Transmission restriction adjustment method and apparatus, device, and readable storage medium

By performing predefined operations based on channel quality and scheduling-related information through terminal and network-side devices, the data transmission delay and service capacity problems caused by Gap mechanism and scheduling restrictions in the new air interface are solved, and high data rate and low latency are achieved. Service transmission performance.

WO2025031246A1PCT designated stage expired Publication Date: 2025-02-13VIVO MOBILE COMM CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/109071
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-08-07
Filing Date
2024-08-01
Publication Date
2025-02-13

AI Technical Summary

Technical Problem

The Gap mechanism introduced in the new radio (NR) and its corresponding data transmission and reception restrictions, as well as scheduling availability/restrictions, provide corresponding scheduling restrictions, resulting in increased data transmission delay and reduced service capacity, which affects communication performance.

Method used

Perform predefined operations, including relaxing or disabling scheduling restrictions, based on the uplink information related to the Serving cell's channel quality, uplink buffer status report (BSR) or scheduling request (SR) and uplink scheduling related information through terminal and network-side devices. , skip or disable the target interval timing, adjust the interval pattern parameters of the interval timing.

Benefits of technology

The transmission and reception restrictions brought by the Gap mechanism and the scheduling restrictions stipulated by scheduling availability/restrictions are achieved, thereby reducing data delays, improving service capacity, and ensuring the transmission performance of high data rates and low latency services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024109071_13022025_PF_FP_ABST
    Figure CN2024109071_13022025_PF_FP_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of communications, and discloses a transmission restriction adjustment method and apparatus, a device, and a readable storage medium. The method comprises: a terminal and a network side device determine that scheduling restrictions or effective target gap occasions are present in a first serving cell; and on the basis of a preset rule, the terminal and the network side device execute a predefined operation. The first serving cell is any serving cell configured by the terminal. The preset rule is associated with any one of the following: first reporting information related to channel quality of a serving cell; second reporting information related to an uplink buffer status report (BSR) or a scheduling request (SR); and scheduling information related to uplink and downlink scheduling. The predefined operation comprises at least one of the following: relaxing the scheduling restrictions or disabling the scheduling restrictions within a first time domain unit set; skipping or disabling at least one gap occasion among the target gap occasions; and adjusting a gap pattern parameter corresponding to at least one gap occasion among the target gap occasions.
Need to check novelty before this filing date? Find Prior Art

Description

Method, device, apparatus and readable storage medium for adjusting transmission restrictions

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims priority to Chinese patent application No. 202310990766.8 filed on August 7, 2023, the entire contents of which are incorporated herein by reference. Technical Field

[0003] The present application belongs to the field of communication technology, and specifically relates to a method, apparatus, device and readable storage medium for adjusting transmission restrictions. Background Art

[0004] In order to support Radio Resource Management measurements (RRM measurements), positioning, cell global identity reporting (CGI reporting), multi universal subscriber identity module operation (MUSIM operation), transmission power management (Tx power management), etc., the New Radio (NR) introduces a variety of gap mechanisms and corresponding data transmission and reception restrictions. At the same time, in order to ensure the performance of RRM measurements, Radio Link Management (RLM), Beam Failure Detection (BFD), etc., many regulations on scheduling availability / restrictions are introduced. The above-mentioned Gap mechanism and its corresponding transmission and reception restrictions, as well as the scheduling restrictions corresponding to the scheduling availability / restrictions regulations, will increase data transmission delay, reduce service capacity, etc., affecting communication performance.

[0005] Summary of the Invention

[0006] The embodiments of the present application provide a method, apparatus, device, and readable storage medium for adjusting transmission restrictions, which can reasonably relax the transmission and reception restrictions brought about by the Gap mechanism, as well as the scheduling restrictions corresponding to the scheduling availability / restrictions provisions, to ensure the transmission performance of high data rate and low latency services.

[0007] In a first aspect, a method for adjusting a transmission restriction is provided, comprising:

[0008] The terminal determines that there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0009] The terminal performs a predefined operation according to a preset rule;

[0010] The first serving cell is any serving cell configured for the terminal;

[0011] The preset rule is associated with any of the following:

[0012] First reporting information related to the channel quality of the serving cell;

[0013] Second reporting information related to an uplink buffer status report BSR or a scheduling request SR;

[0014] Scheduling information related to uplink and downlink scheduling;

[0015] The predefined operation includes at least one of the following:

[0016] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0017] skipping or disabling at least one of the target intervals;

[0018] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0019] In a second aspect, a method for adjusting a transmission restriction is provided, comprising:

[0020] The network side device determines that there is a scheduling restriction or a valid target interval timing in the first serving cell;

[0021] The network side device performs predefined operations according to preset rules;

[0022] The first serving cell is any serving cell configured by the terminal;

[0023] The preset rule is associated with any of the following:

[0024] First reporting information related to the channel quality of the serving cell;

[0025] Second reporting information related to uplink BSR or SR;

[0026] Scheduling information related to uplink and downlink scheduling;

[0027] The predefined operation includes at least one of the following:

[0028] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0029] skipping or disabling at least one of the target interval opportunities;

[0030] Adjust an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0031] According to a third aspect, a device for adjusting transmission restrictions is provided, including:

[0032] A first determining module is configured to determine whether a scheduling restriction exists in the first serving cell or whether a target interval timing is effective; a first executing module is configured to execute a predefined operation according to a preset rule;

[0033] The first serving cell is any serving cell configured for the terminal;

[0034] The preset rule is associated with any of the following:

[0035] First reporting information related to the channel quality of the serving cell;

[0036] Second reporting information related to uplink BSR or SR;

[0037] Scheduling information related to uplink and downlink scheduling;

[0038] The predefined operation includes at least one of the following:

[0039] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0040] skipping or disabling at least one of the target intervals;

[0041] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0042] In a fourth aspect, a device for adjusting transmission restrictions is provided, comprising:

[0043] A second determining module is configured to determine whether a scheduling restriction exists in the first serving cell or whether a target interval timing is effective; a second executing module is configured to execute a predefined operation according to a preset rule;

[0044] The first serving cell is any serving cell configured by the terminal;

[0045] The preset rule is associated with any of the following:

[0046] Report information related to the channel quality of the serving cell;

[0047] First reporting information related to uplink BSR or SR;

[0048] Scheduling information related to uplink and downlink scheduling;

[0049] The predefined operation includes at least one of the following:

[0050] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0051] skipping or disabling at least one of the target intervals;

[0052] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0053] In a fifth aspect, a terminal is provided, comprising a processor and a memory, wherein the memory stores a program or instruction that can be run on the processor, and when the program or instruction is executed by the processor, the steps of the method described in the first aspect are implemented.

[0054] In a sixth aspect, a terminal is provided, including a processor and a communication interface, wherein the processor is configured to:

[0055] Determining whether a scheduling restriction exists in the first serving cell or whether a target interval timing is effective;

[0056] Execute predefined operations according to preset rules;

[0057] The first serving cell is any serving cell configured for the terminal;

[0058] The preset rule is associated with any of the following:

[0059] First reporting information related to the channel quality of the serving cell;

[0060] Second reporting information related to an uplink buffer status report BSR or a scheduling request SR;

[0061] Scheduling information related to uplink and downlink scheduling;

[0062] The predefined operation includes at least one of the following:

[0063] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0064] skipping or disabling at least one of the target intervals;

[0065] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0066] In the seventh aspect, a network side device is provided, which includes a processor and a memory, wherein the memory stores programs or instructions that can be run on the processor, and when the program or instructions are executed by the processor, the steps of the method described in the second aspect are implemented.

[0067] In an eighth aspect, a network-side device is provided, including a processor and a communication interface, wherein the processor is configured to:

[0068] Determining whether a scheduling restriction exists in the first serving cell or whether a target interval timing is effective;

[0069] Execute predefined operations according to preset rules;

[0070] The first serving cell is any serving cell configured by the terminal;

[0071] The preset rule is associated with any of the following:

[0072] First reporting information related to the channel quality of the serving cell;

[0073] Second reporting information related to uplink BSR or SR;

[0074] Scheduling information related to uplink and downlink scheduling;

[0075] The predefined operation includes at least one of the following:

[0076] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0077] skipping or disabling at least one of the target intervals;

[0078] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0079] In the ninth aspect, a readable storage medium is provided, on which a program or instruction is stored. When the program or instruction is executed by a processor, the steps of the method described in the first aspect are implemented, or the steps of the method described in the second aspect are implemented.

[0080] In the tenth aspect, a wireless communication system is provided, comprising: a terminal and a network side device, wherein the terminal can be used to execute the steps of the method described in the first aspect, and the network side device can be used to execute the steps of the method described in the second aspect.

[0081] In the eleventh aspect, a chip is provided, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the method as described in the first aspect, or to implement the method as described in the second aspect.

[0082] In the twelfth aspect, a computer program / program product is provided, which is stored in a storage medium and executed by at least one processor to implement the method as described in the first aspect, or to implement the method as described in the second aspect.

[0083] In an embodiment of the present application, the terminal side and the network side relax the scheduling restriction or disable the scheduling restriction within the first time domain unit set according to the preset rules associated with any one of the reporting information related to the channel quality of the serving cell, the reporting information related to the uplink BSR or SR, and the uplink and downlink scheduling related information, or skip or disable at least one interval opportunity in the target interval opportunity, or adjust the interval pattern parameters corresponding to at least one interval opportunity in the target interval opportunity, and release the scheduling restriction or interval opportunity as much as possible to reduce data delay and improve service capacity. Without affecting the measurement requirements or reducing the impact on the measurement performance, timely or as timely as possible data transmission is guaranteed, thereby ensuring the transmission performance of the service. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] FIG1a is a block diagram of a wireless communication system applicable to embodiments of the present application;

[0085] Figure 1b is a schematic diagram of NCSG parameters;

[0086] FIG2 is a flow chart of a method for adjusting transmission restrictions according to an embodiment of the present application;

[0087] FIG3 is a schematic diagram of a scenario in which a predefined operation is determined to be started based on an L3 measurement report or an L1 CSI report of a serving cell;

[0088] FIG4 is a second flow chart of a method for adjusting transmission restrictions according to an embodiment of the present application;

[0089] FIG5 is a schematic diagram of a structure of a device for adjusting transmission restrictions according to an embodiment of the present application;

[0090] FIG6 is a second schematic diagram of the structure of the device for adjusting transmission restrictions according to an embodiment of the present application;

[0091] FIG7 is a schematic structural diagram of a communication device provided in an embodiment of the present application;

[0092] FIG8 is a schematic diagram of the structure of a terminal provided in an embodiment of the present application;

[0093] FIG9 is a schematic diagram of a structure of a network side device according to an embodiment of the present application;

[0094] FIG10 is a second structural diagram of the network side device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0095] The following will be combined with the accompanying drawings in the embodiments of this application to clearly describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field are within the scope of protection of this application.

[0096] The terms "first", "second", etc. in this application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the terms used in this way are interchangeable where appropriate, so that the embodiments of the present application can be implemented in an order other than those illustrated or described herein, and the objects distinguished by "first" and "second" are generally of the same type, and do not limit the number of objects, for example, the first object can be one or more. In addition, "or" in this application represents at least one of the connected objects. For example, "A or B" covers three options, namely, Option 1: including A but not including B; Option 2: including B but not including A; Option 3: including both A and B. The character " / " generally indicates that the objects associated before and after are in an "or" relationship.

[0097] The term "indication" in this application can be either a direct indication (or explicit indication) or an indirect indication (or implicit indication). A direct indication can be understood as the sender explicitly informing the receiver of specific information, the operation to be performed, or the requested result, etc. in the instruction sent; an indirect indication can be understood as the receiver determining the corresponding information based on the instruction sent by the sender, or making a judgment and determining the operation to be performed or the requested result, etc. based on the judgment result.

[0098] It is worth noting that the technology described in the embodiments of the present application is not limited to the Long Term Evolution (LTE) / LTE-Advanced (LTE-A) system, but can also be used in other wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency-Division Multiple Access (SC-FDMA) or other systems. The terms "system" and "network" in the embodiments of the present application are often used interchangeably, and the technology described can be used for the systems and radio technologies mentioned above, as well as for other systems and radio technologies. The following description describes a New Radio (NR) system for illustrative purposes, and NR terminology is used in most of the following description, but these technologies can also be applied to systems other than NR systems, such as 6th generation (6G) systems. th Generation, 6G) communication system.

[0099] FIG1a shows a block diagram of a wireless communication system applicable to an embodiment of the present application. The wireless communication system includes a terminal 11 and a network-side device 12. The terminal 11 may be a mobile phone, a tablet computer (Tablet Personal Computer), a laptop computer (Laptop Computer), a notebook computer, a personal digital assistant (PDA), a handheld computer, a netbook, an ultra-mobile personal computer (UMPC), a mobile internet device (MID), an augmented reality (AR), a virtual reality (VR) device, a robot, a wearable device (Wearable Device), an aircraft (flight vehicle), a vehicle user equipment (VUE), a ship-borne device, a pedestrian user equipment (PUE), a smart home (home appliances with wireless communication capabilities, such as refrigerators, televisions, washing machines, or furniture), a game console, a personal computer (PC), an ATM, or a self-service machine, or other terminal-side devices. Wearable devices include: smart watches, smart bracelets, smart headphones, smart glasses, smart jewelry (smart bracelets, smart bracelets, smart rings, smart necklaces, smart anklets, smart anklets, etc.), smart wristbands, smart clothing, etc. Among them, the vehicle-mounted device can also be called a vehicle-mounted terminal, a vehicle-mounted controller, a vehicle-mounted module, a vehicle-mounted component, a vehicle-mounted chip or a vehicle-mounted unit, etc. It should be noted that the specific type of the terminal 11 is not limited in the embodiment of the present application. The network side device 12 may include an access network device or a core network device, wherein the access network device may also be called a radio access network (Radio Access Network, RAN) device, a radio access network function or a radio access network unit. The access network device may include a base station, a wireless local area network (WLAN) access point (AP) or a wireless fidelity (WiFi) node, etc.Among them, the base station can be referred to as Node B (NB), Evolved Node B (eNB), the next generation Node B (gNB), New Radio Node B (NR Node B), access point, Relay Base Station (RBS), Serving Base Station (SBS), Base Transceiver Station (BTS), radio base station, radio transceiver, Basic Service Set (BSS), Extended Service Set (ESS), Home Node B (HNB), Home evolved Node B (home evolved Node B), Transmission Reception Point (TRP) or other appropriate terms in the relevant field. As long as the same technical effect is achieved, the base station is not limited to specific technical vocabulary. It should be noted that in the embodiment of the present application, only the base station in the NR system is used as an example for introduction, and the specific type of the base station is not limited.

[0100] The core network equipment may include but is not limited to at least one of the following: core network node, core network function, mobility management entity (MME), access mobility management function (AMF), session management function (SMF), user plane function (UPF), policy control function (PCF), policy and charging rules function unit (PCRF), edge application service discovery function (EASDF), unified data management (UDM), unified data repository (UDR), home user server (HSS), centralized network configuration (CNC), network storage function (NRF), network exposure function (NEF), local NEF (L-NEF), binding support function (BSF), application function ( It should be noted that in the embodiments of the present application, only the core network device in the NR system is introduced as an example, and the specific type of the core network device is not limited.

[0101] In order to better understand the technical solution of this application, the following contents are first introduced:

[0102] Extended reality (XR) refers to all combined real and virtual environments and human-computer interactions generated by computer technology and wearable devices. It includes representative forms such as augmented reality (AR), mixed reality (MR), virtual reality (VR), and their intersections. The levels of virtual worlds range from partial sensory input to fully immersive virtual reality. A key aspect of XR is the expansion of human experience, especially those related to presence (represented by VR) and cognitive learning (represented by AR).

[0103] For VR services, the uplink primarily involves the transmission of relatively dense small data packets. These small data packets can carry information such as gestures and controls, serving as input and reference for downlink presentation data. The downlink primarily involves the transmission of multimedia data such as video and audio. The timely reception and presentation of this multimedia data provides users with an immersive experience. Taking downlink video data as an example, video data can be modeled as video frames based on frames per second (FPS), with a typical FPS value of 60 or 120. These video frames arrive periodically or quasi-periodically based on a period determined by the FPS (1 / FPS second), and the size of the video frames changes dynamically. Each video frame is generally required to be successfully transmitted within 10ms over the air interface, with a transmission success rate of no less than 99% or even 99.9%. In addition, downlink video data generally requires a very high data rate, typically reaching tens or even hundreds of Mbps (typical values ​​are 30 / 45Mbps).

[0104] For AR services, in addition to the above-mentioned dense transmission of small data packets, uplink may also transmit multimedia data such as video, audio, and scene images. Its service characteristics are similar to those of downlink. The data rate is usually relatively low, for example, at most tens of Mbps (typically 10 / 20 Mbps). The time limit for air interface transmission can also be relaxed. For example, each video frame is generally required to be successfully transmitted within 30ms. The downlink data transmission characteristics are basically the same as those of VR services.

[0105] Gap mechanism in NR

[0106] Configuration of basic measurement gap (MG):

[0107] If the UE requires a measurement gap to identify and measure intra-frequency cells and / or inter-frequency cells and / or inter-Radio Access Technology (RAT) Evolved UMTS Terrestrial Radio Access Network (E-UTRAN) cells:

[0108] (1) If the UE does not support independent measurement gap patterns for different frequency ranges, the network must provide a single per-UE measurement gap pattern to concurrently monitor all frequency layers.

[0109] (2) If the UE supports independent measurement gap modes for different frequency ranges, the network must provide: a per-FR measurement gap mode for each frequency range (where the UE requires a frequency range-level measurement gap to concurrently monitor all its frequency layers independently for each frequency range), or a single UE-level measurement gap mode to concurrently monitor all frequency layers for all frequency ranges.

[0110] UE behavior when the Measurement gap is configured:

[0111] During the per-UE measurement gap, the UE:

[0112] (1) For Evolved Universal Terrestrial Radio Access-New Radio (E-UTRA-NR) dual connectivity, except for the reception of signals for radio resource management (RRM) measurements and signals for the random access procedure, there is no need to receive / send from / to the corresponding Evolved Universal Terrestrial Radio Access Network (E-UTRAN) primary cell (PCell), E-UTRAN secondary cell (SCell) and NR serving cell.

