Safety assessment method for pile foundation of existing piled wharf
By installing stress sensors at the top and bottom of the pile foundations of high-pile wharves, stress values are measured in real time and the safety status of the pile foundations is evaluated in combination with numerical models. This solves the problem of ineffective monitoring and early warning in existing technologies, realizes efficient pile foundation safety assessment and early warning, and improves the safety of wharves.
Patent Information
- Application Number
- PCT/CN2026/090505
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-07
- Filing Date
- 2026-04-14
- Publication Date
- 2026-11-12
AI Technical Summary
High-pile wharves that have been in operation for a long time are aging due to factors such as wind and wave loads, resulting in reduced risk resistance. Existing detection methods cannot effectively provide long-term continuous monitoring and early warning support, leading to prominent structural safety issues.
Stress sensors are installed at the top and bottom of the pile foundation to measure stress values in real time. The bending moment, axial force and shear force of the pile foundation are calculated by formula. A numerical model of pile-soil interaction is established by combining the m-value method or PY curve method to evaluate the safety status of the pile foundation. Data analysis and early warning are performed on the cloud platform.
It enables continuous and efficient assessment of pile foundations, provides real-time early warnings, improves the wharf's resilience, and supports subsequent maintenance and safe operation.
Smart Images

Figure CN2026090505_12112026_PF_FP_ABST
Abstract
Description
A safety assessment method for existing high-pile wharf foundations Technical Field
[0001] This invention relates to a method for safety assessment of existing high-pile wharf foundations. Background Technology
[0002] High-pile wharves, after long-term operation, suffer severe aging due to factors such as wind, waves, and loads, resulting in reduced resilience. As their service life increases, structural safety issues become increasingly prominent, with many existing high-pile wharves exhibiting material performance degradation and functional weakening. Therefore, the inspection and evaluation of existing wharves has become increasingly important, and this has received high attention from relevant wharf management units.
[0003] By testing the stress state of existing wharf pile foundations using various methods, the overall safety status of the wharf can be comprehensively assessed. Regarding wharf safety, existing wharves require long-term, continuous, and stable monitoring to support their safe operation. Periodic wharf inspections primarily focus on current maintenance and subsequent repairs, failing to address unforeseen circumstances. Therefore, conducting long-term monitoring research on in-service wharves is essential. This not only provides support for subsequent maintenance but also enhances the wharf's resilience through assessment and early warning systems, providing data support for safe wharf operation. Summary of the Invention
[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a method for assessing the safety of existing high-pile wharf foundations. This method can assess and provide early warning of the structural safety of existing pile foundations during the operation of coastal wharves in service, and provide data support for the safe operation of wharves.
[0005] The objective of this invention is achieved as follows: a method for safety assessment of existing high-pile wharf foundations, comprising the following steps:
[0006] S1, Two stress sensors are symmetrically installed on an upper cross-section and a lower cross-section at the top of the pile foundation. The stress value σ of the pile foundation at the upper cross-section is obtained from the two stress sensors on the upper cross-section. A σ B The stress value σ of the pile foundation at the lower cross section was obtained from two stress sensors on the lower cross section. C σ D The stress value measured by each stress sensor is the sum of the stress value generated by the bending moment and the stress value generated by the axial force, expressed by the following equations (1) and (2):
[0007] In equations (1) and (2) above, σ N The stress generated by the axial force; σ MM1 is the stress generated by the bending moment; F1 is the bending moment of the pile foundation at the upper cross-section; y is the axial force of the pile foundation at the upper cross-section; A is the distance from a point on the upper cross-section of the pile foundation to the neutral axis; I is the area of the pile foundation at the upper cross-section; and y is the moment of inertia of the pile foundation at the upper cross-section. d is the diameter of the pile foundation at the upper cross section;
[0008] The bending moment M1 and axial force F1 of the pile foundation at the upper cross section are obtained by using the above equations (1) and (2);
[0009] Similarly, based on the stress value σ measured by the two stress sensors on the lower cross section... C σ D The bending moment M2 and the axial force F2 of the pile foundation at the lower cross section are obtained.
