The method of checks and tests of pressure vessels and tanks for crimping

In-situ testing of pressure vessels and tanks using oil or air-oil as the working fluid addresses the impracticality of traditional methods by reducing downtime and costs, ensuring compliance and safety.

WO2026019335A1PCT designated stage Publication Date: 2026-01-22TĂUŢAN NICOLAE VALER
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/RO2025/000003
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2024-07-17
Filing Date
2025-02-25
Publication Date
2026-01-22

AI Technical Summary

Technical Problem

Existing methods require stopping, removing, and emptying containers and tanks from installations for pressure tests, which is impractical due to contamination and high-pressure issues, leading to lengthy downtime and increased costs.

Method used

A method for checking and testing containers and tanks under pressure using oil, air, or air-oil as the working fluid, allowing tests to be performed in situ without disassembly, isolation, or emptying, at the working pressure, reducing downtime to 1-2 days.

Benefits of technology

This approach significantly reduces the time and cost of pressure vessel and tank checks by enabling in-situ testing, adhering to regulatory standards, and ensuring safety without dismantling or reassembly, thus optimizing operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure RO2025000003_22012026_PF_FP_ABST
    Figure RO2025000003_22012026_PF_FP_ABST
Patent Text Reader

Abstract

A method of checks and tests of pressure vessel and tanks under pressure with oil and air is the subject-matter of the invention. The method for checks and tests comprises shutting down and putting the installation back into operation after carrying out checks and tests. The method is characterized by the fact that the installation of which the containers and tanks, the pipes are part, remains in working condition, does not require their emptying. The checks and tests are done with working fluid at working pressure with authorization to operate at the technical characteristics - parameters guaranteed by the manufacturer or established by technical expertise.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] THE METHOD OF CHECKS AND TESTS OF PRESSURE VESSELS AND TANKS FOR CRIMPING.

[0002] 12.2. Description af the invention with the title

[0003] 1. Ppxerinre - posd / co - mefood of checks and samptes pressun? rnse / s and fecks wite os, a / r ait. alr / ott, Air (and oifh air

[0004] The invention is characterized by th® fact that the process - the method of checking and testing containers and tanks under pressure with oil. air oil. air / oii, Air (and oil) is a novelty compared to the current state of the art which provides for the performance of checks and tests with water, nitrogen, air with the removal and / or Isolation of containers, tanks, pipes under pressure from the installation in which they are installed; lubrication groups, air-oil installations from eccentric presses, hydraulic presses. Dismantling and their reassembly, reinstallation and re-commissioning after checks and tests .

[0005] In the chapters below, we expose and present ail the new technical elements noted with reference signs, corresponding to those in the drawings and placed in brackets which, in combination with the features presented, define the essential security features, define the requested protection as pertinent and necessary

[0006] 2. Txhrh / x / characteristics of the te w?.tew - Mate parameters

[0007] P9s 64 bar and other pressures

[0008] V K 60 nr

[0009] T»^-40 (-50) / + 120«C (15CW)

[0010] Fluid, oil, air oil, oil air, steoil

[0011] 3. Pfesenfeffor? o f the fecfifeca / fie / d to which tea invention refers

[0012] The invention relates to ths technical fields betow:

[0013] - Industry

[0014] - Production linos and technological lines with eccentric presses with pneumo- hydraulic actuation, presses with hydraulic, pneumatic actuation (from the car manufacturing industry)

[0015] - Hydropower plants - CHE- with lubrication groups G.U.P,

[0016] • Installations and equipment with hydraulic and pneumatic drives from various fields

[0017] 4. Prasenfafw t of tee current state of the art

[0018] The current state of (he art stipulates that checks and tests at the CP (Pt + IP) maturity of periodical control (Technical review + Pressure test) for the evaluation of the technical condition of containers and tanks and connecting pipes under pressure, shouid be done with these containers and tanks stopped from operation, taken out of operation, emptied, isolated from the rest of ths installation following the tests to ba done; hydraulic and / or pneumatic with nitrogen, air if the manufacturer and ths designer wanted these tests to be carried out.

[0019] The correct stats of the art provides far the performance of resistance tests Pt«« (bar) ~ 15 min and the tightness test at pressure P4(bar) 30 min •* 60 min with the working fluid established in the construction technical book and mentioned on th® stamp piste. 12.2 ~ (tontfoUStfoh

[0020] S. Presentation of rfte tec / J.tecs / probf&n h‘?at the inverrlfon solves end / weenteffoo of tbs advantegss in re.taflor? to the state of the art.