[0113] (2) For Standalone Architecture (SA) (configured with a single carrier or carrier aggregation (CA)), except for the reception of signals for RRM measurement, Positioning Reference Signal (PRS) measurement, and signals for random access procedures, there is no need to receive / send from / to the corresponding NR serving cell.

[0114] (3) For NR-E-UTRA dual connectivity, except for the reception of signals for RRM measurement, PRS measurement, and signals for random access procedures, there is no need to receive / send signals from / to the corresponding PCell, SCell, and E-UTRAN serving cell.

[0115] (4) For NR-DC, except for the reception of signals for RRM measurement, PRS measurement, and signals for the random access procedure, there is no need to receive / send signals from / to the corresponding NR serving cell.

[0116] During the per-FR measurement gap, the UE:

[0117] (1) For E-UTRA-NR dual connectivity, within the corresponding frequency range, except for the reception of signals for RRM measurement and signals for random access procedures, no reception / transmission is required from / to the corresponding E-UTRAN PCell, E-UTRAN SCell, and NR serving cell.

[0118] (2) For SA (single carrier or CA configured), within the corresponding frequency range, except for the reception of signals for RRM measurement, PRS measurement, and signals for random access procedures, there is no need to receive / send from / to the corresponding NR serving cell.

[0119] (3) For NR-E-UTRA dual connectivity, within the corresponding frequency range, except for the reception of signals for RRM measurement, PRS measurement, and signals for random access procedures, there is no need to receive / send from / to the corresponding PCell, SCell, and E-UTRAN serving cell.

[0120] (4) For NR-DC, within the corresponding frequency range, except for the reception of signals for RRM measurement, PRS measurement, and signals for the random access process, there is no need to receive / send signals from / to the corresponding NR serving cell.

[0121] Derivative / enhancement mechanism based on Measurement gap:

[0122] Based on the above per-UE measurement gap or per-FR measurement gap configuration and UE behavior, NR further introduces the following derivative or enhanced mechanisms:

[0123] Measurement gap sharing

[0124] When either intra-frequency measurement or inter-frequency measurement requires the use of the Measurement gap, or affects the use of the Measurement gap (for example, the SSB Measurement Timing Configuration (SMTC) window corresponding to the Synchronization Signal Block (SSB)-based measurement completely overlaps with the Measurement gap), it is necessary to consider the sharing of the Measurement gap between intra-frequency measurement and inter-frequency measurement.

[0125] Specifically, when the following conditions are met simultaneously based on UE granularity or FR granularity, Measurement gap sharing for per-UE measurement gap or per-FR measurement gap corresponding to FR is applied:

[0126] Condition 1: Intra-frequency measurement requires or affects the use of the Measurement gap.

[0127] Condition 2: Inter-frequency / RAT measurement requires the use of the Measurement gap, or inter-frequency measurement does not require the use of the Measurement gap but affects the use of the Measurement gap.

[0128] Condition 3: The UE is configured to measure positioning frequency layers.

[0129] Measurement gap sharing is controlled by the network configuration radio resource control (RRC) parameter MeasGapSharingScheme.

[0130] Pre-configured measurement gap:

[0131] Compared to the basic measurement gap, an activation / deactivation mechanism is introduced. When a pre-configured measurement gap is activated, its operation is exactly the same as the basic measurement gap.

[0132] The activation / deactivation mechanism can be further divided into the following two mechanisms:

[0133] (1) Autonomous activation / deactivation mechanism

[0134] The UE may autonomously change the Pre-MG state from activated to deactivated, or vice versa, based on any one or any combination of the triggering conditions.

[0135] (2) Network-controlled activation / deactivation mechanism

[0136] The UE determines whether a Pre-configured MG is Activated or Deactivated based on the RRC parameter preConfGapStatus configured on the network side.

[0137] Concurrent measurement gaps:

[0138] Compared with the basic Measurement gap, it allows the configuration of a gap combination (Gap combination) with collision of MG occasions for the UE.

[0139] When the UE does not support configuration of per-FR MG, the network may configure up to two per-UE MG patterns for the UE; when the UE supports configuration of per-FR MG, the network may configure a combination of MG patterns for the UE.

[0140] Determining Collision of MG Occasions: When a collision is detected, the priority configured for the Measurement gap is used to process the situation: the MG occasion with the higher priority is applied (valid), and the MG occasion with the lower priority is discarded (invalid). It is required that any two MG occasions that are detected as having a collision have corresponding priorities, and the corresponding priorities are different.

[0141] Other Gap mechanisms (independent of Measurement gap):

[0142] In NR, the following Gap mechanism is further introduced:

[0143] (1) Network controlled small gap (NCSG)

[0144] When NCSG is configured, other MGs cannot be configured at the same time.

[0145] The schematic diagram of the NCSG parameters is shown in Figure 1b.

[0146] (a) Visible interruption length (VIL) 1 and VIL 2

[0147] VIL1 is the visible interruption length before the measurement length (ML), and VIL2 is the visible interruption length after the ML. During VIL1 and VIL2, the UE does not expect to send or receive any data.

[0148] (b) Measurement length (ML)

[0149] ML is the measured length.

[0150] During ML, whether the UE is expected to transmit and receive data on the corresponding serving carrier depends on the scheduling restriction requirements.

[0151] (c) Visible interruption repetition period (VIRP)

[0152] VIRP is the Visible Interruption Repetition Period.

[0153] The NCSG Configurations table is different from the Measurement gap configuration table.

[0154] Multi-Universal Subscriber Identity Module (MUSIM) gap:

[0155] The MUSIM gap is used for MUSIM operations, such as cell identification and measurement of a target cell in a target network, paging monitoring, System Information Block (SIB) acquisition, and / or on-demand System Information (SI) requests.

[0156] It is currently understood that the data transmission and reception restrictions of the UE in the MUSIM gap follow the same restrictions as the Measurement gap.

[0157] The MUSIM Gap Pattern Configurations table is different from the Measurement gap configuration table.

[0158] Uplink (UL) gap is used for Tx power management

[0159] The UL gap is used for Tx power management in NR FR2 and has limitations for some uplink transmissions in the following scenarios.

[0160] When the UL gap overlaps with uplink transmissions in the NR serving cell in a FR2 single CC scenario, an intra-FR2 CA scenario, or an inter-FR2 CA scenario where the UE does not support tx-Support-UL-GapFR2-r17, the UE does not need to perform any uplink transmissions other than the specified uplink transmissions on the NR serving cell during the UL gap. The UL Gap Pattern Configurations table is different from the Measurement gap configuration table.

[0161] Restrictions on scheduling availability in NR

[0162] Taking into account UE-side RRM operations, in addition to the UE-side data transmission and reception restrictions of the aforementioned Gap mechanism, restrictions on scheduling availability are further introduced for the time period (or symbol subset thereof) during which the UE (may) perform RRM operations. The following cases focus on scheduling restrictions when the UE is not in the Measurement gap (some cases marked with NCSG are scheduling restrictions during the ML period of the NCSG, during which the UE is not allowed to configure other MGs simultaneously).

[0163] The considerations for introducing restrictions on scheduling availability during the period when the UE (may) perform RRM operations generally include:

[0164] Factor 1: Switching between uplink and downlink transmission directions

[0165] (1) Impacts

[0166] This only affects uplink transmission: the UE does not expect to send the Physical Uplink Control Channel (PUCCH), Physical Uplink Shared Channel (PUSCH), or Sounding Reference Signal (SRS).

[0167] (2) Involved cases

[0168] Case I: UE performs measurements in the Time Division Duplexing (TDD) band (on FR1 (Note 11))

[0169] Case 1: NR based on SSB with co-frequency measurement without MG (or using NCSG);

[0170] Symbols involved in scheduling restrictions: SSB symbols within the SMTC window duration, received signal strength indication (RSSI) measurement symbols (applicable only to SS-RSRQ measurements), and some data symbols before and after the aforementioned symbols;

[0171] Extension to other service areas: Note 12; Note 13;

[0172] Case 2: NR based on SSB without MG (or using NCSG) inter-frequency measurement;

[0173] Symbols involved in scheduling restrictions: SSB symbols within the SMTC window duration, RSSI measurement symbols (only applicable to SS-RSRQ measurement), and some data symbols before / after the aforementioned symbols;

[0174] Extension to other serving cells: Note 12; Note 13 (applicable only when NCSG is used);

[0175] Case 3: Cross Link Interference (CLI) (SRS-RSRP / CLI-RSSI) measurement on FR1 / FR2 (MG is not always required);

[0176] Symbols involved in scheduling restrictions: OFDM symbols where CLI measurements are performed and some data symbols preceding these OFDM symbols;

[0177] Extension to other service areas: Note 12;

[0178] Case 4: NR CSI-RS-based intra-frequency measurement (MG is not always required);

[0179] Symbols of interest: configured CSI-RS resource symbols and some data symbols before / after these symbols;

[0180] Extension to other service areas: Note 12;

[0181] Note 11: For Case 3 and Case 4, not limited to FR1

[0182] Note 12: Scheduling restrictions apply to other serving cells within the same frequency band (understandably, Note 12 also applies to Case 1 / 2 / 3 / 4 above)

[0183] Specifically, when performing carrier aggregation within the TDD frequency band, the scheduling restrictions for a given service cell should also be applied to all other service cells in the same frequency band, and apply to symbols in other service cells that fully or partially overlap with the symbols involved in the aforementioned Scheduling restrictions.

[0184] Note 13: When the UE does not support simultaneous RxTx InterBand CA for the frequency band pair formed by the current frequency band and the other frequency band, the scheduling restrictions apply to the serving cell in the other frequency band.

[0185] Specifically, when performing TDD inter-band carrier aggregation, the scheduling restrictions for a given service cell should also be applied to service cells in other frequency bands, and apply to symbols in this service cell that completely or partially overlap with the symbols involved in the aforementioned Scheduling restrictions, if the UE does not have the capability to support simultaneousRxTxInterBandCA for the frequency band pair consisting of the frequency band in which the given service cell is located and this other frequency band.

[0186] Factor 2: Switching between different DL SCSs in FR1

[0187] (1)Impacts

[0188] This affects both uplink transmission and downlink reception: the UE does not expect to transmit PUCCH / PUSCH / SRS or receive PDCCH / Physical Downlink Shared Channel (PDSCH) / CSI-RS for tracking (TRS) / CSI-RS for Channel Quality Indicator (CQI). The bracketed items above are only applicable to the following cases.

[0189] (2) Involved cases

[0190] SSB-based operations for UEs that do not support the simultaneousRxDataSSB-DiffNumerology (simultaneous reception of data and SSB with different subcarrier spacings (SCS)) capability (this capability involves intra-frequency measurements (including cases where MG is not required or NCSG is used), Layer 1 reference signal received power (L1-RSRP) measurement (including L1-RSRP reporting or L1-RSRP is used for candidate beam detection), Layer 1 signal-to-noise and interference ratio (L1-SINR) measurement, radio link monitoring, beam failure detection, etc.) or the simultaneousRxDataSSB-DiffNumerology-Inter-r16 (simultaneous reception of data and SSB with different SCSs on different frequency bands) capability (this capability involves inter-frequency measurements);

[0191] Case 1: The UE performs measurements in FR1 using a subcarrier spacing different from that of PDSCH / PDCCH (this case is not applicable to CSI-RS).

[0192] Case 1: NR based on SSB without MG (or using NCSG) co-frequency measurement

[0193] Symbols involved in scheduling restrictions: If deriveSSB_IndexFromCell is enabled, then the SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbols; if deriveSSB_IndexFromCell is not enabled, then all symbols within the SMTC window duration;

[0194] Extension to other service areas: Note 21;

[0195] Case 2: NR based on SSB without MG (or using NCSG) inter-frequency measurement

[0196] Symbols involved in scheduling restrictions: SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbols;

[0197] Extension to other service areas: Note 21;

[0198] Case 3: NR L1-RSRP measurement based on SSB for reporting (or for candidate beam detection) (MG is not always required)

[0199] Scheduling restrictions related symbols: symbols corresponding to the SSB index configured for L1-RSRP measurement;

[0200] Extension to other service areas: Note 21; Note 22;

[0201] Case 4: NR L1-SINR measurement based on SSB (MG is not always required)

[0202] Symbols involved in scheduling restrictions: SSB symbols to be measured for L1-SINR measurement;

[0203] Extension to other service areas: Note 21; Note 22;

[0204] CASE II: UE performs radio link monitoring on FR1 using a subcarrier spacing different from that of PDSCH / PDCCH. Scheduling restrictions Symbols involved: SSB symbols measured for radio link monitoring;

[0205] Extension to other service areas: Note 21; Note 22;

[0206] Case III: UE performs beam failure detection on FR1 using a subcarrier spacing different from that of PDSCH / PDCCH

[0207] Symbols involved in scheduling restrictions: SSB symbols measured for beam failure detection;

[0208] Extension to other service areas: Note 21; Note 22;

[0209] Note 21: Scheduling restrictions apply to other serving cells in the same frequency band (it is understandable that Note 21 also applies to all the above cases)

[0210] Specifically, when performing intra-band carrier aggregation, the scheduling restrictions for a given serving cell should also apply to all other serving cells in the same frequency band, and apply to symbols in other serving cells that fully or partially overlap with the symbols involved in the aforementioned Scheduling restrictions.

[0211] Note 22: Scheduling restrictions do not apply to service cells in other frequency bands

[0212] Specifically, when inter-FR1 frequency band carrier aggregation is configured, for other FR1 frequency bands other than the frequency band where the serving cell with scheduling restrictions is located, there is no scheduling restriction for the FR1 serving cells in these other FR1 frequency bands.

[0213] Factor 3: Switching between different analog beams in FR2 (Beam management)

[0214] (1) Impacts

[0215] This affects both uplink transmission and downlink reception: the UE does not expect to send PUCCH / PUSCH / SRS or receive PDCCH / PDSCH( / TRS)( / CSI-RS for tracking) / CSI-RS for CQI. The above bracketed items are only valid for the following cases.

[0216] (2) Involved cases

[0217] CASE 1: UE performs measurements in FR2;

[0218] Case 1: NR based on SSB without MG (or using NCSG) co-frequency measurement

[0219] Symbols involved in scheduling restrictions: If deriveSSB_IndexFromCell is enabled, then the SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbols; if deriveSSB_IndexFromCell is not enabled, then all symbols within the SMTC window duration;

[0220] Extension to other service areas: Note 31; Note 32; Note 33; Note 34;

[0221] Case 2: NR based on SSB without MG (or using NCSG) inter-frequency measurement

[0222] Scheduling restrictions involve symbols: SSB symbols within the SMTC window duration and some data symbols before / after the SSB symbol

[0223] Extension to other serving cells: Note 31; Note 35 (applicable only when NCSG is used);

[0224] Case 3: NR L1-RSRP measurement based on CSI-RS / SSB for reporting (or for candidate beam detection) (MG is not always required)

[0225] Scheduling restrictions apply to symbols corresponding to the SSB indices or periodic / semi-persistent / aperiodic CSI-RS resources configured for L1-RSRP measurement, as well as some data symbols before and after these symbols (for FR2-2 and 480 / 960 kHz SCS reference symbols, and for HST scenarios);

[0226] Extension to other service areas: Note 31; Note 32; Note 33;

[0227] Case 4: NR L1-SINR measurement based on CSI-RS / SSB (MG is not always required)

[0228] Scheduling restrictions apply to symbols used to measure L1-SINR, and (for FR2 power class 6 UEs configured with highSpeedMeasFlagFR2-r17) some data symbols before and after these symbols.

[0229] Extension to other service areas: Note 31;

[0230] Case 5: NR CSI-RS-based co-frequency measurement (MG is not always required)

[0231] Scheduling restrictions apply to symbols: CSI-RS symbols configured within the configured time slots for the CSI-RS resources used for measurement;

[0232] Extension to other service areas: Note 31; Note 32;

[0233] CASE II: UE monitors the radio link in FR2

[0234] Symbols covered by the scheduling restrictions: RLM-RS symbols measured for radio link monitoring, and (for FR2-2 and RLM-RS using 480 / 960kHz SCS) some data symbols before / after the RLM-RS symbols;

[0235] Extension to other service areas: Note 31; Note 32; Note 33;

[0236] Case III: UE performs beam failure detection on FR2

[0237] Scheduling restrictions involve symbols: reference symbols used for candidate beam detection, and (for FR2-2 and RLM-RS using 480 / 960kHz SCS) some data symbols before / after the reference symbols;

[0238] Extension to other service areas: Note 31; Note 32; Note 33;

[0239] Note 31: Scheduling restrictions apply to other serving cells in the same frequency band (it is understandable that Note 31 also applies to all the above cases)

[0240] Specifically, when performing intra-band carrier aggregation in FR2, the scheduling restrictions for a given serving cell should also apply to all other serving cells in the same frequency band, and to symbols in other serving cells that fully or partially overlap with the symbols involved in the aforementioned Scheduling restrictions.

[0241] Note 32: Scheduling restrictions do not apply to serving cells in other frequency bands

[0242] Specifically, when performing inter-band carrier aggregation of FR2, there will be no scheduling restrictions on the FR2 service cells in other different FR2 bands, which will lead to scheduling restrictions on the FR2 service cells in the current FR2 band. It is assumed here that the UE can perform independent beam management for the band pairs consisting of other different FR2 bands and the current FR2 band.

[0243] Note 33: Scheduling restrictions do not apply to inter-band scenarios where the SSB of one FR2 band is different from the SCS of data in another FR2 band, assuming that independent beam management (IBM) operations are supported for the band pair consisting of these two FR2 bands.

[0244] Specifically, if the UE is configured with different SCSs for SSB on one FR2 band and data on another FR2 band, there will be no scheduling restriction, assuming that the UE is configured with IBM operation for the band pair consisting of the two FR2 bands.

[0245] Note 34: When the UE does not support simultaneous RxTx InterBand CA for the frequency band pair formed by the current frequency band and the other frequency band, the scheduling restrictions apply to the serving cell in the other frequency band.