[0010] S2, based on the bending moment M1 at the upper cross section and the bending moment M2 at the lower cross section of the pile foundation, the shear force V of the pile body is calculated using the following formula (3):
[0011] In equation (3) above, ΔL 1-2 This is the distance from the upper cross section to the lower cross section of the pile foundation;
[0012] S3, the axial force N of the pile foundation at the mud surface is obtained by the following formula (4):
[0013] N = G + F (4)
[0014] In the above formula (4), G is the self-weight of the pile foundation above the mud surface; F is the axial force on the pile foundation above the mud surface;
[0015] S4, based on the shear force V of the pile body and ignoring the influence of wave flow on the shear force of the pile body, the bending moment M of the pile foundation at the mud surface is obtained by the following formula (5). 泥面 :
[0016] M 泥面 =M2+V*ΔL 2-泥面 (5)
[0017] In equation (5) above, ΔL 2-泥面 This is the distance from the bottom cross-section of the pile foundation to the mud surface;
[0018] S5, based on the bending moment M of the pile foundation at the mud surface 泥面 Based on the shear force V of the pile body, a numerical model of pile-soil interaction is established using the m-value method or the PY curve method to obtain the bending moment M of the pile foundation at any depth below the mud surface. n The axial force F experienced by the pile foundation at any depth below the mud surface nThen, the stress value σ of the pile foundation at any depth below the mud surface can be obtained by the following formula (6). n :
[0019] S6, based on the stress value σ of the pile body at any depth below the mud surface. n and the material yield strength σ of the pile foundation y An assessment of the safety status of the pile structure is conducted.
[0020] The existing safety assessment method for high-pile wharf foundations of the present invention is characterized by the continuity and efficiency of the process from real-time measurement of the stress value at the top of the pile to the stress calculation of the pile foundation below the mud surface. On the one hand, it can provide support for the subsequent maintenance of the wharf, and on the other hand, it can improve the wharf's risk resistance through assessment and early warning, and provide data support for the safe operation of the wharf. Attached Figure Description
[0021] Figure 1 is a structural diagram of step S1 of the safety assessment method for existing high-pile wharf foundations of the present invention. Detailed Implementation
[0022] The invention will now be further described with reference to the accompanying drawings.
[0023] The safety assessment method for existing high-pile wharf foundations of the present invention includes the following steps:
[0024] S1, Two stress sensors are symmetrically installed on an upper cross-section and a lower cross-section at the top of the pile foundation. The stress value σ of the pile foundation at the upper cross-section is obtained from the two stress sensors on the upper cross-section. A σ B The stress value σ of the pile foundation at the lower cross section was obtained from two stress sensors on the lower cross section. C σ D The stress value measured by each stress sensor is the sum of the stress value generated by the bending moment and the stress value generated by the axial force, expressed by the following equations (1) and (2):
[0025] In equations (1) and (2) above, σ N The stress generated by the axial force; σ M M1 is the stress generated by the bending moment; F1 is the bending moment of the pile foundation at the upper cross section; y is the axial force of the pile foundation at the upper cross section; A is the distance from a point on the upper cross section of the pile foundation to the neutral axis; I is the area of the pile foundation at the upper cross section; and I is the moment of inertia of the pile foundation at the upper cross section. d is the diameter of the pile foundation at the upper cross section;
[0026] The bending moment M1 and axial force F1 of the pile foundation at the upper cross section are obtained by using the above equations (1) and (2);
[0027] Similarly, based on the stress value σ measured by the two stress sensors on the lower cross section... C σ D The bending moment M2 and the axial force F2 of the pile foundation at the lower cross section are obtained.
[0028] S2, based on the bending moment M1 at the upper cross section and the bending moment M2 at the lower cross section of the pile foundation, the shear force V of the pile body is calculated using the following formula (3):
[0029] In equation (3) above, ΔL 1-2 This is the distance from the upper cross section to the lower cross section of the pile foundation;
[0030] S3, the axial force N of the pile foundation at the mud surface is obtained by the following formula (4):
[0031] N = G + F (4)
[0032] In the above formula (4), G is the self-weight of the pile foundation above the mud surface; F is the axial force on the pile foundation above the mud surface;
[0033] S4, based on the shear force V of the pile body and ignoring the influence of wave flow on the shear force of the pile body, the bending moment M of the pile foundation at the mud surface is obtained by the following formula (5). 泥面 :
[0034] M 泥面 =M2+V*ΔL 2-泥面 (5)
[0035] In equation (5) above, ΔL 2-泥面 This is the distance from the bottom cross-section of the pile foundation to the mud surface;
[0036] S5, based on the bending moment M of the pile foundation at the mud surface 泥面 Based on the shear force V of the pile body, a numerical model of pile-soil interaction is established using the m-value method or the PY curve method to obtain the bending moment M of the pile foundation at any depth below the mud surface. n The axial force F experienced by the pile foundation at any depth below the mud surface n Then, the stress value σ of the pile foundation at any depth below the mud surface can be obtained by the following formula (6). n :
[0037] S6, based on the stress value σ of the pile body at any depth below the mud surface. n and the material yield strength σ of the pile foundation y An assessment of the safety status of the pile structure is conducted.
[0038] The present invention will now be illustrated by a specific embodiment.
[0039] The parameters of a certain pile foundation in a high-pile wharf that is actually in operation along the coast are as follows:
[0040] Pile type: Circular concrete pile (concrete grade C40), pile diameter d = 1.2m; pile length above mud surface L = 5m; material yield strength σ of the pile foundation. y =26.8MPa.