[0021] The invention solves the teohnicsl problems in the fields of applicability presented under the conditions in which:

[0022] - it is not necessary to stop, remove from the installation and / w isotate, empty containers and tanks in order to cany out checks and samples it is not allowed to carry out hydraulic tests due to contamination considerations air and / or nitrogen flow and pressure cannot be ensured

[0023] - it is not possible to stop tee operation and empty the insfafiations / eguipment in which the tanks and containers are mounted

[0024] Solving the technical problem is done by tea invention presented by checks and tests in the installalkxvEqufomenl of which these IMSPs are a part (mechanical installations under pressure and pipelines), without removing them from the installation, without stopping and without emptying the installation, checking and doing tests -ss with the working fluid, at the working pressure in a distinct loop.

[0025] I specify that the national regulatory authority in the field of pressure equipment IMSP - mechanical installations under pressure, admits and accepts this Procedure of checks and tests and the European and international certification body on the Brussels list, TUV Austria with RENAR accreditation, for equipment under pressure 97 / 23CE accepts end admits this procedure for this field of applicability and has issued national and European certificauo^s

[0026] Protocol of technical verification Nd. 51 C ~ 100 / 20.102321 of Acceptance of the Procedure.

[0027] The invention solves the technical problems that had no solution, . it is a procedure - an operative method procedure that reduces the lime of checks, tests at installations, comptex equipment groups in which tea containers and tanks with this working fluid under pressure, from 10 * 16 days to 1 *■ 2 days, the savings being considerable, not having to stop, emptying these complex installations, not having to dismantle and / or isolate and remove these containers and tanks from ths instatiations in order to check and carry out samples and reassemble them in the Installations.

[0028] & ft&fow? of toe towtffon as cia#ned

[0029] The Invention with the title Procedure - practice - method of checks and samples pressure vessels and tanks with oil. air oil, air / oii, Air (and oil} and the presentation of the advantages in retation to the current state of the art.

[0030] Checks and tests at periodic control due at 1 (one) * 4 (four years) of IMS? - mechanical installations under pressure, containers, tanks, pipelines for fluid CP ~ periodic: control (Rl + IP) (infernal review + Pressure test ) are done in order to evaluate their technical condition for safe operation. Checks, tests that are canted out based on this procedure that Is the subject of the patent application.

[0031] The procedure - practice ~ method is characterized by the fact that:

[0032] ~ applies to the field of applicability' presented, to the technical field presented with the technical characteristics and technical parameters of the presented invention. ,2 ~ aontmuotion

[0033] - does not require disassembly and / or isolation. removal of containers. pressure tanks from the installation, equipment, group in which they are installed- installed

[0034] - does not require stopping, emptying, decommissioning

[0035] - it is performed with rhe plant and containers and tanks in working condition

[0036] - it is performed wth the working fluid existing in the installation, containers, tanks at the working pressure

[0037] - does not require reassembly and reinstaliafion after checks and tests

[0038] - since the hydraulc test is not possible for masons of contamination and / or for reasons of high votome and weight of the test fluid, checks and tests are done with working fluid at working pressure.

[0039] - the time and period of cheeks and samples is considerably reduced ton W * 16 days to 1 * 2 days

[0040] - since pneumatic tests cannot be performed due to the volume, high fluid flow. and the lack of possibility of raising the pressure to high Pw (bar) and P&^sss (bar) vetoes, the tests and checks are done with the working fluid at the working pressure, reducing considerable costs related to these checks and tests.

[0041] 7. T / }& rferaMd presenfetfon of a m&ffitxi of / mp&mepfe / kjw. too fagfcaf sequence of stages on operations. phases that characterize the procedure - p / scbde - method wffo foe presentation of toe oMdiffaris for foe d&v&fapmefrt of the parameters and foe techefoaf means used

[0042] Stages

[0043] 7,1, VT - external vfeuat fospect / cn of msteffet / ons that Include pressure v&$&» / s and tanks and visual - external / nspecfen of vessels, tanks, Wngs, safety va&es. 4MCs - measuring and control cfevfoes. security accessories (pressor®, temperature, / eve / fonfohg devices) automation efements ~ mofotorieg

[0044] - verification of the agreement between the data on to stamp plates of to containers, tanks, pipes, installations with the technical constructfon data and to technical operation books.