[0246] Specifically, when performing FR2 inter-band carrier aggregation, the scheduling restrictions for a given serving cell should also be applied to serving cells in other frequency bands, and apply to symbols in this serving cell that completely or partially overlap with the symbols involved in the aforementioned Scheduling restrictions, if the UE does not have the capability to support simultaneousRxTxInterBandCA for the frequency band pair consisting of the frequency band in which the given serving cell is located and this other frequency band.

[0247] Note 35: Applicability of scheduling restrictions for various combinations of inter-band, IBM, and simultaneous transmit and receive capabilities

[0248] Specifically, the following situations A / B / C / D can be distinguished and regulated separately:

[0249] Case A: For the frequency band pair consisting of the target measurement frequency band and the serving cell frequency band, the UE supports neither IBM nor simultaneousRxTxInterBandCA;

[0250] Case B: For the frequency band pair consisting of the target measurement frequency band and the serving cell frequency band, the UE does not support IBM but supports simultaneousRxTxInterBandCA;

[0251] Case C: For the frequency band pair consisting of the target measurement frequency band and the serving cell frequency band, the UE supports IBM but does not support simultaneousRxTxInterBandCA;

[0252] Case D: For the frequency band pair consisting of the target measurement frequency band and the frequency band where the serving cell is located, the UE supports both IBM and simultaneousRxTxInterBandCA: In this case, there is no scheduling restriction for the serving cell.

[0253] Factor 4: Different downlink FDMed measurement and receiving UE capabilities

[0254] (1) Impacts

[0255] This only affects downlink reception: the UE does not expect to receive PDCCH / PDSCH / CSI-RS for tracking / CSI-RS for CQI.

[0256] (2) Involved cases

[0257] Case 1: UE performs CLI measurement and DL reception in frequency division multiplex (FDM) mode

[0258] Case 1: CLI (SRS-RSRP / CLI-RSSI) measurement on FR1 / FR2 (MG is not always required)

[0259] Symbols involved in scheduling restrictions: For SRS-RSRP measurement, the orthogonal frequency division multiplex (OFDM) symbols on which SRS-RSRP measurement is performed, and some data symbols preceding these OFDM symbols; for CLI-RSSI measurement, the OFDM symbols on which CLI-RSSI measurement is performed, and some data symbols preceding these OFDM symbols.

[0260] Extension to other service areas: Note 41;

[0261] Note 41: Scheduling restrictions apply to other serving cells in the same frequency band (it is understood that Note 41 also applies to all the above cases)

[0262] Specifically, when carrier aggregation within the TDD frequency band is configured, the scheduling restrictions for the service cell performing CLI measurement are also applied to all other service cells in the same frequency band, and apply to symbols in other service cells that fully or partially overlap with the symbols involved in the aforementioned Scheduling restrictions.

[0263] The following describes in detail the method for adjusting transmission restrictions provided in the embodiments of the present application through some embodiments and their application scenarios in conjunction with the accompanying drawings.

[0264] Referring to FIG. 2 , the present application provides a method for adjusting transmission restrictions. The method is performed by a terminal and includes:

[0265] Step 201: The terminal determines whether a scheduling restriction exists in a first serving cell or a target interval timing is effective;

[0266] Step 202: The terminal performs a predefined operation according to a preset rule;

[0267] The first serving cell is any serving cell configured by the terminal;

[0268] A preset rule is associated with any of the following:

[0269] (1) First reporting information related to the channel quality of the serving cell (hereinafter referred to as mode 1);

[0270] (2) Second reporting information related to an uplink buffer status report (BSR) or a scheduling request (SR); referred to as mode 2.

[0271] (3) Scheduling information related to uplink and downlink scheduling; referred to as mode 3;

[0272] Predefined operations include at least one of the following:

[0273] (1) relaxing or disabling scheduling restrictions within the first time domain unit set;

[0274] (2) skipping or disabling at least one of the target intervals;

[0275] (3) adjusting the interval pattern parameters corresponding to at least one of the target interval opportunities;

[0276] It is understandable that the “disable” here can also be understood as “disable”.

[0277] In an embodiment of the present application, the terminal side and the network side perform predefined operations based on preset rules associated with any one of the reporting information related to the channel quality of the serving cell, the reporting information related to the uplink BSR or SR, and the uplink and downlink scheduling related information, to implement a rule-based solution for adjusting transmission restrictions. By ensuring that measurement requirements are not affected or the impact on measurement performance is reduced, and ensuring timely or as timely as possible data transmission, the transmission and reception restrictions brought about by the Gap mechanism and the scheduling restrictions corresponding to the scheduling availability / restrictions are reasonably relaxed, thereby ensuring the transmission performance of high data rate and low latency services.

[0278] Optionally, the above predefined operations may also be referred to as predefined behaviors.

[0279] For the above predefined operations:

[0280] (1) Relaxing or disabling scheduling restrictions within the first time domain unit set. A time domain unit may correspond to a unit divided in a predefined manner in the time domain, such as a time slot or a symbol. In the following, a symbol is used as an example of a time domain unit, and a set of symbols is used as an example of the first time domain unit set. Relaxing or disabling scheduling restrictions is referred to as Relax / disable scheduling restrictions.

[0281] Here, a set of symbols can correspond to the existence of scheduling restrictions within one or more windows or window groups, or within a time period / time subsegment, or within the duration or extended duration of a scheduled / triggered transmission corresponding to a DCI. For the existence of scheduling restrictions, see the corresponding description above. For the NCSG mechanism, the window here can be ML.

[0282] The Relax / disable scheduling restrictions here can be understood as closing / removing the Scheduling restrictions corresponding to the symbol set, so that channels / signals that were not allowed to be sent or received before closing / removal are allowed to be sent or received within this symbol set, or partially closing / removing the Scheduling restrictions corresponding to the symbol set, so that channels / signals that were not allowed to be sent or received before closing / removal are allowed to be sent or received within this symbol set, and that meet one or more pre-set conditions (for the specific description of the conditions, see below), thereby ensuring more timely data scheduling and transmission, so as to ensure or improve the transmission performance of high data rate and low latency services.

[0283] (2) skipping the gap occasion or disabling the gap occasion, where the gap occasion is a Gap occasion;

[0284] A gap occasion can be understood as a (for example, a single) gap window corresponding to a certain gap mechanism in NR after configuration / activation. For the NCSG mechanism, the gap occasion here can be a window consisting of VIL1, ML, and VIL2, or it can only include the time portion corresponding to VIL1 and VIL2. Skip / disable here can be understood as turning off / removing the transmission and reception restrictions within the gap occasion (i.e., invalidating the gap occasion or treating it as non-existent), or turning off / removing the transmission and reception restrictions within the gap occasion for reception / transmission that meets predefined conditions (i.e., only invalidating the gap occasion for reception / transmission that meets predefined conditions or treating it as non-existent). Accordingly, after closing / removing the above-mentioned transmission and reception restrictions, data (or data that meets one or more pre-set conditions (for a specific description of the conditions, see below)) can be allowed to be scheduled and transmitted during the Gap occasion, or data (or data that meets one or more pre-set conditions (for a specific description of the conditions, see below)) can be allowed to overlap with the Gap occasion in the time domain, thereby ensuring more timely data scheduling and transmission to ensure or improve the transmission performance of high data rate and low latency services.

[0285] (3) adjusting the gap pattern parameters corresponding to the gap timing, wherein the gap pattern parameters are gap pattern parameters;

[0286] Adjusting the Gap pattern parameters includes adjusting (eg, extending / shortening) the Gap period length (eg, the value of the parameter mgrp), the Gap offset (eg, the value of the parameter gapOffset), the Gap length (eg, the value of the parameter mgl), and the like.

[0287] Adjustment here can be understood as adjusting the corresponding parameters for the target gap occasion(s) or the gap occasion(s) within the target time period / time sub-segment. For example, by extending or shortening the gap period, the frequency or probability of the corresponding transmission and reception restrictions in the time domain can be controlled, thereby reducing the impact of transmission and reception restrictions on data scheduling and transmission, thereby ensuring or improving the transmission performance of high-data-rate and low-latency services.

[0288] The phrase "a target gap opportunity exists in the first serving cell" can be understood as meaning that the first serving cell is included in the serving cell set for which the target gap opportunity is effective or applied. The serving cell set for which the target gap opportunity is effective or applied is generally based on protocol-specified gap occasions or scheduling restrictions, or a serving cell or serving cell set for which scheduling restrictions apply. For details, see the corresponding description below. Optionally, the serving cell set for which the target gap opportunity is effective or applied can be configured via higher-layer signaling.

[0289] It should be noted that the scope of the target Serving cell for the above-mentioned predefined operations defaults to the Serving cell or Serving cell set to which the Gap occasion or Scheduling restrictions apply based on the protocol provisions. For example, for the Gap occasion corresponding to the UE-level measurement gap (per-UE measurement gap), the target Serving cell can be understood as all serving cells configured by the UE, including NR serving cells or E-UTRAN serving cells; for the Gap occasion corresponding to the FR-level measurement gap (per-FR measurement gap), the target Serving cell can be understood as all serving cells configured by the UE in the corresponding FR (FR1 or FR2), including NR serving cells or E-UTRAN serving cells. For another example, for Scheduling restrictions, in addition to the Serving cells that are directly introduced into Scheduling restrictions based on RRM measurement, CLI measurement, L1-RSRP measurement, L1-SINR measurement, RLM, BFD and other behaviors, it also includes other same-band or different-band Serving cells that are extended and determined based on the capabilities of being located in the same frequency band, or being located in other frequency bands but the UE does not support simultaneous transmission and reception or IBM of the corresponding frequency band pair (for specific extension rules, please refer to the corresponding description in the previous text). Optionally, the target serving cell for a predefined operation can be determined based on other rules for different methods. For example, for Method 1: based on the channel quality-related reporting information of the serving cell, the serving cell to be applied is the serving cell corresponding to the channel quality; for Method 3: based on uplink and downlink scheduling-related information, whether each serving cell performs the predefined operation is determined based on the uplink and downlink scheduling-related information of each serving cell, and the target serving cell when the predefined operation is performed is the serving cell. Optionally, when determining to perform a predefined operation in each method, the target serving cell or target serving cell list / set can be explicitly configured by higher-layer signaling.

[0290] It can be understood that the target serving cells of the above predefined operation must include the first serving cell.

[0291] It should be noted that the above-mentioned preset rules can be understood as continuing to use the semi-static / dynamic signaling and processes in the relevant technology, without introducing / adding new semi-static configuration / dynamic indication information to explicitly indicate whether the UE performs a predefined operation (which specific method to adopt, and the relevant parameters involved when adopting a certain method, can be specified by the protocol or configured by high-level signaling), but introducing new rules so that both parties can reach an agreement on the above-mentioned determination of the operation (including start and end time).

[0292] The following is a detailed description of the technical solution of this application based on the above preset rules:

[0293] Method 1: Based on the channel quality related reporting information of the serving cell (corresponding to the measurement requirements).

[0294] In a possible implementation, when the preset rule is associated with the reporting information related to the channel quality of the serving cell, the terminal performs a predefined operation according to the preset rule, including:

[0295] When the channel quality of the serving cell is higher than or equal to the first threshold, the terminal performs a predefined operation according to the reporting information related to the channel quality of the serving cell.

[0296] It can be understood that the better the channel quality of the serving cell, the less necessary it is for the UE to perform mobility procedures such as neighbor measurements and handover preparation. Consequently, the less need there is to occupy gaps for measurements, and the actual occupied gaps can be fewer or more sparsely spaced in the time domain. Accordingly, not all configured gaps need to be used. Some gaps can be skipped or disabled as needed, or gap parameters can be adjusted to reduce the frequency of gaps or shorten the duration of each gap, thereby minimizing data transmission latency, capacity, and other performance requirements while avoiding or reducing performance requirements related to gap occupancy. Similarly, the better the channel quality of the serving cell, the less necessary it is for the UE to perform mobility procedures such as neighbor measurements and handover preparation, thereby minimizing the need to introduce scheduling restrictions for measurements, and the fewer situations in which scheduling restrictions are actually required, or the more sparsely spaced in the time domain. Accordingly, scheduling restrictions can be relaxed or disabled in some situations or at certain times, thereby minimizing data transmission latency, capacity, and other performance requirements while avoiding or reducing performance requirements related to measurements. When the channel quality of the serving cell is higher than or not lower than a predefined threshold (ie, the first threshold mentioned above), both sides may consider that scheduling restrictions can be temporarily lifted or measurement gap can be closed, that is, predefined operations can be performed.

[0297] Optionally, when the channel quality of the serving cell is higher than or equal to the first threshold, the occupied interval is used to perform non-serving cell measurements, or the scheduling restriction is introduced to perform non-serving cell detection. The terminal performs a predefined operation based on the channel quality-related reporting information of the serving cell.

[0298] It is understandable that if the Gap is occupied or scheduling restrictions are introduced in order to measure the Serving cell, for example, if the Gap is occupied to measure the SSB of the Serving cell outside the Active Bandwidth Part (Active BWP), or if scheduling restrictions are introduced to perform RLM / BFD of an SSB based on a different SCS from the PDSCH / Physical downlink control channel (PDCCH) in FR1 or RLM / BFD in FR2, then when the channel quality of the Serving cell is good enough, the predefined operation cannot be performed. Therefore, "performing predefined operations when the channel quality of the Serving cell is good enough" is only applicable to some scenarios, that is, occupying the Gap or introducing scheduling restrictions is to perform measurements or detection on non-serving cells.

[0299] The Serving cell here can be only a special cell (SpCell), only an SCell, or any Serving cell. It is understandable that there is an association between the Serving cell here and the first serving cell. In some embodiments, the Serving cell here is the first serving cell. In other embodiments, the Serving cell here and the first serving cell are different serving cells; optionally, the two are located in the same frequency domain range (FR1 or FR2), or in the same Cell group, or in a Serving cell group or list specified by the protocol or configured by high-level signaling.

[0300] Specifically, the above method 1 is as follows:

[0301] In a possible implementation, the terminal performs a predefined operation based on the channel quality-related reporting information of the serving cell, including any one of the following:

[0302] Method 1-1: The terminal performs a predefined operation based on the Layer 3 (L3) measurement report information of the serving cell.

[0303] Method 1-2: The terminal performs a predefined operation based on the Channel State Information (CSI) reported by the serving cell.

[0304] That is, the channel quality of the serving cell can be determined by L3 measurement reporting or layer 1 (L1) CSI reporting in related technologies, for example, see the scenario shown in Figure 3. Accordingly, the terminal performs a predefined operation according to the L3 measurement reporting or L1 CSI reporting.

[0305] Specifically, method 1-1 is as follows:

[0306] In a possible implementation, the first reporting information includes a measurement report based on L3 measurement, and the terminal performs a predefined operation according to the first reporting information, including any one of the following:

[0307] Mode 1-1-1: When sending a measurement report based on L3 measurement, the terminal performs a predefined operation. The measurement report based on L3 measurement is triggered by a measurement reporting event.

[0308] Method 1-1-2: The terminal performs a predefined operation based on the channel quality information in the measurement report of the L3 measurement.

[0309] With respect to the above-mentioned method 1-1-1, in one possible implementation manner, the terminal performs a predefined operation according to the measurement reporting event, including:

[0310] (1) After the terminal sends a measurement report based on L3 measurement based on the first event, the terminal performs a predefined operation starting from a first predefined time;

[0311] (2) After the terminal sends the measurement report based on the L3 measurement based on the second event, the terminal stops performing the predefined operation at a second predefined time;

[0312] The first predefined moment is determined based on the transmission moment of the measurement report of the layer 3 measurement sent in the first event, and the second predefined moment is determined based on the transmission moment of the measurement report of the layer 3 measurement sent in the second event.

[0313] In an embodiment of the present application, after the UE reports a measurement report for a specific event for one or more specific Serving cells, both sides may consider that the UE does not need or needs to perform intra-frequency / inter-frequency / inter-RAT measurements, and thus performs or stops performing predefined operations.

[0314] The first predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement sent by the first event, and the second predefined time is determined based on the transmission time of the measurement report of the second event, which can be specifically as follows:

[0315] The first predefined time is the hybrid automatic repeat request acknowledgement (HARQ-ACK) feedback time corresponding to the transport block (TB) where the acknowledgement (ACK) corresponding to the radio link control service data unit (RLC SDU) carrying the measurement report of the layer 3 measurement sent for the first event is located plus the first time interval. The HARQ-ACK feedback time is the start time or end time of the physical uplink control channel PUCCH transmission carrying HARQ-ACK information (generally, it may be required to be HARQ-ACK information corresponding to the transport block and having the value of ACK), or the HARQ-ACK feedback time is the start time or end time of the time unit (e.g., Slot or sub-slot) where the PUCCH carrying the HARQ-ACK information is transmitted. The first time interval is specified by the protocol or configured by high-layer signaling. By determining the first predefined time, both the terminal and the network can have a consistent understanding of the time when the predefined operation is started, and the predefined operation can be started as early as possible to ensure or improve data transmission performance.

[0316] The second predefined moment is the HARQ-ACK feedback moment corresponding to the TB where the ACK corresponding to the RLC SDU carrying the measurement report of the second event is located plus the second time interval. The HARQ-ACK feedback moment is the start moment or end moment of the PUCCH transmission carrying the HARQ-ACK information (generally, it may be required to be the HARQ-ACK information corresponding to the transmission block and having the value of ACK), or the HARQ-ACK feedback moment is the start moment or end moment of the time unit (such as Slot or Sub-slot) where the PUCCH transmission carrying the HARQ-ACK information is located. The second time interval is specified by the protocol or configured by high-level signaling. By determining the second predefined moment, both the terminal and the network can have a consistent understanding of the moment to stop executing the predefined operation, and stop executing the predefined operation as soon as possible to avoid affecting performance such as measurement.

[0317] For example: after the UE reports the A1 event measurement report for SpCell, both sides may consider that the UE performs the predefined operation starting from the predefined time 1 (for example, the HARQ-ACK feedback time corresponding to the TB (downlink direction) where the ACK corresponding to the RLC SDU carrying the (uplink direction) measurement report (Measurement report) is located + delta1; the HARQ-ACK feedback time can be the start / end time of the PUCCH transmission carrying the HARQ-ACK information, or the start / end time of the Slot where the PUCCH transmission is located; where delta1 can be specified by the protocol or configured by high-level signaling); after the UE reports the A2 event measurement report for SpCell, both sides may consider that the UE stops performing the predefined operation starting from the predefined time 2 (its definition refers to the predefined time 1, only the referenced Measurement report is different).

