Electrolysis system and method for starting up an electrolysis system
A controlled start-up process for hydrogen compression systems using a slow ramp-up and inert gas purging under hydrogen operation addresses the sensitivity of atmospheric electrolyzers to pressure fluctuations, ensuring safe and cost-effective system initiation without complex buffer volumes.
Patent Information
- Application Number
- PCT/EP2026/063522
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-09
- Filing Date
- 2026-05-08
- Publication Date
- 2026-11-12
AI Technical Summary
Atmospheric electrolyzers are sensitive to pressure fluctuations, which can cause mechanical stress and risk explosions due to oxygen-hydrogen mixtures, necessitating a safe and cost-effective start-up method for hydrogen compression systems without requiring large buffer volumes or complex control systems.
A method involving a controlled start-up process with a slow ramp-up of compressor speed, separation of outlet and suction lines, and use of inert gas purging to prevent pressure fluctuations, ensuring the compression system operates under hydrogen from the outset, eliminating the need for high inert gas consumption and buffer volumes.
This approach prevents damage to electrolyzers by avoiding excessive pressure fluctuations, reduces nitrogen usage, and lowers capital expenditure, ensuring a safe and efficient start-up of the hydrogen compression system.
Smart Images

Figure EP2026063522_12112026_PF_FP_ABST
Abstract
Description
Electrolysis system and procedure for starting up an electrolysis system The invention relates to a method and a device for starting a piston compressor for compressing hydrogen which has been produced by water electrolysis, in particular in an atmospheric water electrolysis plant. Electrolyzers are frequently used, particularly in green chemical plants such as those producing green ammonia or methanol. Currently, these are primarily alkaline water electrolyzers. This type of electrolyzer often operates at or just above ambient pressure, as this minimizes mechanical stress on the system and simplifies its design. Therefore, they are also referred to as "atmospheric electrolyzers." The hydrogen produced in such electrolyzers is thus generated at a pressure level close to ambient pressure. Unlike high-pressure electrolyzers, which produce hydrogen at pressures significantly above ambient, atmospheric alkaline electrolyzers operate at a low hydrogen pressure. This necessitates additional compression steps if the hydrogen is required for applications demanding higher pressures, such as hydrogen storage or transport, or for further processing as a feedstock in chemical plants, for example, for the production of ammonia or methanol. For instance, the hydrogen produced in an atmospheric electrolyzer may be mixed with nitrogen during further processing, such as to generate synthesis gas required for ammonia synthesis. The nitrogen can originate from an air separation plant. Often, the nitrogen produced in an air separation plant is generated at a pressure in the range of 7 to 9 bara.To mix the hydrogen produced in the atmospheric electrolyzer with the nitrogen present at a higher pressure, the hydrogen must be compressed to the pressure level of the nitrogen. For other applications as well, the hydrogen produced by alkaline atmospheric water electrolysis must be compressed to higher pressures. In practice, compression systems with piston compressors or – especially for large volume flows – screw or centrifugal compressors are frequently used for this purpose. Atmospheric electrolyzers operating at ambient pressure are sensitive to pressure fluctuations. Such fluctuations can be introduced, for example, through the pipes connected to the electrolyzer to carry the generated hydrogen into the electrolyzer's interior. The membrane or diaphragm of the electrolysis cells is sensitive to mechanical stresses that can be caused by these pressure fluctuations. The diffusion of oxygen or hydrogen to the opposite side of the electrolysis cell must also be prevented to avoid the formation of oxygen-hydrogen mixtures and thus prevent the risk of explosion. Since electrolysis in alkaline water electrolyzers takes place at ambient pressure, and alkaline electrolyzers are generally very sensitive to pressure fluctuations, this must be taken into account during plant operation planning, the electrolyzer start-up process, and the hydrogen compression system start-up process. For example, it is essential to prevent excessive pressure fluctuations on the suction side of the hydrogen compression system from affecting the electrolysis plant or the electrolyzer and causing damage. Therefore, it is known from practice, for example, that atmospheric electrolyzers that are upstream of a hydrogen compression system must be protected even from small pressure fluctuations of + / - 15 mbar. Especially during the start-up of the compression system, a procedure that provides sufficient protection for the electrolyzer against pressure fluctuations is essential. There is a significant risk when starting the compressor, as the volume drawn in by the compression system can easily lead to an excessive pressure drop in the suction line, thus endangering the electrolysis cells. Since the compression system is hydrogen-powered, there are not only risks to the electrolysis cells, but a technically safe and cost-optimized arrangement of all components is also required to ensure the necessary inerting of the system before start-up. Inerting refers to the displacement of air, and especially atmospheric oxygen, by an inert gas such as nitrogen. Against this background, the inventive method can in principle also be applied to PEM electrolyzers (proton exchange membrane) as well as to other electrolyzers, in particular those operated under pressure, since the need for safe inerting and pressure-friendly start-up of the downstream compression system exists regardless of the specific electrolyzer technology. The publication "Best Practice Hydrogen Compression" by Maximator (https: / / www.maximator.de / assets / mime / b314554a08dec3ae2b2fe559f1175c43 / Maximator-Best-Practice-Wasserstoffverdichtung-11-2013.pdf) describes, for example, purging plans for cleaning a hydrogen compression compressor system with an inert gas such as nitrogen. It states that the purging process must ensure that the oxygen content within the compressor or system drops below 1% by volume. The duration of the purging depends on the volume being cleaned. However, a few minutes may be sufficient. Measures to improve the start-up behavior during the commissioning of a compressor system are known from DE 102022211 743 A1 (see section 1).
