Slope widening method of open-pit sandy soil slope

An open-pit mine and sandy soil technology, which is applied in the mining of open-pit mines, earthwork drilling, special mining, etc., can solve the problems of affecting the coal mining volume, the hidden danger of landslides, and affecting the width of the bottom boundary, so as to avoid potential safety hazards and improve the Resource recovery rate, the effect of increasing the bottom mining realm

Active Publication Date: 2015-01-21
CHINA SHENHUA ENERGY CO LTD +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In the prior art, there are the following defects in the direct extension of the edge by the electric shovel: 1) Since the steps are high, exceeding the rated mining height of the electric shovel, there are potential safety hazards when using the electric shovel to directly extend the edge; 2) Since the edge is a sandy soil slope, If you use an electric shovel to dire

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Slope widening method of open-pit sandy soil slope
  • Slope widening method of open-pit sandy soil slope

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention will be described in detail below in conjunction with examples. Wherein the same components are denoted by the same reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to the directions in the drawings, and the words "inner" and "outer ” refer to directions towards or away from the geometric center of a particular part, respectively.

[0023] figure 2 The method for expanding the side of the open-pit mine sand and soil provided by the embodiment of the present invention, such as figure 2 Shown, the present invention provides a kind of open-pit mine sandy soil side wall rubbing method, which comprises the following steps:

[0024] Step a, on the side of the top of the side rail close to the slope, peel off the sand at a set height downwards to form a step.

[0025] Specifically, crawler bulldozers or small hydraulic excavators can be used to achieve...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a slope widening method of an open-pit sandy soil slope. The slope widening method comprises the following steps: step a, stripping sandy soil by a set height downwards on one side, close to the slope surface, of the top of the slope to form a step; step b, moving outwards towards the slope surface by a set width, and continuously stripping the sandy soil by the set width downwards to form a new step; and step c, repeating the step a and the step b, and when the height of the left sandy soil of the slope is smaller than the maximum digging height of an electric shovel, stripping the left sandy soil by use of the electric shovel to form a bottommost step. According to the slope widening method of the open-pit sandy soil slope, a combined section of a plurality of small steps is formed from top to bottom, and when the height of the left part after the sandy soil is stripped is smaller than the maximum digging height of the electric shovel, the left sandy soil is directly stripped by use of the electric shovel. Compared with the prior art, the landslide can be prevented, and therefore, a safety protective flat plate adopted in the prior art for guaranteeing safety can be cancelled, and consequently, the bottom mining limit is widened and the resource recovery rate is increased.

Description

technical field [0001] The invention relates to a technology for stabilizing sandy soil sides and slopes in open-pit mines, in particular to a method for expanding sides of sandy soil sides in open-pit mines. Background technique [0002] The mining of open-pit mines is to remove the topsoil covering the upper part of the ore body and the surrounding rocks in an open space within a certain range, and to mine the ore. The problem of slope stability is the main problem of open-pit mining. one. [0003] figure 1 It is a schematic diagram of the step structure of an open-pit mine. The side of a large-scale open-pit mine is composed of two or three steps and sections, plus transportation roads and security flat plates. The steps above are composed of the following elements: upper flat plate 1, lower flat plate 2, slope surface 3, slope top line 4, slope bottom line 5, height h, and slope angle α. [0004] For the merging of soft rock steps or sandy soil steps, the electric sho...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21C47/00
CPCE21C47/00
Inventor 罗怀廷霍文高富强韩占占杨国华刘月亭刘爱兄杨洋张文罡
Owner CHINA SHENHUA ENERGY CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products