[0318] With respect to the above-mentioned method 1-1-2, in one possible implementation manner, the terminal performs a predefined operation based on the channel quality information in the measurement report, including:

[0319] (1) when the channel quality information in the first measurement report is higher than or equal to the second threshold, the terminal performs the predefined operation starting from the third predefined time;

[0320] (2) when the channel quality information in the second measurement report is lower than or equal to the third threshold, the terminal stops performing the predefined operation at a fourth predefined time;

[0321] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0322] The L3 measurement and channel quality information here can be the cell-level reference signal received power (RSRP) / reference signal received quality (RSRQ) / signal to interference plus noise ratio (SINR) corresponding to the serving cell, or the RSRP / RSRQ / SINR of the strongest beam or one or more predefined beams.

[0323] Specifically, whether to execute or stop executing the predefined operation is determined based on the RSRP / RSRQ / SINR reported for one or more specific Serving cells in the Measurement report. For example, when the RSRP / RSRQ / SINR corresponding to one or more Serving cells is higher than or not lower than the predefined threshold, both parties may consider that the UE (starts or continues) to execute the predefined operation; when the RSRP / RSRQ / SINR corresponding to one or more Serving cells is lower than or not higher than the predefined threshold, both parties may consider that the UE stops / no longer executes the predefined operation.

[0324] The measurement report here may include all serving cells or at least one or N serving cells in the specific one or more serving cells. Optionally, the report type (reportType) corresponding to the measurement report is required to be periodic (periodical) and / or event-triggered (eventTriggered).

[0325] For a certain Measurement report, the effective time of RSRP / RSRQ / SINR contained therein may refer to the definition of predefined time 1 / 2 in the above method 1-1-1.

[0326] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report, which may be specifically as follows:

[0327] The third predefined moment is the HARQ-ACK feedback moment corresponding to the TB where the ACK corresponding to the RLC SDU carrying the first measurement report is located plus the third time interval. The HARQ-ACK feedback moment is the start moment or end moment of the PUCCH transmission carrying the HARQ-ACK information (generally, it may be required to be the HARQ-ACK information corresponding to the transport block and having the value of ACK), or the HARQ-ACK feedback moment is the start moment or end moment of the time unit (e.g., Slot or Sub-slot) where the PUCCH transmission carrying the HARQ-ACK information is located. The third time interval is specified by the protocol or configured by high-layer signaling. By determining the third predefined moment, the terminal and the network can have a consistent understanding of the moment when the predefined operation is started, and can start executing the predefined operation as soon as possible to ensure or improve the performance of data transmission.

[0328] The fourth predefined moment is the HARQ-ACK feedback moment corresponding to the TB where the ACK corresponding to the RLC SDU carrying the second measurement report is located plus the fourth time interval. The HARQ-ACK feedback moment is the start moment or end moment of the PUCCH transmission carrying the HARQ-ACK information (generally, it may be required to be the HARQ-ACK information corresponding to the transmission block and having the value of ACK), or the HARQ-ACK feedback moment is the start moment or end moment of the time unit (for example, Slot or Sub-slot) where the PUCCH transmission carrying the HARQ-ACK information is located. The fourth time interval is specified by the protocol or configured by high-level signaling. By determining the fourth predefined moment, both the terminal and the network can have a consistent understanding of the moment to stop executing the predefined operation, and stop executing the predefined operation as soon as possible to avoid affecting performance such as measurement.

[0329] Specifically, methods 1-2 are as follows:

[0330] In a possible implementation, the terminal performs a predefined operation based on the CSI reporting information of the serving cell, including any one of the following:

[0331] (1) when the channel quality information in the first CSI report is higher than or equal to the fourth threshold, the terminal performs the predefined operation starting from the fifth predefined time;

[0332] (2) when the channel quality information in the second CSI report is lower than or equal to the fifth threshold, the terminal stops performing the predefined operation at a sixth predefined time;

[0333] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0334] Specifically, whether to execute or stop executing a predefined operation can be determined based on the reported information in the CSI report, such as L1-RSRP / L1-SINR or Channel Quality Indicator (CQI). For example, when the reported information is higher than or not lower than a predefined threshold, both parties may consider that the UE has started or continued to execute the predefined operation for the serving cell corresponding to the CSI report; when the reported information is lower than or not higher than the predefined threshold, both parties may consider that the UE has stopped / no longer executed the predefined operation for this serving cell.

[0335] Optionally, the CSI report here can introduce certain restrictions for its corresponding CSI-ReportConfig. For example, its reportConfigType must be one or more of the following:

[0336] Periodic (Periodic CSI on PUCCH);

[0337] semiPersistentOnPUCCH (Semi-persistent CSI on PUCCH);

[0338] semiPersistentOnPUSCH(Semi-persistent CSI on PUSCH);

[0339] Aperiodic (Aperiodic CSI on PUSCH);

[0340] Or it must be reported via PUCCH or PUSCH;

[0341] And / or, limit its reportQuantity, which must be one or more of the following:

[0342] cri-RI-PMI-CQI;

[0343] cri-RI-i1-CQI;

[0344] cri-RI-CQI;

[0345] cri-RSRP;

[0346] ssb-Index-RSRP;

[0347] cri-RI-LI-PMI-CQI;

[0348] Or the reported quantity must include L1-RSRP and / or L1-SINR and / or CQI;

[0349] and / or, limiting its frequency granularity, for example, requiring it to be wideband frequency-granularity, or requiring the reported quantity to include wideband CQI;

[0350] And / or, limit its measurement bandwidth, for example, the percentage of the measurement frequency domain resources corresponding to the CSI-ReportingBand relative to the DL active BWP or the Serving cell bandwidth is higher than or not lower than a predefined threshold.

[0351] When determining based on the CQI in the CSI report, it can be based only on the CQI in the single-codeword CSI report; or, for a single-codeword CSI report, based on the CQI of the single codeword; for a dual-codeword CSI report, based on the CQI of a predefined codeword (e.g., the first codeword / the second codeword / the codeword with the larger CQI / the codeword with the smaller CQI) or the average CQI of the two codewords. The CQI here can be the wideband CQI and / or one or more subband CQIs with the minimum / maximum values.

[0352] For a certain CSI report, the effective time of the reporting information contained therein (i.e., the start time that can be used to determine whether to execute or stop executing the predefined operation) can be the end time of the PUCCH / PUSCH carrying this CSI report + delta2; where delta2 can be specified by the protocol or configured by high-layer signaling, mainly considering the decoding delay of the CSI report.

[0353] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report. Specifically, it can be as follows:

[0354] The fifth predefined time is the end time of the PUCCH or PUSCH carrying the first CSI reporting information plus the fifth time interval. The fifth time interval is specified by the protocol or configured by higher-layer signaling. By determining the fifth predefined time, both the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0355] The sixth predefined moment is the end moment of the PUCCH or PUSCH carrying the second CSI reporting information plus the sixth time interval, and the sixth time interval is specified by the protocol or configured by high-level signaling; by determining the sixth predefined moment, the terminal and the network can have a consistent understanding of the moment to stop executing the predefined operation, and stop executing the predefined operation as early as possible to avoid affecting measurement performance.

[0356] Method 2: Based on uplink BSR / SR related reporting information (corresponding to uplink data transmission requirements).

[0357] In a possible implementation, when the preset rule is associated with the reporting information related to the uplink BSR or SR, the terminal performs a predefined operation according to the preset rule, including at least one of the following:

[0358] Processing criterion 1: When the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs a predefined operation on the target serving cell;

[0359] Processing criterion 2: If the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the terminal performs a predefined operation on the target serving cell;

[0360] The first condition includes at least one of the following:

[0361] (1) The waiting time for data to be transmitted on the target logical channel or target logical channel group is longer than or equal to the sixth threshold; that is, the waiting time for data to be transmitted in the uplink direction of the specific logical channel (Logical channel) / Logical Channel Group (LCG) is long;

[0362] (2) The remaining packet delay budget (PDB) of the data to be transmitted on the target logical channel or target logical channel group is less than or equal to the seventh threshold; that is, the data to be transmitted in the uplink direction of the specific logical channel / LCG is about to time out or is likely to be discarded, which is more urgent;

[0363] (3) The amount of data to be transmitted on the target logical channel or target logical channel group is greater than or equal to the eighth threshold; that is, the amount of data to be transmitted in the uplink direction of the specific Logical Channel / LCG is relatively large;

[0364] The second condition includes at least one of the following:

[0365] (1) The terminal triggers and actually sends an SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0366] (2) The uplink BSR reporting information indicates that there is a quantity of data to be transmitted for the target logical channel or target logical channel group.

[0367] Regarding the above-mentioned processing principle 1:

[0368] When there are numerous, concentrated, or urgent data transmission requests in the uplink direction of a specific logical channel / LCG, gaps or scheduling restrictions can be temporarily ignored to prioritize data transmission. This prioritizes data transmission over measurement. This approach only sacrifices RAN4 performance, such as RRM measurements, when necessary, and has a relatively minimal impact on RAN4 performance.

[0369] Specifically, when the reporting information for a specific Logical channel / LCG in the uplink buffer reporting information (for example, information in a BSR report or an enhanced BSR report) satisfies at least one of the following (ie, the first condition above), both sides may determine that the UE performs a predefined operation for all Serving cells (or, all Serving cells in FR1 / FR2, or, all Serving cells in MCG / SCG, or, each Serving cell in the Serving cell list specified by the protocol or configured by higher-layer signaling) (start or continue):

[0370] (a) The amount of data to be transmitted on a specific Logical channel / LCG is higher or not lower than the predefined threshold

[0371] (b) The waiting time for data to be transmitted on a specific Logical channel / LCG is longer or not shorter than the predefined threshold

[0372] The waiting time of the data to be transmitted here may be the maximum value / minimum value / average value of the waiting time of all the data to be transmitted.

[0373] (c) The remaining PDB of the data to be transmitted on a specific Logical channel / LCG is shorter or not longer than the predefined threshold

[0374] The Remaining PDB of the data to be transmitted here may be the maximum value / minimum value / average value of the Remaining PDB of all the data to be transmitted.

[0375] The specific Logical channel / LCG corresponds to at least one Logical channel / LCG, which can be determined by any of the following methods:

[0376] (a) Implicit determination based on rules (protocol requirements)

[0377] A specific Logical channel / LCG may be a Logical channel / LCG corresponding to an RB that maps a specific service type or a Quality of Service (QoS) flow with specific attributes (for example, an XR service, or a video stream of an XR service, or an I Frame of a Video stream of an XR service), or the configuration of the Logical channel / LCG or its mapped resource block (RB) meets predefined requirements (for example, the discard timer configured for the RB is shorter than or not longer than a predefined threshold).

[0378] (b) Explicit configuration by higher-layer signaling

[0379] For example, explicit configuration is performed using UE specific RRC signaling.

[0380] In a possible implementation, when the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs a predefined operation on the target serving cell, including:

[0381] The terminal starts or continues to perform the predefined operation on the target serving cell from the seventh predefined time;

[0382] It should be noted that, if the current UE has started to perform the predefined operation, then based on the current uplink BSR reporting information, the UE continues to perform the predefined operation.

[0383] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0384] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information, and may be specifically as follows:

[0385] The seventh predefined time is any one of the following:

[0386] (1) The start time or end time of the first PUSCH transmission of the TB carrying uplink BSR reporting information plus the seventh time interval, which is specified by the protocol or configured by higher-layer signaling;

[0387] The start / end time of the first PUSCH transmission of the TB carrying the above-mentioned uplink buffer reporting information + delta3; where delta3 can be specified by the protocol or configured by high-level signaling, mainly considering the delay of HARQ transmission, decoding and decapsulation of the TB.

[0388] (2) For the HARQ process occupied by the TB transmission carrying the uplink BSR reporting information, the start time or end time of the PDCCH transmission corresponding to the uplink grant (UL grant) received by the terminal indicating the new transmission plus the eighth time interval, which is specified by the protocol or configured by the higher-layer signaling

[0389] For the HARQ process occupied by the TB transmission carrying the above-mentioned uplink buffer reporting information, the start / end time of the PDCCH transmission corresponding to the UL grant indicating the new transmission received by the UE + delta4; where delta4 can be specified by the protocol or configured by high-level signaling, mainly considering the PDCCH decoding delay.

[0390] By determining the seventh predefined time as described above, the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0391] In a possible implementation, when the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs a predefined operation on the target serving cell, further comprising:

[0392] When the third condition is met, the terminal stops executing the predefined operation;

[0393] The third condition includes any of the following:

[0394] (1) Starting from the time when the terminal determines to start or continue to perform a predefined operation, a first preset time duration is reached;

[0395] (2) The reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0396] After both parties determine to start or continue executing the predefined operation for all or specific serving cells, they can stop executing the predefined operation based on any of the following:

[0397] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted. When the timer times out, both parties determine to stop executing the predefined operation, that is, determine whether the first preset time length is reached through the timer.

[0398] (b) When the reporting information for a specific Logical channel / LCG in the uplink buffer reporting information no longer satisfies the above-mentioned specified items (i.e., one or more items that are satisfied when determining to execute the predefined operation (start or continue) for all or specific serving cells) or any one of the items, both sides determine to stop executing the predefined operation.

[0399] Regarding the above-mentioned processing principle 2:

[0400] If data transmission needs to be transmitted uplink on a specific logical channel / LCG, gaps or scheduling restrictions are temporarily ignored to prioritize data transmission. This approach prioritizes uplink data transmission on a specific logical channel / LCG, significantly impacting RAN4 performance.

[0401] Specifically, when at least one of the following conditions is met (that is, the second condition above), both sides may determine that the UE performs a predefined operation for all serving cells (or all serving cells in FR1 / FR2, or all serving cells in MCG / SCG, or each serving cell in the serving cell list specified by the protocol or configured by higher-layer signaling) (start or continue):

[0402] (a) The UE triggers and actually sends an SR PUCCH for a specific Logical channel or at least one Logical channel in a specific LCG

[0403] Here, it is considered that for a specific Logical channel, or a Logical channel in a specific LCG, an associated SR Config can be configured. When the LCG where this specific Logical channel is located, or this specific LCG, triggers a Regular BSR, and when the UE does not have available uplink shared channel (UL-SCH) initial transmission resources, the corresponding SR PUCCH can be sent based on this associated SR Config.

[0404] (b) Uplink Buffer Reporting Information Indicates the amount of data to be transmitted for a specific Logical Channel / LCG (or, the amount of data to be transmitted is > 0)

[0405] The determination of a specific Logical channel / LCG refers to the relevant description in Processing Criteria 1.

[0406] In a possible implementation, when the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the terminal performs a predefined operation on the target serving cell, including:

[0407] The terminal starts or continues to perform the predefined operation on the target serving cell from the eighth predefined time;

[0408] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0409] The eighth predefined time is any one of the following:

[0410] (1) The terminal's first SR PUCCH transmission after triggering the SR is started or ended plus a ninth time interval, where the ninth time interval is specified by the protocol or configured by higher-layer signaling.

[0411] (2) The start time or end time of the first PUSCH transmission of the TB carrying the uplink BSR reporting information plus the tenth time interval, where the tenth time interval is specified by the protocol or configured by higher-layer signaling;

[0412] (3) For the HARQ process occupied by the TB transmission carrying the uplink BSR reporting information, the start time or end time of the PDCCH transmission corresponding to the uplink grant UL grant received by the terminal indicating the new transmission plus the eleventh time interval, which is specified by the protocol or configured by higher-layer signaling.

[0413] When the uplink buffer reporting information is used, the time for determining (starting or continuing) to execute the predefined operation may be any one of the above items.

[0414] When based on SR PUCCH transmission, the time for determining (starting or continuing) to perform the predefined operation may be: the start / end time of the first SR PUCCH transmission by the UE after triggering SR + delta5; where delta5 may be specified by the protocol or configured by higher-layer signaling, mainly taking into account possible delays such as multiple SR PUCCH transmissions and decoding.

[0415] By determining the eighth predefined time as described above, the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0416] In a possible implementation, when the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the second condition, the terminal performs a predefined operation on the target serving cell, further comprising:

[0417] When the fourth condition is met, the terminal stops performing the predefined operation;

[0418] The fourth condition includes any of the following:

[0419] (1) From the time the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0420] (2) The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or target logical channel group is 0.

[0421] After both parties determine to (start or continue) execute the predefined operation for all or specific serving cells, they can determine to stop executing the predefined operation based on any of the following (i.e., the fourth condition above):

[0422] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted. When the timer times out, both parties determine to stop executing the predefined operation. That is, the timer is used to determine whether the second preset time has been reached.

[0423] (b) When the amount of data to be transmitted for a specific Logical channel / LCG is 0 (for example, the uplink buffer reporting information indicates that the amount of data to be transmitted for a specific Logical channel / LCG is 0, or the UE reports an End of video frame indication (which can be indicated by physical layer dynamic signaling or through MAC CE)), both sides determine to stop performing the predefined operation.

[0424] Method 3: Based on uplink and downlink scheduling information or scheduling conditions (corresponding to uplink and downlink data transmission requirements).

[0425] In a possible implementation, when the preset rule is associated with the uplink and downlink scheduling related information, the terminal performs a predefined operation according to the preset rule, including:

[0426] Mode 3-1: The terminal performs a predefined operation based on the transmission location of the Physical Downlink Shared Channel (PDSCH), Channel State Information-Reference Signal (CSI-RS), Physical Uplink Shared Channel (PUSCH), Physical Uplink Control Channel (PUCCH), or Sounding Reference Signal (SRS) corresponding to the scheduling of Downlink Control Information (DCI);

[0427] Mode 3-2: The terminal performs a predefined operation based on the transmission attribute information indicated in the scheduling DCI. The transmission attribute information is related to the size of the TB or the physical layer priority.

[0428] Method 3-3: The terminal performs predefined operations based on data scheduling related information.

[0429] Specifically, method 3-1 is as follows:

[0430] In one possible implementation, the terminal performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to the scheduled DCI, including:

[0431] It is assumed that for a Control Resource Set (CORESET) instance that overlaps with a Gap occasion(s) or symbols with scheduling restrictions, the UE does not perform PDCCH detection.