[0069] until
[0072] ). DE 102022211 743 A1 describes an electrolysis system with a plurality of electrolysis units, each comprising an electrolyzer with a product gas line by which a product gas can be discharged from the electrolysis unit, and a compressor unit comprising a pre-compression device with a plurality of pre-compressors, a post-compressor station, and a central manifold, wherein the product gas line inlet is connected to a pre-compressor and the pre-compressors outlet to the central manifold, and wherein the post-compressor station is connected to the central manifold. To improve start-up performance, a pressurized gas storage tank (pressurized gas storage tank 17, see Figs. 2 and 3) is provided, which supplies a hydrogen reserve. In DE 102022211 743 A1, with reference to Fig.Figure 2 explains that a pressurized gas storage tank 17 is connected to the central manifold 15 for buffering and as a pressurized gas reservoir. This tank can be charged with hydrogen as needed, both via the manifold 15 and on the pressure side via the compressor station 13. For this purpose, a gas return line 19 branches off from a pressure-side outlet line at the outlet of the compressor station 13 and connects to the pressurized gas storage tank 17. A valve 51 and a pressure reducing device 21 are installed in the return line 19, allowing for the adjustment of the charging pressure for the pressurized gas storage tank 17, which is reduced compared to the final pressure of 30 bar at the compressor station 13. In the paragraph.
[0069] DE 102022211 743 A1 describes how the start-up behavior during commissioning of the compressor unit 7 or one or more of the electrolysis units 3, 3A, 3B, 3C in the electrolysis system 1 is also improved by the hydrogen supply in the compressed gas storage tank 17. It is stated that this can be particularly advantageous for the piston compressors of the secondary compressor station 13, since a sufficiently large quantity of pressurized hydrogen is already stored in the compressed gas storage tank 17, which can be fed into the manifold 15 at a pre-pressure and made available there as needed. In the paragraph.
[0071] A solution for protecting the electrolysis plant 3, 3A, 3B, 3C from pressure fluctuations caused by the compressor plant 7 is then described. In this solution, the gas storage tank 27 fulfills an important buffering function with regard to pressure fluctuations in the electrolysis pressure. To utilize the buffering function of the gas storage tank 27, the switching valve 61 is operated in the open position towards the product gas line. As already shown with reference to Fig. 1, in the embodiment according to Fig. 3, reliable constant pressure control in the control concept is further supported within certain limits by the gas storage tank 27, since the large storage volume and its changes enable the compensation of small and minute pressure fluctuations on the order of seconds within a fluctuation range of 10 mbar to several hundred mbar around the setpoint pressure of, for example, P = 1.1 bar.Thus, the inlet pressure of the screw-type pre-compressors 11, 11A, 11B can be kept constant at a predetermined setpoint pressure. This prevents excessively high pressure feedback from the compressor system 7 into the electrolyzers 3, 3A, 3B, 3C. The text continues in paragraph 1.
[0072] DE 102022211 743 A1 describes the embodiment according to Fig. 3, in which this plant engineering solution allows, in particular, hydrogen to be selectively extracted from the intermediate gas storage 27 or from the compressed gas storage 17 even when starting up the electrolysis plants 3, 3A, 3B, 3C in the electrolysis system 1 – i.e., with still reduced hydrogen production – in order to operate the compressor plant 7 at a favorable operating point and to supply it with sufficient hydrogen volume flow and pressure. DE 102022211 743 A1 thus teaches that when starting up the electrolysis plants, the compressor plant 7 can already be operated “at a favorable operating point”. If the compressor plant 7 is operated at a “favorable operating point” when the electrolyzers are started up, then the process shown in Fig. 3 and described in paragraph 1 of the DE 102022211 743 A1 must be carried out in accordance with the DE 102022211 743 A1.