[0041] The safety assessment method for existing high-pile wharf foundations of the present invention includes the following steps:
[0042] S1, two fiber optic stress sensors are symmetrically installed at two cross-sections at the top of the pile body of the wharf pile foundation, labeled as upper cross-section 1 and lower cross-section 2 respectively (see Figure 1); the distance ΔL between upper cross-section 1 and lower cross-section 2 is... 1-2 =2m; the stress value collected in real time by the two stress sensors on the upper cross section 1 is σ. 11 =12 MPa, σ 12 = -8MPa; the stress value collected in real time by the two stress sensors at the lower cross section 2 is σ. 21 =10MPa, σ 22 = -6MPa, and transmit the monitoring data to the cloud monitoring platform;
[0043] The cross-sectional area of the pile foundation
[0044] Moment of inertia of pile foundation
[0045] Section modulus of pile foundation The distance y from a point on the upper cross section of the pile foundation to the neutral axis is obtained;
[0046] The stress value σ is measured by two stress sensors on the upper cross section 1. 11 σ 12 And, combined with the cross-sectional geometric parameters of the pile foundation, the bending moment M1 = 1.7 and the axial force F1 of the upper cross-section 1 are calculated by the following formulas (1) and (2):
[0047] Combining equations (1) and (2):
[0048] The bending moment M1 of the upper cross section 1 is obtained as 1.7;
[0049] Similarly, based on the stress value σ measured by the two stress sensors in the lower cross section 2... 21 σ 22Based on the cross-sectional geometric parameters of the pile foundation, the bending moment M2 = 1.36 and the axial force F2 of the lower cross-section 2 were calculated.
[0050] S2, using the difference between the bending moment at the upper cross-section 1 and the bending moment at the lower cross-section 2, and the distance from the upper cross-section 1 to the lower cross-section 2 of the pile foundation, calculate the shear force V of the pile body:
[0051] S3, based on the self-weight G of the pile foundation above the mud surface and the axial force F acting on the pile foundation above the mud surface, the axial force N of the pile foundation at the mud surface is obtained by the following formula (4):
[0052] N = G + F (4)
[0053] The self-weight of the pile foundation above the mud surface: G = ALρg = 0.1386MN
[0054] Axial force of the pile foundation at the mud surface: N = F + G = 2.3986MN
[0055] S4, based on the shear force V of the pile body and ignoring the influence of wave flow on the shear force of the pile body, the bending moment M_mud_surface of the pile foundation at the mud surface is obtained by the following formula (5):
[0056] M 泥面 =M2+V*ΔL 2-泥面 (5)
[0057] S5, based on the bending moment M of the pile foundation at the mud surface 泥面 A numerical model of pile-soil interaction was established using the PY curve method to determine the shear force V of the pile body. In the model, a spring stiffness was applied to the pile body, and a bending moment M was applied to the pile body at the mud surface. 泥面 Axial forces N and F 水平力 The bending moment M of the pile foundation at any depth below the mud surface is obtained. n Axial force F at any depth below the mud surface of the pile foundation n Then, the combined stress value σ of the pile foundation at any depth below the mud surface is calculated using the following formula (6). n :
[0058] The combined stress value σ of the pile foundation at any depth below the mud surface, calculated according to equation (6). n Generate a stress distribution cloud map of the pile foundation below the mud surface;
[0059] If the depth of the pile foundation below the mud surface is 3m, the stress distribution model of the pile foundation below the mud surface is established by using the PY curve method. The PY curve method is a composite foundation reaction method that considers the nonlinear effect of the soil. It is based on the relationship curve between the horizontal reaction force of the soil at a certain depth below the mud surface and the deflection of the pile at that point under horizontal load.
[0060] The bending moment distribution of the pile foundation below the mud surface is: M(z) = M 泥面 ·e -kz
[0061] In the above formula, z is the depth of the pile foundation below the mud surface (unit: m); k is the soil reaction coefficient, reflecting the lateral restraint capacity of the soil on the pile (unit: MN / m°). The larger the value of k, the harder the soil. In this embodiment, k is taken as 50MN / m°; e -kz It is an exponentially decaying function, which characterizes the trend of bending moment gradually decreasing with increasing depth;
[0062] Calculate the bending moment M3 = 0.85·e at a depth of 3m below the mud surface of the pile foundation. -50×0.003 ≈0.731MNm
[0063] The axial force F3 = N = 2.3986MN experienced by the pile foundation at a depth of 3m below the mud surface (assuming the axial force remains constant along the depth).
[0064] The combined stress value of the pile foundation at a depth of 3m below the mud surface is:
[0065] S6, based on the stress value σ of the pile body at any depth below the mud surface. n and the material yield strength σ of the pile foundation y An assessment of the safety status of the pile structure is conducted.