[0432] For a gap occasion or a window with scheduling restrictions (which can be understood as a window with scheduling restrictions for some or all symbols included in the configured window, such as an SMTC window), you can use any of the following methods:

[0433] (1) When the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to the scheduled DCI overlaps with the interval opportunity or the first window in the time domain, or when the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to the scheduled DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the ninth threshold, the terminal performs a predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with scheduling restrictions;

[0434] When the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduled DCI overlaps in time domain with this Gap occasion or Window with scheduling restrictions (i.e., the first window), or the time domain interval between any Symbols occupied by the two is less than or not greater than the predefined threshold, both sides consider that a predefined operation is performed for this Gap occasion or Window with scheduling restrictions, such as disabling this Gap occasion or disabling the Scheduling restrictions in this Window with scheduling restrictions.

[0435] (2) When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI overlaps with the interval opportunity or the first window, the terminal performs a predefined operation for the area of ​​time domain overlap;

[0436] (3) When the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the terminal performs a predefined operation on the area of ​​extended time domain overlap, where the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0437] When the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduled DCI overlaps in time domain with this Gap occasion or Window with scheduling restrictions, or the time domain interval between any symbols occupied by the two is less than or not greater than the predefined threshold (it can be understood that the extended duration corresponding to the union of the duration corresponding to any symbol occupied by the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by this scheduled DCI and the duration consisting of the predefined threshold durations before and after this symbol overlaps in time domain with this Gap occasion or Window with scheduling restrictions, which can be called "extended time domain overlap"), both parties consider that predefined operations are performed only on the time domain overlap area of ​​this Gap occasion or Window with scheduling restrictions, or the extended time domain overlap area, such as lifting the data transmission and reception restrictions in the time domain overlap area / extended time domain overlap area of ​​this Gap occasion, or lifting the scheduling in the time domain overlap area / extended time domain overlap area of ​​this Window with scheduling restrictions. restrictions.

[0438] Similarly, when a Symbol with scheduling restrictions does not correspond to any Window, or is not further organized as a Window, you can use any of the following methods:

[0439] (4) the terminal performs a predefined operation for all time domain units with scheduling restrictions within a first time period, where the first time period is determined by the transmission of the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS corresponding to the scheduling DCI;

[0440] Perform predefined operations on all symbols with scheduling restrictions within a period of time determined by the PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduling DCI. For example, this period of time is the time period corresponding to the specified duration starting from the earliest corresponding / triggered PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission or the start time of the slot where the transmission is located (or the duration / number of symbols corresponding to the predefined threshold). The specified duration here can be specified by the protocol or configured by high-level signaling, or directly indicated in the scheduling DCI.

[0441] (5) The terminal performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with the second time period and have scheduling restrictions, where the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0442] Predefined operations are performed only for all Symbols that have time domain overlap with PDSCH / CSI-RS or PUSCH / PUCCH / SRS transmission corresponding to / triggered by the scheduled DCI, or extended time domain overlap (based on the extended duration, see the corresponding description in the previous text for details), and have Scheduling restrictions.

[0443] Optionally, the priority of the PUCCH / PUSCH scheduled by the DCI meets predefined requirements, such as a high priority, or the priority of the HARQ-ACK corresponding to the PDSCH scheduled by the DCI meets predefined requirements, such as a high priority. When PHY priority is further introduced in the downlink direction, optionally, the priority of the PDSCH scheduled by the DCI meets predefined requirements, such as a high priority.

[0444] Specifically, method 3-2 is as follows:

[0445] In a possible implementation, the terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, including:

[0446] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the terminal performs a predefined operation on the target serving cell, where N is specified by the protocol or configured by higher-layer signaling;

[0447] The fifth condition includes at least one of the following:

[0448] (1) The size of TB is greater than or equal to the eleventh threshold;

[0449] (2) The physical layer priority is a predefined priority.

[0450] Specifically, when the transmission attribute information indicated in the N (N>=1) consecutive (new transmission) scheduling DCIs recently detected by the UE in the specified transmission direction (downlink or uplink) meets at least one of the following (ie, the fifth condition above), both sides can determine that the UE performs a predefined operation for all serving cells (or, all serving cells in FR1 / FR2, or, all serving cells in MCG / SCG, or, serving cells specified by the protocol or configured by higher-layer signaling, or each serving cell in the serving cell list) (start or continue):

[0451] (a) TB Size is greater than or not less than the predefined threshold;

[0452] (b) PHY priority is a predefined priority, such as a higher priority;

[0453] Based on relevant protocol regulations, PHY priority is only supported in the uplink direction. In fact, PHY priority can also be introduced in the downlink direction as needed. For example, the PHY priority corresponding to the scheduled PDSCH can be indicated in the DCI to distinguish the priority of the data carried by the PDSCH (which can be independently indicated from the HARQ-ACK priority corresponding to the scheduled PDSCH in the related art).

[0454] In a possible implementation, when the terminal detects that transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition in the target transmission direction, the terminal performs a predefined operation on the target serving cell, including:

[0455] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition in the target transmission direction, the terminal starts or continues to perform the predefined operation for the target serving cell from a ninth predefined time;

[0456] The ninth predefined time is determined based on the transmission time of N consecutive scheduled DCIs.

[0457] The ninth predefined time is determined based on the transmission time of N consecutive scheduled DCIs, and may be specifically as follows:

[0458] The ninth predefined time is the latest start time or the latest end time of the PDCCH transmission corresponding to N consecutive scheduled DCIs plus a twelfth time interval, where the twelfth time interval is specified by the protocol or configured by high-layer signaling.

[0459] The above-mentioned time for determining (starting or continuing) to perform the predefined operation can be: the latest start / end time of the PDCCH transmission corresponding to N consecutive (newly transmitted) scheduled DCIs + delta6; where delta6 can be specified by the protocol or configured by high-level signaling, mainly considering the PDCCH decoding delay.

[0460] By determining the ninth predefined time as described above, the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0461] In a possible implementation, the terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, further comprising:

[0462] When the sixth condition is met, the terminal stops executing the predefined operation;

[0463] The sixth condition includes any of the following:

[0464] (1) From the time the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0465] (2) The terminal detects in the target transmission direction that the transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0466] After both parties determine to (start or continue) execute the predefined operation for all or specific serving cells, they can determine to stop executing the predefined operation based on any of the following (i.e., the sixth condition above):

[0467] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted. When the timer times out, both parties determine to stop executing the predefined operation. That is, the timer is used to determine whether the third preset time period has been reached.

[0468] (b) When the information indicated in the N consecutive (new transmission) scheduling DCIs recently detected by the UE in the specified transmission direction no longer satisfies the above-mentioned specified items (i.e., one or more items satisfied when determining to (start or continue) performing the predefined operation for all or specific serving cells) or any one of the items, both sides determine to stop performing the predefined operation.

[0469] Specifically, method 3-3 is as follows:

[0470] In a possible implementation, the terminal performs a predefined operation according to the data scheduling related information, including:

[0471] When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or target logical channel group is greater than or equal to an eleventh threshold, the terminal performs a predefined operation on the target serving cell;

[0472] The third time period is specified by a protocol or configured by high-layer signaling.

[0473] Specifically, the determination of whether to (start or continue) perform a predefined operation can be based on the amount of data scheduled by a specified UE in a specified transmission direction (downlink or uplink) within a recent period of time, or the amount of data actually scheduled for a specific RB / Logical channel. For example, when the above-mentioned data amount is greater than or not less than a predefined threshold, both parties can determine that the UE (start or continue) perform a predefined operation on all serving cells (or all serving cells in FR1 / FR2, or all serving cells in an MCG / SCG, or serving cells specified in the protocol or configured by higher-layer signaling, or each serving cell in a serving cell list).

[0474] The above duration may be specified by the protocol or configured by high-level signaling.

[0475] The amount of data scheduled above may be considered as the sum of the TB Sizes indicated by the (new transmission) scheduling DCI detected by the UE for the specified transmission direction within the above duration.

[0476] The above-mentioned data volume actually scheduled for a specific RB / Logical channel can be directly determined based on the data assembly in the Medium Access Control (MAC) Protocol Data Unit (PDU) (the corresponding Logical channel can be identified based on the Logical Channel Identity (LCID) field in the MAC subheader corresponding to each MAC SDU). The specific RB / Logical channel here can be an RB / Logical channel that maps a QoS flow corresponding to a specific service type or having specific attributes (such as XR service, or the Video stream of the XR service, or the I Frame of the Video stream of the XR service), or the configuration of the RB / Logical channel meets predefined requirements (for example, the Discard Timer configured for the RB is shorter than or not longer than a predefined threshold).

[0477] The above-mentioned most recent duration can be determined using a sliding window method, and its end time can be the start / end time of the PDCCH transmission corresponding to the scheduling DCI for the specified transmission direction received by the UE; its start time can be implicitly determined based on the end time and duration.

[0478] In a possible implementation, the terminal performs a predefined operation on the target serving cell, including:

[0479] The terminal starts or continues to perform the predefined operation on the target serving cell from the tenth predefined time;

[0480] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by the protocol or configured by high-layer signaling.

[0481] The above-mentioned time for determining (starting or continuing) executing the predefined operation can be: the end time of the most recent period + delta7; where delta7 can be specified by the protocol or configured by high-level signaling, mainly considering the delay of TB's HARQ transmission, decoding and decapsulation.

[0482] By determining the tenth predefined time, the terminal and the network can have a consistent understanding of the time to start executing the predefined operation, and can start executing the predefined operation as early as possible to ensure or improve data transmission performance.

[0483] In a possible implementation, the terminal performs a predefined operation according to the data scheduling related information, further comprising:

[0484] When the seventh condition is met, the terminal stops executing the predefined operation;

[0485] The seventh condition includes any of the following:

[0486] (1) from the time the terminal determines to start executing or continuing the predefined operation, a fourth preset time period is reached;

[0487] (2) The amount of data scheduled by the terminal in the third time period of the specified transmission direction, or the amount of data actually scheduled for the target logical channel or target logical channel group, is less than an eleventh threshold.

[0488] After both parties determine to (start or continue) execute the predefined operation for all or specific serving cells, they can determine to stop executing the predefined operation based on any of the following (i.e., the seventh condition above):

[0489] (a) Each time a predefined operation is determined (started or continued), a timer is started or restarted. When the timer times out, both parties determine to stop executing the predefined operation.

[0490] (b) When the information indicated in the N consecutive (new transmission) scheduling DCIs recently detected by the UE in the specified transmission direction no longer satisfies the above-mentioned specified items (i.e., one or more items satisfied when determining to (start or continue) performing the predefined operation for all or specific serving cells) or any one of the items, both sides determine to stop performing the predefined operation.

[0491] In one possible implementation, the first object targeted by the predefined operation satisfies a predefined condition;

[0492] Among them, the first object includes a first time domain unit set or interval opportunity. For one or more of the above methods (methods 1 / 2 / 3), it is determined to perform a predefined operation, or it is determined that the Window (such as Gap occasion or SMTC window, etc.) or Symbol with scheduling restrictions in which the predefined operation can be performed meets the predefined conditions.

[0493] Predefined conditions include at least one of the following:

[0494] (1) The first object is applied to a scenario other than the first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0495] Window / Symbol with scheduling restrictions is not used for predefined purposes or scenario 1, such as Radio Link Monitoring (RLM) and / or Beam Failure Detection (BFD).

[0496] (2) The first object applies only to the second scenario, which is specified by the protocol or configured by high-layer signaling;

[0497] Window / Symbol with scheduling restrictions is only used for predefined purposes or scenario 2, such as intra / inter-frequency measurement and / or Positioning. The predefined purposes or scenario 2 here can be specified by the protocol or configured by higher-layer signaling.

[0498] (3) The priority of the first object meets the predefined priority requirement;

[0499] The priority of a window must meet predefined requirements, including absolute requirements and / or relative requirements. Here, only windows with a low or sufficiently low priority are allowed to perform predefined operations, so as to minimize the impact on windows with higher priority or more important functions.

[0500] For absolute value requirements, for example, requiring the corresponding priority to be lower or no higher than a predefined threshold, or requiring the gapPriority-r17 corresponding to the GapConfig-r17 corresponding to the Gap occasion to be greater than or no less than a predefined threshold. The predefined threshold here can be specified by the protocol or configured by higher-layer signaling.

[0501] For relative requirements, for example, the corresponding priority is the lowest among all configured GapConfig-r17s or is one of the lowest N priorities (or, the corresponding gapPriority-r17 is the largest among all configured GapConfig-r17s or is one of the largest N priorities), or the corresponding priority is the lowest among the GapConfig-r17 corresponding to the gap occasion that exists within a period of time (given by the period of time for determining whether to perform the predefined operation in each specific method) or is one of the lowest M priorities (or, the corresponding gapPriority-r17 is the largest among the GapConfig-r17 corresponding to the gap occasion that exists within this period of time or is one of the largest M priorities).

[0502] Currently, it is believed that there is no concept of priority for symbols with scheduling restrictions.

[0503] (4) The period or length of the first object meets predefined requirements.

[0504] The period or length of the Window meets predefined requirements, for example, the period is not longer than a predefined threshold, and / or the length is not shorter than a predefined threshold. The predefined threshold here can be specified by the protocol or configured by high-layer signaling.

[0505] It is currently believed that Symbols with scheduling restrictions do not involve concepts such as period and length.

[0506] In a possible implementation, when the predefined operation is to relax scheduling restrictions or disable scheduling restrictions within the first symbol time domain unit set, or to skip gap opportunities or disable gap opportunities, the predefined operation is performed, that is, for one or more of the above methods (methods 1 / 2 / 3), when it is determined to perform a predefined operation on a certain Window or Symbol with scheduling restrictions, if the predefined operation is Relax / disable scheduling restrictions during a set of symbols or Skip / disable Gap occasion(s), any of the following is performed:

[0507] (1) The terminal expects to be scheduled, and the priorities of uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements;

[0508] (2) The terminal expects to be scheduled, and the priorities corresponding to the uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements;

[0509] For the above (1) and (2), the UE expects that within the Window or Symbol with scheduling restrictions (including the situation where the scheduled uplink transmission / downlink reception is partially or completely within the Window or Symbol with scheduling restrictions; when the scheduled uplink transmission / downlink reception is only partially within the Window or Symbol with scheduling restrictions, it can also be understood that the scheduled uplink transmission / downlink reception overlaps with the Window or Symbol with scheduling restrictions in the time domain), only the uplink transmission / downlink reception whose priority meets specific requirements is scheduled, such as high-priority PUSCH / PUCCH / SRS transmission, or the corresponding HARQ-ACK is a high-priority PDSCH reception, or high-priority PDSCH reception.

[0510] (3) The terminal does not expect to be scheduled, and the priorities of uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirements;

[0511] (4) The terminal does not expect to be scheduled, and the priorities corresponding to the uplink transmission or downlink reception that overlap with the time range corresponding to the first object do not meet the specified priority requirements.

[0512] For the above (3) and (4), the UE does not expect to be scheduled only for uplink transmission / downlink reception whose priority does not meet specific requirements within the Window or Symbol with scheduling restrictions (including the situation where the scheduled uplink transmission / downlink reception is partially or completely within the Window or Symbol with scheduling restrictions; when the scheduled uplink transmission / downlink reception is only partially within the Window or Symbol with scheduling restrictions, it can also be understood that the scheduled uplink transmission / downlink reception overlaps with the Window or Symbol with scheduling restrictions in the time domain), such as high-priority PUSCH / PUCCH / SRS transmission, or the corresponding HARQ-ACK is a high-priority PDSCH reception, or high-priority PDSCH reception. It can be understood that the UE expects to be scheduled for at least one uplink transmission or downlink reception whose priority meets specific requirements within the Window or Symbol with scheduling restrictions, and at this time, scheduling of other uplink transmissions or downlink receptions whose priorities do not meet specific requirements is also allowed (or without restriction).

[0513] Referring to FIG. 4 , an embodiment of the present application provides a method for adjusting transmission restrictions. The method is performed by a network-side device and includes:

[0514] Step 401: The network side device determines whether a scheduling restriction exists in the first serving cell or whether a target interval timing is effective.

[0515] Step 402: The network-side device performs a predefined operation according to a preset rule;

[0516] The first serving cell is any serving cell configured by the terminal;

[0517] A preset rule is associated with any of the following:

[0518] (1) First reporting information related to the channel quality of the serving cell;

[0519] (2) Second reporting information related to uplink BSR or SR;

[0520] (3) Scheduling information related to uplink and downlink scheduling;

[0521] Predefined operations include at least one of the following:

[0522] (1) relaxing or disabling scheduling restrictions within the first time domain unit set;

[0523] (2) skipping or disabling at least one of the target intervals;

[0524] (3) Adjusting the interval pattern parameters corresponding to at least one of the target intervals.

[0525] It should be noted that the relevant content in the network side method can be directly understood by referring to the relevant content in the terminal side method. In the method for adjusting transmission restrictions provided in this application, the terminal side and the network side perform predefined operations based on the same preset rules, so that the terminal side and the network side have consistent understanding.

[0526] In an embodiment of the present application, the terminal side and the network side perform predefined operations based on preset rules associated with any one of the reporting information related to the channel quality of the serving cell, the reporting information related to the uplink BSR or SR, and the uplink and downlink scheduling related information, to implement a rule-based solution for adjusting transmission restrictions. By ensuring that measurement requirements are not affected or the impact on measurement performance is reduced, and ensuring timely or as timely as possible data transmission, the transmission and reception restrictions brought about by the Gap mechanism and the scheduling restrictions corresponding to the scheduling availability / restrictions are reasonably relaxed, thereby ensuring the transmission performance of high data rate and low latency services.

[0527] In one possible implementation, when the preset rule is associated with the channel quality-related reporting information of the serving cell, the network-side device performs a predefined operation according to the preset rule, including:

[0528] When the channel quality of the serving cell is higher than or equal to the first threshold, the network-side device performs a predefined operation according to the channel quality-related reporting information of the serving cell.

[0529] In a possible implementation, the first reporting information includes a measurement report based on layer 3 measurement, and the network-side device performs a predefined operation according to the first reporting information, including any one of the following:

[0530] In case of receiving a measurement report based on L3 measurement, the network side device performs a predefined operation, and the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0531] The network-side device performs predefined operations based on the channel quality information in the measurement report of the layer 3 measurement.