[0072] described elaborate control systems take on the task of protecting the electrolyzers from severe pressure fluctuations. A disadvantage of the electrolysis system described in the embodiment shown in Fig. 3 of DE 102022211 743 A1 is its complex plant and control systems and the need for a large buffer volume in the form of the gas storage tank 27. This results in high investment costs (high CapEx). Furthermore, there is a risk that if the compressor system is already operating at a favorable point and the electrolyzers are only then started up, excessively high pressure fluctuations could affect the electrolyzers and damage them, despite the control devices and the gas storage tank 27. It is state-of-the-art practice, when starting up a plant that includes an electrolysis system with at least one water electrolyzer and a compression system for the hydrogen produced in the electrolyzer, to start up the compressor of the compression system under nitrogen and ramp it up to a specific operating point BP before the hydrogen to be compressed is introduced into the compression system. Once stable compressor operation in recycle mode is established (suction and discharge valves are closed, the entire gas is circulated through the recycle line, and the suction pressure corresponds to the electrolysis pressure), a shut-off valve in the hydrogen product line of the electrolyzer is opened to allow hydrogen to enter the compressor.When starting up the compressor using this known method, a specific quantity of nitrogen must be supplied, which is then displaced by the hydrogen after the shut-off valve in the hydrogen product line is opened. Opening this shut-off valve after reaching the operating point BP poses a risk of pressure fluctuations that can penetrate the electrolyzer's interior. The nitrogen requirement for this method is high. Furthermore, the thermodynamic properties of hydrogen and nitrogen are fundamentally different, resulting in significantly different temperature and pressure conditions, and consequently, different rotational speeds and control positions of, for example, the compressor system valves, when operating under nitrogen compared to operating under hydrogen. The gas exchange during compressor operation therefore presents additional risks of pressure fluctuations. CN 220669 148 U discloses a large-scale, high-pressure hydrogen storage and supply device belonging to the technical field of high-pressure hydrogen storage and supply. This device is used in electrolytic hydrogen production plants and comprises a hydrogen storage unit connected to a hydrogen supply header of the electrolytic hydrogen production plant via a first switching valve and a hydrogen storage compression mechanism. A second switching valve, a pressure control valve, a third switching valve, and a hydrogen supply compression mechanism are sequentially connected to the gas outlet of the hydrogen storage unit, and a gas outlet of the hydrogen supply compression mechanism is connected to a hydrogen supply header.The device further comprises a parallel line and an associated fourth switching valve, which are connected between an outlet of the hydrogen supply manifold of the electrolytic hydrogen generation plant and a gas inlet (air inlet) of the hydrogen supply compression mechanism, as well as a fifth switching valve and a flow control valve, which are arranged in parallel to the third switching valve and the hydrogen supply compression mechanism; a flow meter is arranged at the inlet of the hydrogen supply manifold. In addition, a pressure detection / pressure measuring module is arranged at the outlet of the pressure control valve. In a device according to WO 2023 / 217683 A2 for providing hydrogen by means of an electrolysis unit, a reciprocating compressor is provided for compressing the hydrogen produced by the electrolysis unit, wherein the reciprocating compressor has at least one automatic suction valve, wherein a lifting gripper is provided to selectively hold the suction valve in an open position, wherein an electrically controllable actuator is provided for actuating the lifting gripper, and wherein a control unit is provided for controlling the actuator, wherein the control unit is configured to control the actuator in such a way that an output pressure of the hydrogen at the output of the electrolysis unit or a differential pressure between an anode and a cathode of the electrolysis unit can be adjusted to a predetermined setpoint. The invention is based on the objective of providing a simple and cost-effective electrolysis system (lower CAPEX). The invention is further based on the objective of providing a safe method for starting up a compression system of an electrolysis system, in which damage to the electrolyzers due to the transmission of excessively large pressure fluctuations caused by the compression system into the electrolyzers is reliably avoided. This objective is achieved by an electrolysis system with the features of claim 1 or by a method with the features of claim 7. Advantageous embodiments of the electrolysis system are specified in the dependent claims directly or indirectly related to claim 1 and in the description. Advantageous embodiments of the method are specified in the dependent claims directly or indirectly related to claim 7 and in the description. The invention relates to an electrolysis system with at least one electrolyzer for producing hydrogen by alkaline water electrolysis and a compression system downstream of the electrolyzer for compressing the hydrogen from the electrolyzer at an outlet pressure p. a escaping hydrogen to a higher pressure p > p a , wherein the electrolyzer has at least one outlet line through which hydrogen is extracted from the electrolyzer at an outlet pressure p a The system comprises at least one suction line for drawing in the hydrogen to be compressed, and at least one piston compressor with a compressor drive. Such an electrolysis system is known from DE 102022 211 743 A1. According to the invention, the outlet line and the suction line can be separated and connected via a first valve. Upstream of the first valve, between the outlet line and a vent line for the removal of uncompressed hydrogen, a first connecting line with a second valve is arranged. A control unit is provided with which the speed of the compressor drive can be increased from zero speed with a predefinable start-up curve, wherein the gradient of the start-up curve is less than 100 revolutions per minute. By limiting the speed gradient, the change over time in the amount of gas delivered by the compression system is