[0045] - checking the condition of the outer surfaces of to basic materials (sheets, pipes, profiles) and of the welds with the related SR EN references. Veribcatos of dimensions! and shape deviations, with SR EN 5817 references: SR EN 6520. for to quality class of welds

[0046] - knocks, deformations. cracks, defects, leaks are not allowed

[0047] - checking the technical condition of fittings, safety valves, security accessories, pressure and temperature transducers, level probes, fevei regulators, working pressure switches, maximum pressure switches, AMCs

[0048] - aS these must be in good working condition and to AMCs and transducers. sensors, must be with mefrofogicai verification, vatves with verification, adjustment report, pressure switches and level regulators with metrological verification

[0049] - verification of automation, protection functions (protection control, regulation, signaling. monitoring) - monitoring. grounding, PRAM measurements 122 - corWtoafion

[0050] At 100% visual examination, examination technique - means of measurameot and verification. quaiity level and acceptance levels according to applicable European standards

[0051] SR EN 17637:2011 + SR EN 5817:2015 + SR EN 5817:2015

[0052] Examination technique + Wetds quaiity level + Acceptance level

[0053] Examination level 8 discontinuity not specified

[0054] The VT result is recorded in a VT examination bulletin with the result Admitted or Rejected as the case may be.

[0055] 7 2 After canytog out these checks with good results - ADMITTED. w move on to carrying out .nontoestochVs checks according to the metoocl - toe sgecMy UT9~ ultrasonic thickness

[0056] UTS~ uitrasonic welds

[0057] MT - magnetic cartes! test ~ with magnetic powders: with electromagnets or permanent magnets

[0058] PT - control with penetrating liquids

[0059] - control with metallographic replicas ~ as appropriate. in justified cases; macrostructure check.

[0060] VT visual control shall be performed by certified and / or authorized VT control operators by iSCiR

[0061] Ncn-destrudive testing according to the UT«. UT< MT, FI specialty methods will be carried out by ISCIR authorized nondestructive testing laboratories, with RTEND specialized technical staff, with certified andtor i$C!R authorized nondestructive testing operators.

[0062] 7.2. t ~ Thickness contra / measurements VTg ~ uffresento totofcness accoreftog to to® nofMtostractive canM buSetin

[0063] - Examination method according to 8R ER 16809:2018

[0064] Examination techniques + quality level * acceptance level

[0065] Thickness measurements according to the Measurement Plan developed by an authorized economic agent for technical expertise, with acceptance and rejection criteria, who have the competence and ability to Interpret the measurement resells, comparing the minimum thickness measured with the minimum thickness allowed in the resistance calculation abstract. Control with an ultrasonic thickness measuring device with metrological ere the to / cfctess of toe base matente' a 8 m and 8 mm.

[0066] Circular and longitudinal buttwelds shall be UTScontrolled.

[0067] The UTs control according to the applicable European norms with an ultrasonic welding control device with metrological verification.

[0068] SR EN ISO 17640:2019 + SR EN 5817:2015 + SR EN 11668:2018

[0069] Exam / nafibn technique + IWds level + Acceptance level

[0070] Examination level B fi 2

[0071] A UTs nondestructive control report will be issued with an ADMITTED or REJECTED result as appropriate. ?2.2 ■ doniihuatfon

[0072] 7.2.3. Afon-destritet ive conrrof MT - magnetfe test

[0073] Cflw / a^ tor^todfasf. comer connedw welds - a? fenomagnefic .ntete.ria.te accordfog to toe spplteabfe European steodards

[0074] SR EN ISO 17633:2011 -*• SR £N 5817:2015 + SR EN 23278:2015

[0075] Examtoa^sn terton«?ue + Htfe gua / tty t'&vei + Acceptance tevet

[0076] Examination level not B 2X specified

[0077] 7.24. PT non-cfestntct / ve testfog - wfo? penetrant Rfofos for ctodar. tongjfudHM CCfW butt wto as an aferofte to MT tesrfog and non-magn^feabto maferiafe.

[0078] PT non-destrucfive testing according to applicable European standards

[0079] SR EN ISO 3452-1 :2013; 2:3:2014 * SR EN 5817:2015 * SR EN 23277:2015 Exammatton tedmigw + VW / cts quality fevel + Acceptance fevs /

[0080] Examination level not S 2X specified

[0081] 7.3. Sampfes

[0082] If all checks, previous non-destructive checks have obtained good results - ADMITED you can proceed to carrying out tests, with working fluid at working pressure.

[0083] The test is carried out at the test pressure of the insteltatiun of which toe container or tank is a part at toe working pressure with toe working fluid. it is checked whether the installation. the conteinedrecipients. the tank are in normal working condition, the safety valves in the SITU (used technological installation) are checked, toe safety accessories are checked, the input parameters, the output parameters, the intermediate parameters (pressures, temperatures, the minimum, maximum fluid level to be within the admissible limits of the construction technical books).