[0532] In a possible implementation, the network-side device performs a predefined operation based on the measurement reporting event, including:

[0533] After the network side device receives the measurement report based on the L3 measurement reported based on the first event, the network side device performs the predefined operation starting from the first predefined time;

[0534] After the network side device receives the measurement report based on the L3 measurement reported based on the second event, the network side device stops performing the predefined operation at a second predefined time;

[0535] The first predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement reported by the first event, and the second predefined time is determined based on the transmission time of the measurement report of the layer 3 measurement reported by the second event.

[0536] In a possible implementation, the network-side device performs a predefined operation based on the channel quality information in the measurement report, including:

[0537] When the channel quality information in the first measurement report is higher than or equal to the second threshold, the network side device performs the predefined operation starting from a third predefined time;

[0538] When the channel quality information in the second measurement report is lower than or equal to the third threshold, the network side device stops performing the predefined operation at a fourth predefined time;

[0539] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0540] In one possible implementation, the network-side device performs a predefined operation based on the CSI reporting information of the serving cell, including any one of the following:

[0541] When the channel quality information in the first CSI report is higher than or equal to the fourth threshold, the network side device performs the predefined operation starting from the fifth predefined time;

[0542] When the channel quality information in the second CSI report is lower than or equal to the fifth threshold, the network side device stops performing the predefined operation at a sixth predefined time;

[0543] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0544] In a possible implementation, when the preset rule is associated with the reporting information related to the uplink BSR or SR, the network-side device performs a predefined operation according to the preset rule, including at least one of the following:

[0545] When the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs a predefined operation on the target serving cell;

[0546] When the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the network side device performs a predefined operation on the target serving cell;

[0547] The first condition includes at least one of the following:

[0548] The waiting time for data to be transmitted on the target logical channel or target logical channel group is longer than or equal to a sixth threshold;

[0549] The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or target logical channel group is shorter than or equal to the seventh threshold;

[0550] The amount of data to be transmitted on the target logical channel or target logical channel group is greater than or equal to an eighth threshold;

[0551] The second condition includes at least one of the following:

[0552] The network side device actually receives the SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0553] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or target logical channel group.

[0554] In a possible implementation, when the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the network-side device performs a predefined operation on the target serving cell, including:

[0555] The network-side device starts or continues to perform the predefined operation on the target serving cell from the seventh predefined time;

[0556] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0557] In a possible implementation, when the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs a predefined operation on the target serving cell, further comprising:

[0558] When the third condition is met, the network side device stops performing the predefined operation;

[0559] The third condition includes any of the following:

[0560] Starting from when the network side device determines to start or continue to perform the predefined operation, a first preset time period is reached;

[0561] The reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0562] In a possible implementation, when the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the network-side device performs a predefined operation on the target serving cell, including:

[0563] The network-side device starts or continues to perform the predefined operation on the target serving cell from the eighth predefined time;

[0564] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0565] In a possible implementation, when the reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the second condition, the network side device performs a predefined operation on the target serving cell, further comprising:

[0566] When the fourth condition is met, the network side device stops performing the predefined operation;

[0567] The fourth condition includes any of the following:

[0568] Starting from when the network side device determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0569] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or target logical channel group is 0.

[0570] In a possible implementation, when the preset rule is associated with the uplink and downlink scheduling related information, the network side device performs a predefined operation according to the preset rule, including:

[0571] The network-side device performs predefined operations based on the location of the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to the scheduled DCI;

[0572] The network-side device performs predefined operations based on the transmission attribute information indicated in the scheduling DCI;

[0573] The network-side device performs predefined operations based on the data scheduling related information.

[0574] In one possible implementation, the network-side device performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to the scheduled DCI, including any one of the following:

[0575] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the ninth threshold, the network side device performs a predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with scheduling restrictions;

[0576] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window, the network side device performs a predefined operation on the area of ​​time domain overlap;

[0577] When the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the network side device performs a predefined operation on the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0578] The network side device performs a predefined operation for all time domain units with scheduling restrictions within a first time period, where the first time period is determined by the transmission of a PDSCH, CSI-RS, PUSCH, PUCCH, or SRS corresponding to the scheduling DCI;

[0579] The network side device performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with the second time period and have scheduling restrictions. The second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0580] In one possible implementation, the network-side device performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, including:

[0581] When the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the network side device performs a predefined operation on the target serving cell, where N is specified by the protocol or configured by higher-layer signaling;

[0582] The fifth condition includes at least one of the following:

[0583] The size of the TB is greater than or equal to the eleventh threshold;

[0584] The physical layer priority is a predefined priority.

[0585] In one possible implementation, when the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition in the target transmission direction, the network side device performs a predefined operation on the target serving cell, including:

[0586] When the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs meets the fifth condition in the target transmission direction, the network side device starts or continues to perform the predefined operation for the target serving cell from the ninth predefined time;

[0587] The ninth predefined time is determined based on the transmission time of N consecutive scheduled DCIs.

[0588] In a possible implementation, the network-side device performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, further comprising:

[0589] When the sixth condition is met, the network side device stops performing the predefined operation;

[0590] The sixth condition includes any of the following:

[0591] Starting from when the network side device determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0592] The network-side device detects in the target transmission direction that the transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0593] In one possible implementation, the network-side device performs a predefined operation based on the data scheduling related information, including:

[0594] When the amount of data scheduled by the network device in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or target logical channel group is greater than or equal to an eleventh threshold, the network device performs a predefined operation on the target serving cell;

[0595] The third time period is specified by a protocol or configured by high-layer signaling.

[0596] In one possible implementation, the network-side device performs a predefined operation on the target serving cell, including:

[0597] The network-side device starts or continues to perform the predefined operation on the target serving cell from the tenth predefined time;

[0598] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by the protocol or configured by high-layer signaling.

[0599] In a possible implementation, the network-side device performs a predefined operation based on the data scheduling related information, further comprising:

[0600] When the seventh condition is met, the network side device stops performing the predefined operation;

[0601] The seventh condition includes any of the following:

[0602] Starting from when the network side device determines to start executing or continuing the predefined operation, a fourth preset time period is reached;

[0603] The amount of data scheduled by the network side device in the third time period of the specified transmission direction, or the amount of data actually scheduled for the target logical channel or target logical channel group, is less than the eleventh threshold.

[0604] In one possible implementation, the first object targeted by the predefined operation satisfies a predefined condition;

[0605] The first object includes a first time domain unit set or an interval opportunity, and the predefined condition includes at least one of the following:

[0606] The first object is applied to a scenario other than the first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0607] The first object is only applied to the second scenario, which is specified by the protocol or configured by high-layer signaling;

[0608] The priority of the first object meets the predefined priority requirement;

[0609] The period or length of the first object meets predefined requirements.

[0610] In a possible implementation, when the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping gap opportunities or disabling gap opportunities within the first symbol time domain unit set, performing the predefined operation includes any one of the following:

[0611] (1) The network-side device ensures that the priorities of the uplink transmission or downlink reception for the terminal scheduling within the time range corresponding to the first object meet the specified priority requirements;

[0612] (2) The network-side device ensures that the priorities of the uplink transmission or downlink reception that overlap with the time range corresponding to the first object for the terminal scheduling meet the specified priority requirements;

[0613] (3) The network-side device ensures that the terminal is scheduled, and the priority of at least one uplink transmission or downlink reception within the time range corresponding to the first object meets the specified priority requirement;

[0614] (4) The network side device ensures that the terminal is scheduled, and the priority corresponding to at least one uplink transmission or downlink reception that overlaps with the time range corresponding to the first object meets the specified priority requirement.

[0615] With respect to (3) and (4) above, it can be understood that, corresponding to the terminal side, the terminal does not expect the scheduled uplink transmission or downlink reception to have the following situation: the priorities corresponding to the uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirements, or the priorities corresponding to the uplink transmission or downlink reception overlapping with the time range corresponding to the first object do not meet the specified priority requirements. Therefore, on the network side, the uplink transmission or downlink reception scheduled by the network side device for the terminal requires that: the priority corresponding to at least one of the uplink transmission or downlink reception within the time range corresponding to the first object meets the specified priority requirements, or the priority corresponding to at least one of the uplink transmission or downlink reception overlapping with the time range corresponding to the first object meets the specified priority requirements.

[0616] The method for adjusting transmission restrictions provided in the embodiment of the present application can be performed by a device for adjusting transmission restrictions. In the embodiment of the present application, the device for adjusting transmission restrictions performing the method for adjusting transmission restrictions is used as an example to illustrate the device for adjusting transmission restrictions provided in the embodiment of the present application.

[0617] Referring to FIG. 5 , an embodiment of the present application provides a device for adjusting transmission restrictions, which can be applied to a terminal and includes:

[0618] A first determining module 501 is configured to determine whether a scheduling restriction exists in a first serving cell or whether a target interval timing is effective;

[0619] A first execution module 502 is configured to execute a predefined operation according to a preset rule;

[0620] The first serving cell is any serving cell configured for the terminal;

[0621] The preset rule is associated with any of the following:

[0622] First reporting information related to the channel quality of the serving cell;

[0623] Second reporting information related to uplink BSR or SR;

[0624] Scheduling information related to uplink and downlink scheduling;

[0625] The predefined operation includes at least one of the following:

[0626] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0627] skipping or disabling at least one of the target intervals;

[0628] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0629] Optionally, when the preset rule is associated with first reporting information related to the channel quality of the serving cell, the first execution module is specifically configured to:

[0630] When the channel quality of the serving cell is higher than or equal to the first threshold, the predefined operation is performed according to the reporting information related to the channel quality of the serving cell.

[0631] Optionally, the first reporting information includes a measurement report based on layer 3 measurement, and the first execution module is specifically configured to perform any one of the following:

[0632] In case of sending a measurement report based on L3 measurement, performing the predefined operation, wherein the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0633] The predefined operation is performed according to the channel quality information in the measurement report of the layer 3 measurement.

[0634] Optionally, the first execution module is specifically configured to:

[0635] After the terminal sends a measurement report based on L3 measurement based on the first event, performing the predefined operation from a first predefined time;

[0636] After the terminal sends the measurement report based on the L3 measurement based on the second event, stopping performing the predefined operation at a second predefined time;

[0637] The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the second event.

[0638] Optionally, the first execution module is specifically configured to:

[0639] When the channel quality information in the first measurement report is higher than or equal to the second threshold, performing the predefined operation starting from a third predefined time;

[0640] When the channel quality information in the second measurement report is lower than or equal to a third threshold, stopping performing the predefined operation at a fourth predefined time;

[0641] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0642] Optionally, the first reporting information includes a channel state information (CSI) report, and the first execution module is specifically configured to perform any one of the following:

[0643] When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, performing the predefined operation starting from a fifth predefined time;

[0644] When the channel quality information in the second CSI report is lower than or equal to a fifth threshold, stopping performing the predefined operation at a sixth predefined time;

[0645] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0646] Optionally, when the preset rule is associated with second reporting information related to an uplink BSR or SR, the first execution module is specifically configured to perform at least one of the following:

[0647] When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, performing the predefined operation on the target serving cell;

[0648] When the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, perform the predefined operation on the target serving cell;

[0649] The first condition includes at least one of the following:

[0650] The waiting time for data to be transmitted on the target logical channel or target logical channel group is longer than or equal to a sixth threshold;

[0651] A remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or target logical channel group is shorter than or equal to a seventh threshold;

[0652] The amount of data to be transmitted on the target logical channel or target logical channel group is greater than or equal to an eighth threshold;

[0653] The second condition includes at least one of the following:

[0654] The terminal triggers and actually sends an SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0655] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or target logical channel group.

[0656] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the first execution module is specifically configured to:

[0657] Starting or continuing to perform the predefined operation on the target serving cell from a seventh predefined time;

[0658] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0659] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the first execution module is specifically configured to:

[0660] When a third condition is met, stopping execution of the predefined operation;

[0661] The third condition includes any one of the following:

[0662] Starting from the time when the terminal determines to start or continue to perform the predefined operation, a first preset time period is reached;

[0663] The reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0664] Optionally, when the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the first execution module is specifically configured to:

[0665] Starting or continuing to perform the predefined operation on the target serving cell from an eighth predefined time;

[0666] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0667] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the second condition, the first execution module is specifically configured to:

[0668] If the fourth condition is met, stop executing the predefined operation;

[0669] The fourth condition includes any one of the following:

[0670] Starting from the time when the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0671] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or target logical channel group is 0.

[0672] Optionally, when the preset rule is associated with uplink and downlink scheduling related information, the first execution module is specifically configured to:

[0673] Perform predefined operations based on the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI;

[0674] Perform predefined operations according to the transmission attribute information indicated in the scheduling DCI;

[0675] Execute predefined operations based on data scheduling related information.

[0676] Optionally, the first execution module is specifically used for any of the following:

[0677] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a ninth threshold, perform the predefined operation on the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction;

[0678] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI overlaps with the interval opportunity or the first window in the time domain, performing the predefined operation on the area of ​​the time domain overlap;

[0679] When the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a tenth threshold, perform the predefined operation on the area of ​​extended time domain overlap, where the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0680] Performing the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by scheduling PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to DCI;

[0681] Predefined operations are performed for all time domain units that have time domain overlap or extended time domain overlap with the second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0682] Optionally, the first execution module is specifically configured to:

[0683] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, performing the predefined operation on the target serving cell, where N is specified by the protocol or configured by higher-layer signaling;

[0684] The fifth condition includes at least one of the following:

[0685] The size of the TB is greater than or equal to the eleventh threshold;

[0686] The physical layer priority is a predefined priority.

[0687] Optionally, when the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition in the target transmission direction, the first execution module is specifically configured to:

[0688] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, starting or continuing to perform the predefined operation for the target serving cell from a ninth predefined time;

[0689] The N is specified by a protocol or configured by high-level signaling, and the ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

[0690] Optionally, the first execution module is specifically configured to:

[0691] If the sixth condition is met, stop executing the predefined operation;

[0692] The sixth condition includes any one of the following:

[0693] Starting from the time when the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0694] The terminal detects in the target transmission direction that transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0695] Optionally, the first execution module is specifically configured to:

[0696] When the amount of data scheduled by the terminal in the third time period in the designated transmission direction or the amount of data actually scheduled for the target logical channel or target logical channel group is greater than or equal to an eleventh threshold, performing the predefined operation on the target serving cell;

[0697] The third time period is specified by a protocol or configured by high-level signaling.

[0698] Optionally, the first execution module is specifically configured to:

[0699] Starting or continuing to perform the predefined operation on the target serving cell from a tenth predefined time;

[0700] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-layer signaling.

[0701] Optionally, the first execution module is specifically configured to:

[0702] If the seventh condition is met, stop executing the predefined operation;

[0703] The seventh condition includes any one of the following:

[0704] Starting from the time when the terminal determines to start executing or continuing the predefined operation, a fourth preset time period is reached;

[0705] The amount of data scheduled by the terminal in the third time period of the specified transmission direction, or the amount of data actually scheduled for the target logical channel or the target logical channel group, is less than an eleventh threshold.

[0706] Optionally, the first object targeted by the predefined operation satisfies a predefined condition;

[0707] The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following:

[0708] The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0709] The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-layer signaling;

[0710] The priority of the first object meets a predefined priority requirement;

[0711] The period or length of the first object meets a predefined requirement.

[0712] Optionally, when the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping interval opportunities or disabling interval opportunities within the first symbol time domain unit set, the first execution module is specifically configured to do any one of the following:

[0713] The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements;

[0714] The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements;

[0715] The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirement;

[0716] The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object do not meet the specified priority requirement.

[0717] 6 , an embodiment of the present application provides a device for adjusting transmission restrictions, which is applied to a network-side device and includes:

[0718] The second determining module 601 is configured to determine whether a scheduling restriction exists in the target serving cell or whether a transmission / reception restriction corresponds to the target interval timing;

[0719] The second execution module 602 is used to execute a predefined operation according to a preset rule;

[0720] The preset rule is associated with any of the following:

[0721] First reporting information related to the channel quality of the serving cell;

[0722] Second reporting information related to uplink BSR or SR;

[0723] Scheduling information related to uplink and downlink scheduling;

[0724] The predefined operation includes at least one of the following:

[0725] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0726] skipping or disabling at least one of the target interval opportunities or disabling the interval opportunity;

[0727] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0728] Optionally, when the preset rule is associated with reporting information related to channel quality of the serving cell, the second execution module is configured to:

[0729] When the channel quality of the serving cell is higher than or equal to the first threshold, the predefined operation is performed according to the reporting information related to the channel quality of the serving cell.

[0730] Optionally, the first reporting information includes a measurement report based on layer 3 measurement, and the first execution module is specifically configured to perform any one of the following:

[0731] In case of sending a measurement report based on L3 measurement, performing the predefined operation, wherein the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0732] The predefined operation is performed according to the channel quality information in the measurement report of the layer 3 measurement.

[0733] Optionally, the first execution module is specifically configured to:

[0734] After the network-side device receives the measurement report based on the L3 measurement reported based on the first event, performing the predefined operation from a first predefined time;

[0735] After the network-side device receives the measurement report based on the L3 measurement reported based on the second event, stopping performing the predefined operation at a second predefined time;

[0736] The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement reported by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement reported by the second event.

[0737] Optionally, the second execution module is configured to:

[0738] When the channel quality information in the first measurement report is higher than or equal to the second threshold, performing the predefined operation starting from a third predefined time;

[0739] When the channel quality information in the second measurement report is lower than or equal to a third threshold, stopping performing the predefined operation at a fourth predefined time;

[0740] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0741] Optionally, the first reporting information includes a channel state information (CSI) report, and the second execution module is configured to perform any one of the following:

[0742] When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, performing the predefined operation starting from a fifth predefined time;

[0743] When the channel quality information in the second CSI report is lower than or equal to a fifth threshold, stopping performing the predefined operation at a sixth predefined time;

[0744] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0745] Optionally, when the preset rule is associated with relevant reporting information of an uplink BSR or SR, the second execution module is configured to perform at least one of the following:

[0746] When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, performing the predefined operation on the target serving cell;

[0747] When the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, perform the predefined operation on the target serving cell;

[0748] The first condition includes at least one of the following:

[0749] The waiting time for data to be transmitted on the target logical channel or target logical channel group is longer than or equal to a sixth threshold;

[0750] A remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or target logical channel group is shorter than or equal to a seventh threshold;

[0751] The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold;

[0752] The second condition includes at least one of the following:

[0753] The network side device actually receives the SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0754] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or target logical channel group.