simultaneously limited, thus preventing pressure fluctuations in the suction line. The first valve, located between the outlet and suction lines, allows the at least one electrolyzer to be brought to a desired operating point during the start-up process of the electrolysis system. At this operating point, a predefined quantity of hydrogen is produced without allowing the hydrogen to enter the suction line of the compression system. The hydrogen produced at this operating point can be introduced into the vent line via the first connecting line and discharged through it. By slowly opening the first valve, the deactivated compression system, after having been purged and filled with inert gas, can then be slowly filled with hydrogen. Before slowly opening the first valve, it must be ensured that the pressure within the compression system is equal to or slightly below the hydrogen supply pressure of the electrolysis system.Once pressure equalization has occurred between the suction line and the discharge line, the compression system is switched on and started up. The start-up process is controlled by the control unit. The start-up begins at zero speed, and the aforementioned slow ramp-up of at least one compressor of the compression system follows a ramp-up curve with a gradient that is always less than 100 revolutions per minute. The second valve is used to regulate the pressure of the vent line in such a way that the suction pressure of the compression system is kept constant. The slow and steady start-up of the compressor, as provided for in the invention, with a start-up curve exhibiting a low gradient, enables a start-up process in which the compression system can be started under hydrogen with the first valve open. Thus, unlike prior art, the compression system is not started up to a specific operating point under inert gas before hydrogen is introduced. This eliminates the need for the hydrogen buffer volumes required by the prior art. A gentle start-up without opening the first valve, with the compressor already operating at a specific point, can be ensured. The risk of introducing excessively high pressure fluctuations, which could damage the electrolyzers, is avoided. The electrolysis system according to the invention can be started up with a significantly lower consumption of inert gas because the compression system is started up under hydrogen and does not need to be ramped up to a specific operating point under inert gas before hydrogen is introduced. This enables the plant operator to achieve a more cost-effective start-up process compared to the prior art. Another significant advantage of the electrolysis system and the start-up method according to the invention is the elimination of the need to operate the compression system with gases that have very different molar masses. The molar mass significantly determines the thermodynamic properties of a gas and thus also its behavior during compression. The molar mass of nitrogen molecules is approximately 28 g / mol, while the molar mass of hydrogen molecules is approximately 2 g / mol. If the hydrogen is only introduced into the compression system after it has already been operated under nitrogen at a specific operating point, the molar mass of the gas to be compressed changes abruptly, which can lead to pressure fluctuations in the suction line and other compression difficulties, or it changes very slowly, which can considerably lengthen the start-up process.In the start-up process according to the invention, this danger does not exist because the first valve is opened while the compression system is still switched off (zero speed). The compression system is only switched on and slowly started up after the first valve has already been opened, so that the hydrogen displaces the nitrogen from the volume of the compression system even at very low compressor drive speeds, and the compression system is then slowly ramped up further under hydrogen. Therefore, in the start-up process according to the invention, sudden, strong fluctuations in the molar mass of the gas to be compressed are avoided, particularly at increased compressor speeds and / or pressure levels. Furthermore, according to the invention, an inert gas line equipped with a shut-off valve is provided, which is fluidically connected to the suction line. Inert gas (e.g., hydrogen) can be supplied via this inert gas line.Nitrogen is introduced into the compression system to displace air, and in particular atmospheric oxygen, from the system. Purging the compression system with inert gas (also referred to as inerting or the intertization process) takes place, according to the invention, before the first valve is opened and hydrogen from the at least one electrolyzer is introduced into the suction line, and also before the compressor of the compression system is switched on. This ensures a safe start-up of the compression system while avoiding the risk of explosion. PA2: According to one embodiment, the control unit for changing the compressor speed includes a frequency converter or a hydraulic coupling. This allows the increase in compressor speed to be adjusted very precisely and sensitively. The low gradient of the start-up curve required by the invention can be reliably maintained. PA3: According to one embodiment, the compression system has a hydrogen pressure gas line on the pressure side of the compressor, the hydrogen pressure gas line being connected to the vent line via a second connecting line, the second connecting line having a vent valve (G). During the inerting process, the vent valve (G) can be used in the open position to discharge the air displaced from the compression system by the inert gas. During the start-up of the compression system, after the first valve has been opened and pressure equalization between the discharge line and the suction line has occurred, the vent valve (G) is switched to the so-called automatic mode. In this case, automatic mode means that, based on input signals, e.g.,Based on the pressure measurement signals, the valve is automatically controlled to predefined values without the need for manual intervention. These predefined values can vary depending on the system capacity or remain constant. 