[0084] It goes to the actual test sample the pressure test of the instaSahon at the working pressure, 15 min (bar) and bar - 80 mln Check, visualize and pose toe AMCs (measuring and control devices with test parameters, check, visualize and pose toe parameters of the automation Installation - monitoring - test parameters).

[0085] It is recorded, recorded in the evidence report.

[0086] 7.4. Drafting &f dacum&ats and documentation that wtfl Oe presented to CP ( / ? / + IP? periodic contra / wrier? due (Pl + IP).

[0087] 7.4.1. Docuin&tfs, docum&ntaticn, Design C«fe, reference docttete / jfs records - Archiving - to write / ? we refer

[0088] - The technical construction books with the technical characteristics and parameters of the testeiiation, containers, tanks, automation and monitoring installation (written parts ~ specification. Technical Report, Operating, Service Instructions, SSM - PCI Instructions, drawn parts

[0089] - The technical operating books of toe container’s installation

[0090] - Design Code and PT - technical applicable provisions f A .? - oonffodafibr?

[0091] AO 20DQ Regeiwerk (A) Merkblat - Specific technical applications

[0092] SR EN 13445 -1 * 6 Nomffammabfe pressure vessels

[0093] PTC4-2010 - Technical prescriptions I SCI R

[0094] Pressure vessels

[0095] - Reference documents

[0096] - SR EN ISO 9001.2015 Quagty Management Systems

[0097] - SR £N 14001

[0098] - SR EM 45000

[0099] Law 64 / 2008 with subsequent amendments and additions

[0100] - HG - Government Decision 584 / 2004

[0101] 454 / 2003

[0102] - Euempean Directive 97 / 23CE; 2014 / 68UE

[0103] ■■ PED

[0104] - SR EN 13445: 1 * 8

[0105] - A02090 ~ AD Merkbfeit

[0106] - Construction and operation technical documentation

[0107] Responsibilities

[0108] > The company's specialized technical staff authorized - certified by ISCIR

[0109] RSI - responsible for supervising the works

[0110] -■ RSVT - responsible for the supfisvislon and technical verification of the installations

[0111] ■ RADTE the technical staff ~ ths technical expert from ths ISCIR authorized company for investigations - technical expertise, responsible for approving technical expertise documentation and technical reports

[0112] - Records ~ Archiving Circuits

[0113] -■ Visual control bulletin VT - NoJdate

[0114] - UTg thickness measurements Report - with the measured g®« thickness (nun)

[0115] - resistance calculation abstract with calculated at ffie mantle, bottoms

[0116] - Nondestructive butt welds inspection report UTSla g St 4 mm

[0117] - Non -destructive control report of welds

[0118] MT - magnetic test to detect discontinuities and possible defects near the surface 2.5 * 3 mm depth of verification

[0119] - Control bulletin with penetrating Squids PT - to detect discontinuities and possible defects with exit to the surface

[0120] - Minutes of the homework test

[0121] - Technical report with the evaluation of the technical condition with results and conclusions chapter

[0122] - Declarations of Conformity

[0123] If ail the checks (tests),, nondestructive cheeks, samples and tests are with Good results, documents are issued and the documehfation will be presented to the CP - periodic control at maturity. - Technical report and specific technical documentation for the installation, containers, tanks with conclusions chapter, specifying the technical characteristics ■■ the parameters at which these iMSP -■■ mechanicai installations under pressure can operate safely, at the cwecteosifcs and parameters guaranteed by the manufacturer. al foe parameters established by technical expertise in ths case of containers with technics! expertise or to tee parameters recorded in the final technical reports ~ condusfon chaptef. the parameters established based on a resistance calculation having the references horn the applicable European norms.

[0124] The specific technical documentation for carrying out checks and teste will indude the stages ■■ operations - the phases cf re U and tests the way of foiling the requirements for carrying out tests - tests with wyt nu ^uid at i9^ working pressure, fell details of foe technical conditions to be carriers our, means of measurement, results of checks and tests, SSJVt ~ PCI instructions, conclusions chapter.