[0755] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the second execution module is configured to:

[0756] Starting or continuing to perform the predefined operation on the target serving cell from a seventh predefined time;

[0757] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0758] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the second execution module is configured to:

[0759] When a third condition is met, stopping execution of the predefined operation;

[0760] The third condition includes any one of the following:

[0761] Starting from the time when the network side device determines to start or continue to perform the predefined operation, a first preset time period is reached;

[0762] The reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0763] Optionally, when the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the second execution module is configured to:

[0764] Starting or continuing to perform the predefined operation on the target serving cell from an eighth predefined time;

[0765] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0766] Optionally, when the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the second condition, the second execution module is configured to:

[0767] If the fourth condition is met, stop executing the predefined operation;

[0768] The fourth condition includes any one of the following:

[0769] Starting from the time when the network-side device determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0770] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or target logical channel group is 0.

[0771] Optionally, when the preset rule is associated with uplink and downlink scheduling related information, the second execution module is configured to:

[0772] Perform predefined operations based on the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI;

[0773] Perform predefined operations according to the transmission attribute information indicated in the scheduling DCI;

[0774] Execute predefined operations based on data scheduling related information.

[0775] Optionally, the second execution module is used for any of the following:

[0776] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a ninth threshold, perform the predefined operation on the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction;

[0777] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI overlaps with the interval opportunity or the first window in the time domain, performing the predefined operation on the area of ​​the time domain overlap;

[0778] When the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a tenth threshold, perform the predefined operation on the area of ​​extended time domain overlap, where the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0779] Performing the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by scheduling PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to DCI;

[0780] Predefined operations are performed for all time domain units that have time domain overlap or extended time domain overlap with the second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0781] Optionally, the second execution module is configured to:

[0782] When the network-side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, performing the predefined operation on the target serving cell, where N is specified by the protocol or configured by higher-layer signaling;

[0783] The fifth condition includes at least one of the following:

[0784] The size of the TB is greater than or equal to the eleventh threshold;

[0785] The physical layer priority is a predefined priority.

[0786] Optionally, when the network side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs satisfies the fifth condition in the target transmission direction, the second execution module is configured to:

[0787] When the network-side device detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, starting or continuing to perform the predefined operation on the target serving cell from a ninth predefined time;

[0788] The ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

[0789] Optionally, the second execution module is configured to:

[0790] If the sixth condition is met, stop executing the predefined operation;

[0791] The sixth condition includes any one of the following:

[0792] Starting from the time when the network-side device determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0793] The network side device detects in the target transmission direction that the transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0794] Optionally, the second execution module is configured to:

[0795] When the amount of data scheduled by the network side device in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or target logical channel group is greater than or equal to an eleventh threshold, performing the predefined operation on the target serving cell;

[0796] The third time period is specified by a protocol or configured by high-level signaling.

[0797] Optionally, the second execution module is configured to:

[0798] Starting or continuing to perform the predefined operation on the target serving cell from a tenth predefined time;

[0799] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-layer signaling.

[0800] Optionally, the second execution module is configured to:

[0801] If the seventh condition is met, stop executing the predefined operation;

[0802] The seventh condition includes any one of the following:

[0803] Starting from the time when the network-side device determines to start executing or continuing the predefined operation, a fourth preset time period is reached;

[0804] The amount of data scheduled by the network side device in the third time period of the specified transmission direction, or the amount of data actually scheduled for the target logical channel or target logical channel group, is less than an eleventh threshold.

[0805] Optionally, the first object targeted by the predefined operation satisfies a predefined condition;

[0806] The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following:

[0807] The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0808] The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-layer signaling;

[0809] The priority of the first object meets a predefined priority requirement;

[0810] The period or length of the first object meets a predefined requirement.

[0811] Optionally, when the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping interval opportunities or disabling interval opportunities within the first symbol time domain unit set, the second execution module is configured to do any one of the following:

[0812] ensuring that priorities corresponding to uplink transmission or downlink reception scheduled for the terminal and within a time range corresponding to the first object meet specified priority requirements;

[0813] ensuring that priorities corresponding to uplink transmissions or downlink receptions scheduled for the terminal and overlapping with a time range corresponding to the first object meet specified priority requirements;

[0814] ensuring that the priority of at least one uplink transmission or downlink reception scheduled for the terminal and within the time range corresponding to the first object meets a specified priority requirement;

[0815] It is ensured that the priority corresponding to at least one uplink transmission or downlink reception scheduled for the terminal and overlapping with the time range corresponding to the first object meets the specified priority requirement.

[0816] The device for adjusting transmission restrictions in the embodiments of the present application can be an electronic device, such as an electronic device with an operating system, or a component in an electronic device, such as an integrated circuit or chip. The electronic device can be a terminal or other device other than a terminal. For example, the terminal can include but is not limited to the types of terminal 11 listed above, and other devices can be servers, network attached storage (NAS), etc., which are not specifically limited in the embodiments of the present application.

[0817] The device for adjusting transmission restrictions provided in the embodiment of the present application can implement the various processes implemented in the method embodiments of Figures 2 to 4 and achieve the same technical effects. To avoid repetition, they will not be described here.

[0818] As shown in Figure 7, an embodiment of the present application further provides a communication device 700, including a processor 701 and a memory 702. The memory 702 stores a program or instruction that can be run on the processor 701. For example, when the communication device 700 is a terminal, the program or instruction, when executed by the processor 701, implements the various steps of the above-mentioned method embodiment and can achieve the same technical effect. When the communication device 700 is a network-side device, the program or instruction, when executed by the processor 701, implements the various steps of the above-mentioned method embodiment and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0819] The present application also provides a terminal comprising a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is configured to execute a program or instruction to implement the steps of the terminal-side method embodiment. This terminal embodiment corresponds to the aforementioned terminal-side method embodiment, and each implementation process and implementation method of the aforementioned method embodiment are applicable to this terminal embodiment and can achieve the same technical effects. Specifically, Figure 8 is a schematic diagram of the hardware structure of a terminal implementing an embodiment of the present application.

[0820] The terminal 800 includes but is not limited to: a radio frequency unit 801, a network module 802, an audio output unit 803, an input unit 804, a sensor 805, a display unit 806, a user input unit 807, an interface unit 808, a memory 809 and at least some of the components of the processor 810.

[0821] Those skilled in the art will appreciate that the terminal 800 may also include a power supply (such as a battery) to power various components. The power supply may be logically connected to the processor 810 via a power management system, thereby enabling the power management system to manage charging, discharging, and power consumption. The terminal structure shown in FIG8 does not limit the terminal. The terminal may include more or fewer components than shown, or may combine certain components, or have different component arrangements, which will not be described in detail here.

[0822] It should be understood that in an embodiment of the present application, the input unit 804 may include a graphics processing unit (GPU) 8041 and a microphone 8042, and the graphics processor 8041 processes the image data of a static picture or video obtained by an image capture device (such as a camera) in a video capture mode or an image capture mode. The display unit 806 may include a display panel 8061, and the display panel 8061 may be configured in the form of a liquid crystal display, an organic light emitting diode, etc. The user input unit 807 includes a touch panel 8071 and at least one of other input devices 8072. The touch panel 8071 is also called a touch screen. The touch panel 8071 may include two parts: a touch detection device and a touch controller. Other input devices 8072 may include, but are not limited to, a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, and a joystick, which will not be repeated here.

[0823] In the embodiment of the present application, after receiving downlink data from a network-side device, the radio frequency unit 801 may transmit the data to the processor 810 for processing. Furthermore, the radio frequency unit 801 may send uplink data to the network-side device. Typically, the radio frequency unit 801 includes, but is not limited to, an antenna, an amplifier, a transceiver, a coupler, a low-noise amplifier, a duplexer, and the like.

[0824] The memory 809 can be used to store software programs or instructions and various data. The memory 809 may mainly include a first storage area for storing programs or instructions and a second storage area for storing data, wherein the first storage area may store an operating system, applications or instructions required for at least one function (such as a sound playback function, an image playback function, etc.). In addition, the memory 809 may include a volatile memory or a non-volatile memory. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be random access memory (RAM), static random access memory (SRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct RAM bus random access memory (DRRAM). The memory 809 in the embodiment of the present application includes but is not limited to these and any other suitable types of memory.

[0825] Processor 810 may include one or more processing units. Optionally, processor 810 integrates an application processor and a modem processor. The application processor primarily handles operations related to the operating system, user interface, and application programs, while the modem processor primarily processes wireless communication signals, such as a baseband processor. It is understood that the modem processor may not be integrated into processor 810.

[0826] The processor 810 is configured to determine whether a scheduling restriction exists in the first serving cell or whether a target interval timing is effective;

[0827] Processor 810, configured to execute predefined operations according to preset rules;

[0828] The first serving cell is any serving cell configured for the terminal;

[0829] The preset rule is associated with any of the following:

[0830] First reporting information related to the channel quality of the serving cell;

[0831] Second reporting information related to uplink BSR or SR;

[0832] Scheduling information related to uplink and downlink scheduling;

[0833] The predefined operation includes at least one of the following:

[0834] Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units;

[0835] skipping or disabling at least one of the target intervals;

[0836] Adjusting an interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities.

[0837] Optionally, when the preset rule is associated with first reporting information related to the channel quality of the serving cell, the processor 810 is specifically configured to:

[0838] When the channel quality of the serving cell is higher than or equal to the first threshold, the predefined operation is performed according to the reporting information related to the channel quality of the serving cell.

[0839] Optionally, the first reporting information includes a measurement report based on layer 3 measurement, and the processor 810 is specifically configured to do any one of the following:

[0840] In case of sending a measurement report based on L3 measurement, performing the predefined operation, wherein the measurement report based on L3 measurement is triggered based on a measurement reporting event;

[0841] The predefined operation is performed according to the channel quality information in the measurement report of the layer 3 measurement.

[0842] Optionally, the processor 810 is specifically configured to:

[0843] After the terminal sends a measurement report based on L3 measurement based on the first event, performing the predefined operation from a first predefined time;

[0844] After the terminal sends the measurement report based on the L3 measurement based on the second event, stopping performing the predefined operation at a second predefined time;

[0845] The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the second event.

[0846] Optionally, the processor 810 is specifically configured to:

[0847] When the channel quality information in the first measurement report is higher than or equal to the second threshold, performing the predefined operation starting from a third predefined time;

[0848] When the channel quality information in the second measurement report is lower than or equal to a third threshold, stopping performing the predefined operation at a fourth predefined time;

[0849] The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

[0850] Optionally, the first reporting information includes a channel state information (CSI) report, and the processor 810 is specifically configured to perform any one of the following:

[0851] When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, performing the predefined operation starting from a fifth predefined time;

[0852] When the channel quality information in the second CSI report is lower than or equal to a fifth threshold, stopping performing the predefined operation at a sixth predefined time;

[0853] The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

[0854] Optionally, when the preset rule is associated with second reporting information related to an uplink BSR or SR, the processor 810 is specifically configured to perform at least one of the following:

[0855] When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, performing the predefined operation on the target serving cell;

[0856] When the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, perform the predefined operation on the target serving cell;

[0857] The first condition includes at least one of the following:

[0858] The waiting time for data to be transmitted on the target logical channel or target logical channel group is longer than or equal to a sixth threshold;

[0859] A remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or target logical channel group is shorter than or equal to a seventh threshold;

[0860] The amount of data to be transmitted on the target logical channel or target logical channel group is greater than or equal to an eighth threshold;

[0861] The second condition includes at least one of the following:

[0862] The terminal triggers and actually sends an SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group;

[0863] The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or target logical channel group.

[0864] Optionally, when reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the processor 810 is specifically configured to:

[0865] Starting or continuing to perform the predefined operation on the target serving cell from a seventh predefined time;

[0866] The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

[0867] Optionally, when reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the first condition, the processor 810 is specifically configured to:

[0868] When a third condition is met, stopping execution of the predefined operation;

[0869] The third condition includes any one of the following:

[0870] Starting from the time when the terminal determines to start or continue to perform the predefined operation, a first preset time period is reached;

[0871] The reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information does not meet the first condition.

[0872] Optionally, when the SR reporting information or uplink BSR reporting information of the target logical channel or target logical channel group meets the second condition, the processor 810 is specifically configured to:

[0873] Starting or continuing to perform the predefined operation on the target serving cell from an eighth predefined time;

[0874] The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

[0875] Optionally, when reporting information for the target logical channel or target logical channel group in the uplink BSR reporting information meets the second condition, the processor 810 is specifically configured to:

[0876] If the fourth condition is met, stop executing the predefined operation;

[0877] The fourth condition includes any one of the following:

[0878] Starting from the time when the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached;

[0879] The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or target logical channel group is 0.

[0880] Optionally, when the preset rule is associated with uplink and downlink scheduling related information, the processor 810 is specifically configured to:

[0881] Perform predefined operations based on the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI;

[0882] Perform predefined operations according to the transmission attribute information indicated in the scheduling DCI;

[0883] Execute predefined operations based on data scheduling related information.

[0884] Optionally, the processor 810 is specifically configured to perform any one of the following:

[0885] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a ninth threshold, perform the predefined operation on the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction;

[0886] When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduled DCI overlaps with the interval opportunity or the first window in the time domain, performing the predefined operation on the area of ​​the time domain overlap;

[0887] When the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to a tenth threshold, perform the predefined operation on the area of ​​extended time domain overlap, where the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold;

[0888] Performing the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by scheduling PDSCH, CSI-RS, PUSCH, PUCCH, or SRS transmission corresponding to DCI;

[0889] Predefined operations are performed for all time domain units that have time domain overlap or extended time domain overlap with the second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

[0890] Optionally, the processor 810 is specifically configured to:

[0891] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, performing the predefined operation on the target serving cell, where N is specified by the protocol or configured by higher-layer signaling;

[0892] The fifth condition includes at least one of the following:

[0893] The size of the TB is greater than or equal to the eleventh threshold;

[0894] The physical layer priority is a predefined priority.

[0895] Optionally, the processor 810 is specifically configured to:

[0896] When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, starting or continuing to perform the predefined operation for the target serving cell from a ninth predefined time;

[0897] The N is specified by a protocol or configured by high-level signaling, and the ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

[0898] Optionally, the processor 810 is specifically configured to:

[0899] If the sixth condition is met, stop executing the predefined operation;

[0900] The sixth condition includes any one of the following:

[0901] Starting from the time when the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached;

[0902] The terminal detects in the target transmission direction that transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not meet the fifth condition.

[0903] Optionally, the processor 810 is specifically configured to:

[0904] When the amount of data scheduled by the terminal in the third time period in the designated transmission direction or the amount of data actually scheduled for the target logical channel or target logical channel group is greater than or equal to an eleventh threshold, performing the predefined operation on the target serving cell;

[0905] The third time period is specified by a protocol or configured by high-level signaling.

[0906] Optionally, the processor 810 is specifically configured to:

[0907] Starting or continuing to perform the predefined operation on the target serving cell from a tenth predefined time;

[0908] The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-layer signaling.

[0909] Optionally, the processor 810 is specifically configured to:

[0910] If the seventh condition is met, stop executing the predefined operation;

[0911] The seventh condition includes any one of the following:

[0912] Starting from the time when the terminal determines to start executing or continuing the predefined operation, a fourth preset time period is reached;

[0913] The amount of data scheduled by the terminal in the third time period of the specified transmission direction, or the amount of data actually scheduled for the target logical channel or the target logical channel group, is less than an eleventh threshold.

[0914] Optionally, the first object targeted by the predefined operation satisfies a predefined condition;

[0915] The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following:

[0916] The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling;

[0917] The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-layer signaling;

[0918] The priority of the first object meets a predefined priority requirement;

[0919] The period or length of the first object meets a predefined requirement.

[0920] Optionally, when the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping interval opportunities or disabling interval opportunities within the first symbol time domain unit set, the processor 810 is specifically configured to do any one of the following:

[0921] The priorities of uplink transmission or downlink reception expected to be scheduled and within the time range corresponding to the first object meet the specified priority requirements;

[0922] The priorities of uplink transmission or downlink reception that are expected to be scheduled and overlap with the time range corresponding to the first object both meet the specified priority requirements;

[0923] It is not expected to be scheduled, and the priorities of uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirements;

[0924] The priorities of uplink transmission or downlink reception that are not expected to be scheduled and overlap with the time range corresponding to the first object do not meet the specified priority requirements.

[0925] It can be understood that the implementation process of each implementation method mentioned in this embodiment can refer to the relevant description of the method embodiment and achieve the same or corresponding technical effects. To avoid repetition, it will not be described here.

[0926] The present application also provides a network-side device, including a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is configured to execute a program or instruction to implement the steps of the network-side method embodiment. This network-side device embodiment corresponds to the aforementioned network-side device method embodiment, and each implementation process and implementation method of the aforementioned method embodiment is applicable to this network-side device embodiment and can achieve the same technical effects.

[0927] Specifically, embodiments of the present application also provide a network-side device. As shown in Figure 9, the network-side device 900 includes an antenna 91, a radio frequency device 92, a baseband device 93, a processor 94, and a memory 95. Antenna 91 is connected to radio frequency device 92. In the uplink direction, radio frequency device 92 receives information via antenna 91 and sends the received information to baseband device 93 for processing. In the downlink direction, baseband device 93 processes the information to be transmitted and sends it to radio frequency device 92. Radio frequency device 92 processes the received information and then sends it through antenna 91.

[0928] The method executed by the network-side device in the above embodiment may be implemented in the baseband device 93 , which includes a baseband processor.

[0929] The baseband device 93 may include, for example, at least one baseband board, on which multiple chips are arranged, as shown in Figure 9, one of the chips is, for example, a baseband processor, which is connected to the memory 95 through a bus interface to call the program in the memory 95 and execute the network device operations shown in the above method embodiment.

[0930] The network side device may further include a network interface 96, which is, for example, a Common Public Radio Interface (CPRI).