240749P10WÖ. PA4: According to one embodiment, the compression system has a hydrogen pressure gas line on the pressure side of the compressor, wherein the hydrogen pressure gas line is connected via a second connecting line to a pressure vent line, the second connecting line having a vent valve (G). In this embodiment, the pressure vent line on the pressure side of the compression system is connected to a pressure vent line, while on the suction side of the compression system, the outlet line of the electrolyzer is connected to a vent line that opens at the outlet pressure p. aThe electrolyzer operates in this manner. This results in improved operation during the start-up of the compression system with increased safety against pressure fluctuations entering the electrolyzer, because the additional pressure vent line prevents pressure fluctuations on the pressure side from reaching the suction side and thus from entering the electrolyzer. This is safer for the electrolyzer cells. PA5: According to one embodiment, the first valve A is automatically controllable. Valve A can advantageously be equipped with an actuator that enables the fastest possible closure in the event of an emergency shutdown. The signal for this comes from the central compressor control unit. Valve A is particularly important for protecting the electrolysis process during an emergency shutdown. Furthermore, a slow and steady opening of valve A is advantageous when the electrolyzer and compressor components are coupled and the start-up process can begin. This slow and steady opening can be achieved particularly well with a mechanical and automated control system. The technical problem described above is also achieved by a process for starting up an electrolysis system according to the invention, comprising the following process steps: V1) Starting up the electrolyzer to an operating point P1 with the first valve (A) closed and diverting the hydrogen produced during start-up and at operating point P1 via the open second valve (D) into the vent line, V2) Purging the compressor system with inert gas at a compressor speed of zero until the compressor system is completely inertized, V3) Slowly opening the first valve (A) at a compressor speed of zero to equalize the pressure in the suction line and in the discharge line until the first valve (A) is fully open, V4) Slow start-up of the compressor from a speed of zero using the control unit with a start-up curve that has a gradient of less than 100 revolutions per minute, V5) during the start-up of the compressor after process step V4) slow closing of the second valve (D) while maintaining a constant pressure in the suction line, so that more and more hydrogen flows from the outlet line into the compressor, but hydrogen not required for pressure build-up in the compressor is discharged via the second valve (D) into the vent line, V6) Setting the compressor drive to an automatic operating mode after the compressor has reached a target speed, where the target speed is the speed at which a hydrogen production rate of the electrolyzer corresponds to a delivery rate of the compressor and in the automatic operating mode depending on input signals, e.g. Pressure measurements are taken, and the compressor drive is automatically controlled to predefined values without the need for manual intervention. Depending on the valve size, an additional valve can be installed in parallel with valve (A) to achieve pressure equalization. The inventive method achieves that the compression system operates "under hydrogen". 1 is started and not "under nitrogen" 1as with the start-up procedure known from the prior art. This results in significant nitrogen savings during start-up. In particular, the pressure equalization between the suction line of the compression system and the outlet line of the electrolyzer before switching on the compressor drive, as well as the slow increase in the compressor speed during the start-up of the compression system under hydrogen, prevents excessively high pressure fluctuations from being introduced into the electrolyzer. This effectively prevents damage to the electrolyzer or the electrolysis cells and ensures a safe start-up of the compression system. The preset values to which the compressor drive is regulated in automatic operation can depend on the system capacity or be constant.In the piston compressors used in the electrolysis system according to the invention, the target speed is a function of the hydrogen production rate of the electrolyzer. In general terms, it can therefore be stated that the target speed of the at least one piston compressor is reached when the hydrogen production rate corresponds to the delivery rate of the at least one compressor. If this is the case, the vent valve (D) is completely closed. PA7: According to one embodiment of the method, process steps V1) and V4) are carried out in parallel, with the hydrogen production rate of the electrolyzer always being 0.5–9%, preferably 1%–5%, higher than the delivery rate of the compressor. This process ensures an efficient start-up process and low losses of produced hydrogen. This approach, along with the implementation of a recycle or bypass line including valve B, reduces the amount of unused hydrogen vented. In particular, the recycle or bypass line ensures that a defined hydrogen gas flow can be supplied to the compression system regardless of the electrolyzer's production rate, even if little or no gas enters the system (gas recycling). Excess hydrogen is vented through the exhaust line.This process also helps to prevent pressure fluctuations from the compression system from passing into the at least one electrolyzer. PA8: According to one embodiment of the method, the venting valve (G) is opened as soon as a pressure level corresponding to the target speed of the compressor drive is reached in the hydrogen compressed gas line, in order to maintain a constant pressure in the hydrogen compressed gas line. This enables the supply of compressed hydrogen at a constant pressure for subsequent process stages, such as the production of a desired synthesis gas. It is particularly advantageous if the venting of hydrogen on the suction side and the pressure side occurs via separate lines. This prevents negative effects on the suction pressure and the transmission of pressure fluctuations from the compression system to the at least one electrolyzer. PA9: According to one embodiment of the method, the second valve (D) is closed when the compressor has reached its target speed. This ensures that the entire amount of hydrogen produced is supplied to the compression system. PA10: According to one embodiment of the method, the start-up curve in process step V4) has a gradient that lies in the range between 30 and 80 revolutions per minute, preferably between 40 and 70 revolutions per minute. PA11: According to one embodiment of the method, the start-up curve has a gradient in the range between 90% and 100% of the compressor's target speed that is lower