[0125] The specific technical documentation with conclusions chapter, the technical reports with the evaluation of the technical condition of each container, the test minutes, the minutes of presentation and appropriation of the verification and samples procedure, the reception minutes, will be signed by:

[0126] - The Segal representative of the company authorized for invsstigaiionsfexaminafions ~ technical expertise by the technical expert RADTE

[0127] - The person responsible for supervising the RSL works of the authorized repair company in the field of applicability

[0128] - RSVTI - the person in charge of supervision and technical verification of foe facilities of foe owner / user, the beneficiary

[0129] - The iegai representative of the owner / ussr

[0130] For Archiving;

[0131] An original copy will be given to foe owner / ussf with a report of receipt of foe works and

[0132] One copy will be kept and archived at ths company authorized for investigationsZexaminations - technical expertise that carried out foe checks and samples

[0133] - One copy of the non-destmctivs control bultetins will be registered and kept - the archive at the ISCIR authorized Laboratory according to the speciaized method for which the nori-destructive control bulletins were issued.

[0134] - After invesi^aftonsfexaminatkms - technics! expertise of air ■■ oil containers from Etedrolux Satu Mare - at the periodic control at maturity, the Procedure for checks and samples of air containers from eccentric presses with pneumatic ~ hydraulic actuation can be applied

[0135] - After the inves^ations / examiaahws - technical expertise air / oii containers from CHS Lybrfeaiiorf Groups - hydroelectric power plants - Hydropower plants the Procedure of checks and samples can be applied.

[0136] Technical expertise is required to be canted out after axceeding the normal operating time (tests). The vedftcafton and testing procedure can be carried out on containers before the expiry of the standard operating time and / or after the expiry of the standard operating time.

[0137] Regarding Patent Application with the title;

[0138] Procecfem ~ oraoffce - metem' of checfcs and samptes prams wssefe and femfer mfh oi / . a / r M aitf&ff, Air farto »$. air with technical characteristics - parameters

[0139] P» £ 84 bar; V s 60 m3: Ts*^ - 4QM 2<J«C

[0140] Fluid: oil. air oil, airfoil, air (and oil) sir and other temperatures, pressures amt volumes

[0141] Checks and tests are done with the plant in operating ccndftten with the working fluid at the writing pressure.

[0142] In Figure No. 1 is shown the diagram of the insteiiation related to the CHE lubrication group - from hydropower plants with the parameters:

[0143] ■ 0 m3Vessel

[0144] With the parameters Ps64 bar T -40M 20°C

[0145] FWse 40 bar

[0146] - Fluid oil air; sir oil with related automation and monitoring facility

[0147] - The oil is maintained between the minimum and maximum level by supplying 4 with a pressure pump at Pwoa^, tee di level is msinteined between these tevsts automafiesliy through minimum and maximum level sensors (min - max level probes.)

[0148] Oil volume at normal level is 2000 ltmaintaining at working pressure.

[0149] Air is introduced .-010 the container by a compressor

[0150] The container is supplied with oil from a S m3tank by mew of a pressure pump.

Claims

1. &W ft; toe ptow toe- tow-atov?■" ^ww - wtoto <to Atob eW atos <5^mrwg swr4r ftW torab«; / . tor, <«£ ar> aWnr / , <r.toWith the technical characteristics of the invention Ps < 64 ban Vs < 60 m3, TmmAnax - -WtoSCoCFluid; oil, afr oil, mr / oil, air (and oil J, sir and other pressures, volumes and temperatures.The invention is characterized by the fast that tbs process - method of checking and tasting containers and tanks under pressure with oil, air oil, airfoil, air (and oil) is a rwelty compared to the current state of ths art which provides ter carrying out checks and teste with water, nitrogen, air with the removal andfer isoiabon of the container, tank, pressure pipas from the tosteltetton in which they are tosteited; lubrication groups atooii installations from eccentric presses, hysfrauS© presses. Shutting down and reassembling, reinsteiling and putting trie installation back into operation after carrying out checks and tests.

1. Excites ive right to exploit, use, benefit during die validity period of this patent2. The right to prohibit third panics from ssteg and ssplolting this procedure - process - method frwn the date of regismfon of the pa tent appllesiion with OSXM - Application RegistryProperty rights are established on she basis cfs eoterari.3 , The us# of this mvcntkm by other commercial compames and / or third parties is only possible with the consent surd acceptance of the inventor to writing by concluding a contract.

Citation Information

Patent Citations

  • Gas feeding and exhausting device for thermal state test device of pressure vessel

    CN202485976U

  • Method of testing reservoirs

    RU2265817C2

  • Method and device for checking tightness of internal combustion engine cooling system

    RU2819110C1

  • Method of regular technical inspections of cryogenic reservoirs performed during operation

    SU1640494A1