[0931] Specifically, the network side device 900 of the embodiment of the present application also includes: instructions or programs stored in the memory 95 and executable on the processor 94. The processor 94 calls the instructions or programs in the memory 95 to execute the methods of execution of each module shown in FIG6 and achieve the same technical effect. To avoid repetition, it will not be described here.

[0932] Specifically, the embodiment of the present application further provides a network side device. As shown in FIG10 , the network side device 1000 includes: a processor 1001, a network interface 1002, and a memory 1003. The network interface 1002 is, for example, a common public radio interface (CPRI).

[0933] Specifically, the network side device 1000 of the embodiment of the present application also includes: instructions or programs stored in the memory 1003 and executable on the processor 1001. The processor 1001 calls the instructions or programs in the memory 1003 to execute the method of execution of each module shown in Figure 6 and achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0934] An embodiment of the present application also provides a readable storage medium, on which a program or instruction is stored. When the program or instruction is executed by a processor, the various processes of the above-mentioned method embodiment for adjusting the transmission restriction are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0935] The processor is the processor in the terminal described in the above embodiment. The readable storage medium includes a computer-readable storage medium, such as a computer read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk. In some examples, the readable storage medium may be a non-transitory readable storage medium.

[0936] An embodiment of the present application further provides a chip, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the various processes of the above-mentioned method embodiment for adjusting transmission restrictions, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0937] It should be understood that the chip mentioned in the embodiments of the present application can also be called a system-level chip, a system chip, a chip system or a system-on-chip chip, etc.

[0938] An embodiment of the present application further provides a computer program / program product, which is stored in a storage medium. The computer program / program product is executed by at least one processor to implement the various processes of the above-mentioned method embodiment for adjusting transmission restrictions, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0939] An embodiment of the present application also provides a wireless communication system, including: a terminal and a network side device, wherein the terminal can be used to execute the steps of the terminal side method described above, and the network side device can be used to execute the steps of the network side method described above.

[0940] It should be noted that, in this article, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device comprising the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in the opposite order according to the functions involved. For example, the described method may be performed in an order different from that described, and various steps may also be added, omitted or combined. In addition, the features described with reference to certain examples may be combined in other examples.

[0941] Through the description of the above embodiments, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of a computer software product plus a necessary general-purpose hardware platform, or of course, by hardware. The computer software product is stored in a storage medium (such as ROM, RAM, magnetic disk, optical disk, etc.) and includes a number of instructions for enabling a terminal or network-side device to execute the methods described in each embodiment of the present application.

[0942] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of this application, ordinary technicians in this field can also make many forms of implementation methods without departing from the purpose of this application and the scope of protection of the claims. These implementation methods are all within the protection of this application.

Claims

1. A method for adjusting a transmission restriction, comprising: The terminal determines that there is a scheduling restriction or a valid target interval timing in the first serving cell; The terminal performs a predefined operation according to a preset rule; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: First reporting information related to the channel quality of the serving cell; Second reporting information related to an uplink buffer status report BSR or a scheduling request SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

2. The method according to claim 1, wherein: In a case where the preset rule is associated with first reporting information related to the channel quality of the serving cell, the terminal performs a predefined operation according to the preset rule, including: When the channel quality of the serving cell is higher than or equal to a first threshold, the terminal performs the predefined operation according to the first reporting information.

3. The method according to claim 2, wherein: The first reporting information includes a measurement report based on layer 3 measurement, and the terminal performs the predefined operation according to the first reporting information, including any one of the following: In case of sending a measurement report based on layer 3 measurement, the terminal performs the predefined operation, wherein the measurement report based on layer 3 measurement is triggered based on a measurement reporting event; The terminal performs the predefined operation according to the channel quality information in the measurement report based on the layer 3 measurement.

4. The method according to claim 3, wherein: In the case of sending a measurement report based on layer 3 measurement, the terminal performing the predefined operation includes: After the terminal sends a measurement report based on layer 3 measurement based on the first event, the terminal performs the predefined operation starting from a first predefined time; After the terminal sends a measurement report based on layer 3 measurement based on the second event, the terminal stops performing the predefined operation at a second predefined time; The first predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the first event, and the second predefined time is determined based on a transmission time of a measurement report of layer 3 measurement sent by the second event.

5. The method according to claim 3, wherein: The terminal performs the predefined operation according to the channel quality information in the measurement report based on the layer 3 measurement, including: When the channel quality information in the first measurement report is higher than or equal to the second threshold, the terminal performs the predefined operation from a third predefined time; When the channel quality information in the second measurement report is lower than or equal to a third threshold, the terminal stops performing the predefined operation at a fourth predefined time; The third predefined time is determined based on the transmission time of the first measurement report, and the fourth predefined time is determined based on the transmission time of the second measurement report.

6. The method according to claim 2, wherein: The first reporting information includes a channel state information CSI report, and the terminal performs the predefined operation according to the first reporting information, including any one of the following: When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, the terminal performs the predefined operation starting from a fifth predefined time; When the channel quality information in the second CSI report is lower than or equal to a fifth threshold, the terminal stops performing the predefined operation at a sixth predefined time; The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

7. The method according to claim 1, wherein: In a case where the preset rule is associated with the second reporting information related to the uplink BSR or SR, the terminal performs a predefined operation according to the preset rule, including at least one of the following: When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the terminal performs the predefined operation for the target serving cell; When the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the terminal performs the predefined operation for the target serving cell; The first condition includes at least one of the following: The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold; The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold; The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold; The second condition includes at least one of the following: The terminal triggers or actually sends a SR physical uplink control channel PUCCH for the target logical channel or at least one logical channel in the target logical channel group; The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

8. The method according to claim 7, wherein: When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information satisfies the first condition, the terminal performs the predefined operation for the target serving cell, including: The terminal starts or continues to perform the predefined operation for the target serving cell from a seventh predefined time; The seventh predefined time is determined based on the transmission time of the uplink BSR reporting information.

9. The method according to claim 8, wherein: When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information satisfies the first condition, after the terminal starts or continues to perform the predefined operation for the target serving cell, the further comprising: When a third condition is met, the terminal stops executing the predefined operation; The third condition includes any one of the following: Starting from when the terminal determines to start or continue to perform the predefined operation, a first preset time length is reached; The reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information does not meet the first condition.

10. The method according to claim 7, wherein: When the SR reporting information or uplink BSR reporting information for the target logical channel or the target logical channel group meets the second condition, the terminal performs the predefined operation for the target serving cell, including: The terminal starts or continues to perform the predefined operation for the target serving cell from an eighth predefined time; The eighth predefined time is determined based on the transmission time of the SR reporting information or the uplink BSR reporting information.

11. The method according to claim 10, wherein: When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information satisfies the second condition, after the terminal starts or continues to perform the predefined operation for the target serving cell, the further comprising: When the fourth condition is met, the terminal stops executing the predefined operation; The fourth condition includes any one of the following: Starting from when the terminal determines to start or continue to perform the predefined operation, a second preset time period is reached; The uplink BSR reporting information indicates that the amount of data to be transmitted for the target logical channel or the target logical channel group is zero.

12. The method according to claim 1, wherein: In a case where the preset rule is associated with the uplink and downlink scheduling related information, the terminal performs a predefined operation according to the preset rule, including: The terminal performs a predefined operation according to a transmission position of a physical downlink shared channel PDSCH, a channel state information reference signal CSI-RS, a physical uplink shared channel PUSCH, a PUCCH or a sounding reference signal SRS corresponding to scheduling downlink control information DCI; The terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, where the transmission attribute information is related to the size of the transport block TB or the physical layer priority; The terminal performs a predefined operation according to the data scheduling related information.

13. The method according to claim 12, wherein: The terminal performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI, including any one of the following: The PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, or the PDSCH, CSI-RS, PUSCH, When the time domain interval between the time domain unit occupied by PUCCH or SRS transmission and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the ninth threshold, the terminal performs the predefined operation for the interval opportunity or the first window; wherein the first window is a predefined window with the scheduling restriction; When the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI overlaps with the interval opportunity or the first window in the time domain, the terminal performs the predefined operation for the area of ​​the time domain overlap; In a case where the time domain interval between the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the time domain unit occupied by the interval opportunity or the first window is less than or equal to the tenth threshold, the terminal performs the predefined operation for the area of ​​extended time domain overlap, and the area of ​​extended time domain overlap is determined based on the time domain unit occupied by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI and the tenth threshold; The terminal performs the predefined operation for all time domain units within the scheduling restriction within a first time period, where the first time period is determined by the transmission of a PDSCH, a CSI-RS, a PUSCH, a PUCCH or an SRS corresponding to the scheduling DCI; The terminal performs predefined operations for all time domain units that have time domain overlap or extended time domain overlap with a second time period and have the scheduling restriction, and the second time period is determined by the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI.

14. The method according to claim 12, wherein: The terminal performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, including: When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction all meets the fifth condition, the terminal performs the predefined operation for the target serving cell, where N is specified by the protocol or configured by high-layer signaling; The fifth condition includes at least one of the following: The size of TB is greater than or equal to the eleventh threshold; The physical layer priority is a predefined priority.

15. The method according to claim 14, wherein: When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction satisfies the fifth condition, the terminal performs the predefined operation for the target serving cell, including: When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, the terminal starts or continues to perform the predefined operation for the target serving cell from a ninth predefined time; The N is specified by a protocol or configured by high-level signaling, and the ninth predefined time is determined based on the transmission time of the N consecutive scheduled DCIs.

16. The method according to claim 15, wherein: When the terminal detects that the transmission attribute information indicated in N consecutive scheduling DCIs in the target transmission direction meets the fifth condition, after the terminal starts or continues to perform the predefined operation for the target serving cell, the further comprising: When the sixth condition is met, the terminal stops executing the predefined operation; The sixth condition includes any one of the following: Starting from when the terminal determines to start or continue to perform the predefined operation, a third preset time period is reached; The terminal detects in the target transmission direction that transmission attribute information indicated by at least one scheduling DCI in N consecutive scheduling DCIs does not satisfy the fifth condition.

17. The method according to claim 12, wherein: The terminal performs a predefined operation according to the data scheduling related information, including: When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, the terminal performs the predefined operation for the target serving cell; The third time period is specified by a protocol or configured by high-level signaling.

18. The method according to claim 17, wherein: When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to an eleventh threshold, the terminal performs the predefined operation for the target serving cell, including: The terminal starts or continues to perform the predefined operation for the target serving cell from a tenth predefined time; The tenth predefined time is the end time of the third time period plus a preset time interval, and the preset time interval is specified by a protocol or configured by high-level signaling.

19. The method according to claim 18, wherein: When the amount of data scheduled by the terminal in the third time period in the specified transmission direction or the amount of data actually scheduled for the target logical channel or the target logical channel group is greater than or equal to the eleventh threshold, after the terminal starts or continues to perform the predefined operation for the target serving cell, the method further includes: When the seventh condition is met, the terminal stops executing the predefined operation; The seventh condition includes any one of the following: Starting from when the terminal determines to start executing or continuing the predefined operation, a fourth preset time length is reached; The amount of data scheduled by the terminal in a third time period in a specified transmission direction, or the amount of data actually scheduled for a target logical channel or a target logical channel group, is less than an eleventh threshold.

20. The method according to claim 1, wherein: The first object targeted by the predefined operation satisfies a predefined condition; The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following: The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling; The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-level signaling; The priority of the first object meets a predefined priority requirement; The period or length of the first object meets a predefined requirement.

21. The method according to claim 20, wherein: In the case where the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping interval opportunities or disabling interval opportunities within the first symbol time domain unit set, the performing of the predefined operation includes any one of the following: The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements; The terminal expects to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements; The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object do not meet the specified priority requirement; The terminal does not expect to be scheduled, and the priorities corresponding to uplink transmission or downlink reception overlapping with the time range corresponding to the first object do not meet the specified priority requirements.

22. A method for adjusting a transmission restriction, comprising: The network side device determines that there is a scheduling restriction or a valid target interval timing in the first serving cell; The network side device performs a predefined operation according to a preset rule; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: First reporting information related to the channel quality of the serving cell; Second reporting information related to uplink BSR or SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

23. The method according to claim 22, wherein: In a case where the preset rule is associated with the reporting information related to the channel quality of the serving cell, the network side device performs a predefined operation according to the preset rule, including: When the channel quality of the serving cell is higher than or equal to a first threshold, the network side device performs the predefined operation according to the first reporting information.

24. The method according to claim 23, wherein: The first reporting information includes a measurement report based on layer 3 measurement, and the network side device performs the predefined operation according to the first reporting information, including any one of the following: In the case of sending a measurement report based on layer 3 measurement, the network side device performs the predefined operation, and the measurement report based on layer 3 measurement is triggered based on a measurement reporting event; The network side device performs the predefined operation according to the channel quality information in the measurement report of the layer 3 measurement.

25. The method according to claim 23, wherein: The first reporting information includes a CSI report, and the network side device performs the predefined operation according to the first reporting information, including any one of the following: When the channel quality information in the first CSI report is higher than or equal to a fourth threshold, the network side device performs the predefined operation from a fifth predefined time; When the channel quality information in the second CSI report is lower than or equal to the fifth threshold, the network side device stops performing the predefined operation at a sixth predefined time; The fifth predefined time is determined based on the transmission time of the first CSI report, and the sixth predefined time is determined based on the transmission time of the second CSI report.

26. The method of claim 22, wherein: In a case where the preset rule is associated with the second reporting information related to the uplink BSR or SR, the network side device performs a predefined operation according to the preset rule, including at least one of the following: When the reporting information for the target logical channel or the target logical channel group in the uplink BSR reporting information meets the first condition, the network side device performs the predefined operation for the target serving cell; When the SR reporting information or uplink BSR reporting information for the target logical channel or target logical channel group meets the second condition, the network side device performs the predefined operation for the target serving cell; The first condition includes at least one of the following: The waiting time of the data to be transmitted of the target logical channel or the target logical channel group is longer than or equal to the sixth threshold; The remaining packet delay budget PDB of the to-be-transmitted data of the target logical channel or the target logical channel group is shorter than or equal to the seventh threshold; The amount of data to be transmitted on the target logical channel or target logical channel group is higher than or equal to an eighth threshold; The second condition includes at least one of the following: The network side device actually receives the SR PUCCH for the target logical channel or at least one logical channel in the target logical channel group; The uplink BSR reporting information indicates that there is an amount of data to be transmitted for the target logical channel or the target logical channel group.

27. The method of claim 22, wherein: In a case where the preset rule is associated with the uplink and downlink scheduling related information, the network side device performs a predefined operation according to the preset rule, including: The network side device performs a predefined operation according to the location of the PDSCH, CSI-RS, PUSCH, PUCCH or SRS transmission corresponding to the scheduling DCI; The network side device performs a predefined operation according to the transmission attribute information indicated in the scheduling DCI, where the transmission attribute information is related to the size of the TB or the physical layer priority; The network side device performs a predefined operation according to the data scheduling related information.

28. The method of claim 22, wherein: The first object targeted by the predefined operation satisfies a predefined condition; The first object includes the first time domain unit set or the interval opportunity, and the predefined condition includes at least one of the following: The first object is applied to a scenario other than a first scenario, where the first scenario is specified by a protocol or configured by high-layer signaling; The first object is only applied to a second scenario, where the second scenario is specified by a protocol or configured by high-level signaling; The priority of the first object meets a predefined priority requirement; The period or length of the first object meets a predefined requirement.

29. The method according to claim 28, wherein: In the case where the predefined operation is relaxing scheduling restrictions or disabling scheduling restrictions, or skipping interval opportunities or disabling interval opportunities within the first symbol time domain unit set, the performing of the predefined operation includes any one of the following: The network side device ensures scheduling for the terminal, and the priorities corresponding to uplink transmission or downlink reception within the time range corresponding to the first object meet the specified priority requirements; The network side device ensures that the terminal is scheduled, and the priorities corresponding to the uplink transmission or downlink reception overlapping with the time range corresponding to the first object meet the specified priority requirements; The network side device ensures that the terminal is scheduled, and the priority corresponding to at least one of the uplink transmission or downlink reception within the time range corresponding to the first object meets the specified priority requirement; The network side device ensures scheduling for the terminal, and at least one of the uplink transmissions or downlink receptions overlapping with the time range corresponding to the first object has a priority level that meets the specified priority requirement.

30. An apparatus for adjusting a transmission restriction, comprising: A first determination module is used to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell; A first execution module, used to execute a predefined operation according to a preset rule; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: First reporting information related to the channel quality of the serving cell; Second reporting information related to uplink BSR or SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

31. A device for adjusting transmission restrictions, comprising: A second determination module is used to determine whether there is a scheduling restriction or a valid target interval timing in the first serving cell; A second execution module, used to execute a predefined operation according to a preset rule; The first serving cell is any serving cell configured by the terminal; The preset rule is associated with any of the following: Reporting information related to the channel quality of the serving cell; First reporting information related to uplink BSR or SR; Scheduling information related to uplink and downlink scheduling; The predefined operation includes at least one of the following: Relaxing the scheduling restriction or disabling the scheduling restriction within a first set of time domain units; skipping or disabling at least one of the target intervals; An interval pattern parameter corresponding to at least one interval opportunity among the target interval opportunities is adjusted.

32. A terminal comprising a processor and a memory, wherein the memory stores a program or instruction that can be run on the processor, and when the program or instruction is executed by the processor, the steps of the method for adjusting transmission restrictions according to any one of claims 1 to 22 are implemented.

33. A network side device, comprising a processor and a memory, wherein the memory stores a program or instruction that can be executed on the processor, and when the program or instruction is executed by the processor, the steps of the method for adjusting transmission restrictions as described in any one of claims 23 to 29 are implemented.

34. A readable storage medium storing a program or instruction, wherein the program or instruction, when executed by a processor, implements the steps of the method for adjusting transmission restrictions as described in any one of claims 1 to 22, or implements the steps of the method for adjusting transmission restrictions as described in any one of claims 23 to 29.

Citation Information

Patent Citations

  • Communication method and device

    CN111918327A

  • Uplink sending processing method and device, terminal and readable storage medium

    CN115087082A

  • Channel monitoring method and apparatus, and user equipment

    US20230199648A1

  • Techniques for skipping scheduling requests

    US20230217430A1