than the gradient in the range below 90% of the target speed. This ensures reliable start-up in a particularly critical section of the start-up process and prevents pressure fluctuations from being transmitted to the at least one electrolyzer. Pressure control is more demanding in the aforementioned range of the target speed than in the range below 90% of the target speed, especially when the second valve (D) is almost completely closed, because then pressure overshoots can occur when the target speed is reached, which can lead to damage in the electrolyzer. The invention will be explained in more detail below with reference to a drawing. The drawing shows... Fig. 1 shows a first embodiment of the electrolysis system according to the invention, Fig. 2 shows a second embodiment of the electrolysis system according to the invention, Fig. 3 shows an example of a start-up curve of the compression system with a gradient < 100 revolutions / min. Fig. 1 shows a first embodiment of the electrolysis system according to the invention with an electrolyzer 2 for producing hydrogen by alkaline water electrolysis and a compression system 3 downstream of the electrolyzer 2 for compressing the hydrogen from the electrolyzer 2 with an outlet pressure p a escaping hydrogen to a higher pressure p > p a The electrolyzer 2 has an outlet line 4 through which hydrogen is released from the electrolyzer 2 at an outlet pressure p. aThe compression system 3 has a suction line 5 for drawing in the hydrogen to be compressed. The compression system 3 comprises at least one piston compressor 6 with a compressor drive 7, wherein the outlet line 4 and the suction line 5 can be separated from and coupled to each other via a first valve A. Upstream of the first valve A, between the outlet line 4 and a vent line 10 for the removal of non-compressible hydrogen, a first connecting line 11 with a second valve D is arranged, wherein a control unit 8 is provided which is configured to increase the speed of the compressor 6 with the first valve A open from a speed of zero with a predefinable start-up curve, wherein a gradient of the start-up curve is always less than 100 revolutions per minute. In control unit 8, measurement data is collected and then converted into control commands. The procedures for the safe start-up and shutdown of the compressor and electrolysis systems are also stored there. The incoming measurement data 60 include, for example, but are not limited to: • The suction pressure in line 4 • The suction pressure in line 5 • The suction temperature in line 5 • The outlet pressure behind the compressor system 3 • The outlet temperature downstream of the compressor system 3 • The motor / compressor speed • The hydrogen production rate of electrolysis • The valve positions AG and N The outgoing signals 70 serve in particular, but not exclusively: • Speed control (depending on the operating condition) • The control of valve actuators A-G and N The key to solving the technical problem described at the beginning lies in the sequence of events and the correct setting of the start-up curve of the compressor drive 7. The electrolysis system 2 should already be operational before the compression system 3 is started up to ensure a safe start-up of the system. The H2 gas (hydrogen gas) produced by the electrolysis cells of the electrolyzer 2 is introduced into the vent line 10 via the first connecting line 11 and the suction-side second valve D and directed to a flare (not shown) as long as the first valve A is closed. In the inventive method for starting up the electrolysis system, the first valve A is opened so that H2 enters the suction line 5 of the compression system 3 and pressure equalization occurs between the outlet line 4 and the suction line 5. At this point, the drive 7 of the piston compressor 6 has a rotational speed of zero. It is important to adjust the compressor drive 7 to a very shallow gradient of the start-up curve using a speed control, a frequency converter, or a hydraulic coupling 40 to ensure that the compressor 6 does not inadvertently draw in too large a quantity of gas, thereby generating an unacceptably large pressure fluctuation in the suction line. This fluctuation could then pass through the outlet line 4 into the electrolyzer 2 and cause mechanical and / or other damage to or within the electrolysis cells. The gradient of the compressor drive 7's start-up curve should be significantly less than 100 l / min per minute (e.g., approximately 40–70 l / min). As the compressor 6 continues its slow start-up, the second valve D gradually closes, thus maintaining a constant pressure in the suction line 5 while simultaneously allowing increasing amounts of H₂ to flow to the compressor 6. To avoid potential damage to the electrolysis cells, the start-up procedure described in greater detail below was developed. The special feature of this start-up procedure is that the compression system 3 is not operated at a predetermined operating point with inert gas before it is supplied with the hydrogen to be compressed. Instead, the compression system 3 is started up from zero rotational speed and under hydrogen, not inert gas. For the sake of completeness, the entire procedure, including the inerting phase, will be described below. The method according to the invention takes into account a so-called cold start, in which inerting of the compression system 2 together with the connected pipelines (e.g. suction line 5, compressed gas line 20) is required. Nitrogen is usually used as the inert gas for inerting, and is also preferably used in the present invention. Once the system has been purged with inert gas, the start-up process of the compression system 2 can take place under hydrogen (i.e., starting with section III below). I) Prerequisites: 1. Electrolyzer 2 is not in operation. 2. The first valve A between the outlet line 4 and the suction line 5 is closed. 3. Sufficient purging of the compressor was carried out while stationary by introducing inert gas (such as nitrogen) via the inert gas line 12 into the suction line 5 and from there displacing the air from the compression system 3 and the pipes connected to it (such as the pressure gas line 20, through which the compressed hydrogen produced during the operation of the compression system 2 is discharged). 4. The necessary auxiliary equipment is operational and ready for starting (e.g. oil pump in operation). 