling plan defining a plurality of holes to be drilled in a drilling surface (202) of the rock by defining one or mure of start position, direction angle, length or endpoint of each hole to be drilled, the holes are to be drilled by a drilling rig comprising at least one feed beam carrying a drilling machine, and being arranged to communicate with at least one processor and at least one control unit with a drilling plan therein, the method comprising:(101 ) generating a surface profile of said drilling surface (202),(102) comparing said generated surface profile with the drilling plan, and, based on said comparison, (103) identifying non-drillable holes,(104) modifying the drilling plan for said identified non-drillable holes, and(105) saving the modified drilling plan as a new drilling plan in the control unit.

2. A method according to claim 1 , wherein steps (102), (103), and (104) are repeated for the modified drilling plan, and, if non-drillable holes are still identified, marking said identified holes.

3. A method to any of the preceding claims, wherein said surface profile is generated by use of one or more devices configured to generate a digital representation of said drilling surface (202).

4. A method to any of the preceding claims, wherein said surface profile is generated by scanning said drilling surface (202).

5. A method according to the preceding claim, wherein the scanning is performed by one or more scanner being arranged at different positions and / or at different angles in relation to said drilling surface (202).

6. A method according to claim 4 or 5, wherein the scanning is performed by one or more LIDAR scanners.

7. A method according to any of the preceding claims, wherein said surface profile is generated by measuring said drilling surface (202).

8. A method according to any of the preceding claims, wherein generating the surface profile comprises receiving images of the drilling surface (202): and performing image analysis of said images whereby a three-dimensional image of the surface is provided representing the surface profile.

9. A method according to the preceding claim, wherein the image analysis comprises detecting high contrast areas such as edges or contours in the images.

10. A method according to any of the preceding claims, wherein said generated surface profile is presented as a 3D point cloud.11 . A method according to any of the preceding claims, wherein the drilling plan is modified by moving the start position and the angle of a hole identified as non- drillable such that the end point of the hole is maintained.

12. A method according to any of the preceding claims, wherein comparing said generated surface profile with the drilling plan comprises comparing, for each respective hole, the direction angle at the respective start position of the hole according to the drilling plan with the surface angle at the corresponding position of the generated surface profile, and, if the angles are not compatible, identify the hole as a non-driliable hole.

13. A method according to any of the preceding claims, wherein comparing said generated surface profile with the drilling plan comprises comparing, for each respective hole, the start position of the hole according to the drilling plan with the end position of the holes according to the previous drilling plan, and, if the positions are located close to each other, identify the hole as a non-driliable hole.

14. A method according to any of the preceding ciaims, wherein comparing said generated surface profiie with the drilling plan comprises comparing, for each respective hole, the start position of the hole according to the drilling plan with the corresponding position of the generated surface profile, and, if the surface profile indicate a cracked or loose surface at the corresponding position, identifying the hole as a non-drillable hole.

15. A method according to any of the preceding claims, wherein modifying the drilling plan is performed by changing the start position and / or by changing the direction angle and / or by changing the length for said identified non- drillable holes such that drillability is achieved.

16. A method according to the preceding claim, wherein modifying the drilling plan is performed such that each respective end position for said identified non- drillable holes is maintained.

17. A method according to any of the preceding claims, further comprising selecting, for relocation, a plurality of holes in the drilling plan constituting a group of holes; relocating simultaneously the start points of all holes belonging to the group of holes to the new location indicated by the drilling unit ; and keeping a mutual position of the start points of the holes with respect to one another unchanged during the relocation such that the end plane and the relative end points pattern are substantially maintained for the end points.

18. A computer program comprising instructions which, when the program is executed by a computer, cause the computer to carry out the method according to any one of the preceding claims.

19. A system (300) for modifying a drilling plan for excavating a cavity in rook, the drilling plan determining a plurality of holes to be drilled in a drilling surface (202) of the rock by defining any of start position, direction angle or length of each hole to be drilled, the holes being arranged to be drilled by a drilling rig comprising at least one feed beam carrying a drilling machine, the system comprising:- one or more devices configured to provide a digital representation of the drilling surface (202),- at least one control unit (214) with a drilling plan therein,- a processor (302) wherein the control unit and the processor is arranged to communicate with the drilling rig wherein the processor is configured to:- compare said provided surface profile with the current drilling plan, and, based on said comparing,- identify non-drillable holes,- modify the drilling plan for said identified non-drillable holes such that drillability is achieved, and- save the modified drilling plan as a new drilling plan in the control unit.

20. A system according to claim 19 further comprising: one or more devices (303) configured to generate a digital representation of said drilling surface (202); and wherein the processor is further configured to provide said surface profile by obtaining said generated digital representation.21 .A system according to claim 22 wherein said one or more devices configured to generate a digital representation are one or more camera providing images of the drilling surface (202); and wherein the processor is further configured to provide said surface profile by obtaining a three-dimensional image based on said images.

22. A system according to the preceding claim wherein said one or more camera is arranged to be moved to different positions or angles, and / or are located at different positions, or arranged with different angles in relation to said drilling surface (202).

23. A rock drilling rig, comprising at least one drilling unit which comprises a feed beam arranged in a drilling boom, and a rock drill machine movable by means of a feed device with respect to the feed beam, and further comprising a system according to any of claims 21-25.

Citation Information

Patent Citations

  • Drilling device for blasting

    JP2021017767A

  • Mine drilling system and related method

    US11002075B1

  • Automated guided apparatus suitable for toping applications

    US6349249B1

  • Method and system for generating a drilling pattern, and a rock drilling rig

    WO2018156072A1

Cited By

  • Underground mining overbreak minimisation method and system

    WO2025156006A1