[0066] Pile stress refers to the stress generated within the pile body when subjected to external loads. If this stress exceeds the strength limit of the pile material, it can lead to yielding, fracture, or deformation, thus affecting the integrity of the pile structure. The integrity of the pile structure is crucial for its bearing capacity. If stress causes cracks, fractures, or deformation, it reduces the effective length and cross-sectional area of the pile, thereby decreasing its bearing capacity. The magnitude and distribution of stress directly impact the integrity of the pile structure, ultimately affecting the safety and stability of the entire pile foundation.
[0067] The calculated composite stress value of the pile foundation at a depth of 3m below the mud surface is compared with the allowable stress threshold of the pile foundation material.
[0068] The allowable stress threshold for the pile foundation material is 0.8σ. y =0.8 × 26.8 = 21.44 MPa
[0069] The combined stress value σ3 at a depth of 3m below the mud surface of the pile foundation is 6.43MPa < 21.44MPa, which does not exceed the allowable stress threshold of the pile foundation material. Therefore, the pile foundation is safe.
[0070] If the combined stress value of the pile foundation at a certain depth below the mud surface exceeds the allowable stress threshold of the pile foundation material, the system will automatically trigger an early warning signal, indicating that the pile foundation needs to be reinforced or its load limited.
[0071] The safety assessment method for existing high-pile wharf foundations of the present invention is continuous and efficient, from real-time measurement of the load on the cross-section of the pile foundation (stress value at the top of the pile) to the stress calculation process of the pile foundation below the mud surface. Long-term monitoring data can also be used to analyze the deterioration trend of the pile foundation and optimize the maintenance cycle of the wharf, thus providing theoretical support for the safe operation of the wharf.
[0072] The above embodiments are for illustrative purposes only and are not intended to limit the invention. Those skilled in the art can make various changes or modifications without departing from the spirit and scope of the invention. Therefore, all equivalent technical solutions should also fall within the scope of the invention and should be defined by the claims.
Claims
1. A method for safety assessment of existing high-pile wharf foundations, characterized in that, The security assessment method includes the following steps: S1, Two stress sensors are symmetrically installed on an upper cross-section and a lower cross-section at the top of the pile foundation. The stress value σ of the pile foundation at the upper cross-section is obtained from the two stress sensors on the upper cross-section. A σ B The stress value σ of the pile foundation at the lower cross section was obtained from two stress sensors on the lower cross section. C σ D The stress value measured by each stress sensor is the sum of the stress value generated by the bending moment and the stress value generated by the axial force, expressed by the following equations (1) and (2): In equations (1) and (2) above, σ N The stress generated by the axial force; σ M M1 is the stress generated by the bending moment; F1 is the bending moment of the pile foundation at the upper cross-section; y is the axial force of the pile foundation at the upper cross-section; A is the distance from a point on the upper cross-section of the pile foundation to the neutral axis; I is the area of the pile foundation at the upper cross-section; and y is the moment of inertia of the pile foundation at the upper cross-section. d is the diameter of the pile foundation at the upper cross section; The bending moment M1 and axial force F1 of the pile foundation at the upper cross section are obtained by using the above equations (1) and (2); Similarly, based on the stress value σ measured by the two stress sensors on the lower cross section... C σ D The bending moment M2 and the axial force F2 of the pile foundation at the lower cross section are obtained. S2, based on the bending moment M1 at the upper cross section and the bending moment M2 at the lower cross section of the pile foundation, the shear force V of the pile body is calculated using the following formula (3): In equation (3) above, ΔL 1-2 This is the distance from the upper cross section to the lower cross section of the pile foundation; S3, the axial force N of the pile foundation at the mud surface is obtained by the following formula (4): N = G + F (4) In the above formula (4), G is the self-weight of the pile foundation above the mud surface; F is the axial force on the pile foundation above the mud surface; S4, based on the shear force V of the pile body and ignoring the influence of wave flow on the shear force of the pile body, the bending moment M of the pile foundation at the mud surface is obtained by the following formula (5). 泥面 : M 泥面 =M2+V*ΔL 2-泥面 (5) In equation (5) above, ΔL 2-泥面 This is the distance from the bottom cross-section of the pile foundation to the mud surface; S5, based on the bending moment M of the pile foundation at the mud surface 泥面 Based on the shear force V of the pile body, a numerical model of pile-soil interaction is established using the m-value method or the PY curve method to obtain the bending moment M of the pile foundation at any depth below the mud surface. n The axial force F experienced by the pile foundation at any depth below the mud surface n Then, the stress value σ of the pile foundation at any depth below the mud surface can be obtained by the following formula (6). n : S6, based on the stress value σ of the pile body at any depth below the mud surface. n and the material yield strength σ of the pile foundation y An assessment of the safety status of the pile structure is conducted.