5. The downstream system is ready to receive hydrogen. If the preconditions are met, the inerting of the compression system 3 can take place (see section II of the procedure below). The term "automatic mode" means that, based on input signals, e.g., the measurement signals from pressure measurements, the valve is automatically controlled to values specified by the control unit (8) without the need for manual intervention. These specified values can vary depending on the system capacity or remain constant. II) Inerting of the compaction system 3: 1. The recycling valve B of compressor 6 is fully open. 2. The manual discharge valve C is open. 3. The vent valve G is in automatic mode. 4. Open the nitrogen valve N. 5. Start compressor 6 and purge with nitrogen (either towards vent valve G or towards the downstream system (via valve E)). 6. Let the compressor run slowly for several minutes. 7. Stop compressor 6. 8. Set the recycling valve B to automatic mode. 9. Stop the nitrogen supply by closing valve N. 10. Purge the compression system 3 upstream of the first valve A to a pressure slightly below the electrolysis pressure (i.e. the pressure in the outlet line 4) with nitrogen. After inerting has been carried out, the compression system 3 can be started up using hydrogen (see section III of the procedure below). Here again, the term "automatic mode" means that, based on input signals, such as pressure measurement signals, the valve is automatically controlled to predefined values without the need for manual intervention. These predefined values can depend on the system capacity or remain constant. III) Starting up the compression system 3 under hydrogen 1. Prerequisites a. Ensure that the recycling valve B is in automatic mode. b. Ensure that the vent valve G is in automatic mode. c. Ensure that the pressure of the compression system 3 upstream of valve A is slightly below the pressure in the electrolysis outlet line 4. d. Ensure that the discharge valve C is open. e. Ensure that valve E is in automatic mode. 2. Electrolyzer 2 is running at a predetermined capacity (ensure that the second valve D is open and operating in automatic mode). 3. Slowly open the first valve A to equalize the pressure between the suction line 5 of the compressor 6 and the electrolysis outlet line 4 until it is fully open. 4. Start the compressor drive 7 with a low gradient of the start-up curve of < 100 rpm (especially when reaching a range between 90% and 100% of the target speed of the compressor 6, the acceleration gradient should be further reduced). 5. Once the compressor drive 7 has reached full speed, switch the speed controller to automatic mode. During the start-up phase of compressor 6, unused hydrogen, which is not used to fill the compression system 3 and to increase the pressure of the hydrogen gas to be compressed, is released via the vent valve D on the suction side of the compression system 3. Once the setpoint on the pressure side is reached, the vent valve G opens to maintain a constant pressure on the pressure side. When the setpoint for the speed of the compressor drive 7 is reached (this setpoint depends on the production capacity of the electrolysis), the second valve D closes and all the hydrogen is discharged via the vent valve G. Once the electrolysis system is running stably at a predetermined operating point, the compressed hydrogen can be fed via valve E to a subsequent process (e.g., synthesis gas production for an ammonia synthesis plant or a methanol synthesis plant). For this, pressure equalization must again take place via valve E. During this process, valve E opens, while valve G closes simultaneously, preventing any further hydrogen from being vented. Depending on the system configuration, opening the bypass valve B during start-up can be omitted if sufficient hydrogen is available from electrolysis 2 to ensure safe operation of the compressor system 3 without recycling. All the hydrogen produced is then released on the pressure side through the vent valve G. Fig. 2 shows a second embodiment of the electrolysis system according to the invention. The structure and wiring of the electrolysis system according to Fig. 2 largely correspond to that of Fig. 1. Identical components and elements are designated with the same reference numerals. The only difference from the electrolysis system described for Fig. 1 is that instead of a single vent line 10, two separate vent lines 10, 30 are provided, which have different pressure levels. A vent line 10 operating at ambient pressure is provided on the suction side of the compression system 3 and is connected upstream of the first valve A to the outlet line 4 via the first connecting line 11 and the second valve D arranged therein.A pressure vent line 30 is arranged on the pressure side of the compression system 3 and is connected to the hydrogen pressure gas line 13 via a second connecting line 13. This embodiment has the advantage that the venting of hydrogen on the suction side and on the pressure side occurs via separate lines 10 and 30. This prevents negative effects of pressure fluctuations on the pressure side on the pressure on the suction side of the compression system 3 via a common vent line. It also effectively prevents pressure fluctuations from the pressure side of the compression system 3 from affecting the suction side and the at least one electrolyzer 2. In the electrolysis system according to the invention or the start-up method, it is advantageous if the control of the suction pressure by the second valve D and the bypass valve B do not influence each other. Fig. 3 shows an example of a start-up curve for the compressor drive 7 of a compressor of the compression system 3, which, according to the invention, has a gradient of < 100 revolutions / min. In the initial range 50, the compressor drive 7 is still switched off. After the compressor drive 7 is switched on, it is gradually ramped up according to a start-up curve with a constant gradient of < 100 revolutions / min (acceleration range 51). In the final range 53, a constant target speed of the compressor drive 7 is set. The start-up curve has a transition range 52 between the acceleration range 51 and the final range, in which the drive speed of the compressor drive 7 changes more slowly than in the acceleration range 51. In other words: The gradient of the speed increase of the compressor 6 is reduced in the transition range 52 compared to the gradient present in the acceleration range 51.The transition range 52 lies within a range between 90% and 100% of the target speed of compressor 6. Providing a transition range 52 is important because pressure control in this range of the target speed is more demanding than in the range below 90% of the target speed, especially when the second valve D is almost completely closed. In this case, pressure overshoots can occur when the target speed is reached, which can lead to damage in electrolyzer 2. The reduced gradient of the start-up curve in transition range 52 ensures a safe start-up during a particularly critical phase of the start-up process and prevents pressure fluctuations from being transmitted to at least one electrolyzer 2. (Reference numeral list.) 1 Electrolysis system 2 Electrolyzer 3 Compaction system 4 Exit line 5 Suction line 6 piston compressor 7 Compressor drive 8 Control unit 10 Vent line 11 First connection line 12 Inert gas line 13 Second connecting line 20 Hydrogen pressurized gas line 30 Pressure vent line 40 frequency converters or hydraulic couplings 50 Initial area of the acceleration curve 51 Ascent section of the acceleration curve 52 Transition area of the acceleration curve 53 End of the acceleration curve 60 measurement data 70 control signals A First valve (between outlet line and suction line) B Recycle or bypass valve C discharge valve The second valve E valve G Vent valve N Nitrogen valve / Shut-off valve P1 Operating point Electrolyzer BP Operating point p a Electrolyzer outlet pressure p Compressed hydrogen pressure
Claims
Patent claims 1. Electrolysis system (1 ) with at least one electrolyzer (2) for producing hydrogen by alkaline water electrolysis and a compression system (3) downstream of the electrolyzer (2) for compressing the hydrogen from the electrolyzer (2) with an outlet pressure p a escaping hydrogen to a higher pressure p > p a , wherein the electrolyzer (2) has at least one outlet line (4) through which hydrogen is extracted from the electrolyzer (2) at an outlet pressure p aoutlet, wherein the compression system (3) has at least one suction line (5) for drawing in the hydrogen to be compressed, wherein the compression system (3) has at least one piston compressor (6) with a compressor drive (7), wherein the outlet line (4) and the suction line (5) are separable from and coupled to each other via a first valve (A), wherein an inert gas line (12) provided with a shut-off valve (N) is provided, which is fluidically connected to the suction line (5), characterized in that upstream of the first valve (A) between the outlet line (4) and a vent line (10) for the removal of hydrogen not to be compressed, a first connecting line (11) with a second valve (D) is arranged, wherein a control unit (8) is provided which is configured toto increase the speed of the compressor drive (7) with the first valve (A) open, starting from a speed of zero, using a predefinable start-up curve, wherein the gradient of the start-up curve is always less than 100 revolutions per minute.
2. Electrolysis system (1) according to claim 1, wherein the control unit (8) for changing the speed of the compressor drive (7) comprises a frequency converter or a hydraulic coupling.
3. Electrolysis system (1) according to one of the preceding claims, wherein the compression system (3) has a hydrogen pressurized gas line (20) on the pressure side of the compressor (6), wherein the hydrogen pressurized gas line (20) is connected to the vent line (10) via a second connecting line (13), wherein the second connecting line (13) has a vent valve (G).
4. Electrolysis system (1) according to claim 1 or 2, wherein the compression system (3) has a hydrogen pressurized gas line (20) on the pressure side of the compressor (6), wherein the hydrogen pressurized gas line (20) is connected to a pressure vent line (30) via a second connecting line (13), wherein the second connecting line (13) has a vent valve (G).
5. Electrolysis system (1 ) according to one of the preceding claims, wherein the first valve (A) is automatically controllable.
6. Method for starting up an electrolysis system (1) according to one of the preceding claims, comprising the following method steps: V1) Starting up the electrolyzer (2) to an operating point P1 with the first valve (A) closed and diverting the hydrogen produced during start-up and at operating point P1 via the open second valve (D) into the vent line (10), V2) Purging the compressor system (3) with inert gas at a speed of the compressor drive (7) of zero, until the compressor system (3) is completely inertized, V3) Slowly opening the first valve (A) at a compressor drive speed (7) of zero to equalize the pressure in the suction line (5) and in the discharge line (4) until the first valve (A) is fully open, V4) slow start-up of the compressor (6) from a speed of zero using the control unit (8) with a start-up curve that has a gradient of less than 100 revolutions per minute, V5) during the start-up of the compressor (6) after process step V4) slow closing of the second valve (D) while maintaining a constant pressure in the suction line (5), so that more and more hydrogen flows from the outlet line (4) into the compressor (6), but hydrogen not required for pressure build-up in the compressor (6) is discharged via the second valve (D) into the vent line (10), V6) Setting the compressor drive (7) to an automatic operating mode after the compressor drive (7) has reached a target speed, wherein the target speed is the speed at which a hydrogen production rate of the electrolyzer (2) corresponds to a delivery rate of the compressor (6) and in the automatic operating mode, depending on input signals, e.g. pressure measurements, an automatic control of the compressor drive (7) to predetermined values takes place without the need for manual intervention.
7. Method according to claim 6, wherein process steps V1) and V4) are carried out in parallel, wherein the hydrogen production rate of the electrolyzer (2) is always 0.5 - 9%, preferably 1% - 5%, above the delivery rate of the compressor (6).
8. Method according to claim 6 or 7, wherein the venting valve (G) is opened as soon as a pressure level corresponding to the target speed of the compressor drive (7) is reached in the hydrogen pressurized gas line (20) in order to keep the pressure in the hydrogen pressurized gas line (20) constant.
9. Method according to any one of claims 6 to 8, wherein the second valve (D) is closed when the compressor drive (7) has reached its target speed.
10. Method according to one of claims 6 to 9, wherein the start-up curve in process step V4) has a gradient which lies in the range between 30 and 80 revolutions per minute, preferably between 40 and 70 revolutions per minute.
11. Method according to any one of claims 6 to 10, wherein in a range between 90% and 100% of the target speed of the compressor drive (7) the start-up curve has a gradient which is lower than the gradient in the range below 90% of the target speed.